Page 1: 1 PCG15_11 Report of MCC Activities since PCG#14 Adrian Scrase MCC

1

PCG15_11

Report of MCC Activities since Report of MCC Activities since PCG#14PCG#14

Adrian ScraseAdrian ScraseMCCMCC

Page 2: 1 PCG15_11 Report of MCC Activities since PCG#14 Adrian Scrase MCC

2

PCG15_11

Table of ContentsTable of Contents3GPP Reorganization

Corresponding MCC Reorganization

Workload

Performance

Resources

Problems

Conclusions

Page 3: 1 PCG15_11 Report of MCC Activities since PCG#14 Adrian Scrase MCC

3

PCG15_11

3GPP Reorganization (1)3GPP Reorganization (1)

• TSG Reorganization now completed • New Technical Bodies in place and old Technical

Bodies closed• New leadership appointed and in place• Summary of the new organization given in

following slide

Page 4: 1 PCG15_11 Report of MCC Activities since PCG#14 Adrian Scrase MCC

4

PCG15_11

3GPP Reorganization (2)3GPP Reorganization (2)

Page 5: 1 PCG15_11 Report of MCC Activities since PCG#14 Adrian Scrase MCC

5

PCG15_11

MCC Reorganization (1)MCC Reorganization (1)

• TSG Reorganization led to a re-allocation of MCC resources

• An opportunity for a “change of scenery” for some experts

• Core competences retained• Transfer of responsibilities achieved without

interruption to service level• No departures or new arrivals since PCG#14

(except-----)

Page 6: 1 PCG15_11 Report of MCC Activities since PCG#14 Adrian Scrase MCC

6

PCG15_11

MCC Reorganization (2)MCC Reorganization (2)

Lisa Ishiiborn Saturday 24

September 2005

Page 7: 1 PCG15_11 Report of MCC Activities since PCG#14 Adrian Scrase MCC

7

PCG15_11

Workload (1)Workload (1)

• Workload is not decreasing • RAN LTE has led to a resurgence of interest • TSG and WG meeting participation shows a

growing trend • Number of contributions shows a rising trend• Number of CRs shows a rising trend (following

Rel 6 freeze)

Page 8: 1 PCG15_11 Report of MCC Activities since PCG#14 Adrian Scrase MCC

8

PCG15_11

Workload (2)Workload (2)

Specifications by Release (pre TSG#29)

CLASSIFICATION NUMBER OF ACTIVE SPECS

GSM Phase 1 122

GSM Phase 2 182

GSM Phase 2+ Release 96 201

GSM Phase 2+ Release 97 220

GSM Phase 2+ Release 98 282

GERAN / UTRAN Release 99 446

GERAN / UTRAN Release 4 518

GERAN / UTRAN Release 5 581

GERAN / UTRAN Release 6 777

GERAN / UTRAN Release 7 129

TOTAL SPECIFICATIONS 3458

Page 9: 1 PCG15_11 Report of MCC Activities since PCG#14 Adrian Scrase MCC

9

PCG15_11

Workload (3)Workload (3)

CRs by year and Release (pre TSG#29)

Release / Year 1999 2000 2001 2002 2003 2004

2005to date

(excluding TSG#29) TOTAL

R99 1408 4398 2266 1003 581 512 67 10235

Rel-4 0 376 2828 1900 690 257 80 6131

Rel-5 0 27 644 3281 2840 2162 799 9753

Rel-6 0 0 0 171 1088 2457 2279 5995

Rel-7 0 0 0 0 1 20 177 198

TOTAL 1408 4801 5738 6355 5200 5408 3402 32312

Page 10: 1 PCG15_11 Report of MCC Activities since PCG#14 Adrian Scrase MCC

10

PCG15_11

Workload (4)Workload (4)

1999

2000

2001

2002

2003

2004Rel-7

Rel-6Rel-5

Rel-4R99

0

500

1000

1500

2000

2500

3000

3500

4000

4500

no. of CRs

year

Release

Approved CRs per year per Release

Release ’99: stable

Release 4: stable

Release 5: CRs reducing

Release 6: work now starts!

Page 11: 1 PCG15_11 Report of MCC Activities since PCG#14 Adrian Scrase MCC

11

PCG15_11

PerformancePerformance

• Targets for delivering specifications after each TSG meeting consistently being met:– 90% delivered within 2 weeks– 100% delivered within 3 weeks

• Error rate static at 0,3% (or 3 errors in 1000 implementations)

• All regular WG meetings being supported (even using substitution for collocated meetings)

Page 12: 1 PCG15_11 Report of MCC Activities since PCG#14 Adrian Scrase MCC

12

PCG15_11

ResourcesResources

• MCC Resources for 2005 have been reduced (below the budget allocation)

• Rationalization results in 0,5 expert saving• One MCC Assistant now working 80%• Resources are now at the minimum level

without imposing a degradation of service• Support sought for the 2006 Budget request to

enable service continuity

Page 13: 1 PCG15_11 Report of MCC Activities since PCG#14 Adrian Scrase MCC

13

PCG15_11

Problems (1)Problems (1)

• IT services at TSG/WG meetings are provided on a “best effort” basis

• Provision of service is executed by TSG/WG Secretaries on a goodwill basis

• Delegate expectations are higher due to experiences in other bodies where professional support is provided (eg OMA)

• Internet access is a particular problem• Any tangible increase in service level implies budget

increase• PCG advice sought!

Page 14: 1 PCG15_11 Report of MCC Activities since PCG#14 Adrian Scrase MCC

14

PCG15_11

Problems (2)Problems (2)

• Many WGs are now holding collocated meetings • Such meetings become very large and

introduce logistic challenges• Collocation of groups reduces the possibility to

reuse MCC experts

Page 15: 1 PCG15_11 Report of MCC Activities since PCG#14 Adrian Scrase MCC

15

PCG15_11

ConclusionsConclusions

• MCC functioning well • Staff/experts turnover at a consistent level (at

around two experts per year)• Resources now trimmed to the limit• Service level being maintained• Some frustration in not being able to deliver the

IT service level expected from the community• Working environment remains healthy and

conducive to high output