On-orbit GOES storage
Operational
Future Options
Calendar Year
27 34 3635333231302928262524232221201918171615
GOES-14
GOES-P
GOES-R
GOES-S
GOES-T
GOES-U
141312111009
GOES-13
GOES-12
GOES-11
07 08
GOES 10 Backup & South American Support
GOES East
GOES West
On-orbit Spare
In post-launch checkout
SENSITIVE AND PRIVILEGED: FOR OFFICIAL USE ONLY
As of October 30, 2009
Satellite is operationalbeyond design life
Command and Data Acquisition StationWallops, VA
NOAASatellite Operations Facility
Suitland, MD
RemoteBackup Facility
Fairmont WV
GOES-East75° W
GOES-West137° W
Command control & telemetry, data, GRB, eGVAR
GRB, eGVAR
Co
mm
and
co
ntr
ol &
tel
emet
ry, d
ata,
GR
B, e
GV
AR
Other Users
GRB, eGVAR
Storage105° W Checkout/Post Launch Test
90° W
Unique Payload Services
33
DCS
HRIT/EMWIN
Users
SARSAT
Un
iqu
e Paylo
ad S
ervicesGOES-R Series OverviewGOES-R Series Overview
GOES-R Program FundingGOES-R Program Funding
44
FY 09 &
Prior FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 TC Total1,501 737 848 826 816 836 780 1,328 7,672
Based on 2010 Approved President’s Budget
GOES-R Program Master ScheduleGOES-R Program Master Schedule
FY09 FY10 FY11 FY12 FY13 FY14 FY15
Spacecraft (Lockheed)*
ABI (ITT)
SEISS (ATC)
EXIS (LASP)
SUVI (LM)
GLM (LM)
Ground Segment Prime Contract:MM, PG, PD, EM (Harris)*
CLASS Upgrades (OSD)*
Antennas (TBD)*
ESPDS/ GAS (OSD)*
PDR CDR GRDIBR
PDR CDRIBR
Requirements Complete
PDR CDR
*Schedule is notional until Integrated Baseline Review
CA
CA
CA
CA
PTM
PTM
ConstructionIntegration/Testing
Design/DevelopmentDeliverableMilestone
CDR
CDR
CDR
CDR
CDR
Delta CDR
As of September 30, 2009
5
66
GOES-R SpacecraftGOES-R Spacecraft
Lockheed-Martin Space Systems Co (LMSSC) began work on July 22, 2009.
Spacecraft kick-off meeting held at the end of September.
Size: ~5.5 meters (from launch vehicle interface to top in ABI)
Mass: Satellite (spacecraft and payloads) dry mass <2800kg
Power Capacity: > 4000W at end-of-life (includes accounting for limited array degredation)
Flight Technical StatusFlight Technical Status
77
ABI Prototype Model (PTM)ABI Prototype Model (PTM) EXISEXIS SUVISUVI
SEISSSEISS
GOES-R System DescriptionGOES-R System Description
GOES-R Program OfficeGOES-R Program Office
88
RBU
Core Ground SegmentFunctions
NSOF
Core Ground SegmentFunctions
WCDAS
Core Ground SegmentFunctions
AWIPS(NWS)
CLASS(OSD)
Product Users
GOES-N/P(OSD)
GAS(OSD)
GRB
Blue – PrimaryRed – Back-up
Antenna System Sites Antenna System Sites
NOAA Satellite Operations FacilityRemote Backup Facility – possible site
Wallops Command & Data Acquisition Station
Algorithm Working GroupAlgorithm Working Group
05/08/2008 v405/08/2008 v4
1010
Goal: Follow Repeatable Processes to Reduce Program Risks
Algorithm Development Calibration,Validation and Verification
Algorithm Sustainment & Product Tailoring
Form Teams
Kick-off Meeting
Initial Requirements Analysis
Final Requirements Analysis
Develop Software Tools
Documentation
Monitoring and Validation Tools
Requirements Analysis
Develop Standards and Documentation Templates
Develop Proxy Data
Algorithm Design Reviews and Designate Competitive Algorithms
Algorithm Selection
Algorithm Integration
Algorithm Testing
Algorithm Validation
Develop ATBDs
DAP Documentation
Deliver ATBD & DAP to GPO
IV&V
Support A&O Contractor
Initial Requirements Analysis
Final Requirements Analysis
Develop Coding Standards
Design Reviews
Develop Tools
Select Tools
