1 interop wp1: knowledge map michaël petit (u. of namur) january 19 th 2004 updated description of...

10
1 INTEROP WP1: Knowledge Map Michaël Petit (U. of Namur) January 19 th 2004 Updated description of tasks after INTEROP Kickoff Meeting, Bordeaux

Upload: zoe-preston

Post on 03-Jan-2016

214 views

Category:

Documents


0 download

TRANSCRIPT

1

INTEROP WP1: Knowledge Map

Michaël Petit (U. of Namur)

January 19th 2004

Updated description of tasks after INTEROP Kickoff Meeting, Bordeaux

2WP1, INTEROP Kickoff, Bordeaux, 12/1/ 2004

WP1: First Map & recommendations

Create DB and Encode RE

DB ofResearch

Elements (RE)

Define Framework

Unifying Framework

Draw INTEROP

Knowledge Map

Diagnose

First Map

Orientation of research

New collaborations

M6

M6

M9

D1.1

D1.2

M18

M12

M10

M10

D1.1: Knowledge map of research in interoperability in the INTEROP NoE (first version)

D1.2 : Diagnostic of research inside INTEROP NoE and Recommendations to strengthen research efforts in interoperability (including updated framework, state of the art and knowledge map)

3WP1, INTEROP Kickoff, Bordeaux, 12/1/ 2004

WP1: Tasks planning

M0 M6 M9 M12 M18

Task 1: Create DB and Encode Research

Elements

Task 2: Define first framework

Task 3: Draw first INTEROP

Knowledge Map

Task 4: Refine

framework and

Update DB

Task 5: Diagnose

D1.1 D1.2

4WP1, INTEROP Kickoff, Bordeaux, 12/1/ 2004

Task 1: Create DB and Encode Research Elements (M1-M6)• Task 1.1: Choose DB technology (M1-M2)

– Database with web user interface?

• Task 1.2: Define structure of DB contents (M1-M2)– Kind of elements (projects, competencies,

publications, …) and relations – Templates for elements (attributes)

• Task 1.3: Implement and test DB (M3-M5)• Task 1.4: Describe and encode elements

(M6)

10WP1, INTEROP Kickoff, Bordeaux, 12/1/ 2004

Task 2: Define first framework (M1-M6)• Task 2.1: Study existing frameworks

(UEML, IDEAS,…) and collect input from partners and other WPs (M1-M3)

• Task 2.2: Define INTEROP framework, disseminate, get feedback (M4-M5)

• Task 2.3: Extend DB structure with framework and extend DB user interface to allow classification (M6)

16WP1, INTEROP Kickoff, Bordeaux, 12/1/ 2004

Task 3: Draw first INTEROP Knowledge Map (M7-M9)• Task 3.1: Classify research elements (RE)

according to framework and encode classification in DB (M8)

• Task 3.2: Define and implement queries on RE DB (M7-M8)

• Task 3.3: Write deliverable D1.1 (use queries and summarise) (M8-M9)

19WP1, INTEROP Kickoff, Bordeaux, 12/1/ 2004

Task 4: Refine framework and Update DB (M9-M12)• Task 4.1: Refine framework• Task 4.2: Refine DB structure and refine

queries• Task 4.3: Encode new RE and update

existing RE

20WP1, INTEROP Kickoff, Bordeaux, 12/1/ 2004

Task 5: Diagnose (M12-M18)

• Task 5.1: Analyse INTEROP Map (DB) and elaborate proposals for research reorganisation

• Task 5.2: Write deliverable D1.2• Task 5.3: Disseminate D1.2

2. U

niv

Bor

dea

ux

3. G

RA

ISO

FT

4.U

niv

Nan

cy

5. U

niv

Nam

ur

8. D

FK

I

11. C

NR

- I

AS

I

16. S

INT

EF

19. U

niv

Val

enci

a

32. U

niv

Ath

ens

33. S

ingu

lar

Sof

twar

e

34. U

niv

Mil

ano

35. U

niv

Bre

scia

37. U

niv

Pol

it M

arch

e

38. P

olit

Bar

i

45. N

orw

Un

iv S

&T

46. U

niv

Ber

gen

47. K

un

gl T

ekn

Hög

sk

All

oh

er p

artn

ers

TO

TA

L

Task 1: Create DB and Encode Research Elements

10

Task 1.1: Choose DB technology

Task 1.2: Define structure of DB contents

Task 1.3: Implement and test DB

Task 1.4: Describe and encode elements

Task 2: Define first framework 25

Task 3: Draw first INTEROP Knowledge Map

8

Task 3.1: Extend DB structure with framework

Task 3.2: Classify RE and encode in DB

Task 3.3: Define queries on RE DB

Task 3.4: Write deliverable D1.1

Task 4: Refine framework and Update DB

6.01

Task 4.1: Refine framework

Task 4.2: Refine DB structure and queries

Task 4.3: Encode new RE and update existing RE

Task 5: Diagnose 15 Task 5.1: Analyse

INTEROP Map

Task 5.2: Write deliverable D1.2

Task 5.3: Disseminate D1.2 Total effort M1-18 3 2 4 10 0.66 6.4 1 3.6 2 4 3 3 7 5.1 4 2.25 3 64.01

23WP1, INTEROP Kickoff, Bordeaux, 12/1/ 2004

WP1: Meetings planningM

0:

Nov. 0

3

M6

: M

ay 0

4

M9

: A

ug. 0

4

M1

2:

Nov. 0

4

M1

8:

May 0

5

Task 1: Create DB and Encode Research

Elements

Task 2: Define first framework

Task 3: Draw first INTEROP

Knowledge Map

Task 4: Refine

framework and

Update DB

Task 5: Diagnose

D1.1 D1.2

Kick-off Coord.

M5:

Ap

ril 04

M8:

July

04

D1.1 + Task 4 planning

Coord. andFinal planning

M1

6:

Marc

h 0

5

Finalactivities