Page 1: 1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005

1Sasha Milov DC meeting Dec 7, 2005

HBD upgrade status.HBD upgrade status.

Sasha Milov

Dec 07, 2005

Page 2: 1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005

2Sasha Milov DC meeting Dec 7, 2005

Mechanical assembly

Photocathode production and measurement

Glove Box modification

GEMs testing

Electronics status

Beam test

Progress:Progress:

Page 3: 1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005

3Sasha Milov DC meeting Dec 7, 2005

Mechanical parts are being produced

Delay in the PCB due to changes in the pad design

Finalizing the HV panel design

Good progress in GEM assembly and test.

Mechanical assembly.Mechanical assembly.

Page 4: 1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005

4Sasha Milov DC meeting Dec 7, 2005

Pad plane design.Pad plane design. Fixed number of electronics channels (192 per sector) needs to be matched with the number of pads. Best solution in the old version eliminates acceptance loss by wiring pads between HV sectors. That might create grounding problems.

To avoid that we consider modification of the pad shape at the edges where pads are partially shadowed by GEM frames. That has several advantages: best grounding easy to match with Nchannels

no acceptance loss somewhat smaller pad size

(good) a=15.0 mm

Page 5: 1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005

5Sasha Milov DC meeting Dec 7, 2005

Pad plane productionPad plane production

Pad plane production is foreseen at CERN ( as done for the full scale prototype).

Quotation is higher than originally estimated (small problem)

Delivery time is 19 weeks !!! (big problem). Negotiations are underway with CERN to speed up production a factor of two at least.

Page 6: 1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005

6Sasha Milov DC meeting Dec 7, 2005

New HV panel.New HV panel. Eliminates the HV divider boxes. Reduces the number of HV cables to the HBD and the number of SHV connectors on the HBD from 168 to 48. HV dividers should be made smaller to reduce the material and mechanical stress on the detector boxes. Current version is below.Prototype constructed and tested up to 6 KV without any problem(operating voltage is less than 4 KV).

Page 7: 1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005

7Sasha Milov DC meeting Dec 7, 2005

INFN evaporator from JLab is at SUNYSB is up and working vacuum down to 8E-8 mbarr capable to produce 4 full size at a time Q.E. control works inside the vessel Residual Gas Analyzer works inside the vessel

Produced several 10x10 cm2 photocathodes on GEMs (previously used and washed, but fully operational)

Photocathodes.Photocathodes.

Q.E. is controlled during production at SUNYSB and precisely measured at BNL. Results are:

a) reproducibleb) as good as best WIS

results !!!

Page 8: 1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005

8Sasha Milov DC meeting Dec 7, 2005

GB bids came out x2.5-x5 higher than originally planned. INFN GB is not a good investment opportunity. Way out: reconsider procedure to lower cost of the required GB.

Pipe-line gain test & installation rather than doing them in one shot First the gain test is done on all needed shots for CsI cathodes. Each successful cathode goes into high vacuum storage. Only when all needed cathodes are made installation of all cathodes into HBD vessel begins. Such new protocol makes glove box smaller AND takes better care of GEMS. New bid process for (budget)-lighter table was started yesterday.

Use Laminar Table prior to deposition instead of GB, which provides STRICT control over dust and less that of H2O and O2 but they are not yet an issue. Laminar table is better solution than using GB (better dexterity). A working table is in possession, needs fresh filters... on order.

These changes reduce the needed size of the glove box by 2X. We can additionally reduce the cost by re-engineering the air-lock(flow-through not pumped).

Glove Box design vs. cost.Glove Box design vs. cost.

Page 9: 1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005

9Sasha Milov DC meeting Dec 7, 2005

 Vacuum storage needed for new procedure is the ultimate quality storage for GEM+CsI.

A suitable Stainless steel vessel was found (free) Missing end-flanges were made ($1800) Turbo Pump (borrowed) will be removed from NSL beam line 2 weeks from now (free).

Re-assessed overall budget and it seems with the new glove box design we are on track.

Design of full sized GEM holder for evaporator done and in shop.

Ancillary designs (pizza boxes, railroads, flip tables, ...)underway (finished conceptually).

Other parts needed.Other parts needed.

