wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/sc21132-works-services.pdf1 sc21132 (132) works...

587

Upload: others

Post on 06-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________
Page 2: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

1

SC21132 (132)Works & Services

BUDGET ESTIMATES 2017-2018_______________________________________________________________________________

DISTRICT BUDGET REVISED BUDGET ESTIMATES 2017-2018POSTS ESTIMATES ESTIMATES ________________________________________

2017-2018 2016-2017 2016-2017 SALARY NON-SALARY TOTAL_______________________________________________________________________________

Hyderabad 1,572 2,767,906,000 2,762,139,500 661,010,000 2,340,425,000 3,001,435,000

Karachi 1,570 3,078,272,000 2,595,180,000 660,218,000 2,737,731,000 3,397,949,000

Larkana 939 963,148,000 980,216,000 293,005,000 716,770,000 1,009,775,000

Khairpur 860 734,158,000 711,017,000 308,956,000 469,259,000 778,215,000

Sukkur 794 845,044,000 715,088,500 287,310,000 595,229,000 882,539,000

Mirpurkhas 634 814,032,000 859,257,000 237,731,000 604,682,000 842,413,000

Sanghar 601 534,217,000 807,666,000 210,358,000 341,610,000 551,968,000

Dadu 592 612,568,000 742,550,000 207,293,000 433,715,000 641,008,000

Benazirabad 549 714,103,000 612,258,000 195,592,000 511,471,000 707,063,000

Thatta 497 385,599,000 320,243,000 181,123,000 174,138,000 355,261,000

Badin 407 476,931,000 470,157,000 148,486,000 348,473,000 496,959,000

Shahdad Kot - Kamber 383 147,279,000 146,030,000 123,623,000 74,863,000 198,486,000

Nausheroferoze 334 176,254,000 188,221,000 133,106,000 63,503,000 196,609,000

Shikarpur 326 535,605,000 455,742,000 169,421,000 386,948,000 556,369,000

Ghotki 299 147,528,000 145,754,000 103,237,000 56,987,000 160,224,000

Jacobabad 266 163,360,000 159,082,000 92,422,000 84,681,000 177,103,000

Kashmore 246 106,188,000 106,171,000 80,684,000 33,509,000 114,193,000

Umerkot 239 213,170,000 323,951,000 83,925,000 140,963,000 224,888,000

Jamshoro 234 123,285,000 311,496,000 89,435,000 46,749,000 136,184,000

Tharparkar@Mithi 228 249,450,000 196,800,000 104,991,000 164,849,000 269,840,000

Matiari 194 93,157,000 91,206,000 68,122,000 32,261,000 100,383,000

Tando Muhammad Khan 174 87,467,000 88,514,000 66,712,000 30,287,000 96,999,000

Tando Allahyar 164 84,354,000 83,178,000 59,144,000 31,725,000 90,869,000

Sujawal 31 7,469,000 61,359,000 7,178,000 55,865,000 63,043,000

_______________________________________________________________________________TOTAL 12,133 14,060,544,000 13,933,276,000 4,573,082,000 10,476,693,000 15,049,775,000

_______________________________________________________________________________

Page 3: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

2

SC21132 (132)Works & Services

RsCharged: 0 ______________Voted: 15,049,775,000 ______________Total: 15,049,775,000 ______________

_______________________________________________________________________________HEAD OF DEPARTMENT

_______________________________________________________________________________BUDGET REVISED BUDGET

ESTIMATES ESTIMATES ESTIMATES2016-2017 2016-2017 2017-2018

_______________________________________________________________________________Rs Rs Rs

SUMMARYFUNCTIONAL

045101 ADMINISTRATION 460,521,000 435,976,000 560,534,000

045201 ADMINISTRATION 76,211,000 68,589,000 80,401,000

045202 HIGHWAYS, ROADS AND BRIDGES 7,228,176,000 8,210,526,000 7,602,466,000

045701 ADMINISTRATION 85,899,000 76,143,000 89,407,000

045702 BUILDINGS AND STRUCTURES 6,209,737,000 5,142,042,000 6,716,967,000

_______________________________________________________________________________ TOTAL 14,060,544,000 13,933,276,000 15,049,775,000 _______________________________________________________________________________

Page 4: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

3

SC21132 (132)Works & Services

_______________________________________________________________________________BUDGET REVISED BUDGET

SCHEME SCHEME NAME ESTIMATES ESTIMATES ESTIMATES NO 2016-2017 2016-2017 2017-2018_______________________________________________________________________________

Rs Rs Rs

BI0563 EXECUTIVE ENGINEER HIGHWAYS 100,664,000 100,664,000 100,664,000 DIVISION BADIN

BI0564 EXECUTIVE ENGINEER BUILDINGS 4,156,000 4,156,000 4,156,000 DIVISION BADIN

DD0372 EXECUTIVE ENGINEER BUILDINGS 6,728,000 6,728,000 6,728,000 DIVISION DADU

GO0253 EXECUTIVE ENGINEER HIGHWAYS 49,393,000 49,393,000 49,393,000 DIVISION GHOTKI

GO0254 EXECUTIVE ENGINEER BUILDINGS 3,255,000 3,255,000 3,255,000 DIVISION GHOTKI

HB0629 EXECUTIVE ENGINEER HIGHWAYS 149,347,000 149,347,000 149,347,000 DIVISION HYDERABAD

HB0630 EXECUTIVE ENGINEER BUILDINGS 73,350,000 73,350,000 73,350,000 DIVISION HYDERABAD

JK0240 EXECUTIVE ENGINEER HIGHWAYS 70,594,000 70,594,000 70,594,000 DIVISION JACOBABAD

JK0241 EXECUTIVE ENGINEER BUILDINGS 6,298,000 6,298,000 6,298,000 DIVISION JACOBABAD

JO0252 EXECUTIVE ENGINEER BUILDINGS 14,146,000 14,146,000 14,146,000 DIVISION JAMSHORO

KK0252 EXECUTIVE ENGINEER HIGHWAYS 28,803,000 28,803,000 28,803,000 DIVISION KASHMORE @ KANDHKOT

KK0253 EXECUTIVE ENGINEER BUILDINGS 1,485,000 4,130,000 1,485,000 DIVISION KASHMORE @ KANDHKOT

KQ2000 EXECUTIVE ENGINEER HIGHWAYS 56,690,000 56,690,000 56,690,000 DIVISION KARACHI

KQ2001 EXECUTIVE ENGINEER BUILDINGS 54,730,000 54,730,000 54,730,000 DIVISION-I KARACHI

KQ2002 EXECUTIVE ENGINEER BUILDINGS 36,121,000 36,121,000 36,121,000 DIVISION-II KARACHI

Page 5: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

4

SC21132 (132)Works & Services

_______________________________________________________________________________BUDGET REVISED BUDGET

SCHEME SCHEME NAME ESTIMATES ESTIMATES ESTIMATES NO 2016-2017 2016-2017 2017-2018_______________________________________________________________________________

Rs Rs Rs

KQ2003 EXECUTIVE ENGINEER BUILDINGS 54,180,000 54,180,000 54,180,000 DIVISIONIII KARACHI

KX0591 EXECUTIVE ENGINEER HIGHWAYS 96,221,000 96,221,000 96,221,000 DIVISION KHAIRPUR

KX0592 EXECUTIVE ENGINEER BUILDINGS 12,860,000 12,860,000 12,860,000 DIVISION KHAIRPUR

LN0459 EXECUTIVE ENGINEER HIGHWAYS 84,006,000 84,006,000 84,006,000 DIVISION LARKANA

LN0460 EXECUTIVE ENGINEER BUILDINGS 20,616,000 20,616,000 20,616,000 DIVISION LARKANA

MP0450 EXECUTIVE ENGINEER HIGHWAYS 122,383,000 122,383,000 122,383,000 DIVISION MIRPURKHAS

MP0451 EXECUTIVE ENGINEER BUILDINGS 6,012,000 6,012,000 6,012,000 DIVISION MIRPURKHAS

MX0350 EXECUTIVE ENGINEER HIGHWAYS 42,323,000 42,323,000 42,323,000 DIVISION THARPARKAR

MX0351 EXECUTIVE ENGINEER BUILDINGS 2,884,000 2,884,000 2,884,000 DIVISION THARPARKAR

MY0215 EXECUTIVE ENGINEER HIGHWAYS 25,665,000 25,665,000 25,665,000 DIVISION MATIARI

MY0216 EXECUTIVE ENGINEER BUILDINGS 2,579,000 2,579,000 2,579,000 DIVISION MATIARI

NX0352 EXECUTIVE ENGINEER HIGHWAYS 55,091,000 55,091,000 55,091,000 DIVISION NAUSHERO FEROZE

NX0353 EXECUTIVE ENGINEER BUILDINGS 4,892,000 13,381,000 4,892,000 DIVISION NAUSHERO FEROZE

QS0279 EXECUTIVE ENGINEER HIGHWAYS 28,235,000 28,235,000 52,289,000 DIVISION KAMBER-SHAHDADKOT @ KAMBER

QS0280 EXECUTIVE ENGINEER BUILDINGS 2,207,000 2,207,000 15,000,000 DIVISION KAMBER-SHAHDADKOT @ KAMBER

Page 6: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

5

SC21132 (132)Works & Services

_______________________________________________________________________________BUDGET REVISED BUDGET

SCHEME SCHEME NAME ESTIMATES ESTIMATES ESTIMATES NO 2016-2017 2016-2017 2017-2018_______________________________________________________________________________

Rs Rs Rs

SB0421 EXECUTIVE ENGINEER HIGHWAYS 62,724,000 62,724,000 62,724,000 DIVISION SHAHEED BENAZIRABAD

SB0422 EXECUTIVE ENGINEER BUILDINGS 13,473,000 15,963,000 13,473,000 DIVISION SHAHEED BENAZIRABAD

SL0040 EXECUTIVE ENGINEER HIGHWAYS 53,838,000 53,838,000 DIVISION SAJAWAL

SL0041 EXECUTIVE ENGINEER BUILDINGS 2,027,000 2,027,000 2,027,000 DIVISION SAJAWAL

SL0042 SUPERITENDING ENGINEER WORKS & 1,091,000 1,091,000 2,179,000 SERVICE SAJAWAL

SN0411 EXECUTIVE ENGINEER HIGHWAYS 99,164,000 99,164,000 99,164,000 DIVISION SANGHAR

SN0412 EXECUTIVE ENGINEER BUILDINGS 5,191,000 15,982,000 5,191,000 DIVISION SANGHAR

SQ0355 EXECUTIVE ENGINEER HIGHWAYS 42,271,000 42,271,000 42,271,000 DIVISION SHIKARPUR

SQ0356 EXECUTIVE ENGINEER BUILDINGS 5,329,000 5,329,000 5,329,000 DIVISION SHIKARPUR

SY0462 EXECUTIVE ENGINEER HIGHWAYS 51,933,000 51,933,000 51,933,000 DIVISION SUKKUR

SY0463 EXECUTIVE ENGINEER BUILDINGS 12,317,000 12,317,000 12,317,000 DIVISION SUKKUR

TN0212 EXECUTIVE ENGINEER HIGHWAYS 25,665,000 25,665,000 25,665,000 DIVISION TANDO MUHAMMAD KHAN

TN0213 EXECUTIVE ENGINEER BUILDINGS 2,598,000 2,598,000 2,598,000 DIVISION TANDO MUHAMMAD KHAN

TQ0216 EXECUTIVE ENGINEER HIGHWAYS 25,665,000 25,665,000 25,665,000 DIVISION TANDO ALLAH YAR

TQ0217 EXECUTIVE ENGINEER BUILDINGS 3,779,000 3,779,000 3,779,000 DIVISION TANDO ALLAH YAR

Page 7: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

6

SC21132 (132)Works & Services

_______________________________________________________________________________BUDGET REVISED BUDGET

SCHEME SCHEME NAME ESTIMATES ESTIMATES ESTIMATES NO 2016-2017 2016-2017 2017-2018_______________________________________________________________________________

Rs Rs Rs

TX0378 EXECUTIVE ENGINEER HIGHWAYS 53,838,000 53,838,000 53,838,000 DIVISION THATTA

TX0379 EXECUTIVE ENGINEER BUILDINGS 2,027,000 2,027,000 2,027,000 DIVISION THATTA

UT0305 EXECUTIVE ENGINEER HIGHWAYS 40,641,000 40,641,000 40,641,000 DIVISION UMERKOT

UT0306 EXECUTIVE ENGINEER BUILDINGS 2,923,000 2,923,000 2,923,000 DIVISION UMERKOT

BI0063 HIGHWAY DIVISION BADIN 53,887,000 48,902,000 55,977,000

BI0064 HIGHWAYS ROADS AND BRIDGES 234,881,000 234,881,000 234,881,000 BADIN

DD0065 HIGHWAY DIVISION DADU 82,958,000 82,737,000 95,036,000

DD0066 HIGHWAYS ROADS AND BRIDGES 250,092,000 250,092,000 250,092,000 DADU

DD0067 HIGHWAYS ROADS AND BRIDGES 64,558,000 193,845,000 64,558,000 JAMSHORO

HB0196 LAND CONTROL AND ACQUISTION 5,828,000 5,223,000 6,157,000 OFFICER (B&R) HYDERABAD

HB0197 CHIEF ENGINEER BUILDINGS SINDH 43,013,000 39,446,000 46,042,000 HYDERABAD

HB0198 CHEIF ARCHITECT BUILDINGS 22,132,000 23,872,000 28,108,000 SINDH HYDERABAD

HB0199 BUILDINGS CIRCLE HYDERABAD 16,869,000 15,761,000 18,904,000

HB0200 BUILDING DIVISION HYDERABAD 156,242,000 134,986,000 183,394,000

HB0201 PROVINCIAL BUILDINGS DIVISION 726,813,000 494,150,000 861,844,000 HYDERABAD

HB0202 HIGWAYS CIRCLE HYDERABAD 16,182,000 16,898,000 20,135,000

HB0203 HIGHWAY DIVISION HYDERABAD 121,176,000 118,601,000 136,369,000

Page 8: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

7

SC21132 (132)Works & Services

_______________________________________________________________________________BUDGET REVISED BUDGET

SCHEME SCHEME NAME ESTIMATES ESTIMATES ESTIMATES NO 2016-2017 2016-2017 2017-2018_______________________________________________________________________________

Rs Rs Rs

HB0204 DIRECTOR (ELECTRICAL AND 5,827,000 7,168,000 8,232,000 MECHANICAL) SINDH HYDERABAD

HB0205 CHIEF ENGINEER (HIGHWAYS) 53,844,000 50,559,000 58,363,000 SINDH HYDERABAD

HB0206 HIGHWAY DIVISION (COASTAL) 31,458,000 30,347,000 34,505,000 HYDERABAD

HB0207 HIGHWAYS ROADS AND BRIDGES 348,475,000 415,559,500 348,475,000 HYDERABAD

HB0208 PROJECT IMPLEMENTATION UNIT 6,738,000 6,646,000 7,861,000 HYDERABAD

HB0209 PROVINCIAL BUILDING DIVISION 37,405,000 34,517,000 37,405,000 HYDERABAD DISTRICT TANDO ALLAHYAR

HB0210 PROVINCIAL BUILDING DIVISION 25,530,000 17,852,000 25,530,000 HYDERABAD DISTRICT MATIARI

HB0211 PROVINCIAL BUILDING DIVISION 140,050,000 33,340,000 140,050,000 HYDERABAD DISTRICT JAMSHORO

HB0212 PROVINCIAL BUILDING DIVISION 66,632,000 44,122,000 66,632,000 HYDERABAD DISTRICT DADU

HB0213 HIGHWAYS ROADS AND BRIDGES 132,276,000 180,617,000 132,276,000 KARACHI

HB0214 HIGHWAYS ROADS AND BRIDGES 59,882,000 209,882,000 59,882,000 TANDO MUHAMMAD KHAN

HB0215 HIGHWAYS ROADS AND 59,882,000 98,882,000 59,882,000 BRIDGESTANDO TANDO ALLAH YAR

HB0216 HIGHWAYS ROADS AND BRIDGES 59,882,000 114,009,000 59,882,000 MATIARI

HB0217 PROJECT IMPLEMENTATIONUNIT 6,020,000 6,020,000 6,020,000 JHIRK MULLAH KHAIR BRIDGE HYDERABAD

HB0218 KARACHI THATTA DUAL 16,006,000 42,914,000 17,057,000 CARRIAGEWAY PROJECT

Page 9: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

8

SC21132 (132)Works & Services

_______________________________________________________________________________BUDGET REVISED BUDGET

SCHEME SCHEME NAME ESTIMATES ESTIMATES ESTIMATES NO 2016-2017 2016-2017 2017-2018_______________________________________________________________________________

Rs Rs Rs

HB0219 DIRECTOR ROAD RESEARCH 32,314,000 32,650,000 39,609,000 LABORTARY KARACHI

HB0220 PROJECT IMPLEMENTATION UNIT 7,573,000 6,604,000 7,934,000 HYDERABAD BADIN ROAD

HB0221 HIGHWAYS ROADS AND BRIDGES 251,247,000 257,247,000 251,247,000 THATTA

HB0222 CHIEF ENGINEER ELECTRICAL & 3,342,000 6,491,000 7,429,000 MECHNICAL HYDERABAD

KQ0529 SECRETARIAT ESTABLISHMENT 110,657,000 115,905,000 176,564,000 (NON-TECHNICAL AND TECHNICAL) KARACHI

KQ0530 DIRECTOR GENERAL (DESIGN) 35,894,000 33,167,000 35,153,000 SINDH KARACHI

KQ0531 PROVINCIAL BUILDINGS CIRCLE 17,032,000 14,698,000 15,955,000 KARACHI

KQ0532 DIRECTOR GENERAL (DESIGN) 10,978,000 10,304,000 12,112,000 SINDH KARACHI II- ROAD MANAGMENT UNITSINDH

KQ0533 DIRECTOR GENERAL ROAD SECTOR 43,917,000 40,874,000 46,074,000 DEVELOPMENT DIRECTORATE (RSDD) SINDH

KQ0534 BUILDING DIVISION KARACHI-I 125,684,000 124,294,000 137,703,000

KQ0535 BUILDING DIVISION KARACHI-II 95,068,000 106,107,000 116,096,000

KQ0536 BUILDING DIVISION KARACHI-III 92,617,000 86,670,000 95,243,000

KQ0537 COMP: SINDH HOUSE 64,773,000 77,964,000 74,755,000 ISLAMABAD/MURREE

KQ0538 RESIDENT ENGINEER SPECIAL 14,790,000 46,274,000 17,767,000 PROJECT SINDH HOUSE ISLAMABAD

KQ0539 PROVINCIAL BUILDINGS 357,598,000 340,719,000 357,598,000 DIVISION-II KARACHI

KQ0540 PROVINCIAL BUILDINGS 1,133,033,000 624,209,000 1,333,033,000 DIVISION-I KARACHI

Page 10: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

9

SC21132 (132)Works & Services

_______________________________________________________________________________BUDGET REVISED BUDGET

SCHEME SCHEME NAME ESTIMATES ESTIMATES ESTIMATES NO 2016-2017 2016-2017 2017-2018_______________________________________________________________________________

Rs Rs Rs

KQ0541 PROVINCIAL BUILDINGS 516,781,000 546,787,000 516,781,000 DIVISION-III KARACH

KQ0542 RESIDENT ENGINEER / SPECIAL 92,804,000 77,804,000 92,804,000 PROJECT SINDH HOUSE ISLAMABAD

KX0080 HIGHWAYS ROADS AND BRIDGES 224,517,000 120,591,500 224,517,000 KHAIRPUR

KX0081 HIGHWAY DIVISION NAUSHERO 101,455,000 102,798,000 116,744,000 FEROZE AT KHAIRPUR

KX0082 HIGHWAYS ROADS AND BRIDGES N 128,545,000 205,087,500 128,545,000 FEROZE

LN0102 BUILDING DIVISION LARKANA 70,194,000 54,617,000 80,065,000

LN0103 HIGHWAY DIVISION LARKANA 96,026,000 112,200,000 112,038,000

LN0104 HIGHWAYS ROADS AND BRIDGES 196,013,000 196,013,000 196,013,000 LARKANA

LN0105 PROVINCIAL BUILDINGS DIVISION 204,112,000 177,352,000 168,018,000 LARKANA

LN0106 HIGWAYS CIRCLE @ LARKANA 6,044,000 6,616,000 7,792,000

LN0107 PROVINCIAL BUILDINGS DIVISION 21,855,000 24,808,000 21,855,000 LARKANA DISTRICT SHAHDADPUR AT KAMBAR

LN0108 PROVINCIAL BUILDINGS DIVISION 62,347,000 64,972,000 62,347,000 LARKANA DISTRICT JABCOBABAD

LN0109 PROVINCIAL BUILDINGS DIVISION 14,701,000 18,998,000 14,701,000 LARKANA DISTRICT KASHMORE

LN0110 HIGHWAYS ROADS AND BRIDGES 65,883,000 65,883,000 105,341,000 QAMBAR

MP0096 BUILDING DIVISION MIRPURKHAS 48,391,000 45,438,000 54,812,000

MP0097 HIGWAYS CIRCLE MIRPURKHAS 16,809,000 16,810,000 19,742,000

MP0098 HIGHWAY DIVISION MIRPURKHAS 60,173,000 59,938,000 68,597,000

Page 11: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

10

SC21132 (132)Works & Services

_______________________________________________________________________________BUDGET REVISED BUDGET

SCHEME SCHEME NAME ESTIMATES ESTIMATES ESTIMATES NO 2016-2017 2016-2017 2017-2018_______________________________________________________________________________

