1Salinisation of the Kapuas Delta
Solutions for raw water intake during the dry season
- Introduction- Current situation- Long term & Short term Solutions- Criteria
Imput from:Cipta Karya (Province): Pak Angiat BWSK: Pak SapriPak Masryatno (former technical director)PDAM Kota Pontianak
![Page 2: 1 Salinisation of the Kapuas Delta Solutions for raw water intake during the dry season - Introduction - Current situation - Long term & Short term Solutions](https://reader035.vdocument.in/reader035/viewer/2022062619/551944cc55034679738b4630/html5/thumbnails/2.jpg)
2Salinisation of the Kapuas Delta
Introduction: characteristics of the treatment facility in Pontianak
2010 2017- Drinking water demand: 1,068 m3/s 1,769 m3/s - Production capacity 1,21 m3/s 1,51 m3/s- Production capacity in the dry season: 300 l/s 1300 l/s- Costumers coverage: 60% 90%- Population growth: 2,74 %/year 2,74 %/year
![Page 3: 1 Salinisation of the Kapuas Delta Solutions for raw water intake during the dry season - Introduction - Current situation - Long term & Short term Solutions](https://reader035.vdocument.in/reader035/viewer/2022062619/551944cc55034679738b4630/html5/thumbnails/3.jpg)
3Salinisation of the Kapuas Delta
(Technical) Problems during the dry season
- During the extreme events of 1997 and 2002 (resp. 110 and 80 days) the pipe to Penepat (24 km upstream) was only 20-30% of the time operational due to:
- Lack of fuel
- Mechanical failure of the pumps
- Leakage of the transport pipe
- Beside these problems there is a capacity deficit of approx.
900 l/s
![Page 4: 1 Salinisation of the Kapuas Delta Solutions for raw water intake during the dry season - Introduction - Current situation - Long term & Short term Solutions](https://reader035.vdocument.in/reader035/viewer/2022062619/551944cc55034679738b4630/html5/thumbnails/4.jpg)
4Salinisation of the Kapuas Delta
New transport pipe to Penepat- New transport pipe to Penepat (under construction)
Capacity: - Current Pipe (d=600 mm) = 300 l/s (v = 1 m/s)
- New Pipe (d=800) = 500 l/s (v = 1 m/s) - In Holland the transport velocity of 1 m/s is normal)
![Page 5: 1 Salinisation of the Kapuas Delta Solutions for raw water intake during the dry season - Introduction - Current situation - Long term & Short term Solutions](https://reader035.vdocument.in/reader035/viewer/2022062619/551944cc55034679738b4630/html5/thumbnails/5.jpg)
5Salinisation of the Kapuas Delta
A sustainable solution for the future?
![Page 6: 1 Salinisation of the Kapuas Delta Solutions for raw water intake during the dry season - Introduction - Current situation - Long term & Short term Solutions](https://reader035.vdocument.in/reader035/viewer/2022062619/551944cc55034679738b4630/html5/thumbnails/6.jpg)
6Salinisation of the Kapuas Delta
Short term / Long term
![Page 7: 1 Salinisation of the Kapuas Delta Solutions for raw water intake during the dry season - Introduction - Current situation - Long term & Short term Solutions](https://reader035.vdocument.in/reader035/viewer/2022062619/551944cc55034679738b4630/html5/thumbnails/7.jpg)
7Salinisation of the Kapuas Delta
Scope of solutionsShort term-Intake further upstream-Optimise capacity WTPs and decrease leakage-Update Penepat intake, including reservoir or extend pipeline to Biyung
Long term-Blocking salt water from the sea-Create fresh water reservoir for the dry period-Flushing KK by constructing canal Sukalanting
![Page 8: 1 Salinisation of the Kapuas Delta Solutions for raw water intake during the dry season - Introduction - Current situation - Long term & Short term Solutions](https://reader035.vdocument.in/reader035/viewer/2022062619/551944cc55034679738b4630/html5/thumbnails/8.jpg)
8Salinisation of the Kapuas Delta
Stop sea water from entering the river system
Construct a dam, must be able toRegulate river dischargePass the ships
It depends on the functional requirements
Location: River mouth (Jungkat) or Ambawang (idea of Prof. Arwin)
![Page 9: 1 Salinisation of the Kapuas Delta Solutions for raw water intake during the dry season - Introduction - Current situation - Long term & Short term Solutions](https://reader035.vdocument.in/reader035/viewer/2022062619/551944cc55034679738b4630/html5/thumbnails/9.jpg)
9Salinisation of the Kapuas Delta
A fresh water reservoir1.26 m3/s = 150,000 m3/day (in combination with Penepat)Dry season = 110 days
Reservoir: 12,000,000 m3
When you fill it up to two meters you need an area of approx. 600 ha.
![Page 10: 1 Salinisation of the Kapuas Delta Solutions for raw water intake during the dry season - Introduction - Current situation - Long term & Short term Solutions](https://reader035.vdocument.in/reader035/viewer/2022062619/551944cc55034679738b4630/html5/thumbnails/10.jpg)
10Salinisation of the Kapuas Delta
Flushing the Kapuas Kecil in the dry season
- Construct a bypass in the river near Sukalanting (not as simple as it looks like)
![Page 11: 1 Salinisation of the Kapuas Delta Solutions for raw water intake during the dry season - Introduction - Current situation - Long term & Short term Solutions](https://reader035.vdocument.in/reader035/viewer/2022062619/551944cc55034679738b4630/html5/thumbnails/11.jpg)
11Salinisation of the Kapuas Delta
Criteria Feasibility