1 international water sharing: the first step in conflict resolution – agree on the base-line...
TRANSCRIPT
![Page 1: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/1.jpg)
1
International water sharing: the first step in conflict resolution – agree on the base-line
information
Peter H. van NiekerkDepartment of Water Affairs
![Page 2: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/2.jpg)
2
Water needs and shared rivers• South Africa is relatively water scarce: Rainfall skewly distributed and
evaporation high
![Page 3: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/3.jpg)
3
Water needs and shared rivers (cont’d)• South Africa is already using 65% of its potentially available
conventional water resources (estimated at 20000 million cubic m/a)
• This is expected to increase to 71% by 2025• South Africa shares in four international rivers; the Orange,
the Limpopo, the Incomati and the Maputo Rivers.
![Page 4: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/4.jpg)
4
Basins in which SA shares
![Page 5: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/5.jpg)
5
MAR Contributions and Use
![Page 6: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/6.jpg)
6
Water needs and shared rivers (cont’d)
• South Africa’s use is high, relative to that of neighbours, due to earlier economic growth. This is now changing and the pressure on these shared resources is expected to increase.
• International water commissions have been created to address issues in this regard.
![Page 7: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/7.jpg)
7
Water needs and shared rivers (cont’d) Negotiations over the years….
• Komati – South Africa and Swaziland• Incomati – South Africa, Swaziland, and Mozambique• Upper Orange (Senqu) – South Africa and Lesotho• Lower Orange – South Africa and Namibia• Orange – South Africa, Lesotho, Namibia and Botswana• Upper Limpopo: South Africa and Botswana• Limpopo: South Africa, Botswana, Zimbabwe and
Mozambique
Case Studies: Komati and Incomati
![Page 8: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/8.jpg)
8
Incomati Basin
![Page 9: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/9.jpg)
9
Komati negotiations between Swaziland and South Africa : History
• 1948: South Africa agreed “not to object” to Swaziland’s run-of-river project (7.76 cumec)
• 1954: Swaziland unilaterally increased abstraction to 9.71 cumec.
![Page 10: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/10.jpg)
10
Komati Basin
![Page 11: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/11.jpg)
11
Komati negotiations between Swaziland and South Africa : History
• 1948: RSA agreed “not to object” to Swaziland’s run-of-river project (7.76 cumec)
• 1954: Swaziland unilaterally increased abstraction to 9.71 cumec
• 1957: South African White Paper on Nooitgedacht Dam
![Page 12: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/12.jpg)
12
![Page 13: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/13.jpg)
13
Komati Basin
Nooitgedacht Dam
![Page 14: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/14.jpg)
14
Nooitgedacht Dam completed in 1962
![Page 15: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/15.jpg)
15
Komati negotiations between Swaziland and South Africa : History
• 1948: South Africa agreed “not to object” to Swaziland’s run-of-river project (7.76 cumec)
• 1954: Swaziland unilaterally increased abstraction to 9.71 cumec
• 1957: South Africa White Paper on Nooitgedacht Dam – completed 1962
• 1966 Swaziland built Sand River Dam (off-channel to the Komati River) without consulting South Africa
![Page 16: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/16.jpg)
16
Komati Basin
Sand RiverDam
![Page 17: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/17.jpg)
17
Komati negotiations between Swaziland and South Africa : History
• 1948: South Africa agreed “not to object” to Swaziland’s run-of-river project (7.76 cumec)
• 1954: Swaziland unilaterally increased abstraction to 9.71 cumec
• 1957: South Africa White Paper on Nooitgedacht Dam – completed 1962
• 1966 Swaziland built Sand River Dam (off-channel to the Komati River) without consulting South Africa
• 1967 South African White Paper on Vygeboom Dam
![Page 18: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/18.jpg)
18
![Page 19: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/19.jpg)
19
Komati Basin
VygeboomDam
![Page 20: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/20.jpg)
20
Vygeboom Dam – completed 1971
![Page 21: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/21.jpg)
21
Komati negotiations between Swaziland and South Africa : History
• 1948: South Africa agreed “not to object” to Swaziland’s run-of-river project (7.76 cumec)
• 1954: Swaziland unilaterally increased abstraction to 9.71 cumec
• 1957: South Africa White Paper on Nooitgedacht Dam – completed 1962
• 1966 Swaziland built Sand River Dam (off-channel to the Komati River) without consulting South Africa
• 1967 South African White Paper on Vygeboom Dam. Completed 1971
Swaziland unhappy. Protracted negotiations on low flows on all trans-boundary rivers during mid 70’s – but no agreement
![Page 22: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/22.jpg)
22
Case Study: Komati negotiations between Swaziland and South Africa: Breaking the
Impasse
• 1981: Meeting of Ministers on Cape Town – agreed to a joint study of the Komati Basin by the JPTC (South Africa to fund). Consultants appointed
• 1984: Reconnaissance Study for the Development of the Water Resources of the Komati River Basin accepted after Swaziland had a review done by USACE)
![Page 23: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/23.jpg)
23
Reconnaissance Study for the Development of the Water Resources of the Komati River Basin
• General information collated on a basin-wide basis such as topography, geology, climate, soils, land use and water use
• This was followed by studies into issues such as potential developments requiring water, legal and institutional matters, and water resource development opportunities in the short, medium and long term
• Recommended plan of action
![Page 24: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/24.jpg)
24
Case Study: Komati negotiations between Swaziland and South Africa: Cooperation cont’d
• 1985 JPTC appoints consultants for Feasibility Study
• 1987 “Feasibility for the First Phase Development of the Water Resources of the Komati River Basin”
• 1992 Treaty on the Development and Utilisation of the Water Resources of the Komati River Basin– Driekoppies and Maguga Dams and
establishment of KOBWA
![Page 25: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/25.jpg)
25
Driekoppies Dam completed in 1998
![Page 26: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/26.jpg)
26
Maguga Dam under
construction (completed
2002)
![Page 27: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/27.jpg)
27
Case Study: Komati negotiations between Swaziland and South Africa: Cooperation cont’d
• Win-win outcome for South Africa and Swaziland –however, did not include the third country with an important stake in the waters of the basin: Mozambique.