Rs Rs Rs

MP0099 HIGHWAYS ROADS AND BRIDGES 285,559,000 335,618,000 285,559,000 MIRPURKHAS

MP0100 PROVINCIAL BUILDINGS DIVISION 59,559,000 60,954,000 59,559,000 MIRPURKHAS

MP0101 MACHINERY MAINTENANCE DIVISION 15,396,000 14,144,000 16,670,000 MIRPURKHAS

MP0102 PROVINCIAL BUILDINGS DIVISION 51,386,000 51,386,000 51,386,000 MIPURKHAS DISTRICT SANGHAR

MP0103 PROVINCIAL BUILDINGS DIVISION 28,938,000 28,938,000 28,938,000 MIPURKHAS DISTRICT UMERKOT

MP0104 PROVINCIAL BUILDINGS DIVISION 39,549,000 39,549,000 39,549,000 MIPURKHAS DISTRICT MITHI

MP0105 HIGHWAYS SUB DIVISION 3,873,000 4,172,000 4,744,000 SHUJAABAD

MX0051 HIGHWAYS ROADS AND BRIDGES 98,752,000 52,709,000 98,752,000 MITHI

MX0052 HIGHWAY DIVISION THAR AT MITHI 17,238,000 15,213,000 17,874,000

SB0083 HIGHWAY DIVISION BENAZIRABAD 40,563,000 41,717,000 47,880,000

SB0084 HIGHWAYS ROADS AND BRIDGES 146,357,000 152,357,000 146,357,000 BENAZIRABAD

SB0085 BUILDING DIVISION BENAZIRABAD 60,024,000 53,172,000 68,968,000

SB0086 PROVINCIAL BUILDINGS DIVISION 133,393,000 90,574,000 97,299,000 BENAZIRABAD

SB0087 PROVINCIAL BUILDINGS DIVISION 48,430,000 36,733,000 48,430,000 NAWABSHAH DISTRICT NAUSHERO FEROZE

SB0088 PROVINCIAL BUILDINGS DIVISION 127,314,000 76,496,000 127,314,000 NAWABSHAH DISTRICT KHAIRPUR

SN0062 HIGHWAY DIVISION SANGHAR 66,704,000 68,062,000 77,709,000

SN0063 HIGHWAYS ROADS AND BRIDGES 231,382,000 503,355,000 231,382,000 SANGHAR

Page 12: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

11

SC21132 (132)Works & Services

_______________________________________________________________________________BUDGET REVISED BUDGET

SCHEME SCHEME NAME ESTIMATES ESTIMATES ESTIMATES NO 2016-2017 2016-2017 2017-2018_______________________________________________________________________________

Rs Rs Rs

SQ0054 HIGHWAYS ROADS AND BRIDGES 98,630,000 52,648,000 98,630,000 SHIKARPUR

SQ0055 MACHINERY MAINTENANCE DIVISION 49,023,000 47,921,000 54,869,000 KHAIRPUR AT SHIKARPUR

SQ0056 HIGHWAYS ROADS AND BRIDGES 164,718,000 164,777,000 164,718,000 JACOBABAD

SQ0057 HIGHWAYS ROADS AND BRIDGES 67,208,000 36,937,000 67,208,000 KASHMORE

SY0104 BUILDING DIVISION SUKKUR 122,487,000 55,956,000 136,721,000

SY0105 HIGHWAY DIVISION SUKKUR 48,707,000 47,916,000 54,487,000

SY0106 BUILDING CIRCLE SUKKUR 14,910,000 14,598,000 16,946,000

SY0107 HIGWAYS CIRCLE SUKKUR 15,234,000 15,000,000 17,323,000

SY0108 HIGHWAYS ROADS AND BRIDGES 121,175,000 121,175,000 121,175,000 SUKKUR

SY0109 PROVINCIAL BILDINGS DIVISION 121,936,000 131,594,000 121,936,000 SUKKUR

SY0110 PROVINCIAL BUILDINGS DIVISION 32,219,000 39,009,000 32,219,000 SUKKUR DISTRICT GHOTKI

SY0111 PROVINCIAL BUILDINGS DIVISION 52,758,000 36,767,000 52,758,000 SUKKUR DISTRICT SHIKARPUR

SY0112 HIGHWAYS ROADS AND BRIDGES 115,250,000 60,295,500 115,250,000 GHOTKI

SY0113 CHIEF ENGINEER HIGHWAYS SUKKUR 22,367,000 18,030,000 22,038,000

SY0114 CHIEF ENGINEER BUILDING SUKKUR 20,754,000 12,825,000 15,257,000

SY0486 DIRECTOR GENERAL (DESIGN) 3,200,000 3,530,000 SUKKUR

TX0065 BUILDING DIVISION THATTA 41,206,000 41,323,000 46,990,000

TX0066 PROVINCIAL BUILDINGS DIVISION 40,139,000 37,973,000 40,139,000 THATTA

Page 13: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

12

SC21132 (132)Works & Services

_______________________________________________________________________________BUDGET REVISED BUDGET

SCHEME SCHEME NAME ESTIMATES ESTIMATES ESTIMATES NO 2016-2017 2016-2017 2017-2018_______________________________________________________________________________

Rs Rs Rs

TX0067 PROVINCIAL BUILDING DIVISION 25,719,000 21,913,000 25,719,000 THATTA DISTRICT TANDO MUHAMMAD KHAN

TX0068 PROVINCIAL BUILDING DIVISION 41,146,000 37,898,000 41,146,000 THATTA DISTRICT BADIN

UT0047 HIGHWAYS ROADS AND BRIDGES 94,832,000 204,408,000 94,832,000 UMERKOT

BI0060 SUPERINTENDING ENGINEER (WORK 10,868,000 7,672,000 15,700,000 & SERVICE) BADIN

BI0061 EXECTIVE ENGINEER BUILDINGS 23,336,000 24,657,000 29,275,000 DIVISION BADIN

BI0062 EXECTIVE ENGINEER HIGHWAYS 49,139,000 49,225,000 56,306,000 DIVISION BADIN

DD0062 SUPERINTENDING ENGINEER (WORK 13,330,000 10,963,000 13,330,000 & SERVICE) DADU

DD0063 EXECTIVE ENGINEER HIGHWAYS 56,623,000 58,993,000 67,544,000 DIVISION DADU

DD0064 EXECTIVE ENGINEER BUILDINGS 31,096,000 32,009,000 36,537,000 DIVISION DADU

DD0374 EXECTIVE ENGINEER HIGHWAYS 107,183,000 107,183,000 107,183,000 DIVISION DADU

GO0055 SUPERINTENDING ENGINEER (WORK 14,876,000 11,036,000 13,092,000 & SERVICE) GHOTKI

GO0056 EXECTIVE ENGINEER BUILDINGS 20,784,000 22,672,000 26,606,000 DIVISION GHOTKI

GO0057 EXECTIVE ENGINEER HIGHWAYS 59,220,000 59,398,000 67,878,000 DIVISION GHOTKI

HB0223 EXECTIVE ENGINEER HIGHWAYS 42,283,000 43,569,000 49,535,000 DIVISION HYDERABAD

HB0224 SUPERINTENDING ENGINEER (WORK 16,195,000 15,025,000 17,359,000 & SERVICE) HYDERABAD

Page 14: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

13

SC21132 (132)Works & Services

_______________________________________________________________________________BUDGET REVISED BUDGET

SCHEME SCHEME NAME ESTIMATES ESTIMATES ESTIMATES NO 2016-2017 2016-2017 2017-2018_______________________________________________________________________________

Rs Rs Rs

HB0225 EXECTIVE ENGINEER BUILDINGS 34,093,000 36,485,000 42,620,000 DIVISION HYDERABAD

JK0053 SUPERINTENDING ENGINEER (WORK 18,040,000 10,709,000 19,029,000 & SERVICE) JACOBABAD

JK0054 EXECTIVE ENGINEER HIGHWAYS 48,073,000 49,641,000 56,331,000 DIVISION JACOBABAD

JK0055 EXECTIVE ENGINEER BUILDINGS 20,355,000 21,840,000 24,851,000 DIVISION JACOBABAD

JO0054 SUPERINTENDING ENGINEER (WORK 11,328,000 12,078,000 13,822,000 & SERVICE) JAMSHORO

JO0055 EXECTIVE ENGINEER BUILDINGS 25,125,000 24,412,000 27,944,000 DIVISION JAMSHORO

JO0056 EXECTIVE ENGINEER HIGHWAYS 45,019,000 46,392,000 52,605,000 DIVISION JAMSHORO

JO0057 EXECUTIVE ENGINEER HIGHWAYS 27,667,000 214,468,000 27,667,000 DIVISION JAMSHORO

KK0045 SUPERINTENDING ENGINEER (WORK 9,220,000 7,503,000 8,796,000 & SERVICE) KASHMOR

KK0046 EXECTIVE ENGINEER BUILDINGS 23,328,000 23,133,000 26,367,000 DIVISION KASHMOR

KK0047 EXECTIVE ENGINEER HIGHWAYS 43,352,000 42,602,000 48,742,000 DIVISION KASHMOR

KQ0543 EXECTIVE ENGINEER 22,277,000 14,400,000 17,368,000 ELECTRICAL/ENERGY -II KARACHI

KQ0544 EXECTIVE ENGINEER BUILDINGS 30,559,000 28,766,000 32,961,000 -II DIVISION KARACHI

KQ0545 EXECTIVE ENGINEER BUILDINGS 25,064,000 20,315,000 22,905,000 -III DIVISION KARACHI

KQ0546 EXECTIVE ENGINEER 15,598,000 19,975,000 22,698,000 ELECTRICAL/ENERGY - I KARACHI

Page 15: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

14

SC21132 (132)Works & Services

_______________________________________________________________________________BUDGET REVISED BUDGET

SCHEME SCHEME NAME ESTIMATES ESTIMATES ESTIMATES NO 2016-2017 2016-2017 2017-2018_______________________________________________________________________________

Rs Rs Rs

KQ0547 SUPERINTENDING ENGINEER (WORK 12,307,000 10,042,000 11,379,000 & SERVICE) KARACHI

KQ0548 EXECTIVE ENGINEER BUILDINGS -I 24,538,000 21,287,000 24,105,000 DIVISION KARACHI

KQ0549 EXECTIVE ENGINEER HIGHWAYS 34,582,000 32,898,000 37,174,000 DIVISION KARACHI

KX0083 SUPERINTENDING ENGINEER (WORK 17,184,000 15,880,000 18,702,000 & SERVICE) KHAIRPUR

KX0084 EXECTIVE ENGINEER HIGHWAYS 102,996,000 107,490,000 123,157,000 DIVISION KHAIRPUR

KX0085 EXECTIVE ENGINEER BUILDINGS 50,380,000 50,089,000 57,469,000 DIVISION KHAIRPUR

LN0111 SUPERINTENDING ENGINEER (WORK 14,713,000 14,755,000 16,606,000 & SERVICE) LARKANA

LN0112 EXECTIVE ENGINEER HIGHWAYS 77,757,000 112,320,000 88,974,000 DIVISION LARKANA

LN0113 EXECTIVE ENGINEER BUILDINGS 28,881,000 27,060,000 31,403,000 DIVISION LARKANA

MP0092 SUPERINTENDING ENGINEER (WORK 12,987,000 11,681,000 13,236,000 & SERVICE) MIRPURKHAS

MP0093 EXECTIVE ENGINEER HIGHWAYS 38,279,000 37,288,000 42,537,000 DIVISION MIRPURKHAS

MP0094 EXECTIVE ENGINEER BUILDINGS 23,994,000 23,913,000 27,503,000 DIVISION MIRPURKHAS

MP0095 ASSISTANT ENGINEER BUILDING 744,000 1,033,000 1,186,000 SUB DIVISIONAL TALUKA SHUJJABAD MPK

MX0048 SUPERINTENDING ENGINEER (WORK 12,542,000 12,149,000 14,482,000 & SERVICE) MITHI

MX0049 EXECTIVE ENGINEER BUILDINGS 38,065,000 33,477,000 50,637,000 DIVISION MITHI

Page 16: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

15

SC21132 (132)Works & Services

_______________________________________________________________________________BUDGET REVISED BUDGET

SCHEME SCHEME NAME ESTIMATES ESTIMATES ESTIMATES NO 2016-2017 2016-2017 2017-2018_______________________________________________________________________________

Rs Rs Rs

MX0050 EXECTIVE ENGINEER HIGHWAYS 37,646,000 38,045,000 42,888,000 DIVISION MITHI

MY0054 SUPERINTENDING ENGINEER (WORK 9,967,000 9,744,000 11,356,000 & SERVICE) MATIARI

MY0055 EXECTIVE ENGINEER HIGHWAYS 34,740,000 34,447,000 39,286,000 DIVISION MATIARI

MY0056 EXECTIVE ENGINEER BUILDINGS 20,206,000 18,771,000 21,497,000 DIVISION MATIARI

NX0054 SUPERINTENDING ENGINEER (WORK 12,122,000 12,481,000 14,332,000 & SERVICE) NOSHEROFEROZ

NX0055 EXECTIVE ENGINEER HIGHWAYS 72,504,000 73,849,000 84,029,000 DIVISION NOSHEROFEROZ

NX0056 EXECTIVE ENGINEER BUILDINGS 31,645,000 33,419,000 38,265,000 DIVISION NOSHEROFEROZ

QS0052 SUPERINTENDING ENGINEER (WORK 10,284,000 10,657,000 11,799,000 & SERVICE) SHAHDADKOT

QS0053 EXECTIVE ENGINEER BUILDINGS 10,424,000 9,043,000 10,226,000 DIVISION SHAHDADKOT

QS0054 ASSISTANT ENGINEER-I 4,431,000 5,065,000 5,710,000 SHAHDADKOT

QS0055 ASSISTANT ENGINEER-IWARAH 4,248,000 3,969,000 4,570,000 DISTRICT SHAHDADKOT

QS0056 ASSISTANT ENGINEER-IKAMBAR 4,875,000 4,542,000 5,143,000 DISTRICT SHAHDADKOT

QS0057 EXECTIVE ENGINEER HIGHWAYS 13,720,000 13,194,000 15,064,000 DIVISION SHAHDADKOT

QS0058 ASSISTANT ENGINEER-II 17,369,000 17,162,000 19,589,000 SHAHDADKOT

QS0059 ASSISTANT ENGINEER-IIWARAH 16,385,000 17,624,000 20,041,000 DISTRICT SHAHDADKOT

Page 17: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

16

SC21132 (132)Works & Services

_______________________________________________________________________________BUDGET REVISED BUDGET

SCHEME SCHEME NAME ESTIMATES ESTIMATES ESTIMATES NO 2016-2017 2016-2017 2017-2018_______________________________________________________________________________

Rs Rs Rs

QS0060 ASSISTANT ENGINEER-IIKAMBAR 16,484,000 16,406,000 18,695,000 DISTRICT SHAHDADKOT

QS0061 ASSISTANT ENGINEER MIROKHAN 18,617,000 17,926,000 20,360,000 DISTRICT SHAHDADKOT

SB0089 SUPERINTENDING ENGINEER (WORK 14,272,000 14,081,000 16,479,000 & SERVICE) BENAZIRABAD

SB0090 EXECTIVE ENGINEER BUILDINGS 20,575,000 21,791,000 25,028,000 DIVISION BENAZIRABAD

SB0091 EXECTIVE ENGINEER HIGHWAYS 46,978,000 46,650,000 53,111,000 DIVISION BENAZIRABAD

SL0009 EXECUTIVE ENGINEER HIGHWAYS 2,575,000 2,415,000 2,682,000 DIVION SUJAWAL

SL0010 EXECUTIVE ENGINEER BUILDING 1,776,000 1,988,000 2,317,000 DIVION SUJAWAL

SN0059 SUPERINTENDING ENGINEER (WORK 11,957,000 8,657,000 10,477,000 & SERVICE) SANGHAR

SN0060 EXECTIVE ENGINEER BUILDINGS 33,948,000 32,052,000 36,570,000 DIVISION SANGHAR

SN0061 EXECTIVE ENGINEER HIGHWAYS 85,871,000 80,394,000 91,475,000 DIVISION SANGHAR

SQ0051 SUPERINTENDING ENGINEER (WORK 12,334,000 8,890,000 11,030,000 & SERVICE) SHIKARPUR

SQ0052 EXECTIVE ENGINEER BUILDINGS 26,210,000 26,706,000 31,452,000 DIVISION SHIKARPUR

SQ0053 EXECTIVE ENGINEER HIGHWAYS 69,882,000 70,263,000 80,862,000 DIVISION SHIKARPUR

SY0115 SUPERINTENDING ENGINEER (WORK 13,884,000 12,022,000 14,118,000 & SERVICE) SUKKUR

SY0116 EXECTIVE ENGINEER HIGHWAYS 48,110,000 47,506,000 53,900,000 DIVISION SUKKUR

Page 18: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

17

SC21132 (132)Works & Services

_______________________________________________________________________________BUDGET REVISED BUDGET

SCHEME SCHEME NAME ESTIMATES ESTIMATES ESTIMATES NO 2016-2017 2016-2017 2017-2018_______________________________________________________________________________

Rs Rs Rs

SY0117 EXECTIVE ENGINEER BUILDINGS 31,003,000 34,945,000 40,631,000 DIVISION SUKKUR

TN0047 SUPERINTENDING ENGINEER (WORK 12,273,000 10,008,000 11,411,000 & SERVICE) TANDO MUHAMMAD KHAN

TN0048 EXECTIVE ENGINEER HIGHWAYS 31,447,000 33,747,000 38,566,000 DIVISION TANDO MUHAMMAD KHAN

TN0049 EXECTIVE ENGINEER BUILDINGS 15,484,000 16,496,000 18,759,000 DIVISION TANDO MUHAMMAD KHAN

TQ0041 SUPERINTENDING ENGINEER (WORK 9,841,000 9,333,000 10,890,000 & SERVICE) TANDO ALLAH YAR

TQ0042 EXECTIVE ENGINEER HIGHWAYS 28,629,000 29,004,000 33,036,000 DIVISION TANDO ALLAH YAR

TQ0043 EXECTIVE ENGINEER BUILDINGS 16,440,000 15,397,000 17,499,000 DIVISION TANDO ALLAH YAR

TX0069 SUPERINTENDING ENGINEER (WORK 17,732,000 17,817,000 21,957,000 & SERVICE) THATTA

TX0070 EXECTIVE ENGINEER BUILDINGS 32,297,000 31,472,000 36,501,000 DIVISION THATTA

TX0071 EXECTIVE ENGINEER HIGHWAYS 77,657,000 75,982,000 86,944,000 DIVISION\ THATTA

TX0072 EXECUTIVE ENGINEER HIGHWAYS 53,838,000 DIVISION SAJ

UT0048 SUPERINTENDING ENGINEER (WORK 9,626,000 10,548,000 11,908,000 & SERVICE) UMERKOT

UT0049 EXECTIVE ENGINEER BUILDINGS 19,361,000 19,013,000 22,099,000 DIVISION UMERKOT

UT0050 EXECTIVE ENGINEER HIGHWAYS 45,787,000 46,418,000 52,485,000 DIVISION UMERKOT

_______________________________________________________________________________ TOTAL 14,060,544,000 13,933,276,000 15,049,775,000 _______________________________________________________________________________

Page 19: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

18

SC21132 (132)Works & Services

_______________________________________________________________________________BUDGET REVISED BUDGET

ESTIMATES ESTIMATES ESTIMATES2016-2017 2016-2017 2017-2018

_______________________________________________________________________________Rs Rs Rs

SUMMARY OBJECT

A01 TOTAL EMPLOYEES RELATED 4,015,862,000 4,017,508,000 4,573,082,000 EXPENSES.

