    S. No. DesriptionAmount

    (Lakhs)Length

    1 Construction of Pucca internrnal roads with drains, culvert innew SC colony of Mothkur (v).

    25.00 310.00

    2Construction of Pucca Internal roads, drains in old SC colony

    of Mothkur(v).25.00 340.00

    3Construction of Pucca Internal roads, drains in ST-SC-BC

    colony of Mothkur(v).25.00 340.00

    4Construction of Pucca Internal roads, drains in General

    colony of Mothkur(v).50.00 700.00

    TOTAL 125.00 1690.00

    Lakhs Mt

    GENERAL ABSTRACT (Work Done)Construction of Pucca Internal roads or streets including side drains,

    culverts in Mothkur village.

  • 8/10/2019 1. Mothkur new SC colony.xls

    2/66

    SC

    990.00

    700.00

    1690.00

    Mt

  • 8/10/2019 1. Mothkur new SC colony.xls

    3/66

    S.No

    Materials

    GSB

    (Gravel+Stone

    dust)

    WBM GrII

    Sand forfilling

    PCCM10

    PCC M15

    1384.08 520.84

    584.40 22.50 672.06 18.22 267.85

    1 CW01.Amount for wage

    com onent2

    CW02.cement(Work done)

    CW02.cement 3.936 #REF!

    3CW03.sand for filling #REF!

    4 .san or mortar or

    done)

    CW04.sand for mortar 8.20 #REF!

    5 . ra e e a : or

    done) 630.20

    6CW05.Grade III Metal: 27.23

    7 CW07.20mm to 12mm HBG/HBT

    graded Metal:(Work done)

    CW07.20mm to 12mm HBG/HBT

    graded Metal: #REF!

    8 CW08.Graded Metal (40mm +

    20mm +10mm) #REF!

    9

    CW09.40 mm nominal HBGMetal 16.398

    11 CW11.VAT@5% (except on labourcharges)

    [email protected]%

    13CW13.Seignorage charges

    INPUT DATA SHEET

    Name of Work: Name of the Work:Providing CC Roads and CC D

    mailto:CW11.VAT@5%25%20(except%20on%20labour%20charges)mailto:CW11.VAT@5%25%20(except%20on%20labour%20charges)mailto:[email protected]%25mailto:[email protected]%25mailto:CW11.VAT@5%25%20(except%20on%20labour%20charges)mailto:CW11.VAT@5%25%20(except%20on%20labour%20charges)
  • 8/10/2019 1. Mothkur new SC colony.xls

    4/66

    14CW14.cost of NP, other Pipes

    15CW15.LS amount

    10 CW10.Cost towards skilled

    labour, sami skilled labour other

    equipments & material charges

    including all other materials not

    Supply of Gravel for sub base

    (work done) 1218.43

    Supply of stone dust for sub

    base (work done) 484.43

    Supply of Gravel for shoulders 496.74

    Supply of stone dust forshoulders 204.54

    Supply of Gravel for sub base #REF!

    Supply of stone dust for sub

    base #REF!

    Compaction of Granual soil

    (work done) 1153.38

    Compaction of Granual soil 48.00

    Screenings(Work done) 130.40

    Compaction of WBM(Work done) 520.84

    Screenings 5.40

    Compaction of WBM 22.50

    Centering & labour charges M15

    side drain bed 267.85Centering & labour charges M15

    side drain side walls #REF!

    Centering & labour charges M10

    PC bed 18.22

    Centering & labour charges M15

    PC side walls #REF!

  • 8/10/2019 1. Mothkur new SC colony.xls

    5/66

  • 8/10/2019 1. Mothkur new SC colony.xls

    6/66

    M30 CC

    pavemen

    t

    RCCM20

    TotalQty

    MaterialRate

    Amount

    892.12

    30.00 24.75

    43673.00 143673.00

    312.24 6244.84 275.00 1717331.00

    10.50 8.168 #REF! 300.00 #REF!

    #REF! 355.18 #REF!

    401.45 401.45 1331.32 534458.00 1376.7

    13.50 11.14 #REF! 1455.18 #REF! 1376.7

    630.20 1440.00 907488.00 1566.7

    27.23 1550.00 42207.00 2151.7

    802.91 802.91 1730.00 1389031.00

    27.00 22.28 #REF! 2030.00 #REF!

    #REF! 1430.00 #REF! 1763.11

    16.40 1645.00 26975.00

    #REF!

    72477.00

    257263.00

    ains in Jammi Nagar (ST colony) at Velugodu.

  • 8/10/2019 1. Mothkur new SC colony.xls

    7/66

    251802.00

    25611.00

    1218.43 209.21 254908.00

    484.43 1044.21 505847.00

    496.74 241.86 120142.00

    204.54 1172.11 239743.00

    #REF! 241.86 #REF!

    #REF! 1172.11 #REF!

    1153.38 110.46 127402.00

    48.00 131.12 6294.00

    130.40 1310.46 170884.00 151.24

    520.84 315.60 164377.00

    5.40 1410.00 7614.00

    22.50 368.63 8294.00

    267.85 880.16 235751.00

    #REF! 2897.48 #REF!

    18.22 838.25 15273.00

    #REF! 1352.09 #REF!

  • 8/10/2019 1. Mothkur new SC colony.xls

    8/66

    24.75 24.75 1206.81 29869.00

    892.12 892.12 1280.83 1142654.00

    30.00 30.00 1438.01 43140.00

    189000.00

    10688.00

    5000.00

    #REF! -16184000 #REF!

    Assistant Executive EngineerM.P. Velugodu.

  • 8/10/2019 1. Mothkur new SC colony.xls

    9/66

    Work ID :

    :

    : 25.00 lakhs

    :

    :

    :

    :

    :

    :

    :

    PANCHAYATRAJ ENGINEERING DEPARTMENT

    DETAILED ESTIMATE

    NAME OF SUB.DIVISION PRI., ATMAKUR

    NAME OF THE WORK Construction of Pucca internrnal roads withdrains, culvert in new SC colony of Mothkur

    (v).

    ESTIMATE COST

    NAME OF THEGRANT MGNREGS

    NAME OF ASMB.CONSTITUENCY ATMAKUR

    NAME OF DISTRICT / CIRCLE KURNOOL

    NAME OF THE VILLAGE MOTHKUR

    NAME OF THE MANDAL VELUGODU

    NAME OF THE DIVISION PR : NANDYAL

  • 8/10/2019 1. Mothkur new SC colony.xls

    10/66

    Est Cost Rs : 25.00 Lakhs

    1

    2

    3

    4

    5

    Providing of WBM surface over Granular Sub base.

    SPECIFICATION REPORT

    Specification report to accompany the Detailed estimate for the work

    Construction of Pucca internrnal roads with drains, culvert in new SC colony of Mothkur

    (v).

    The above work is proposed for sanction under under MGNREGS

    The following provisions are made in the estimate.

    The estimate is prepared as per standards of MORD with current S.S.R. of2014-15 and RSSR and the work will be executed as per A.P.S.S Standards .

    CC pavement using M30 grade with 3.00Mts width and 170mm thick.

    Providing RCC M- 20 for slabs over drains for cross roads

    Provision for VAT and Q.C. Charges

    Provision for Seigniorage charges

    Assistant Executive EngiM.P. Velugodu.

    Dy. Executive EngineerPRI(P.R), Atmakur.

    Executive EngineerP.R.Division, Nandyal.

    Superintending EngineerP.R. Kurnool.

  • 8/10/2019 1. Mothkur new SC colony.xls

    11/66

    Pop Estimate Cost : 25.00 Lakhs

    L B D

    1

    for road work 1 x 1 310.00 3.50 0.18 195.30

    shouders 1 x 2 310.00 0.50 0.120 37.20

    310.00 Total 232.50 500.58 116385

    2

    for road work 1 x 1 310.00 3.50 0.10 108.50

    shouders 1 x 2 310.00 0.50 0.120 37.20Total 145.70 20.51 2988

    3

    for road work 1 x 1 310.00 3.50 0.15 162.75

    Total 162.75 199.72 325044

    For Base course 1 x 1 310.00 3.20 0.075 74.40

    Total 74.40 2122.88 1579425

    For Base course 1 x 1 310.00 3.20 0.075 74.40

    Total 74.40 487.84 36295

    Side Drian:

    Construction of Pucca internrnal roads with drains, culvert in new SC colony of Mothkur

    (v).Population of the locality

    Sl.

    No.Task Name Nos

    Measurements Quantity

    (cum)

    Rate per (1

    cum)Amount

    CC16- Supply and collection of well graded granular material (i.e. 66%

    (61%-71%)of gravel having stone aggregate of 9.5 mm to 4.75 mm size,

    and 34%(29%-39%) of stone dust of size less than 2.6 mm) with CBR

    not

  • 8/10/2019 1. Mothkur new SC colony.xls

    12/66

    Pop Estimate Cost : 25.00 Lakhs

    L B D

    Population of the localitySl.

