Planning form/myPBLfkaas FACULTY OF CIVIL ENVIRONAMNTAL ENGINEERING UNIVERSITI TUN HUSSIEN ONN MALAYSIA Planning of Works Problem Based Learning Title of problem: METHOD OF IBS CONSTRUCTION Duration of problem: 6 hours Subject: INDUSTRIALISED BUILDING SYSTEMS Code subject: BFP 40603 Section: 1, 2 Semester: 2 Session 2015/2016 Possible integration with the following subjects : - 1. OUTCOMES Contents: 1.0 METHOD OF IBS CONSTRUCTION 1.1 Precast concrete framing, panel construction 1.1.1 Main Element Framing and Flooring 1.1.2 Types and Method of Jointing 1.1.3 Construction Process 1.2 Formwork Systems 1.2.1Main Element 1.2.2Types and Method of Jointing 1.2.3Construction Process 1.3 Prefabricated steel framing systems 1.3.1Main Element Framing and Flooring 1.3.2Types and Method of Jointing 1.3.3Construction Process 1.4 Prefabricated timber framing systems 1.4.1Main Element Framing and Flooring 1.4.2Types and Method of Process: 1. Work in team 2. Web surfing 3. Site visit 4. Communicating and interviewing with industry 5. Learn independently 6. Conduct oral presentation

Upload: mohd-afzal

Post on 13-Jul-2016

214 views

Category:

Documents


3 download

DESCRIPTION

IBS

TRANSCRIPT

Planning form/myPBLfkaas

FACULTY OF CIVIL ENVIRONAMNTAL ENGINEERINGUNIVERSITI TUN HUSSIEN ONN MALAYSIA

Planning of WorksProblem Based Learning

Title of problem: METHOD OF IBS CONSTRUCTION Duration of problem: 6 hours

Subject: INDUSTRIALISED BUILDING SYSTEMS Code subject: BFP 40603

Section: 1, 2 Semester: 2 Session 2015/2016

Possible integration with the following subjects : -

1. OUTCOMES

Contents:

1.0 METHOD OF IBS CONSTRUCTION 1.1 Precast concrete framing, panel construction

1.1.1 Main Element Framing and Flooring1.1.2 Types and Method of Jointing1.1.3 Construction Process

1.2 Formwork Systems1.2.1 Main Element 1.2.2 Types and Method of Jointing1.2.3 Construction Process

1.3 Prefabricated steel framing systems1.3.1 Main Element Framing and Flooring1.3.2 Types and Method of Jointing1.3.3 Construction Process

1.4 Prefabricated timber framing systems1.4.1 Main Element Framing and Flooring1.4.2 Types and Method of Jointing1.4.3 Construction Process

1.5 Blockwork systems1.5.1 Main Element Framing and Flooring1.5.2 Types and Method of Jointing1.5.3 Construction Process

1.6 Innovative system1.6.1 Main Element Framing and Flooring1.6.2 Types and Method of Jointing1.6.3 Construction Process

Process:

1. Work in team

2. Web surfing

3. Site visit

4. Communicating and interviewing with industry

5. Learn independently

6. Conduct oral presentation

2. PROFILE OF STUDENTS

Course of study: INDUSTRIALISED BUILDING SYSTEMS

Year of study: 4th Year

Number of students: 71

Comments on learning abilities: -

Planning form/myPBLfkaas

Experience in PBL: Yes

3. PRIOR KNOWLEDGE & SKILLS

N/A

4. NEW INTEGRATED LEARNING ISSUES

1. Construct and evaluate appropriate solutions for construction problems using an Industrialised Building System (IBS) approach.

2. Applying appropriate techniques, resources, and modern engineering and IT tools to modeling/complete the assigned project.

3. Propose suitable application of an industrialized building system for a construction project in a group.

5. PROBLEM FORMAT

Trigger:

Working in a group, you are required to propose a suitable construction method for a building construction project using Industrialised Building Systems (IBS) approach. You are also required to make justification on the selection of the construction method, including the advantages of the method, discussing the main elements of framing and flooring, proposing the types and method of jointing, and prepare the construction process of the selected method.

6. FILA TABLE

Facts Ideas Learning Issues Actions

1. Propose a suitable

construction

method for a

building project

using IBS

approach.

1. Building a

bungalow house

using the

selected IBS

construction

method.

2. Each IBS

method has

advantages and

disadvantages.

3. Construction

process of IBS

include

manufacturing of

the components,

transportation,

1. What are the

advantages of

selected

construction

method?

2. What are the

elements for

framing and

flooring?

3. What types and

method of jointing

are suitable?

Why?

4. What are the

activities involved

in the construction

1. Interview with

industry.

2. Web-surfing.

3. Site visit/field

observation.

4. Document

analysis.

Planning form/myPBLfkaas

site assembly

and other on-site

works.

of selected IBS

method?

Facts (From given

trigger):

Ideas Learning Issues Action

7. ASSESSMENT PLAN

Tool Individual/

Group

Formative/

Summative

Weightage Assessed by

1. Peer Assessment

2. Presentation

Individual/Group

Individual/Group

Formative

Summative

40

60

Peers

Peers/Facilitator

8. FOLLOW-UP AFTER PROBLEM REVIEW

Action taken:

Followed up by:

Date of follow-up:

9.PROBLEM-CRAFTING TEAM

Name: Dr. Nor Haslinda Abas

Designation: Lecturer

Email: [email protected]