1 nks r researchseminars competence & education exchange of information safety advancements 21...
TRANSCRIPT
1
NKSR
Research Seminars
Competence& Education
Exchange ofinformation
Safetyadvancements
21 March 2002
2002…
2
Overall themes, topics and possible subjects
R
Development& Validation
Management &Organisation
Performance
Evaluation
Requirements
Assessment
Inspection
Ageing
Passive systems
Automation
Experiments
Analyses
Predictionmethods
Newtechnology
Integrity & operability
Safety principles
Human factors
3
Research Projects and Seminars
Competence & Education
Safety advancements
Research Area
MANGANResearch Area
DELI
New Automation andProgrammable Devices:
Requirements &Experiences
Ageing & Inspection:Requirements, Methods
& Experiences RadiationProtection
During Operation &Decommissioning
Safety ManagementMethods and Trends –
Defense-in-Depth &Risk Informed
Safety & QualityManagement in a
Changing Environment
Exchange of information in Seminars
R
Development& Validation
Management &Organisation
Predictionmethods
Newtechnology
Integrity & operability
Safety principles
Human factors
4
Research area nr 1: Development & Validation (DELI)
• Major parts:– Pool behaviour (DELIPOOL):
• Experiments and analyses (CFD) on flows, particle/bubble transport, dynamics.• Extension of the experimental database for CFD validation.
– Melt behaviour (DELIMELT): • Ex-vessel melt behaviour, with coupling to vessel failure.• Other possible items: fission products, hydrogen, accident management tools, etc.
– Others to be considered based on research proposals:• E.g., structural aspects (”DELISTRU”), new safety analysis (”DELINEWS”)…
• Key benefits:– Focus on current issues of potential safety-technical relevance.– Research and educational attraction: challenging phenomena, new methods (CFD), and
experimental (=real) observations. – Support for the Nordic experimental facilities and analysis network.
• Efficient startup:– DELIPOOL to be based on pool-related efforts launched, e.g., by the Nordic BWR
operators and by the regulators (including national research programmes).– DELIMELT to involve some continuation of previous NKS work, and a fast identification
of potentially new questions to be examined.
Water pool
Focus
Core melt
Focus
5
DELI connections and relevance
R
Development& Validation
Management &Organisation
Accident phenomena
Plant response to accidents
Safety function performance
Integrity of physical barriers
Passive systems characteristics
Relevance of DELI
CFD and experimental methods
etc.
Predictionmethods
Newtechnology
Integrity & operability
Safetyprinciples
Human factors
Research Area
DELI
DELIMELT
DELIPOOL
DELINEWS
6
Research area nr 2: Management and Organisation (MANGAN)
• Major parts:– Decisions and activities during operation and shutdown (MANGANOS)
• Critical decisions on different organisational levels;• Critical actions during shutdown conditions;
– Design and technology (MANGANES): • Inspection and testing metods, e.g., for structures and automation devices;• Control room design, including operator information in general.
– Others to be considered based on research proposals:• E.g., interface issues and requirements specification in projects (”MANGANIP”),
new analysis methods (”MANGANEW”)…
• Key benefits:– Focus on current issues of safety management relevance.– Research and educational attraction: application and development of evaluation methods
in practical cases (”close to the applications/users of results”). – Support for the Nordic networking and information exchange.
• Efficient startup:– Early ensurance/commitment of the availability of current expert(i)s(e).
Decision making
Tools and techniques
Focus
Focus
7
MANGAN connections and relevance
R
Development& Validation
Management &Organisation
Human performance & evaluation
Human factors in operation
Organisational factors
Safety management
Relevance of MANGAN
Project management
Human factors in design
etc.