    No.Task Name Nos

    Measurements Quantity

    (cum)

    Rate per (1

    cum)Amount

    6

    For side drain 1 x 2 310.00 0.55 0.60 204.60

    Total 204.60 99.25 203077

    For side drain 1 x 2 310.00 0.55 0.23 78.43

    Total 78.43 415.77 326098

    For side drain 1 x 2 310.00 0.55 0.23 78.43

    Total 78.43 20.51 16099

    For side drain bed 1 x 2 310.00 0.55 0.10 34.10

    Total 34.10 5062.79 17264110

    side walls of side drain 1 x 2 310.00 0.55 0.45 153.45

    Deductions 1 x -2 310.00

    (0.3+0.1)/

    2 0.45 -55.80

    97.65 7191.77 702276

    Total 0.00 5354.88 011

    For slabs over drain 1 x 2 75.00 150.00 46.2 6930

    Labour charges for fitting1 x 2 75.00 150.00 49.28 7392

    Kg Kg12

    For slabs over drain 1 x 2 5.00 0.55 0.15 0.83

    CC 33 Earth work in excavation for side drain structure as per drawing

    and technical specification clause 305.1 including setting out,

    construction of shoring and bracing, removal of stumps and other

    deliterious material and diposal up to a lead of 50 , dressing of sides

    and bottom and back filling in trenches with excavated suitable

    material as per technical specification 305 MORD/304 MORTh.(CSSR)

    CC07-Cost and conveyance of sand for filling including all charges but

    excluding labour charges for filling.

    CC09.Engaging unskilled labour for Filling foundation with sand

    includin cost and conve ance of sand and labour char es RSSR

    Providing plain cement concrete M15 using 20 mm to 12 mm Graded

    HBG crushed Metal with 250 Kgs of cement per 1 cum of concrete,

    including C/c of all materials, curing, labour charges etc., complete as

    per drawings & tech. specifications Clause 802,803,1202 & 1203 as per

    caluse 800 & 1200 (1) of MORD and guidelines For side drains.

    Providing plain cement concrete M15 using 20 mm to 12 mm Graded

    HBG crushed Metal with 250 Kgs of cement per 1 cum of concrete,

    including C/c of all materials, curing, labour charges etc., complete as

    per drawings & tech. specifications Clause 802,803,1202 & 1203 as per

    caluse 800 & 1200 (1) of MORD and guidelines For side walls of side

    CC58Supplying, fitting and placing HYSD bar reinforcement in slab

    over drain complete and technical specifications including fabrication

    RCC M-20 Nominal mix using 20 mm to 12 mm Graded size crushed

    hard granite metal including C/c of all materials, taxes, operational,

    incidental and labour charges such as machine mixing, laying concrete,

    curing etc., complete but excluding cost of steel and its fabrication

    charges for finished item of work for Slab over drain.

  • 8/10/2019 1. Mothkur new SC colony.xls

    13/66

    Pop Estimate Cost : 25.00 Lakhs

    L B D

    Population of the localitySl.

    No.Task Name Nos

    Measurements Quantity

    (cum)

    Rate per (1

    cum)Amount

    Total 0.83 5819.63 480113

    For C C pavement 1 x 1 310.00 3.00 0.170 158.10

    Total 158.10 6092.95 963295

    2262974

    14

    5% 2262974 11314915

    0.50% 2262974 11315

    16 79936

    17 32626

    Grand Total 2500000

    Construction of un-reinforced, dowel jointed at expansion and

    construction joint only,PCC pavement thickness as per design over a

    prepared sub base using M30 grade, coarse and fine aggregates

    confirming to IS 383 including all labour charges etc. complete (CSSR)

    VAT @ 5%

    QC Charges @ 0.50%

    Seigniorage charges

    Provision for unforseen items

    Assistant Executive EngineerM.P. Velugodu.

    Dy. Executive EngineerPRI(P.R), Atmakur.

    Executive EngineerP.R.Division, Nandyal.

    Superintending EngineerP.R. Kurnool.

  • 8/10/2019 1. Mothkur new SC colony.xls

    14/66

    Sl.

    Nocription of i No

    L B D QTY RATE AMOUNT Qty Rate Amount

    1 2 3 4 5 6 7 8 9 10 11 12 13

    1

    535.24 80.47 43071.00 535.24 80.47 43071.00 0.00Page 1,5 of Cum

    2

    for sub base 598.97 452.75 271184.00 598.97 452.75 271184.00 0.00Page 7 of MB Cum Cum

    3

    Page 7 of MB 598.97 16.64 9967.00 598.97 16.64 9967.00 0.00Cum Cum

    Engaging Unskilled Labour for earth work excavation inordinary soils AT SITE with initial lead & initial lift

    and sectioning for formation of embankment - (RSSR)

    CC 16- Supply and collection of well graded granular

    material (i.e. 66% (61%-71%)of gravel having stone

    aggregate of 9.5 mm to 4.75 mm size, and 34%(29%-

    39%) of stone dust of size less than 2.6 mm) with CBR

    not

  • 8/10/2019 1. Mothkur new SC colony.xls

    15/66

    4

    Page 9 of MB 499.14 110.46 55135.00 499.14 110.46 55135.00 0.00Cum Cum

    Part 'B' - WORK TO BE DONE AS PER SSR 2013-14

    5

    737.96 80.47 59384.00 0.00 99.25 0.00 0.00Cum Cum

    6

    2456.71 452.75 1112275.00 232.50 500.58 116385.00 0.00 9Cum Cum

    Engaging Unskilled Labour for earth work excavation in

    ordinary soils AT SITE with initial lead & initial lift

    and sectioning for formation of embankment - (RSSR)

    CC16- Supply and collection of well graded granular

    material (i.e. 66% (61%-71%)of gravel having stoneaggregate of 9.5 mm to 4.75 mm size, and 34%(29%-

    39%) of stone dust of size less than 2.6 mm) with CBR

    not

  • 8/10/2019 1. Mothkur new SC colony.xls

    16/66

    7

    2456.71 16.64 40880.00 145.70 20.51 2988.00 0.00Cum Cum

    8

    1410.66 110.46 155822.00 162.75 199.72 32504.00 0.00 1Cum Cum

    9

    895.22 2063.11 1846937.00 74.40 2122.88 157942.00 0.00 16Cum Cum

    CC24-Engaging Unskilled labour for spreading the

    collected well graded granular material and sectioning

    for sub base & shoulders. (RSSR)

    CC25-Compaction of collected well graded granular soil

    to OMC using 8-l0T Power Road Roller to achieve CBRvalue not

  • 8/10/2019 1. Mothkur new SC colony.xls

    17/66

    10

    895.22 315.60 282531.00 74.40 487.84 36295.00 0.00 2Cum Cum

    11

    4999.18 80.47 402284.00 204.60 99.25 20307.00 0.00 3Cum Cum

    12

    1474.12 313.44 462048.00 78.43 415.77 32609.00 0.00 4Cum Cum

    13

    1474.12 16.64 24529.00 78.43 20.51 1609.00 0.00

    CC30-Spreading & compaction of collected mixer of

    stone aggregates in uniform thicknesses and good

    gravel for blindage, hand packing and rolling with 8-l0T

    Power Road Roller in stages to proper grade and

    camber with required waterings and keeping the rolled

    surface wet for a period of 15 days including brooming

    (91 mm loose to 75 mm compacted) (CSSR)

    CC 33 Earth work in excavation for side drain

    structure as per drawing and technical specification

    clause 305.1 including setting out, construction of

    shoring and bracing, removal of stumps and other

    deliterious material and diposal up to a lead of 50 ,

    dressing of sides and bottom and back filling in

    trenches with excavated suitable material as per

    technical specification 305 MORD/304 MORTh.(CSSR)

    CC07-Cost and conveyance of sand for filling including

    all charges but excluding labour charges for filling.

    CC09.Engaging unskilled labour for Filling foundation

    with sand including cost and conveyance of sand and

    labour charges (RSSR)

  • 8/10/2019 1. Mothkur new SC colony.xls

    18/66

    Cum Cum

    14

    503.58 3965.72 1997057.00 34.10 5062.79 172641.00 0.00 18Cum Cum

    15

    1442.07 5759.19 8305155.00 97.65 7191.77 702276.00 0.00 760.00 5354.88 0.00 0.00

    Cum Cum

    16

    HYSD bars 4500.00 46.20 207900.00 150.00 46.20 6930.00 0.00 2

    For Labour & Bindin wire 4500.00 2.56 11520.00 150.00 49.28 7392.00 0.00

    Kg Kg

    CC58Supplying, fitting and placing HYSD bar

    reinforcement in slab over drain complete and

    technical specifications including fabrication charges

    Providing plain cement concrete M15 using 20 mm to 12

    mm Graded HBG crushed Metal with 250 Kgs of

    cement per 1 cum of concrete, including C/c of all

    materials, curing, labour charges etc., complete as per

    drawings & tech. specifications Clause 802,803,1202 &

    1203 as per caluse 800 & 1200 (1) of MORD and

    Providing plain cement concrete M15 using 20 mm to 12

    mm Graded HBG crushed Metal with 250 Kgs of

    cement per 1 cum of concrete, including C/c of all

    materials, curing, labour charges etc., complete as per

    drawings & tech. specifications Clause 802,803,1202 &

    1203 as per caluse 800 & 1200 (1) of MORD and

    guidelines For side walls of side drains.

  • 8/10/2019 1. Mothkur new SC colony.xls

    19/66

    17

    29.70 4511.38 133988.00 0.83 5819.63 4801.00 0.00 1Cum Cum

    17

    0.00 1348.05 0.00 0.00Cum

    18

    1456.50 4871.92 7095951.00 158.10 6092.95 963295.00 0.00 61Cum Cum

    19

    1.00 4500.00 3500.00 1.00 5000.00 5000.00 1500.00

    Construction of un-reinforced, dowel jointed at

    expansion and construction joint only,PCC pavement

    thickness as per design over a prepared sub base usingM30 grade, coarse and fine aggregates confirming to

    IS 383 including all labour charges etc. complete

    CSSR

    CRW16.Supply and fixing of MS name board of size

    2feet.6inch x4feet including painting and required

    lettering

    RCC M-20 Nominal mix using 20 mm to 12 mm Graded

    size crushed hard granite metal including C/c of all

    materials, taxes, operational, incidental and labour

    charges such as machine mixing, laying concrete, curing

    etc., complete but excluding cost of steel and its

    fabrication charges for finished item of work for Slab

    Providing and laying reinforced cement concrete pipe

    NP3 for culverts on first class bedding of granular

    material with cement mortar 1:2 but excluding

    excavation, protection works, backfilling, concrete and

    masonry works in head wall and parapets. Tech

  • 8/10/2019 1. Mothkur new SC colony.xls

    20/66

    No. No.

