1. mothkur new sc colony.xls
TRANSCRIPT
-
8/10/2019 1. Mothkur new SC colony.xls
1/66
S. No. DesriptionAmount
(Lakhs)Length
1 Construction of Pucca internrnal roads with drains, culvert innew SC colony of Mothkur (v).
25.00 310.00
2Construction of Pucca Internal roads, drains in old SC colony
of Mothkur(v).25.00 340.00
3Construction of Pucca Internal roads, drains in ST-SC-BC
colony of Mothkur(v).25.00 340.00
4Construction of Pucca Internal roads, drains in General
colony of Mothkur(v).50.00 700.00
TOTAL 125.00 1690.00
Lakhs Mt
GENERAL ABSTRACT (Work Done)Construction of Pucca Internal roads or streets including side drains,
culverts in Mothkur village.
-
8/10/2019 1. Mothkur new SC colony.xls
2/66
SC
990.00
700.00
1690.00
Mt
-
8/10/2019 1. Mothkur new SC colony.xls
3/66
S.No
Materials
GSB
(Gravel+Stone
dust)
WBM GrII
Sand forfilling
PCCM10
PCC M15
1384.08 520.84
584.40 22.50 672.06 18.22 267.85
1 CW01.Amount for wage
com onent2
CW02.cement(Work done)
CW02.cement 3.936 #REF!
3CW03.sand for filling #REF!
4 .san or mortar or
done)
CW04.sand for mortar 8.20 #REF!
5 . ra e e a : or
done) 630.20
6CW05.Grade III Metal: 27.23
7 CW07.20mm to 12mm HBG/HBT
graded Metal:(Work done)
CW07.20mm to 12mm HBG/HBT
graded Metal: #REF!
8 CW08.Graded Metal (40mm +
20mm +10mm) #REF!
9
CW09.40 mm nominal HBGMetal 16.398
11 CW11.VAT@5% (except on labourcharges)
13CW13.Seignorage charges
INPUT DATA SHEET
Name of Work: Name of the Work:Providing CC Roads and CC D
mailto:CW11.VAT@5%25%20(except%20on%20labour%20charges)mailto:CW11.VAT@5%25%20(except%20on%20labour%20charges)mailto:[email protected]%25mailto:[email protected]%25mailto:CW11.VAT@5%25%20(except%20on%20labour%20charges)mailto:CW11.VAT@5%25%20(except%20on%20labour%20charges) -
8/10/2019 1. Mothkur new SC colony.xls
4/66
14CW14.cost of NP, other Pipes
15CW15.LS amount
10 CW10.Cost towards skilled
labour, sami skilled labour other
equipments & material charges
including all other materials not
Supply of Gravel for sub base
(work done) 1218.43
Supply of stone dust for sub
base (work done) 484.43
Supply of Gravel for shoulders 496.74
Supply of stone dust forshoulders 204.54
Supply of Gravel for sub base #REF!
Supply of stone dust for sub
base #REF!
Compaction of Granual soil
(work done) 1153.38
Compaction of Granual soil 48.00
Screenings(Work done) 130.40
Compaction of WBM(Work done) 520.84
Screenings 5.40
Compaction of WBM 22.50
Centering & labour charges M15
side drain bed 267.85Centering & labour charges M15
side drain side walls #REF!
Centering & labour charges M10
PC bed 18.22
Centering & labour charges M15
PC side walls #REF!
-
8/10/2019 1. Mothkur new SC colony.xls
5/66
-
8/10/2019 1. Mothkur new SC colony.xls
6/66
M30 CC
pavemen
t
RCCM20
TotalQty
MaterialRate
Amount
892.12
30.00 24.75
43673.00 143673.00
312.24 6244.84 275.00 1717331.00
10.50 8.168 #REF! 300.00 #REF!
#REF! 355.18 #REF!
401.45 401.45 1331.32 534458.00 1376.7
13.50 11.14 #REF! 1455.18 #REF! 1376.7
630.20 1440.00 907488.00 1566.7
27.23 1550.00 42207.00 2151.7
802.91 802.91 1730.00 1389031.00
27.00 22.28 #REF! 2030.00 #REF!
#REF! 1430.00 #REF! 1763.11
16.40 1645.00 26975.00
#REF!
72477.00
257263.00
ains in Jammi Nagar (ST colony) at Velugodu.
-
8/10/2019 1. Mothkur new SC colony.xls
7/66
251802.00
25611.00
1218.43 209.21 254908.00
484.43 1044.21 505847.00
496.74 241.86 120142.00
204.54 1172.11 239743.00
#REF! 241.86 #REF!
#REF! 1172.11 #REF!
1153.38 110.46 127402.00
48.00 131.12 6294.00
130.40 1310.46 170884.00 151.24
520.84 315.60 164377.00
5.40 1410.00 7614.00
22.50 368.63 8294.00
267.85 880.16 235751.00
#REF! 2897.48 #REF!
18.22 838.25 15273.00
#REF! 1352.09 #REF!
-
8/10/2019 1. Mothkur new SC colony.xls
8/66
24.75 24.75 1206.81 29869.00
892.12 892.12 1280.83 1142654.00
30.00 30.00 1438.01 43140.00
189000.00
10688.00
5000.00
#REF! -16184000 #REF!
Assistant Executive EngineerM.P. Velugodu.
-
8/10/2019 1. Mothkur new SC colony.xls
9/66
Work ID :
:
: 25.00 lakhs
:
:
:
:
:
:
:
PANCHAYATRAJ ENGINEERING DEPARTMENT
DETAILED ESTIMATE
NAME OF SUB.DIVISION PRI., ATMAKUR
NAME OF THE WORK Construction of Pucca internrnal roads withdrains, culvert in new SC colony of Mothkur
(v).
ESTIMATE COST
NAME OF THEGRANT MGNREGS
NAME OF ASMB.CONSTITUENCY ATMAKUR
NAME OF DISTRICT / CIRCLE KURNOOL
NAME OF THE VILLAGE MOTHKUR
NAME OF THE MANDAL VELUGODU
NAME OF THE DIVISION PR : NANDYAL
-
8/10/2019 1. Mothkur new SC colony.xls
10/66
Est Cost Rs : 25.00 Lakhs
1
2
3
4
5
Providing of WBM surface over Granular Sub base.
SPECIFICATION REPORT
Specification report to accompany the Detailed estimate for the work
Construction of Pucca internrnal roads with drains, culvert in new SC colony of Mothkur
(v).
The above work is proposed for sanction under under MGNREGS
The following provisions are made in the estimate.
The estimate is prepared as per standards of MORD with current S.S.R. of2014-15 and RSSR and the work will be executed as per A.P.S.S Standards .
CC pavement using M30 grade with 3.00Mts width and 170mm thick.
Providing RCC M- 20 for slabs over drains for cross roads
Provision for VAT and Q.C. Charges
Provision for Seigniorage charges
Assistant Executive EngiM.P. Velugodu.
Dy. Executive EngineerPRI(P.R), Atmakur.
Executive EngineerP.R.Division, Nandyal.
Superintending EngineerP.R. Kurnool.
-
8/10/2019 1. Mothkur new SC colony.xls
11/66
Pop Estimate Cost : 25.00 Lakhs
L B D
1
for road work 1 x 1 310.00 3.50 0.18 195.30
shouders 1 x 2 310.00 0.50 0.120 37.20
310.00 Total 232.50 500.58 116385
2
for road work 1 x 1 310.00 3.50 0.10 108.50
shouders 1 x 2 310.00 0.50 0.120 37.20Total 145.70 20.51 2988
3
for road work 1 x 1 310.00 3.50 0.15 162.75
Total 162.75 199.72 325044
For Base course 1 x 1 310.00 3.20 0.075 74.40
Total 74.40 2122.88 1579425
For Base course 1 x 1 310.00 3.20 0.075 74.40
Total 74.40 487.84 36295
Side Drian:
Construction of Pucca internrnal roads with drains, culvert in new SC colony of Mothkur
(v).Population of the locality
Sl.
No.Task Name Nos
Measurements Quantity
(cum)
Rate per (1
cum)Amount
CC16- Supply and collection of well graded granular material (i.e. 66%
(61%-71%)of gravel having stone aggregate of 9.5 mm to 4.75 mm size,
and 34%(29%-39%) of stone dust of size less than 2.6 mm) with CBR
not
-
8/10/2019 1. Mothkur new SC colony.xls
12/66
Pop Estimate Cost : 25.00 Lakhs
L B D
Population of the localitySl.