![Page 28: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/28.jpg)
28
Incomati Basin
![Page 29: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/29.jpg)
29
Case Study: Incomati negotiations between Swaziland, South Africa and Mozambique
• February 1989 Mozambique voiced its objections to the first phase of the Komati River Project.
• 1991 Ministers of three countries agree to Komati River Project (Piggs Peak Agreement.) One of the conditions that a Joint Incomati Basin Study (JIBS) be undertaken.
• 1991 three countries approve TOR for JIBS.• 1991 South Africa announces its intention to build the
Inyaka Dam on the Mariti River, a tributary of the Sabie River, for municipal use. Mozambique expressed concern about impact on its downstream Corumane Dam (completed mid 1980s) and insisted that JIBS first had to be completed. Not acceptable for South Africa.
![Page 30: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/30.jpg)
30
Case Study: Incomati negotiations between Swaziland, South Africa and Mozambique
(cont’d)
• 1992 consortium of consultants appointed for JIBS, but Mozambique announced their Minister still had to approve the project proposal. Agreed that data collection may start in meantime.
• By 1995 no approval from Mozambique. Result that report covering only South Africa and Swaziland had to be completed.
• 1995 South Africa started construction of Inyaka Dam.
![Page 31: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/31.jpg)
31
Inyaka Dam (completed 2002)
![Page 32: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/32.jpg)
32
Case Study: Incomati negotiations between Swaziland, South Africa and Mozambique (cont’d)
• 1995 Mozambique announced its readiness for the JIBS to include Mozambique portion of basin.
• 1999 same consortium appointed to complete the study.• 2002 Joint Incomati Basin Study completed – more than ten
years after the Piggs Peak Agreement was signed.In 1998 Mozambique argued for an interim agreement as it
could not wait for the completion of the JIBS. Lengthy negotiations without the benefit of the baseline information followed.
• The INCOMAPUTO agreement was signed in 2002.
![Page 33: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/33.jpg)
33
Discussion and Conclusions• Little real negotiation on international water sharing during
first part of twentieth century• Awareness increased gradually
– ILA’s Helsinki Rules (1956)– UN Convention on Uses of Non-navigable rivers (1997)– SADC Revised Protocol on Shared Water Courses (2000)
• Political environment changed: From conflict and Apartheid in the middle of the century to democracy, peace and cooperation at the end.
• Even during turbulent times measure of cooperation on water matters. This improved enormously and today there are functional commissions for the four large river systems in which South Africa shares.
![Page 34: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/34.jpg)
34
Discussion and Conclusions (cont’d)• Experiences in the Incomati Basin in South Africa
showed the importance for countries to first undertake joint studies to ascertain the basic facts about their shared water resources; e.g. hydrology, current water uses, environmental needs and development potential
• The Komati experience between South Africa and Swaziland showed that such a process quickly converged the minds of the negotiators and led to an equitable outcome
![Page 35: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/35.jpg)
35
Discussion and Conclusions (cont’d)• The process of undertaking a three country joint
study of the Incomati Basin was protracted and segmented: The result had been– No agreed base information– Rather than a force for cooperation became an
issue of frustration – Limited capacitating of negotiating parties
• Water sharing negotiations had to start without the benefit of an agreed baseline of technical information and, as a result, were slow.
![Page 36: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/36.jpg)
36
Discussion and Conclusions (cont’d)• Today the importance of agreeing on the base-line
information is accepted; e.g. ORASECOM– undertook a basin-wide IWRM study which this year has
entered its second, follow-up, phase, and– completed a preliminary TDA (transboundary diagnostic
analysis) as foundation for a full GEF project.
• Value of jointly undertaking such base-line studies proven:– Lead to informed, and capacitated, participants– Provides a solid base for agreeing on joint actions and water
sharing
![Page 37: 1 International water sharing: the first step in conflict resolution – agree on the base-line information Peter H. van Niekerk Department of Water Affairs](https://reader035.vdocument.in/reader035/viewer/2022070306/5517b0fe55034645368b5f6f/html5/thumbnails/37.jpg)
37
Thank You