    20 922956.00 113149.00 0.00 8

    21 112918.00 11315.00 0.00 1

    22 436897.00 79936.00 0.00 3

    23 1102111.00 32626.00 0.00 10

    Total 25096000.00 2879357.00 1500.00 222

    QC Charges @ 0.50%

    VAT @ 5%

    Seigniorage charges

    Provision for unforseen items

  • 8/10/2019 1. Mothkur new SC colony.xls

    21/66

    As per Original Estimate 25096000.00 Excess 1500.00

    As per Work done Estimate 2879357.00 Less 22218143.00

    Difference -22216643.00 22216643.00

  • 8/10/2019 1. Mothkur new SC colony.xls

    22/66

    15

    mar

  • 8/10/2019 1. Mothkur new SC colony.xls

    23/66

  • 8/10/2019 1. Mothkur new SC colony.xls

    24/66

  • 8/10/2019 1. Mothkur new SC colony.xls

    25/66

  • 8/10/2019 1. Mothkur new SC colony.xls

    26/66

  • 8/10/2019 1. Mothkur new SC colony.xls

    27/66

  • 8/10/2019 1. Mothkur new SC colony.xls

    28/66

  • 8/10/2019 1. Mothkur new SC colony.xls

    29/66

  • 8/10/2019 1. Mothkur new SC colony.xls

    30/66

    Sl.

    No.Description of material Name of the quarry Lead in Km

    Conveyance

    charges

    (excluding Conc.

    Profit)

    Initial RateBlasting

    charges

    Machine

    crushing

    charges

    1 2 3 4 5 6 7 8

    1 Gravel Banakacherla 19.00 228.51 103.00

    2 Sand for filling Local 5.00 73.77 342.00

    3 Sand for Concrete Sunkesula 121.00 1187.81 462.00

    4 HBG Stone Chips 2.36mm and below yanganti palli 81.00 819.82 357.00

    WBM Grade II metal

    5 60-63mm metal (50% of 435.60) yanganti palli 81.00 819.82 419.00

    6 40-45mm metal (40% of 435.60) yanganti palli 81.00 819.82 845.00

    7 19-22mm metal (4% of 435.60) yanganti palli 81.00 819.82 1365.00

    Cement concrete Metal

    8 20mm M/c HBG metal (60%) yanganti palli 81.00 819.82 1365.00

    9 12mm M/c HBG metal (40%) yanganti palli 81.00 819.82 1097.00

    10 9.50-11.20mm HBG M/c metal yanganti palli 81.00 819.82 935.00

    11 40mm M/C HBG metal yanganti palli 81.00 819.82 845.00

    12 10mm M/c HBG metal yanganti palli 81.00 819.82 935.00

    Type B screens

    13 HBG Stone Chips 5-7mm yanganti palli 81.00 819.82 735.00

    14 HBG Stone Chips 2.36-5mm yanganti palli 81.00 819.82 474.00

    15 Cement At Site 5900.00

    16 450 mm dia NP3 class S&S pipes Gopavaram 43.00 124.68 1284.00

    17 Steel At Site 44000.00

    Certified that the above leads are true and correct to the best of my knowledge.

    LEAD STATEMENT (SSR 2014-2015)

    Construction of Pucca internrnal roads with drains, culvert in new SC colony of Mothkur (v).

    Assistant Executive EnM.P. Velugodu.

    Dy. Executive EngineerPRI(P.R), Atmakur.

    Executive EngineerP.R.Division, Nandyal.

    Superintending EngineerP.R. Kurnool.

  • 8/10/2019 1. Mothkur new SC colony.xls

    31/66

    Index-

    codeDescription Unit Quantity Rate Rs. Amount Rs.

    2 3 4 5 6

    1

    Rate as per Current RSSR Cum 1.00 99.25 99.25

    Net rate 99.25

    2

    Rate per 1.00 Cum loose 20.51

    3

    Sand cum 1.00 415.77 415.77415.77

    4

    Taking Output =1 Cum

    Gravel @ 80% Cum 0.96 331.51 318.25

    Stone dust @ 20% Cum 0.24 1176.82 282.44

    Rate per 1.00 Cum 600.69Loose Rate per 1.00 Cum 500.58

    5 Engaging Unskilled labour for spreading the

    collected well graded granular material and

    sectionin for sub base & shoulders. RSSRRate as sper RSSR Cum 1.20 20.51 24.61

    Rate per 1.00 Cum loose 24.61

    6

    Tractor with Rotavator 25 cum per hour Hrs 12.00 422.00 5064.00

    Water tanker 6 Kl Capacity Hrs 5.00 658.35 3291.75

    Three wheeled 8-10 T roller @10cum /Hr. Hr 30.00 1718.70 51561.00

    Rate per 300 Cum 59916.75

    Rate per 1.00 Cum Compact 199.72

    Engaging Unskilled Labour for earth work excavation in ordinary soils AT SITE with

    initial lead & initial lift and sectioning for formation of embankment - (RSSR)

    Engaging Unskilled Labour for filling/spreding with gravel/sand/stone dust but

    excluding conveyance of sand(RSSR)

    Cost and conveyance of sand for filling including all charges but excluding labour

    charges for filling

    CC 16- Supply and collection of well graded granular material (i.e. 66% (61%-71%)of

    gravel having stone aggregate of 9.5 mm to 4.75 mm size, and 34%(29%-39%) of

    stone dust of size less than 2.6 mm) with CBR not

  • 8/10/2019 1. Mothkur new SC colony.xls

    32/66

    Index-

    codeDescription Unit Quantity Rate Rs. Amount Rs.

    2 3 4 5 6

    S.

    No

    1

    7

    Taking Output =360 Cum 435.60 1472.00 641203.20

    60-63mm IRC HBG metal(50% of 435.60 cum) Cum 217.80

    40-45mm IRC HBG metal(46% of 435.60 cum) Cum 200.38

    19-22mm irc METAL m/C (4% OF 435.60 cum) Cum 17.42

    Stone Screening

    Type B 11.2 mm for Grading 2 @ 0.18 / 0.20

    cum/10sqm cum 86.401424.00

    123033.60

    Rate per 360.00 Cum Compact 764236.80

    i. Total Rate per 1.00 Cum Compact 2122.88

    ii.Graded metal Rate per 1.00 Cum excluding screening 1781.12

    iii. screens (i-ii) cum 341.76

    8

    (a) MaterialBinding material ( Gravel)@ 0.06cum /10 sqm for

    WBM Grading II Cum 28.80 331.51 9547.49

    Water kl 144.00 77.00 11088.00

    (b) Labour

    Mazdoor(skilled) days 12.08 295.00 3563.60

    Mazdoor(Unskilled) days 250.00 295.00 73750.00

    Water tanker 6Kl capacity Hrs 24.00 658.35 15800.40

    three wheeled 8-10T static roller Hrs 36.00 1718.70 61873.20

    Rate per 360 Cum 175622.69

    Rate per 1.00 Cum 487.84

    9

    Unit = cum

    (a) Material

    Cement t 0.25 5900.00 1475.00

    Coarse sand cum 0.48 1649.81 791.91

    20 mm aggregate @0.54 cum 0.90 2077.00 1869.30

    12 mm [email protected] cum

    sub total for material 4136.21

    Taking Output = 360 Cum

    Providing plain cement concrete M15 using 20 mm to 12 mm Graded HBG crushed

    Metal with 250 Kgs of cement per 1 cum of concrete, including C/c of all materials,

    curing, labour charges etc., complete as per drawings & tech. specifications Clause

    802,803,1202 & 1203 as per caluse 800 & 1200 (1) of MORD and guidelines For

    side drains Bed.

    Supply and collection of mixer of stone aggregates having 50% of 60-63mm HBG

    metal ,46% of 40-45mm HBG metal and 4% of 19-22mm HBG metal including cost

    ,conveyance, loading, unloading and stacking to departmental gauge for pre

    measurements for WBM Grade.II surfaces per MORD standards (91 mm loose to75 mm com acted) (CSSR)

    CC30-Spreading & compaction of collected mixer of stone aggregates in uniform

    thicknesses and good gravel for blindage, hand packing and rolling with 8-l0T Power

    Road Roller in stages to proper grade and camber with required waterings and

    keeping the rolled surface wet for a period of 15 days including brooming (91 mm

    loose to 75 mm com acted CSSR

  • 8/10/2019 1. Mothkur new SC colony.xls

    33/66

    Index-

    codeDescription Unit Quantity Rate Rs. Amount Rs.

    2 3 4 5 6

    S.

