1 project information requirements: 2 technical ...€¦ · 3. please provide gas analysis (sweet,...

1
1 PROJECT INFORMATION REQUIREMENTS: Company Name: Application: Industry: Media: Location: Email: Agent: Telephone: 2 TECHNICAL INFORMATION REQUIREMENTS: Operating Data Design Data Operating Pressure: Design Pressure: Operating Temperature: Design Temperature: Maximum Flow Rate: Configuration: Viscosity: Sour Service (%): Yes No Liquid Density: Corrosion Allowance: Solids Analysis: Special Material Required: Vessel Connections Process Documents Size [in] Flange Class PFD: Included Inlet P&ID: Included Outlet Media Composition Report: Included Drain Please Select Vessel Certification Vessel Testing Hydro Test Yes No Radiography Yes No 3 ADDITIONAL INFORMATION: Notes: 1. Black Powder is the abrasive, reactive contamination particulate present in all gas and hydrocarbon fluid transmission lines due to corrosion and erosion of pipeline walls. 2. Please provide Black Powder particulate contaminant analysis. 3. Please provide gas analysis (sweet, sour, wet or dry) or hydro carbon stream analysis (light or heavy crude, refined product). 4. Please provide pipe line length, pumping stations, compression stations, metering stations. 5. Please attach related PFD and P&IDs to the inquiry form. 6. Each application or equipment request requires a separate sheet. PROJECT NUMBER: 11/18

Upload: others

Post on 10-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 PROJECT INFORMATION REQUIREMENTS: 2 TECHNICAL ...€¦ · 3. Please provide gas analysis (sweet, sour, wet or dry) or hydro carbon stream analysis (light or heavy crude, refined

1 PROJECT INFORMATION REQUIREMENTS: Company Name: Application:

Industry: Media:

Location: Email:

Agent: Telephone:

2 TECHNICAL INFORMATION REQUIREMENTS: Operating Data Design Data

Operating Pressure: Design Pressure:

Operating Temperature: Design Temperature:

Maximum Flow Rate: Configuration:

Viscosity: Sour Service (%): Yes No Liquid Density: Corrosion Allowance:

Solids Analysis: Special Material Required:

Vessel Connections Process Documents

Size [in] Flange Class PFD: Included

Inlet P&ID: Included

Outlet Media Composition Report: Included

Drain Please Select Vessel Certification

Vessel Testing

Hydro Test Yes No Radiography Yes No

3 ADDITIONAL INFORMATION:

Notes: 

1. Black Powder is the abrasive, reactive contamination particulate present in all gas and hydrocarbon fluid transmission lines due to corrosion and erosion of pipeline walls.2. Please provide Black Powder particulate contaminant analysis.3. Please provide gas analysis (sweet, sour, wet or dry) or hydro carbon stream analysis (light or heavy crude, refined  product).4. Please provide pipe line length, pumping stations, compression stations, metering stations.

5. Please attach related PFD and P&IDs to the inquiry form.6. Each application or equipment request requires a separate sheet.

PROJECT NUMBER: 11/18

Steven Lahoda
Typewritten Text
Request Date:
Steven Lahoda
Typewritten Text
Steven Lahoda
Typewritten Text
Steven Lahoda
Typewritten Text
Steven Lahoda
Typewritten Text
Steven Lahoda
Typewritten Text
BPS PROJECT DATA REQUISITION FORM
Steven Lahoda
Typewritten Text
Steven Lahoda
Typewritten Text
Steven Lahoda
Typewritten Text
Steven Lahoda
Typewritten Text
Steven Lahoda
Typewritten Text
Steven Lahoda
Typewritten Text
Steven Lahoda
Typewritten Text
Received Date:
Steven Lahoda
Typewritten Text
Steven Lahoda
Typewritten Text
Steven Lahoda
Typewritten Text
Steven Lahoda
Typewritten Text
Steven Lahoda
Typewritten Text
Steven Lahoda
Typewritten Text
Steven Lahoda
Typewritten Text