1 project information requirements: 2 technical ...€¦ · 3. please provide gas analysis (sweet,...
TRANSCRIPT
1 PROJECT INFORMATION REQUIREMENTS: Company Name: Application:
Industry: Media:
Location: Email:
Agent: Telephone:
2 TECHNICAL INFORMATION REQUIREMENTS: Operating Data Design Data
Operating Pressure: Design Pressure:
Operating Temperature: Design Temperature:
Maximum Flow Rate: Configuration:
Viscosity: Sour Service (%): Yes No Liquid Density: Corrosion Allowance:
Solids Analysis: Special Material Required:
Vessel Connections Process Documents
Size [in] Flange Class PFD: Included
Inlet P&ID: Included
Outlet Media Composition Report: Included
Drain Please Select Vessel Certification
Vessel Testing
Hydro Test Yes No Radiography Yes No
3 ADDITIONAL INFORMATION:
Notes:
1. Black Powder is the abrasive, reactive contamination particulate present in all gas and hydrocarbon fluid transmission lines due to corrosion and erosion of pipeline walls.2. Please provide Black Powder particulate contaminant analysis.3. Please provide gas analysis (sweet, sour, wet or dry) or hydro carbon stream analysis (light or heavy crude, refined product).4. Please provide pipe line length, pumping stations, compression stations, metering stations.
5. Please attach related PFD and P&IDs to the inquiry form.6. Each application or equipment request requires a separate sheet.
PROJECT NUMBER: 11/18