    No

    1

    (b) Labour

    Mate day -

    Mason (1st Class) day 0.10 385.00 38.50

    Mazdoor (Unskilled) day 1.39 295.00 410.05

    sub total for labour 448.55

    (c) Machinery

    Concrete mixer 0.4/0.28 cum capacity hour 0.40 328.60 131.44

    Vibrator charges hour 0.40 165.70 66.28

    Water tanker 6 kl capacity hour 0.13 658.35 85.59

    sub total for mechinery 283.31

    (d) Formwork @ 4% on cost of material, labour and

    machiner (a+b+c) 4.00% 4868.07 194.72

    Rate per cum = a+b+c+d+e+f 5062.79

    Supply & delivery of Cement kg 1475.00

    Supply & collection of metal cum 1869.30Supply & collection of sand cum 791.91

    Centering & labour charges 926.58

    10

    Unit = cum

    (a) Material

    Cement t 0.25 5900.00 1475.00

    Coarse sand cum 0.48 1649.81 791.9120 mm aggregate @0.54 cum 0.90 2077.00 1869.30

    12 mm [email protected] cum

    sub total for material 4136.21

    (b) Labour

    Mate day -

    Mason (1st Class) day 0.10 385.00 38.50

    Mazdoor (Unskilled) day 1.39 295.00 410.05

    sub total for labour 448.55

    (c) Machinery

    Concrete mixer 0.4/0.28 cum capacity hour 0.40 328.60 131.44

    Vibrator charges hour 1.40 165.70 231.98Water tanker 6 kl capacity hour 0.13 658.35 85.59

    sub total for mechinery 449.01

    (d) Formwork as per plinth beam centering charges

    of CSSR 2410.00 2158.00

    Rate per cum = a+b+c+d+e+f 7191.77

    Supply & delivery of Cement kg 1475.00

    Supply & collection of metal cum 1869.30

    Supply & collection of sand cum 791.91

    Centering & labour charges 3055.56

    Providing plain cement concrete M15 using 20 mm to 12 mm Graded HBG crushed

    Metal with 250 Kgs of cement per 1 cum of concrete, including C/c of all materials,

    curing, labour charges etc., complete as per drawings & tech. specifications Clause

    802,803,1202 & 1203 as per caluse 800 & 1200 (1) of MORD and guidelines For

  • 8/10/2019 1. Mothkur new SC colony.xls

    34/66

    Index-

    codeDescription Unit Quantity Rate Rs. Amount Rs.

    2 3 4 5 6

    S.

    No

    1

    11

    Unit = cum

    a MaterialCement t 0.330 5900.00 1947.00Coarse sand cum 0.450 1649.81 742.41

    20 mm aggregate @0.54 cum 0.90 2077.00 1869.30

    12 mm [email protected] cum 0.00

    sub total for material 4558.71

    (b) Labour

    Mate day -

    Mason (1st Class) day 0.10 385.00 38.50

    Mazdoor (Unskilled) day 1.39 295.00 410.05

    sub total for labour 448.55

    c) Machinery

    Concrete mixer 0.4/0.28 cum capacity hr / 0.40 328.60 131.44

    Vibrator charges hour 0.40 165.70 66.28

    Water tanker 6 kl capacity hour 0.13 658.35 85.59

    sub total for mechinery 283.31

    Total (a+b+c) 5290.57

    d) For formwork and staging add the following

    percentage of (a+b+c):

    10 per cent 10.00% 5290.57 529.06e&f) Overheads & Contractors Profit

    Rate per cum = a+b+c+d+e+f 5819.63

    Supply & delivery of Cement kg 1947.00

    Supply & collection of metal cum 1869.30

    Supply & collection of sand cum 742.41

    Centering & labour charges 1260.92

    12

    (a) Material

    HYSD/TMT/ MS bars including 5 per cent foroverla s and wasta e

    t 1.05 44000.00 46200.00

    (b) Labour

    Blacksmith / Bar bender day 2.00 385.00 770.00

    Mazdoor (Unskilled) day 6.40 295.00 1888.00

    Binding wire kg 6.00 70.00 420.00

    Rate per MT of HYSD bars 49278.00

    RCC M-20 Nominal mix using 20 mm to 12 mm Graded size crushed hard granite

    metal including C/c of all materials, taxes, operational, incidental and labour

    charges such as machine mixing, laying concrete, curing etc., complete but

    excluding cost of steel and its fabrication charges for finished item of work forSlab over drain.

    CC58Supplying, fitting and placing HYSD bar reinforcement in slab over drain

    complete and technical specifications including fabrication charges

  • 8/10/2019 1. Mothkur new SC colony.xls

    35/66

    Index-

    codeDescription Unit Quantity Rate Rs. Amount Rs.

    2 3 4 5 6

    S.

    No

    1

    13

    Unit = cum

    Taking output = 75 cum (172.50 t)

    (2147 x 3.00 x 0.17)

    a) Labour

    Mate day -

    Mason (1st class) day 5.00 385.00 1925.00

    Mason (2nd class) day 5.00 345.00 1725.00

    Mazdoor (Unskilled) day 150.00 295.00 44250.00

    Mazdoor (Skilled) day 6.00 295.00 1770.00

    Mazdoor (Semi-Skilled) day 6.00 295.00 1770.00

    sub total for labour 51440.00

    b) Machinery

    Concrete mixer 0.28 / 0.4 cum capacity (6 mixers) hour 36.00 328.60 11829.60

    Plate vibrator hour 9.00 165.70 1491.30

    Water tanker 6 kl capacity hour 5.00 658.35 3291.75

    sub total for mechinery 16612.65

    c) Material

    Crushed stone coarse aggregates, grading will be as

    er Clause 1501.2.4.1 (Table 1500.1) of s ecifications

    cum 67.50

    20 mm aggregate @0.60 cum 67.50 2077.00 140197.50

    12 mm [email protected] cum 0.00Sand for concrete @ 0.45 cum/cum of concrete cum 33.75 1649.81 55681.09

    Cement @ 350 kg/cum of concrete t 26.25 5900.00 154875.00

    Polythene sheet 125 micron (200x3.00x1.10=660) sqm 660.00 20.00 13200.00

    Mastic Pad 3x.0.15x28=12.60 sqm 12.60 925.00 11655.00

    sub total for material 375608.59

    sub total of a+b+c 443661.24

    d) Formwork @ 3% of (a+b+c) 0.03 443661.24 13309.84Cost for 75 cum = a+b+c+d+e+f 456971.08

    Rate per cum = (a+b+c+d+e+f)/75 6092.95

    Supply & delivery of Cement kg 2065.00Supply & collection of metal cum 1869.30

    Supply & collection of sand cum 742.41

    Centering & labour charges 1416.24

    Construction of un-reinforced, dowel jointed at expansion and construction joint

    only,PCC pavement thickness as per design over a prepared sub base using M30

    grade, coarse and fine aggregates confirming to IS 383 including all labour

    charges etc. complete (CSSR)

  • 8/10/2019 1. Mothkur new SC colony.xls

    36/66

    Index-

    codeDescription Unit Quantity Rate Rs. Amount Rs.

    2 3 4 5 6

    S.

    No

    1

    13

    Unit = cum

    (a) Material

    Cement t 0.25 5900.00 1475.00

    Coarse sand cum 0.48 1649.81 791.91

    20 mm aggregate @0.54 cum 0.90 2077.00 1869.30

    12 mm [email protected] cum

    sub total for material 4136.21

    (b) Labour

    Mate day -

    Mason (1st Class) day 0.10 385.00 38.50Mazdoor (Unskilled) day 1.39 295.00 410.05

    sub total for labour 448.55

    (c) Machinery

    Concrete mixer 0.4/0.28 cum capacity hour 0.40 328.60 131.44

    Vibrator charges hour 0.40 165.70 66.28

    Water tanker 6 kl capacity hour 0.13 658.35 85.59

    sub total for mechinery 283.31

    (d) Formwork @ 10% on cost of material, labour and

    machinery (a+b+c) 10.00% 4868.07 486.81

    Rate per cum = a+b+c+d+e+f 5354.88

    14

    Unit = m

    Taking output = 7.5 m

    Rate per m

    450 mm dia

    a) Labour

    Mate day -Mason (1st Class) day 0.12 385.00 46.20

    Mazdoor (Unskilled) day 1.00 295.00 295.00

    Laying & fixing of Pipes position including lifting,

    aligning etc.,

    rm 341.20

    sub total for labour 341.20

    b) Material

    Sand at site cum 0.020 1649.81 33.00

    Cement at site t 0.018 5900.00 106.20

    Providing plain cement concrete M15 using 20 mm to 12 mm Graded HBG crushed

    Metal with 250 Kgs of cement per 1 cum of concrete, including C/c of all materials,

    curing, labour charges etc., complete as per drawings & tech. specifications Clause

    802,803,1202 & 1203 as per caluse 800 & 1200 (1) of MORD and guidelines Forside drains Bed.

    Providing and laying reinforced cement concrete pipe NP3 for culverts on first

    class bedding of granular material with cement mortar 1:2 but excluding

    excavation, protection works, backfilling, concrete and masonry works in head wall

    and parapets. Tech Specification Clause 1106 MORD

  • 8/10/2019 1. Mothkur new SC colony.xls

    37/66

    Index-

    codeDescription Unit Quantity Rate Rs. Amount Rs.

    2 3 4 5 6

    S.

    No

    1

    450 mm dia RCC pipe NP3 pipe m 7.50 1284.00 9630.00

    sub total for material 9769.20

    Cost for 7.5 m = a+b+c 10110.40

    Rate per m = (a+b)/7.5 Rs. 1348.05

    Assistant Executive EngineerM.P. Velugodu.

    Dy. Executive EngineerPRI(P.R), Atmakur.

    Executive EngineerP.R.Division, Nandyal.

    Superintending EngineerP.R. Kurnool.

