1. materials and equipment for hydroelectric power stations · materials and equipment for...

19
1 / 19 1. Materials and Equipment for Hydroelectric Power Stations Quotation Date Delivery Date Year/Mon. Year/Mon. Replacement and repairs of spillway gate rocker roller exchange (No.2 gate) Omogo No.3 Power Station 1 Unit 2018/04 2019/03 Installed & adjusted Replacement of scouring sluice in Okuota dam Otaguchi Power Station 1 Unit 2018/04 2019/03 Installed & adjusted Replacement of Sawatani No.2 intake works scouring sluice winch Hirono Power Station 1 Unit 2018/04 2019/02 Installed & adjusted Replacement of landslide observer within branch Bunsu No.1 Power Station 1 Unit 2018/04 2019/03 Installed & adjusted Replacement of monitoring control device PC within Kochi Branch Hongawa Power Station and others 1 Unit 2018/04 2019/03 Installed & adjusted Replacement of dam discharge alarm station DC power supply Iokigawa Power Station 1 Unit 2018/04 2019/01 Installed & adjusted Replacement of Inamura dam maintenance discharge facilities relay panel Hongawa Power Station and others 1 Unit 2018/04 2019/03 Installed & adjusted Replacement of information transmission equipment for Kakumodani intake dam, etc. Hirayama Power Station 1 Unit 2018/04 2019/03 Installed & adjusted Replacement of Ohashi dam spillway gate winch electric motor Ohashi Power Station 1 Unit 2018/04 2019/03 Installed & adjusted Replacement of Omidani dam uninterruptible power supply Hirono Power Station 1 Unit 2018/04 2019/02 Installed & adjusted Replacement of automatic control panels in Kusunoki Valley, etc. Hirayama Power Station 1 Unit 2018/04 2019/03 Installed & adjusted Shunt reactor Shingai Power Station 1 Piece 2018/04 2019/10 Delivered & adjusted Renewal of generator monitoring maintenance support server Hongawa Power Station 1 Unit 2018/04 2018/12 Delivered & adjusted Modification of circuit breaker and switch box Hirono Power Station 1 Unit 2018/04 2019/01 Delivered & adjusted Installation of remote monitoring control system Yusuharagawa No.1/No.3 Power Station 1 Unit 2018/05 2020/03 Installed & adjusted Installation of Hatsuse dam remote monitoring control system Yusuharagawa No.2 Power Station 1 Unit 2018/05 2020/03 Installed & adjusted Replacement of Hatsuse dam monitoring control device Yusuharagawa No.2 Power Station 1 Unit 2018/05 2020/03 Installed & adjusted Replacement of No.1 water turbine, CFD analysis, modification of generator Kae Power Station 1 Unit 2018/05 2021/01 Installed & adjusted TR control and protection panel Matsuogawa No.2 Power Station 2 Panel 2018/05 2019/04 Delivered & adjusted Main transformer 3.3/66kV 7MVA special three-phase outdoor Kirikoshi Power Station 1 Set 2018/05 2020/02 Delivered & adjusted Replacement of Fujikoso River stream intake dam scouring sluice control panel Omogo No.1 Power Station 1 Unit 2018/06 2018/12 Installed & adjusted Replacement of dam spillway gate electric motor Nagasawa Power Station 1 Unit 2018/06 2019/03 Installed & adjusted Runner and water turbine-related parts Iyogawa Power Station 1 Unit 2018/06 2021/01 Delivered & adjusted Reform of 1U (water turbine, inlet valve, regulator, generator, exciter, control panel, etc.) Yusuharagawa No.2 Power Station 1 Unit 2018/06 2021/03 Installed & adjusted Reform of 2U (water turbine, inlet valve, regulator, generator, exciter, control panel, main transformer, etc.) Yusuharagawa No.2 Power Station 1 Unit 2018/06 2022/03 Installed & adjusted Automatic output control device Bunsui No.2/No.3 Power Station 1 Unit 2018/06 2021/03 Delivered & adjusted Automatic restoration system, for multi-transmission lines Matsuogawa No.2 Power Station 1 Panel 2018/06 2019/04 Delivered & adjusted Remote monitoring control system Nagasawa Power Station 2 Panel 2018/08 2020/02 Delivered & adjusted Replacement of water gauge of intake dam, etc. Matsuogawa No.1 Power Station 1 Unit 2018/08 2018/10 Installed & adjusted Replacement of Sadamitsu intake dam hydraulic device Kira Power Station 1 Unit 2018/08 2018/12 Installed & adjusted Water turbine and generator inspection with repairs Sogawa Power Station 1 Unit 2018/08 2020/02 Delivered & adjusted Switch box (generator box) Nagasawa Power Station 4 Box 2018/08 2020/01 Delivered & adjusted Integrated control panel, etc. Nagasawa Power Station 1 Unit 2018/08 2020/02 Delivered & adjusted Main feed-water pump Hongawa Power Station 1 Set 2018/08 2019/11 Delivered & adjusted Water turbine and generator inspection with repairs Nagasawa Power Station 1 Unit 2018/09 2020/02 Delivered & adjusted Turbine generator disassembly inspection with repairs Hirono Power Station 1 Unit 2018/09 2020/02 Delivered & adjusted Generator monitoring device maintenance support server Kubokawa Hydropower Stations & Substations Maintenance Offices 1 Unit 2018/09 2020/01 Delivered & adjusted Generator control panel, etc. Hirono Power Station 1 Unit 2018/09 2019/10 Delivered & adjusted Item name/Product name (Specification etc.) Branch/Station Qty Unit Delivery Condition

Upload: lyduong

Post on 17-Jun-2018

223 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: 1. Materials and Equipment for Hydroelectric Power Stations · Materials and Equipment for Hydroelectric Power Stations ... Replacement of dam spillway gate electric motor Nagasawa

1 / 19

1. Materials and Equipment for Hydroelectric Power StationsQuotation Date Delivery Date

Year/Mon. Year/Mon.Replacement and repairs of spillway gate rocker roller

exchange (No.2 gate)Omogo No.3 Power Station 1 Unit 2018/04 2019/03

Installed &

adjusted

Replacement of scouring sluice in Okuota dam Otaguchi Power Station 1 Unit 2018/04 2019/03Installed &

adjusted

Replacement of Sawatani No.2 intake works scouring

sluice winchHirono Power Station 1 Unit 2018/04 2019/02

Installed &

adjusted

Replacement of landslide observer within branch Bunsu No.1 Power Station 1 Unit 2018/04 2019/03Installed &

adjusted

Replacement of monitoring control device PC within

Kochi Branch

Hongawa Power Station and

others1 Unit 2018/04 2019/03

Installed &

adjusted

Replacement of dam discharge alarm station DC power

supplyIokigawa Power Station 1 Unit 2018/04 2019/01

Installed &

adjusted

Replacement of Inamura dam maintenance discharge

facilities relay panel

Hongawa Power Station and

others1 Unit 2018/04 2019/03

Installed &

adjusted

Replacement of information transmission equipment for

Kakumodani intake dam, etc.Hirayama Power Station 1 Unit 2018/04 2019/03

Installed &

adjusted

Replacement of Ohashi dam spillway gate winch electric

motorOhashi Power Station 1 Unit 2018/04 2019/03

Installed &

adjusted

Replacement of Omidani dam uninterruptible power

supplyHirono Power Station 1 Unit 2018/04 2019/02

Installed &

adjusted

Replacement of automatic control panels in Kusunoki

Valley, etc.Hirayama Power Station 1 Unit 2018/04 2019/03

Installed &

adjusted

Shunt reactor Shingai Power Station 1 Piece 2018/04 2019/10Delivered &

adjusted

Renewal of generator monitoring maintenance support

serverHongawa Power Station 1 Unit 2018/04 2018/12

Delivered &

adjusted

Modification of circuit breaker and switch box Hirono Power Station 1 Unit 2018/04 2019/01Delivered &

adjusted

Installation of remote monitoring control systemYusuharagawa No.1/No.3 Power

Station1 Unit 2018/05 2020/03

Installed &

adjusted

Installation of Hatsuse dam remote monitoring control

systemYusuharagawa No.2 Power Station 1 Unit 2018/05 2020/03

Installed &

adjusted

Replacement of Hatsuse dam monitoring control device Yusuharagawa No.2 Power Station 1 Unit 2018/05 2020/03Installed &

adjusted

Replacement of No.1 water turbine, CFD analysis,

modification of generatorKae Power Station 1 Unit 2018/05 2021/01

Installed &

adjusted

TR control and protection panel Matsuogawa No.2 Power Station 2 Panel 2018/05 2019/04Delivered &

adjusted

Main transformer 3.3/66kV 7MVA special three-phase

outdoorKirikoshi Power Station 1 Set 2018/05 2020/02

Delivered &

adjusted

Replacement of Fujikoso River stream intake dam

scouring sluice control panelOmogo No.1 Power Station 1 Unit 2018/06 2018/12

Installed &

adjusted

Replacement of dam spillway gate electric motor Nagasawa Power Station 1 Unit 2018/06 2019/03Installed &

adjusted

Runner and water turbine-related parts Iyogawa Power Station 1 Unit 2018/06 2021/01Delivered &

adjusted

Reform of 1U (water turbine, inlet valve, regulator,

generator, exciter, control panel, etc.)Yusuharagawa No.2 Power Station 1 Unit 2018/06 2021/03

Installed &

adjusted

Reform of 2U (water turbine, inlet valve, regulator,

generator, exciter, control panel, main transformer, etc.)Yusuharagawa No.2 Power Station 1 Unit 2018/06 2022/03

Installed &

adjusted

Automatic output control device Bunsui No.2/No.3 Power Station 1 Unit 2018/06 2021/03Delivered &

adjusted

Automatic restoration system, for multi-transmission lines Matsuogawa No.2 Power Station 1 Panel 2018/06 2019/04Delivered &

adjusted

Remote monitoring control system Nagasawa Power Station 2 Panel 2018/08 2020/02Delivered &

adjusted

Replacement of water gauge of intake dam, etc. Matsuogawa No.1 Power Station 1 Unit 2018/08 2018/10Installed &

adjusted

Replacement of Sadamitsu intake dam hydraulic device Kira Power Station 1 Unit 2018/08 2018/12Installed &

adjusted

Water turbine and generator inspection with repairs Sogawa Power Station 1 Unit 2018/08 2020/02Delivered &

adjusted

Switch box (generator box) Nagasawa Power Station 4 Box 2018/08 2020/01Delivered &

adjusted

Integrated control panel, etc. Nagasawa Power Station 1 Unit 2018/08 2020/02Delivered &

adjusted

Main feed-water pump Hongawa Power Station 1 Set 2018/08 2019/11Delivered &

adjusted

Water turbine and generator inspection with repairs Nagasawa Power Station 1 Unit 2018/09 2020/02Delivered &

adjusted

Turbine generator disassembly inspection with repairs Hirono Power Station 1 Unit 2018/09 2020/02Delivered &

adjusted

Generator monitoring device maintenance support serverKubokawa Hydropower Stations &