No.Task Name Nos
Measurements Quantity
(cum)
Rate per (1
cum)Amount
6
For side drain 1 x 2 310.00 0.55 0.60 204.60
Total 204.60 99.25 203077
For side drain 1 x 2 310.00 0.55 0.23 78.43
Total 78.43 415.77 326098
For side drain 1 x 2 310.00 0.55 0.23 78.43
Total 78.43 20.51 16099
For side drain bed 1 x 2 310.00 0.55 0.10 34.10
Total 34.10 5062.79 17264110
side walls of side drain 1 x 2 310.00 0.55 0.45 153.45
Deductions 1 x -2 310.00
(0.3+0.1)/
2 0.45 -55.80
97.65 7191.77 702276
Total 0.00 5354.88 011
For slabs over drain 1 x 2 75.00 150.00 46.2 6930
Labour charges for fitting1 x 2 75.00 150.00 49.28 7392
Kg Kg12
For slabs over drain 1 x 2 5.00 0.55 0.15 0.83
CC 33 Earth work in excavation for side drain structure as per drawing
and technical specification clause 305.1 including setting out,
construction of shoring and bracing, removal of stumps and other
deliterious material and diposal up to a lead of 50 , dressing of sides
and bottom and back filling in trenches with excavated suitable
material as per technical specification 305 MORD/304 MORTh.(CSSR)
CC07-Cost and conveyance of sand for filling including all charges but
excluding labour charges for filling.
CC09.Engaging unskilled labour for Filling foundation with sand
includin cost and conve ance of sand and labour char es RSSR
Providing plain cement concrete M15 using 20 mm to 12 mm Graded
HBG crushed Metal with 250 Kgs of cement per 1 cum of concrete,
including C/c of all materials, curing, labour charges etc., complete as
per drawings & tech. specifications Clause 802,803,1202 & 1203 as per
caluse 800 & 1200 (1) of MORD and guidelines For side drains.
Providing plain cement concrete M15 using 20 mm to 12 mm Graded
HBG crushed Metal with 250 Kgs of cement per 1 cum of concrete,
including C/c of all materials, curing, labour charges etc., complete as
per drawings & tech. specifications Clause 802,803,1202 & 1203 as per
caluse 800 & 1200 (1) of MORD and guidelines For side walls of side
CC58Supplying, fitting and placing HYSD bar reinforcement in slab
over drain complete and technical specifications including fabrication
RCC M-20 Nominal mix using 20 mm to 12 mm Graded size crushed
hard granite metal including C/c of all materials, taxes, operational,
incidental and labour charges such as machine mixing, laying concrete,
curing etc., complete but excluding cost of steel and its fabrication
charges for finished item of work for Slab over drain.
-
8/10/2019 1. Mothkur new SC colony.xls
13/66
Pop Estimate Cost : 25.00 Lakhs
L B D
Population of the localitySl.
No.Task Name Nos
Measurements Quantity
(cum)
Rate per (1
cum)Amount
Total 0.83 5819.63 480113
For C C pavement 1 x 1 310.00 3.00 0.170 158.10
Total 158.10 6092.95 963295
2262974
14
5% 2262974 11314915
0.50% 2262974 11315
16 79936
17 32626
Grand Total 2500000
Construction of un-reinforced, dowel jointed at expansion and
construction joint only,PCC pavement thickness as per design over a
prepared sub base using M30 grade, coarse and fine aggregates
confirming to IS 383 including all labour charges etc. complete (CSSR)
VAT @ 5%
QC Charges @ 0.50%
Seigniorage charges
Provision for unforseen items
Assistant Executive EngineerM.P. Velugodu.
Dy. Executive EngineerPRI(P.R), Atmakur.
Executive EngineerP.R.Division, Nandyal.
Superintending EngineerP.R. Kurnool.
-
8/10/2019 1. Mothkur new SC colony.xls
14/66
Sl.
Nocription of i No
L B D QTY RATE AMOUNT Qty Rate Amount
1 2 3 4 5 6 7 8 9 10 11 12 13
1
535.24 80.47 43071.00 535.24 80.47 43071.00 0.00Page 1,5 of Cum
2
for sub base 598.97 452.75 271184.00 598.97 452.75 271184.00 0.00Page 7 of MB Cum Cum
3
Page 7 of MB 598.97 16.64 9967.00 598.97 16.64 9967.00 0.00Cum Cum
Engaging Unskilled Labour for earth work excavation inordinary soils AT SITE with initial lead & initial lift
and sectioning for formation of embankment - (RSSR)
CC 16- Supply and collection of well graded granular
material (i.e. 66% (61%-71%)of gravel having stone
aggregate of 9.5 mm to 4.75 mm size, and 34%(29%-
39%) of stone dust of size less than 2.6 mm) with CBR
not
-
8/10/2019 1. Mothkur new SC colony.xls
15/66
4
Page 9 of MB 499.14 110.46 55135.00 499.14 110.46 55135.00 0.00Cum Cum
Part 'B' - WORK TO BE DONE AS PER SSR 2013-14
5
737.96 80.47 59384.00 0.00 99.25 0.00 0.00Cum Cum
6
2456.71 452.75 1112275.00 232.50 500.58 116385.00 0.00 9Cum Cum
Engaging Unskilled Labour for earth work excavation in
ordinary soils AT SITE with initial lead & initial lift
and sectioning for formation of embankment - (RSSR)
CC16- Supply and collection of well graded granular
material (i.e. 66% (61%-71%)of gravel having stoneaggregate of 9.5 mm to 4.75 mm size, and 34%(29%-
39%) of stone dust of size less than 2.6 mm) with CBR
not
-
8/10/2019 1. Mothkur new SC colony.xls
16/66
7
2456.71 16.64 40880.00 145.70 20.51 2988.00 0.00Cum Cum
8
1410.66 110.46 155822.00 162.75 199.72 32504.00 0.00 1Cum Cum
9
895.22 2063.11 1846937.00 74.40 2122.88 157942.00 0.00 16Cum Cum
CC24-Engaging Unskilled labour for spreading the
collected well graded granular material and sectioning
for sub base & shoulders. (RSSR)
CC25-Compaction of collected well graded granular soil
to OMC using 8-l0T Power Road Roller to achieve CBRvalue not
-
8/10/2019 1. Mothkur new SC colony.xls
17/66
10
895.22 315.60 282531.00 74.40 487.84 36295.00 0.00 2Cum Cum
11
4999.18 80.47 402284.00 204.60 99.25 20307.00 0.00 3Cum Cum
12
1474.12 313.44 462048.00 78.43 415.77 32609.00 0.00 4Cum Cum
13
1474.12 16.64 24529.00 78.43 20.51 1609.00 0.00
CC30-Spreading & compaction of collected mixer of
stone aggregates in uniform thicknesses and good
gravel for blindage, hand packing and rolling with 8-l0T
Power Road Roller in stages to proper grade and
camber with required waterings and keeping the rolled
surface wet for a period of 15 days including brooming
(91 mm loose to 75 mm compacted) (CSSR)
CC 33 Earth work in excavation for side drain
structure as per drawing and technical specification
clause 305.1 including setting out, construction of
shoring and bracing, removal of stumps and other
deliterious material and diposal up to a lead of 50 ,
dressing of sides and bottom and back filling in
trenches with excavated suitable material as per
technical specification 305 MORD/304 MORTh.(CSSR)
CC07-Cost and conveyance of sand for filling including
all charges but excluding labour charges for filling.
CC09.Engaging unskilled labour for Filling foundation
with sand including cost and conveyance of sand and
labour charges (RSSR)
-
8/10/2019 1. Mothkur new SC colony.xls
18/66
Cum Cum
14
503.58 3965.72 1997057.00 34.10 5062.79 172641.00 0.00 18Cum Cum
15
1442.07 5759.19 8305155.00 97.65 7191.77 702276.00 0.00 760.00 5354.88 0.00 0.00
Cum Cum
16
HYSD bars 4500.00 46.20 207900.00 150.00 46.20 6930.00 0.00 2
For Labour & Bindin wire 4500.00 2.56 11520.00 150.00 49.28 7392.00 0.00
Kg Kg
CC58Supplying, fitting and placing HYSD bar
reinforcement in slab over drain complete and
technical specifications including fabrication charges
Providing plain cement concrete M15 using 20 mm to 12
mm Graded HBG crushed Metal with 250 Kgs of
cement per 1 cum of concrete, including C/c of all
materials, curing, labour charges etc., complete as per
drawings & tech. specifications Clause 802,803,1202 &
1203 as per caluse 800 & 1200 (1) of MORD and
Providing plain cement concrete M15 using 20 mm to 12
mm Graded HBG crushed Metal with 250 Kgs of
cement per 1 cum of concrete, including C/c of all
materials, curing, labour charges etc., complete as per
drawings & tech. specifications Clause 802,803,1202 &
1203 as per caluse 800 & 1200 (1) of MORD and
guidelines For side walls of side drains.
-
8/10/2019 1. Mothkur new SC colony.xls
19/66
17
29.70 4511.38 133988.00 0.83 5819.63 4801.00 0.00 1Cum Cum
17
0.00 1348.05 0.00 0.00Cum
18
1456.50 4871.92 7095951.00 158.10 6092.95 963295.00 0.00 61Cum Cum
19
1.00 4500.00 3500.00 1.00 5000.00 5000.00 1500.00
Construction of un-reinforced, dowel jointed at
expansion and construction joint only,PCC pavement
thickness as per design over a prepared sub base usingM30 grade, coarse and fine aggregates confirming to
IS 383 including all labour charges etc. complete
CSSR
CRW16.Supply and fixing of MS name board of size
2feet.6inch x4feet including painting and required
lettering
RCC M-20 Nominal mix using 20 mm to 12 mm Graded
size crushed hard granite metal including C/c of all
materials, taxes, operational, incidental and labour
charges such as machine mixing, laying concrete, curing
etc., complete but excluding cost of steel and its
fabrication charges for finished item of work for Slab
Providing and laying reinforced cement concrete pipe
NP3 for culverts on first class bedding of granular
material with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete and
masonry works in head wall and parapets. Tech
-
8/10/2019 1. Mothkur new SC colony.xls
20/66
No. No.