A011 PAY 2,347,365,000 2,478,322,000 2,730,861,000

A011-1 TOTAL PAY OF OFFICERS 425,254,000 420,520,000 464,596,000

A01101 Basic Pay Of Officer 416,820,000 409,334,000 452,709,000 A01102 Personal pay 5,985,000 8,388,000 9,269,000 A01103 Special pay 50,000 68,000 68,000 A01104 Technical pay 18,000 18,000 20,000 A01105 Qualification Pay 184,000 292,000 333,000 A01106 Pay of contract officer 2,160,000 2,160,000 2,160,000 A01107 Index Pay 223,000 A01150 Others 37,000 37,000 37,000

A011-2 TOTAL PAY OF OTHER STAFF 1,922,111,000 2,057,802,000 2,266,265,000

A01151 Basic Pay Other Staff 1,914,239,000 2,045,581,000 2,252,775,000 A01152 Personal pay 7,843,000 12,186,000 13,455,000 A01153 Special pay 18,000 19,000 19,000 A01154 Good conduct pay 2,000 A01155 Qualification Pay 11,000 11,000 13,000 A01170 Others 3,000 3,000

A012 ALLOWANCES 1,668,497,000 1,539,186,000 1,842,221,000

A012-1 TOTAL REGULAR ALLOWANCES 1,650,009,000 1,517,377,000 1,822,425,000

A01201 Senior Post Allowance 116,000 124,000 124,000 A01202 House Rent Allowance 190,562,000 193,201,000 193,845,000 A01203 Conveyance Allowance 307,627,000 312,578,000 313,450,000 A01207 Washing Allowance 1,928,000 2,039,000 2,046,000 A01208 Dress Allowance 97,000 218,000 218,000 A01209 Special Additional Allowance 14,000 A0120D Integrated Allowance 1,968,000 2,091,000 2,102,000 A0120N Special allowances @ 20% of 30,000 30,000

basic pay for SecretarA0120P Adhoc Relief 2009 3,000 A0120Q Fixed Daily Allowance 163,000 197,000 197,000 A0120X Ad - hoc Allowance - 2010 441,328,000 398,361,000 399,074,000 A01210 Risk Allowance 36,000 36,000 36,000 A01216 Qualification Allowance 81,000 101,000 101,000 A01217 Medical Allowance 236,721,000 235,109,000 235,553,000 A0121A Ad - hoc Allowance - 2011 818,000 A0121M Adhoc Relief Allowance - 2012 510,000 144,000

Page 20: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

19

SC21132 (132)Works & Services

_______________________________________________________________________________BUDGET REVISED BUDGET

ESTIMATES ESTIMATES ESTIMATES2016-2017 2016-2017 2017-2018

_______________________________________________________________________________Rs Rs Rs

SUMMARY OBJECT

A0121Q Audit and Accounts Allowance 2,210,000 2,210,000 A0121T Adhoc Relief Allowance 2013 769,000 61,057,000 61,096,000 A0121Z Adhoc Relief Allowance - 2014 603,000 2,084,000 A01224 Entertainment Allowance 176,000 213,000 213,000 A01225 Instruction Allowance 65,000 65,000 A01226 Computer Allowance 176,000 183,000 183,000 A01227 Project Allowance 531,000 711,000 711,000 A01228 Orderly Allowance 874,000 1,042,000 1,042,000 A0122C Adhoc Relief Allowance - 2015 230,155,000 50,278,000 50,321,000 A0122M Adhoc Relief Allowance 2016 241,038,000 273,632,000 A01233 Unattractive Area Allowance 412,000 4,945,000 4,945,000 A01236 Deputation Allowance 12,000 12,000 A01237 Design Allowance 96,000 116,000 116,000 A01238 Charge Allowance 130,000 211,000 211,000 A01239 Special Allowance 211,000 211,000 A01241 Utility allowance for 5,878,000 5,886,000 7,064,000

electricityA01243 Special Travelling Allowance 90,000 A01244 Adhoc Relief 1,405,000 A01257 RC Allowance 12,000 12,000 A01260 Ration Allowance 22,000 22,000 A01264 Technical Allowance 28,000 28,000 A01270 Others 229,582,000 128,000 273,411,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 18,488,000 21,809,000 19,796,000

A01271 Overtime Allowance 373,000 373,000 373,000 A01273 Honoraria 5,709,000 6,430,000 5,709,000 A01274 Medical Charges 11,406,000 14,006,000 12,614,000 A01282 Session Allowance 1,000,000 1,000,000 1,100,000

A03 TOTAL OPERATING EXPENSES 405,388,000 340,587,000 500,707,000

A032 COMMUNICATIONS 14,124,000 42,411,000 14,930,000

A03201 Postage and Telegraph 1,568,000 1,568,000 1,699,000 A03202 Telephone and Trunk call 12,469,000 14,989,000 13,137,000 A03205 Courier and Pilot Service 87,000 87,000 94,000 A03270 Others 25,767,000

A033 UTILITIES 297,357,000 109,894,000 327,921,000

A03301 Gas 21,889,000 21,889,000 24,084,000 A03302 Water 4,539,000 5,349,000 6,027,000 A03303 Electricity 268,345,000 80,072,000 295,226,000 A03305 POL for Generator 2,584,000 2,584,000 2,584,000

Page 21: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

20

SC21132 (132)Works & Services

_______________________________________________________________________________BUDGET REVISED BUDGET

ESTIMATES ESTIMATES ESTIMATES2016-2017 2016-2017 2017-2018

_______________________________________________________________________________Rs Rs Rs

SUMMARY OBJECT

A034 OCCUPANCY COSTS 6,741,000 6,741,000 7,238,000

A03402 Rent for Office Building 2,173,000 4,956,000 5,453,000 A03407 Rates and Taxes 4,568,000 1,785,000 1,785,000

A035 OPERATING LEASES 31,491,000

A03502 Buildings 31,491,000

A036 MOTOR VEHICLES 318,000

A03602 Insurance 138,000 A03603 Registration 180,000

A038 TRAVEL & TRANSPORTATION 52,145,000 52,408,000 53,176,000

A03805 Travelling Allowance 14,508,000 14,621,000 15,386,000 A03806 Transportation of Goods 48,000 48,000 51,000 A03807 P.O.L Charges A.planes 37,589,000 37,739,000 37,739,000

H.coptors S.Cars M/Cycle

A039 GENERAL 35,021,000 97,324,000 97,442,000

A03901 Stationery 6,835,000 6,835,000 7,233,000 A03902 Printing and Publication 3,192,000 3,192,000 3,403,000 A03905 Newspapers Periodicals and 1,717,000 1,717,000 1,860,000

BooksA03906 Uniforms and Protective 2,967,000 3,069,000 3,256,000

ClothingA03919 Payments to other for Service 8,147,000 70,330,000 16,847,000

RenderedA03955 Computer Stationery 397,000 397,000 419,000 A03970 Others 11,766,000 11,784,000 64,424,000

A05 TOTAL GRANTS SUBSIDIES AND 45,220,000 45,220,000 45,220,000 WRITE OFF LOANS

A052 GRANTS-DOMESTIC 45,220,000 45,220,000 45,220,000

A05216 Fin. Assis. to the families of 39,200,000 39,200,000 39,200,000 G. Serv. who expire

A05270 To Others 6,020,000 6,020,000 6,020,000

A09 TOTAL PHYSICAL ASSETS 10,494,000 20,330,000 6,317,000

Page 22: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

21

SC21132 (132)Works & Services

_______________________________________________________________________________BUDGET REVISED BUDGET

ESTIMATES ESTIMATES ESTIMATES2016-2017 2016-2017 2017-2018

_______________________________________________________________________________Rs Rs Rs

SUMMARY OBJECT

A092 COMPUTER EQUIPMENT 1,482,000 1,483,000 388,000

A09201 Hardware 1,482,000 1,483,000 388,000

A095 PURCHASE OF TRANSPORT 7,581,000 17,546,000 4,512,000

A09501 Transport 7,581,000 17,546,000 4,512,000

A096 PURCHASE OF PLANT & MACHINERY 1,081,000 951,000 667,000

A09601 Plant and Machinery 1,081,000 951,000 667,000

A097 PURCHASE FURNITURE & FIXTURE 350,000 350,000 750,000

A09701 Furniture and Fixtures 350,000 350,000 750,000

A13 TOTAL REPAIRS AND MAINTENANCE 9,583,580,000 9,509,631,000 9,924,449,000

A130 TRANSPORT 8,990,000 9,685,000 9,933,000

A13001 Transport 8,990,000 9,685,000 9,933,000

A131 MACHINERY AND EQUIPMENT 57,612,000 57,612,000 58,153,000

A13101 Machinery and Equipment 50,012,000 50,012,000 50,553,000 A13199 Others 7,600,000 7,600,000 7,600,000

A132 FURNITURE AND FIXTURE 3,355,000 3,355,000 3,571,000

A13201 Furniture and Fixture 3,355,000 3,355,000 3,571,000

A133 BUILDINGS AND STRUCTURE 4,558,129,000 3,569,811,000 4,833,765,000

A13301 Office Buildings 2,631,642,000 1,865,964,000 2,902,384,000 A13302 Residential Buildings 1,926,487,000 1,703,847,000 1,931,381,000

A136 ROADS, HIGHWAYS AND BRIDGES 4,955,104,000 5,868,778,000 5,018,616,000

A13602 Other roads 4,803,688,000 5,703,862,000 4,867,200,000 A13604 Other bridges 151,416,000 164,916,000 151,416,000

A137 COMPUTER EQUIPMENT 390,000 390,000 411,000

A13701 Hardware 276,000 276,000 296,000 A13702 Software 96,000 96,000 96,000 A13703 I.T. Equipment 18,000 18,000 19,000

Page 23: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

22

SC21132 (132)Works & Services

_______________________________________________________________________________BUDGET REVISED BUDGET

ESTIMATES ESTIMATES ESTIMATES2016-2017 2016-2017 2017-2018

_______________________________________________________________________________Rs Rs Rs

SUMMARY OBJECT

_______________________________________________________________________________ NET TOTAL 14,060,544,000 13,933,276,000 15,049,775,000 _______________________________________________________________________________

Page 24: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

23

SC21132 (132)Works & Services

SUMMARY OF SCALES FOR 2017-2018_______________________________________________________________________________

Pay Permanent Fresh Continued Total Basic SCALE POSTS POSTS POSTS POSTS PAY_______________________________________________________________________________

01 2869 1 2870 504,805,000

02 2928 2 2930 519,086,000

03 177 177 31,895,000

04 866 3 869 166,802,000

05 1403 3 1406 280,342,000

06 218 218 45,519,000

07 80 80 16,773,000

08 80 80 17,710,000

09 236 1 237 63,490,000

10 124 1 125 34,174,000

11 1557 4 1561 389,238,000

12 69 7 76 18,104,000

13 103 103 29,265,000

14 450 450 126,574,000

15 25 25 8,998,000

16 279 2 281 84,700,000

17 473 1 474 240,775,000

18 106 1 107 71,201,000

19 53 53 44,273,000

20 11 11 11,760,000

_______________________________________________________________________________TOTAL 12107 26 12133 2,705,484,000

_______________________________________________________________________________

Page 25: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

24

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

SL0042 SUPERITENDING ENGINEER WORKS & SERVICESAJAWAL

A01 TOTAL EMPLOYEES RELATED EXPENSES. 1,091,000 1,091,000 2,179,000

A011 TOTAL PAY 1 5 482,000 482,000 1,058,000

A011-1 TOTAL PAY OF OFFICERS 1 2 482,000 482,000 722,000

A01101 Total Basic Pay Of Officer 1 2 482,000 482,000 722,000

S241 SUPERINTENDING ENGINEER (BPS-19) 1 1 482,000 482,000 531,000

A119 ASSISTANT (BPS-16) 1 191,000

A011-2 TOTAL PAY OF OTHER STAFF 3 336,000

A01151 Total Basic Pay Other Staff 3 336,000

J053 JUNIOR CLERK (BPS-11) 1 126,000

A017 ACCOUNT CLERK (BPS-09) 1 118,000

C215 CHOWKIDAR -CUM-NAIB QASID (BPS-01) 1 92,000

A012 TOTAL ALLOWANCES 609,000 609,000 1,121,000

A012-1 TOTAL REGULAR ALLOWANCES 609,000 609,000 1,121,000

A01202 House Rent Allowance 80,000 80,000 172,000

A01203 Conveyance Allowance 60,000 60,000 199,000

A01207 Washing Allowance 1,000

A0120D Integrated Allowance 4,000

A0120X Ad - hoc Allowance - 2010 241,000 241,000 343,000

A01217 Medical Allowance 60,000 60,000 123,000

A0121T Adhoc Relief Allowance 2013 72,000 72,000 72,000

A0121Z Adhoc Relief Allowance - 2014 48,000 48,000

A0122C Adhoc Relief Allowance - 2015 48,000 48,000 48,000

A0122M Adhoc Relief Allowance 2016 106,000

A01270 Others 53,000

Page 26: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

25

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

SL0042 SUPERITENDING ENGINEER WORKS & SERVICESAJAWAL

_______________________________________________________________________________SUPERITENDING ENGINEER WORKS & SERVICE 1,091,000 1,091,000 2,179,000

SAJAWAL

_______________________________________________________________________________

Page 27: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

26

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

HB0196 LAND CONTROL AND ACQUISTION OFFICER(B&R) HYDERABAD

A01 TOTAL EMPLOYEES RELATED EXPENSES. 5,328,000 4,973,000 5,613,000

A011 TOTAL PAY 20 20 3,061,000 2,959,000 3,256,000

A011-1 TOTAL PAY OF OFFICERS 1 1 601,000 361,000 398,000

A01101 Total Basic Pay Of Officer 1 1 601,000 361,000 398,000

L031 LAND CONTROL & (BPS-16) 1 1 601,000 361,000 398,000 ACQUISITION OFFICER

A011-2 TOTAL PAY OF OTHER STAFF 19 19 2,460,000 2,598,000 2,858,000

A01151 Total Basic Pay Other Staff 19 19 2,426,000 2,519,000 2,771,000

H043 HEAD MUNSHI (BPS-11) 1 1 158,000 163,000 179,000

J053 JUNIOR CLERK (BPS-11) 3 488,000 537,000

S245 SUPERVISING TAPEDAR (BPS-08) 1 1 145,000 148,000 162,000

J014 JR CLERK (BPS-07) 3 422,000

S260 SURVEYOR / SUPERVISOR (BPS-06) 2 2 273,000 276,000 303,000

T004 TAPEDAR (BPS-05) 1 1 132,000 133,000 146,000

D161 DRIVER (BPS-04) 1 1 127,000 128,000 141,000

C089 CHOWKIDAR (BPS-01) 1 1 118,000 117,000 131,000

K001 KHALASI (BPS-01) 4 4 466,000 474,000 521,000

K011 KOTAR (BPS-01) 3 3 351,000 355,000 391,000

N003 NAIB QASID (BPS-01) 2 2 234,000 237,000 260,000

A01152 Personal pay 34,000 79,000 87,000

A012 TOTAL ALLOWANCES 2,267,000 2,014,000 2,357,000

A012-1 TOTAL REGULAR ALLOWANCES 2,249,000 1,996,000 2,338,000

A01202 House Rent Allowance 323,000 323,000 323,000

A01203 Conveyance Allowance 457,000 457,000 457,000

Page 28: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

27

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

HB0196 LAND CONTROL AND ACQUISTION OFFICER(B&R) HYDERABAD

A01207 Washing Allowance 3,000 3,000 3,000

A0120D Integrated Allowance 6,000 6,000 6,000

A0120X Ad - hoc Allowance - 2010 559,000 477,000 477,000

A01217 Medical Allowance 295,000 295,000 295,000

A0121T Adhoc Relief Allowance 2013 84,000 84,000

A0122C Adhoc Relief Allowance - 2015 303,000 59,000 59,000

A0122M Adhoc Relief Allowance 2016 292,000 317,000

A01270 Others 303,000 317,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 18,000 18,000 19,000

A01274 Medical Charges 18,000 18,000 19,000

A03 TOTAL OPERATING EXPENSES 465,000 215,000 504,000

A032 TOTAL COMMUNICATIONS 108,000 108,000 114,000

A03201 Postage and Telegraph 92,000 92,000 97,000

A03202 Telephone and Trunk call 16,000 16,000 17,000

A033 TOTAL UTILITIES 251,000 1,000 277,000

A03303 Electricity 251,000 1,000 277,000

A038 TOTAL TRAVEL & 65,000 65,000 67,000

TRANSPORTATION

A03805 Travelling Allowance 39,000 39,000 41,000

A03807 P.O.L Charges A.planes 26,000 26,000 26,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 41,000 41,000 46,000

A03901 Stationery 10,000 10,000 11,000

A03902 Printing and Publication 7,000 7,000 8,000

A03905 Newspapers Periodicals and Books 4,000 4,000 5,000

A03906 Uniforms and Protective Clothing 9,000 9,000 10,000

A03970 Others 11,000 11,000 12,000

Page 29: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

28

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

HB0196 LAND CONTROL AND ACQUISTION OFFICER(B&R) HYDERABAD

1 Others 11,000 11,000 12,000

A13 TOTAL REPAIRS AND MAINTENANCE 35,000 35,000 40,000

A130 TOTAL TRANSPORT 21,000 21,000 24,000

A13001 Transport 21,000 21,000 24,000

A131 TOTAL MACHINERY AND 8,000 8,000 9,000

EQUIPMENT

A13101 Machinery and Equipment 8,000 8,000 9,000

A132 TOTAL FURNITURE AND 6,000 6,000 7,000

FIXTURE

A13201 Furniture and Fixture 6,000 6,000 7,000

_______________________________________________________________________________LAND CONTROL AND ACQUISTION OFFICER 5,828,000 5,223,000 6,157,000

(B&R) HYDERABAD

_______________________________________________________________________________

Page 30: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

29

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

HB0204 DIRECTOR (ELECTRICAL AND MECHANICAL)SINDH HYDERABAD

A01 TOTAL EMPLOYEES RELATED EXPENSES. 5,395,000 6,809,000 7,771,000

A011 TOTAL PAY 9 9 3,493,000 4,541,000 4,996,000

A011-1 TOTAL PAY OF OFFICERS 2 4 1,414,000 2,208,000 2,429,000

A01101 Total Basic Pay Of Officer 2 4 1,315,000 2,050,000 2,255,000

S243 SUPERINTENDING ENGINEER /(BPS-19) 1 1 868,000 950,000 1,045,000 DIRECTOR (E&M)

P051 PLANNING OFFICER (BPS-17) 1 1 447,000 489,000 538,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 2 611,000 672,000

A01102 Personal pay 99,000 158,000 174,000

A011-2 TOTAL PAY OF OTHER STAFF 7 5 2,079,000 2,333,000 2,567,000

A01151 Total Basic Pay Other Staff 7 5 2,044,000 2,298,000 2,528,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 2 659,000

S181 STENOGRAPHER (BPS-14) 1 1 332,000 625,000 687,000

J053 JUNIOR CLERK (BPS-11) 1 516,000 568,000

J014 JR CLERK (BPS-07) 1 240,000

D161 DRIVER (BPS-04) 1 1 215,000 407,000 447,000

N003 NAIB QASID (BPS-01) 1 1 399,000 375,000 413,000

S009 SANITARY WORKER / (BPS-01) 1 1 199,000 375,000 413,000 GUTTERMAN

A01152 Personal pay 35,000 35,000 39,000

A012 TOTAL ALLOWANCES 1,902,000 2,268,000 2,775,000

A012-1 TOTAL REGULAR ALLOWANCES 1,875,000 2,241,000 2,746,000

A01202 House Rent Allowance 177,000 277,000 277,000

A01203 Conveyance Allowance 287,000 343,000 343,000

A01207 Washing Allowance 2,000 2,000 2,000

Page 31: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

30

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

HB0204 DIRECTOR (ELECTRICAL AND MECHANICAL)SINDH HYDERABAD

A0120D Integrated Allowance 9,000 9,000 9,000

A0120X Ad - hoc Allowance - 2010 576,000 739,000 739,000

A01217 Medical Allowance 218,000 257,000 257,000

A0121T Adhoc Relief Allowance 2013 65,000 65,000

A01224 Entertainment Allowance 7,000 7,000

A0122C Adhoc Relief Allowance - 2015 303,000 91,000 91,000

A0122M Adhoc Relief Allowance 2016 451,000 478,000

A01270 Others 303,000 478,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 27,000 27,000 29,000

A01274 Medical Charges 27,000 27,000 29,000

A03 TOTAL OPERATING EXPENSES 387,000 314,000 411,000

A032 TOTAL COMMUNICATIONS 69,000 69,000 74,000

A03201 Postage and Telegraph 8,000 8,000 9,000

A03202 Telephone and Trunk call 61,000 61,000 65,000

A033 TOTAL UTILITIES 74,000 1,000 82,000

A03303 Electricity 74,000 1,000 82,000

A038 TOTAL TRAVEL & 146,000 146,000 150,000

TRANSPORTATION

A03805 Travelling Allowance 77,000 77,000 81,000

A03807 P.O.L Charges A.planes 69,000 69,000 69,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 98,000 98,000 105,000