Page 10: 1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005

10Sasha Milov DC meeting Dec 7, 2005

GEM testing.GEM testing. GEM triplet assembled at WIS has ~50% gain variation across the area Production of other GEMs was suspended to investigate the reasons. Assembly procedure was found not to be an issue, it is well reproducible.

Page 11: 1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005

11Sasha Milov DC meeting Dec 7, 2005

GEM testing.GEM testing.Ratio of single GEM gain product over triplet is flat. That proves that the large gain variations in the triple GEM detector are not due to assembly. The non-uniformities in single GEMs add to a larger effect in the triple GEM module.

Strategy: A possible solution to minimize the gain variations in the triple GEM detector is to make all possible combinations of GEMs and to choose the combinations with minimum spread. For that the gain maps of each GEM (corrected for P/T variations) will be stored in a database.

CERN production is restored

Page 12: 1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005

12Sasha Milov DC meeting Dec 7, 2005

Electronics status (FEE).Electronics status (FEE). Motherboard with preamps is installed on the prototype at BNL. Signals and noise are under investigation. Shielding helps a lot!

Page 13: 1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005

13Sasha Milov DC meeting Dec 7, 2005

Outside channel Inside channel

20 pe

Test pulse100,000 e’s

HV connected (V=0), all 68 preamps plugged in

1.4 mV ~ 0.6 pe 1.1 mV ~ 0.4 pe

Electronics status (FEE).Electronics status (FEE).

Page 14: 1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005

14Sasha Milov DC meeting Dec 7, 2005

• Propose going to single test cell to save $ • Use valves to switch gas test cell

Gas transmission monitorGas transmission monitor

Page 15: 1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005

15Sasha Milov DC meeting Dec 7, 2005

Clock Master

Clock fanout ADCOptical

out

Backplane

Crate

GTM/Ethernet

New Daughter card + DCM

Test pulse

(7 blank boards, 4 crates+ 1 spare+ 2 test stands)

(7 blank boards, 4 crates+ 1 spare+ 2 test stands)

(4 blank boards, 1 needed + 1 spare+ 2 test stands)

(25 blank boards. We have most of the parts for 5 boards)

Optical out – Design is done -- checkingNew DCM daughter card design is done -- checkingFor Clockmaster, clock fanout, ADC and backplane, the prototype boards are assembled

Electronics Electronics status (FEM).status (FEM).

Page 16: 1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005

16Sasha Milov DC meeting Dec 7, 2005

LEGS beam test.LEGS beam test.

Everything was in place and ready to go, besides LEGS magnet.

Got water leak from the repaired coil on the day of operation. This problem cannot be fixed and would require a major repair.

Optimistic forecast brings us to the end of spring.

Other options are very welcomed, like getting beam at AGS.

Page 17: 1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005

17Sasha Milov DC meeting Dec 7, 2005

Mechanical assembly is on its way. Some modifications are made to the pad plane and HV feed-ins.

CsI Q.E. curve is good and reproducible

Glove Box is reconsidered to match existing budget. Requires slightly different game plan on assembly, but well doable without quality compromise.

GEM testing is important. GEMs will be separately tested at WIS and assembled in triplets to get best uniformity

Electronics has in work. Motherboard is under test with the prototype.

Test beam is needed. LEGS option is still considered, but nothing will happen soon.

Summary:Summary:

Page 18: 1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005

18Sasha Milov DC meeting Dec 7, 2005

BACKUPSBACKUPS

Page 19: 1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005

19Sasha Milov DC meeting Dec 7, 2005

Clock Master Board

GTM Input

ClockCircuits

Ethernet interface

Serial dataIn/out

Page 20: 1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005

20Sasha Milov DC meeting Dec 7, 2005

Signals from Preamp

Receiver/shaping

ADC

FPGA

HBD ADC board

Page 21: 1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005

21Sasha Milov DC meeting Dec 7, 2005

HBD ADC crate

Clock Fanout

Clock and serial data cablesfrom ClockMaster

Clock cables

We have just enough connectors for populating 3 slots 2 weeks ago.

Page 22: 1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005

22Sasha Milov DC meeting Dec 7, 2005

Status

• Get the ADC board and backplane middle/late of last week

• Finish assemble the system Monday morning.

• Testing is in progress

Page 23: 1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005

23Sasha Milov DC meeting Dec 7, 2005

HV on, Ar/CO2 (70/30)

Positive signals ? 55Fe signal