Page 1: 1 Overview of Reliability Requirements XYZ Cooperative Date: abc

1

Overview of Reliability Requirements

XYZ Cooperative

Date: abc

Page 2: 1 Overview of Reliability Requirements XYZ Cooperative Date: abc

2

Overview• History & Timeline• Requirements

– General– Recording– Reporting

• Understanding the 3 Indices• IAEC Model Reliability & Inspection & Maintenance

Plan• XYZ REC’s Reliability Plan Development

Page 3: 1 Overview of Reliability Requirements XYZ Cooperative Date: abc

3

History & Timeline

• 1995--IUB began studying customer choice• March 1999--IUB staff report on electric

reliability as a part of studying customer choice• 1999 and 2000--customer choice debate in

legislative process• December 2000--IUB opens inquiry case on

electric reliability• December 2001--Final IUB staff report in the

inquiry on electric reliability

Page 4: 1 Overview of Reliability Requirements XYZ Cooperative Date: abc

4

History & Timeline

• February 2002 IUB proposes revised reliability rules

• October 25, 2002 IUB adopts revised rules related to electric reliability

• December 18, 2002 Revised reliability rules effective

• January 2003 IAEC files for waiver of rules to make changes in 7/1/03 filing

• January 2003 IUB grants IAEC waiver request

Page 5: 1 Overview of Reliability Requirements XYZ Cooperative Date: abc

5

History & Timeline• December 2002 - February 2003 IAEC works with

Regulatory Affairs Committee to develop model reliability plan and works with IUB and OCA staff

• March 2003 IAEC distributes final model reliability plan

• July 1, 2003 Local board must adopt and approve of cooperative’s reliability plan; updated annually

• Plan as approved by the local board must be filed with the IUB & OCA

• April 1, 2004 1st Annual Reliability Report provided to local board with copies to the state

Page 6: 1 Overview of Reliability Requirements XYZ Cooperative Date: abc

6

Requirements--General

1. Reasonable efforts to avoid and prevent interruptions2. Design, construction and maintenance3. Effective preventive maintenance program4. Appraising reliability5. Keep records of interruptions of service & analysis 6. Reasonable efforts to reduce the risk of future interruptions 7. Waiver

• Note: All of the general requirements, for the most part, were in the IUB reliability rules prior to the revised rules and they applied to electric cooperatives.

Page 7: 1 Overview of Reliability Requirements XYZ Cooperative Date: abc

7

Requirements—General: Power Quality

• Utility must investigate customer power quality complaints.

• Utility must determine the cause of the problem on the utility’s systems.

• In addressing these problems, each utility must implement to the extent reasonably practical the practices outlined in the IEEE standard.

Page 8: 1 Overview of Reliability Requirements XYZ Cooperative Date: abc

8

Requirements—General: Harmonics

• Utility must investigate and take actions to cure the problem of excess when excessive harmonics.

• Utility must implement to the extent practicable and in conformance with prudent operation the practices outlined in the IEEE standard.

Page 9: 1 Overview of Reliability Requirements XYZ Cooperative Date: abc

9

Requirements—Recording

• Utilities with less than 50,000 meters– Record and maintain data to compute 7 year

period average annual hours of interruptions due to cause in 4 categories:

• Power Supplier• Major Storm• Scheduled• All Other

– Note: Must maintain 7 years of data but do not have to compute 7 year average.

Page 10: 1 Overview of Reliability Requirements XYZ Cooperative Date: abc

10

Requirements—Recording

• Utilities with less than 50,000 meters– Requires use of Table 1 and 2 from RUS Bulletin

161-1.– Includes the major cause categories of equipment

or installation, age or deterioration, weather, birds or animals, member (or public), and unknown.

– Also, it must include the subcategories recommended by RUS for each of these major cause categories.

Page 11: 1 Overview of Reliability Requirements XYZ Cooperative Date: abc

11

Requirements—Recording

• Utilities with less than 50,000 meters– Maintain and record data to compute

SAIFI, SAIDI and CAIDI; once with “major storms” and once without.

• Make records of interruptions available to board staff as needed.

Page 12: 1 Overview of Reliability Requirements XYZ Cooperative Date: abc

12

Reliability Indices

• Understanding the 3 reliability indices with an example:– SAIFI– SAIDI– CAIDI

Page 13: 1 Overview of Reliability Requirements XYZ Cooperative Date: abc

13

Reliability Indices--SAIFI

• System average interruption frequency index (SAIFI).

• Average number of interruptions per customer during the year.

• Computed as follows:Total Number of Customer Interruptions

Total Number of Customers Served

Page 14: 1 Overview of Reliability Requirements XYZ Cooperative Date: abc

14

Reliability Indices—SAIDI

• System average interruption duration index (SAIDI)

• Average interruption duration per customer served during the year.

• SAIDI is the index computed to comply with current RUS requirements.

Page 15: 1 Overview of Reliability Requirements XYZ Cooperative Date: abc

15

Reliability Indices—SAIDI

• SAIDI computed as follows:Sum of All Customer Interruption Durations

Total Number of Customers Served

Page 16: 1 Overview of Reliability Requirements XYZ Cooperative Date: abc

16

Reliability Indices—CAIDI

• Customer average interruption duration index (CAIDI)• Average interruption duration for those

customers who experience interruptions during the year.