20 922956.00 113149.00 0.00 8
21 112918.00 11315.00 0.00 1
22 436897.00 79936.00 0.00 3
23 1102111.00 32626.00 0.00 10
Total 25096000.00 2879357.00 1500.00 222
QC Charges @ 0.50%
VAT @ 5%
Seigniorage charges
Provision for unforseen items
-
8/10/2019 1. Mothkur new SC colony.xls
21/66
As per Original Estimate 25096000.00 Excess 1500.00
As per Work done Estimate 2879357.00 Less 22218143.00
Difference -22216643.00 22216643.00
-
8/10/2019 1. Mothkur new SC colony.xls
22/66
15
mar
-
8/10/2019 1. Mothkur new SC colony.xls
23/66
-
8/10/2019 1. Mothkur new SC colony.xls
24/66
-
8/10/2019 1. Mothkur new SC colony.xls
25/66
-
8/10/2019 1. Mothkur new SC colony.xls
26/66
-
8/10/2019 1. Mothkur new SC colony.xls
27/66
-
8/10/2019 1. Mothkur new SC colony.xls
28/66
-
8/10/2019 1. Mothkur new SC colony.xls
29/66
-
8/10/2019 1. Mothkur new SC colony.xls
30/66
Sl.
No.Description of material Name of the quarry Lead in Km
Conveyance
charges
(excluding Conc.
Profit)
Initial RateBlasting
charges
Machine
crushing
charges
1 2 3 4 5 6 7 8
1 Gravel Banakacherla 19.00 228.51 103.00
2 Sand for filling Local 5.00 73.77 342.00
3 Sand for Concrete Sunkesula 121.00 1187.81 462.00
4 HBG Stone Chips 2.36mm and below yanganti palli 81.00 819.82 357.00
WBM Grade II metal
5 60-63mm metal (50% of 435.60) yanganti palli 81.00 819.82 419.00
6 40-45mm metal (40% of 435.60) yanganti palli 81.00 819.82 845.00
7 19-22mm metal (4% of 435.60) yanganti palli 81.00 819.82 1365.00
Cement concrete Metal
8 20mm M/c HBG metal (60%) yanganti palli 81.00 819.82 1365.00
9 12mm M/c HBG metal (40%) yanganti palli 81.00 819.82 1097.00
10 9.50-11.20mm HBG M/c metal yanganti palli 81.00 819.82 935.00
11 40mm M/C HBG metal yanganti palli 81.00 819.82 845.00
12 10mm M/c HBG metal yanganti palli 81.00 819.82 935.00
Type B screens
13 HBG Stone Chips 5-7mm yanganti palli 81.00 819.82 735.00
14 HBG Stone Chips 2.36-5mm yanganti palli 81.00 819.82 474.00
15 Cement At Site 5900.00
16 450 mm dia NP3 class S&S pipes Gopavaram 43.00 124.68 1284.00
17 Steel At Site 44000.00
Certified that the above leads are true and correct to the best of my knowledge.
LEAD STATEMENT (SSR 2014-2015)
Construction of Pucca internrnal roads with drains, culvert in new SC colony of Mothkur (v).
Assistant Executive EnM.P. Velugodu.
Dy. Executive EngineerPRI(P.R), Atmakur.
Executive EngineerP.R.Division, Nandyal.
Superintending EngineerP.R. Kurnool.
-
8/10/2019 1. Mothkur new SC colony.xls
31/66
Index-
codeDescription Unit Quantity Rate Rs. Amount Rs.
2 3 4 5 6
1
Rate as per Current RSSR Cum 1.00 99.25 99.25
Net rate 99.25
2
Rate per 1.00 Cum loose 20.51
3
Sand cum 1.00 415.77 415.77415.77
4
Taking Output =1 Cum
Gravel @ 80% Cum 0.96 331.51 318.25
Stone dust @ 20% Cum 0.24 1176.82 282.44
Rate per 1.00 Cum 600.69Loose Rate per 1.00 Cum 500.58
5 Engaging Unskilled labour for spreading the
collected well graded granular material and
sectionin for sub base & shoulders. RSSRRate as sper RSSR Cum 1.20 20.51 24.61
Rate per 1.00 Cum loose 24.61
6
Tractor with Rotavator 25 cum per hour Hrs 12.00 422.00 5064.00
Water tanker 6 Kl Capacity Hrs 5.00 658.35 3291.75
Three wheeled 8-10 T roller @10cum /Hr. Hr 30.00 1718.70 51561.00
Rate per 300 Cum 59916.75
Rate per 1.00 Cum Compact 199.72
Engaging Unskilled Labour for earth work excavation in ordinary soils AT SITE with
initial lead & initial lift and sectioning for formation of embankment - (RSSR)
Engaging Unskilled Labour for filling/spreding with gravel/sand/stone dust but
excluding conveyance of sand(RSSR)
Cost and conveyance of sand for filling including all charges but excluding labour
charges for filling
CC 16- Supply and collection of well graded granular material (i.e. 66% (61%-71%)of
gravel having stone aggregate of 9.5 mm to 4.75 mm size, and 34%(29%-39%) of
stone dust of size less than 2.6 mm) with CBR not
-
8/10/2019 1. Mothkur new SC colony.xls
32/66
Index-
codeDescription Unit Quantity Rate Rs. Amount Rs.
2 3 4 5 6
S.
No
1
7
Taking Output =360 Cum 435.60 1472.00 641203.20
60-63mm IRC HBG metal(50% of 435.60 cum) Cum 217.80
40-45mm IRC HBG metal(46% of 435.60 cum) Cum 200.38
19-22mm irc METAL m/C (4% OF 435.60 cum) Cum 17.42
Stone Screening
Type B 11.2 mm for Grading 2 @ 0.18 / 0.20
cum/10sqm cum 86.401424.00
123033.60
Rate per 360.00 Cum Compact 764236.80
i. Total Rate per 1.00 Cum Compact 2122.88
ii.Graded metal Rate per 1.00 Cum excluding screening 1781.12
iii. screens (i-ii) cum 341.76
8
(a) MaterialBinding material ( Gravel)@ 0.06cum /10 sqm for
WBM Grading II Cum 28.80 331.51 9547.49
Water kl 144.00 77.00 11088.00
(b) Labour
Mazdoor(skilled) days 12.08 295.00 3563.60
Mazdoor(Unskilled) days 250.00 295.00 73750.00
Water tanker 6Kl capacity Hrs 24.00 658.35 15800.40
three wheeled 8-10T static roller Hrs 36.00 1718.70 61873.20
Rate per 360 Cum 175622.69
Rate per 1.00 Cum 487.84
9
Unit = cum
(a) Material
Cement t 0.25 5900.00 1475.00
Coarse sand cum 0.48 1649.81 791.91
20 mm aggregate @0.54 cum 0.90 2077.00 1869.30
12 mm [email protected] cum
sub total for material 4136.21
Taking Output = 360 Cum
Providing plain cement concrete M15 using 20 mm to 12 mm Graded HBG crushed
Metal with 250 Kgs of cement per 1 cum of concrete, including C/c of all materials,
curing, labour charges etc., complete as per drawings & tech. specifications Clause
802,803,1202 & 1203 as per caluse 800 & 1200 (1) of MORD and guidelines For
side drains Bed.
Supply and collection of mixer of stone aggregates having 50% of 60-63mm HBG
metal ,46% of 40-45mm HBG metal and 4% of 19-22mm HBG metal including cost
,conveyance, loading, unloading and stacking to departmental gauge for pre
measurements for WBM Grade.II surfaces per MORD standards (91 mm loose to75 mm com acted) (CSSR)
CC30-Spreading & compaction of collected mixer of stone aggregates in uniform
thicknesses and good gravel for blindage, hand packing and rolling with 8-l0T Power
Road Roller in stages to proper grade and camber with required waterings and
keeping the rolled surface wet for a period of 15 days including brooming (91 mm
loose to 75 mm com acted CSSR
-
8/10/2019 1. Mothkur new SC colony.xls
33/66
Index-
codeDescription Unit Quantity Rate Rs. Amount Rs.
2 3 4 5 6
S.
