1 Heuristics “Rules of Thumb”

Upload: anton-search

Post on 16-Dec-2015

236 views

Category:

Documents


2 download

TRANSCRIPT

1

Heuristics

“Rules of Thumb”

2

Turton: Chapter 11

• Check new process designs• Provide equipment size and performance estimates• Help with troubleshooting problems with existing systems• Verify computer simulations and results• Provide initial estimates for simulator inputs• Use as a starting place for initial designs• Developing preliminary process layouts

Use of Experience-Based Principles to:

Turton indicates that heuristics:• Don’t guarantee a solution• May contradict other heuristics• Can reduce the time to solve problems• Depends on the context in which it is used

3

Example of Heuristic Usage• What is the density of water in SI units? In English units?

• What does a gallon of milk weigh? What about 4 gallons of milk?

• What does a cubic meter of air weigh?

• The ratio of is approximately ____?G

L

4

Creation of Heuristics / Shortcuts• Turton suggests a 3 step process:

• Predict• Authenticate/Analyze• Reevaluate/Rethink:

Example: suppose you calculated a turbulent heat transfer coefficient inside

a 1.5” pipe as: , for water at 21OC and a velocity of 1.83 m/s.Cm

Wo2

5250

Now, you need to estimate a heat transfer coefficient when the water temperature is 93OC and a velocity of 3.05 m/s.

Solution: assume still turbulent flow and that the viscosity and density of water may change significantly over this temperature range. So find appropriate equation for calculation of Nusselt number.

4.08.0 PrRe023.0k

hD14.0

333.08.0 PrRe027.0

sk

hD

5

Creation of Heuristics / Shortcuts

Let subscript 1 be old, 2 be new T

14.0

333.08.0 PrRe027.0

sk

hD

Property 21 deg. C 93 deg. C Ratio (93o/21o)

] 997.4 963.2 0.966

] 0.604 0.678 1.12

] 4.19 4.20 1.00

/s] 9.8 x 10-4 3.06 x 10-4 0.312

14.0

1

2

333.0

2

1

1

2

1

2

8.0

2

1

1

2

1

2

1

2

2

1

1

212 027.0

027.0

k

k

Cp

Cp

u

u

D

D

D

D

k

khh

3267.0

2

1

333.0

1

2

8.0

1

2

1

2

2.0

2

1

667.0

1

212

Cp

Cp

u

u

D

D

k

khh

6

Creation of Heuristics / Shortcuts

So for same diameter pipe; with water flowing; ignoring effects of T on

3267.0

333.08.08.0

2.0667.02 312.0

100.1966.0

83.1

05.3112.15250

h

463.119727.05048.110785.152502 h Cm

Wh

o22 7.125,12

:,, andCpk

Cm

Wo

uTh 23267.0

8.0

69.336

][][: smkg

sm anduwith

Property 21 deg. C 93 deg. C Ratio (93o/21o)

] 997.4 963.2 0.966

] 0.604 0.678 1.12

] 4.19 4.20 1.00

/s] 9.8 x 10-4 3.06 x 10-4 0.312

3267.0

2

1

333.0

1

2

8.0

1

2

1

2

2.0

2

1

667.0

1

212

Cp

Cp

u

u

D

D

k

khh

7

Chapter 11 Heuristics

8

9

10

11

12

13

Example

14

Example

Estimate size of flash drum V-102

15

16

17

Heuristics

“Rules of Thumb”

18

Example

Estimate size of heat exchanger E-

105

19

20

21

In Class Exercise

Estimate size of reboiler E-106

Given:• mps (medium pressure steam) = 10 barg• T-101 operates at 3 bar• From simulation, reboiler duty =

2,512,500 W

22

23

Heuristics??

Homework: Problem 11.1 Turton