I N C I SOYDASP R O J E C T M A N A G E M E N T + S M A R T A R C H I T E C T U R E + C O N T E M P O R A R Y D E S I G N
GRAND HYATT ISTANBUL HOTELRO O M S & P U C L I C A R EA S - 2003
P ROJ EC T: • Project Manager of the production contractor
• Coordination with HBA Design Group
• Refurbishment Project
• Loose & Millwork Furniture for restaurant, lobby, bar and rooms
• My first Hyatt Hotel project
• Completed the production of only upholstery items in
an ergonomic way
KÖŞEBAŞI AMSTERDAMR ESTAU R A N T - 2011
P ROJ EC T: • My first (freelance) project in Amsterdam as
a Project Manager
• Turn-Key Refurbishment Project
• Selection of purchasing of every item for the restaurant
• Well-coordinated project and timely completion
ANDAZ LONDONLO B BY-G E C LU B - 2007
P ROJ EC T: • Senior Project Manager of production contractor
• Coordination with WDA Design Group
• First Andaz Hotel in Europe, the newest brand for
Global Hyatt Corp
• Refurbishment Project
• Loose & Millwork Furniture for GE Club, lobby and
Terminus Restaurant
• Different design solutions for reception desk
• Successfully solved log table
• Good opportunity to have worked in a stylish hotel
HYATT REGENCY MAINZ- FORT MALAKOFFR ESTAU R A N T - 2008
P ROJ EC T: • Senior Project Manager of production contractor
• Coordination with FG Stijl Design Group
• Refurbishment Project
• Loose & Millwork Furniture for restaurant
• Smart solutions for bar and leather wall
• Complicated places in a historical building for taking
dimensions such as wedding wall, wine units
• Completion of production in limited time
HYATT REGENCY MAINZLO B BY - 2007
P ROJ EC T: • Project Manager of the production contractor
• Coordination with HBA Design Group
• Refurbishment Project
• Loose & Millwork Furniture for the restaurant,
lobby, bar and rooms
• Solving of bronze cladding details
• Installation in less than one day
• Completion before due date
HYATT REGENCY BIRMINGHAMP U B L I C A R EA S - 2004
P ROJ EC T: • Project Manager of the production contractor
• Coordination with WDA Design Group
• Refurbishment Project
• Loose & Millwork Furniture for restaurant, lobby and bar
• Smart solutions in metal design wall
• Completion of installation on time while being
6-month pregnant and without own installation team
PARK HYATT BAKUM EZ ZO R ESTAU R A N T - 2003
P ROJ EC T: • My first Hyatt International project
• Coordination with HBA Design Group
• Refurbishment Project
• Loose & Millwork Furniture for Restaurant
• Smartly solved wooden doors and claddings
• Well-coordinated project
PARK HYATT ISTANBUL- MACKA PALASLO B BY & RO O M S - 2008
P ROJ EC T: • Senior project Manager of the project in this
historical building called ‘Macka Palas’
• Coordination with GKV Design Group
• Refurbishment project
• Loose & Millwork Furniture items for public areas and
upholstery items for all rooms & suites
• Smart solutions for brick wall design timber cladding
• Successfully solved curved wine display unit