A03901 Stationery 35,000 35,000 37,000

A03902 Printing and Publication 9,000 9,000 10,000

A03905 Newspapers Periodicals and Books 4,000 4,000 5,000

A03906 Uniforms and Protective Clothing 19,000 19,000 20,000

A03970 Others 31,000 31,000 33,000

Page 32: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

31

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

HB0204 DIRECTOR (ELECTRICAL AND MECHANICAL)SINDH HYDERABAD

1 Others 31,000 31,000 33,000

A13 TOTAL REPAIRS AND MAINTENANCE 45,000 45,000 50,000

A130 TOTAL TRANSPORT 10,000 10,000 11,000

A13001 Transport 10,000 10,000 11,000

A131 TOTAL MACHINERY AND 21,000 21,000 24,000

EQUIPMENT

A13101 Machinery and Equipment 21,000 21,000 24,000

A132 TOTAL FURNITURE AND 14,000 14,000 15,000

FIXTURE

A13201 Furniture and Fixture 14,000 14,000 15,000

_______________________________________________________________________________DIRECTOR (ELECTRICAL AND MECHANICAL) 5,827,000 7,168,000 8,232,000

SINDH HYDERABAD

_______________________________________________________________________________

Page 33: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

32

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

HB0222 CHIEF ENGINEER ELECTRICAL & MECHNICALHYDERABAD

A01 TOTAL EMPLOYEES RELATED EXPENSES. 3,342,000 6,491,000 7,429,000

A011 TOTAL PAY 4 4 2,238,000 4,248,000 4,673,000

A011-1 TOTAL PAY OF OFFICERS 4 4 2,238,000 4,248,000 4,673,000

A01101 Total Basic Pay Of Officer 4 4 2,238,000 4,248,000 4,673,000

C061 CHIEF ENGINEER (BPS-20) 1 1 668,000 1,429,000 1,573,000

S241 SUPERINTENDING ENGINEER (BPS-19) 1 1 601,000 1,230,000 1,353,000

E060 EXECUTIVE ENGINEER (BPS-18) 2 2 969,000 1,589,000 1,747,000

A012 TOTAL ALLOWANCES 1,104,000 2,243,000 2,756,000

A012-1 TOTAL REGULAR ALLOWANCES 1,104,000 2,243,000 2,756,000

A01201 Senior Post Allowance 17,000 17,000 17,000

A01202 House Rent Allowance 148,000 376,000 376,000

A01203 Conveyance Allowance 199,000 199,000

A0120X Ad - hoc Allowance - 2010 228,000 684,000 684,000

A01217 Medical Allowance 94,000 257,000 257,000

A0121T Adhoc Relief Allowance 2013 14,000 14,000

A0121Z Adhoc Relief Allowance - 2014 14,000

A01224 Entertainment Allowance 9,000 14,000 14,000

A01228 Orderly Allowance 160,000 160,000 160,000

A0122C Adhoc Relief Allowance - 2015 224,000 101,000 101,000

A0122M Adhoc Relief Allowance 2016 407,000 467,000

A01270 Others 224,000 467,000

_______________________________________________________________________________CHIEF ENGINEER ELECTRICAL & MECHNICAL 3,342,000 6,491,000 7,429,000

HYDERABAD

_______________________________________________________________________________

Page 34: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

33

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

KQ0529 SECRETARIAT ESTABLISHMENT(NON-TECHNICAL AND TECHNICAL)KARACHI

A01 TOTAL EMPLOYEES RELATED EXPENSES. 61,900,000 66,847,000 74,933,000

A011 TOTAL PAY 97 107 31,435,000 36,158,000 40,372,000

A011-1 TOTAL PAY OF OFFICERS 27 42 19,636,000 22,561,000 24,815,000

A01101 Total Basic Pay Of Officer 27 42 17,057,000 19,935,000 22,145,000

S018 SECRETARY (BPS-20) 1 1 1,370,000 1,064,000 1,182,000

S573 SENIOR CHEIF (DEV) (BPS-20) 1 1,064,000 1,182,000

A057 ADDITIONAL SECRETARY (BPS-19) 1 1 1,366,000 915,000 1,016,000

C391 CHEIF (DEV) (BPS-19) 1 915,000 1,016,000

A987 ASSISTANT CHIEF (DEV) (BPS-18) 3 1,773,000 1,970,000

D049 DEPUTY DIRECTOR (PMEC) (BPS-18) 1 1 760,000 591,000 657,000

D062 DEPUTY SECRETARY (BPS-18) 1 1 1,177,000 591,000 657,000

D063 DEPUTY SECRETARY (ADMN) (BPS-18) 1 1 760,000 591,000 657,000

P052 PLANNING OFFICER (PMEC) (BPS-17) 2 2 1,217,000 943,000 1,048,000

P103 PRIVATE SECRETARY (BPS-17) 1 1 608,000 472,000 524,000

R046 RESEARCH OFFICERS (PMEC) (BPS-17) 2 2 1,217,000 943,000 1,048,000

S033 SECTION OFFICER (BPS-17) 9 9 5,924,000 4,244,000 4,714,000

S236 SUPERINTENDENT (BPS-17) 3 1,415,000 1,571,000

A052 ADDITIONAL PRIVATE (BPS-16) 4 4 1,520,000 1,177,000 1,306,000 SECRETARY

A119 ASSISTANT (BPS-16) 6 1,766,000 1,962,000

A299 ASSISTANT SUPERINTENDENT (BPS-16) 4 1,177,000 1,308,000

C150 COMPUTER PROGRAMMER (BPS-16) 1 1 378,000 294,000 327,000

S236 SUPERINTENDENT (BPS-16) 3 760,000

A01102 Personal pay 386,000 416,000 458,000

A01103 Special pay 19,000 36,000 36,000

A01105 Qualification Pay 14,000 14,000 16,000

Page 35: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

34

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

KQ0529 SECRETARIAT ESTABLISHMENT(NON-TECHNICAL AND TECHNICAL)KARACHI

A01106 Total Pay of contract officer 2,160,000 2,160,000 2,160,000

A011-2 TOTAL PAY OF OTHER STAFF 70 65 11,799,000 13,597,000 15,557,000

A01151 Total Basic Pay Other Staff 70 65 11,770,000 13,555,000 15,511,000

A299 ASSISTANT SUPERINTENDENT (BPS-15) 4 968,000

A119 ASSISTANT (BPS-14) 6 1,363,000

S053 SENIOR CLERK (BPS-14) 8 2,046,000 2,250,000

S181 STENOGRAPHER (BPS-14) 5 5 1,136,000 1,547,000 1,702,000

C146 COMPUTER OPERATOR (BPS-12) 1 4 199,000 271,000 699,000

J053 JUNIOR CLERK (BPS-11) 12 3,069,000 3,376,000

S222 SUB ENGINEER (BPS-11) 1 1 187,000 256,000 281,000

D150 DRAUGHTSMAN (BPS-10) 2 2 362,000 495,000 545,000

S053 SENIOR CLERK (BPS-09) 8 705,000

J014 JR CLERK (BPS-07) 12 2,636,000

D111 DESPATCH RIDER (BPS-05) 1 1 154,000 209,000 230,000

T050 TRACER (BPS-05) 1 1 154,000 209,000 230,000

D111 DESPATCH RIDER (BPS-04) 1 1 56,000 201,000 222,000

D161 DRIVER (BPS-04) 2 4 296,000 403,000 642,000

D003 DAFTARI (BPS-02) 3 3 418,000 569,000 626,000

C089 CHOWKIDAR (BPS-01) 1 1 136,000 186,000 204,000

F012 FERO PRINTER (BPS-01) 1 1 136,000 186,000 205,000

G038 GESTETNOR OPERATOR (BPS-01) 1 1 136,000 186,000 205,000

N003 NAIB QASID (BPS-01) 19 19 2,592,000 3,536,000 3,889,000

S008 SANITARY WORKER (BPS-01) 1 1 136,000 186,000 205,000

A01152 Personal pay 22,000 35,000 39,000

A01153 Special pay 7,000 7,000 7,000

Page 36: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

35

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

KQ0529 SECRETARIAT ESTABLISHMENT(NON-TECHNICAL AND TECHNICAL)KARACHI

A012 TOTAL ALLOWANCES 30,465,000 30,689,000 34,561,000

A012-1 TOTAL REGULAR ALLOWANCES 25,990,000 23,614,000 29,446,000

A01201 Senior Post Allowance 30,000 30,000 30,000

A01202 House Rent Allowance 3,072,000 3,072,000 3,178,000

A01203 Conveyance Allowance 3,513,000 3,513,000 3,659,000

A01207 Washing Allowance 15,000 15,000 17,000

A01208 Dress Allowance 3,000 3,000 3,000

A0120D Integrated Allowance 86,000 86,000 93,000

A0120X Ad - hoc Allowance - 2010 5,398,000 4,652,000 4,769,000

A01217 Medical Allowance 2,611,000 2,611,000 2,694,000

A0121T Adhoc Relief Allowance 2013 390,000 390,000

A0121Z Adhoc Relief Allowance - 2014 28,000

A01224 Entertainment Allowance 15,000 15,000 15,000

A01226 Computer Allowance 24,000 24,000 24,000

A01228 Orderly Allowance 208,000 208,000 208,000

A0122C Adhoc Relief Allowance - 2015 2,883,000 639,000 639,000

A0122M Adhoc Relief Allowance 2016 3,043,000 3,744,000

A01241 Utility allowance for electricity 5,249,000 5,249,000 6,299,000

A01244 Adhoc Relief 36,000

A01270 Others 2,883,000 3,684,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 4,475,000 7,075,000 5,115,000

A01271 Overtime Allowance 104,000 104,000 104,000

A01273 Honoraria 3,666,000 3,666,000 3,666,000

A01274 Medical Charges 705,000 3,305,000 1,345,000

A03 TOTAL OPERATING EXPENSES 5,938,000 6,216,000 58,379,000

A032 TOTAL COMMUNICATIONS 694,000 694,000 729,000

A03201 Postage and Telegraph 80,000 80,000 84,000

A03202 Telephone and Trunk call 614,000 614,000 645,000

Page 37: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

36

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

KQ0529 SECRETARIAT ESTABLISHMENT(NON-TECHNICAL AND TECHNICAL)KARACHI

A033 TOTAL UTILITIES 1,761,000 1,761,000 1,938,000

A03301 Gas 230,000 230,000 253,000

A03302 Water 697,000 697,000 767,000

A03303 Electricity 834,000 834,000 918,000

A036 TOTAL MOTOR VEHICLES 119,000

A03602 Insurance 69,000

A03603 Registration 50,000

A038 TOTAL TRAVEL & 2,215,000 2,365,000 2,381,000

TRANSPORTATION

A03805 Travelling Allowance 317,000 317,000 333,000

A03807 P.O.L Charges A.planes 1,898,000 2,048,000 2,048,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 1,268,000 1,277,000 53,331,000

A03901 Stationery 697,000 697,000 732,000

A03902 Printing and Publication 209,000 209,000 220,000

A03905 Newspapers Periodicals and Books 140,000 140,000 147,000

A03906 Uniforms and Protective Clothing 140,000 140,000 147,000

A03970 Others 82,000 91,000 52,085,000

1 Others 82,000 91,000 85,000

N14 LSP for PPP Node (Works & Services) 52,000,000

A05 TOTAL GRANTS SUBSIDIES AND WRITE OF 39,200,000 39,200,000 39,200,000

A052 TOTAL GRANTS-DOMESTIC 39,200,000 39,200,000 39,200,000

A05216 Fin. Assis. to the families of 39,200,000 39,200,000 39,200,000

G. Serv. who expire

A09 TOTAL PHYSICAL ASSETS 3,215,000 3,238,000 3,609,000

Page 38: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

37

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

KQ0529 SECRETARIAT ESTABLISHMENT(NON-TECHNICAL AND TECHNICAL)KARACHI

A092 TOTAL COMPUTER EQUIPMENT 617,500 618,000 194,000

A09201 Hardware 617,500 618,000 194,000

016 Five Printers 175,000

120 Two Printers 70,000

16 One Laser Printer 175,000

LL4 Five Computer with LCD 400,000 400,000

LL5 five UPS for Computer 42,500 43,000

TC2 Two Computer with LCD Monitor 94,000

UP6 Two UPS for Computer 30,000

A095 TOTAL PURCHASE OF 1,712,500 1,735,000 2,248,000

TRANSPORT

A09501 Transport 1,712,500 1,735,000 2,248,000

444 Two Suzuki Cultus (1000 CC) 2,248,000

OM1 One Motorcycle (70cc) 70,000 70,000

T29 One Toyota Corrola XLI (1300 cc) 1,642,500 1,665,000

A096 TOTAL PURCHASE OF PLANT & 785,000 785,000 667,000

MACHINERY

A09601 Plant and Machinery 785,000 785,000 667,000

15 One Fax Machine 37,000

395 One Multimedia 55,000 55,000

467 Five Water Dispensers 70,000 70,000

5 Two Split A C 1.5 Ton 110,000 110,000 130,000

914 One Photo Copier Machine 550,000 550,000

918 One photo copier (heavy Duty) 500,000

A097 TOTAL PURCHASE FURNITURE 100,000 100,000 500,000

& FIXTURE

A09701 Furniture and Fixtures 100,000 100,000 500,000

001 Furniture and Fixtures 100,000 100,000 500,000

Page 39: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

38

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

KQ0529 SECRETARIAT ESTABLISHMENT(NON-TECHNICAL AND TECHNICAL)KARACHI

A13 TOTAL REPAIRS AND MAINTENANCE 404,000 404,000 443,000

A130 TOTAL TRANSPORT 276,000 276,000 304,000

A13001 Transport 276,000 276,000 304,000

A131 TOTAL MACHINERY AND 64,000 64,000 71,000

EQUIPMENT

A13101 Machinery and Equipment 64,000 64,000 71,000

A132 TOTAL FURNITURE AND 64,000 64,000 68,000

FIXTURE

A13201 Furniture and Fixture 64,000 64,000 68,000

_______________________________________________________________________________SECRETARIAT ESTABLISHMENT 110,657,000 115,905,000 176,564,000

(NON-TECHNICAL AND TECHNICAL)

KARACHI

_______________________________________________________________________________

Page 40: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

39

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

KQ0530 DIRECTOR GENERAL (DESIGN) SINDH KARACHI

A01 TOTAL EMPLOYEES RELATED EXPENSES. 32,094,000 29,366,000 33,348,000

A011 TOTAL PAY 55 55 18,766,000 18,062,000 19,870,000

A011-1 TOTAL PAY OF OFFICERS 14 20 11,015,000 10,251,000 11,277,000

A01101 Total Basic Pay Of Officer 14 20 10,722,000 9,928,000 10,921,000

C062 CHIEF ENGINEER / DG (BPS-20) 1 1 1,379,000 1,035,000 1,139,000 (DESIGN)

S244 SUPERT: ENGINEER / (BPS-19) 2 2 2,375,000 1,780,000 1,958,000 DIRECTORS (DESIGN)

E061 EXECUTIVE4ENGINEER / DY (BPS-18) 3 3 2,296,000 1,725,000 1,898,000 DIRECTORS

A219 ASSISTANT ENGINEER / (BPS-17) 7 7 4,288,000 3,211,000 3,531,000 ASSISTANT DIRECTOR

S236 SUPERINTENDENT (BPS-17) 1 459,000 505,000

A235 ASSISTANT HEAD CLERK (BPS-16) 6 1,718,000 1,890,000

S236 SUPERINTENDENT (BPS-16) 1 384,000

A01102 Personal pay 293,000 323,000 356,000

A011-2 TOTAL PAY OF OTHER STAFF 41 35 7,751,000 7,811,000 8,593,000

A01151 Total Basic Pay Other Staff 41 35 7,650,000 7,694,000 8,464,000

A235 ASSISTANT HEAD CLERK (BPS-14) 6 1,516,000

S053 SENIOR CLERK (BPS-14) 2 504,000 555,000

S181 STENOGRAPHER (BPS-14) 2 2 505,000 610,000 671,000

J053 JUNIOR CLERK (BPS-11) 8 2,017,000 2,219,000

D150 DRAUGHTSMAN (BPS-10) 4 4 809,000 977,000 1,075,000

S053 SENIOR CLERK (BPS-09) 2 392,000

J018 JR CLERK / TYPIST (BPS-07) 8 1,465,000

T050 TRACER (BPS-05) 3 3 512,000 618,000 680,000

D161 DRIVER (BPS-04) 2 2 328,000 397,000 437,000

Page 41: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

40

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

KQ0530 DIRECTOR GENERAL (DESIGN) SINDH KARACHI

C092 CHOWKIDAR / WATCHMAN (BPS-01) 2 2 306,000 368,000 404,000

F013 FERO PRINTER / KHADASI (BPS-01) 1 1 151,000 184,000 202,000

N003 NAIB QASID (BPS-01) 10 10 1,515,000 1,835,000 2,019,000

S008 SANITARY WORKER (BPS-01) 1 1 151,000 184,000 202,000

A01152 Personal pay 101,000 117,000 129,000

A012 TOTAL ALLOWANCES 13,328,000 11,304,000 13,478,000

A012-1 TOTAL REGULAR ALLOWANCES 12,815,000 10,791,000 12,939,000

A01201 Senior Post Allowance 15,000 18,000 18,000

A01202 House Rent Allowance 1,852,000 1,852,000 1,852,000

A01203 Conveyance Allowance 1,828,000 1,828,000 1,828,000

A01207 Washing Allowance 9,000 9,000 9,000

A0120D Integrated Allowance 32,000 32,000 32,000

A0120X Ad - hoc Allowance - 2010 3,701,000 2,932,000 2,932,000

A01217 Medical Allowance 1,498,000 1,498,000 1,498,000

A0121T Adhoc Relief Allowance 2013 246,000 246,000

A01224 Entertainment Allowance 14,000 15,000 15,000

A01228 Orderly Allowance 137,000 167,000 167,000

A0122C Adhoc Relief Allowance - 2015 1,837,000 409,000 409,000

A0122M Adhoc Relief Allowance 2016 1,730,000 1,939,000

A01237 Design Allowance 55,000 55,000 55,000

A01270 Others 1,837,000 1,939,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 513,000 513,000 539,000

A01274 Medical Charges 513,000 513,000 539,000

A03 TOTAL OPERATING EXPENSES 1,459,000 1,567,000 1,541,000

A032 TOTAL COMMUNICATIONS 188,000 188,000 198,000

A03201 Postage and Telegraph 18,000 18,000 19,000

A03202 Telephone and Trunk call 170,000 170,000 179,000

Page 42: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

41

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

KQ0530 DIRECTOR GENERAL (DESIGN) SINDH KARACHI

A033 TOTAL UTILITIES 734,000 734,000 808,000

A03303 Electricity 734,000 734,000 808,000

A034 TOTAL OCCUPANCY COSTS 32,000 32,000 32,000

A03407 Rates and Taxes 32,000 32,000 32,000

A036 TOTAL MOTOR VEHICLES 119,000

A03602 Insurance 69,000

A03603 Registration 50,000

A038 TOTAL TRAVEL & 371,000 351,000 351,000

TRANSPORTATION

A03805 Travelling Allowance 88,000 68,000 68,000

A03807 P.O.L Charges A.planes 283,000 283,000 283,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 134,000 143,000 152,000

A03901 Stationery 44,000 44,000 47,000

A03902 Printing and Publication 17,000 17,000 18,000

A03905 Newspapers Periodicals and Books 16,000 16,000 17,000

A03906 Uniforms and Protective Clothing 31,000 31,000 33,000

A03970 Others 26,000 35,000 37,000

1 Others 26,000 35,000 37,000

A09 TOTAL PHYSICAL ASSETS 2,283,000 2,176,000 200,000

A092 TOTAL COMPUTER EQUIPMENT 370,500 371,000

A09201 Hardware 370,500 371,000

LP3 Three Laser Printers 105,000 105,000

TC3 Three Computers with LCD 240,000 240,000

UP3 Three U.P.S for computer 25,500 26,000

Page 43: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

42

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

KQ0530 DIRECTOR GENERAL (DESIGN) SINDH KARACHI

A095 TOTAL PURCHASE OF 1,642,500 1,665,000

TRANSPORT

A09501 Transport 1,642,500 1,665,000

T29 One Toyota Corrola XLI (1300 cc) 1,642,500 1,665,000

A096 TOTAL PURCHASE OF PLANT & 270,000 140,000

MACHINERY

A09601 Plant and Machinery 270,000 140,000

111 Two Water Dispensers 28,000 28,000

15 One Fax Machine 12,000 12,000

M50 One Photo Copier Machine(light duty) 230,000 100,000

A097 TOTAL PURCHASE FURNITURE 200,000

& FIXTURE

A09701 Furniture and Fixtures 200,000

001 Furniture and Fixtures 200,000

A13 TOTAL REPAIRS AND MAINTENANCE 58,000 58,000 64,000

A130 TOTAL TRANSPORT 17,000 17,000 19,000

A13001 Transport 17,000 17,000 19,000

A131 TOTAL MACHINERY AND 18,000 18,000 20,000

EQUIPMENT

A13101 Machinery and Equipment 18,000 18,000 20,000

A132 TOTAL FURNITURE AND 14,000 14,000 15,000

FIXTURE

A13201 Furniture and Fixture 14,000 14,000 15,000

A137 TOTAL COMPUTER EQUIPMENT 9,000 9,000 10,000

A13701 Hardware 9,000 9,000 10,000

Page 44: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

43

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

KQ0530 DIRECTOR GENERAL (DESIGN) SINDH KARACHI

_______________________________________________________________________________DIRECTOR GENERAL (DESIGN) SINDH KARACHI 35,894,000 33,167,000 35,153,000

