Planning of WorksProblem Based Learning
Title of problem: METHOD OF IBS CONSTRUCTION Duration of problem: 6 hours
Subject: INDUSTRIALISED BUILDING SYSTEMS Code subject: BFP 40603
Section: 1, 2 Semester: 2 Session 2015/2016
Possible integration with the following subjects : -
1. OUTCOMES
Contents:
1.0 METHOD OF IBS CONSTRUCTION 1.1 Precast concrete framing, panel construction
1.1.1 Main Element Framing and Flooring1.1.2 Types and Method of Jointing1.1.3 Construction Process
1.2 Formwork Systems1.2.1 Main Element 1.2.2 Types and Method of Jointing1.2.3 Construction Process
1.3 Prefabricated steel framing systems1.3.1 Main Element Framing and Flooring1.3.2 Types and Method of Jointing1.3.3 Construction Process
1.4 Prefabricated timber framing systems1.4.1 Main Element Framing and Flooring1.4.2 Types and Method of Jointing1.4.3 Construction Process
1.5 Blockwork systems1.5.1 Main Element Framing and Flooring1.5.2 Types and Method of Jointing1.5.3 Construction Process
1.6 Innovative system1.6.1 Main Element Framing and Flooring1.6.2 Types and Method of Jointing1.6.3 Construction Process
Process:
1. Work in team
2. Web surfing
3. Site visit
4. Communicating and interviewing with industry
5. Learn independently
6. Conduct oral presentation
2. PROFILE OF STUDENTS
Course of study: INDUSTRIALISED BUILDING SYSTEMS
Year of study: 4th Year
Number of students: 71
Comments on learning abilities: -
Planning form/myPBLfkaas
Experience in PBL: Yes
3. PRIOR KNOWLEDGE & SKILLS
N/A
4. NEW INTEGRATED LEARNING ISSUES
1. Construct and evaluate appropriate solutions for construction problems using an Industrialised Building System (IBS) approach.
2. Applying appropriate techniques, resources, and modern engineering and IT tools to modeling/complete the assigned project.
3. Propose suitable application of an industrialized building system for a construction project in a group.
5. PROBLEM FORMAT
Trigger:
Working in a group, you are required to propose a suitable construction method for a building construction project using Industrialised Building Systems (IBS) approach. You are also required to make justification on the selection of the construction method, including the advantages of the method, discussing the main elements of framing and flooring, proposing the types and method of jointing, and prepare the construction process of the selected method.
6. FILA TABLE
Facts Ideas Learning Issues Actions
1. Propose a suitable
construction
method for a
building project
using IBS
approach.
1. Building a
bungalow house
using the
selected IBS
construction
method.
2. Each IBS
method has
advantages and
disadvantages.
3. Construction
process of IBS
include
manufacturing of
the components,
transportation,
1. What are the
advantages of
selected
construction
method?
2. What are the
elements for
framing and
flooring?
3. What types and
method of jointing
are suitable?
Why?
4. What are the
activities involved
in the construction
1. Interview with
industry.
2. Web-surfing.
3. Site visit/field
observation.
4. Document
analysis.
Planning form/myPBLfkaas
site assembly
and other on-site
works.
of selected IBS
method?
Facts (From given
trigger):
Ideas Learning Issues Action
7. ASSESSMENT PLAN
Tool Individual/
Group
Formative/
Summative
Weightage Assessed by
1. Peer Assessment
2. Presentation
Individual/Group
Individual/Group
Formative
Summative
40
60
Peers
Peers/Facilitator
8. FOLLOW-UP AFTER PROBLEM REVIEW
Action taken:
Followed up by:
Date of follow-up:
9.PROBLEM-CRAFTING TEAM
Name: Dr. Nor Haslinda Abas
Designation: Lecturer
Email: [email protected]