Substations Maintenance Offices1 Unit 2018/09 2020/01

Delivered &

adjusted

Generator control panel, etc. Hirono Power Station 1 Unit 2018/09 2019/10Delivered &

adjusted

Item name/Product name (Specification etc.) Branch/Station Qty Unit Delivery Condition

Page 2: 1. Materials and Equipment for Hydroelectric Power Stations · Materials and Equipment for Hydroelectric Power Stations ... Replacement of dam spillway gate electric motor Nagasawa

2 / 19

Quotation Date Delivery Date

Year/Mon. Year/Mon.Item name/Product name (Specification etc.) Branch/Station Qty Unit Delivery Condition

Replacement of water tank dust collector Omogo No.1 Power Station 1 Unit 2018/10 2019/06Installed &

adjusted

Replacement of intake gate winch Hirono Power Station 1 Unit 2018/10 2020/02Installed &

adjusted

Replacement of intake automatic dust collector Hirono Power Station 1 Unit 2018/10 2020/02Installed &

adjusted

Generator monitoring device Sakamoto Power Station 1 Unit 2018/10 2020/01Delivered &

adjusted

Pressure oil pump, pressure oil control panel Nagasawa Power Station 1 Unit 2018/10 2020/02Delivered &

adjusted

Water turbine generator control panel (integrated) Sogawa Power Station 1 Unit 2018/11 2020/02Delivered &

adjusted

Regulator Sogawa Power Station 1 Unit 2018/11 2020/02Delivered &

adjusted

Installation of generator monitoring device Omogo No.2 Power Station 1 Unit 2018/11 2019/11Delivered &

adjusted

Generator box, generator transformer box, boxes in

stationsSogawa Power Station 1 Unit 2018/11 2020/01

Delivered &

adjusted

Generator relay panel Sogawa Power Station 1 Unit 2018/11 2020/02Delivered &

adjusted

Generator monitoring device, ITV camera Namuragawa Power Station 1 Unit 2018/09 2020/03Delivered &

adjusted

Generator monitoring device, ITV camera Ohashi Power Station 1 Unit 2018/11 2020/03Delivered &

adjusted

Generator monitoring device, ITV camera Otaguchi Power Station 1 Unit 2018/11 2019/11Delivered &

adjusted

Generator monitoring device, ITV camera Nagasawa Power Station 1 Unit 2018/11 2020/03Delivered &

adjusted

Tsuga dam discharge warning device Tsuga Power Station 1 Unit 2018/12 2021/03Installed &

adjusted

Generator monitoring device Iwayagawa Power Station 1 Unit 2019/01 2020/01Delivered &

adjusted

Switch box (direct distribution box) Kagamigawa Power Station 5 Box 2019/01 2020/05Delivered &

unloaded

Distribution transformer Kagamigawa Power Station 1 Set 2019/01 2020/05Delivered &

adjusted

Replacement of Yusuhara No.2 Power Station dam

constant voltage constant frequency power supply

Kubokawa Hydropower Stations &

Substations Maintenance Offices1 Unit 2019/02 2020/03

Installed &

adjusted

Gas circuit breaker 204kV 2kA31.5kA 3∞ salt-tolerant Shingai Power Station 1 Piece 2019/02 2020/05 Free on truck

Generator CB box, boxes in stations, generator

transformer boxSogawa Power Station 3 Box 2019/03 2019/12 Free on truck

(Reference) For fiscal 2019

Replacement of water tank channel emergency water

cut-off equipment, modification of water tank regulating

gate control panel

Omogo No.1 Power Station 1 Unit 2019/04 2019/09Installed &

adjusted

Replacement of dam channel water level stabilizer Omogo No.1 Power Station 1 Unit 2019/04 2019/06Installed &

adjusted

Replacement of dam MDX device Ohashi Power Station 1 Unit 2019/04 2020/03Installed &

adjusted

Replacement of dam TM device Ohashi Power Station 1 Unit 2019/04 2020/03Installed &

adjusted

Replacement of dam high voltage power receiving

facilitiesNagasawa Power Station 1 Unit 2019/04 2020/03

Installed &

adjusted

Replacement of dam high voltage power receiving

facilitiesOmorigawa Power Station 1 Unit 2019/04 2020/03

Installed &

adjusted

Replacement of dam hydraulic water gauge Nagasawa Power Station 1 Unit 2019/04 2019/12Installed &

adjusted

Replacement of dam water gauge Ohashi Power Station 1 Unit 2019/04 2019/12Installed &

adjusted

Replacement of draft gate hydraulic unit Hongawa Power Station 1 Unit 2019/04 2020/03Installed &

adjusted

Replacement of Bunsui system ITV device Bunsui No.4 Power Station 1 Unit 2019/04 2019/09Installed &

adjusted

Replacement of former No. 2 intake regulating gate

hydraulic deviceNagasawa Power Station 1 Unit 2019/04 2020/03

Installed &

adjusted

Replacement of high voltage power receiving facilities Omorigawa Power Station 1 Unit 2019/04 2019/12Installed &

adjusted

Installation of intake remote control system Hirono Power Station 1 Unit 2019/04 2020/03Installed &

adjusted

Installation of intake remote control system Hirayama Power Station 1 Unit 2019/04 2020/03Installed &

adjusted

Replacement of intake stepup transformer, etc. Hongawa Power Station 1 Unit 2019/04 2020/03Installed &

adjusted

Replacement of east channel telecommunication cable Higashitoyonaga Power Station 1 Unit 2019/04 2019/12Installed &

adjusted

Page 3: 1. Materials and Equipment for Hydroelectric Power Stations · Materials and Equipment for Hydroelectric Power Stations ... Replacement of dam spillway gate electric motor Nagasawa

3 / 19

Quotation Date Delivery Date

Year/Mon. Year/Mon.Item name/Product name (Specification etc.) Branch/Station Qty Unit Delivery Condition

Replacement of power generation discharge warning

deviceNagasawa Power Station 1 Unit 2019/04 2019/09

Installed &

adjusted

Replacement of Shigeto dam gate remote control panel Hirayama Power Station 1 Unit 2019/04 2020/03Installed &

adjusted

Replacement of Hongawa PS intake regulating gate

electric motorHongawa Power Station 1 Unit 2019/04 2020/03

Installed &

adjusted

Replacement of Hongawa PS outlet regulating gate

electric motorHongawa Power Station 1 Unit 2019/04 2020/03

Installed &

adjusted

Replacement of Hongawa system ITV device Ohashi Power Station 1 Unit 2019/04 2019/09Installed &

adjusted

Installation of dam downstream turbidimeter Tsuga Power Station 1 Unit 2019/04 2020/02Installed &

adjusted

Installation of regulating pond muddy water reduction

facilitiesTsuga Power Station 1 Unit 2019/04 2020/02

Installed &

adjusted

Installation of Shimanto River rain gauge Yusuharagawa No.2 Power Station 1 Unit 2019/04 2019/12Installed &

adjusted

Motorizing of running and traversing, new construction of

2.8t hoist, replacement of winch motorYusuharagawa No.2 Power Station 1 Unit 2019/04 2020/04

Installed &

adjusted

Replacement of dam MDX device Kae Power Station 1 Unit 2019/05 2021/03Installed &

adjusted

Replacement of dam monitoring control device Kae Power Station 1 Unit 2019/05 2021/03Installed &

adjusted

Replacement of dam remote monitoring control device Kae Power Station 1 Unit 2019/05 2021/03Installed &

adjusted

Replacement of Hatsuse dam water system display unit

and PCsYusuharagawa No.2 Power Station 1 Unit 2019/05 2020/03

Installed &

adjusted

Maintenance support server for generator monitoring

deviceOmogo No.3 Power Station 1 Unit 2019/05 2019/11

Installed &

adjusted

Replacement of dam spillway unit side operation panel Yanadani Power Station 1 Unit 2019/06 2019/12Installed &

adjusted

Replacement of water tank regulating gate Sogawa Power Station 1 Unit 2019/06 2020/02Installed &

adjusted

Replacement of dam automatic dust collector control

panelYanadani Power Station 1 Unit 2019/06 2019/12

Installed &

adjusted

Replacement of dam scouring sluice control panel Yanadani Power Station 1 Unit 2019/06 2019/12Installed &

adjusted

Replacement of dam outlet and maintenance discharge

control panelYanadani Power Station 1 Unit 2019/06 2019/12

Installed &

adjusted

Installation of Hatsuse dam meteorological equipment Yusuharagawa No.2 Power Station 1 Unit 2019/06 2020/03Installed &

adjusted

Replacement of Tsuga dam net boom Tsuga Power Station 1 Unit 2019/06 2020/03Installed &

adjusted

Installation of water system monitoring panel Tsuga Power Station 1 Unit 2019/07 2020/03Installed &

adjusted

Logic panel x 2, measurement auxiliary panel x1 Kae Power Station 1 Unit 2019/07 2020/12Delivered &

adjusted

Switch box (generator box, LRT, MTR primary box, VCT

box)Kagamigawa Power Station 1 Unit 2019/07 2020/11

Delivered &

unloaded

Main transformer Kagamigawa Power Station 1 Set 2019/07 2020/11Delivered &

adjusted

Replacement of Yanadani dam Gomyo sand basin

simple dust collectorYanadani Power Station 1 Unit 2019/08 2020/03

Installed &

adjusted

Replacement of distribution board and power incoming

unit in intake stationOdo Power Station 1 Unit 2019/08 2020/03

Installed &

adjusted

Main transformer no-voltage tap 4.5MVA 66kV/6.6kV Yuyama Power Station 1 Set 2019/08 2020/11Delivered &

