1 interconnection: the moroccan experience m. elkadiri, technical director anrt [email protected]...

25
INTERCONNECTION: THE MOROCCAN EXPERIENCE M. ELKADIRI, Technical Director ANRT [email protected] Algiers 19-21 April 2003 1st REGULATORY MEETING FOR THE ARAB REGION

Upload: bertha-shaw

Post on 26-Dec-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 INTERCONNECTION: THE MOROCCAN EXPERIENCE M. ELKADIRI, Technical Director ANRT elkadiri@anrt.net.ma Algiers 19-21 April 2003 1st REGULATORY MEETING FOR

1

INTERCONNECTION:THE MOROCCAN EXPERIENCE

M. ELKADIRI, Technical Director ANRT

[email protected]

Algiers 19-21 April 2003

1st REGULATORY MEETING FOR THE ARAB REGION

Page 2: 1 INTERCONNECTION: THE MOROCCAN EXPERIENCE M. ELKADIRI, Technical Director ANRT elkadiri@anrt.net.ma Algiers 19-21 April 2003 1st REGULATORY MEETING FOR

2

WHY INTERCONNECTION?

Interconnection is one of the main issues of the liberalization process :

The access of a new entrant to the market is conditioned by the current interconnection policy.

Interconnection tariffs are the “Hard-core” of competition

Page 3: 1 INTERCONNECTION: THE MOROCCAN EXPERIENCE M. ELKADIRI, Technical Director ANRT elkadiri@anrt.net.ma Algiers 19-21 April 2003 1st REGULATORY MEETING FOR

3

DEFINITION AND SCOPE OF INTERCONNECTION

*In Europe, long distance network often considered as part of core network

**Point of Interconnection

Source:Team analysis Mckinsey

Newentrant´s network

•Long distance network*

•Core network

•Access network •Remote concentrator

•Feeder

•Local switch

•Tandem

•Distribution

•Tandem

•Incumbent’s network

•PoI**

•PoI

• Ter

min

atio

n

• Ori

g in a

t io n

• Sin

g le-

Tan

dem

• Dou

b le-

Tan

dem

•Definitions

Page 4: 1 INTERCONNECTION: THE MOROCCAN EXPERIENCE M. ELKADIRI, Technical Director ANRT elkadiri@anrt.net.ma Algiers 19-21 April 2003 1st REGULATORY MEETING FOR

4

Regulatory levers

Industry structure

Pricing

Interconnect

Equal access

Cross-subsidySupport

• Number of competitors• Speed of liberalisation• Area of competition and type of players that can compete• Licensing procedures and conditions

Example regulatory levers

• Price caps (x factor, basket weights, subcaps . . . )• Tariff rebalancing

• Interconnect charges• Process of setting / negotiating interconnect charges• Establishing points of physical interconnection and/or

co-location

• Access deficit compensation• Universal service obligation definition, funding

mechanisms

• Length and ease of prefix• Pre-subscription mechanism• Number portability

INTERCONNECTION IS ONE OF REGULATORY LEVERS AND CANNOT BE CONSIDERED IN ISOLATION

DEFINITION AND SCOPE OF INTERCONNECTION

Page 5: 1 INTERCONNECTION: THE MOROCCAN EXPERIENCE M. ELKADIRI, Technical Director ANRT elkadiri@anrt.net.ma Algiers 19-21 April 2003 1st REGULATORY MEETING FOR

5

MOROCCAN REGULATORY FRAMEWORK OF INTERCONNECTION

1- The post and telecommunications Act n° 24-96 which sets up :

The right of interconnection for each operator.The necessary conditions which should respect in interconnection The power of the regulator to solve interconnection disputes.

2- The Interconnection decree which specifies :

The main clauses (technical, financial and administrative clauses) that each interconnect agreement should include. The operator’s obligations ( General obligations for all operators and specific ones for SMP). The principles of interconnection tariffs. The conditions of interconnect offer. The ANRT prerogatives.