_______________________________________________________________________________

Page 45: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

44

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

SY0486 DIRECTOR GENERAL (DESIGN) SUKKUR

A01 TOTAL EMPLOYEES RELATED EXPENSES. 3,200,000 3,530,000

A011 TOTAL PAY 22 1,726,000 1,900,000

A011-1 TOTAL PAY OF OFFICERS 10 982,000 1,081,000

A01101 Total Basic Pay Of Officer 10 982,000 1,081,000

D094 DIRECTOR GENERAL (BPS-20) 1 164,000 180,000

D077 DIRECTOR (BPS-19) 2 282,000 310,000

D045 DEPUTY DIRECTOR (BPS-18) 2 182,000 201,000

A181 ASSISTANT DIRECTOR (BPS-17) 3 218,000 240,000

A119 ASSISTANT (BPS-16) 2 136,000 150,000

A011-2 TOTAL PAY OF OTHER STAFF 12 744,000 819,000

A01151 Total Basic Pay Other Staff 12 744,000 819,000

S222 SUB ENGINEER (BPS-14) 2 169,000 185,000

C146 COMPUTER OPERATOR (BPS-12) 2 148,000 163,000

D111 DESPATCH RIDER (BPS-04) 1 55,000 61,000

D161 DRIVER (BPS-04) 3 165,000 182,000

N003 NAIB QASID (BPS-02) 4 207,000 228,000

A012 TOTAL ALLOWANCES 1,474,000 1,630,000

A012-1 TOTAL REGULAR ALLOWANCES 1,474,000 1,630,000

A01201 Senior Post Allowance 5,000 5,000

A01202 House Rent Allowance 202,000 202,000

A01203 Conveyance Allowance 216,000 216,000

A0120D Integrated Allowance 10,000 10,000

A0120X Ad - hoc Allowance - 2010 353,000 353,000

A01217 Medical Allowance 158,000 158,000

A0121T Adhoc Relief Allowance 2013 123,000 123,000

A01224 Entertainment Allowance 4,000 4,000

Page 46: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

45

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

SY0486 DIRECTOR GENERAL (DESIGN) SUKKUR

A01228 Orderly Allowance 48,000 48,000

A0122C Adhoc Relief Allowance - 2015 116,000 116,000

A0122M Adhoc Relief Allowance 2016 224,000 190,000

A01237 Design Allowance 15,000 15,000

A01270 Others 190,000

_______________________________________________________________________________DIRECTOR GENERAL (DESIGN) SUKKUR 3,200,000 3,530,000

_______________________________________________________________________________

Page 47: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

46

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

BI0060 SUPERINTENDING ENGINEER (WORK &SERVICE) BADIN

A01 TOTAL EMPLOYEES RELATED EXPENSES. 8,429,000 5,851,000 13,119,000

A011 TOTAL PAY 12 12 4,964,000 3,321,000 3,654,000

A011-1 TOTAL PAY OF OFFICERS 3 4 2,207,000 641,000 706,000

A01101 Total Basic Pay Of Officer 3 4 2,207,000 641,000 706,000

E076 EXECUTIVE DISTRICT (BPS-19) 1 1 1,087,000 273,000 300,000 OFFICER

D262 DEPUTY DISTRICT OFFICER (BPS-17) 1 1 560,000 140,000 154,000

I043 INVESTIGATOR / RO (BPS-17) 1 1 560,000 140,000 155,000

A235 ASSISTANT HEAD CLERK (BPS-16) 1 88,000 97,000

A011-2 TOTAL PAY OF OTHER STAFF 9 8 2,757,000 2,680,000 2,948,000

A01151 Total Basic Pay Other Staff 9 8 2,746,000 2,660,000 2,926,000

A235 ASSISTANT HEAD CLERK (BPS-14) 1 834,000

J053 JUNIOR CLERK (BPS-11) 1 397,000 436,000

A017 ACCOUNT CLERK (BPS-09) 2 2 431,000 744,000 819,000

J053 JUNIOR CLERK (BPS-07) 1 603,000

T047 TRACER (BPS-05) 1 1 187,000 324,000 357,000

D161 DRIVER (BPS-04) 1 1 181,000 313,000 344,000

C089 CHOWKIDAR (BPS-02) 1 1 170,000 294,000 323,000

N003 NAIB QASID (BPS-02) 2 2 340,000 588,000 647,000

A01152 Personal pay 11,000 20,000 22,000

A012 TOTAL ALLOWANCES 3,465,000 2,530,000 9,465,000

A012-1 TOTAL REGULAR ALLOWANCES 3,335,000 2,400,000 9,328,000

A01202 House Rent Allowance 246,000 246,000 246,000

A01203 Conveyance Allowance 653,000 653,000 653,000

Page 48: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

47

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

BI0060 SUPERINTENDING ENGINEER (WORK &SERVICE) BADIN

A01207 Washing Allowance 17,000 17,000 17,000

A0120D Integrated Allowance 4,000 4,000 4,000

A0120X Ad - hoc Allowance - 2010 963,000 530,000 530,000

A01217 Medical Allowance 455,000 455,000 455,000

A0121M Adhoc Relief Allowance - 2012 6,000

A0121T Adhoc Relief Allowance 2013 85,000 85,000

A0121Z Adhoc Relief Allowance - 2014 3,000

A01224 Entertainment Allowance 7,000 7,000 7,000

A0122C Adhoc Relief Allowance - 2015 495,000 67,000 67,000

A0122M Adhoc Relief Allowance 2016 327,000 3,632,000

A01270 Others 495,000 3,632,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 130,000 130,000 137,000

A01274 Medical Charges 130,000 130,000 137,000

A03 TOTAL OPERATING EXPENSES 2,117,000 1,499,000 2,231,000

A032 TOTAL COMMUNICATIONS 144,000 144,000 152,000

A03201 Postage and Telegraph 10,000 10,000 11,000

A03202 Telephone and Trunk call 134,000 134,000 141,000

A033 TOTAL UTILITIES 690,000 72,000 760,000

A03301 Gas 28,000 28,000 31,000

A03302 Water 36,000 36,000 40,000

A03303 Electricity 626,000 8,000 689,000

A038 TOTAL TRAVEL & 881,000 881,000 894,000

TRANSPORTATION

A03805 Travelling Allowance 238,000 238,000 250,000

A03806 Transportation of Goods 16,000 16,000 17,000

A03807 P.O.L Charges A.planes 627,000 627,000 627,000

H.coptors S.Cars M/Cycle

Page 49: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

48

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

BI0060 SUPERINTENDING ENGINEER (WORK &SERVICE) BADIN

A039 TOTAL GENERAL 402,000 402,000 425,000

A03901 Stationery 87,000 87,000 92,000

A03902 Printing and Publication 31,000 31,000 33,000

A03905 Newspapers Periodicals and Books 26,000 26,000 28,000

A03906 Uniforms and Protective Clothing 15,000 15,000 16,000

A03970 Others 243,000 243,000 256,000

1 Others 243,000 243,000 256,000

A13 TOTAL REPAIRS AND MAINTENANCE 322,000 322,000 350,000

A130 TOTAL TRANSPORT 146,000 146,000 161,000

A13001 Transport 146,000 146,000 161,000

A131 TOTAL MACHINERY AND 74,000 74,000 82,000

EQUIPMENT

A13101 Machinery and Equipment 74,000 74,000 82,000

A132 TOTAL FURNITURE AND 68,000 68,000 72,000

FIXTURE

A13201 Furniture and Fixture 68,000 68,000 72,000

A137 TOTAL COMPUTER EQUIPMENT 34,000 34,000 35,000

A13701 Hardware 18,000 18,000 19,000

A13702 Software 16,000 16,000 16,000

_______________________________________________________________________________SUPERINTENDING ENGINEER (WORK & 10,868,000 7,672,000 15,700,000

SERVICE) BADIN

_______________________________________________________________________________

Page 50: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

49

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

DD0062 SUPERINTENDING ENGINEER (WORK &SERVICE) DADU

A01 TOTAL EMPLOYEES RELATED EXPENSES. 11,754,000 10,168,000 11,638,000

A011 TOTAL PAY 16 16 7,874,000 6,731,000 7,405,000

A011-1 TOTAL PAY OF OFFICERS 3 6 3,263,000 2,150,000 2,365,000

A01101 Total Basic Pay Of Officer 3 6 3,263,000 2,150,000 2,365,000

E076 EXECUTIVE DISTRICT (BPS-19) 1 1 1,606,000 718,000 790,000 OFFICER

A218 ASSISTANT ENGINEER (BPS-17) 1 1 828,000 369,000 406,000

R045 RESEARCH OFFICER (BPS-17) 1 1 829,000 370,000 407,000

A119 ASSISTANT (BPS-16) 3 693,000 762,000

A011-2 TOTAL PAY OF OTHER STAFF 13 10 4,611,000 4,581,000 5,040,000

A01151 Total Basic Pay Other Staff 13 10 4,549,000 4,499,000 4,949,000

A119 ASSISTANT (BPS-14) 3 1,226,000

J053 JUNIOR CLERK (BPS-11) 1 548,000 602,000

A017 ACCOUNT CLERK (BPS-09) 2 2 634,000 1,026,000 1,131,000

J014 JR CLERK (BPS-07) 1 889,000

D161 DRIVER (BPS-05) 1 1 274,000 448,000 492,000

T047 TRACER (BPS-05) 1 1 274,000 448,000 492,000

C089 CHOWKIDAR (BPS-02) 2 2 499,000 812,000 893,000

H064 HELPER (BPS-02) 3 3 753,000 1,217,000 1,339,000

A01152 Personal pay 62,000 82,000 91,000

A012 TOTAL ALLOWANCES 3,880,000 3,437,000 4,233,000

A012-1 TOTAL REGULAR ALLOWANCES 3,880,000 3,437,000 4,233,000

A01202 House Rent Allowance 298,000 298,000 298,000

A01203 Conveyance Allowance 619,000 645,000 645,000

Page 51: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

50

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

DD0062 SUPERINTENDING ENGINEER (WORK &SERVICE) DADU

A01207 Washing Allowance 4,000 4,000 4,000

A0120X Ad - hoc Allowance - 2010 1,111,000 1,084,000 1,084,000

A01217 Medical Allowance 439,000 439,000 439,000

A0121T Adhoc Relief Allowance 2013 161,000 161,000

A01224 Entertainment Allowance 3,000 7,000 7,000

A0122C Adhoc Relief Allowance - 2015 703,000 133,000 133,000

A0122M Adhoc Relief Allowance 2016 666,000 731,000

A01270 Others 703,000 731,000

A03 TOTAL OPERATING EXPENSES 1,473,000 692,000 1,579,000

A032 TOTAL COMMUNICATIONS 226,000 226,000 238,000

A03201 Postage and Telegraph 10,000 10,000 11,000

A03202 Telephone and Trunk call 216,000 216,000 227,000

A033 TOTAL UTILITIES 782,000 1,000 861,000

A03303 Electricity 782,000 1,000 861,000

A034 TOTAL OCCUPANCY COSTS 8,000 8,000 8,000

A03407 Rates and Taxes 8,000 8,000 8,000

A038 TOTAL TRAVEL & 291,000 291,000 296,000

TRANSPORTATION

A03805 Travelling Allowance 95,000 95,000 100,000

A03807 P.O.L Charges A.planes 196,000 196,000 196,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 166,000 166,000 176,000

A03901 Stationery 84,000 84,000 89,000

A03902 Printing and Publication 17,000 17,000 18,000

A03905 Newspapers Periodicals and Books 16,000 16,000 17,000

A03906 Uniforms and Protective Clothing 15,000 15,000 16,000

A03970 Others 34,000 34,000 36,000

Page 52: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

51

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

DD0062 SUPERINTENDING ENGINEER (WORK &SERVICE) DADU

1 Others 34,000 34,000 36,000

A13 TOTAL REPAIRS AND MAINTENANCE 103,000 103,000 113,000

A130 TOTAL TRANSPORT 34,000 34,000 38,000

A13001 Transport 34,000 34,000 38,000

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

A13101 Machinery and Equipment 36,000 36,000 40,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

_______________________________________________________________________________SUPERINTENDING ENGINEER (WORK & 13,330,000 10,963,000 13,330,000

SERVICE) DADU

_______________________________________________________________________________

Page 53: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

52

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

GO0055 SUPERINTENDING ENGINEER (WORK &SERVICE) GHOTKI

A01 TOTAL EMPLOYEES RELATED EXPENSES. 13,869,000 10,528,000 12,007,000

A011 TOTAL PAY 28 28 9,131,000 6,738,000 7,414,000

A011-1 TOTAL PAY OF OFFICERS 5 6 4,124,000 2,340,000 2,575,000

A01101 Total Basic Pay Of Officer 5 6 4,042,000 2,236,000 2,460,000

E076 EXECUTIVE DISTRICT (BPS-19) 1 1 1,511,000 701,000 771,000 OFFICER

D262 DEPUTY DISTRICT OFFICER (BPS-17) 1 1 778,000 361,000 397,000

I043 INVESTIGATOR / RO (BPS-17) 1 1 779,000 361,000 397,000

S236 SUPERINTENDENT (BPS-17) 1 361,000 397,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 1 226,000 248,000

C052 CHIEF / CIRCLE HEAD (BPS-16) 1 1 487,000 226,000 250,000 DRAFTSMAN

S236 SUPERINTENDENT (BPS-16) 1 487,000

A01102 Personal pay 82,000 104,000 115,000

A011-2 TOTAL PAY OF OTHER STAFF 23 22 5,007,000 4,398,000 4,839,000

A01151 Total Basic Pay Other Staff 23 22 5,003,000 4,394,000 4,834,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 1 554,000

S053 SENIOR CLERK (BPS-14) 3 663,000 729,000

S181 STENOGRAPHER (BPS-14) 1 1 278,000 267,000 294,000

D133 DIVISIONAL HEAD / JR (BPS-13) 1 1 258,000 251,000 276,000 DRAUGHTSMAN

C148 COMPUTER OPERATORS (BPS-12) 1 1 242,000 234,000 258,000

J053 JUNIOR CLERK (BPS-11) 2 442,000 486,000

D230 DRAFTSMAN (BPS-10) 2 2 444,000 428,000 471,000

A017 ACCOUNT CLERK (BPS-09) 2 2 429,000 415,000 457,000

S053 SENIOR CLERK (BPS-09) 3 644,000

Page 54: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

53

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

GO0055 SUPERINTENDING ENGINEER (WORK &SERVICE) GHOTKI

J014 JR CLERK (BPS-07) 2 401,000

D161 DRIVER (BPS-05) 1 1 187,000 181,000 199,000

T047 TRACER (BPS-05) 2 2 374,000 361,000 397,000

D003 DAFTARI (BPS-03) 1 1 175,000 169,000 186,000

C092 CHOWKIDAR / WATCHMAN (BPS-02) 1 1 169,000 164,000 180,000

N003 NAIB QASID (BPS-02) 4 4 679,000 655,000 721,000

S008 SANITARY WORKER (BPS-02) 1 1 169,000 164,000 180,000

A01152 Personal pay 4,000 4,000 5,000

A012 TOTAL ALLOWANCES 4,738,000 3,790,000 4,593,000

A012-1 TOTAL REGULAR ALLOWANCES 4,711,000 3,763,000 4,564,000

A01202 House Rent Allowance 381,000 420,000 420,000

A01203 Conveyance Allowance 723,000 723,000 723,000

A01207 Washing Allowance 3,000 3,000 3,000

A0120D Integrated Allowance 13,000 13,000 13,000

A0120X Ad - hoc Allowance - 2010 1,202,000 1,068,000 1,068,000

A01217 Medical Allowance 581,000 581,000 581,000

A0121T Adhoc Relief Allowance 2013 152,000 152,000

A0122C Adhoc Relief Allowance - 2015 904,000 146,000 146,000

A0122M Adhoc Relief Allowance 2016 657,000 729,000

A01270 Others 904,000 729,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 27,000 27,000 29,000

A01274 Medical Charges 27,000 27,000 29,000

A03 TOTAL OPERATING EXPENSES 871,000 372,000 936,000

A032 TOTAL COMMUNICATIONS 58,000 58,000 62,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 40,000 40,000 42,000

A03205 Courier and Pilot Service 9,000 9,000 10,000

Page 55: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

54

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

GO0055 SUPERINTENDING ENGINEER (WORK &SERVICE) GHOTKI

A033 TOTAL UTILITIES 500,000 1,000 550,000

A03303 Electricity 500,000 1,000 550,000

A034 TOTAL OCCUPANCY COSTS 13,000 13,000 13,000

A03407 Rates and Taxes 13,000 13,000 13,000

A038 TOTAL TRAVEL & 189,000 189,000 193,000

TRANSPORTATION

A03805 Travelling Allowance 64,000 64,000 68,000

A03807 P.O.L Charges A.planes 125,000 125,000 125,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 111,000 111,000 118,000

A03901 Stationery 37,000 37,000 39,000

A03902 Printing and Publication 31,000 31,000 33,000

A03905 Newspapers Periodicals and Books 15,000 15,000 16,000

A03906 Uniforms and Protective Clothing 15,000 15,000 16,000

A03970 Others 13,000 13,000 14,000

1 Others 13,000 13,000 14,000

A13 TOTAL REPAIRS AND MAINTENANCE 136,000 136,000 149,000

A130 TOTAL TRANSPORT 58,000 58,000 64,000

A13001 Transport 58,000 58,000 64,000

A131 TOTAL MACHINERY AND 45,000 45,000 50,000

EQUIPMENT

A13101 Machinery and Equipment 45,000 45,000 50,000

Page 56: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

55

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

GO0055 SUPERINTENDING ENGINEER (WORK &SERVICE) GHOTKI

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

_______________________________________________________________________________SUPERINTENDING ENGINEER (WORK & 14,876,000 11,036,000 13,092,000

SERVICE) GHOTKI

_______________________________________________________________________________

Page 57: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

56

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

HB0224 SUPERINTENDING ENGINEER (WORK &SERVICE) HYDERABAD

A01 TOTAL EMPLOYEES RELATED EXPENSES. 14,982,000 14,166,000 16,071,000

A011 TOTAL PAY 29 29 8,815,000 8,705,000 9,577,000

A011-1 TOTAL PAY OF OFFICERS 5 8 3,451,000 3,083,000 3,392,000

A01101 Total Basic Pay Of Officer 5 8 3,379,000 2,975,000 3,273,000

E076 EXECUTIVE DISTRICT (BPS-19) 1 1 1,263,000 776,000 854,000 OFFICER

D261 DIRECTOR RESEARCH AND (BPS-17) 1 1 651,000 400,000 440,000 PUBLICATION

R045 RESEARCH OFFICER (BPS-17) 1 1 653,000 400,000 440,000

S236 SUPERINTENDENT (BPS-17) 1 400,000 440,000

A119 ASSISTANT (BPS-16) 3 749,000 824,000

C101 CIRCLE HEAD DRAFTSMEN (BPS-16) 1 1 405,000 250,000 275,000

S236 SUPERINTENDENT (BPS-16) 1 407,000

A01102 Personal pay 72,000 108,000 119,000

A011-2 TOTAL PAY OF OTHER STAFF 24 21 5,364,000 5,622,000 6,185,000

A01151 Total Basic Pay Other Staff 24 21 5,339,000 5,579,000 6,137,000

A119 ASSISTANT (BPS-14) 3 881,000

S053 SENIOR CLERK (BPS-14) 3 892,000 981,000

S181 STENOGRAPHER (BPS-14) 1 1 294,000 360,000 396,000

D134 DIVISIONAL HEAD / JUNIOR (BPS-13) 1 1 276,000 337,000 371,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 2 594,000 654,000