adjusted

Switch box (MTR primary box, Ohashi line box, LRT

primary box, VCT box)Ohashi Power Station 1 Unit 2019/08 2020/11

Delivered &

unloaded

Distribution transformer 66/6kV 6.6MVA Hirono Power Station 1 Set 2019/08 2020/12Delivered &

adjusted

Modification of integrated control panel, etc. Ohashi Power Station 1 Unit 2019/08 2021/02Delivered &

adjusted

Switch box (generator box) Ohashi Power Station 4 Box 2019/08 2020/12Delivered &

unloaded

Replacement of Nagoro dam spillway gate remote

control panelNagoro Power Station 1 Unit 2019/09 2020/01

Installed &

adjusted

No.1 turbine generator disassembly inspection with

repairsKae Power Station 1 Unit 2019/09 2021/03

Delivered &

adjusted

Water turbine and generator inspection with repairs Iyogawa Power Station 1 Unit 2019/09 2021/01Delivered &

adjusted

Water turbine and generator inspection with repairs Ohashi Power Station 1 Unit 2019/09 2021/02Delivered &

adjusted

Switch box (main transformer primary box, distribution

line box, PC box)Ittyuu Power Station 3 Box 2019/09 2020/10 Free on truck

Replacement of dam discharge warning device Kagehira Power Station 1 Unit 2019/10 2021/03Installed &

adjusted

Switch box (Tr secondary box, PC box, distribution line

box 5Fe)Yuyama Power Station 7 Box 2019/10 2020/10 Free on truck

Page 4: 1. Materials and Equipment for Hydroelectric Power Stations · Materials and Equipment for Hydroelectric Power Stations ... Replacement of dam spillway gate electric motor Nagasawa

4 / 19

Quotation Date Delivery Date

Year/Mon. Year/Mon.Item name/Product name (Specification etc.) Branch/Station Qty Unit Delivery Condition

Pressure oil and lubricating oil pump Iyogawa Power Station 1 Unit 2019/10 2020/11 Free on truck

Switch box for generator 6.6kV Ittyuu Power Station 6 Box 2019/10 2020/10 Free on truck

Replacement of automatic control system in Kuriyose

intake damIttyuu Power Station 1 Unit 2019/11 2020/03

Installed &

adjusted

Installation of intake remote control system Kirikoshi Power Station 1 Unit 2019/11 2020/03Installed &

adjusted

Replacement of Dozan River intake dam downstream

warning deviceIyogawa Power Station 1 Unit 2019/11 2020/03

Installed &

adjusted

Gas circuit breaker 72kV 800A 20kA Yusuharagawa No.2 Power Station 3 Piece 2019/11 2020/12 Free on truck

Replacement of intake automatic dust collector Tsuga Power Station 1 Unit 2019/12 2021/03Installed &

adjusted

Replacement of fish ladder parallel plate winch Kae Power Station 1 Unit 2020/02 2021/03Installed &

adjusted

Replacement of cubicle in the dam Tsuga Power Station 1 Unit 2020/03 2021/03Installed &

adjusted

Replacement of Odo/Ikadatsu dam discharge warning

device DC power supplyNiyodogawa No.3 Power Station 1 Unit 2020/03 2021/03

Installed &

adjusted

Page 5: 1. Materials and Equipment for Hydroelectric Power Stations · Materials and Equipment for Hydroelectric Power Stations ... Replacement of dam spillway gate electric motor Nagasawa

5 / 19

2. Materials and Equipment for Thermal Power StationsQuotation Date Delivery Date

Year/Mon. Year/Mon.Anan Power Station Renewal of in-station common

panel, etc.Anan Power Station 1 Unit 2018/11 2020/12

Installed &

adjusted

Anan Power Station New construction of No.1 and No.2

central control room linking power supplyAnan Power Station 1 Unit 2019/03 2021/07

Delivered &

adjusted

Anan Power Station 3U: Purchase of expansion joint for

condenser inlet/outlet, etc.Anan Power Station 1 Unit 2018/06 2019/07 Free on truck

Tachibanawan Power Station Purchase of coal transport

equipment conveyor beltTachibanawan Power Station 1 Unit 2018/05 2018/12 Free on truck

Saijo Power Station 2U: Renewal of control center I Saijo Power Station 1 Unit 2019/03 2020/06Delivered &

adjusted

Saijo Power Station 2U: Renewal of No.8 feed water

heaterSaijo Power Station 1 Unit 2018/08 2020/07

Installed &

adjusted

Saijo Power Station Renewal of track scale Saijo Power Station 1 Unit 2018/04 2019/03Installed &

adjusted

Saijo Power Station Replacement of plaster ship loader

telescopic shootSaijo Power Station 1 Unit 2018/12 2019/10

Installed &

adjusted

Sakaide Power Station Renewal of emergency generator

#2Sakaide Power Station 1 Unit 2018/07 2019/11

Installed &

adjusted

Sakaide Power Station Renewal of chlorination

equipment rectifierSakaide Power Station 1 Unit 2019/01 2020/03

Delivered &

adjusted

Sakaide Power Station 3U: Purchase of 187kV CV cable Sakaide Power Station 1 Unit 2018/08 2019/12Installed &

adjusted

Sakaide Power Station 3U: Purchase of boiler burner

partsSakaide Power Station 1 Unit 2019/03 2019/10 Free on truck

Sakaide Power Station 3U and 4U: Renewal of air

conditioners for 2nd floor of electric roomSakaide Power Station 1 Unit 2018/07 2019/03

Delivered &

adjusted

Sakaide Power Station 4U: Purchase of 6.6kV cable for

circulating water pumpSakaide Power Station 1 Unit 2018/04 2018/09 Free on truck

(Reference) For fiscal 2019

Anan Power Station Renewal of common metal clad 6K-

CAnan Power Station 1 Unit 2020/03 2021/07

Delivered &

adjusted

Anan Power Station 3U: Renewal of uninterruptive power

systemAnan Power Station 1 Unit 2019/05 2020/05

Delivered &

adjusted

Tachibanawan Power Station Purchase of lighting

equipmentTachibanawan Power Station 1 Unit 2019/10 2020/04

Delivered &

unloaded

Tachibanawan Power Station Purchase of coal transport

equipment conveyor beltTachibanawan Power Station 1 Unit 2019/05 2019/12 Free on truck

Saijo Power Station 2U: Renewal of 3K-2B metal clad

circuit breaker partSaijo Power Station 1 Unit 2019/04 2020/06

Installed &

adjusted

Saijo Power Station 2U: Purchase of instrument

transformer and current transformer, etc.Saijo Power Station 1 Unit 2019/04 2020/06

Installed &

adjusted

Saijo Power Station Renewal of common 220V load

centerSaijo Power Station 1 Unit 2019/04 2020/06

Delivered &

adjusted

Saijo Power Station Renewal of common control center II Saijo Power Station 1 Unit 2019/04 2020/06Delivered &

adjusted

Saijo Power Station Renewal of coal transport 440V

power transformerSaijo Power Station 1 Unit 2019/04 2020/06

Installed &

adjusted

Saijo Power Station 2U: Replacement of NOx removal

catalystSaijo Power Station 1 Unit 2019/06 2020/07

Delivered &

adjusted

Saijo Power Station Purchase of plaster shipment

facilities ship loader partsSaijo Power Station 1 Unit 2019/04 2020/08

Installed &

adjusted

Sakaide Power Station 4U: Purchase of 187kV CV cable Sakaide Power Station 1 Unit 2019/11 2021/05Installed &

adjusted

Sakaide Power Station 4U: Renewal of in-station

transformerSakaide Power Station 1 Unit 2019/09 2021/05

Installed &

adjusted

Renewal of gas circuit breaker for Sakaide Power Station

Sanuki Sakaide Line 1 and 2Sakaide Power Station 1 Unit 2019/09 2020/12

Delivered &

adjusted

Sakaide Power Station Renewal of sea transport heavy

crude receiving flow meterSakaide Power Station 1 Unit 2019/11 2020/11

Installed &

adjusted

Item name/Product name (Specification etc.) Branch/Station Qty Unit Delivery Condition

Page 6: 1. Materials and Equipment for Hydroelectric Power Stations · Materials and Equipment for Hydroelectric Power Stations ... Replacement of dam spillway gate electric motor Nagasawa

6 / 19

3. Materials and Equipment for Nuclear Power StationsQuotation Date Delivery Date

Year/Mon. Year/Mon.Ikata 3U: Replacement of seawater desalinization

equipment reverse osmotic membraneIkata Power Station 1 Unit 2018/04 2018/07

Installed &

adjusted

Ikata 3U: Replacement of water purification system

(2B3T-B, MBP-B) resinIkata Power Station 1 Unit 2018/04 2018/12

Installed &

adjusted

Ikata 3U: Replacement of seawater desalinization

equipment reverse osmotic membraneIkata Power Station 1 Unit 2018/11 2019/04

Delivered &

unloaded

Batteries for periphery monitoring post (9 stations)

uninterruptive power supplyIkata Power Station 1 Unit 2018/09 2019/03

Installed &

adjusted

Batteries for periphery monitoring post (7 stations)

uninterruptive power supplyIkata Power Station 1 Unit 2018/10 2019/04

Installed &

adjusted

Ikata Power Station Replacement of parts, etc. in low

level radioactive waste carrying-out inspection equipmentIkata Power Station 1 Unit 2018/10 2019/11

Delivered &

adjusted

Ikata Power Station Replacement of 187kV bus

connection protective relay (equipment)Ikata Power Station 1 Unit 2018/06 2020/01 Free on truck

Ikata 3U: Replacement of nuclear reactor auxiliary

building exhaust fan-3A electric motor statorIkata Power Station 1 Unit 2018/08 2019/07

Installed &

adjusted

Ikata 3U: Purchase of safety system power center Ikata Power Station 1 Unit 2018/08 2019/06Installed &

adjusted

Ikata 2U: Special inspection during long suspension (5th) Ikata Power Station 1 Unit 2018/06 2019/06Installed &

adjusted

Ikata Power Station Inspection on air-cooled emergency

generatorIkata Power Station 1 Unit 2019/01 2019/06

Installed &

adjusted

Ikata 3U: Heat trace facilities PI control panel

replacement work (CDS)Ikata Power Station 1 Unit 2018/06 2019/01

Installed &

adjusted

Modification work of power station data server pertaining

to power system reform responseIkata Power Station 1 Unit 2018/04 2019/01

Installed &

adjusted

Ikata 2U: Irradiation specimen test removal work Ikata Power Station 1 Unit 2018/04 2018/07Installed &

adjusted

Ikata 2U: Special inspection (5th) Ikata Power Station 1 Unit 2018/12 2019/06Installed &

adjusted

Ikata 3U: Seawater system rubber expansion joint Ikata Power Station 1 Unit 2019/02 2019/12 Free on truck