Page 6: 1 INTERCONNECTION: THE MOROCCAN EXPERIENCE M. ELKADIRI, Technical Director ANRT elkadiri@anrt.net.ma Algiers 19-21 April 2003 1st REGULATORY MEETING FOR

6

Respect of principles and rules of interconnection.

Produce all necessary information to the regulator.

Operators with market share more than 20% of a telecommunications service must submit an interconnection offer to the regulator for approval. They have to inform the regulator of the modifications concerning the RIO.

OPERATORS ’OBLIGATIONSOPERATORS ’OBLIGATIONS

LEGAL FRAMEWORK

Page 7: 1 INTERCONNECTION: THE MOROCCAN EXPERIENCE M. ELKADIRI, Technical Director ANRT elkadiri@anrt.net.ma Algiers 19-21 April 2003 1st REGULATORY MEETING FOR

7

THE ROLE OF ANRTTHE ROLE OF ANRT

Ensure clear terms, conditions and fair prices for interconnection

Make sure that the interconnect agreement is inaccordance with interconnection decreeand approve the interconnection offer

Impose sanctions and penalties for violation of regulation

Play a role of arbitrator in the interconnect dispute

LEGAL FRAMEWORK

Page 8: 1 INTERCONNECTION: THE MOROCCAN EXPERIENCE M. ELKADIRI, Technical Director ANRT elkadiri@anrt.net.ma Algiers 19-21 April 2003 1st REGULATORY MEETING FOR

8

REFERALL TO THE ANRT

When?

No conclusion of the interconnect

agreement

Problems related to the

interconnection tests

How?

Inquiry of the dispute file made

by the Director of the

ANRT

Decision of the (administrative

committee)15 days

30 days

LEGAL FRAMEWORK: Dispute resolutionDispute resolution

Page 9: 1 INTERCONNECTION: THE MOROCCAN EXPERIENCE M. ELKADIRI, Technical Director ANRT elkadiri@anrt.net.ma Algiers 19-21 April 2003 1st REGULATORY MEETING FOR

9

INTERCONNECTION: The players

ICXInterconnection

Operator 2 Operator 1

Regulator

Page 10: 1 INTERCONNECTION: THE MOROCCAN EXPERIENCE M. ELKADIRI, Technical Director ANRT elkadiri@anrt.net.ma Algiers 19-21 April 2003 1st REGULATORY MEETING FOR

10

Resolution of interconnection Dispute

The first interconnection dispute that the ANRT had to arbitrate was over termination tariffs :

1- The dispute: Disagreement between IAM (the incumbent) & Medi Telecom (the new entrant) about interconnection Tariffs.

2- The dispute inquiry : ANRT entrust the inquiry to an internal Interconnection comity, which was supported by international experts.

3- The inquiry process :- Benchmark- Audition of both parties.- Analysis of the interconnection cost models of both parties

4- The decision of the administrative comity of the ANRT : With reference to the commission inquiry report, the administrative commission of the ANRT decided that Interconnection tariffs proposed by the interconnection commission are applicable.

Page 11: 1 INTERCONNECTION: THE MOROCCAN EXPERIENCE M. ELKADIRI, Technical Director ANRT elkadiri@anrt.net.ma Algiers 19-21 April 2003 1st REGULATORY MEETING FOR

11

The 1st Interco dispute

IAM proposal 41,5%

MédiTél proposal 20%

MOBILE

MOBILE PSTN

PSTN

IAM proposal 61%

MédiTél proposal 80%

58,5%

80%

39%

20%

Page 12: 1 INTERCONNECTION: THE MOROCCAN EXPERIENCE M. ELKADIRI, Technical Director ANRT elkadiri@anrt.net.ma Algiers 19-21 April 2003 1st REGULATORY MEETING FOR