No
1
(b) Labour
Mate day -
Mason (1st Class) day 0.10 385.00 38.50
Mazdoor (Unskilled) day 1.39 295.00 410.05
sub total for labour 448.55
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.40 328.60 131.44
Vibrator charges hour 0.40 165.70 66.28
Water tanker 6 kl capacity hour 0.13 658.35 85.59
sub total for mechinery 283.31
(d) Formwork @ 4% on cost of material, labour and
machiner (a+b+c) 4.00% 4868.07 194.72
Rate per cum = a+b+c+d+e+f 5062.79
Supply & delivery of Cement kg 1475.00
Supply & collection of metal cum 1869.30Supply & collection of sand cum 791.91
Centering & labour charges 926.58
10
Unit = cum
(a) Material
Cement t 0.25 5900.00 1475.00
Coarse sand cum 0.48 1649.81 791.9120 mm aggregate @0.54 cum 0.90 2077.00 1869.30
12 mm [email protected] cum
sub total for material 4136.21
(b) Labour
Mate day -
Mason (1st Class) day 0.10 385.00 38.50
Mazdoor (Unskilled) day 1.39 295.00 410.05
sub total for labour 448.55
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.40 328.60 131.44
Vibrator charges hour 1.40 165.70 231.98Water tanker 6 kl capacity hour 0.13 658.35 85.59
sub total for mechinery 449.01
(d) Formwork as per plinth beam centering charges
of CSSR 2410.00 2158.00
Rate per cum = a+b+c+d+e+f 7191.77
Supply & delivery of Cement kg 1475.00
Supply & collection of metal cum 1869.30
Supply & collection of sand cum 791.91
Centering & labour charges 3055.56
Providing plain cement concrete M15 using 20 mm to 12 mm Graded HBG crushed
Metal with 250 Kgs of cement per 1 cum of concrete, including C/c of all materials,
curing, labour charges etc., complete as per drawings & tech. specifications Clause
802,803,1202 & 1203 as per caluse 800 & 1200 (1) of MORD and guidelines For
-
8/10/2019 1. Mothkur new SC colony.xls
34/66
Index-
codeDescription Unit Quantity Rate Rs. Amount Rs.
2 3 4 5 6
S.
No
1
11
Unit = cum
a MaterialCement t 0.330 5900.00 1947.00Coarse sand cum 0.450 1649.81 742.41
20 mm aggregate @0.54 cum 0.90 2077.00 1869.30
12 mm [email protected] cum 0.00
sub total for material 4558.71
(b) Labour
Mate day -
Mason (1st Class) day 0.10 385.00 38.50
Mazdoor (Unskilled) day 1.39 295.00 410.05
sub total for labour 448.55
c) Machinery
Concrete mixer 0.4/0.28 cum capacity hr / 0.40 328.60 131.44
Vibrator charges hour 0.40 165.70 66.28
Water tanker 6 kl capacity hour 0.13 658.35 85.59
sub total for mechinery 283.31
Total (a+b+c) 5290.57
d) For formwork and staging add the following
percentage of (a+b+c):
10 per cent 10.00% 5290.57 529.06e&f) Overheads & Contractors Profit
Rate per cum = a+b+c+d+e+f 5819.63
Supply & delivery of Cement kg 1947.00
Supply & collection of metal cum 1869.30
Supply & collection of sand cum 742.41
Centering & labour charges 1260.92
12
(a) Material
HYSD/TMT/ MS bars including 5 per cent foroverla s and wasta e
t 1.05 44000.00 46200.00
(b) Labour
Blacksmith / Bar bender day 2.00 385.00 770.00
Mazdoor (Unskilled) day 6.40 295.00 1888.00
Binding wire kg 6.00 70.00 420.00
Rate per MT of HYSD bars 49278.00
RCC M-20 Nominal mix using 20 mm to 12 mm Graded size crushed hard granite
metal including C/c of all materials, taxes, operational, incidental and labour
charges such as machine mixing, laying concrete, curing etc., complete but
excluding cost of steel and its fabrication charges for finished item of work forSlab over drain.
CC58Supplying, fitting and placing HYSD bar reinforcement in slab over drain
complete and technical specifications including fabrication charges
-
8/10/2019 1. Mothkur new SC colony.xls
35/66
Index-
codeDescription Unit Quantity Rate Rs. Amount Rs.
2 3 4 5 6
S.
No
1
13
Unit = cum
Taking output = 75 cum (172.50 t)
(2147 x 3.00 x 0.17)
a) Labour
Mate day -
Mason (1st class) day 5.00 385.00 1925.00
Mason (2nd class) day 5.00 345.00 1725.00
Mazdoor (Unskilled) day 150.00 295.00 44250.00
Mazdoor (Skilled) day 6.00 295.00 1770.00
Mazdoor (Semi-Skilled) day 6.00 295.00 1770.00
sub total for labour 51440.00
b) Machinery
Concrete mixer 0.28 / 0.4 cum capacity (6 mixers) hour 36.00 328.60 11829.60
Plate vibrator hour 9.00 165.70 1491.30
Water tanker 6 kl capacity hour 5.00 658.35 3291.75
sub total for mechinery 16612.65
c) Material
Crushed stone coarse aggregates, grading will be as
er Clause 1501.2.4.1 (Table 1500.1) of s ecifications
cum 67.50
20 mm aggregate @0.60 cum 67.50 2077.00 140197.50
12 mm [email protected] cum 0.00Sand for concrete @ 0.45 cum/cum of concrete cum 33.75 1649.81 55681.09
Cement @ 350 kg/cum of concrete t 26.25 5900.00 154875.00
Polythene sheet 125 micron (200x3.00x1.10=660) sqm 660.00 20.00 13200.00
Mastic Pad 3x.0.15x28=12.60 sqm 12.60 925.00 11655.00
sub total for material 375608.59
sub total of a+b+c 443661.24
d) Formwork @ 3% of (a+b+c) 0.03 443661.24 13309.84Cost for 75 cum = a+b+c+d+e+f 456971.08
Rate per cum = (a+b+c+d+e+f)/75 6092.95
Supply & delivery of Cement kg 2065.00Supply & collection of metal cum 1869.30
Supply & collection of sand cum 742.41
Centering & labour charges 1416.24
Construction of un-reinforced, dowel jointed at expansion and construction joint
only,PCC pavement thickness as per design over a prepared sub base using M30
grade, coarse and fine aggregates confirming to IS 383 including all labour
charges etc. complete (CSSR)
-
8/10/2019 1. Mothkur new SC colony.xls
36/66
Index-
codeDescription Unit Quantity Rate Rs. Amount Rs.
2 3 4 5 6
S.
No
1
13
Unit = cum
(a) Material
Cement t 0.25 5900.00 1475.00
Coarse sand cum 0.48 1649.81 791.91
20 mm aggregate @0.54 cum 0.90 2077.00 1869.30
12 mm [email protected] cum
sub total for material 4136.21
(b) Labour
Mate day -
Mason (1st Class) day 0.10 385.00 38.50Mazdoor (Unskilled) day 1.39 295.00 410.05
sub total for labour 448.55
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.40 328.60 131.44
Vibrator charges hour 0.40 165.70 66.28
Water tanker 6 kl capacity hour 0.13 658.35 85.59
sub total for mechinery 283.31
(d) Formwork @ 10% on cost of material, labour and
machinery (a+b+c) 10.00% 4868.07 486.81
Rate per cum = a+b+c+d+e+f 5354.88
14
Unit = m
Taking output = 7.5 m
Rate per m
450 mm dia
a) Labour
Mate day -Mason (1st Class) day 0.12 385.00 46.20
Mazdoor (Unskilled) day 1.00 295.00 295.00
Laying & fixing of Pipes position including lifting,
aligning etc.,
rm 341.20
sub total for labour 341.20
b) Material
Sand at site cum 0.020 1649.81 33.00
Cement at site t 0.018 5900.00 106.20
Providing plain cement concrete M15 using 20 mm to 12 mm Graded HBG crushed
Metal with 250 Kgs of cement per 1 cum of concrete, including C/c of all materials,
curing, labour charges etc., complete as per drawings & tech. specifications Clause
802,803,1202 & 1203 as per caluse 800 & 1200 (1) of MORD and guidelines Forside drains Bed.
Providing and laying reinforced cement concrete pipe NP3 for culverts on first
class bedding of granular material with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete and masonry works in head wall
and parapets. Tech Specification Clause 1106 MORD
-
8/10/2019 1. Mothkur new SC colony.xls
37/66
Index-
codeDescription Unit Quantity Rate Rs. Amount Rs.
2 3 4 5 6
S.
No
1
450 mm dia RCC pipe NP3 pipe m 7.50 1284.00 9630.00
sub total for material 9769.20
Cost for 7.5 m = a+b+c 10110.40
Rate per m = (a+b)/7.5 Rs. 1348.05
Assistant Executive EngineerM.P. Velugodu.
Dy. Executive EngineerPRI(P.R), Atmakur.
Executive EngineerP.R.Division, Nandyal.
Superintending EngineerP.R. Kurnool.
