HVACR214 – Electrical for Oil
HVACR214 – Electrical for Oil
Oil Solenoid ValvesOil Solenoid Valves
![Page 2: 1 HVACR214 – Electrical for Oil Oil Solenoid Valves](https://reader035.vdocument.in/reader035/viewer/2022062422/56649f2b5503460f94c4627e/html5/thumbnails/2.jpg)
2
The Solenoid ValveThe Solenoid Valve
• A solenoid valve is an electronic valve.• A coil of wire is energizes and creates
magnetism.• The magnetism either opens or closes a
valve.• A valve that is open when de-energized is
considered a normally open valve.• A valve that is closed when de-energized is
considered a normally closed valve.
• A solenoid valve is an electronic valve.• A coil of wire is energizes and creates
magnetism.• The magnetism either opens or closes a
valve.• A valve that is open when de-energized is
considered a normally open valve.• A valve that is closed when de-energized is
considered a normally closed valve.
![Page 3: 1 HVACR214 – Electrical for Oil Oil Solenoid Valves](https://reader035.vdocument.in/reader035/viewer/2022062422/56649f2b5503460f94c4627e/html5/thumbnails/3.jpg)
3
The Solenoid ValveThe Solenoid Valve
• Used in both older and newer high pressure burners.– Older burners this is a field installation– Newer burners this valve is included with the burner
• The valve has two purposes– Delay the flow of oil to the burner at startup– Provide a clean shutoff of the flow of oil at
shutdown.
• Used in both older and newer high pressure burners.– Older burners this is a field installation– Newer burners this valve is included with the burner
• The valve has two purposes– Delay the flow of oil to the burner at startup– Provide a clean shutoff of the flow of oil at
shutdown.
![Page 4: 1 HVACR214 – Electrical for Oil Oil Solenoid Valves](https://reader035.vdocument.in/reader035/viewer/2022062422/56649f2b5503460f94c4627e/html5/thumbnails/4.jpg)
4
Solenoid ValveSolenoid Valve
![Page 5: 1 HVACR214 – Electrical for Oil Oil Solenoid Valves](https://reader035.vdocument.in/reader035/viewer/2022062422/56649f2b5503460f94c4627e/html5/thumbnails/5.jpg)
5
Solenoid ValveSolenoid Valve
![Page 6: 1 HVACR214 – Electrical for Oil Oil Solenoid Valves](https://reader035.vdocument.in/reader035/viewer/2022062422/56649f2b5503460f94c4627e/html5/thumbnails/6.jpg)
6
Delay at startDelay at start
• The oil pump is set at 100psi or 140psi in most cases.
• This pressure is based upon the burner motor operating the pump at full RPMs.
• There is a brief period at the start of the burner cycle that the motor, pump, and air fan are not moving at full speed.
• Thus, the oil delivered to the combustion chamber would not be at the correct pressure or velocity.
• The oil pump is set at 100psi or 140psi in most cases.
• This pressure is based upon the burner motor operating the pump at full RPMs.
• There is a brief period at the start of the burner cycle that the motor, pump, and air fan are not moving at full speed.
• Thus, the oil delivered to the combustion chamber would not be at the correct pressure or velocity.
![Page 7: 1 HVACR214 – Electrical for Oil Oil Solenoid Valves](https://reader035.vdocument.in/reader035/viewer/2022062422/56649f2b5503460f94c4627e/html5/thumbnails/7.jpg)
7
Delay at startDelay at start
• The oil solenoid valve remains closed until the burner motor, the burner fan, and the pump all reach the correct operating speeds.
• The solenoid then opens and allows the correct pressure and air mixtures to occur in the combustion chamber.
• This can also be used as a pre-purge in high efficiency boilers.
• If used as a pre-purge the primary control must be setup for this pre-purge or it will trip.
• The oil solenoid valve remains closed until the burner motor, the burner fan, and the pump all reach the correct operating speeds.
• The solenoid then opens and allows the correct pressure and air mixtures to occur in the combustion chamber.
• This can also be used as a pre-purge in high efficiency boilers.
• If used as a pre-purge the primary control must be setup for this pre-purge or it will trip.
![Page 8: 1 HVACR214 – Electrical for Oil Oil Solenoid Valves](https://reader035.vdocument.in/reader035/viewer/2022062422/56649f2b5503460f94c4627e/html5/thumbnails/8.jpg)
8
Delay at startDelay at start
• If you are at a customers oil furnace or boiler and are not able to solve a rough ignition problem through setting of pressures, cleaning, and air adjustment install an oil solenoid valve and the problem will go away.