  • 8/10/2019 1. Mothkur new SC colony.xls

    38/66

    S.N

    oItem Quantity Unit

    Qty Ratio Rate Amount

    1 2 3 4 5 6 7 8

    1 GSB 162.75

    Gravel 162.75 0.66 22.00 2363.00

    stone dust 162.75 0.34 50.00 2767.00

    2 WBM 895.22

    Metal 895.22 1.00 50.00 44761.00

    Screenings 895.22 0.24 40.00 8594.00

    3 Sand filling Sand 78.43 1.00 40.00 3137.00

    4 M15 Concrete 131.75

    131.75 0.900 50.00 5929.00

    Sand 131.75 0.45 40.00 2372.00

    5 M20 Concrete 0.83 Cum

    Metal 0.83 0.90 50.00 37.00

    Sand 0.83 0.45 40.00 15.00

    6 M30 Concrete 158.10 Cum

    Metal 158.10 0.90 50.00 7115.00

    Sand 158.10 0.45 40.00 2846.00

    Total 79936.00

    Seigniorage Charges

    Construction of Pucca internrnal roads with drains, culvert in new SC colony of Mothkur

    (v).

    Seigniorage Charges

    Metal

    Assistant Executive EngineerM.P. Velugodu.

    Dy. Executive EngineerPRI(P.R), Atmakur.

    Executive EngineerP.R.Division, Nandyal.

    Superintending EngineerP.R. Kurnool.

  • 8/10/2019 1. Mothkur new SC colony.xls

    39/66

    Pop Estimate Cost : #REF! Lakhs

    L B D

    Part 'A' - WORK DONE AS PER SSR 2012-13

    1

    for road work 831.90 535.24 80.47 43071

    Page 1,5 of MB 0727A

    2

    for sub base 1 x 1 831.90 4.00 0.18 598.97 452.75 271184

    Page 7 of MB 0786A

    3

    for sub base 1 x 1 831.90 4.00 0.18 598.97 16.64 9967

    Page 7 of MB 0727A

    4

    for sub base 1 x 1 831.90 4.00 0.15 499.14 110.46 55135

    Page 9 of MB 0727A

    Part 'B' - WORK TO BE DONE AS PER SSR 2013-14

    1

    for road work 1 x 1 3183.00 4.00 0.15 1909.80

    deduct work done 1 x 1 -831.90 -535.24

    2351.10 1374.56 87.51 120288

    2

    for road work 1 x 1 3183.00 4.00 0.18 2291.76

    For side drain shouders 1 x 2 3183.00 1.00 0.120 763.92

    CC 16-Engaging Unskilled labour for spreading the collected well

    graded granular material and sectioning for sub base & shoulders.

    CRWA09-Compaction of collected well graded granular soil to OMC

    using 8-l0T Power Road Roller to achieve CBR value not

  • 8/10/2019 1. Mothkur new SC colony.xls

    40/66

  • 8/10/2019 1. Mothkur new SC colony.xls

    41/66

    Pop Estimate Cost : #REF! Lakhs

    L B D

    Population of the localitySl.

    No.Task Name Nos Amount

    Quantity

    (cum)

    Rate per (1

    cum)

    Measurements

    Total 4341.88 87.51 3799588

    For side drain 1 x 2 3878.00 0.70 0.23 1248.72

    For 450mm dia RCC pipes 1 x 30 5.20 0.80 0.15 18.72

    for body walls to 450 mm

    dia RCC pipes (0.30+0.30) 2 x 30 0.60 0.50 0.15 2.70

    Total 1270.14 358.77 4556889

    For side drain 1 x 2 3878.00 0.70 0.23 1248.72

    For 450mm dia RCC pipes 1 x 30 5.20 0.80 0.15 18.72

    for body walls to 450 mm

    dia RCC pipes (0.30+0.30) 2 x 30 0.60 0.50 0.15 2.70

    Total 1270.14 18.09 2297710

    For side drain bed 1 x 2 3878.00 0.55 0.10 426.58

    For 450mm dia RCC pipes 1 x 30 5.20 0.80 0.15 18.72

    for body walls to 450 mm

    dia RCC pipes (0.30+0.30) 2 x 30 0.60 0.50 0.15 2.70

    Total 448.00 4724.4

    Supply & delivery of Cement 448.00 1300.00 582400

    Supply & collection of metal 448.00 1827.00 818496

    Supply & collection of sand 448.00 724.21 324446

    Centering & labour charges 448.00 873.19 39118911

    side walls of side drain 1 x 2 3878.00 0.55 0.45 1919.61

    Deductions 1 x -2 3878.00

    (0.3+0.1)/

    2 0.45 -698.04for body walls to 450 mm

    dia RCC pipes 2 x 30 1.20

    (0.27+0.4

    5)/2 1.00 25.92

    Deduct for pipe dia 2 x 30 0.36 -6.1122/7*0.6*0.6/4

    Providing plain cement concrete M15 using 20 mm to 12 mm Graded

    HBG crushed Metal with 250 Kgs of cement per 1 cum of concrete,

    including C/c of all materials, curing, labour charges etc., complete as

    per drawings & tech. specifications Clause 802,803,1202 & 1203 as per

    caluse 800 & 1200 (1) of MORD and guidelines For side drains.

    CC09.Engaging unskilled labour for Filling foundation with sand

    including cost and conveyance of sand and labour charges (RSSR)

    CC07-Cost and conveyance of sand for filling including all charges but

    excluding labour charges for filling.

    Providing plain cement concrete M15 using 20 mm to 12 mm Graded

    HBG crushed Metal with 250 Kgs of cement per 1 cum of concrete,

    including C/c of all materials, curing, labour charges etc., complete as

    per drawings & tech. specifications Clause 802,803,1202 & 1203 as per

    caluse 800 & 1200 (1) of MORD and guidelines For side walls of side

    drains.

  • 8/10/2019 1. Mothkur new SC colony.xls

    42/66

    Pop Estimate Cost : #REF! Lakhs

    L B D

    Population of the localitySl.

    No.Task Name Nos Amount

    Quantity

    (cum)

    Rate per (1

    cum)

    Measurements

    Total 1241.38 6748.69

    Supply & delivery of Cement 1241.38 1300.00 1613794

    Supply & collection of metal 1241.38 1827.00 2268001

    Supply & collection of sand 1241.38 724.21 899020

    Centering & labour charges 1241.38 2897.48 359687412

    For slabs over drain 1 x 80 75.00 6000.00 45.15 270900

    Labour charges for fitting1 x 80 75.00 6000.00 2.85 17100

    Kg Kg13

    For slabs over drain 1 x 80 5.00 0.55 0.15 33.00

    Total 33.00 5404.77

    Supply & delivery of Cement 33.00 1716.00 56628

    Supply & collection of metal 33.00 1827.00 60291

    Supply & collection of sand 33.00 678.95 22405

    Centering & labour charges 33.00 1182.82 3903314

    for drain 1 x 30 5.00 150.00

    Total 150.00 1740.97

    cement 150.00 12.48 1872

    sand 150.00 4.02 603

    450 mm dia RCC pipe NP3 pipe 150.00 1681.53 252230

    labour charges 150.00 42.94 6441

    Rmt Rmt15

    For C C pavement 1 x 1 3884.00 3.00 0.125 1456.50

    Total 1456.50 5756.28

    Supply & delivery of Cement kg 1456.50 6092.95 8874382

    Supply & collection of metal cum 1456.50 #REF! #REF!

    Supply & collection of sand cum 1456.50 #REF! #REF!

    Centering & labour charges 1456.50 #REF! #REF!16

    Providing and laying reinforced cement concrete pipe NP3 for culverts

    on first class bedding of granular material with cement mortar 1:2 but

    excluding excavation, protection works, backfilling, concrete and

    masonry works in head wall and parapets. Tech Specification Clause

    CRW16.Supply and fixing of MS name board of size 2feet.6inch x4feet

    including painting and required lettering

    CC58Supplying, fitting and placing HYSD bar reinforcement in slab

    over drain complete and technical specifications including fabrication

    charges

    RCC M-20 Nominal mix using 20 mm to 12 mm Graded size crushed

    hard granite metal including C/c of all materials, taxes, operational,

    incidental and labour charges such as machine mixing, laying concrete,

    curing etc., complete but excluding cost of steel and its fabricationcharges for finished item of work for Slab over drain.

    Construction of un-reinforced, dowel jointed at expansion and

    construction joint only,PCC pavement thickness as per design over a

    prepared sub base using M30 grade, coarse and fine aggregates

    confirming to IS 383 including all labour charges etc. complete (CSSR)

  • 8/10/2019 1. Mothkur new SC colony.xls

    43/66

    Pop Estimate Cost : #REF! Lakhs

    L B D

    Population of the localitySl.

    No.Task Name Nos Amount

    Quantity

    (cum)

    Rate per (1

    cum)

    Measurements

    Name board 1 1 5000.00 5000

    #REF!

    17

    5% #REF! #REF!18

    0.50% #REF! #REF!

    19 79936

    20 550789

    Grand Total #REF!

    VAT @ 5%

    Provision for unforseen items

    Seigniorage charges

    QC Charges @ 0.50%

    Assistant Executive Engineer

    M.P. Velugodu.

    Dy. Executive Engineer

    PRI(P.R), Atmakur.

    Executive Engineer

    P.R.Division, Nandyal.

    Superintending Engineer

    P.R. Kurnool.

  • 8/10/2019 1. Mothkur new SC colony.xls

    44/66

    Sl.

    No.Description of material Name of the quarry Lead in Km

    Conveyance

    charges

    (excluding Conc.