D230 DRAFTSMAN (BPS-10) 2 2 470,000 576,000 633,000

A017 ACCOUNT CLERK (BPS-09) 2 2 455,000 559,000 615,000

S053 SENIOR CLERK (BPS-09) 3 684,000

J014 JR CLERK (BPS-07) 2 427,000

Page 58: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

57

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

HB0224 SUPERINTENDING ENGINEER (WORK &SERVICE) HYDERABAD

T047 TRACER (BPS-05) 2 2 397,000 486,000 534,000

D161 DRIVER (BPS-04) 1 1 192,000 234,000 258,000

C089 CHOWKIDAR (BPS-02) 1 1 180,000 220,000 242,000

D003 DAFTARI (BPS-02) 1 1 180,000 220,000 242,000

N003 NAIB QASID (BPS-02) 4 4 723,000 881,000 969,000

S008 SANITARY WORKER (BPS-02) 1 1 180,000 220,000 242,000

A01152 Personal pay 25,000 43,000 48,000

A012 TOTAL ALLOWANCES 6,167,000 5,461,000 6,494,000

A012-1 TOTAL REGULAR ALLOWANCES 5,653,000 4,947,000 5,954,000

A01202 House Rent Allowance 772,000 772,000 772,000

A01203 Conveyance Allowance 893,000 893,000 893,000

A01207 Washing Allowance 4,000 4,000 4,000

A0120D Integrated Allowance 13,000 13,000 13,000

A0120X Ad - hoc Allowance - 2010 1,613,000 1,366,000 1,366,000

A01217 Medical Allowance 659,000 659,000 659,000

A0121M Adhoc Relief Allowance - 2012 6,000

A0121T Adhoc Relief Allowance 2013 179,000 179,000

A0121Z Adhoc Relief Allowance - 2014 6,000

A01224 Entertainment Allowance 7,000 7,000 7,000

A0122C Adhoc Relief Allowance - 2015 846,000 179,000 179,000

A0122M Adhoc Relief Allowance 2016 863,000 941,000

A01270 Others 846,000 941,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 514,000 514,000 540,000

A01274 Medical Charges 514,000 514,000 540,000

A03 TOTAL OPERATING EXPENSES 1,043,000 689,000 1,102,000

A032 TOTAL COMMUNICATIONS 209,000 209,000 220,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 200,000 200,000 210,000

Page 59: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

58

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

HB0224 SUPERINTENDING ENGINEER (WORK &SERVICE) HYDERABAD

A033 TOTAL UTILITIES 355,000 1,000 391,000

A03303 Electricity 355,000 1,000 391,000

A038 TOTAL TRAVEL & 357,000 357,000 361,000

TRANSPORTATION

A03805 Travelling Allowance 79,000 79,000 83,000

A03807 P.O.L Charges A.planes 278,000 278,000 278,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 122,000 122,000 130,000

A03901 Stationery 44,000 44,000 47,000

A03902 Printing and Publication 15,000 15,000 16,000

A03905 Newspapers Periodicals and Books 31,000 31,000 33,000

A03970 Others 32,000 32,000 34,000

1 Others 32,000 32,000 34,000

A13 TOTAL REPAIRS AND MAINTENANCE 170,000 170,000 186,000

A130 TOTAL TRANSPORT 74,000 74,000 82,000

A13001 Transport 74,000 74,000 82,000

A131 TOTAL MACHINERY AND 45,000 45,000 50,000

EQUIPMENT

A13101 Machinery and Equipment 45,000 45,000 50,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

A137 TOTAL COMPUTER EQUIPMENT 18,000 18,000 19,000

Page 60: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

59

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

HB0224 SUPERINTENDING ENGINEER (WORK &SERVICE) HYDERABAD

A13703 I.T. Equipment 18,000 18,000 19,000

_______________________________________________________________________________SUPERINTENDING ENGINEER (WORK & 16,195,000 15,025,000 17,359,000

SERVICE) HYDERABAD

_______________________________________________________________________________

Page 61: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

60

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

JK0053 SUPERINTENDING ENGINEER (WORK &SERVICE) JACOBABAD

A01 TOTAL EMPLOYEES RELATED EXPENSES. 11,426,000 10,348,000 11,763,000

A011 TOTAL PAY 26 26 7,102,000 6,557,000 7,216,000

A011-1 TOTAL PAY OF OFFICERS 4 6 2,789,000 2,144,000 2,360,000

A01101 Total Basic Pay Of Officer 4 6 2,691,000 2,011,000 2,213,000

E076 EXECUTIVE DISTRICT (BPS-19) 1 1 1,143,000 631,000 694,000 OFFICER

D262 DEPUTY DISTRICT OFFICER (BPS-17) 1 1 590,000 324,000 357,000

I043 INVESTIGATOR / RO (BPS-17) 1 1 590,000 325,000 358,000

S236 SUPERINTENDENT (BPS-17) 1 325,000 358,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 2 406,000 446,000

S236 SUPERINTENDENT (BPS-16) 1 368,000

A01102 Personal pay 98,000 133,000 147,000

A011-2 TOTAL PAY OF OTHER STAFF 22 20 4,313,000 4,413,000 4,856,000

A01151 Total Basic Pay Other Staff 22 20 4,307,000 4,402,000 4,843,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 2 528,000

D133 DIVISIONAL HEAD / JR (BPS-14) 1 1 263,000 299,000 329,000 DRAUGHTSMAN

S053 SENIOR CLERK (BPS-14) 3 741,000 815,000

J053 JUNIOR CLERK (BPS-11) 2 494,000 543,000

D230 DRAFTSMAN (BPS-10) 2 2 420,000 478,000 526,000

A017 ACCOUNT CLERK (BPS-09) 2 2 406,000 462,000 509,000

S053 SENIOR CLERK (BPS-09) 3 612,000

J014 JR CLERK (BPS-07) 2 382,000

T047 TRACER (BPS-07) 2 2 382,000 433,000 477,000

D161 DRIVER (BPS-05) 1 1 176,000 202,000 222,000

D003 DAFTARI (BPS-03) 1 1 166,000 189,000 208,000

Page 62: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

61

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

JK0053 SUPERINTENDING ENGINEER (WORK &SERVICE) JACOBABAD

S008 SANITARY WORKER (BPS-03) 1 1 166,000 189,000 208,000

C092 CHOWKIDAR / WATCHMAN (BPS-02) 1 1 161,000 183,000 201,000

N003 NAIB QASID (BPS-02) 4 4 645,000 732,000 805,000

A01152 Personal pay 6,000 11,000 13,000

A012 TOTAL ALLOWANCES 4,324,000 3,791,000 4,547,000

A012-1 TOTAL REGULAR ALLOWANCES 4,324,000 3,791,000 4,547,000

A01202 House Rent Allowance 448,000 448,000 448,000

A01203 Conveyance Allowance 777,000 777,000 777,000

A01207 Washing Allowance 6,000 6,000 6,000

A0120D Integrated Allowance 15,000 15,000 15,000

A0120X Ad - hoc Allowance - 2010 1,211,000 1,023,000 1,023,000

A01217 Medical Allowance 603,000 603,000 603,000

A0121T Adhoc Relief Allowance 2013 132,000 132,000

A0122C Adhoc Relief Allowance - 2015 632,000 131,000 131,000

A0122M Adhoc Relief Allowance 2016 656,000 706,000

A01270 Others 632,000 706,000

A03 TOTAL OPERATING EXPENSES 6,482,000 229,000 7,121,000

A032 TOTAL COMMUNICATIONS 30,000 30,000 33,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 21,000 21,000 23,000

A033 TOTAL UTILITIES 6,254,000 1,000 6,880,000

A03303 Electricity 6,254,000 1,000 6,880,000

A038 TOTAL TRAVEL & 146,000 146,000 152,000

TRANSPORTATION

A03805 Travelling Allowance 105,000 105,000 111,000

Page 63: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

62

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

JK0053 SUPERINTENDING ENGINEER (WORK &SERVICE) JACOBABAD

A03807 P.O.L Charges A.planes 41,000 41,000 41,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 52,000 52,000 56,000

A03901 Stationery 15,000 15,000 16,000

A03902 Printing and Publication 9,000 9,000 10,000

A03905 Newspapers Periodicals and Books 9,000 9,000 10,000

A03970 Others 19,000 19,000 20,000

1 Others 19,000 19,000 20,000

A13 TOTAL REPAIRS AND MAINTENANCE 132,000 132,000 145,000

A130 TOTAL TRANSPORT 63,000 63,000 70,000

A13001 Transport 63,000 63,000 70,000

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

A13101 Machinery and Equipment 36,000 36,000 40,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

_______________________________________________________________________________SUPERINTENDING ENGINEER (WORK & 18,040,000 10,709,000 19,029,000

SERVICE) JACOBABAD

_______________________________________________________________________________

Page 64: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

63

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

JO0054 SUPERINTENDING ENGINEER (WORK &SERVICE) JAMSHORO

A01 TOTAL EMPLOYEES RELATED EXPENSES. 9,304,000 10,261,000 11,702,000

A011 TOTAL PAY 20 20 5,556,000 6,519,000 7,174,000

A011-1 TOTAL PAY OF OFFICERS 4 7 2,335,000 3,414,000 3,757,000

A01101 Total Basic Pay Of Officer 4 7 2,303,000 3,382,000 3,721,000

E076 EXECUTIVE DISTRICT (BPS-19) 1 1 976,000 963,000 1,060,000 OFFICER

A131 ASSISTANT ENGINEER (BPS-17) 1 1 504,000 497,000 546,000

R045 RESEARCH OFFICER (BPS-17) 1 1 506,000 496,000 546,000

S236 SUPERINTENDENT (BPS-17) 1 496,000 546,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 3 930,000 1,023,000

S236 SUPERINTENDENT (BPS-16) 1 317,000

A01102 Personal pay 32,000 32,000 36,000

A011-2 TOTAL PAY OF OTHER STAFF 16 13 3,221,000 3,105,000 3,417,000

A01151 Total Basic Pay Other Staff 16 13 3,218,000 3,102,000 3,413,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 3 783,000

S181 STENOGRAPHER (BPS-14) 1 1 262,000 333,000 366,000

D230 DRAFTSMAN (BPS-10) 1 1 208,000 266,000 293,000

A017 ACCOUNT CLERK (BPS-09) 2 2 404,000 516,000 567,000

A014 AC TEACH (BPS-07) 3 3 569,000 722,000 797,000

D161 DRIVER (BPS-05) 1 1 176,000 225,000 247,000

T047 TRACER (BPS-05) 1 1 176,000 225,000 247,000

C089 CHOWKIDAR (BPS-02) 1 1 161,000 204,000 224,000

D003 DAFTARI (BPS-02) 1 1 161,000 204,000 224,000

N003 NAIB QASID (BPS-02) 2 2 318,000 407,000 448,000

A01152 Personal pay 3,000 3,000 4,000

Page 65: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

64

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

JO0054 SUPERINTENDING ENGINEER (WORK &SERVICE) JAMSHORO

A012 TOTAL ALLOWANCES 3,748,000 3,742,000 4,528,000

A012-1 TOTAL REGULAR ALLOWANCES 3,748,000 3,742,000 4,528,000

A01202 House Rent Allowance 528,000 611,000 611,000

A01203 Conveyance Allowance 589,000 767,000 767,000

A01207 Washing Allowance 5,000 6,000 6,000

A0120D Integrated Allowance 12,000 12,000 12,000

A0120X Ad - hoc Allowance - 2010 1,052,000 994,000 994,000

A01217 Medical Allowance 458,000 458,000 458,000

A0121T Adhoc Relief Allowance 2013 126,000 126,000

A0122C Adhoc Relief Allowance - 2015 552,000 128,000 128,000

A0122M Adhoc Relief Allowance 2016 640,000 713,000

A01270 Others 552,000 713,000

A03 TOTAL OPERATING EXPENSES 1,718,000 1,511,000 1,786,000

A032 TOTAL COMMUNICATIONS 143,000 143,000 151,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 134,000 134,000 141,000

A033 TOTAL UTILITIES 208,000 1,000 229,000

A03303 Electricity 208,000 1,000 229,000

A034 TOTAL OCCUPANCY COSTS 8,000 8,000 8,000

A03407 Rates and Taxes 8,000 8,000 8,000

A038 TOTAL TRAVEL & 706,000 706,000 710,000

TRANSPORTATION

A03805 Travelling Allowance 79,000 79,000 83,000

A03807 P.O.L Charges A.planes 627,000 627,000 627,000

H.coptors S.Cars M/Cycle

Page 66: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

65

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

JO0054 SUPERINTENDING ENGINEER (WORK &SERVICE) JAMSHORO

A039 TOTAL GENERAL 653,000 653,000 688,000

A03901 Stationery 191,000 191,000 201,000

A03902 Printing and Publication 132,000 132,000 139,000

A03905 Newspapers Periodicals and Books 27,000 27,000 29,000

A03970 Others 303,000 303,000 319,000

1 Others 303,000 303,000 319,000

A13 TOTAL REPAIRS AND MAINTENANCE 306,000 306,000 334,000

A130 TOTAL TRANSPORT 219,000 219,000 241,000

A13001 Transport 219,000 219,000 241,000

A131 TOTAL MACHINERY AND 38,000 38,000 42,000

EQUIPMENT

A13101 Machinery and Equipment 38,000 38,000 42,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

A137 TOTAL COMPUTER EQUIPMENT 16,000 16,000 16,000

A13702 Software 16,000 16,000 16,000

_______________________________________________________________________________SUPERINTENDING ENGINEER (WORK & 11,328,000 12,078,000 13,822,000

SERVICE) JAMSHORO

_______________________________________________________________________________

Page 67: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

66

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

KK0045 SUPERINTENDING ENGINEER (WORK &SERVICE) KASHMOR

A01 TOTAL EMPLOYEES RELATED EXPENSES. 7,986,000 6,475,000 7,486,000

A011 TOTAL PAY 20 20 4,858,000 4,212,000 4,634,000

A011-1 TOTAL PAY OF OFFICERS 3 6 1,725,000 1,000,000 1,100,000

A01101 Total Basic Pay Of Officer 3 6 1,725,000 1,000,000 1,100,000

E076 EXECUTIVE DISTRICT (BPS-19) 1 1 848,000 334,000 367,000 OFFICER

A128 ASSISTANT / DATA ENTRY (BPS-17) 1 1 440,000 172,000 190,000 OPR

I042 INVESTIGATOR / RESEARCH (BPS-17) 1 1 437,000 172,000 189,000 OFFICER

A119 ASSISTANT (BPS-16) 3 322,000 354,000

A011-2 TOTAL PAY OF OTHER STAFF 17 14 3,133,000 3,212,000 3,534,000

A01151 Total Basic Pay Other Staff 17 14 3,117,000 3,196,000 3,516,000

A119 ASSISTANT (BPS-14) 3 733,000

S181 STENOGRAPHER (BPS-14) 1 1 242,000 314,000 346,000

J053 JUNIOR CLERK (BPS-11) 3 779,000 857,000

D230 DRAFTSMAN (BPS-10) 1 1 194,000 251,000 277,000

A017 ACCOUNT CLERK (BPS-09) 2 2 376,000 487,000 534,000

J014 JR CLERK (BPS-07) 3 527,000

T073 TRESSOR (BPS-05) 1 1 164,000 212,000 233,000

D161 DRIVER (BPS-04) 1 1 155,000 205,000 225,000

D003 DAFTARI (BPS-02) 1 1 149,000 192,000 212,000

C088 CHOWIKADAR / WATCHMAN (BPS-01) 1 1 145,000 189,000 208,000

N003 NAIB QASID (BPS-01) 2 2 287,000 378,000 416,000

S008 SANITARY WORKER (BPS-01) 1 1 145,000 189,000 208,000

A01152 Personal pay 16,000 16,000 18,000

Page 68: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

67

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

KK0045 SUPERINTENDING ENGINEER (WORK &SERVICE) KASHMOR

A012 TOTAL ALLOWANCES 3,128,000 2,263,000 2,852,000

A012-1 TOTAL REGULAR ALLOWANCES 3,128,000 2,263,000 2,852,000

A01202 House Rent Allowance 270,000 270,000 270,000

A01203 Conveyance Allowance 502,000 502,000 502,000

A01207 Washing Allowance 12,000 12,000 12,000

A01208 Dress Allowance 13,000 13,000 13,000

A0120D Integrated Allowance 1,000 1,000 1,000

A0120X Ad - hoc Allowance - 2010 931,000 537,000 537,000

A01217 Medical Allowance 431,000 431,000 431,000

A0121T Adhoc Relief Allowance 2013 94,000 94,000

A0122C Adhoc Relief Allowance - 2015 484,000 68,000 68,000

A0122M Adhoc Relief Allowance 2016 335,000 462,000

A01270 Others 484,000 462,000

A03 TOTAL OPERATING EXPENSES 997,000 791,000 1,050,000

A032 TOTAL COMMUNICATIONS 103,000 103,000 109,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 94,000 94,000 99,000

A033 TOTAL UTILITIES 207,000 1,000 228,000

A03303 Electricity 207,000 1,000 228,000

A038 TOTAL TRAVEL & 447,000 447,000 459,000

TRANSPORTATION

A03805 Travelling Allowance 238,000 238,000 250,000

A03807 P.O.L Charges A.planes 209,000 209,000 209,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 240,000 240,000 254,000

A03901 Stationery 70,000 70,000 74,000

Page 69: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

68

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

KK0045 SUPERINTENDING ENGINEER (WORK &SERVICE) KASHMOR

A03902 Printing and Publication 31,000 31,000 33,000

A03905 Newspapers Periodicals and Books 14,000 14,000 15,000

A03906 Uniforms and Protective Clothing 15,000 15,000 16,000

A03970 Others 110,000 110,000 116,000

1 Others 110,000 110,000 116,000

A13 TOTAL REPAIRS AND MAINTENANCE 237,000 237,000 260,000

A130 TOTAL TRANSPORT 219,000 219,000 241,000

A13001 Transport 219,000 219,000 241,000

A137 TOTAL COMPUTER EQUIPMENT 18,000 18,000 19,000

A13701 Hardware 18,000 18,000 19,000

_______________________________________________________________________________SUPERINTENDING ENGINEER (WORK & 9,220,000 7,503,000 8,796,000

SERVICE) KASHMOR

_______________________________________________________________________________

Page 70: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

69

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

KQ0547 SUPERINTENDING ENGINEER (WORK &SERVICE) KARACHI

A01 TOTAL EMPLOYEES RELATED EXPENSES. 12,002,000 9,737,000 11,058,000

A011 TOTAL PAY 11 11 7,161,000 5,963,000 6,562,000

A011-1 TOTAL PAY OF OFFICERS 3 4 3,441,000 3,876,000 4,265,000

A01101 Total Basic Pay Of Officer 3 4 3,440,000 3,761,000 4,138,000

S249 SUPTD ENGINEER (BPS-19) 1 1 1,692,000 1,599,000 1,759,000

A218 ASSISTANT ENGINEER (BPS-17) 1 1 872,000 824,000 907,000

I043 INVESTIGATOR / RO (BPS-17) 1 1 876,000 824,000 906,000

A235 ASSISTANT HEAD CLERK (BPS-16) 1 514,000 566,000

A01102 Personal pay 114,000 126,000

A01103 Special pay 1,000 1,000 1,000

A011-2 TOTAL PAY OF OTHER STAFF 8 7 3,720,000 2,087,000 2,297,000

A01151 Total Basic Pay Other Staff 8 7 3,716,000 2,076,000 2,284,000

A235 ASSISTANT HEAD CLERK (BPS-14) 1 1,160,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 364,000 371,000 408,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 1 327,000 359,000

A017 ACCOUNT CLERK (BPS-09) 2 2 600,000 612,000 674,000

J014 JR CLERK (BPS-07) 1 841,000

T047 TRACER (BPS-05) 1 1 262,000 267,000 294,000

D161 DRIVER (BPS-04) 1 1 252,000 257,000 283,000

C088 CHOWIKADAR / WATCHMAN (BPS-02) 1 1 237,000 242,000 266,000

A01152 Personal pay 4,000 11,000 13,000

A012 TOTAL ALLOWANCES 4,841,000 3,774,000 4,496,000

A012-1 TOTAL REGULAR ALLOWANCES 4,807,000 3,740,000 4,460,000

Page 71: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

70

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

KQ0547 SUPERINTENDING ENGINEER (WORK &SERVICE) KARACHI

A01202 House Rent Allowance 648,000 648,000 648,000

A01203 Conveyance Allowance 787,000 787,000 787,000

A01208 Dress Allowance 2,000 2,000 2,000

A0120D Integrated Allowance 12,000 12,000 12,000

A0120Q Fixed Daily Allowance 1,000 1,000

A0120X Ad - hoc Allowance - 2010 1,357,000 975,000 975,000

A01217 Medical Allowance 566,000 566,000 566,000

A0121T Adhoc Relief Allowance 2013 61,000 61,000

A01224 Entertainment Allowance 7,000 7,000 7,000

A0122C Adhoc Relief Allowance - 2015 714,000 117,000 117,000

A0122M Adhoc Relief Allowance 2016 564,000 642,000

A01270 Others 714,000 642,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 34,000 34,000 36,000

