Preliminary definition of Integration & Testing sequences
IBL meeting, CERN, the 31th of August 10
2
Integration & Test sequences
Brainstorming this morning dedicated to the Integration & Testing sequences…very useful to kick off these activities (first priorities, constraint definitions, …)
IBL meeting, CERN, the 31th of August 10
Baseline defined as follows:-STAVE considered with the max length…7m long! Even if we keep some backup solutions such as “post loading” OWelding, different STAVE design (see next slide)-1 central Jig per STAVE (starting from the bare STAVE up to its final integration)…about 1 meter long.-20 STAVES to be considered for the full prod…so 20 “central Jigs”!-All the Integration activities in SR1
SR1 area
08/31/10
Temporary fittings for loading and QC and then welding before integration
Z=0
Stave length for loading: 1.3 m
Ti-bushin
Option 2:
TIGFitting
Manifold
Z=0
3203203330 3330
Fitting
No fitting inside the ID envelope
TIGZ=0
320320 3330
Fitting
Stave length for loading: ~ 4.5m
Fitting
Baseline: Manifold
Starting with the Stave envelopeStarting with the Stave envelope
Ti-bushin
TIG
~1200
No cooling pipe in the stave until the integration with the beam pipeZ=0
Stave length for loading: 0.64m + Type0 cable ends
Option 3:
Preferable, but…Needs much more time to validate the process!
Official baseline for tooling
Sort of back up in case… DPNC will investigate
4
Steps Requirements (Seen from loading side) Support & specs from
Stave reception tests Visual inspection , Tape electrical tests, Pressure/Leak tests, Mechanical references (3D metrology)
Stave fabrication experts
Module reception tests Visual inspection & Electrical tests Module experts
Module loading Stave support on 3 points (as on the structure) + strain relief for the pipe at the 2 sides
Module loading
Electrical tests Should be done in the same position as in the previous step. Requirements?
Module experts
Wire bonding Stave tooling jig move on the bonding machine. Module loading
Metrology Stave tooling jig move on the CMM Module loading
Thermal cycling & Cold tests
Stave tooling jig move on the test place inside an insulating box for the full stave envelope.
System test
Storage up to the integration
Dedicate a safe area to store up to 15 staves All
1 central jig following the STAVE throughout the whole sequences …to be interfaced / several stands
Integration & Test sequences
5
Central Jig definition (3 fixations over the length like connection / IST)
Flex not shown
STAVE will be fixed onto the jig from the bottom (be careful / Flex)
IBL meeting, CERN, the 31th of August 10
Integration & Test sequences
Clear access from the top…
IDEA: get this end part (x2) longer(in order to locate a threaded hole for fixation onto the jig)
6
Wire bonding & Metrology processing @ SR1
Wire bonding Machine…simplified!
Extensions to release the
stress thru the stave (STAVE Cradle)
7m long
IBL meeting, CERN, the 31th of August 10
Integration & Test sequences
08/31/10
Stave Envelope versus Wire Bonding Machine H&K 810Stave Envelope versus Wire Bonding Machine H&K 810(located today at UniGe)(located today at UniGe)
7 m
08/31/10
Wire bonding area on the machineWire bonding area on the machine
305 mm
180
mm
To cover the 640 mm stave length one need to move the stave 3 times
08/31/10
Base plate height Base plate height
~110 mm
Working height has to be set correctly within ~20mm
Height for cradle and stave jig
08/31/10
How to move in 7m stave jig for the fixation on the base plateHow to move in 7m stave jig for the fixation on the base plate
Vertical pillar for the binocular that could be dismounted but
preferable not!
Stave jig when setting it on the bonding space has to get around the pillar
08/31/10
Considering long stave envelope such has 7 m is possible with the H&K machineConsidering long stave envelope such has 7 m is possible with the H&K machine
BUT BUT a dedicated space only for wire bonding of ~20m a dedicated space only for wire bonding of ~20m22 has to be considered (8x2.5m has to be considered (8x2.5m22))
m
Dedicated space for wire bonding
8 m
2.5 m
1.1 m
1.7mH&K
Operator space
Somewhere in SR1
+ Metrology machine, and areas for :Loading, electrical Testing, Thermal cycling, Storage (x20), Final IntegrationOne should come up soon with a complete SR1 configuration, should be OK, but…
08/31/10
SR1 organizationSR1 organization
Wire bondingMetrology
??????
???
Loading
Something like that…
08/31/10
Integration & Test sequences
DPNC will focus soon on the “central jig” + Cradle design in order to:-Iterate / STAVE design-Flex design (accessibility issue)-Transfer tool onto the ITT