Nuclear Research & Training Center: Renewal of

computer for 3U model operation training simulator

simulation (3rd)

Nuclear Research & Training

Center1 Unit 2018/10 2020/02

Installed &

adjusted

Lithium hydroxide solution Ikata Power Station 1 Unit 2019/03 2019/05Delivered &

unloaded

Ikata 3U: Recorder Ikata Power Station 1 Unit 2019/02 2019/09Delivered &

unloaded

Ikata Power Station Replacement of portable area

monitorIkata Power Station 1 Unit 2018/04 2019/03

Installed &

adjusted

Ikata 3U: Repairs of shipping inspection equipment Ikata Power Station 1 Unit 2018/05 2018/12Delivered &

unloaded

Ikata 3U: Turbine parts repair work Ikata Power Station 1 Unit 2018/12 2019/11 Free on truck

Ikata 3U: Renewal of system auxiliary panel Ikata Power Station 1 Unit 2018/07 2019/12Installed &

adjusted

Ikata Power Station Purchase of 187kV southern main

line protective relayIkata Power Station 1 Unit 2018/08 2020/12 Free on truck

Ikata 1U: Abolition measures inspection (2nd), diesel

generator company-supplied partsIkata Power Station 1 Unit 2019/01 2020/01

Delivered &

unloaded

Inspection on waste liquid treatment device (permeable

membrane)Ikata Power Station 1 Unit 2018/11 2019/05

Delivered &

unloaded

Calibration of main steam safety valve inspection

equipment (period: 5 years)Ikata Power Station 1 Unit 2018/12 2019/04

Delivered &

unloaded

Ikata 2U: Repair work for reactor auxiliary building air

inletIkata Power Station 1 Unit 2018/10 2019/10

Delivered &

unloaded

Nuclear Research & Training Center: Renewal of NEC

computer for 2U model training simulator (1st)

Nuclear Research & Training

Center1 Unit 2019/03 2020/03

Installed &

adjusted

Ikata 3U: Storage battery reinforcement work (installation

of 3rd DC power supply)Ikata Power Station 1 Unit 2018/04 2021/06

Installed &

adjusted

(Reference) For fiscal 2019

Ikata 2U: Replacement of storage battery 2A and 2B for

plantIkata Power Station 1 Unit 2019/05 2020/09 Free on truck

Ikata 2U: Control rod control panel renewal work Ikata Power Station 1 Unit 2019/10 2022/03Installed &

adjusted

Ikata 3U: 500kV system watt-hour meter installation work Ikata Power Station 1 Unit 2019/04 2021/06Installed &

adjusted

Nuclear Research & Training Center: Replacement of

main turbine control panel

Nuclear Research & Training

Center1 Unit 2020/02 2021/09

Installed &

adjusted

Ikata 3U: Replacement of seawater desalinization

equipment reverse osmotic membraneIkata Power Station 1 Unit 2019/04 2019/08

Installed &

adjusted

Ikata 2U: Replacement of incore nuclear instrumentation

deviceIkata Power Station 1 Unit 2019/08 2022/03

Installed &

adjusted

Item name/Product name (Specification etc.) Branch/Station Qty Unit Delivery Condition

Page 7: 1. Materials and Equipment for Hydroelectric Power Stations · Materials and Equipment for Hydroelectric Power Stations ... Replacement of dam spillway gate electric motor Nagasawa

7 / 19

Quotation Date Delivery Date

Year/Mon. Year/Mon.Item name/Product name (Specification etc.) Branch/Station Qty Unit Delivery Condition

Ikata IU and 2U: Operation commanding device parts Ikata Power Station 1 Unit 2019/07 2020/02Delivered &

unloaded

Ikata 1U and 2U: Office automation - LAN cable

development (competitive bidding)Ikata Power Station 1 Unit 2019/09 2020/03

Installed &

adjusted

Ikata Power Station Miscellaneous solid incineration

system charcoal incineration system installation workIkata Power Station 1 Unit 2020/01 2021/03

Installed &

adjusted

Ikata Power Station Replacement of miscellaneous solid

incineration system building exhaust system damperIkata Power Station 1 Unit 2019/07 2020/02

Installed &

adjusted

Nuclear Research & Training Center: Renewal of 2U

model training simulator process I/O unit (1st)

Nuclear Research & Training

Center1 Unit 2019/04 2020/06

Installed &

adjusted

Nuclear Research & Training Center: CENTUM renewal

work

Nuclear Research & Training

Center1 Unit 2019/06 2020/04

Installed &

adjusted

Ikata Power Station 1U and 2U: 187kV system watt-hour

meter installation workIkata Power Station 1 Unit 2019/09 2021/12

Installed &

adjusted

Ikata Power Station 1U and 2U: 66kV system watt-hour

meter installation workIkata Power Station 1 Unit 2020/02 2022/02

Installed &

adjusted

Ikata 1U and 2U: Observation seismometer repair work Ikata Power Station 1 Unit 2019/06 2020/09Installed &

adjusted

Ikata 2U: Electric penetration (triple coaxial) repair work Ikata Power Station 1 Unit 2019/06 2022/03Installed &

adjusted

Dry type cask installation work Ikata Power Station 1 Unit 2019/10 2023/03Installed &

adjusted

Page 8: 1. Materials and Equipment for Hydroelectric Power Stations · Materials and Equipment for Hydroelectric Power Stations ... Replacement of dam spillway gate electric motor Nagasawa

8 / 19

4. Materials and Equipment for TransmissionQuotation Date Delivery Date

Year/Mon. Year/Mon.

LED type airplane warning light OM-3C 4 units Takamatsu Branch 1 Unit 2018/04 2018/09Installed &

adjusted

Vertically mounting hardware for underground power

transmission cable, etc.Takamatsu Branch 1 Unit 2018/04 2018/05

Delivered &

unloaded

Ground fault point indicator (G finder) Niihama Branch 181 Pair 2018/04 2018/06Delivered &

unloaded

Replacement of airplane warning light Niihama Branch 1 Unit 2018/06 2018/12Installed &

adjusted

LED type airplane warning light, middle and high altitude,

low altitude airplane warning light, OM-6C type, OM-3C

type

Tokushima Branch 5 Unit 2018/08 2019/03Installed &

adjusted

Faulty section detector Matsuyama Branch 1 Unit 2018/09 2019/09Delivered &

adjusted

N-FL device Niihama Branch 1 Unit 2018/10 2019/11Installed &

adjusted

Replacement of airplane warning light Ikeda Branch 1 Unit 2019/02 2019/09Installed &

adjusted

N-FL device Ikeda Branch 1 Unit 2019/02 2019/09Installed &

adjusted

Line hardware Matsuyama Branch 1 Unit 2019/02 2019/08Delivered &

unloaded

Line hardware Niihama Branch 1 Unit 2019/02 2019/09Delivered &

unloaded

(Reference) For fiscal 2019

LED type airplane warning light OM-3C 3 units Takamatsu Branch 1 Unit 2019/04 2019/09Installed &

adjusted

Replacement of airplane warning light Niihama Branch 1 Unit 2019/07 2020/04Installed &

adjusted

Line hardware Matsuyama Branch 1 Unit 2019/08 2020/02Delivered &

unloaded

Replacement of airplane warning light Uwajima Branch 1 Unit 2020/01 2020/07Installed &

adjusted

Loose spacer Uwajima Branch 187 Piece 2020/01 2020/07Delivered &

unloaded

N-FL device Ikeda Branch 1 Unit 2020/02 2020/09Installed &

adjusted

Line hardware Niihama Branch 1 Unit 2020/02 2020/09Delivered &

unloaded

Line hardware Tokushima Branch 1 Unit 2020/03 2020/09Delivered &

unloaded

Item name/Product name (Specification etc.) Branch/Station Qty Unit Delivery Condition

Page 9: 1. Materials and Equipment for Hydroelectric Power Stations · Materials and Equipment for Hydroelectric Power Stations ... Replacement of dam spillway gate electric motor Nagasawa

9 / 19

5. Materials and Equipment for SubstationsQuotation Date Delivery Date

Year/Mon. Year/Mon.

Line switch 204kV 2000A 31.5kA, no grounding device Ikawa Substation 4 Pair 2018/06 2019/04Delivered &

adjusted

Line switch 204kV 4000A 50kA, E-equipped motored Sanuki Substation 2 Pair 2018/08 2019/09Delivered &

adjusted

Line switch 204kV 3000A 31.5kA Asa Substation 2 Pair 2018/10 2019/10Delivered &

adjusted

Line switch 204kV 3000A 32kA horizontal 2-point switch,

grounding, high reliability, etc.Kokufu Substation 3 Pair 2018/12 2019/09 Free on truck

Line switch 204kV 4kA 32kA horizontal 1-point switch,

salt-tolerant M, etc.Naruto Substation 3 Pair 2019/01 2019/10 Free on truck

Line switch 120kV 800A 20kA, horizontal 2-point switch Sakawa Substation 2 Pair 2018/10 2019/10 Free on truck

Line switch 120kV 2000A 20kA, horizontal 2-point switch Sakawa Substation 4 Pair 2019/01 2019/11 Free on truck

Line switch 72kV 1200A 31.5kA motored E-equipped

motoredKagawa Substation 12 Pair 2018/04 2019/03 Free on truck

Line switch 72kV 800A 20kA Tadotsu Substation 8 Pair 2018/05 2019/04 Free on truck

Line switch 72kV 800A 1200A 20kA horizontal electric 2-

point switch, main body high reliability salt-tolerantHashioka Substation 6 Pair 2018/06 2019/04 Free on truck

