1 nwpp adi task force status report for columbia grid by darrel vancoevering september 17, 2007

5
1 NWPP ADI Task Force Status Report for Columbia Grid by Darrel VanCoevering September 17, 2007

Upload: stephany-lawson

Post on 17-Jan-2016

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 1 NWPP ADI Task Force Status Report for Columbia Grid by Darrel VanCoevering September 17, 2007

1

NWPP ADI Task Force

Status Report for Columbia Gridby

Darrel VanCoevering

September 17, 2007

Page 2: 1 NWPP ADI Task Force Status Report for Columbia Grid by Darrel VanCoevering September 17, 2007

2

ACE Data Access

• In response to letter request all BA quickly agreed to provide their ACE data to the ADI Task Force.

• Task Force now has 10 second ACE data for each BA for 1 week of each month in 2006.

• One week of data is over 60,000 rows in an Excel spreadsheet.

Page 3: 1 NWPP ADI Task Force Status Report for Columbia Grid by Darrel VanCoevering September 17, 2007

3

ACE Data Analysis

• The volume of data makes analysis labor intensive and time consuming.

• The first method to model is equal allocation.

• Another method is proportional allocation.• There will probably be other ideas to test.• Within a method there are possible

variations in calculating ACE adjustments.

Page 4: 1 NWPP ADI Task Force Status Report for Columbia Grid by Darrel VanCoevering September 17, 2007

4

Preliminary Results

• Sample of data run through equal allocation model.

• Results not yet error checked or peer reviewed.

• Measure is AVG( ABS(ACE original)) - AVG( ABS(ACE new))

• ABS(ACE) reduced from 20% to 33%.

Page 5: 1 NWPP ADI Task Force Status Report for Columbia Grid by Darrel VanCoevering September 17, 2007

5

ADI Trial Status

• First need to complete modeling and select method or methods of ACE sharing to try.

• Analysis may be completed in September although this may be optimistic.

• New agreements likely needed with Balancing Authorities for actual ADI trial.