• CAIDI approximates the average length of time required to complete service restoration on average.

• Or thought of from the member-consumer’s perspective: it is on average how long it took the cooperative to restore service to those members who were interrupted in the period.

Page 17: 1 Overview of Reliability Requirements XYZ Cooperative Date: abc

17

Reliability Indices—CAIDI

• CAIDI computed as follows:Sum of All Customer Interruption Durations

Total Number of Customer Interruptions

or

• CAIDI=SAIDI/SAIFI

Page 18: 1 Overview of Reliability Requirements XYZ Cooperative Date: abc

18

ExampleElectric utility serving a total number of 2,000 customers (meters).

DateDuration (Minutes)

No. of Customers

Sum of All Customer Interruption Durations

17-Mar 8.17 200 1,634.00 5-May 71.30 600 42,780.00

12-Jun 30.30 25 757.50 20-Aug 267.20 90 24,048.00 31-Aug 120.00 700 84,000.00 3-Sep 10.00 1,500 15,000.00

27-Oct 40.00 100 4,000.00 Sum 546.97 3,215 172,219.50

CAIDI 172,219.50 / 3,215 = 53.567 minutes

SAIDI 172,219.50 / 2,000 = 86.11 minutes

SAIFI 3,215 / 2,000 = 1.6075 interruptions per customer

Page 19: 1 Overview of Reliability Requirements XYZ Cooperative Date: abc

19

Indices--Question• What is a good or acceptable index?• Answer: This depends upon several factors.

First, a utility should compare itself overtime. Care must be taken in comparing one utility to the next because of factors such as terrain of service area, ownership of substations, methods used in recording information, consistency among staff and from year to year in recording data to name a few.

Page 20: 1 Overview of Reliability Requirements XYZ Cooperative Date: abc

20

Requirements—Reporting

• Reliability Plan & Inspection and Maintenance Plan

• Reliability Report

Page 21: 1 Overview of Reliability Requirements XYZ Cooperative Date: abc

21

Requirements—Reporting

• Reliability Plan & Inspection and Maintenance Plan– Local Board approve by 7/1/03– The plan must describe the cooperative's reliability programs

related to:• (1) vegetation management; • (2) animal contact reduction program, if applicable; • (3) lightning outage mitigation program, if applicable; • (4) other programs that may be reliability related.

– Additionally, the plan must describe the cooperative's current ability to track and monitor interruptions.

– And describe how the electric cooperative plans to communicate its plan with customers/consumer owners.

– Plan must be updated not less than annually.

Page 22: 1 Overview of Reliability Requirements XYZ Cooperative Date: abc

22

Requirements—Reporting

• Annual Reliability Report– By April 1 cooperative must prepare for its board

of directors a reliability report. (1st report due 4/1/04)

– Report must address:• 3 Reliability indices (SAIFI, SAIDI & CAIDI) {5 years with

and without major storms}• Progress on any reliability programs identified in its

reliability plan– Informational copies to IUB and OCA and must be

made publicly available in its entirety to customers/consumer owners.

Page 23: 1 Overview of Reliability Requirements XYZ Cooperative Date: abc

23

Requirements—Reporting

• Information to customers– Customer may request a report about the service

reliability of the circuit serving that customer.– Within 20 days utility must supply report to

customer at a reasonable cost.– Report should identify which items are due to

major events.– Rule is encouraged, “to the extent it is

administratively feasible,” for utilities with under 50,000 customers.

– Rule is required for utilities with over 50,000 customers.

Page 24: 1 Overview of Reliability Requirements XYZ Cooperative Date: abc

24

Reporting--IOUs• Annual Reliability and Service Quality Report for

Utilities with More than 50,000.– a. Description of Service Area. (Urban & Rural).– b. System Reliability Performance--Annual.

– c. Reporting on customer outages.– d. Major Event Summary.– e. Information of Transmission & Distribution Facilities.– f. Plans & Status Report.– g. Capital Expenditure Information.– h. Maintenance.

Page 25: 1 Overview of Reliability Requirements XYZ Cooperative Date: abc

25

IAEC Model Reliability Plan

• IAEC Regulatory Affairs Committee worked with IAEC to develop a model reliability plan & inspection and maintenance plan

• IAEC worked with IUB and OCA staff in addressing their concerns with the model.

• The model is a guide for each cooperative to use in developing their own plan.

• The model will need to be revised to fit the specifics at a given cooperative.

• Make sure what is in your plan lines up with what you are doing or what you plan to do.

Page 26: 1 Overview of Reliability Requirements XYZ Cooperative Date: abc

26

Outline of IAEC Model Plan

• System design

• System construction

• System operation

• System maintenance and inspections

• Data recording

• Data reporting and

• Communications

Page 27: 1 Overview of Reliability Requirements XYZ Cooperative Date: abc

27

IAEC Resources• IAEC Reliability web page

– http://www.iowarec.org/members/regulatory/relaibility_info.shtml

• IAEC model reliability & inspection & maintenance plan

• FAQs related to reliability• RUS Bulletin 161.1• IUB order adopting rules• IUB order with IAEC notes on co-op applicability• Other documents

Page 28: 1 Overview of Reliability Requirements XYZ Cooperative Date: abc

28

XYZ REC’s Plan Development