12

ANRT’s Decision

Interconnexion Mobile vers Fixe: tarif normal

30,61%

ALB

11,30%

BUL

21,05%

EST

24,00%

POL25,89%

SLOVA

25,00%

SLOVE

39,00%Offre IAM

8,92%

DAN

19,23%

HON

4,87%

ITA

3,67%

DEU

7,78%

AUT

5,48%

FRA

5,42%

SUE4,27%

HOL

27,13%Recommandation

ANRT

0,000

0,100

0,200

0,300

0,400

0,500

0,600

0,00% 5,00% 10,00% 15,00% 20,00% 25,00% 30,00% 35,00% 40,00% 45,00%

% retenu par le fixe

Pri

x e

n $

pay

é p

ar l'

abo

nn

é

20%Proposition MT

ROM

Page 13: 1 INTERCONNECTION: THE MOROCCAN EXPERIENCE M. ELKADIRI, Technical Director ANRT elkadiri@anrt.net.ma Algiers 19-21 April 2003 1st REGULATORY MEETING FOR

13

ICX Fixe vers Mobile

81%74%

74%

81%

59%

71%

77%

76%

59% 80%

59%

84%

93%

82%

88%80%

72%

0,0

0,1

0,2

0,3

0,4

0,5

0,6

50% 60% 70% 80% 90% 100%

taux de rémunération du reseau mobile

tari

f p

ub

lic

(US

$)

PropositionIAM

Rom PropositionMediTel

All Ita

Hol

Slov

Autri

PolFr

Slov

Alb

Hong

BulgEston

Sue

Dan

RecommandationANRT

ANRT’s Decision

Page 14: 1 INTERCONNECTION: THE MOROCCAN EXPERIENCE M. ELKADIRI, Technical Director ANRT elkadiri@anrt.net.ma Algiers 19-21 April 2003 1st REGULATORY MEETING FOR

14

Approval of interconnect offer

The TECHNICAL AND TARIFF INTERCONNECTION OFFERTECHNICAL AND TARIFF INTERCONNECTION OFFER should be published by the operator who holds a market share higher than 20% of a telecommunications service.- It  must be approved by the regulator.- The regulator shall be informed on the modifications of the interconnection offers.

Process of approval of the interconnection offer

-Effective cooperation with the incumbent operator in term of providing relevant information related to interconnection cost.-Efficient tools for analysing and assessing the tariff offer.

The principal difficulty : INFORMATION ASYMMETRY

Page 15: 1 INTERCONNECTION: THE MOROCCAN EXPERIENCE M. ELKADIRI, Technical Director ANRT elkadiri@anrt.net.ma Algiers 19-21 April 2003 1st REGULATORY MEETING FOR

15

MOROCCAN COST ALLOCATION MODEL

-The MCAM was developed with international experts and ANRT’s multidisciplinary team .

-The MCAM provide two basic deliverables: financial results by service using Fully Allocated Costing methodology based on “cost causation” and unit cost information suitable for calculating interconnect conveyance costs.

- MCAM is based on historic costs.

ANRT developed its own tools for calculations and assessment of interconnection costs for.

- assessing the relevancy of the interconnect tariff data provided by operators - preparing the regulator for interconnect dispute arbitration- checking the eventual anti-competitive behaviour of the operator in the telecommunications market.

Page 16: 1 INTERCONNECTION: THE MOROCCAN EXPERIENCE M. ELKADIRI, Technical Director ANRT elkadiri@anrt.net.ma Algiers 19-21 April 2003 1st REGULATORY MEETING FOR

16

Operator 1 Operator 2 Operator 3

MCAM

USOCosts

Fixedinterconnect

Costs

Mobileinterconnect

Costs

Excel Models

ServiceCosts

MOROCCAN COST ALLOCATION MODEL

Operator 2

Page 17: 1 INTERCONNECTION: THE MOROCCAN EXPERIENCE M. ELKADIRI, Technical Director ANRT elkadiri@anrt.net.ma Algiers 19-21 April 2003 1st REGULATORY MEETING FOR

17

MCAM STRUCTURE

ManpowerAnalysis

CurrentAccount Cost

Capitalcosts

FunctionalActivities

CostPools

Direct

Shared

Common

Drivers

FinalServices

Algorithms

Page 18: 1 INTERCONNECTION: THE MOROCCAN EXPERIENCE M. ELKADIRI, Technical Director ANRT elkadiri@anrt.net.ma Algiers 19-21 April 2003 1st REGULATORY MEETING FOR

18

NEW CHALLENGES

to adapt the legal framework of interconnection to the international context and the development of technology.

