1 pre-bid conference & site tour state library and courts building renovation

36
1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

Upload: trey-crist

Post on 30-Mar-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

1

Pre-Bid Conference & Site Tour

State Library and Courts Building Renovation

Page 2: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

2

Project Management Overview

Department of General Services –Owner, Building Manager, Contract Authority, and InspectionCarey & Co. – ArchitectVanir Construction Management - On-site Construction ManagerCalifornia State Library, Supreme Court, Court of Appeals - Tenants

Page 3: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

3

Project Funding

Pre-sold Lease Revenue BondsState’s Estimate: $ 50,000,000

Page 4: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

4

NeighborhoodParade/Demonstration Routes

State Historic Preservation Office (SHPO)

Jesse Unruh Building

Library & Courts Building

State Capitol Building

Capitol Park

Capitol Extension Group

Parade/Demonstration RoutesParade/Demonstration RoutesParade/Demonstration RoutesParade/Demonstration Routes

Page 5: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

5

Project Overview

188,000 GSFSix stories plus basementComplete fire, life and safety upgradeMEP and telecom infrastructure replacementHazardous materials abatement. Registered State Historic Landmark and on the National Register of Historic Places

Page 6: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

6

General Requirements & Conditions

Building is vacant.Special Project Procedures include:

Intensive coordination requirementsMethod of proceduresInterval schedules, work plans & coordination drawing submittals

Requirement for qualified designated historic preservationist on GC staff.LEED accredited professional

Page 7: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

7

Decorative Elements

Page 8: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

8

Historic Fabric & Fine Art

Page 9: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

9

Project Overview - Site

~ 3.90 AcresWithin the jurisdiction of Capitol ParkSeveral memorial statuary, placards, and plantingsMature tree and landscape protectionLandscape irrigation replacementReplacement of aged shrubberyMiscellaneous signage

Page 10: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

10

Site Views

Page 11: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

11

Memorials & Statuary

Page 12: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

12

Exterior Improvements

Repair and re-point granite and terra cottaRepair windowsReplace roofRemove and replace mechanical penthousesRestore light wellsImprove accessibility

Page 13: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

13

Façades

Page 14: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

14

Fine Art Fenestrations

Page 15: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

15

Fine Art Statuary & Detail

Page 16: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

16

Interior Improvements

Abate hazardous materialsReplace MEPReplace telecommunicationNew fire suppression & alarmReplace or refresh most finishesNew access, security, and controlsTenant Improvements

Page 17: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

17

Interiors

Page 18: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

18

Typical Interiors

Page 19: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

19

Plant Rooms

Page 20: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

20

Elaborate Ceilings

Page 21: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

21

Light Fixture Restoration

Page 22: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

22

Maynard Dixon Mural – Rm 301

Page 23: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

23

Dixon Paintings - Second Floor North Corridor

Page 24: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

24

Memorial Vestibule History of War Panels

Page 25: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

25

Decorative Arts

Page 26: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

26

Decorative Arts

Page 27: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

27

Review of Bid Instructions

Bid Date: August 17, 2010Bid Time: 2:00 PMBid Location: Third Floor PMB Reception Desk, 707 3rd Street, West SacramentoAnticipated NTP: Late 2010Project Duration: 670 calendar days

Page 28: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

28

Bid Forms:

The bid proposal forms will be distributed at the conclusion of the conference. All Contractors bidding as a Prime Contractor must sign-in and receive bid forms today!

Page 29: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

29

Request for Bidders Information

Please submit bid questions on form included in project manual E-file is available from Project Director & on BidsyncEmail to: [email protected]

Cut-off date: 10 days prior to bid date

Page 30: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

30

Bidding & Contracting Requirements

Lump sumPrevailing wage February 2010Disable Veteran Business EnterpriseReference documents available

Original 1920s documentsHazardous Materials Survey DataHistoric Structures Survey

DGS General ConditionsAugust 2009 Edition

Page 31: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

31

Disable Veterans Business Enterprise Program

Good Faith Effort has been discontinued!Bidders must meet or exceed 3% DVBE participation or bid will be non-responsive.Incentives for exceeding DBVE requirement and stated SBE goal are calculated based on lowest responsive bidder.

Page 32: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

32

Disable Veteran & Small Business Enterprise Requirements

James Frolich, Contract OfficerContract Management Section916-376-1770

Page 33: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

33

Supplementary Conditions

Contract time 670 Calendar DaysLiquated Damages on completion dateInsurance

Commercial General Liability = $10,000,000Employer Liability = $1,000,000Pollution Liability = $2,000,000Builder’s Risk = Contract Sum

Escrow Bid Documents

Page 34: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

34

Supplementary Non-Mandatory Bid Walks

July 28, 2010:9:30 to 11:30: Architectural Protection, Restoration, Exterior Restoration, Hazardous Materials Abatement and Demolition1:00 to 3:00: Electrical, Telecommunication, and Security Systems and Historic Light Fixture Restoration

July 29, 2010:9:30 to 11:30: Mechanical and Plumbing1:00 to 3:00: Fire Suppression and Elevator renovation

No new Prime Contractors admitted to bid!

Page 35: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

Questions?

Page 36: 1 Pre-Bid Conference & Site Tour State Library and Courts Building Renovation

Last Chance!

Prime contractors must sign-in and receive bid proposal forms before

leaving this area.