-
8/10/2019 1. Mothkur new SC colony.xls
38/66
S.N
oItem Quantity Unit
Qty Ratio Rate Amount
1 2 3 4 5 6 7 8
1 GSB 162.75
Gravel 162.75 0.66 22.00 2363.00
stone dust 162.75 0.34 50.00 2767.00
2 WBM 895.22
Metal 895.22 1.00 50.00 44761.00
Screenings 895.22 0.24 40.00 8594.00
3 Sand filling Sand 78.43 1.00 40.00 3137.00
4 M15 Concrete 131.75
131.75 0.900 50.00 5929.00
Sand 131.75 0.45 40.00 2372.00
5 M20 Concrete 0.83 Cum
Metal 0.83 0.90 50.00 37.00
Sand 0.83 0.45 40.00 15.00
6 M30 Concrete 158.10 Cum
Metal 158.10 0.90 50.00 7115.00
Sand 158.10 0.45 40.00 2846.00
Total 79936.00
Seigniorage Charges
Construction of Pucca internrnal roads with drains, culvert in new SC colony of Mothkur
(v).
Seigniorage Charges
Metal
Assistant Executive EngineerM.P. Velugodu.
Dy. Executive EngineerPRI(P.R), Atmakur.
Executive EngineerP.R.Division, Nandyal.
Superintending EngineerP.R. Kurnool.
-
8/10/2019 1. Mothkur new SC colony.xls
39/66
Pop Estimate Cost : #REF! Lakhs
L B D
Part 'A' - WORK DONE AS PER SSR 2012-13
1
for road work 831.90 535.24 80.47 43071
Page 1,5 of MB 0727A
2
for sub base 1 x 1 831.90 4.00 0.18 598.97 452.75 271184
Page 7 of MB 0786A
3
for sub base 1 x 1 831.90 4.00 0.18 598.97 16.64 9967
Page 7 of MB 0727A
4
for sub base 1 x 1 831.90 4.00 0.15 499.14 110.46 55135
Page 9 of MB 0727A
Part 'B' - WORK TO BE DONE AS PER SSR 2013-14
1
for road work 1 x 1 3183.00 4.00 0.15 1909.80
deduct work done 1 x 1 -831.90 -535.24
2351.10 1374.56 87.51 120288
2
for road work 1 x 1 3183.00 4.00 0.18 2291.76
For side drain shouders 1 x 2 3183.00 1.00 0.120 763.92
CC 16-Engaging Unskilled labour for spreading the collected well
graded granular material and sectioning for sub base & shoulders.
CRWA09-Compaction of collected well graded granular soil to OMC
using 8-l0T Power Road Roller to achieve CBR value not
-
8/10/2019 1. Mothkur new SC colony.xls
40/66
-
8/10/2019 1. Mothkur new SC colony.xls
41/66
Pop Estimate Cost : #REF! Lakhs
L B D
Population of the localitySl.
No.Task Name Nos Amount
Quantity
(cum)
Rate per (1
cum)
Measurements
Total 4341.88 87.51 3799588
For side drain 1 x 2 3878.00 0.70 0.23 1248.72
For 450mm dia RCC pipes 1 x 30 5.20 0.80 0.15 18.72
for body walls to 450 mm
dia RCC pipes (0.30+0.30) 2 x 30 0.60 0.50 0.15 2.70
Total 1270.14 358.77 4556889
For side drain 1 x 2 3878.00 0.70 0.23 1248.72
For 450mm dia RCC pipes 1 x 30 5.20 0.80 0.15 18.72
for body walls to 450 mm
dia RCC pipes (0.30+0.30) 2 x 30 0.60 0.50 0.15 2.70
Total 1270.14 18.09 2297710
For side drain bed 1 x 2 3878.00 0.55 0.10 426.58
For 450mm dia RCC pipes 1 x 30 5.20 0.80 0.15 18.72
for body walls to 450 mm
dia RCC pipes (0.30+0.30) 2 x 30 0.60 0.50 0.15 2.70
Total 448.00 4724.4
Supply & delivery of Cement 448.00 1300.00 582400
Supply & collection of metal 448.00 1827.00 818496
Supply & collection of sand 448.00 724.21 324446
Centering & labour charges 448.00 873.19 39118911
side walls of side drain 1 x 2 3878.00 0.55 0.45 1919.61
Deductions 1 x -2 3878.00
(0.3+0.1)/
2 0.45 -698.04for body walls to 450 mm
dia RCC pipes 2 x 30 1.20
(0.27+0.4
5)/2 1.00 25.92
Deduct for pipe dia 2 x 30 0.36 -6.1122/7*0.6*0.6/4
Providing plain cement concrete M15 using 20 mm to 12 mm Graded
HBG crushed Metal with 250 Kgs of cement per 1 cum of concrete,
including C/c of all materials, curing, labour charges etc., complete as
per drawings & tech. specifications Clause 802,803,1202 & 1203 as per
caluse 800 & 1200 (1) of MORD and guidelines For side drains.
CC09.Engaging unskilled labour for Filling foundation with sand
including cost and conveyance of sand and labour charges (RSSR)
CC07-Cost and conveyance of sand for filling including all charges but
excluding labour charges for filling.
Providing plain cement concrete M15 using 20 mm to 12 mm Graded
HBG crushed Metal with 250 Kgs of cement per 1 cum of concrete,
including C/c of all materials, curing, labour charges etc., complete as
per drawings & tech. specifications Clause 802,803,1202 & 1203 as per
caluse 800 & 1200 (1) of MORD and guidelines For side walls of side
drains.
-
8/10/2019 1. Mothkur new SC colony.xls
42/66
Pop Estimate Cost : #REF! Lakhs
L B D
Population of the localitySl.
No.Task Name Nos Amount
Quantity
(cum)
Rate per (1
cum)
Measurements
Total 1241.38 6748.69
Supply & delivery of Cement 1241.38 1300.00 1613794
Supply & collection of metal 1241.38 1827.00 2268001
Supply & collection of sand 1241.38 724.21 899020
Centering & labour charges 1241.38 2897.48 359687412
For slabs over drain 1 x 80 75.00 6000.00 45.15 270900
Labour charges for fitting1 x 80 75.00 6000.00 2.85 17100
Kg Kg13
For slabs over drain 1 x 80 5.00 0.55 0.15 33.00
Total 33.00 5404.77
Supply & delivery of Cement 33.00 1716.00 56628
Supply & collection of metal 33.00 1827.00 60291
Supply & collection of sand 33.00 678.95 22405
Centering & labour charges 33.00 1182.82 3903314
for drain 1 x 30 5.00 150.00
Total 150.00 1740.97
cement 150.00 12.48 1872
sand 150.00 4.02 603
450 mm dia RCC pipe NP3 pipe 150.00 1681.53 252230
labour charges 150.00 42.94 6441
Rmt Rmt15
For C C pavement 1 x 1 3884.00 3.00 0.125 1456.50
Total 1456.50 5756.28
Supply & delivery of Cement kg 1456.50 6092.95 8874382
Supply & collection of metal cum 1456.50 #REF! #REF!
Supply & collection of sand cum 1456.50 #REF! #REF!
Centering & labour charges 1456.50 #REF! #REF!16
Providing and laying reinforced cement concrete pipe NP3 for culverts
on first class bedding of granular material with cement mortar 1:2 but
excluding excavation, protection works, backfilling, concrete and
masonry works in head wall and parapets. Tech Specification Clause
CRW16.Supply and fixing of MS name board of size 2feet.6inch x4feet
including painting and required lettering
CC58Supplying, fitting and placing HYSD bar reinforcement in slab
over drain complete and technical specifications including fabrication
charges
RCC M-20 Nominal mix using 20 mm to 12 mm Graded size crushed
hard granite metal including C/c of all materials, taxes, operational,
incidental and labour charges such as machine mixing, laying concrete,
curing etc., complete but excluding cost of steel and its fabricationcharges for finished item of work for Slab over drain.
Construction of un-reinforced, dowel jointed at expansion and
construction joint only,PCC pavement thickness as per design over a
prepared sub base using M30 grade, coarse and fine aggregates
confirming to IS 383 including all labour charges etc. complete (CSSR)
-
8/10/2019 1. Mothkur new SC colony.xls
43/66
Pop Estimate Cost : #REF! Lakhs
L B D
Population of the localitySl.
No.Task Name Nos Amount
Quantity
(cum)
Rate per (1
cum)
Measurements
Name board 1 1 5000.00 5000
#REF!
17
5% #REF! #REF!18
0.50% #REF! #REF!
19 79936
20 550789
Grand Total #REF!
VAT @ 5%
Provision for unforseen items
Seigniorage charges
QC Charges @ 0.50%
Assistant Executive Engineer
M.P. Velugodu.
Dy. Executive Engineer
PRI(P.R), Atmakur.
Executive Engineer
P.R.Division, Nandyal.
Superintending Engineer
P.R. Kurnool.
-
8/10/2019 1. Mothkur new SC colony.xls
44/66
Sl.
No.Description of material Name of the quarry Lead in Km
Conveyance
charges
(excluding Conc.