Predictionmethods
Newtechnology
Integrity & operability
Safetyprinciples
Human factors
Research Area
MANGAN
MANGANOS
MANGANES
MANGANEWMANGANIP
8
Overall plan for the NKS-R programme 2002…
Jul 01 Jan 02 Jul 02 Jan 03 Jul 03 Jan 04 Jul 04 Jan 05 Jul 05 Jan 06 Jul 06
PlanningResearch area ”DELI”
Researchseminar
Researchseminar
Researchseminar
Researchseminar
Research area ”MANGAN”
Annual summaries
Communication within national research programmes and networks
SeminarsNKS-Rseminar
NKS-Rseminar
NKS-Rseminar
NKS-Rseminar
NKS-Rseminar
Board meetings
Program manager reports for the board
9
Proposal-and-decision process – The main way and two additional ones
EhdotusEhdotusEhdotusEhdotusEhdotusEhdotusProposal
ProposalMakerProposal
MakerProposal
MakerProposal
MakerProposal
MakerProposal
MakerProposal
Maker
ProgrammeManager (PrgMan)
Bureau
Board
1. Plan presented ina board meeting
Limited activities ( 200 kDKK)in direct accordance withthe NKS-R framework
2. Board commentsthrough e-mail
Limited activities ( 100 kDKK)in direct accordance withthe accepted NKS-R frameworkand requiring a fast decision
3. ”Silent procedure”within two (2) weeks
10
Background to the First Call for Proposals
• A long preparation process for the NKS-R framework– Start in summer 2001.– Several discussions in different occasions.– Several presentations in different meetings.
• First Call for Proposals (through e-mail and on the NKS homepage)– Advance notice in December 2001.– First Call for Proposals in late January 2002, deadline 20 Feb 2002!
• Handling of proposals:– Standard template. All proposal makers used that.– ProgramManager (TimO) filled in the evaluation and sent this immediately back
to the proposal maker(s). Some more iteration in some cases.– Status briefing to the NKS bureau on 26 February 2002.– ProgrammeManager recommendations sent out to the proposal makers
(summary table and these status slides) on 27 February 2002.
• NKS board meeting on 19 March 2002:– Status information sent out to the board, via e-mail, on 27 February 2002.– Clear recommendation categories: direct start, little later, and to be reconsidered.
11
PrgMan recommendations after the First Call for Proposals
R
DELI MANGAN
Little later
Direct start
09 MKB seminarium13 Seminarium on
low/med.level waste10 Workshop om
miljö/säk.redovisning
01 PREPOOL
DELIPOOL
DELINEWS
05 3D transientmethodology
14 PREMELT
12 Ruthenium insevere accidents
DELIMELT
07 Barriers, controland management
16 Requirementsin digital I&C
MANGANESMANGANIP
15 Review ofCCF models
17 Risk-informeddecision making
MANGANEW
02 Maintenanceculture safety
04 Safetymanagement
11 MTO andmaintenance…
MANGANOS
12
PrgMan recommendations after the First Call for Proposals
R
DELI MANGAN
Little later
Direct start
09 MKB seminarium13 Seminarium on
low/med.level waste10 Workshop om
miljö/säk.redovisning
01 PREPOOL
DELIPOOL
DELINEWS
05 3D transientmethodology
14 PREMELT
12 Ruthenium insevere accidents
DELIMELT
07 Barriers, controland management
16 Requirementsin digital I&C
MANGANESMANGANIP
15 Review ofCCF models
17 Risk-informeddecision making
MANGANEW
02 Maintenanceculture safety
04 Safetymanagement
11 MTO andmaintenance…
MANGANOS
13
Group RED – PrgMan recommends ”direct start”
• Proposals– In direct agreement with the NKS-R framework (v1.0).
• Results– Activities give results already this year.– Results are of direct interest to end users.
• Nordic dimension:– In each activity, at least two countries are involved.– The whole set of foreseen activities should cover all countries.
• Particular merits:– Preparing for the future NKS-R work to come, within a prioritized
topic (DELI or MANGAN) – including network building and clarification of different interests (”going around”).
14
Group GREEN – PrgMan recommends ”little later”
• Proposals– In good agreement with the NKS-R framework (v1.0).
• Some unclarity, e.g.:– The best workshop timing yet to be decided.– Combination of different workshop proposals to be considered.– More networking (across the borders) to be aimed at.– Use of NKS funds to be refocused.
15
Group BLACK – PrgMan recommends ”to be reconsidered later”
• Some problems, e.g.:– The research topic in question is not in accordance with the NKS-
R framework (v1.0).– No networking/cooperation across the borders.– The NKS funding level is high in comparison with the priorisation
of the topic in question.
• …but there may still be possibilities:– Coordination (possible fusion) with another, more favourable
activity, may change the situation.– Proposal may be improved.– Proposal may be more suitable for the NKS-B framework.– Also the NKS-R framework could be later modified.
• All proposals saved – they need not be resent (but may of course be updated) in another Call for Proposals.