    Profit

    Initial RateBlasting

    charges

    Machine

    crushing

    charges

    1 2 3 4 5 6 7 8

    1 Gravel Banakacherla 12.00 151.14 98.00

    2 Sand for filling Local 5.00 73.77 285.00

    3 Sand for Concrete Sunkesula 114.00 1123.77 385.00

    4 HBG Stone Chips 2.36mm and below yanganti palli 88.00 884.30 330.00

    WBM Grade II metal

    5 60-63mm metal (50% of 435.60) yanganti palli 88.00 884.30 419.00 70.00 104.75

    6 40-45mm metal (40% of 435.60) yanganti palli 88.00 884.30 588.00 70.00 147.00

    7 19-22mm metal (4% of 435.60) yanganti palli 88.00 884.30 984.00 70.00 246.00

    Cement concrete Metal

    8 20mm M/c HBG metal (60%) yanganti palli 88.00 884.30 984.00 70.00 246.00

    9 12mm M/c HBG metal (40%) yanganti palli 88.00 884.30 780.00 70.00 195.00

    10 9.50-11.20mm HBG M/c metal yanganti palli 88.00 884.30 656.00 70.00 164.00

    11 40mm M/C HBG metal yanganti palli 88.00 884.30 588.00 70.00 147.00

    12 10mm M/c HBG metal yanganti palli 88.00 884.30 656.00 70.00 164.00

    Type B screens

    13 HBG Stone Chips 5-7mm yanganti palli 88.00 884.30 504.00 70.00 126.00

    14 HBG Stone Chips 2.36-5mm yanganti palli 88.00 884.30 308.00 70.00 77.00

    15 Cement At Site 5200.00

    16 450 mm dia pipes Gopavaram 42.00 111.53 1570.00

    Certified that the above leads are true and correct to the best of my knowledge.

    LEAD STATEMENT (SSR 2013-2014)

    Name of the Work:Providing Internal Roads with CC Drains in Indira Nagar (SC colony ) at Velugodu

    Assistant Executive EngineerM.P. Velugodu.

    Dy. Executive EngineerPRI(P.R), Atmakur.

    Executive EngineerP.R.Division, Nandyal.

    Superintending EngineerP.R. Kurnool.

  • 8/10/2019 1. Mothkur new SC colony.xls

    45/66

    WBM Grade II 435.60 Intial Cost & Lead 2012-13 WBM Grade II 435.60 Intial Cost & L

    50 % of 60-63 HBG metal 217.80 1326.71 288957.44 50 % of 60-63 HBG metal 217.80 1478.05 3219

    46 % of 40-45 HBG metal 200.38 1516.71 303912.28 46 % of 40-45 HBG metal 200.38 1689.30 3384

    4 % of 19-22 HBG metal 17.42 2101.71 36620.20 4 % of 19-22 HBG metal 17.42 2184.30 380

    for 435.6 cum 629489.92 for 435.6 cum 6984

    Rate for 1 cum 1445.11 Rate for 1 cum 160

    Type B screens Type B screens

    50 % of 5-7 mm HBG metal 0.50 1419.21 709.61 50 % of 5-7 mm HBG metal 0.50 1584.30 7

    50 % of 2.36 to 5 mm HBG met 0.50 1201.71 600.86 50 % of 2.36 to 5 mm HBG metal 0.50 1339.30 6

    Rate for 1 cum 1310.46 Rate for 1 cum 14

    CC road CC road

    60.00 % of 20 mm HBG metal 0.60 2184.30 1310.58 60.00 % of 20 mm HBG metal 0.60 2184.30 13

    40.00% of 12 mm HBG metal 0.40 1929.30 771.72 40.00% of 12 mm HBG metal 0.40 1929.30 7

    Rate for 1 cum 2082.30 Rate for 1 cum 208

  • 8/10/2019 1. Mothkur new SC colony.xls

    46/66

    Index-

    codeDescription Unit Quantity Rate Rs.

    Amount

    Rs.

    2 3 4 5 6

    1

    Rate as per Current RSSR Cum 1.00 108.00 87.51

    Net rate 87.51

    2

    Rate per 1.00 Cum loose 18.09

    3

    Sand cum 1.00 358.77 358.77358.77

    4

    Taking Output =1 Cum

    Gravel @ 66% Cum 0.85 249.14 211.77

    Stone dust @ 34% Cum 0.35 1214.30 425.01

    Rate per 1.00 Cum 636.78Loose Rate per 1.00 Cum 530.65

    5

    Tractor with Rotavator 25 cum per hour Hrs 12.00 422.00 5064.00

    Water tanker 6 Kl Capacity Hrs 5.00 624.00 3120.00

    Three wheeled 8-10 T roller @10cum /Hr. Hr 30.00 1038.40 31152.00

    Rate per 300 Cum 39336.00Rate per 1.00 Cum Compact 131.12

    Engaging Unskilled Labour for filling/spreding with gravel/sand/stone dust but

    excluding conveyance of sand(RSSR)

    Compaction of collected well graded granular soil to OMC using 8-l0T Power Road

    Roller to achieve CBR value not

  • 8/10/2019 1. Mothkur new SC colony.xls

    47/66

    Index-

    codeDescription Unit Quantity Rate Rs.

    Amount

    Rs.

    2 3 4 5 6

    S.

    No

    1

    6

    Taking Output =360 Cum 435.60 1550.00 675180.00

    60-63mm IRC HBG metal(50% of 435.60 cum) Cum 217.80

    40-45mm IRC HBG metal(46% of 435.60 cum) Cum 200.38

    19-22mm irc METAL m/C (4% OF 435.60 cum) Cum 17.42

    Stone Screening

    Type B 11.2 mm for Grading 2 @ 0.18 / 0.20

    cum/10sqm cum 86.40 1410.00 121824.00

    Rate per 360.00 Cum Compact 797004.00

    i. Total Rate per 1.00 Cum Compact 2213.90

    ii.Graded metal Rate per 1.00 Cum excluding screening 1875.50

    iii. screens (i-ii) cum 338.40

    7

    (a) MaterialBinding material ( Gravel)@ 0.06cum /10 sqm for

    WBM Grading II Cum 28.80 249.14 7175.23

    (b) Labour

    Mazdoor(skilled) days 12.08 280.00 3382.40

    Mazdoor(Unskilled) days 250.00 280.00 70000.00

    Water tanker 6Kl capacity Hrs 24.00 624.00 14976.00

    three wheeled 8-10T static roller Hrs 36.00 1038.40 37382.40

    Rate per 360 Cum 132916.03

    Rate per 1.00 Cum 369.21

    8

    Unit = cum

    (a) Material

    Cement t 0.25 5200.00 1300.00

    Coarse sand cum 0.48 1508.77 724.21

    20 mm aggregate @0.54 cum 0.90 2030.00 1827.00

    12 mm [email protected] cum

    sub total for material 3851.21

    Providing plain cement concrete M15 using 20 mm to 12 mm Graded HBG crushed

    Metal with 250 Kgs of cement per 1 cum of concrete, including C/c of all

    materials, curing, labour charges etc., complete as per drawings & tech.

    specifications Clause 802,803,1202 & 1203 as per caluse 800 & 1200 (1) of MORD

    and uidelines For side drains Bed.

    Taking Output = 360 Cum

    CC30-Spreading & compaction of collected mixer of stone aggregates in uniform

    thicknesses and good gravel for blindage, hand packing and rolling with 8-l0T

    Power Road Roller in stages to proper grade and camber with required waterings

    and keeping the rolled surface wet for a period of 15 days including brooming (91

    mm loose to 75 mm com acted CSSR

    Supply and collection of mixer of stone aggregates having 50% of 60-63mm HBG

    metal ,46% of 40-45mm HBG metal and 4% of 19-22mm HBG metal including cost

    ,conveyance, loading, unloading and stacking to departmental gauge for pre

    measurements for WBM Grade.II surfaces per MORD standards (91 mm loose to75 mm com acted) (CSSR)

  • 8/10/2019 1. Mothkur new SC colony.xls

    48/66

    Index-

    codeDescription Unit Quantity Rate Rs.

    Amount

    Rs.

    2 3 4 5 6

    S.

    No

    1

    (b) Labour

    Mate day -

    Mason (1st Class) day 0.10 350.00 35.00

    Mazdoor (Unskilled) day 1.39 280.00 389.20

    sub total for labour 424.20

    (c) Machinery

    Concrete mixer 0.4/0.28 cum capacity hour 0.40 417.40 166.96

    Vibrator charges hour 0.40 48.00 19.20

    Water tanker 6 kl capacity hour 0.13 624.00 81.12

    sub total for mechinery 267.28

    (d) Formwork @ 4% on cost of material, labour and

    machiner (a+b+c) 4.00% 4542.69 181.71

    Rate per cum = a+b+c+d+e+f 4724.40

    Supply & delivery of Cement kg 1300.00

    Supply & collection of metal cum 1827.00Supply & collection of sand cum 724.21

    Centering & labour charges 873.19

    9

    Unit = cum

    (a) Material

    Cement t 0.25 5200.00 1300.00

    Coarse sand cum 0.48 1508.77 724.2120 mm aggregate @0.54 cum 0.90 2030.00 1827.00

    12 mm [email protected] cum

    sub total for material 3851.21

    (b) Labour

    Mate day -

    Mason (1st Class) day 0.10 350.00 35.00

    Mazdoor (Unskilled) day 1.39 280.00 389.20

    sub total for labour 424.20

    (c) Machinery

    Concrete mixer 0.4/0.28 cum capacity hour 0.40 417.40 166.96

    Vibrator charges hour 1.40 48.00 67.20Water tanker 6 kl capacity hour 0.13 624.00 81.12

    sub total for mechinery 315.28

    (d) Formwork as per plinth beam centering charges

    of CSSR 2158.00 2158.00

    Rate per cum = a+b+c+d+e+f 6748.69

    Supply & delivery of Cement kg 1300.00

    Supply & collection of metal cum 1827.00

    Supply & collection of sand cum 724.21

    Centering & labour charges 2897.48

    Providing plain cement concrete M15 using 20 mm to 12 mm Graded HBG crushed

    Metal with 250 Kgs of cement per 1 cum of concrete, including C/c of all

    materials, curing, labour charges etc., complete as per drawings & tech.

    specifications Clause 802,803,1202 & 1203 as per caluse 800 & 1200 (1) of MORD

  • 8/10/2019 1. Mothkur new SC colony.xls

    49/66

    Index-

    codeDescription Unit Quantity Rate Rs.

