1-portfolio a5

33
INCI SOYDAS PROJECTMANAGEMENT + SMART ARCHITECTURE + CONTEMPORARY DESIGN

Upload: inci-soydas

Post on 22-Jan-2018

111 views

Category:

Documents


0 download

TRANSCRIPT

I N C I SOYDASP R O J E C T M A N A G E M E N T + S M A R T A R C H I T E C T U R E + C O N T E M P O R A R Y D E S I G N

GRAND HYATT ISTANBUL HOTEL

GRAND HYATT ISTANBUL HOTELRO O M S & P U C L I C A R EA S - 2003

P ROJ EC T: • Project Manager of the production contractor

• Coordination with HBA Design Group

• Refurbishment Project

• Loose & Millwork Furniture for restaurant, lobby, bar and rooms

• My first Hyatt Hotel project

• Completed the production of only upholstery items in

an ergonomic way

GRAND HYATT ISTANBUL HOTELRO O M S & P U C L I C A R EA S - 2003

KÖŞEBAŞI AMSTERDAM

KÖŞEBAŞI AMSTERDAMR ESTAU R A N T - 2011

P ROJ EC T: • My first (freelance) project in Amsterdam as

a Project Manager

• Turn-Key Refurbishment Project

• Selection of purchasing of every item for the restaurant

• Well-coordinated project and timely completion

KÖŞEBAŞI AMSTERDAMR ESTAU R A N T - 2011

ANDAZ LONDON

ANDAZ LONDONLO B BY-G E C LU B - 2007

P ROJ EC T: • Senior Project Manager of production contractor

• Coordination with WDA Design Group

• First Andaz Hotel in Europe, the newest brand for

Global Hyatt Corp

• Refurbishment Project

• Loose & Millwork Furniture for GE Club, lobby and

Terminus Restaurant

• Different design solutions for reception desk

• Successfully solved log table

• Good opportunity to have worked in a stylish hotel

ANDAZ LONDONLO B BY-G E C LU B - 2007

HYATT REGENCY MAINZ-FORT MALAKOFF

HYATT REGENCY MAINZ- FORT MALAKOFFR ESTAU R A N T - 2008

P ROJ EC T: • Senior Project Manager of production contractor

• Coordination with FG Stijl Design Group

• Refurbishment Project

• Loose & Millwork Furniture for restaurant

• Smart solutions for bar and leather wall

• Complicated places in a historical building for taking

dimensions such as wedding wall, wine units

• Completion of production in limited time

HYATT REGENCY MAINZ- FORT MALAKOFFR ESTAU R A N T - 2008

HYATT REGENCY MAINZ

HYATT REGENCY MAINZLO B BY - 2007

P ROJ EC T: • Project Manager of the production contractor

• Coordination with HBA Design Group

• Refurbishment Project

• Loose & Millwork Furniture for the restaurant,

lobby, bar and rooms

• Solving of bronze cladding details

• Installation in less than one day

• Completion before due date

HYATT REGENCY MAINZLO B BY - 2007

HYATT REGENCY BIRMINGHAM

HYATT REGENCY BIRMINGHAMP U B L I C A R EA S - 2004

P ROJ EC T: • Project Manager of the production contractor

• Coordination with WDA Design Group

• Refurbishment Project

• Loose & Millwork Furniture for restaurant, lobby and bar

• Smart solutions in metal design wall

• Completion of installation on time while being

6-month pregnant and without own installation team

HYATT REGENCY BIRMINGHAMP U B L I C A R EA S - 2004

PARK HYATT BAKU

PARK HYATT BAKUM EZ ZO R ESTAU R A N T - 2003

P ROJ EC T: • My first Hyatt International project

• Coordination with HBA Design Group

• Refurbishment Project

• Loose & Millwork Furniture for Restaurant

• Smartly solved wooden doors and claddings

• Well-coordinated project

PARK HYATT ISTANBUL-MACKA PALAS

PARK HYATT ISTANBUL- MACKA PALASLO B BY & RO O M S - 2008

P ROJ EC T: • Senior project Manager of the project in this

historical building called ‘Macka Palas’

• Coordination with GKV Design Group

• Refurbishment project

• Loose & Millwork Furniture items for public areas and

upholstery items for all rooms & suites

• Smart solutions for brick wall design timber cladding

• Successfully solved curved wine display unit

PARK HYATT ISTANBUL-MACKA PALASLO B BY & RO O M S - 2008