Profit
Initial RateBlasting
charges
Machine
crushing
charges
1 2 3 4 5 6 7 8
1 Gravel Banakacherla 12.00 151.14 98.00
2 Sand for filling Local 5.00 73.77 285.00
3 Sand for Concrete Sunkesula 114.00 1123.77 385.00
4 HBG Stone Chips 2.36mm and below yanganti palli 88.00 884.30 330.00
WBM Grade II metal
5 60-63mm metal (50% of 435.60) yanganti palli 88.00 884.30 419.00 70.00 104.75
6 40-45mm metal (40% of 435.60) yanganti palli 88.00 884.30 588.00 70.00 147.00
7 19-22mm metal (4% of 435.60) yanganti palli 88.00 884.30 984.00 70.00 246.00
Cement concrete Metal
8 20mm M/c HBG metal (60%) yanganti palli 88.00 884.30 984.00 70.00 246.00
9 12mm M/c HBG metal (40%) yanganti palli 88.00 884.30 780.00 70.00 195.00
10 9.50-11.20mm HBG M/c metal yanganti palli 88.00 884.30 656.00 70.00 164.00
11 40mm M/C HBG metal yanganti palli 88.00 884.30 588.00 70.00 147.00
12 10mm M/c HBG metal yanganti palli 88.00 884.30 656.00 70.00 164.00
Type B screens
13 HBG Stone Chips 5-7mm yanganti palli 88.00 884.30 504.00 70.00 126.00
14 HBG Stone Chips 2.36-5mm yanganti palli 88.00 884.30 308.00 70.00 77.00
15 Cement At Site 5200.00
16 450 mm dia pipes Gopavaram 42.00 111.53 1570.00
Certified that the above leads are true and correct to the best of my knowledge.
LEAD STATEMENT (SSR 2013-2014)
Name of the Work:Providing Internal Roads with CC Drains in Indira Nagar (SC colony ) at Velugodu
Assistant Executive EngineerM.P. Velugodu.
Dy. Executive EngineerPRI(P.R), Atmakur.
Executive EngineerP.R.Division, Nandyal.
Superintending EngineerP.R. Kurnool.
-
8/10/2019 1. Mothkur new SC colony.xls
45/66
WBM Grade II 435.60 Intial Cost & Lead 2012-13 WBM Grade II 435.60 Intial Cost & L
50 % of 60-63 HBG metal 217.80 1326.71 288957.44 50 % of 60-63 HBG metal 217.80 1478.05 3219
46 % of 40-45 HBG metal 200.38 1516.71 303912.28 46 % of 40-45 HBG metal 200.38 1689.30 3384
4 % of 19-22 HBG metal 17.42 2101.71 36620.20 4 % of 19-22 HBG metal 17.42 2184.30 380
for 435.6 cum 629489.92 for 435.6 cum 6984
Rate for 1 cum 1445.11 Rate for 1 cum 160
Type B screens Type B screens
50 % of 5-7 mm HBG metal 0.50 1419.21 709.61 50 % of 5-7 mm HBG metal 0.50 1584.30 7
50 % of 2.36 to 5 mm HBG met 0.50 1201.71 600.86 50 % of 2.36 to 5 mm HBG metal 0.50 1339.30 6
Rate for 1 cum 1310.46 Rate for 1 cum 14
CC road CC road
60.00 % of 20 mm HBG metal 0.60 2184.30 1310.58 60.00 % of 20 mm HBG metal 0.60 2184.30 13
40.00% of 12 mm HBG metal 0.40 1929.30 771.72 40.00% of 12 mm HBG metal 0.40 1929.30 7
Rate for 1 cum 2082.30 Rate for 1 cum 208
-
8/10/2019 1. Mothkur new SC colony.xls
46/66
Index-
codeDescription Unit Quantity Rate Rs.
Amount
Rs.
2 3 4 5 6
1
Rate as per Current RSSR Cum 1.00 108.00 87.51
Net rate 87.51
2
Rate per 1.00 Cum loose 18.09
3
Sand cum 1.00 358.77 358.77358.77
4
Taking Output =1 Cum
Gravel @ 66% Cum 0.85 249.14 211.77
Stone dust @ 34% Cum 0.35 1214.30 425.01
Rate per 1.00 Cum 636.78Loose Rate per 1.00 Cum 530.65
5
Tractor with Rotavator 25 cum per hour Hrs 12.00 422.00 5064.00
Water tanker 6 Kl Capacity Hrs 5.00 624.00 3120.00
Three wheeled 8-10 T roller @10cum /Hr. Hr 30.00 1038.40 31152.00
Rate per 300 Cum 39336.00Rate per 1.00 Cum Compact 131.12
Engaging Unskilled Labour for filling/spreding with gravel/sand/stone dust but
excluding conveyance of sand(RSSR)
Compaction of collected well graded granular soil to OMC using 8-l0T Power Road
Roller to achieve CBR value not
-
8/10/2019 1. Mothkur new SC colony.xls
47/66
Index-
codeDescription Unit Quantity Rate Rs.
Amount
Rs.
2 3 4 5 6
S.
No
1
6
Taking Output =360 Cum 435.60 1550.00 675180.00
60-63mm IRC HBG metal(50% of 435.60 cum) Cum 217.80
40-45mm IRC HBG metal(46% of 435.60 cum) Cum 200.38
19-22mm irc METAL m/C (4% OF 435.60 cum) Cum 17.42
Stone Screening
Type B 11.2 mm for Grading 2 @ 0.18 / 0.20
cum/10sqm cum 86.40 1410.00 121824.00
Rate per 360.00 Cum Compact 797004.00
i. Total Rate per 1.00 Cum Compact 2213.90
ii.Graded metal Rate per 1.00 Cum excluding screening 1875.50
iii. screens (i-ii) cum 338.40
7
(a) MaterialBinding material ( Gravel)@ 0.06cum /10 sqm for
WBM Grading II Cum 28.80 249.14 7175.23
(b) Labour
Mazdoor(skilled) days 12.08 280.00 3382.40
Mazdoor(Unskilled) days 250.00 280.00 70000.00
Water tanker 6Kl capacity Hrs 24.00 624.00 14976.00
three wheeled 8-10T static roller Hrs 36.00 1038.40 37382.40
Rate per 360 Cum 132916.03
Rate per 1.00 Cum 369.21
8
Unit = cum
(a) Material
Cement t 0.25 5200.00 1300.00
Coarse sand cum 0.48 1508.77 724.21
20 mm aggregate @0.54 cum 0.90 2030.00 1827.00
12 mm [email protected] cum
sub total for material 3851.21
Providing plain cement concrete M15 using 20 mm to 12 mm Graded HBG crushed
Metal with 250 Kgs of cement per 1 cum of concrete, including C/c of all
materials, curing, labour charges etc., complete as per drawings & tech.
specifications Clause 802,803,1202 & 1203 as per caluse 800 & 1200 (1) of MORD
and uidelines For side drains Bed.
Taking Output = 360 Cum
CC30-Spreading & compaction of collected mixer of stone aggregates in uniform
thicknesses and good gravel for blindage, hand packing and rolling with 8-l0T
Power Road Roller in stages to proper grade and camber with required waterings
and keeping the rolled surface wet for a period of 15 days including brooming (91
mm loose to 75 mm com acted CSSR
Supply and collection of mixer of stone aggregates having 50% of 60-63mm HBG
metal ,46% of 40-45mm HBG metal and 4% of 19-22mm HBG metal including cost
,conveyance, loading, unloading and stacking to departmental gauge for pre
measurements for WBM Grade.II surfaces per MORD standards (91 mm loose to75 mm com acted) (CSSR)
-
8/10/2019 1. Mothkur new SC colony.xls
48/66
Index-
codeDescription Unit Quantity Rate Rs.
Amount
Rs.
2 3 4 5 6
S.
No
1
(b) Labour
Mate day -
Mason (1st Class) day 0.10 350.00 35.00
Mazdoor (Unskilled) day 1.39 280.00 389.20
sub total for labour 424.20
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.40 417.40 166.96
Vibrator charges hour 0.40 48.00 19.20
Water tanker 6 kl capacity hour 0.13 624.00 81.12
sub total for mechinery 267.28
(d) Formwork @ 4% on cost of material, labour and
machiner (a+b+c) 4.00% 4542.69 181.71
Rate per cum = a+b+c+d+e+f 4724.40
Supply & delivery of Cement kg 1300.00
Supply & collection of metal cum 1827.00Supply & collection of sand cum 724.21
Centering & labour charges 873.19
9
Unit = cum
(a) Material
Cement t 0.25 5200.00 1300.00
Coarse sand cum 0.48 1508.77 724.2120 mm aggregate @0.54 cum 0.90 2030.00 1827.00
12 mm [email protected] cum
sub total for material 3851.21
(b) Labour
Mate day -
Mason (1st Class) day 0.10 350.00 35.00
Mazdoor (Unskilled) day 1.39 280.00 389.20
sub total for labour 424.20
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.40 417.40 166.96
Vibrator charges hour 1.40 48.00 67.20Water tanker 6 kl capacity hour 0.13 624.00 81.12
sub total for mechinery 315.28
(d) Formwork as per plinth beam centering charges
of CSSR 2158.00 2158.00
Rate per cum = a+b+c+d+e+f 6748.69
Supply & delivery of Cement kg 1300.00
Supply & collection of metal cum 1827.00
Supply & collection of sand cum 724.21
Centering & labour charges 2897.48
Providing plain cement concrete M15 using 20 mm to 12 mm Graded HBG crushed
Metal with 250 Kgs of cement per 1 cum of concrete, including C/c of all
materials, curing, labour charges etc., complete as per drawings & tech.
specifications Clause 802,803,1202 & 1203 as per caluse 800 & 1200 (1) of MORD
-
8/10/2019 1. Mothkur new SC colony.xls
49/66
Index-
codeDescription Unit Quantity Rate Rs.