A01274 Medical Charges 34,000 34,000 36,000

A03 TOTAL OPERATING EXPENSES 305,000 305,000 321,000

A039 TOTAL GENERAL 305,000 305,000 321,000

A03970 Others 305,000 305,000 321,000

1 Others 305,000 305,000 321,000

_______________________________________________________________________________SUPERINTENDING ENGINEER (WORK & 12,307,000 10,042,000 11,379,000

SERVICE) KARACHI

_______________________________________________________________________________

Page 72: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

71

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

KX0083 SUPERINTENDING ENGINEER (WORK &SERVICE) KHAIRPUR

A01 TOTAL EMPLOYEES RELATED EXPENSES. 15,050,000 14,450,000 16,438,000

A011 TOTAL PAY 33 33 9,376,000 9,304,000 10,236,000

A011-1 TOTAL PAY OF OFFICERS 5 8 3,168,000 3,844,000 4,229,000

A01101 Total Basic Pay Of Officer 5 8 3,075,000 3,714,000 4,086,000

E076 EXECUTIVE DISTRICT (BPS-19) 1 1 1,148,000 969,000 1,066,000 OFFICER

D262 DEPUTY DISTRICT OFFICER (BPS-17) 1 1 593,000 499,000 549,000

I043 INVESTIGATOR / RO (BPS-17) 1 1 593,000 499,000 549,000

S236 SUPERINTENDENT (BPS-17) 1 499,000 549,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 3 935,000 1,029,000

C080 CHIEF SENIOR / CIRCLE (BPS-16) 1 1 370,000 313,000 344,000 HEAD DRAFTSMAN

S236 SUPERINTENDENT (BPS-16) 1 371,000

A01102 Personal pay 93,000 130,000 143,000

A011-2 TOTAL PAY OF OTHER STAFF 28 25 6,208,000 5,460,000 6,007,000

A01151 Total Basic Pay Other Staff 28 25 6,195,000 5,447,000 5,992,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 3 947,000

S053 SENIOR CLERK (BPS-14) 3 731,000 804,000

S181 STENOGRAPHER (BPS-14) 1 1 275,000 295,000 324,000

D134 DIVISIONAL HEAD / JUNIOR (BPS-13) 1 1 296,000 277,000 304,000 DRAUGHTSMAN

D026 DATA PROCESSING ASSISTANT (BPS-12) 1 1 110,000 258,000 284,000

J053 JUNIOR CLERK (BPS-11) 2 487,000 536,000

D230 DRAFTSMAN (BPS-10) 2 2 504,000 472,000 519,000

A017 ACCOUNT CLERK (BPS-09) 2 2 490,000 456,000 503,000

P026 PESH IMAM (BPS-09) 1 1 112,000 229,000 251,000

Page 73: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

72

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

KX0083 SUPERINTENDING ENGINEER (WORK &SERVICE) KHAIRPUR

S053 SENIOR CLERK (BPS-09) 3 733,000

J020 JR CLERK (BPS-07) 2 457,000

D161 DRIVER (BPS-05) 1 1 215,000 199,000 219,000

M116 MOAZEN (BPS-05) 1 1 88,000 199,000 219,000

T047 TRACER (BPS-05) 2 2 426,000 398,000 438,000

C092 CHOWKIDAR / WATCHMAN (BPS-02) 1 1 193,000 181,000 199,000

D007 DAFTRI / DISPEACH RIDER (BPS-02) 1 1 193,000 181,000 199,000

E021 ELECTRICIAN (BPS-02) 1 1 193,000 181,000 199,000

N003 NAIB QASID (BPS-02) 4 4 770,000 722,000 795,000

S008 SANITARY WORKER (BPS-02) 1 1 193,000 181,000 199,000

A01152 Personal pay 13,000 13,000 15,000

A012 TOTAL ALLOWANCES 5,674,000 5,146,000 6,202,000

A012-1 TOTAL REGULAR ALLOWANCES 5,674,000 5,146,000 6,202,000

A01202 House Rent Allowance 543,000 543,000 543,000

A01203 Conveyance Allowance 1,035,000 1,079,000 1,079,000

A01207 Washing Allowance 2,000 2,000 2,000

A0120D Integrated Allowance 20,000 20,000 20,000

A0120X Ad - hoc Allowance - 2010 1,649,000 1,450,000 1,450,000

A01217 Medical Allowance 696,000 696,000 696,000

A0121A Ad - hoc Allowance - 2011 15,000

A0121M Adhoc Relief Allowance - 2012 10,000

A0121T Adhoc Relief Allowance 2013 192,000 192,000

A01224 Entertainment Allowance 1,000 1,000 1,000

A01226 Computer Allowance 10,000 10,000 10,000

A0122C Adhoc Relief Allowance - 2015 846,000 193,000 193,000

A0122M Adhoc Relief Allowance 2016 920,000 1,008,000

A01241 Utility allowance for electricity 26,000

A01244 Adhoc Relief 15,000

A01270 Others 846,000 1,008,000

Page 74: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

73

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

KX0083 SUPERINTENDING ENGINEER (WORK &SERVICE) KHAIRPUR

A03 TOTAL OPERATING EXPENSES 1,978,000 1,274,000 2,093,000

A032 TOTAL COMMUNICATIONS 172,000 172,000 182,000

A03201 Postage and Telegraph 11,000 11,000 12,000

A03202 Telephone and Trunk call 161,000 161,000 170,000

A033 TOTAL UTILITIES 758,000 54,000 834,000

A03303 Electricity 758,000 54,000 834,000

A034 TOTAL OCCUPANCY COSTS 89,000 89,000 89,000

A03407 Rates and Taxes 89,000 89,000 89,000

A038 TOTAL TRAVEL & 534,000 534,000 540,000

TRANSPORTATION

A03805 Travelling Allowance 117,000 117,000 123,000

A03807 P.O.L Charges A.planes 417,000 417,000 417,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 425,000 425,000 448,000

A03901 Stationery 87,000 87,000 92,000

A03902 Printing and Publication 15,000 15,000 16,000

A03905 Newspapers Periodicals and Books 18,000 18,000 19,000

A03970 Others 305,000 305,000 321,000

1 Others 305,000 305,000 321,000

A13 TOTAL REPAIRS AND MAINTENANCE 156,000 156,000 171,000

A130 TOTAL TRANSPORT 87,000 87,000 96,000

A13001 Transport 87,000 87,000 96,000

Page 75: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

74

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

KX0083 SUPERINTENDING ENGINEER (WORK &SERVICE) KHAIRPUR

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

A13101 Machinery and Equipment 36,000 36,000 40,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

_______________________________________________________________________________SUPERINTENDING ENGINEER (WORK & 17,184,000 15,880,000 18,702,000

SERVICE) KHAIRPUR

_______________________________________________________________________________

Page 76: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

75

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

LN0111 SUPERINTENDING ENGINEER (WORK &SERVICE) LARKANA

A01 TOTAL EMPLOYEES RELATED EXPENSES. 12,388,000 12,430,000 14,180,000

A011 TOTAL PAY 30 30 7,772,000 8,010,000 8,813,000

A011-1 TOTAL PAY OF OFFICERS 5 8 2,816,000 3,027,000 3,330,000

A01101 Total Basic Pay Of Officer 5 8 2,816,000 3,027,000 3,330,000

E076 EXECUTIVE DISTRICT (BPS-19) 1 1 1,049,000 790,000 869,000 OFFICER

D262 DEPUTY DISTRICT OFFICER (BPS-17) 1 1 545,000 407,000 448,000

I042 INVESTIGATOR / RESEARCH (BPS-17) 1 1 544,000 407,000 448,000 OFFICER

S236 SUPERINTENDENT (BPS-17) 1 407,000 448,000

A119 ASSISTANT (BPS-16) 3 762,000 838,000

D150 DRAUGHTSMAN (BPS-16) 1 1 339,000 254,000 279,000

S236 SUPERINTENDENT (BPS-16) 1 339,000

A011-2 TOTAL PAY OF OTHER STAFF 25 22 4,956,000 4,983,000 5,483,000

A01151 Total Basic Pay Other Staff 25 22 4,949,000 4,931,000 5,425,000

A119 ASSISTANT (BPS-14) 3 804,000

S053 SENIOR CLERK (BPS-14) 2 498,000 548,000

S181 STENOGRAPHER (BPS-14) 1 1 267,000 301,000 332,000

H035 HEAD DRAFTSMAN (BPS-13) 1 1 251,000 283,000 311,000

J053 JUNIOR CLERK (BPS-11) 4 996,000 1,096,000

D230 DRAFTSMAN (BPS-10) 2 2 428,000 482,000 531,000

A018 ACCOUNT CLERK / (BPS-09) 2 2 411,000 467,000 514,000 SUB-ACCOUNT

J014 JR CLERK (BPS-07) 4 774,000

D161 DRIVER (BPS-05) 1 1 181,000 204,000 224,000

T047 TRACER (BPS-05) 2 2 361,000 407,000 448,000

Page 77: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

76

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

LN0111 SUPERINTENDING ENGINEER (WORK &SERVICE) LARKANA

C089 CHOWKIDAR (BPS-02) 1 1 163,000 185,000 203,000

D003 DAFTARI (BPS-02) 1 1 163,000 185,000 203,000

N003 NAIB QASID (BPS-02) 4 4 656,000 738,000 812,000

S053 SENIOR CLERK (BPS-02) 2 327,000

S261 SWEEPER (BPS-02) 1 1 163,000 185,000 203,000

A01152 Personal pay 7,000 52,000 58,000

A012 TOTAL ALLOWANCES 4,616,000 4,420,000 5,367,000

A012-1 TOTAL REGULAR ALLOWANCES 4,518,000 4,322,000 5,264,000

A01202 House Rent Allowance 536,000 582,000 582,000

A01203 Conveyance Allowance 745,000 848,000 848,000

A01207 Washing Allowance 2,000 2,000 2,000

A0120D Integrated Allowance 5,000 5,000 5,000

A0120X Ad - hoc Allowance - 2010 1,169,000 1,278,000 1,278,000

A01217 Medical Allowance 509,000 512,000 512,000

A0121A Ad - hoc Allowance - 2011 15,000

A0121M Adhoc Relief Allowance - 2012 13,000

A0121T Adhoc Relief Allowance 2013 127,000 127,000

A0122C Adhoc Relief Allowance - 2015 776,000 158,000 158,000

A0122M Adhoc Relief Allowance 2016 782,000 876,000

A01270 Others 776,000 876,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 98,000 98,000 103,000

A01274 Medical Charges 98,000 98,000 103,000

A03 TOTAL OPERATING EXPENSES 1,914,000 1,914,000 1,975,000

A032 TOTAL COMMUNICATIONS 214,000 214,000 225,000

A03201 Postage and Telegraph 14,000 14,000 15,000

A03202 Telephone and Trunk call 200,000 200,000 210,000

Page 78: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

77

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

LN0111 SUPERINTENDING ENGINEER (WORK &SERVICE) LARKANA

A034 TOTAL OCCUPANCY COSTS 101,000 101,000 101,000

A03407 Rates and Taxes 101,000 101,000 101,000

A038 TOTAL TRAVEL & 1,000,000 1,000,000 1,017,000

TRANSPORTATION

A03805 Travelling Allowance 333,000 333,000 350,000

A03807 P.O.L Charges A.planes 667,000 667,000 667,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 599,000 599,000 632,000

A03901 Stationery 209,000 209,000 220,000

A03902 Printing and Publication 44,000 44,000 47,000

A03905 Newspapers Periodicals and Books 41,000 41,000 44,000

A03970 Others 305,000 305,000 321,000

1 Others 305,000 305,000 321,000

A13 TOTAL REPAIRS AND MAINTENANCE 411,000 411,000 451,000

A130 TOTAL TRANSPORT 261,000 261,000 288,000

A13001 Transport 261,000 261,000 288,000

A131 TOTAL MACHINERY AND 82,000 82,000 91,000

EQUIPMENT

A13101 Machinery and Equipment 82,000 82,000 91,000

A132 TOTAL FURNITURE AND 68,000 68,000 72,000

FIXTURE

A13201 Furniture and Fixture 68,000 68,000 72,000

Page 79: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

78

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

LN0111 SUPERINTENDING ENGINEER (WORK &SERVICE) LARKANA

_______________________________________________________________________________SUPERINTENDING ENGINEER (WORK & 14,713,000 14,755,000 16,606,000

SERVICE) LARKANA

_______________________________________________________________________________

Page 80: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

79

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

MP0092 SUPERINTENDING ENGINEER (WORK &SERVICE) MIRPURKHAS

A01 TOTAL EMPLOYEES RELATED EXPENSES. 11,093,000 9,935,000 11,284,000

A011 TOTAL PAY 25 25 6,622,000 5,993,000 6,593,000

A011-1 TOTAL PAY OF OFFICERS 6 8 2,679,000 2,053,000 2,259,000

A01101 Total Basic Pay Of Officer 6 8 2,679,000 2,053,000 2,259,000

E076 EXECUTIVE DISTRICT (BPS-19) 1 1 892,000 564,000 621,000 OFFICER

D262 DEPUTY DISTRICT OFFICER (BPS-17) 1 1 461,000 291,000 320,000

I043 INVESTIGATOR / RO (BPS-17) 1 1 461,000 291,000 320,000

A235 ASSISTANT HEAD CLERK (BPS-16) 2 363,000 399,000

C222 CHIEF HEAD DRAFTSMAN (BPS-16) 1 1 289,000 182,000 199,000

O006 OFFICE SUPERINTENDENT (BPS-16) 1 1 289,000 181,000 200,000

S181 STENOGRAPHER (BPS-16) 1 1 287,000 181,000 200,000

A011-2 TOTAL PAY OF OTHER STAFF 19 17 3,943,000 3,940,000 4,334,000

A01151 Total Basic Pay Other Staff 19 17 3,943,000 3,940,000 4,334,000

A235 ASSISTANT HEAD CLERK (BPS-14) 2 491,000

S053 SENIOR CLERK (BPS-14) 1 267,000 294,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 230,000 303,000 334,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 2 534,000 588,000

D230 DRAFTSMAN (BPS-10) 2 2 393,000 517,000 569,000

A017 ACCOUNT CLERK (BPS-09) 2 2 380,000 503,000 551,000

S053 SENIOR CLERK (BPS-09) 1 571,000

J014 JR CLERK (BPS-07) 2 355,000

T050 TRACER (BPS-05) 2 2 331,000 437,000 480,000

D161 DRIVER (BPS-04) 1 1 158,000 210,000 231,000

Page 81: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

80

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

MP0092 SUPERINTENDING ENGINEER (WORK &SERVICE) MIRPURKHAS

D003 DAFTARI (BPS-02) 1 1 150,000 198,000 218,000

C089 CHOWKIDAR (BPS-01) 1 1 147,000 194,000 214,000

N003 NAIB QASID (BPS-01) 3 3 588,000 583,000 641,000

S008 SANITARY WORKER (BPS-01) 1 1 149,000 194,000 214,000

A012 TOTAL ALLOWANCES 4,471,000 3,942,000 4,691,000

A012-1 TOTAL REGULAR ALLOWANCES 3,957,000 3,428,000 4,151,000

A01202 House Rent Allowance 389,000 407,000 407,000

A01203 Conveyance Allowance 709,000 709,000 709,000

A0120D Integrated Allowance 14,000 14,000 14,000

A0120X Ad - hoc Allowance - 2010 1,061,000 941,000 941,000

A01217 Medical Allowance 514,000 514,000 514,000

A0121T Adhoc Relief Allowance 2013 122,000 122,000

A01224 Entertainment Allowance 2,000 2,000 2,000

A0122C Adhoc Relief Allowance - 2015 634,000 124,000 124,000

A0122M Adhoc Relief Allowance 2016 595,000 659,000

A01270 Others 634,000 659,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 514,000 514,000 540,000

A01274 Medical Charges 514,000 514,000 540,000

A03 TOTAL OPERATING EXPENSES 1,780,000 1,632,000 1,827,000

A032 TOTAL COMMUNICATIONS 76,000 76,000 81,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 67,000 67,000 71,000

A033 TOTAL UTILITIES 334,000 186,000 368,000

A03303 Electricity 334,000 186,000 368,000

Page 82: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

81

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

MP0092 SUPERINTENDING ENGINEER (WORK &SERVICE) MIRPURKHAS

A038 TOTAL TRAVEL & 1,284,000 1,284,000 1,286,000

TRANSPORTATION

A03805 Travelling Allowance 32,000 32,000 34,000

A03807 P.O.L Charges A.planes 1,252,000 1,252,000 1,252,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 86,000 86,000 92,000

A03901 Stationery 14,000 14,000 15,000

A03902 Printing and Publication 10,000 10,000 11,000

A03905 Newspapers Periodicals and Books 15,000 15,000 16,000

A03906 Uniforms and Protective Clothing 15,000 15,000 16,000

A03970 Others 32,000 32,000 34,000

1 Others 32,000 32,000 34,000

A13 TOTAL REPAIRS AND MAINTENANCE 114,000 114,000 125,000

A130 TOTAL TRANSPORT 45,000 45,000 50,000

A13001 Transport 45,000 45,000 50,000

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

A13101 Machinery and Equipment 36,000 36,000 40,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

_______________________________________________________________________________SUPERINTENDING ENGINEER (WORK & 12,987,000 11,681,000 13,236,000

SERVICE) MIRPURKHAS

_______________________________________________________________________________

Page 83: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

82

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

MX0048 SUPERINTENDING ENGINEER (WORK &SERVICE) MITHI

A01 TOTAL EMPLOYEES RELATED EXPENSES. 10,487,000 10,804,000 12,287,000

A011 TOTAL PAY 13 13 6,447,000 6,860,000 7,547,000

A011-1 TOTAL PAY OF OFFICERS 2 5 2,606,000 2,613,000 2,875,000

A01101 Total Basic Pay Of Officer 2 5 2,555,000 2,530,000 2,783,000

E076 EXECUTIVE DISTRICT (BPS-19) 1 1 1,684,000 1,020,000 1,122,000 OFFICER

D262 DEPUTY DISTRICT OFFICER (BPS-17) 1 1 871,000 526,000 578,000

A130 ASSISTANT / HEAD CLERK / (BPS-16) 3 984,000 1,083,000 DIV HEAD CLERK

A01102 Personal pay 51,000 83,000 92,000

A011-2 TOTAL PAY OF OTHER STAFF 11 8 3,841,000 4,247,000 4,672,000

A01151 Total Basic Pay Other Staff 11 8 3,841,000 4,247,000 4,672,000

A130 ASSISTANT / HEAD CLERK / (BPS-14) 3 1,167,000 DIV HEAD CLERK

J053 JUNIOR CLERK (BPS-11) 1 633,000 697,000

A029 ACCOUNTS CLERK / CASHIER (BPS-09) 2 2 602,000 1,189,000 1,308,000

J014 JR CLERK (BPS-07) 1 846,000

T050 TRACER (BPS-05) 1 1 263,000 518,000 569,000

D161 DRIVER (BPS-04) 1 1 252,000 499,000 549,000

C089 CHOWKIDAR (BPS-02) 1 1 237,000 469,000 516,000

N003 NAIB QASID (BPS-02) 2 2 474,000 939,000 1,033,000

A012 TOTAL ALLOWANCES 4,040,000 3,944,000 4,740,000

A012-1 TOTAL REGULAR ALLOWANCES 3,910,000 3,814,000 4,603,000

A01202 House Rent Allowance 335,000 335,000 335,000

A01203 Conveyance Allowance 588,000 649,000 649,000

A01207 Washing Allowance 2,000 2,000 2,000

Page 84: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

83

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

MX0048 SUPERINTENDING ENGINEER (WORK &SERVICE) MITHI

A0120D Integrated Allowance 8,000 8,000 8,000

A0120X Ad - hoc Allowance - 2010 1,178,000 1,089,000 1,089,000

A01217 Medical Allowance 497,000 497,000 497,000

A0121A Ad - hoc Allowance - 2011 9,000

A0121M Adhoc Relief Allowance - 2012 6,000

A0121T Adhoc Relief Allowance 2013 116,000 116,000

A0121Z Adhoc Relief Allowance - 2014 3,000

A0122C Adhoc Relief Allowance - 2015 639,000 135,000 135,000

A0122M Adhoc Relief Allowance 2016 682,000 746,000

A01233 Unattractive Area Allowance 24,000 280,000 280,000

A01244 Adhoc Relief 3,000

A01270 Others 639,000 746,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 130,000 130,000 137,000

