1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION SYSTEM Our “Invisible” Transportation Network Richard C. Lockwood Richard C. Lockwood Chief, Operations Division Chief, Operations Division U.S. Army Corps of Engineers, Pittsburgh District U.S. Army Corps of Engineers, Pittsburgh District

Upload: mason-cameron

Post on 27-Mar-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION SYSTEM Our Invisible Transportation Network

1

Permanent International Association of Navigation Congresses - PIANC

July 15, 2008

RIS - RIVERS INFORMATION SYSTEMOur “Invisible” Transportation Network

Richard C. LockwoodRichard C. LockwoodChief, Operations DivisionChief, Operations Division

U.S. Army Corps of Engineers, Pittsburgh DistrictU.S. Army Corps of Engineers, Pittsburgh District

Page 2: 1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION SYSTEM Our Invisible Transportation Network

RIVERS INFORMATION SERVICE

RIS GOALS

•RIS will be an electronic system that will pull data from various existing sources both Government and commercial and process and display that information in customizable user friendly formats

•Modify or replace existing USACE systems to achieve a single system that will inform and be informed by the systems already in use by our navigation partners.

• Use existing layered GIS based technology, Electronic Navigation Charting and data summarizing to provide all partners with the specific information they need to staff, operate and use the Inland Navigation system.

• Eliminate duplication of data entry and ensure seamless transfer between USACE systems and Navigation and Government partners.

Page 3: 1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION SYSTEM Our Invisible Transportation Network

3

• Generate confidence both within and outside USACE that RIS is a valuable tool that will improve operational reliability of the system while reducing data entry requirements and costs.

• RIS will use existing technology, Electronic Navigation Charting and data summarizing to provide all partners with the specific information they need to staff, operate and use the Inland Navigation system.

• RIS will eliminate duplication of data entry and ensure seamless transfer between USACE systems and Navigation and Government partners.

• RIS will generate confidence both within and outside the Government that the Inland Waterways System is an efficient, safe and reliable transportation system.

Page 4: 1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION SYSTEM Our Invisible Transportation Network

4

CONSTRAINTS

• RIS must protect sensitive and proprietary information of the commercial Navigation partners.

• RIS must fit seamlessly into the bigger CRIS service and use existing standards for data coding and classification

• RIS must be capable of informing and being informed by USCG’s AIS (Automated Identification System) and other existing commercial systems for tow tracking and scheduling

• RIS must be capable of informing and being informed by other USACE systems (Asset Management, OMBIL, CWMS, etc) and other Partner systems (NWS, USGS, IRS, Customs, etc.)

• Navigation data (current, wind speed, lock condition, gauge readings, dam operating data, etc.) provided via or by RIS must not expose USACE to any liability concerning the use of that data.

Page 5: 1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION SYSTEM Our Invisible Transportation Network

5

CURRENT DATA COLLECTION

• Lock Operators receive hard copy information from deckhand on the tow and then manually enter the data into OMNI or LPMS. (2 systems)

• OMNI/LPMS require 123 Different Items to be entered

• Result is some “simplification” – Barge tonnage information is not accurate.– Not every jumbo barge has 1500 tons

• Facilities are not getting credit for the tonnage they pass each year.Lower tonnage means lower funds

• The Corps have teams of personnel reconciling the OMNI data with the Monthly Commodity Reports submitted to the IRS & Department of Commerce by Industry.

• The data is inaccurate and unreliable.

Page 6: 1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION SYSTEM Our Invisible Transportation Network

6

Lockage Work Area

Times and Stall

Information

Page 7: 1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION SYSTEM Our Invisible Transportation Network

7

Lockage Work Area

Barge Information

Page 8: 1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION SYSTEM Our Invisible Transportation Network

8

Weather Work Area

Entered every three

hours

Page 9: 1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION SYSTEM Our Invisible Transportation Network

9

Readings Work Area

Gage information

entered every hour or after a

dam gate move

Page 10: 1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION SYSTEM Our Invisible Transportation Network

10

Readings Work Area

Individual dam gate levels are recorded

Page 11: 1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION SYSTEM Our Invisible Transportation Network

11

RIS

TOWING VESSELS

USACE ASSET MANAGEMENT

LOCKLOCAL DATA

SYSTEM DATA

TOWING COMPANIES

TERMINAL OPERATORS

PORT AUTHORITIES

SHIPPERS

USCG AIS

OMBILNATNL WEATHER SER

USGS

RECREATIONAL BOATERS

CWMS

IRS

DHS

RIVER INFORMATION SERVICE

CUSTOMS

DOE

Page 12: 1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION SYSTEM Our Invisible Transportation Network

12

STRATEGY

• LEVERAGE WORK OF PIANC WG 125 TO CREATE A NEW INFORMATION SYSTEM– USE EXISTING INFORMATION– CUSTOMIZABLE DATA DISPLAY FOR ALL USERS– UTILIZE MARINE INFORMATION OVERLAYS– ELIMINATE MULTIPLE DISPLAYS

• REPLACE OMNI/LPMS WITH LOMA (LOCK OPERATION MANAGEMENT)– NO MANUAL DATA INPUT– AUTOMATIC CAPTURE OF REAL TIME DATA AT LOCK– ELIMINATE REDUNDANT AND CONFLICTING SYSTEMS

Page 13: 1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION SYSTEM Our Invisible Transportation Network

13

Hydrographic Overlay

The latest data provides a clear view of the channel and river bottom contours.

Page 14: 1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION SYSTEM Our Invisible Transportation Network

14

AIS Overlay

Page 15: 1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION SYSTEM Our Invisible Transportation Network

15

RADARSAT Overlay

Page 16: 1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION SYSTEM Our Invisible Transportation Network

16

Lock Queue Overlay

Page 17: 1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION SYSTEM Our Invisible Transportation Network

17

Connected

SMART LOCK OVERLAY

Page 18: 1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION SYSTEM Our Invisible Transportation Network

18

Environmental Data Overlay

Page 19: 1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION SYSTEM Our Invisible Transportation Network

19

Real Time Current Velocity (RTCV) Overlay

Page 20: 1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION SYSTEM Our Invisible Transportation Network

20

• FIRST MEETING OF US NATIONAL RIS TEAM 15 JULY 2009

• ENDSTATE, GOALS AND INITIATIVES DEFINED• MARK STEVENS VP @ INGRAM BARGE HAS

PILOTHOUSE PROTOTYPE• JIM McCARVILLE / PORT OF PITTSBURGH

COMMISSION AND CMU STUDENT PRACTICUMS– SMARTLOCK– RIVER NET– WIRELESS WATERWAYS

CURRENT INITIATIVES

Page 21: 1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION SYSTEM Our Invisible Transportation Network

21

Page 22: 1 Permanent International Association of Navigation Congresses - PIANC July 15, 2008 RIS - RIVERS INFORMATION SYSTEM Our Invisible Transportation Network

22

Questions?