Tool Integration
Tool Testing
Tool Validation
Tool Documentation
Deliver to OSDPD
(Joint AWG & OSDPD)
AWG Provides Science Support for:
Satellite Products & Services Review Board Approval Required
NWS Alaska RegionAnchorage, Alaska
NWS Alaska RegionAnchorage, Alaska
Cooperative Institute for Meteorological Satellite StudiesMadison, Wisconsin
Cooperative Institute for Meteorological Satellite StudiesMadison, Wisconsin
Cooperative Institute for Research in the Atmosphere
Fort Collins, Colorado
Cooperative Institute for Research in the Atmosphere
Fort Collins, Colorado
NCEP Storm Prediction Center;Norman, OK WFO;
National Severe Storms Laboratory;University of Oklahoma;
Cooperative Institute for Mesoscale Meteorological Studies
Norman, OklahomaHazardous Weather Testbed- Experimental Forecast and
Warning Programs
NCEP Storm Prediction Center;Norman, OK WFO;
National Severe Storms Laboratory;University of Oklahoma;
Cooperative Institute for Mesoscale Meteorological Studies
Norman, OklahomaHazardous Weather Testbed- Experimental Forecast and
Warning Programs
NCEP Tropical Prediction Center Joint Hurricane TestbedMiami, Florida (Planned for FY2010)
NCEP Tropical Prediction Center Joint Hurricane TestbedMiami, Florida (Planned for FY2010)
Green Bay, WI WFOGreen Bay, WI WFO
Sullivan, WI WFOSullivan, WI WFO
La Crosse, WI WFOLa Crosse, WI WFO
Huntsville, AL WFOUniversity of Alabama HuntsvilleNASA Short-term Prediction Research and Transition CenterHuntsville, AL
Huntsville, AL WFOUniversity of Alabama HuntsvilleNASA Short-term Prediction Research and Transition CenterHuntsville, AL
Melbourne, FL WFONASA Kennedy Space CenterMelbourne, FL WFONASA Kennedy Space Center
Sterling, VA WFOSterling, VA WFO
Boulder, CO WFOBoulder, CO WFO
Cheyenne, WY WFOCheyenne, WY WFO
Eureka, CA WFOEureka, CA WFO
NWS Central RegionKansas City, MO
NWS Central RegionKansas City, MO
Cooperative Remote Sensing Science and Technology CenterNew York, NY
Cooperative Remote Sensing Science and Technology CenterNew York, NY
NCEP: National Centers for Environmental Prediction
NWS: National Weather Service
WFO: Weather Forecast Office
NWS Headquarters;Cooperative Institute for Satellite Climate Studies; Center for Satellite Applications and Research; Office of Satellite Data Processing and Distribution;GOES-R Program Office;University of Maryland Baltimore CountyMaryland
NWS Headquarters;Cooperative Institute for Satellite Climate Studies; Center for Satellite Applications and Research; Office of Satellite Data Processing and Distribution;GOES-R Program Office;University of Maryland Baltimore CountyMaryland
GOES-R Proving Ground PartnersGOES-R Proving Ground Partners
GOES-R Program OfficeGOES-R Program Office
1111
NWS Pacific RegionHonolulu, Hawaii
NWS Pacific RegionHonolulu, Hawaii
1111
GOES-R Training Series GOES-R Training Series http://meted.ucar.edu/goes_r/envmon/
12
SummarySummary
• GOES-R Sensors making great progress– ABI Prototype model in test– Other sensors heading towards Critical Design Review (CDR)
• Spacecraft development underway– Working toward System Design Review
• GOES-R Ground Segment development under way– Major Contractor onboard and working towards Integrated
Baseline Review and Preliminary Design.– Government Algorithm team making Great Progress on
developing Mature ATBD– Starting some initial Cal/Val experiments
• GOES-R Proving Ground activities ensuring GOES-R readiness
1313