1 itu-r strategic plan draft report from the rag correspondence group rag informal meeting on itu-r...
TRANSCRIPT
1
ITU-R Strategic PlanDraft Report from the RAG Correspondence Group
RAG Informal Meeting on ITU-R Strategic and Operational PlansGeneva, 21 May 2013
Kavouss ArastehChairman, RAG CG on ITU-R Strategic Plan
2
ITU-R Strategic Plan
This is the Strategic Plan of the ITU-R, i.e. the Membership
This is not the Strategic Plan of the BR. The BR provides support to the activities of the ITU-R
It is a matter for the Membership to address, consistent with the specific strategic plans of each member.
3
Avoid confusion between objectives and means in the “strategic goal”
Possible improvements to Resolution 71
Resolution 71 (Rev. Guadalajara, 2010) may be improved on the following aspects:
Avoid confusion between activities, outputs and objectives
Avoid confusion between ITU-R and BR roles, in respect of activities, results and KPI
Avoid separation between consistent activities (e.g. RA and RAG, publications)
4
ITU-R Strategic Objectives
To ensure interference-free operations of radiocommunication systems by implementing the Radio Regulations and regional agreements, as well as updating these instruments in an efficient and timely manner through the processes of world and regional radiocommunication conferences
To establish worldwide standards and associated materials Recommendations intended to enassure the necessary required performance , interoperability and quality in for operating radiocommunication systems.
To seek ways and means to ensure the rational, equitable, efficient and economical use of the radio-frequency spectrum and satellite-orbit resources and to promote flexibility for future expansion and new technological developments.
5
Proposed Process 1 (Associated to “Objective 1”):
Output of this process is the Final Acts of WRCs and RRCs, updated Radio Regulations, Rules of procedure of the RRB
Activities are: preparatory activities by administrations and regional groups, WRC and RRC discussions, RRB activities and BR activities in support of all this.
Input is proposals from administrations, reports from the Director, BR
Establish and update international regulations on spectrum use
6
ITU-R Production Process 1
On Spectrum Usage
P
Establish and update International Regulations on Spectrum Use
R1
R1A1
BR Support and
reports
Piloting
ITU
ME
MB
ER
ST
AT
ES
SP
EC
TR
UM
R
EQ
UIR
EM
EN
TS
(P
rop
osa
ls f
or
Reg
ula
tio
ns
)
U
PD
AT
ED
RE
GU
LA
TIO
NS
WRC, RRC, Regional groups activities
R1A2
RRB activities
7
Outputs are updated MIFR and Plans by recording/suppression/modifications of assignments/allotments in the MIFR/relevant Plans and associated publications (BRIFIC, Lists of Maritime publications, Inputs are the notices from administrations on intended use of spectrumActivities are:
Proposed Process 2 (Associated to “Objective 2”):
Apply international regulations on spectrum use
- the actions taken by the BR in administering the procedures of theRR and regional Agreements,
- the activities of the RRB other than the adoption of RoPs,
- the actions taken by administrations and operators in coordinating frequencies and exchanging information with the BR, and the BR supports for these works.
8
ITU-R Production Process 2
On Spectrum Usage
P
Apply International Regulations on Spectrum Use
R2
R2A1
BR Support and
reports
Piloting
IT
U M
EM
BE
R S
TA
TE
S S
PE
CT
RU
M
RE
QU
IRE
ME
NT
S (
No
tice
s o
n in
ten
ded
sp
ectr
um
use
)
UP
DA
TE
D M
IFR
, PL
AN
S
Application of procedures by BR, Administrations
R2A2
RRB activities in solving difficulties in the application of the procedures (not including RoP)
(not including RoP)
9
Outputs are recommendations, reports (including the CPM report) and handbooksInputs are contributions by the ITU-R Membership
Activities are the technical, operational and regulatory studies within the ITU-R Study Groups, SCRPM and CPM, as well as the BR activities in support of these tasks
RA is piloting this process
Proposed Process 3 (Associated to “Objective 3”):
Produce worldwide standards, recommendations, reports and Handbooks for optimum use of spectrum and its associated works
10
ITU-R Production Process 3
On Spectrum Usage
P
Produce global standards, recommendations, reports and Handbooks for optimum use of
spectrum
R3
R3A1
BR Support
Piloting (RA)
ITU
ME
MB
ER
SH
IP
CO
NT
RIB
UT
ION
S
Glo
bal
Sta
nd
ard
s,
Rec
om
men
dat
ion
s,, R
epo
rts
and
H
and
bo
oks
Activities of Study Groups, Working parties, SCRPM, CPM
R3A2
Edition and publication of ITU-R outputs
11
The activities relating to informing from those relating to assisting administrations may be difficult to separate. Therefore, these activities have been combined into one process intended to fulfill Objectives 4 and 5.
Proposed Process 4 (Associated to “Objectives” 4 and 5):
Inform and assisting membership in radiocommunication matters
12
ITU-R Production Process 4
On Spectrum Usage
P
Inform and Assist Administrations on Radiocommunications matters
R4
R4A1
BR Support
Piloting
ITU
ME
MB
ER
SH
IP R
EQ
UE
ST
S F
OR
IN
FO
RM
AT
ION
/AS
SIS
TA
NC
E
Del
iver
able
s :
even
ts,
wo
rksh
op
s, s
emin
ars
Development of presentations, tutorial material for information and capacity building
13
ITU-R Processes
On Spectrum Usage
P
Establish and update International Regulations on Spectrum
R1
R2
R3
Inform and Assist Administrations in radiocommunication matters
R4
Piloting
ITU
ME
MB
ER
SH
IP
RE
QU
IRE
ME
NT
S
SA
TIS
FA
CT
ION
OF
IT
U
ME
MB
ER
SH
IP
Apply International Regulations on Spectrum
Produce global Standards, Recommendations, Reports, Handbooks for Optimum Spectrum Use
BR Support
14
Follow up
Modifications to Resolution 71 are to be decided by PP-14Preparation expected to take place in a Council working group to be created by C13 and to produce a report for consideration by C14 and by MS in formulating their formal proposals to PP14RAG may wish to liaise its conclusions, if any, to the Council Working group, as foreseen by Resolution 71