    Amount

    Rs.

    2 3 4 5 6

    S.

    No

    1

    10

    Unit = cum

    a MaterialCement t 0.330 5200.00 1716.00Coarse sand cum 0.450 1508.77 678.95

    20 mm aggregate @0.54 cum 0.90 2030.00 1827.00

    12 mm [email protected] cum 0.00

    sub total for material 4221.95

    (b) Labour

    Mate day -

    Mason (1st Class) day 0.10 350.00 35.00

    Mazdoor (Unskilled) day 1.39 280.00 389.20

    sub total for labour 424.20

    c) Machinery

    Concrete mixer 0.4/0.28 cum capacity hr / 0.40 417.40 166.96

    Vibrator charges hour 0.40 48.00 19.20

    Water tanker 6 kl capacity hour 0.13 624.00 81.12

    sub total for mechinery 267.28

    Total (a+b+c) 4913.43

    d) For formwork and staging add the following

    percentage of (a+b+c):

    10 per cent 10.00% 4913.43 491.34e&f) Overheads & Contractors Profit

    Rate per cum = a+b+c+d+e+f 5404.77

    Supply & delivery of Cement kg 1716.00

    Supply & collection of metal cum 1827.00

    Supply & collection of sand cum 678.95

    Centering & labour charges 1182.82

    11

    (a) Material

    HYSD/TMT/ MS bars including 5 per cent foroverla s and wasta e

    t 1.05 43000.00 45150.00

    (b) Labour

    Blacksmith / Bar bender day 2.00 320.00 640.00

    Mazdoor (Unskilled) day 6.40 280.00 1792.00

    Binding wire kg 6.00 70.00 420.00

    Rate per MT 2852.00

    CC58Supplying, fitting and placing HYSD bar reinforcement in slab over drain

    complete and technical specifications including fabrication charges

    RCC M-20 Nominal mix using 20 mm to 12 mm Graded size crushed hard granite

    metal including C/c of all materials, taxes, operational, incidental and labour

    charges such as machine mixing, laying concrete, curing etc., complete but

    excluding cost of steel and its fabrication charges for finished item of work forSlab over drain.

  • 8/10/2019 1. Mothkur new SC colony.xls

    50/66

    Index-

    codeDescription Unit Quantity Rate Rs.

    Amount

    Rs.

    2 3 4 5 6

    S.

    No

    1

    12

    Unit = cum

    Taking output = 75 cum (172.50 t)

    (200 x 3.00 x 0.125)

    a) Labour

    Mate day -

    Mason (1st class) day 5.00 350.00 1750.00

    Mason (2nd class) day 5.00 320.00 1600.00

    Mazdoor (Unskilled) day 150.00 280.00 42000.00

    Mazdoor (Skilled) day 6.00 280.00 1680.00

    Mazdoor (Semi-Skilled) day 6.00 280.00 1680.00

    sub total for labour 48710.00

    b) Machinery

    Concrete mixer 0.28 / 0.4 cum capacity (6 mixers) hour 36.00 417.40 15026.40

    Plate vibrator hour 9.00 48.00 432.00

    Water tanker 6 kl capacity hour 5.00 624.00 3120.00

    sub total for mechinery 18578.40

    c) Material

    Crushed stone coarse aggregates, grading will be as

    er Clause 1501.2.4.1 (Table 1500.1) of s ecifications

    cum 67.50

    20 mm aggregate @0.54 cum 67.50 2030.00 137025.00

    12 mm [email protected] cum 0.00Sand for concrete @ 0.45 cum/cum of concrete cum 33.75 1508.77 50920.99

    Cement @ 350 kg/cum of concrete t 26.25 5200.00 136500.00

    Polythene sheet 125 micron (200x3.00x1.10=660) sqm 660.00 15.00 9900.00

    Bitumen primer @ 100ml. Per joint for 60 joints tonne 0.01 33620.00 168.10

    Mastic Pad 2.5x.0.125x60=18.75 sqm 18.75 925.00 17343.75

    sub total for material 351857.84

    sub total of a+b+c 419146.24

    d) Formwork @ 3% of (a+b+c) 0.03 419146.24 12574.39

    Cost for 75 cum = a+b+c+d+e+f 431720.63

    Rate per cum = (a+b+c+d+e+f)/75 5756.28Supply & delivery of Cement kg 1820.00

    Supply & collection of metal cum 1827.00

    Supply & collection of sand cum 678.95

    Centering & labour charges 1430.33

    Construction of un-reinforced, dowel jointed at expansion and construction joint

    only,PCC pavement thickness as per design over a prepared sub base using M30

    grade, coarse and fine aggregates confirming to IS 383 including all labour

    charges etc. complete (CSSR)

  • 8/10/2019 1. Mothkur new SC colony.xls

    51/66

    Index-

    codeDescription Unit Quantity Rate Rs.

    Amount

    Rs.

    2 3 4 5 6

    S.

    No

    1

    13

    Unit = m

    Taking output = 7.5 m

    Rate per m

    450 mm dia

    a) Labour

    Mate day -

    Mason (1st Class) day 0.12 350.00 42.00

    Mazdoor (Unskilled) day 1.00 280.00 280.00

    Laying & fixing of Pipes position including lifting,

    ali nin etc.,

    rm 322.00

    sub total for labour 322.00

    b) Material

    Sand at site cum 0.020 1508.77 30.18

    Cement at site t 0.018 5200.00 93.60

    450 mm dia RCC pipe NP3 pipe m 7.50 1681.53 12611.48

    sub total for material 12735.26

    Cost for 7.5 m = a+b+c 13057.26

    Rate per m = (a+b)/7.5 Rs. 1740.97

    Providing and laying reinforced cement concrete pipe NP3 for culverts on first

    class bedding of granular material with cement mortar 1:2 but excluding

    excavation, protection works, backfilling, concrete and masonry works in head wall

    and parapets. Tech Specification Clause 1106 MORD

    Chief Engineer,

    PR, MGNREGS,Hyderabad

    Approved

  • 8/10/2019 1. Mothkur new SC colony.xls

    52/66

    Lead

    Earth, Sand,Gravel

    Metal, Stone Earth, Sand,Gravel

    Metal, StoneBricks

    1000nos

    Kadapa

    slabs,PCCslabs,CC,

    wood/cum

    Bricks1000nos

    Kadapa

    slabs,PCCslabs,CC,

    wood/cum

    1 31.50 3 0.40 27.63 26.67 50.70 44.70 44.47 39.21

    244.10 42.60

    38.68 37.37 71.00 62.60 62.28 54.91

    358.90 58.90

    51.67 51.67 94.60 86.60 82.98 75.96

    471.50 71.50

    62.72 62.72 114.90 105.10 100.79 92.19

    584.10 84.10

    73.77 73.77 135.20 123.70 118.6 108.51

    696.70 96.70

    84.82 84.82 155.50 142.20 136.4 124.74

    7109.30 109.30

    95.88 95.88 175.80 160.70 154.21 140.96

    8121.90 121.90

    106.93 106.93 196.10 179.20 172.02 157.19

    9

    134.50 134.50

    117.98 117.98 216.40 197.70 189.82 173.42

    10147.10 147.10

    129.04 129.04 236.70 216.20 207.63 189.65

    11159.70 159.70

    140.09 140.09 257.00 234.70 225.44 205.88

    12172.30 172.30

    151.14 151.14 277.30 253.20 243.25 222.11

    13184.90 184.90

    162.19 162.19 297.60 271.70 261.05 238.33

    14197.50 197.50

    173.25 173.25 317.90 290.20 278.86 254.56

    15210.10 210.10

    184.3 184.3 338.20 308.70 296.67 270.79

    16222.70 222.70

    195.35 195.35 358.50 327.20 314.47 287.02

    17235.30 235.30

    206.4 206.4 378.80 345.70 332.28 303.25

    18247.90 247.90

    217.46 217.46 399.10 364.20 350.09 319.47

    Lead Chart (14-15)

    SS rate for 14-15 Net Con.Charges Net Con.Charges

  • 8/10/2019 1. Mothkur new SC colony.xls

    53/66

    19260.50 260.50

    228.51 228.51 419.40 382.70 367.89 335.7

    20273.10 273.10

    239.56 239.56 439.70 401.20 385.7 351.93

    21

    285.70 285.70

    250.61 250.61 460.00 419.70 403.51 368.16

    22298.30 298.30

    261.67 261.67 480.30 438.20 421.32 384.39

    23310.90 310.90

    272.72 272.72 500.60 456.70 439.12 400.61

    24323.50 323.50

    283.77 283.77 520.90 475.20 456.93 416.84

    25336.10 336.10

    294.82 294.82 541.20 493.70 474.74 433.07

    26348.70 348.70

    305.88 305.88561.50 512.20

    492.54 449.3

    27

    361.30 361.30

    316.93 316.93 581.80 530.70 510.35 465.53

    28373.90 373.90

    327.98 327.98 602.10 549.20 528.16 481.75

    29 386.50 386.50 339.04 339.04 622.40 567.70 545.96 497.98

    30 399.10 399.10 350.09 350.09 642.70 586.20 563.77 514.21

    31409.60 409.60

    359.3 359.3 659.60 601.70 578.6 527.81

    32420.10 420.10

    368.51 368.51 676.50 617.20 593.42 541.4

    33

    430.60 430.60

    377.72 377.72 693.40 632.70 608.25 555

    34

    441.10 441.10

    386.93 386.93 710.30 648.20 623.07 568.6

    35

    451.60 451.60

    396.14 396.14 727.20 663.70 637.89 582.19

    36

    462.10 462.10

    405.35 405.35 744.10 679.20 652.72 595.79

  • 8/10/2019 1. Mothkur new SC colony.xls

    54/66

  • 8/10/2019 1. Mothkur new SC colony.xls

    55/66

    64 756.10 756.10 663.25 663.25 1217.30 1113.20 1067.81 976.49

    65 766.60 766.60 672.46 672.46 1234.20 1128.70 1082.63 990.09

    66 777.10 777.10 681.67 681.67 1251.10 1144.20 1097.46 1003.68

    67 787.60 787.60 690.88 690.88 1268.00 1159.70 1112.28 1017.28

    68 798.10 798.10 700.09 700.09 1284.90 1175.20 1127.11 1030.88

    69 808.60 808.60 709.3 709.3 1301.80 1190.70 1141.93 1044.4770 819.10 819.10 718.51 718.51 1318.70 1206.20 1156.75 1058.07