Line switch 72kV 800A 20kA horizontal 2-point switch,

salt-tolerant HSaita Substation 4 Pair 2018/07 2019/04 Free on truck

Line switch 72kV 2KA 32kA horizontal 2-point switch,

salt-tolerant MNaruto Substation 6 Pair 2019/01 2019/10 Free on truck

Gas circuit breaker 204kV 4000A 50kA Sanuki Substation 1 Piece 2018/08 2019/10Delivered &

adjusted

Gas circuit breaker 72kV 1200A 31.5kA Kagawa Substation 4 Piece 2018/04 2019/03 Free on truck

Gas circuit breaker 72kV 800A 20kA Wakamiya Substation 2 Piece 2018/04 2019/04 Free on truck

Gas circuit breaker 72kV 1200A 20kA Wajiki Substation 2 Piece 2018/09 2019/10 Free on truck

Gas circuit breaker 72kV 800A 20kA Oura Substation 3 Piece 2018/09 2019/09 Free on truck

Gas circuit breaker 72kV 800A 20kA Kamiura Substation 3 Piece 2018/09 2019/10 Free on truck

Gas circuit breaker 72kV 1200A 20kA Hiuchi Substation 1 Piece 2018/10 2019/12 Free on truck

Gas circuit breaker 72kV 2000A 20kA, salt-tolerant M Sakawa Substation 4 Piece 2018/10 2019/11 Free on truck

Gas circuit breaker 72kV 800A 20kA Hiuchi Substation 1 Piece 2018/10 2019/12 Free on truck

Gas circuit breaker minute inspectionAnan AD/DC Converter

Maintenance Office1 Unit 2018/07 2019/04

Delivered &

adjusted

Circuit breaker 204kV 2000A 31.5kA Asa Substation 2 Piece 2018/10 2019/11Delivered &

adjusted

Circuit breaker 72kV 1200A 31.5kA Asa Substation 2 Piece 2018/09 2019/09 Free on truck

Gas-insulated switchgear (transmission line unit) Tatsumi Substation 1 Set 2019/02 2020/05Delivered &

adjusted

Modification of gas-insulated switchgear Tomioka Substation 2 Set 2019/02 2020/05Installed &

adjusted

Transformer for instrument 66kV 50VA, etc. Saita Substation 7 Piece 2018/05 2019/04 Free on truck

Transformer for instrument 187KV 500VA Sanuki Substation 6 Piece 2018/08 2019/09 Free on truck

Transformer for instrument 204kV No.1 and No.2 Asa Substation 6 Piece 2018/10 2019/11 Free on truck

Transformer for instrument 187kV 500VA salt-tolerant M Saijo Substation 6 Piece 2019/01 2020/02 Free on truck

Distribution transformer 66/6kV 15MVA sound-proof room

high efficiency salt-tolerant MTaga Substation 1 Set 2019/01 2020/04

Delivered &

adjusted

Distribution transformer 66/6kV 15MVA sound-proof room

salt-tolerant MGunchu Substation 1 Set 2018/04 2019/05

Delivered &

adjusted

Distribution transformer 66/6kV 15MVA sound-proof room

high efficiencySakaide Substation 1 Set 2018/06 2019/12

Delivered &

adjusted

Distribution transformer 66/6kV 15MVA double wall salt-

tolerant MIzumikawa Substation 1 Set 2018/10 2019/11

Delivered &

adjusted

Distribution transformer 66/6kV 15MVA Tateda Substation 1 Set 2019/01 2020/05Delivered &

adjusted

Distribution transformer 66/6kV 15MVA salt-tolerant M

double wall high efficiencyYamagiwa Substation 1 Set 2019/02 2020/05

Delivered &

adjusted

Distribution transformer 66/6kV 15MVA sound-proof room

shape primary BGZentsuji Substation 1 Set 2019/03 2020/03

Delivered &

adjusted

Distribution transformer 66/6kV 15MVA sound-proof room

shape primary BGKameda Substation 1 Set 2019/03 2020/05

Delivered &

adjusted

Switch box (Tr secondary box, bus connection box, PC

box, in-station box, distribution line box, 4Fe)Hirata Substation 8 Box 2018/05 2019/05 Free on truck

Switch box (Tr secondary box, bus connection box,

distribution line box, 7Fe (two-layer))Bancho Substation 6 Box 2018/06 2019/09 Free on truck

Item name/Product name (Specification etc.) Branch/Station Qty Unit Delivery Condition

Page 10: 1. Materials and Equipment for Hydroelectric Power Stations · Materials and Equipment for Hydroelectric Power Stations ... Replacement of dam spillway gate electric motor Nagasawa

10 / 19

Quotation Date Delivery Date

Year/Mon. Year/Mon.Item name/Product name (Specification etc.) Branch/Station Qty Unit Delivery Condition

Switch box TR secondary 6kV 2000A outdoor Busshozan Substation 1 Unit 2018/08 2019/08 Free on truck

Switch box TR secondary 6kV 2000A outdoor Zentsuji Substation 1 Unit 2019/03 2020/03 Free on truck

Switch box TR secondary 6kV 2000A outdoor Ohama Substation 1 Unit 2019/03 2020/04 Free on truck

Miniature switch box 6kV 1.2kA outdoor Sakaide Substation 1 Unit 2018/06 2019/10 Free on truck

Miniature switch box 6kV 2kA 20kA outdoor, etc. Izume Substation 7 Box 2019/01 2019/09 Free on truck

Miniature switch box 6kV Ikeda Substation 9 Box 2019/03 2020/04 Free on truck

43PD panel 187kV Takamatsu Substation 2 Panel 2018/07 2019/07 Free on truck

43PD panel 187kV Sanuki Substation 3 Panel 2018/08 2019/10 Free on truck

43PD panel 187kV Hiromi Substation 1 Panel 2019/02 2020/01 Free on truck

43PD panel 66kV Takamatsu Substation 2 Panel 2018/07 2019/07 Free on truck

43PD panel Saijo Substation 3 Panel 2019/01 2020/02 Free on truck

43PD panel Harami Substation 1 Panel 2019/02 2020/02 Free on truck

500kV transformer relay panel Sanuki Substation 4 Panel 2019/01 2020/01 Free on truck

TR panel Shinonome Substation 2 Panel 2018/04 2019/04Delivered &

adjusted

Incoming panel Harami Substation 1 Panel 2019/02 2020/02 Free on truck

Power transmission and reception panel Hiuchi Substation 3 Panel 2018/09 2019/11Delivered &

adjusted

Shunt reactor panel 66kV Sanuki Substation 2 Panel 2019/01 2020/01Delivered &

adjusted

Transformer panel Takamatsu Substation 1 Panel 2018/07 2019/07 Free on truck

Transformer panel Busshozan Substation 2 Panel 2018/08 2019/08 Free on truck

Transformer relay panel Kitamatsuyama Substation 1 Panel 2018/06 2019/08 Free on truck

Transformer relay panel Kitamatsuyama Substation 3 Panel 2018/10 2019/08 Free on truck

Remote monitoring control system interface panel Takamatsu Substation 1 Unit 2018/04 2019/07Delivered &

adjusted

Remote monitoring control system Nagase Substation 2 Panel 2018/04 2019/04Delivered &

adjusted

Remote monitoring control system Yanase Substation 1 Panel 2018/05 2019/10Delivered &

adjusted

Remote monitoring control system Mikame Substation 2 Panel 2018/06 2019/09Delivered &

adjusted

Remote monitoring control system Oura Substation 2 Panel 2018/06 2019/09Delivered &

adjusted

Remote monitoring control system Kuwano Substation 1 Unit 2018/06 2019/11Delivered &

adjusted

Remote monitoring control system Kokufu Substation 1 Unit 2018/08 2020/11Delivered &

adjusted

Remote monitoring control system Yanase Substation 3 Piece 2018/10 2019/11 Free on truck

Remote monitoring control system switchboard

switchgear HDLCHashioka Substation 1 Unit 2019/03 2020/05

Delivered &

adjusted

Remote monitoring control system (logic panel x1,

measurement auxiliary x1)Shingu Substation 2 Panel 2019/03 2020/03

Delivered &

adjusted

No. 1 freezer No. 1 compressor, etc.Anan AD/DC Converter

Maintenance Office1 Unit 2018/08 2019/01

Installed &

adjusted

Renewal of parts of the monitoring control systemAnan AD/DC Converter

Maintenance Office1 Unit 2018/11 2021/02

Installed &

adjusted

Automatic controller calculation device (TCM, EWS, etc.)Tokushima distribution dispatching

center.1 Unit 2019/02 2020/02

Installed &

adjusted

Neutral grounding resistor 100A 30s, 381Ω Sakawa Substation 1 Piece 2018/08 2019/11 Free on truck

Monitoring control system for ultrahigh-pressure

substationTakamatsu Substation 21 Panel 2018/04 2019/07

Delivered &

adjusted

Power supply Okawa Substation 1 Piece 2019/02 2019/08Installed &

adjusted

(Reference) For fiscal 2019

Line switch 204kV 1200A 31.5kA with grounding device,

earthquake-resistant measures, etc.Ikawa Substation 4 Pair 2019/09 2020/10

Delivered &

adjusted

Line switch 204kV 3000A 50kA motorized Sanuki Substation 4 Pair 2019/10 2020/09Delivered &

adjusted

Page 11: 1. Materials and Equipment for Hydroelectric Power Stations · Materials and Equipment for Hydroelectric Power Stations ... Replacement of dam spillway gate electric motor Nagasawa

11 / 19

Quotation Date Delivery Date

Year/Mon. Year/Mon.Item name/Product name (Specification etc.) Branch/Station Qty Unit Delivery Condition

Line switch 204kV 3000A 50kA motored E-equipped

motoredSanuki Substation 2 Pair 2019/10 2020/11

Delivered &

adjusted

Line switch 72kV 800A 20kA 2-point switch Fuchu Substation 7 Pair 2019/07 2020/07 Free on truck

Line switch 72kV 1200A 31.5kA motored E-equipped

motoredKagawa Substation 6 Pair 2019/09 2020/09 Free on truck

Line switch 72kV 2KA 32kA horizontal 2-point switch,

salt-tolerant MNaruto Substation 8 Pair 2020/01 2020/10 Free on truck

Line switch modification 187kV Saijo Substation 1 Unit 2019/09 2020/09Delivered &

adjusted

Gas circuit breaker 204kV 2000A 50kA Sanuki Substation 2 Piece 2019/10 2020/11Delivered &

adjusted

Gas circuit breaker 187kV modification Saijo Substation 1 Unit 2019/09 2020/09Delivered &

adjusted

Gas circuit breaker 72kV 800A 20kA Oda Substation 2 Piece 2019/04 2020/04 Free on truck