Amount
Rs.
2 3 4 5 6
S.
No
1
10
Unit = cum
a MaterialCement t 0.330 5200.00 1716.00Coarse sand cum 0.450 1508.77 678.95
20 mm aggregate @0.54 cum 0.90 2030.00 1827.00
12 mm [email protected] cum 0.00
sub total for material 4221.95
(b) Labour
Mate day -
Mason (1st Class) day 0.10 350.00 35.00
Mazdoor (Unskilled) day 1.39 280.00 389.20
sub total for labour 424.20
c) Machinery
Concrete mixer 0.4/0.28 cum capacity hr / 0.40 417.40 166.96
Vibrator charges hour 0.40 48.00 19.20
Water tanker 6 kl capacity hour 0.13 624.00 81.12
sub total for mechinery 267.28
Total (a+b+c) 4913.43
d) For formwork and staging add the following
percentage of (a+b+c):
10 per cent 10.00% 4913.43 491.34e&f) Overheads & Contractors Profit
Rate per cum = a+b+c+d+e+f 5404.77
Supply & delivery of Cement kg 1716.00
Supply & collection of metal cum 1827.00
Supply & collection of sand cum 678.95
Centering & labour charges 1182.82
11
(a) Material
HYSD/TMT/ MS bars including 5 per cent foroverla s and wasta e
t 1.05 43000.00 45150.00
(b) Labour
Blacksmith / Bar bender day 2.00 320.00 640.00
Mazdoor (Unskilled) day 6.40 280.00 1792.00
Binding wire kg 6.00 70.00 420.00
Rate per MT 2852.00
CC58Supplying, fitting and placing HYSD bar reinforcement in slab over drain
complete and technical specifications including fabrication charges
RCC M-20 Nominal mix using 20 mm to 12 mm Graded size crushed hard granite
metal including C/c of all materials, taxes, operational, incidental and labour
charges such as machine mixing, laying concrete, curing etc., complete but
excluding cost of steel and its fabrication charges for finished item of work forSlab over drain.
-
8/10/2019 1. Mothkur new SC colony.xls
50/66
Index-
codeDescription Unit Quantity Rate Rs.
Amount
Rs.
2 3 4 5 6
S.
No
1
12
Unit = cum
Taking output = 75 cum (172.50 t)
(200 x 3.00 x 0.125)
a) Labour
Mate day -
Mason (1st class) day 5.00 350.00 1750.00
Mason (2nd class) day 5.00 320.00 1600.00
Mazdoor (Unskilled) day 150.00 280.00 42000.00
Mazdoor (Skilled) day 6.00 280.00 1680.00
Mazdoor (Semi-Skilled) day 6.00 280.00 1680.00
sub total for labour 48710.00
b) Machinery
Concrete mixer 0.28 / 0.4 cum capacity (6 mixers) hour 36.00 417.40 15026.40
Plate vibrator hour 9.00 48.00 432.00
Water tanker 6 kl capacity hour 5.00 624.00 3120.00
sub total for mechinery 18578.40
c) Material
Crushed stone coarse aggregates, grading will be as
er Clause 1501.2.4.1 (Table 1500.1) of s ecifications
cum 67.50
20 mm aggregate @0.54 cum 67.50 2030.00 137025.00
12 mm [email protected] cum 0.00Sand for concrete @ 0.45 cum/cum of concrete cum 33.75 1508.77 50920.99
Cement @ 350 kg/cum of concrete t 26.25 5200.00 136500.00
Polythene sheet 125 micron (200x3.00x1.10=660) sqm 660.00 15.00 9900.00
Bitumen primer @ 100ml. Per joint for 60 joints tonne 0.01 33620.00 168.10
Mastic Pad 2.5x.0.125x60=18.75 sqm 18.75 925.00 17343.75
sub total for material 351857.84
sub total of a+b+c 419146.24
d) Formwork @ 3% of (a+b+c) 0.03 419146.24 12574.39
Cost for 75 cum = a+b+c+d+e+f 431720.63
Rate per cum = (a+b+c+d+e+f)/75 5756.28Supply & delivery of Cement kg 1820.00
Supply & collection of metal cum 1827.00
Supply & collection of sand cum 678.95
Centering & labour charges 1430.33
Construction of un-reinforced, dowel jointed at expansion and construction joint
only,PCC pavement thickness as per design over a prepared sub base using M30
grade, coarse and fine aggregates confirming to IS 383 including all labour
charges etc. complete (CSSR)
-
8/10/2019 1. Mothkur new SC colony.xls
51/66
Index-
codeDescription Unit Quantity Rate Rs.
Amount
Rs.
2 3 4 5 6
S.
No
1
13
Unit = m
Taking output = 7.5 m
Rate per m
450 mm dia
a) Labour
Mate day -
Mason (1st Class) day 0.12 350.00 42.00
Mazdoor (Unskilled) day 1.00 280.00 280.00
Laying & fixing of Pipes position including lifting,
ali nin etc.,
rm 322.00
sub total for labour 322.00
b) Material
Sand at site cum 0.020 1508.77 30.18
Cement at site t 0.018 5200.00 93.60
450 mm dia RCC pipe NP3 pipe m 7.50 1681.53 12611.48
sub total for material 12735.26
Cost for 7.5 m = a+b+c 13057.26
Rate per m = (a+b)/7.5 Rs. 1740.97
Providing and laying reinforced cement concrete pipe NP3 for culverts on first
class bedding of granular material with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete and masonry works in head wall
and parapets. Tech Specification Clause 1106 MORD
Chief Engineer,
PR, MGNREGS,Hyderabad
Approved
-
8/10/2019 1. Mothkur new SC colony.xls
52/66
Lead
Earth, Sand,Gravel
Metal, Stone Earth, Sand,Gravel
Metal, StoneBricks
1000nos
Kadapa
slabs,PCCslabs,CC,
wood/cum
Bricks1000nos
Kadapa
slabs,PCCslabs,CC,
wood/cum
1 31.50 3 0.40 27.63 26.67 50.70 44.70 44.47 39.21
244.10 42.60
38.68 37.37 71.00 62.60 62.28 54.91
358.90 58.90
51.67 51.67 94.60 86.60 82.98 75.96
471.50 71.50
62.72 62.72 114.90 105.10 100.79 92.19
584.10 84.10
73.77 73.77 135.20 123.70 118.6 108.51
696.70 96.70
84.82 84.82 155.50 142.20 136.4 124.74
7109.30 109.30
95.88 95.88 175.80 160.70 154.21 140.96
8121.90 121.90
106.93 106.93 196.10 179.20 172.02 157.19
9
134.50 134.50
117.98 117.98 216.40 197.70 189.82 173.42
10147.10 147.10
129.04 129.04 236.70 216.20 207.63 189.65
11159.70 159.70
140.09 140.09 257.00 234.70 225.44 205.88
12172.30 172.30
151.14 151.14 277.30 253.20 243.25 222.11
13184.90 184.90
162.19 162.19 297.60 271.70 261.05 238.33
14197.50 197.50
173.25 173.25 317.90 290.20 278.86 254.56
15210.10 210.10
184.3 184.3 338.20 308.70 296.67 270.79
16222.70 222.70
195.35 195.35 358.50 327.20 314.47 287.02
17235.30 235.30
206.4 206.4 378.80 345.70 332.28 303.25
18247.90 247.90
217.46 217.46 399.10 364.20 350.09 319.47
Lead Chart (14-15)
SS rate for 14-15 Net Con.Charges Net Con.Charges
-
8/10/2019 1. Mothkur new SC colony.xls
53/66
19260.50 260.50
228.51 228.51 419.40 382.70 367.89 335.7
20273.10 273.10
239.56 239.56 439.70 401.20 385.7 351.93
21
285.70 285.70
250.61 250.61 460.00 419.70 403.51 368.16
22298.30 298.30
261.67 261.67 480.30 438.20 421.32 384.39
23310.90 310.90
272.72 272.72 500.60 456.70 439.12 400.61
24323.50 323.50
283.77 283.77 520.90 475.20 456.93 416.84
25336.10 336.10
294.82 294.82 541.20 493.70 474.74 433.07
26348.70 348.70
305.88 305.88561.50 512.20
492.54 449.3
27
361.30 361.30
316.93 316.93 581.80 530.70 510.35 465.53
28373.90 373.90
327.98 327.98 602.10 549.20 528.16 481.75