    71 829.60 829.60 727.72 727.72 1335.60 1221.70 1171.58 1071.67

    72 840.10 840.10 736.93 736.93 1352.50 1237.20 1186.4 1085.26

    73 850.60 850.60 746.14 746.14 1369.40 1252.70 1201.23 1098.86

    74 861.10 861.10 755.35 755.35 1386.30 1268.20 1216.05 1112.46

    75 871.60 871.60 764.56 764.56 1403.20 1283.70 1230.88 1126.05

    76 882.10 882.10 773.77 773.77 1420.10 1299.20 1245.7 1139.65

    77 892.60 892.60 782.98 782.98 1437.00 1314.70 1260.53 1153.25

    78 903.10 903.10 792.19 792.19 1453.90 1330.20 1275.35 1166.84

    79 913.60 913.60 801.4 801.4 1470.80 1345.70 1290.18 1180.44

    80 924.10 924.10 810.61 810.61 1487.70 1361.20 1305 1194.04

    81 934.60 934.60 819.82 819.82 1504.60 1376.70 1319.82 1207.63

    82 945.10 945.10 829.04 829.04 1521.50 1392.20 1334.65 1221.23

    83 955.60 955.60 838.25 838.25 1538.40 1407.70 1349.47 1234.82

    84 966.10 966.10 847.46 847.46 1555.30 1423.20 1364.3 1248.42

    85 976.60 976.60 856.67 856.67 1572.20 1438.70 1379.12 1262.02

    86 987.10 987.10 865.88 865.88 1589.10 1454.20 1393.95 1275.61

    87 997.60 997.60 875.09 875.09 1606.00 1469.70 1408.77 1289.21

    88 1008.10 1008.10 884.3 884.3 1622.90 1485.20 1423.6 1302.81

    89 1018.60 1018.60 893.51 893.51 1639.80 1500.70 1438.42 1316.4

    90 1029.10 1029.10 902.72 902.72 1656.70 1516.20 1453.25 133091 1039.60 1039.60 911.93 911.93 1673.60 1531.70 1468.07 1343.6

    92 1050.10 1050.10 921.14 921.14 1690.50 1547.20 1482.89 1357.19

    93 1060.60 1060.60 930.35 930.35 1707.40 1562.70 1497.72 1370.79

    94 1071.10 1071.10 939.56 939.56 1724.30 1578.20 1512.54 1384.39

    95 1081.60 1081.60 948.77 948.77 1741.20 1593.70 1527.37 1397.98

    96 1092.10 1092.10 957.98 957.98 1758.10 1609.20 1542.19 1411.58

    97 1102.60 1102.60 967.19 967.19 1775.00 1624.70 1557.02 1425.18

    98 1113.10 1113.10 976.4 976.4 1791.90 1640.20 1571.84 1438.77

    99 1123.60 1123.60 985.61 985.61 1808.80 1655.70 1586.67 1452.37

    100 1134.10 1134.10 994.82 994.82 1825.70 1671.20 1601.49 1465.96

    101 1144.60 1144.60 1004.04 1004.04 1842.60 1686.70 1616.32 1479.56

    102 1155.10 1155.10 1013.25 1013.25 1859.50 1702.20 1631.14 1493.16

    103 1165.60 1165.60 1022.46 1022.46 1876.40 1717.70 1645.96 1506.75

    104 1176.10 1176.10 1031.67 1031.67 1893.30 1733.20 1660.79 1520.35

    105 1186.60 1186.60 1040.88 1040.88 1910.20 1748.70 1675.61 1533.95

    106 1197.10 1197.10 1050.09 1050.09 1927.10 1764.20 1690.44 1547.54

  • 8/10/2019 1. Mothkur new SC colony.xls

    56/66

  • 8/10/2019 1. Mothkur new SC colony.xls

    57/66

    150 1644.10 1644.10 1442.19 1442.19 0 0

  • 8/10/2019 1. Mothkur new SC colony.xls

    58/66

  • 8/10/2019 1. Mothkur new SC colony.xls

    59/66

    Teak wood beyond

    2.00 to 3.00 mts84756 1 Cum

    Sand for

    concrete462

    Sal wood 51994 1 CumSand for

    mortor606

    AC sheet corregated 222 1 sqmSand for

    filling

    342

    GI sheet corregated 60 1 Kg Gravel 103

    Barbed wire 70 1 Kg2.36mm

    bellow330

    GI mesh 217 1 Kg RR Stone 160

    Chiken mesh 17 1 sqm

    Rivitment

    stone 225

    mm

    140

    Rolling shetter 2861 1 sqm Bond stone 1250

    Collapsable gate 2503 1 sqmQuarry

    rabbish81

    Tar felt rain seal felt 129 1 SqmCountry

    Bricks4700

    Polythene sheet 125

    micron15.00 1 Sqm Fly ash Bricks 3707

    Mastic pad 12.70 mm 568 1 Sqm

    Vertified tiles 1274 1 Sqm Centeringcharges

    Kadapa slabs/

    sahabad slabs of

    minimum 50 mm thick1100 10 Sqm Footings 723

    Polished Black

    Cuddapah slabs of

    minimum 15 mm thick

    1654 10 Sqm Pedestals 1025

    Polished

    Bethamcherla

    pure(marble

    type)white stone ofminimum 25 mm thick

    3859 10 Sqm Plingth beam 2410

    Polished

    Bethamcherla

    coloured stone of

    minimum 25 mm thick

    2756 10 Sqm Lintels 1663

  • 8/10/2019 1. Mothkur new SC colony.xls

    60/66

    Water proof cement

    powder144 1 Kg Sunsheds 289

    Cement based water

    proof powder52 1 Kg Coloumns 1497

    Wood primer 145 1 Kg Beams 2406

    Red oxide 130 1 KgSlabs upto

    150mm thick

    273

    Synthetic enamil paint 253 1 LitreSlabs above

    150mm thick280

    Exterior emolusion 196 1 Litre Bed blocks 291

    White lime 552/25Kg 22.08 1 Kg Side walls 337

    White cement 29 1 Kg

    Water charges

    (Urban)103

    Water charges (Rural) 77

    Labour

    charges for

    fabrication of

    steel

    window/door

    grill

    22

    Labour

    charges for

    fabrication of

    heavy stress

    20

    Binding wire 70

    Labour for

    fixing of

    heavytrusses

    charges

    18

    White cement 30

    Labour for

    fixing of

    door/window

    grills

    4

    Water profing

    compound72

    Light jungle clearence 2.6

    prosafis jungleclearence

    3.7

  • 8/10/2019 1. Mothkur new SC colony.xls

    61/66

  • 8/10/2019 1. Mothkur new SC colony.xls

    62/66

  • 8/10/2019 1. Mothkur new SC colony.xls

    63/66

  • 8/10/2019 1. Mothkur new SC colony.xls

    64/66

    Hire

    chargws

    Blasting charges 70Vibrator

    roller2541.40

    Smooth

    wheel

    roller

    1718.70

    Tractor 415.00

    Tractorwith

    rotavetor

    422.00

    Water

    tanker

    6000 lt

    658.35

    Dozer

    (D50)/(D3

    0)

    1570.00

    Blasting charges 70

    Concrete

    mixer

    0.28/0.40

    cum capacity

    328.60

    Needle vib 165.70

    Plate vibra 277.30

    Water tanker

    8 Kl.

    Capacity

    877.80

    Air

    compress

    or

    507.50

    Truck 5.5

    cum capacity 995.00

    diesel

    generator

    50 Kva

    1222.00

    diesel

    generator

    100 Kva

    1126.00

  • 8/10/2019 1. Mothkur new SC colony.xls

    65/66

    Motor

    grader3216.00

    Mechanic

    al

    broomer

    357.00

    Bitumin

    presser

    distributor

    1498.00

    Emulsion

    presser

    distributor860.00

    Hot mix

    plant 40

    TPH

    19120.00

    Blasting charges 76

    Paver

    finisher

    100

    2249.00

    Front end

    loader1646.00

    Hydrulic

    excavetor 2754.50Weigh

    batcher (

    hire

    charges)

    Machine

    mixing

    503.90

    1000 Nos

    0.00812 25/each

    CumDismantli

    ng

    Cum

    Cum

    Cum

  • 8/10/2019 1. Mothkur new SC colony.xls

    66/66

    Sqm

    Cum

    Cum

    Sqm

    Sqm

    Cum

    Sqm

    1 Kg

    1 Kg

    1 Kg

    1 Kg