Gas circuit breaker 72kV 1200A 31.5kA Kagawa Substation 2 Piece 2019/09 2020/09 Free on truck

Gas circuit breaker 72kV 800A 20kA Nagahama Substation 3 Piece 2019/09 2020/09 Free on truck

Circuit breaker 72kV 2000A 31.5kA salt-tolerant M Matsuyama Substation 2 Piece 2019/04 2020/04 Free on truck

Gas-insulated switchgear 204kV 1200A 40kA Sanuki Substation 2 Set 2019/06 2020/06Delivered &

adjusted

Gas-insulated switchgear 72kV 1200A 25kA double bus,

transmission lineNishitoori Substation 10 Set 2019/06 2021/09

Delivered &

adjusted

Gas-insulated switchgear 72kV 200VA double bus, bus

PTNishitoori Substation 10 Set 2019/06 2021/09

Delivered &

adjusted

Gas-insulated switchgear 72kV 3000A 25kA double bus,

bus tieNishitoori Substation 10 Set 2019/06 2021/09

Delivered &

adjusted

Gas-insulated switchgear 72kV 800, 1200A double bus,

transformerNishitoori Substation 10 Set 2019/06 2021/09

Delivered &

adjusted

Gas-insulated switchgear bus line + Modification of bus

lineNishitoori Substation 10 Set 2019/06 2021/09

Delivered &

adjusted

Distribution transformer 66/6kV 10MVA sound-proof

room, room flow salt-tolerant M low lossSaika Substation 1 Set 2019/04 2020/06

Delivered &

adjusted

Distribution transformer 66/23kV 10MVA sound-proof

room salt-tolerant M secondary NHojyo Substation 1 Set 2019/04 2020/05

Delivered &

adjusted

Distribution transformer 66/6kV 15MVA sound-proof room

flow high efficiency salt-tolerant HSukumo Substation 1 Set 2019/08 2020/10

Delivered &

adjusted

Distribution transformer 66/6kV 15MVA double wall high

efficiency EF salt-tolerant HKanonji Substation 1 Set 2019/08 2020/12

Delivered &

adjusted

Distribution transformer 66/23kV 20MVA double tank Komatsushima Substation 1 Set 2019/10 2020/12Delivered &

adjusted

Distribution transformer 66/6kV 15MVA salt-tolerant H Saita Substation 1 Set 2020/02 2021/05Delivered &

adjusted

Distribution transformer 66/6kV 20MVA Shikiji Substation 1 Set 2020/03 2021/05Delivered &

adjusted

Distribution transformer 66/6KV 20MVA indoor primary

BGKameda Substation 1 Set 2020/03 2021/04

Delivered &

adjusted

Switch box TR secondary 6kV 2000A outdoor Yusa Substation 1 Unit 2019/04 2020/04 Free on truck

Switch box (Tr secondary box, bus connection box, PC

box, in-station box, distribution line box)Haramachi Substation 8 Box 2019/04 2020/04 Free on truck

Switch box TR secondary 6kV 2000A outdoor Hiketa Substation 2 Unit 2019/07 2020/09 Free on truck

Distribution box Yanase Substation 5 Box 2019/07 2020/08 Free on truck

Switch box TR secondary 6kV 2000A outdoor Ritsurin Substation 1 Unit 2019/09 2020/09 Free on truck

Switch box 6KV 2000A outdoor Takamatsu-Chuo Substation 1 Unit 2019/11 2020/11 Free on truck

Switch box (22kV 4box) Naruto Substation 1 Unit 2019/12 2020/12 Free on truck

Switch box (22kV) Kochi Substation 1 Piece 2020/01 2021/04Delivered &

adjusted

Miniature switch box 6kV Kamiita Substation 1 Unit 2019/05 2020/05 Free on truck

Distribution panel 1 tie transformer protection panel Naruto Substation 1 Panel 2019/09 2020/10 Free on truck

TR panel Mitani Substation 2 Panel 2020/01 2020/11Delivered &

adjusted

In-station panel Toyo Substation 4 Panel 2019/05 2020/08 Free on truck

Monitoring panel (DAC panel) Toyo Substation 12 Panel 2019/05 2020/08Delivered &

adjusted

500kV TRRY panel Toyo Substation 4 Panel 2019/05 2020/08Delivered &

adjusted

Shunt reactor panel 187kV Sanuki Substation 3 Panel 2019/04 2020/05Delivered &

adjusted

Remote control monitoring system Nangoku Substation 1 Unit 2019/04 2020/06Delivered &

adjusted

Remote control monitoring system Niida Substation 1 Unit 2019/04 2021/11Delivered &

adjusted

Page 12: 1. Materials and Equipment for Hydroelectric Power Stations · Materials and Equipment for Hydroelectric Power Stations ... Replacement of dam spillway gate electric motor Nagasawa

12 / 19

Quotation Date Delivery Date

Year/Mon. Year/Mon.Item name/Product name (Specification etc.) Branch/Station Qty Unit Delivery Condition

Remote control monitoring system Ikeda Branch Building 1 Unit 2019/05 2020/05Installed &

adjusted

Remote control monitoring system two-place control TC Takuma Substation 1 Unit 2019/05 2020/02Delivered &

adjusted

Remote control monitoring system (logic panel x2,

measurement auxiliary x1)Susaki Substation 1 Unit 2019/06 2020/11

Delivered &

adjusted

Remote monitoring control system slave station (logic

panel x1, measurement auxiliary x1)Hirata Substation 2 Panel 2019/06 2020/10

Delivered &

adjusted

Remote monitoring control system (monitoring panel-

integrated)Ozu Substation 1 Unit 2019/06 2021/03

Delivered &

adjusted

Remote control monitoring system Tateda Substation 1 Unit 2019/07 2020/12Delivered &

adjusted

Remote control monitoring system Suehiro Substation 2 Panel 2019/08 2020/11Delivered &

adjusted

Remote monitoring control system switchboard

switchgear HDLCBusshozan Substation 1 Unit 2019/10 2021/04

Delivered &

adjusted

Remote control monitoring system Tano Substation 1 Panel 2019/12 2021/04Delivered &

adjusted

Remote monitoring control system slave station (logic

panel x1, measurement auxiliary x1)Kasuga Substation 2 Panel 2020/01 2021/05

Delivered &

adjusted

Power capacitor 66kV 3φ 5MVA Imabari Substation 1 Set 2019/12 2020/12Delivered &

adjusted

Shunt reactor 22kV 30MVA Kochi Substation 1 Piece 2019/12 2021/04Delivered &

adjusted

Transfer interrupting device Sanuki Substation 1 Pair 2019/04 2020/04 Free on truck

Pipe bus line, etc. Tsuda Substation 1 Unit 2019/04 2020/04 Free on truck

Repairs of Group 1 PG panel old partsAnan AD/DC Converter

Maintenance Office1 Unit 2019/09 2020/04

Installed &

adjusted

Pole 1 facilities normal inspectionAnan AD/DC Converter

Maintenance Office1 Unit 2019/09 2020/04

Installed &

adjusted

Repairs of Group 1 secondary cold water and water

spray system auxiliary machine old parts

Anan AD/DC Converter

Maintenance Office1 Unit 2019/09 2020/04

Installed &

adjusted

Repairs of Group 1 air conditioning system auxiliary

machinery old parts

Anan AD/DC Converter

Maintenance Office1 Unit 2019/09 2020/04

Installed &

adjusted

Repairs of Group 1 pure water system auxiliary machine

old parts

Anan AD/DC Converter

Maintenance Office1 Unit 2019/09 2020/04

Installed &

adjusted

Repairs of Group 2 cooling tower electric motorAnan AD/DC Converter

Maintenance Office1 Unit 2019/07 2019/11

Delivered &

adjusted

Repairs of 500kV Group 1 GIS unit pressure oil device,

etc.

Anan AD/DC Converter

Maintenance Office1 Unit 2019/09 2020/04

Installed &

adjusted

Repairs of 500kV transmission line and bus tie GIS unit

pressure oil device, etc.

Anan AD/DC Converter

Maintenance Office1 Unit 2019/10 2020/05

Installed &

adjusted

Insulator cleaning, repairs of fire-fighting equipmentAnan AD/DC Converter

Maintenance Office1 Unit 2019/07 2019/10

Delivered &

adjusted

Operation console sound recording deviceAnan AD/DC Converter

Maintenance Office1 Unit 2019/12 2021/01

Installed &

adjusted

Air conditionerAnan AD/DC Converter

Maintenance Office1 Unit 2020/02 2021/02

Delivered &

unloaded

Page 13: 1. Materials and Equipment for Hydroelectric Power Stations · Materials and Equipment for Hydroelectric Power Stations ... Replacement of dam spillway gate electric motor Nagasawa

13 / 19

6. Materials and Equipment for DistributionQuotation Date Delivery Date

Year/Mon. Year/Mon.

Replacement of Nakajima distribution tower 2B cubicle Nakajima distribution tower 1 Unit 2018/04 2019/08Delivered &

unloaded

Mobile generator vehicle (300kVA)Imabari Sales & Customer Service

Office1 Set 2018/04 2018/12

Delivered &

adjusted

Item name/Product name (Specification etc.) Branch/Station Qty Unit Delivery Condition

Page 14: 1. Materials and Equipment for Hydroelectric Power Stations · Materials and Equipment for Hydroelectric Power Stations ... Replacement of dam spillway gate electric motor Nagasawa

14 / 19

7. Equipment for Information and TelecommunicationQuotation Date Delivery Date

Year/Mon. Year/Mon.

CDT concentrator Sanuki Substation 1 Piece 2018/04 2019/06Delivered &

adjusted

Mobile radio device for 400MHz band digital power

distribution (base station, fixed station, etc.)