To allow visibility to operators including those expected to enter the market. To foster the telecommunications market as whole.

There are many issues related to interconnection to be faced:

ANRT had launched a public consultation in order to set up Interconnection guidelines to precise the legal framework:

Definition of relevant market and the determination of SMP

Introduction of the long run incremental cost (LRIC) method

Carrier pre-selection.

Page 19: 1 INTERCONNECTION: THE MOROCCAN EXPERIENCE M. ELKADIRI, Technical Director ANRT elkadiri@anrt.net.ma Algiers 19-21 April 2003 1st REGULATORY MEETING FOR

19

CONCEPTS OF RELEVANT MARKET AND SMP (Significant Market Power)

-The definition of the relevant market in both its service and geographic dimensions often has a decisive influence on the assessment of a competition case.

-a possible relevant market could be : Market of fixed telephonyMarket of mobile telephonyMarket of leased linesMarket of Interconnection.

-ANRT:

-determine the criteria of the relevant market and

-establish the methods of assessing the position of operators in the market of concern.

Page 20: 1 INTERCONNECTION: THE MOROCCAN EXPERIENCE M. ELKADIRI, Technical Director ANRT elkadiri@anrt.net.ma Algiers 19-21 April 2003 1st REGULATORY MEETING FOR

20

LRIC (Long run Incremental cost)

The LRIC (Long run Incremental cost) method will allow the regulator to assess the operators efficiency through the orientation of their interconnection tariffs toward costs.

On the other hand, LRIC would insure the respect of the following principles :

•relevancy•efficiency•economic optimum• financial viability• fair competition

- The current challenge for ANRT is to develop a tool for interconnection costs calculations based on LRIC Approach.

Page 21: 1 INTERCONNECTION: THE MOROCCAN EXPERIENCE M. ELKADIRI, Technical Director ANRT elkadiri@anrt.net.ma Algiers 19-21 April 2003 1st REGULATORY MEETING FOR

21

INTERCONNECTION & NEW services

Introduce adaptation to the legal framework of interconnection in order to take into

account the specification related to advanced services like UMTS, IP telephony,

GPRS etc…

Page 22: 1 INTERCONNECTION: THE MOROCCAN EXPERIENCE M. ELKADIRI, Technical Director ANRT elkadiri@anrt.net.ma Algiers 19-21 April 2003 1st REGULATORY MEETING FOR

22

LONG TERME CHALLENGES : LOCAL LOOP UNBUNDLING

Important competitive stakes:

• Diversity of choice for customers• Reduction of the access cost to the market.

• Efficient means for the new entrant ( Direct relationship with the customer)

Opportunities for the development of the economy via the development of internet access.

Page 23: 1 INTERCONNECTION: THE MOROCCAN EXPERIENCE M. ELKADIRI, Technical Director ANRT elkadiri@anrt.net.ma Algiers 19-21 April 2003 1st REGULATORY MEETING FOR

23

LONG TERM CHALLENGES : NUMBER PORTABILITY

Number portability is the possibility for the customer to keep his phone number while he :

• change the geographical zone• change the operator• change the telephonic services

Number portability fosters the development of competition.

Page 24: 1 INTERCONNECTION: THE MOROCCAN EXPERIENCE M. ELKADIRI, Technical Director ANRT elkadiri@anrt.net.ma Algiers 19-21 April 2003 1st REGULATORY MEETING FOR

24

CONCLUSION

“healthy” interconnection process :

Independent team with wide ranging expertiseGood calculation toolsGood benchmark knowledgeAnd….But, For sure, your decision will be challenged

Page 25: 1 INTERCONNECTION: THE MOROCCAN EXPERIENCE M. ELKADIRI, Technical Director ANRT elkadiri@anrt.net.ma Algiers 19-21 April 2003 1st REGULATORY MEETING FOR

25

www.anrt.net.ma

MERCI