29 386.50 386.50 339.04 339.04 622.40 567.70 545.96 497.98
30 399.10 399.10 350.09 350.09 642.70 586.20 563.77 514.21
31409.60 409.60
359.3 359.3 659.60 601.70 578.6 527.81
32420.10 420.10
368.51 368.51 676.50 617.20 593.42 541.4
33
430.60 430.60
377.72 377.72 693.40 632.70 608.25 555
34
441.10 441.10
386.93 386.93 710.30 648.20 623.07 568.6
35
451.60 451.60
396.14 396.14 727.20 663.70 637.89 582.19
36
462.10 462.10
405.35 405.35 744.10 679.20 652.72 595.79
-
8/10/2019 1. Mothkur new SC colony.xls
54/66
-
8/10/2019 1. Mothkur new SC colony.xls
55/66
64 756.10 756.10 663.25 663.25 1217.30 1113.20 1067.81 976.49
65 766.60 766.60 672.46 672.46 1234.20 1128.70 1082.63 990.09
66 777.10 777.10 681.67 681.67 1251.10 1144.20 1097.46 1003.68
67 787.60 787.60 690.88 690.88 1268.00 1159.70 1112.28 1017.28
68 798.10 798.10 700.09 700.09 1284.90 1175.20 1127.11 1030.88
69 808.60 808.60 709.3 709.3 1301.80 1190.70 1141.93 1044.4770 819.10 819.10 718.51 718.51 1318.70 1206.20 1156.75 1058.07
71 829.60 829.60 727.72 727.72 1335.60 1221.70 1171.58 1071.67
72 840.10 840.10 736.93 736.93 1352.50 1237.20 1186.4 1085.26
73 850.60 850.60 746.14 746.14 1369.40 1252.70 1201.23 1098.86
74 861.10 861.10 755.35 755.35 1386.30 1268.20 1216.05 1112.46
75 871.60 871.60 764.56 764.56 1403.20 1283.70 1230.88 1126.05
76 882.10 882.10 773.77 773.77 1420.10 1299.20 1245.7 1139.65
77 892.60 892.60 782.98 782.98 1437.00 1314.70 1260.53 1153.25
78 903.10 903.10 792.19 792.19 1453.90 1330.20 1275.35 1166.84
79 913.60 913.60 801.4 801.4 1470.80 1345.70 1290.18 1180.44
80 924.10 924.10 810.61 810.61 1487.70 1361.20 1305 1194.04
81 934.60 934.60 819.82 819.82 1504.60 1376.70 1319.82 1207.63
82 945.10 945.10 829.04 829.04 1521.50 1392.20 1334.65 1221.23
83 955.60 955.60 838.25 838.25 1538.40 1407.70 1349.47 1234.82
84 966.10 966.10 847.46 847.46 1555.30 1423.20 1364.3 1248.42
85 976.60 976.60 856.67 856.67 1572.20 1438.70 1379.12 1262.02
86 987.10 987.10 865.88 865.88 1589.10 1454.20 1393.95 1275.61
87 997.60 997.60 875.09 875.09 1606.00 1469.70 1408.77 1289.21
88 1008.10 1008.10 884.3 884.3 1622.90 1485.20 1423.6 1302.81
89 1018.60 1018.60 893.51 893.51 1639.80 1500.70 1438.42 1316.4
90 1029.10 1029.10 902.72 902.72 1656.70 1516.20 1453.25 133091 1039.60 1039.60 911.93 911.93 1673.60 1531.70 1468.07 1343.6
92 1050.10 1050.10 921.14 921.14 1690.50 1547.20 1482.89 1357.19
93 1060.60 1060.60 930.35 930.35 1707.40 1562.70 1497.72 1370.79
94 1071.10 1071.10 939.56 939.56 1724.30 1578.20 1512.54 1384.39
95 1081.60 1081.60 948.77 948.77 1741.20 1593.70 1527.37 1397.98
96 1092.10 1092.10 957.98 957.98 1758.10 1609.20 1542.19 1411.58
97 1102.60 1102.60 967.19 967.19 1775.00 1624.70 1557.02 1425.18
98 1113.10 1113.10 976.4 976.4 1791.90 1640.20 1571.84 1438.77
99 1123.60 1123.60 985.61 985.61 1808.80 1655.70 1586.67 1452.37
100 1134.10 1134.10 994.82 994.82 1825.70 1671.20 1601.49 1465.96
101 1144.60 1144.60 1004.04 1004.04 1842.60 1686.70 1616.32 1479.56
102 1155.10 1155.10 1013.25 1013.25 1859.50 1702.20 1631.14 1493.16
103 1165.60 1165.60 1022.46 1022.46 1876.40 1717.70 1645.96 1506.75
104 1176.10 1176.10 1031.67 1031.67 1893.30 1733.20 1660.79 1520.35
105 1186.60 1186.60 1040.88 1040.88 1910.20 1748.70 1675.61 1533.95
106 1197.10 1197.10 1050.09 1050.09 1927.10 1764.20 1690.44 1547.54
-
8/10/2019 1. Mothkur new SC colony.xls
56/66
-
8/10/2019 1. Mothkur new SC colony.xls
57/66
150 1644.10 1644.10 1442.19 1442.19 0 0
-
8/10/2019 1. Mothkur new SC colony.xls
58/66
-
8/10/2019 1. Mothkur new SC colony.xls
59/66
Teak wood beyond
2.00 to 3.00 mts84756 1 Cum
Sand for
concrete462
Sal wood 51994 1 CumSand for
mortor606
AC sheet corregated 222 1 sqmSand for
filling
342
GI sheet corregated 60 1 Kg Gravel 103
Barbed wire 70 1 Kg2.36mm
bellow330
GI mesh 217 1 Kg RR Stone 160
Chiken mesh 17 1 sqm
Rivitment
stone 225
mm
140
Rolling shetter 2861 1 sqm Bond stone 1250
Collapsable gate 2503 1 sqmQuarry
rabbish81
Tar felt rain seal felt 129 1 SqmCountry
Bricks4700
Polythene sheet 125
micron15.00 1 Sqm Fly ash Bricks 3707
Mastic pad 12.70 mm 568 1 Sqm
Vertified tiles 1274 1 Sqm Centeringcharges
Kadapa slabs/
sahabad slabs of
minimum 50 mm thick1100 10 Sqm Footings 723
Polished Black
Cuddapah slabs of
minimum 15 mm thick
1654 10 Sqm Pedestals 1025
Polished
Bethamcherla
pure(marble
type)white stone ofminimum 25 mm thick
3859 10 Sqm Plingth beam 2410
Polished
Bethamcherla
coloured stone of
minimum 25 mm thick
2756 10 Sqm Lintels 1663
-
8/10/2019 1. Mothkur new SC colony.xls
60/66
Water proof cement
powder144 1 Kg Sunsheds 289
Cement based water
proof powder52 1 Kg Coloumns 1497
Wood primer 145 1 Kg Beams 2406
Red oxide 130 1 KgSlabs upto
150mm thick
273
Synthetic enamil paint 253 1 LitreSlabs above
150mm thick280
Exterior emolusion 196 1 Litre Bed blocks 291
White lime 552/25Kg 22.08 1 Kg Side walls 337
White cement 29 1 Kg
Water charges
(Urban)103
Water charges (Rural) 77
Labour
charges for
fabrication of
steel
window/door
grill
22
Labour
charges for
fabrication of
heavy stress
20
Binding wire 70
Labour for
fixing of
heavytrusses
charges
18
White cement 30
Labour for
fixing of
door/window
grills
4
Water profing
compound72
Light jungle clearence 2.6
prosafis jungleclearence
3.7
-
8/10/2019 1. Mothkur new SC colony.xls
61/66
-
8/10/2019 1. Mothkur new SC colony.xls
62/66
-
8/10/2019 1. Mothkur new SC colony.xls
63/66
-
8/10/2019 1. Mothkur new SC colony.xls
64/66
Hire
chargws
Blasting charges 70Vibrator
roller2541.40
Smooth
wheel
roller
1718.70
Tractor 415.00
Tractorwith
rotavetor
422.00
Water
tanker
6000 lt
658.35
Dozer
(D50)/(D3
0)
1570.00
Blasting charges 70
Concrete
mixer
0.28/0.40
cum capacity
328.60
Needle vib 165.70
Plate vibra 277.30
Water tanker
8 Kl.
Capacity
877.80
Air
compress
or
507.50
Truck 5.5
cum capacity 995.00
diesel
generator
50 Kva
1222.00
diesel
generator
100 Kva
1126.00
-
8/10/2019 1. Mothkur new SC colony.xls
65/66
Motor
grader3216.00
Mechanic
al
broomer
357.00
Bitumin
presser
distributor
1498.00
Emulsion
presser
distributor860.00
Hot mix
plant 40
TPH
19120.00
Blasting charges 76
Paver
finisher
100
2249.00
Front end
loader1646.00
Hydrulic
excavetor 2754.50Weigh
batcher (
hire
charges)
Machine
mixing
503.90
1000 Nos
0.00812 25/each
CumDismantli
ng
Cum
Cum
Cum
-
8/10/2019 1. Mothkur new SC colony.xls
66/66
Sqm
Cum
Cum
Sqm
Sqm
Cum
Sqm
1 Kg
1 Kg
1 Kg
1 Kg