Tokushima Branch, Kokufu

Substation, Bizan Radio Station

and others

34 Piece 2018/04 2019/07Delivered &

adjusted

Distribution board

Ikata Power Station, Uwajima

Branch, Nomura Substation, Uwa

Customer Services & Maintenance

Center

5 Panel 2018/04 2018/09Delivered &

unloaded

Spare engine (20kVA) Rokuro Radio Station 1 Unit 2018/04 2018/10Delivered &

adjusted

Server equipment for power outage information provisionTakamatsu Network Center

Building1 Unit 2018/04 2018/10

Installed &

adjusted

Server equipment Ikata Power Station 1 Unit 2018/05 2018/08Installed &

adjusted

Centralized reception server equipment, rackTakamatsu Network Center

Building1 Unit 2018/05 2018/08

Installed &

adjusted

Software for centralized reception systemTakamatsu Network Center

Building1 Unit 2018/05 2018/08

Delivered &

unloaded

Computer, etc. for centralized reception systemTakamatsu Network Center

Building1 Unit 2018/05 2018/08

Delivered &

unloaded

Head set, etc. for centralized reception systemTakamatsu Network Center

Building1 Unit 2018/05 2018/08

Delivered &

unloaded

Monitoring software for centralized reception system Information Communication Dept. 18 Piece 2018/05 2018/08Delivered &

unloaded

Mobile radio device for 400MHz band digital power

distribution (base station, etc.)Within Matsuyama Branch 1 Unit 2018/05 2019/05

Delivered &

adjusted

System monitoring panel Head Office 1 Unit 2018/05 2018/12Delivered &

adjusted

Mobile radio device for 400MHz band digital power

distribution (base station, fixed station, etc.)Niihama Branch and others 1 Unit 2018/06 2019/04

Delivered &

adjusted

Mobile computerGeneral Education & Training

Center300 Set 2018/06 2018/08

Delivered &

unloaded

Office software for mobile computer Head Office 300 License 2018/06 2018/08Delivered &

unloaded

Server equipmentTakamatsu Network Center

Building1 Unit 2018/06 2018/09

Installed &

adjusted

Server equipment for emergency call system for power

distribution

Takamatsu Network Center

Building1 Unit 2018/06 2019/04

Installed &

adjusted

Software for emergency call system for power distributionTakamatsu Network Center

Building1 Unit 2018/06 2019/04

Installed &

adjusted

Carrier relay multiplexer (CR-MUX)Anan AD/DC Converter

Maintenance Office8 Piece 2018/06 2019/01

Delivered &

adjusted

Remote desktop CAL Head Office 12,900 License 2018/07 2018/10Delivered &

unloaded

Desktop PCGeneral Education & Training

Center200 Set 2018/07 2018/10

Delivered &

unloaded

Office software for desktop PC Head Office 200 License 2018/07 2018/10Delivered &

unloaded

Optical fiber cable (GWWOP) Takamatsu Stock Center 1 Unit 2018/07 2018/12Delivered &

adjusted

Optical fiber cable (GWWOP) materials Takamatsu Stock Center 1 Unit 2018/07 2019/03Delivered &

adjusted

PON system Matsuyama Branch and others 1 Unit 2018/07 2020/04Delivered &

adjusted

CAD software (AUTOCAD) Head Office 1 Unit 2018/08 2018/09Delivered &

unloaded

Server equipmentTakamatsu Network Center

Building1 Unit 2018/08 2018/11

Installed &

adjusted

Virtualization software (VMWare) Information Communication Dept. 1 Unit 2018/08 2018/11Delivered &

unloaded

Operation control software (Systemwalker) Information Communication Dept. 1 Unit 2018/08 2018/11Delivered &

unloaded

OS for server (Windows Server Datacenter) Information Communication Dept. 1 Unit 2018/08 2018/11Delivered &

unloaded

Spare engine (30kVA) Kokuzosan Radio Station 1 Piece 2018/08 2019/02Delivered &

adjusted

Distribution boardYawatahama Substation, Ozu

Substation5 Panel 2018/08 2019/02

Delivered &

unloaded

CAD software (AUTOCAD)Takamatsu Network Center

Building80 Unit 2018/09 2018/09

Delivered &

unloaded

Optical wavelength division multiplexing system (WDM) Sanuki Substation 1 Piece 2018/09 2019/04Delivered &

adjusted

Optical wavelength division multiplexing system (WDM) Toyo Substation 1 Unit 2018/09 2019/04Delivered &

adjusted

Notebook computerGeneral Education & Training

Center2,100 Set 2018/10 2019/06

Delivered &

unloaded

Office software for notebook computer Head Office 1,250 License 2018/10 2019/06Delivered &

unloaded

Spare engine (50KVA) Ryuo Radio Station 1 Set 2018/10 2019/06Delivered &

adjusted

Digital multiple wireless unit (6.5G-26M)Ryuo Radio Station,

IkawaSubstation2 Piece 2018/10 2019/10

Delivered &

adjusted

IP type data exchange unit Sanuki Substation 1 Unit 2018/10 2021/03Delivered &

adjusted

Delivery ConditionItem name/Product name (Specification etc.) Branch/Station Qty Unit

Page 15: 1. Materials and Equipment for Hydroelectric Power Stations · Materials and Equipment for Hydroelectric Power Stations ... Replacement of dam spillway gate electric motor Nagasawa

15 / 19

Quotation Date Delivery Date

Year/Mon. Year/Mon.Delivery ConditionItem name/Product name (Specification etc.) Branch/Station Qty Unit

Telephone command stand Sanuki Substation 1 Unit 2018/10 2021/03Delivered &

adjusted

Digital multiple wireless unit (6.5G-104M)Oyama Radio Station, Kokufu

Substation2 Piece 2018/11 2019/10

Delivered &

adjusted

Digital multiple wireless unit (6.5G-26M)Nakamura Branch, Katauoyama

Radio Station, Kubokawa Office4 Piece 2018/12 2019/10

Delivered &

adjusted

Optical fiber cable Uwajima Branch and others 15,200 m 2018/12 2019/03Delivered &

unloaded

(Reference) For fiscal 2019

Software for big data analysis Information Communication Dept. 1 Unit 2019/04 2019/06Delivered &

unloaded

Mobile radio for 400MHz band digital power distribution

(in-vehicle unit)Tokushima Branch 51 Set 2019/04 2020/03

Delivered &

adjusted

Digital multiple wireless unit (6.5G-13M) Nyuugawa Substation and others 2 Piece 2019/04 2020/03Delivered &

adjusted

Reflector (8m x 10m) In Saijo City 1 Piece 2019/04 2020/03Delivered &

adjusted

TabletTakamatsu Network Center

Building74 Set 2019/05 2019/05

Delivered &

unloaded

Server equipment for smart meter-related system

(development: MDMS)

Takamatsu Network Center

Building1 Unit 2019/05 2019/10

Installed &

adjusted

Server equipment for smart meter-related system

(development: DCS)

Takamatsu Network Center

Building1 Unit 2019/05 2019/10

Installed &

adjusted

Server equipment for smart meter-related system (actual

use: MDMS)

Takamatsu Network Center

Building1 Unit 2019/05 2020/04

Installed &

adjusted

Server equipment for smart meter-related system (actual

use: DCS)

Takamatsu Network Center

Building1 Unit 2019/05 2020/04

Installed &

adjusted

Software for smart meter-related system (development:

MDMS [additional license])Information Communication Dept. 1 Unit 2019/05 2019/10

Delivered &

unloaded

Software for smart meter-related system (development:

DCS [additional license])Information Communication Dept. 1 Unit 2019/05 2019/10

Delivered &

unloaded

Software for smart meter-related system (actual use:

MDMS [one-year term license])Information Communication Dept. 1 Unit 2019/05 2019/10

Delivered &

unloaded

Software for smart meter-related system (actual use: DCS

[one-year term license])Information Communication Dept. 1 Unit 2019/05 2019/10

Delivered &

unloaded

Software for smart meter-related system (actual use:

MDMS [additional license])Information Communication Dept. 1 Unit 2019/05 2020/04

Delivered &

unloaded

Software for smart meter-related system (actual use: DCS

[additional license])Information Communication Dept. 1 Unit 2019/05 2020/04

Delivered &

unloaded

Mobile radio device for 400MHz band digital power

distribution (base station, fixed station, etc.)

Sakaide Sales & Customer Service

Office and others27 Piece 2019/05 2019/11

Delivered &

adjusted

Spare engine (30kVA) Omoriyama Radio Station 1 Unit 2019/06 2020/06Delivered &

adjusted

Optical fiber cable (GWWOP) Takamatsu Stock Center 1 Unit 2019/07 2019/12Delivered &

adjusted

Mobile radio for 400MHz band digital power distribution

(in-vehicle unit)Within Matsuyama Branch 1 Unit 2019/08 2020/04

Delivered &

unloaded

Server equipment for simultaneous notification systemIkataPower Station, Takamatsu

Network Center Building1 Unit 2019/09 2020/07

Installed &

adjusted

Software for simultaneous notification systemIkata Power Station, Takamatsu

Network Center Building1 Unit 2019/09 2020/07

Delivered &

adjusted

Mobile terminal for power distribution maintenance mobile

system

Takamatsu Network Center

Building150 Set 2019/09 2020/03

Delivered &

unloaded

Server for authentication systemTakamatsu Network Center

Building1 Unit 2019/10 2019/12

Installed &

adjusted

Virtualization software (VMWare) Head Office 1 Unit 2019/10 2019/12Delivered &

unloaded

Virtualization software (VMWare) Information Communication Dept. 1 Unit 2019/10 2020/01Delivered &

unloaded

Server equipmentTakamatsu Network Center

Building1 Unit 2019/10 2020/01

Installed &

adjusted

Operation control software (Systemwalker) Information Communication Dept. 1 Unit 2019/10 2020/01Delivered &

unloaded

OS for server (Windows Server Datacenter) Information Communication Dept. 1 Unit 2019/10 2020/01Delivered &

unloaded

Digital multiple wireless unit (6.5G-26M)Shingai Power Station, Kochi

Branch1 Unit 2019/10 2020/08

Delivered &

adjusted

Digital multiple wireless unit (6.5G-104M)Rokuro Radio Station, Kokufu

Substation2 Piece 2019/11 2020/09

Delivered &

adjusted

Digital terminal equipment (SDH) Kubokawa Office and others 1 Unit 2020/01 2020/10Delivered &

adjusted

Mobile radio device for 400MHz band digital power

distribution (base station, fixed station, etc.)

IkedaBranch, Umaji Radio Station,

Okubo Radio Station1 Unit 2020/02 2020/08

Delivered &

adjusted

Mobile radio device for 400MHz band digital power

distribution (base station, etc.)