• If you are at a customers oil furnace or boiler and are not able to solve a rough ignition problem through setting of pressures, cleaning, and air adjustment install an oil solenoid valve and the problem will go away.
![Page 9: 1 HVACR214 – Electrical for Oil Oil Solenoid Valves](https://reader035.vdocument.in/reader035/viewer/2022062422/56649f2b5503460f94c4627e/html5/thumbnails/9.jpg)
9
Clean shutoffClean shutoff
• When the call for heat is complete the burner shuts down.
• There is a brief period of time where the pump is not delivering the correct oil pressure to the nozzle.
• The oil will “drip” out of the end of the nozzle and cause a buildup of carbon on the end of the nozzle and in the combustion chamber.
• When the call for heat is complete the burner shuts down.
• There is a brief period of time where the pump is not delivering the correct oil pressure to the nozzle.
• The oil will “drip” out of the end of the nozzle and cause a buildup of carbon on the end of the nozzle and in the combustion chamber.
![Page 10: 1 HVACR214 – Electrical for Oil Oil Solenoid Valves](https://reader035.vdocument.in/reader035/viewer/2022062422/56649f2b5503460f94c4627e/html5/thumbnails/10.jpg)
10
Clean shutoffClean shutoff
• The use of the oil solenoid valve causes a clean shutoff. The valve will close at the end of the call for heat and before the pump and burner loose pressure.
• The use of the oil solenoid valve causes a clean shutoff. The valve will close at the end of the call for heat and before the pump and burner loose pressure.
![Page 11: 1 HVACR214 – Electrical for Oil Oil Solenoid Valves](https://reader035.vdocument.in/reader035/viewer/2022062422/56649f2b5503460f94c4627e/html5/thumbnails/11.jpg)
11
Mechanical installationMechanical installation
• The oil solenoid valve is placed on the jet line between the oil pump outlet and the nozzle assembly.
• You will need a second ¼” line to complete this installation.
• The oil solenoid valve is placed on the jet line between the oil pump outlet and the nozzle assembly.
• You will need a second ¼” line to complete this installation.
![Page 12: 1 HVACR214 – Electrical for Oil Oil Solenoid Valves](https://reader035.vdocument.in/reader035/viewer/2022062422/56649f2b5503460f94c4627e/html5/thumbnails/12.jpg)
12
Electrical InstallationElectrical Installation
• For clean shutoff purposes the oil solenoid valve is wired to the burner motor line from the primary control.
• Do not wire to a the ignition transformer line if separate on the control as the ignition transformer may not be operational through the entire cycle.
• For clean shutoff purposes the oil solenoid valve is wired to the burner motor line from the primary control.
• Do not wire to a the ignition transformer line if separate on the control as the ignition transformer may not be operational through the entire cycle.
![Page 13: 1 HVACR214 – Electrical for Oil Oil Solenoid Valves](https://reader035.vdocument.in/reader035/viewer/2022062422/56649f2b5503460f94c4627e/html5/thumbnails/13.jpg)
13
Electrical InstallationElectrical Installation
![Page 14: 1 HVACR214 – Electrical for Oil Oil Solenoid Valves](https://reader035.vdocument.in/reader035/viewer/2022062422/56649f2b5503460f94c4627e/html5/thumbnails/14.jpg)
14
Electrical InstallationElectrical Installation
• For a delayed ignition or pre-purge you must either:– Use a primary control that has a separate line for
the solenoid valve.– Use a solenoid valve with an internal delay
timer.
• Make sure you test any installation prior to leaving the job. Run it through several cycles to be sure the delay will not trip the CAD cell safety.
• For a delayed ignition or pre-purge you must either:– Use a primary control that has a separate line for
the solenoid valve.– Use a solenoid valve with an internal delay
timer.
• Make sure you test any installation prior to leaving the job. Run it through several cycles to be sure the delay will not trip the CAD cell safety.
![Page 15: 1 HVACR214 – Electrical for Oil Oil Solenoid Valves](https://reader035.vdocument.in/reader035/viewer/2022062422/56649f2b5503460f94c4627e/html5/thumbnails/15.jpg)
15
Electrical InstallationElectrical Installation