Ikata Power Station, Ikata Radio

Station1 Unit 2020/02 2020/08

Delivered &

adjusted

IP type digital information transmission unit Toyo Substation 1 Rack 2020/02 2020/10Delivered &

adjusted

Page 16: 1. Materials and Equipment for Hydroelectric Power Stations · Materials and Equipment for Hydroelectric Power Stations ... Replacement of dam spillway gate electric motor Nagasawa

16 / 19

8. Wires and CablesQuotation Date Delivery Date

Year/Mon. Year/Mon.

187kV CV400mm2 Takamatsu Branch 2.1 km 2018/04 2018/08Installed &

adjusted

187kV CV800mm2 Takamatsu Branch 5.1 km 2018/04 2020/06Installed &

adjusted

CVT500mm2, cable fitting Tokushima Branch 0.1 km 2018/10 2020/04Installed &

adjusted

CVT400mm2, cable fitting Tokushima Branch 3.5 km 2018/10 2020/03Installed &

adjusted

ACSR/AC 120mm2 Matsuyama Branch 52.2 km 2019/02 2019/08Delivered &

unloaded

ZTACIR/AC(SB) 330mm2 Matsuyama Branch 18 km 2019/02 2019/08Delivered &

unloaded

SL-TACSR/HRAC 330mm2 Takamatsu Branch 12.6 km 2019/03 2019/10Delivered &

unloaded

66kV CV2000mm2 Takamatsu Branch 7.5 km 2019/03 2021/12Installed &

adjusted

(Reference) For fiscal 2019

Cable 66kV(200sq,100sq)×8 wires 6kV(600sq)×6 wiresMinamiinoue Substation and

others1 Unit 2019/07 2020/07

Delivered &

unloaded

CVT 66KV power cable Nishitoori Substation 1 Unit 2020/01 2021/09 Free on truck

CVT250, accessory Tokushima Branch 0.1 km 2019/05 2020/11Installed &

adjusted

SL-ACSR 120mm2 Takamatsu Branch 20 km 2019/07 2019/12Delivered &

unloaded

XTACIR 85mm2 Matsuyama Branch 67.1 km 2019/08 2020/02Delivered &

unloaded

SL-TACSR/AC 330mm2 Matsuyama Branch 16.2 km 2019/12 2020/05Delivered &

unloaded

ZTACIR/AC 380mm2 Niihama Branch 47 km 2020/02 2020/09Delivered &

unloaded

SL-ACSR 330mm2 Tokushima Branch 26.4 km 2020/03 2020/09Delivered &

unloaded

SL-TACSR/HRAC 330mm2 Takamatsu Branch 23.9 km 2020/03 2020/10Delivered &

unloaded

Item name/Product name (Specification etc.) Branch/Station Qty Unit Delivery Condition

Page 17: 1. Materials and Equipment for Hydroelectric Power Stations · Materials and Equipment for Hydroelectric Power Stations ... Replacement of dam spillway gate electric motor Nagasawa

17 / 19

9. Materials and Equipment for Power FeedingQuotation Date Delivery Date

Year/Mon. Year/Mon.Kawauchi Substation Ozu Replacement of 187kV Ozu

southern main line relay (Icr)Matsuyama Branch 1 Pair 2018/04 2019/11

Delivered &

adjusted

Hiromi Substation Uwajima Installation of southern line

relay (Icr)Matsuyama Branch 1 Pair 2018/04 2019/06 Free on truck

Uwajima Substation Uwajima Installation of southern line

relay (Icr)Matsuyama Branch 1 Pair 2018/04 2019/06 Free on truck

Ozu Substation Replacement of 187kV Ozu southern

main line relay (Icr)Matsuyama Branch 1 Pair 2018/04 2019/11

Delivered &

adjusted

Saijo Substation Replacement of 66kVTPS relay Niihama Branch 1 Pair 2018/04 2019/10 Free on truck

Mishima Substation Replacement of 187kV Mishima

eastern line relay (Icr)Niihama Branch 1 Pair 2018/04 2020/04 Free on truck

Mishima Substation Replacement of 66kV No.1, No.2,

No.3, No.4 TPSNiihama Branch 1 Pair 2018/04 2020/11 Free on truck

Mishima Substation Replacement of Mishima link line

backup relayNiihama Branch 1 Pair 2018/06 2020/02 Free on truck

Takamatsu Substation Replacement of 187kV automatic

oscillographTakamatsu Branch 1 Pair 2018/06 2019/10

Delivered &

adjusted

Kokufu Substation Replacement of 187kV automatic

oscillographTokushima Branch 1 Pair 2018/07 2019/11

Delivered &

adjusted

Ikawa Substation Installation of tie transformer OLR Tokushima Branch 1 Pair 2018/07 2020/03 Free on truck

Kochi Substation Installation of tie transformer OLR Kochi Branch 1 Pair 2018/07 2020/04 Free on truck

Ikawa Substation Replacement of 187kV Mishima

eastern line relay (Icr)Tokushima Branch 1 Pair 2018/08 2020/04 Free on truck

Shingai Power Station Replacement of in-station NW

facilities 66kVTPSKochi Branch 1 Pair 2018/08 2020/04 Free on truck

Sakaide Substation Replacement of 66kV Takamatsu-

Sakaide line backup relay (general-purpose)Takamatsu Branch 1 Pair 2018/11 2020/04 Free on truck

Sakaide Substation Replacement of 66kV No.1 and No.2

TPSTakamatsu Branch 1 Pair 2019/01 2020/10 Free on truck

Naruto Substation Replacement of 187kV automatic

oscillographTokushima Branch 1 Pair 2019/02 2020/05

Delivered &

adjusted

Misho Substation Replacement of Misho line relay Matsuyama Branch 1 Pair 2019/02 2020/05 Free on truck

Ikawa Substation Replacement of 187kV automatic

oscillographTokushima Branch 1 Pair 2019/03 2020/04

Delivered &

adjusted

(Reference) For fiscal 2019

Tomioka Substation: Installation of Tatsumi Line relay

(Icr)Tokushima Branch 1 Pair 2019/04 2020/05 Free on truck

Tatsumi Substation: Installation of Tatsumi Line relay

(Icr), etc.Tokushima Branch 1 Pair 2019/04 2020/05 Free on truck

Naruto Substation Installation of Saita line relay (Icr) Tokushima Branch 1 Pair 2019/04 2021/04 Free on truck

Saita Substation Installation of Saita line relay (Icr) Tokushima Branch 1 Pair 2019/04 2021/04 Free on truck

Ozu Substation Replacement of Ikata southern main line

relayMatsuyama Branch 1 Pair 2019/04 2020/12 Free on truck

Ikawa Substation Replacement of Anan main line 1, 2L

relayTokushima Branch 1 Pair 2019/05 2020/11 Free on truck

Shimoji Substation Replacement of Shimoji link line relay Kochi Branch 1 Pair 2019/05 2020/10 Free on truck

Matsuyama Substation Replacement of tie transformer

LSTMatsuyama Branch 1 Pair 2019/06 2020/10 Free on truck

Shingai Power Station In-station NW facilities,

replacement of 187kV oscillographKochi Branch 1 Pair 2019/07 2020/10

Delivered &

adjusted

Anan AD/DC Converter Maintenance Office:

Replacement of 500kVBP BT relayTokushima Branch 1 Pair 2019/09 2021/05 Free on truck

Awa Substation Replacement of 187kVBP BT relay Tokushima Branch 1 Pair 2019/09 2021/04 Free on truck

Yusuhara Second Power Station: In-station NW facilities,

replacement of Yusuhara line relayKochi Branch 1 Pair 2019/09 2020/12 Free on truck

Ehime Hydropower Stations & Substations Operating

Office System renewal (a software)Power System Operation Dept. 1 Unit 2019/09 2023/03

Installed &

adjusted

Ehime Hydropower Stations & Substations Operating

Office System renewal (hardware)Power System Operation Dept. 1 Unit 2019/09 2023/03

Installed &

adjusted

Kochi Hydropower Stations & Substations Operating

Office System renewal (a software)Power System Operation Dept. 1 Unit 2019/09 2024/03

Installed &

adjusted

Kochi Hydropower Stations & Substations Operating

Office System renewal (hardware)Power System Operation Dept. 1 Unit 2019/09 2024/03

Installed &

adjusted

Saijo Substation Replacement of Kawauchi main line

relayNiihama Branch 1 Pair 2019/10 2021/05 Free on truck

Kagawa Substation Replacement of 187kV oscillograph Takamatsu Branch 1 Pair 2019/12 2021/03Delivered &

adjusted

Item name/Product name (Specification etc.) Branch/Station Qty Unit Delivery Condition

Page 18: 1. Materials and Equipment for Hydroelectric Power Stations · Materials and Equipment for Hydroelectric Power Stations ... Replacement of dam spillway gate electric motor Nagasawa

18 / 19

Quotation Date Delivery Date

Year/Mon. Year/Mon.Item name/Product name (Specification etc.) Branch/Station Qty Unit Delivery Condition

Replacement of meter inspection handy terminal Power System Operation Dept. 565 Set 2019/12 2019/12Delivered &

adjusted

Harami Substation Replacement of transmission line

relayKochi Branch 1 Pair 2020/01 2021/05 Free on truck

Asa Substation Replacement of 187kV oscillograph Takamatsu Branch 1 Pair 2020/01 2021/04Delivered &

adjusted

Kawauchi Substation Replacement of Kawauchi main

line relayMatsuyama Branch 1 Pair 2020/02 2021/05 Free on truck

Page 19: 1. Materials and Equipment for Hydroelectric Power Stations · Materials and Equipment for Hydroelectric Power Stations ... Replacement of dam spillway gate electric motor Nagasawa

19 / 19

10. OthersQuotation Date Delivery Date

Year/Mon. Year/Mon.

Renewal of printer for mobile collection terminalsResidential Customer Service

Dept.200 Set 2018/06 2018/09

Delivered &

unloaded

(Reference) For fiscal 2019

Renewal of mobile collection terminalsResidential Customer Service

Dept.200 Set 2019/06 2019/12

Delivered &

unloaded

Emergency food General Affairs Dept. 2,637 Box 2019/11 2020/02Delivered &

unloaded

Item name/Product name (Specification etc.) Branch/Station Qty Unit Delivery Condition