A01274 Medical Charges 130,000 130,000 137,000

A03 TOTAL OPERATING EXPENSES 1,746,000 1,036,000 1,856,000

A032 TOTAL COMMUNICATIONS 172,000 172,000 182,000

A03201 Postage and Telegraph 23,000 23,000 25,000

A03202 Telephone and Trunk call 135,000 135,000 142,000

A03205 Courier and Pilot Service 14,000 14,000 15,000

A033 TOTAL UTILITIES 757,000 47,000 834,000

A03301 Gas 31,000 31,000 35,000

A03303 Electricity 726,000 16,000 799,000

A034 TOTAL OCCUPANCY COSTS 13,000 13,000 13,000

A03407 Rates and Taxes 13,000 13,000 13,000

A038 TOTAL TRAVEL & 472,000 472,000 477,000

TRANSPORTATION

A03805 Travelling Allowance 95,000 95,000 100,000

Page 85: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

84

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

MX0048 SUPERINTENDING ENGINEER (WORK &SERVICE) MITHI

A03807 P.O.L Charges A.planes 377,000 377,000 377,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 332,000 332,000 350,000

A03901 Stationery 120,000 120,000 126,000

A03902 Printing and Publication 75,000 75,000 79,000

A03905 Newspapers Periodicals and Books 16,000 16,000 17,000

A03970 Others 121,000 121,000 128,000

1 Others 121,000 121,000 128,000

A13 TOTAL REPAIRS AND MAINTENANCE 309,000 309,000 339,000

A130 TOTAL TRANSPORT 146,000 146,000 161,000

A13001 Transport 146,000 146,000 161,000

A131 TOTAL MACHINERY AND 129,000 129,000 142,000

EQUIPMENT

A13101 Machinery and Equipment 129,000 129,000 142,000

A132 TOTAL FURNITURE AND 34,000 34,000 36,000

FIXTURE

A13201 Furniture and Fixture 34,000 34,000 36,000

_______________________________________________________________________________SUPERINTENDING ENGINEER (WORK & 12,542,000 12,149,000 14,482,000

SERVICE) MITHI

_______________________________________________________________________________

Page 86: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

85

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

MY0054 SUPERINTENDING ENGINEER (WORK &SERVICE) MATIARI

A01 TOTAL EMPLOYEES RELATED EXPENSES. 8,401,000 8,511,000 9,706,000

A011 TOTAL PAY 19 19 5,042,000 5,458,000 6,005,000

A011-1 TOTAL PAY OF OFFICERS 3 6 2,343,000 2,144,000 2,359,000

A01101 Total Basic Pay Of Officer 3 6 2,334,000 2,135,000 2,349,000

E076 EXECUTIVE DISTRICT (BPS-19) 1 1 1,150,000 713,000 784,000 OFFICER

D262 DEPUTY DISTRICT OFFICER (BPS-17) 1 1 592,000 367,000 404,000

R045 RESEARCH OFFICER (BPS-17) 1 1 592,000 367,000 404,000

A119 ASSISTANT (BPS-16) 3 688,000 757,000

A01102 Personal pay 9,000 9,000 10,000

A011-2 TOTAL PAY OF OTHER STAFF 16 13 2,699,000 3,314,000 3,646,000

A01151 Total Basic Pay Other Staff 16 13 2,699,000 3,314,000 3,646,000

A119 ASSISTANT (BPS-14) 3 657,000

S181 STENOGRAPHER (BPS-14) 1 1 218,000 344,000 379,000

J053 JUNIOR CLERK (BPS-11) 3 853,000 939,000

D150 DRAUGHTSMAN (BPS-10) 1 1 175,000 275,000 303,000

A017 ACCOUNT CLERK (BPS-09) 2 2 339,000 534,000 585,000

J014 JR CLERK (BPS-07) 3 478,000

D161 DRIVER (BPS-05) 1 1 147,000 232,000 256,000

T001 TRACER (BPS-05) 1 1 147,000 232,000 256,000

C089 CHOWKIDAR (BPS-02) 1 1 134,000 211,000 232,000

D003 DAFTARI (BPS-02) 1 1 134,000 211,000 232,000

N003 NAIB QASID (BPS-02) 2 2 270,000 422,000 464,000

A012 TOTAL ALLOWANCES 3,359,000 3,053,000 3,701,000

Page 87: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

86

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

MY0054 SUPERINTENDING ENGINEER (WORK &SERVICE) MATIARI

A012-1 TOTAL REGULAR ALLOWANCES 3,359,000 3,053,000 3,701,000

A01202 House Rent Allowance 382,000 382,000 382,000

A01203 Conveyance Allowance 587,000 610,000 610,000

A01207 Washing Allowance 2,000 2,000 2,000

A0120D Integrated Allowance 8,000 9,000 9,000

A0120X Ad - hoc Allowance - 2010 936,000 851,000 851,000

A01217 Medical Allowance 432,000 432,000 432,000

A0121A Ad - hoc Allowance - 2011 5,000

A0121T Adhoc Relief Allowance 2013 97,000 97,000

A0121Z Adhoc Relief Allowance - 2014 6,000

A01224 Entertainment Allowance 7,000 7,000 7,000

A0122C Adhoc Relief Allowance - 2015 502,000 110,000 110,000

A0122M Adhoc Relief Allowance 2016 541,000 600,000

A01233 Unattractive Area Allowance 1,000 1,000 1,000

A01270 Others 502,000 600,000

A03 TOTAL OPERATING EXPENSES 1,361,000 1,028,000 1,426,000

A032 TOTAL COMMUNICATIONS 121,000 121,000 128,000

A03201 Postage and Telegraph 14,000 14,000 15,000

A03202 Telephone and Trunk call 107,000 107,000 113,000

A033 TOTAL UTILITIES 351,000 18,000 387,000

A03302 Water 17,000 17,000 19,000

A03303 Electricity 334,000 1,000 368,000

A038 TOTAL TRAVEL & 666,000 666,000 674,000

TRANSPORTATION

A03805 Travelling Allowance 159,000 159,000 167,000

A03807 P.O.L Charges A.planes 507,000 507,000 507,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 223,000 223,000 237,000

Page 88: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

87

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

MY0054 SUPERINTENDING ENGINEER (WORK &SERVICE) MATIARI

A03901 Stationery 15,000 15,000 16,000

A03902 Printing and Publication 9,000 9,000 10,000

A03905 Newspapers Periodicals and Books 9,000 9,000 10,000

A03906 Uniforms and Protective Clothing 8,000 8,000 9,000

A03970 Others 182,000 182,000 192,000

1 Others 182,000 182,000 192,000

A13 TOTAL REPAIRS AND MAINTENANCE 205,000 205,000 224,000

A130 TOTAL TRANSPORT 118,000 118,000 130,000

A13001 Transport 118,000 118,000 130,000

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

A13101 Machinery and Equipment 36,000 36,000 40,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

A137 TOTAL COMPUTER EQUIPMENT 18,000 18,000 19,000

A13701 Hardware 18,000 18,000 19,000

_______________________________________________________________________________SUPERINTENDING ENGINEER (WORK & 9,967,000 9,744,000 11,356,000

SERVICE) MATIARI

_______________________________________________________________________________

Page 89: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

88

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

NX0054 SUPERINTENDING ENGINEER (WORK &SERVICE) NOSHEROFEROZ

A01 TOTAL EMPLOYEES RELATED EXPENSES. 10,808,000 11,321,000 12,945,000

A011 TOTAL PAY 15 15 6,830,000 7,518,000 8,272,000

A011-1 TOTAL PAY OF OFFICERS 4 6 3,191,000 3,828,000 4,212,000

A01101 Total Basic Pay Of Officer 4 6 3,116,000 3,695,000 4,065,000

E076 EXECUTIVE DISTRICT (BPS-19) 1 1 1,220,000 1,159,000 1,275,000 OFFICER

C150 COMPUTER PROGRAMMER (BPS-17) 1 1 632,000 597,000 656,000

D262 DEPUTY DISTRICT OFFICER (BPS-17) 1 1 632,000 597,000 657,000

I041 INVESTIGATOR (BPS-17) 1 1 632,000 597,000 657,000

A119 ASSISTANT (BPS-16) 2 745,000 820,000

A01102 Personal pay 75,000 133,000 147,000

A011-2 TOTAL PAY OF OTHER STAFF 11 9 3,639,000 3,690,000 4,060,000

A01151 Total Basic Pay Other Staff 11 9 3,625,000 3,659,000 4,025,000

A119 ASSISTANT (BPS-14) 2 1,017,000

J053 JUNIOR CLERK (BPS-11) 1 477,000 525,000

A017 ACCOUNT CLERK (BPS-09) 3 3 789,000 1,342,000 1,475,000

J014 JR CLERK (BPS-07) 1 738,000

D161 DRIVER (BPS-05) 1 1 229,000 390,000 429,000

T073 TRESSOR (BPS-05) 1 1 229,000 390,000 429,000

C089 CHOWKIDAR (BPS-02) 1 1 208,000 353,000 389,000

N003 NAIB QASID (BPS-02) 2 2 415,000 707,000 778,000

A01152 Personal pay 14,000 31,000 35,000

A012 TOTAL ALLOWANCES 3,978,000 3,803,000 4,673,000

A012-1 TOTAL REGULAR ALLOWANCES 3,978,000 3,803,000 4,673,000

Page 90: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

89

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

NX0054 SUPERINTENDING ENGINEER (WORK &SERVICE) NOSHEROFEROZ

A01202 House Rent Allowance 379,000 420,000 420,000

A01203 Conveyance Allowance 630,000 737,000 737,000

A01207 Washing Allowance 2,000 2,000 2,000

A01209 Special Additional Allowance 4,000

A0120X Ad - hoc Allowance - 2010 1,169,000 1,180,000 1,180,000

A01217 Medical Allowance 443,000 455,000 455,000

A0121T Adhoc Relief Allowance 2013 105,000 105,000

A01224 Entertainment Allowance 7,000 7,000 7,000

A0122C Adhoc Relief Allowance - 2015 674,000 149,000 149,000

A0122M Adhoc Relief Allowance 2016 744,000 809,000

A01270 Others 674,000 809,000

A03 TOTAL OPERATING EXPENSES 1,122,000 968,000 1,178,000

A032 TOTAL COMMUNICATIONS 153,000 153,000 162,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 134,000 134,000 141,000

A03205 Courier and Pilot Service 10,000 10,000 11,000

A033 TOTAL UTILITIES 206,000 52,000 227,000

A03303 Electricity 206,000 52,000 227,000

A034 TOTAL OCCUPANCY COSTS 8,000 8,000 8,000

A03407 Rates and Taxes 8,000 8,000 8,000

A038 TOTAL TRAVEL & 595,000 595,000 611,000

TRANSPORTATION

A03805 Travelling Allowance 317,000 317,000 333,000

A03807 P.O.L Charges A.planes 278,000 278,000 278,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 160,000 160,000 170,000

Page 91: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

90

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

NX0054 SUPERINTENDING ENGINEER (WORK &SERVICE) NOSHEROFEROZ

A03901 Stationery 59,000 59,000 62,000

A03902 Printing and Publication 24,000 24,000 26,000

A03905 Newspapers Periodicals and Books 15,000 15,000 16,000

A03970 Others 62,000 62,000 66,000

1 Others 62,000 62,000 66,000

A13 TOTAL REPAIRS AND MAINTENANCE 192,000 192,000 209,000

A130 TOTAL TRANSPORT 74,000 74,000 82,000

A13001 Transport 74,000 74,000 82,000

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

A13101 Machinery and Equipment 36,000 36,000 40,000

A132 TOTAL FURNITURE AND 60,000 60,000 63,000

FIXTURE

A13201 Furniture and Fixture 60,000 60,000 63,000

A137 TOTAL COMPUTER EQUIPMENT 22,000 22,000 24,000

A13701 Hardware 22,000 22,000 24,000

_______________________________________________________________________________SUPERINTENDING ENGINEER (WORK & 12,122,000 12,481,000 14,332,000

SERVICE) NOSHEROFEROZ

_______________________________________________________________________________

Page 92: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

91

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

QS0052 SUPERINTENDING ENGINEER (WORK &SERVICE) SHAHDADKOT

A01 TOTAL EMPLOYEES RELATED EXPENSES. 6,764,000 7,156,000 8,120,000

A011 TOTAL PAY 18 18 3,882,000 4,428,000 4,872,000

A011-1 TOTAL PAY OF OFFICERS 4 5 1,577,000 1,580,000 1,739,000

A01101 Total Basic Pay Of Officer 4 5 1,507,000 1,472,000 1,620,000

E076 EXECUTIVE DISTRICT (BPS-19) 1 1 640,000 513,000 565,000 OFFICER

D262 DEPUTY DISTRICT OFFICER (BPS-17) 1 1 331,000 264,000 291,000

R045 RESEARCH OFFICER (BPS-17) 1 1 330,000 265,000 291,000

S236 SUPERINTENDENT (BPS-17) 1 265,000 291,000

A119 ASSISTANT (BPS-16) 1 165,000 182,000

S236 SUPERINTENDENT (BPS-16) 1 206,000

A01102 Personal pay 70,000 108,000 119,000

A011-2 TOTAL PAY OF OTHER STAFF 14 13 2,305,000 2,848,000 3,133,000

A01151 Total Basic Pay Other Staff 14 13 2,305,000 2,848,000 3,133,000

A119 ASSISTANT (BPS-14) 1 562,000

S181 STENOGRAPHER (BPS-14) 1 1 187,000 297,000 326,000

J053 JUNIOR CLERK (BPS-11) 3 735,000 809,000

D230 DRAFTSMAN (BPS-10) 1 1 150,000 237,000 261,000

A017 ACCOUNT CLERK (BPS-09) 2 2 289,000 459,000 505,000

J014 JR CLERK (BPS-07) 3 409,000

T047 TRACER (BPS-05) 1 1 127,000 200,000 220,000

J003 JEEP DRIVER (BPS-04) 1 1 122,000 193,000 212,000

C089 CHOWKIDAR (BPS-02) 1 1 114,000 182,000 200,000

D003 DAFTARI (BPS-02) 1 1 114,000 182,000 200,000

N003 NAIB QASID (BPS-02) 2 2 231,000 363,000 400,000

Page 93: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

92

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

QS0052 SUPERINTENDING ENGINEER (WORK &SERVICE) SHAHDADKOT

A012 TOTAL ALLOWANCES 2,882,000 2,728,000 3,248,000

A012-1 TOTAL REGULAR ALLOWANCES 2,627,000 2,473,000 2,980,000

A01202 House Rent Allowance 284,000 284,000 284,000

A01203 Conveyance Allowance 495,000 507,000 507,000

A0120X Ad - hoc Allowance - 2010 710,000 685,000 685,000

A01217 Medical Allowance 380,000 380,000 380,000

A0121T Adhoc Relief Allowance 2013 85,000 85,000

A0122C Adhoc Relief Allowance - 2015 379,000 89,000 89,000

A0122M Adhoc Relief Allowance 2016 443,000 475,000

A01270 Others 379,000 475,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 255,000 255,000 268,000

A01274 Medical Charges 255,000 255,000 268,000

A03 TOTAL OPERATING EXPENSES 2,807,000 2,788,000 2,900,000

A032 TOTAL COMMUNICATIONS 61,000 61,000 65,000

A03201 Postage and Telegraph 21,000 21,000 23,000

A03202 Telephone and Trunk call 40,000 40,000 42,000

A033 TOTAL UTILITIES 20,000 1,000 22,000

A03303 Electricity 20,000 1,000 22,000

A038 TOTAL TRAVEL & 1,836,000 1,836,000 1,876,000

TRANSPORTATION

A03805 Travelling Allowance 792,000 792,000 832,000

A03807 P.O.L Charges A.planes 1,044,000 1,044,000 1,044,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 890,000 890,000 937,000

A03901 Stationery 365,000 365,000 384,000

Page 94: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

93

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

QS0052 SUPERINTENDING ENGINEER (WORK &SERVICE) SHAHDADKOT

A03902 Printing and Publication 146,000 146,000 154,000

A03905 Newspapers Periodicals and Books 74,000 74,000 78,000

A03970 Others 305,000 305,000 321,000

1 Others 305,000 305,000 321,000

A13 TOTAL REPAIRS AND MAINTENANCE 713,000 713,000 779,000

A130 TOTAL TRANSPORT 435,000 435,000 479,000

A13001 Transport 435,000 435,000 479,000

A131 TOTAL MACHINERY AND 146,000 146,000 161,000

EQUIPMENT

A13101 Machinery and Equipment 146,000 146,000 161,000

A132 TOTAL FURNITURE AND 132,000 132,000 139,000

FIXTURE

A13201 Furniture and Fixture 132,000 132,000 139,000

_______________________________________________________________________________SUPERINTENDING ENGINEER (WORK & 10,284,000 10,657,000 11,799,000

SERVICE) SHAHDADKOT

_______________________________________________________________________________

Page 95: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

94

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

SB0089 SUPERINTENDING ENGINEER (WORK &SERVICE) BENAZIRABAD

A01 TOTAL EMPLOYEES RELATED EXPENSES. 12,538,000 12,763,000 14,639,000

A011 TOTAL PAY 30 30 7,638,000 8,392,000 9,234,000

A011-1 TOTAL PAY OF OFFICERS 4 6 2,841,000 3,440,000 3,785,000

A01101 Total Basic Pay Of Officer 4 6 2,775,000 3,332,000 3,666,000

E076 EXECUTIVE DISTRICT (BPS-19) 1 1 1,179,000 1,045,000 1,150,000 OFFICER

A218 ASSISTANT ENGINEER (BPS-17) 1 1 608,000 539,000 593,000

R045 RESEARCH OFFICER (BPS-17) 1 1 608,000 538,000 592,000

S236 SUPERINTENDENT (BPS-17) 1 538,000 592,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 2 672,000 739,000

S236 SUPERINTENDENT (BPS-16) 1 380,000

A01102 Personal pay 66,000 108,000 119,000

A011-2 TOTAL PAY OF OTHER STAFF 26 24 4,797,000 4,952,000 5,449,000

A01151 Total Basic Pay Other Staff 26 24 4,794,000 4,941,000 5,436,000

S053 SENIOR CLERK (BPS-14) 2 458,000 504,000

S181 STENOGRAPHER (BPS-14) 1 1 254,000 277,000 305,000

H035 HEAD DRAFTSMAN (BPS-13) 1 1 237,000 260,000 286,000

A129 ASSISTANT / HEAD CLERK (BPS-11) 2 417,000

C146 COMPUTER OPERATOR (BPS-11) 1 1 208,000 229,000 252,000

D230 DRAFTSMAN (BPS-11) 2 2 416,000 458,000 504,000

J053 JUNIOR CLERK (BPS-11) 4 916,000 1,008,000

A017 ACCOUNT CLERK (BPS-09) 2 2 392,000 430,000 471,000

S053 SENIOR CLERK (BPS-09) 2 392,000

J014 JR CLERK (BPS-07) 4 734,000

T001 TRACER (BPS-05) 2 2 341,000 374,000 412,000

Page 96: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

95

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

SB0089 SUPERINTENDING ENGINEER (WORK &SERVICE) BENAZIRABAD

D161 DRIVER (BPS-04) 1 1 164,000 180,000 199,000

C089 CHOWKIDAR (BPS-02) 1 1 154,000 170,000 187,000

D003 DAFTARI (BPS-02) 1 1 154,000 170,000 187,000

M022 MALI (BPS-02) 1 1 154,000 170,000 187,000

N003 NAIB QASID (BPS-02) 4 4 623,000 679,000 747,000

S008 SANITARY WORKER (BPS-02) 1 1 154,000 170,000 187,000

A01152 Personal pay 3,000 11,000 13,000

A012 TOTAL ALLOWANCES 4,900,000 4,371,000 5,405,000

A012-1 TOTAL REGULAR ALLOWANCES 4,900,000 4,371,000 5,405,000

A01202 House Rent Allowance 433,000 472,000 472,000

A01203 Conveyance Allowance 813,000 813,000 813,000

A01207 Washing Allowance 4,000 4,000 4,000

A0120D Integrated Allowance 12,000 13,000 13,000

A0120X Ad - hoc Allowance - 2010 1,487,000 1,322,000 1,322,000

A01217 Medical Allowance 634,000 634,000 634,000

A0121T Adhoc Relief Allowance 2013 165,000 165,000

A0121Z Adhoc Relief Allowance - 2014 10,000

A01224 Entertainment Allowance 3,000 7,000 7,000

A0122C Adhoc Relief Allowance - 2015 757,000 155,000 155,000

A0122M Adhoc Relief Allowance 2016 770,000 910,000

A01244 Adhoc Relief 6,000

A01270 Others 757,000 910,000

A03 TOTAL OPERATING EXPENSES 1,578,000 1,162,000 1,669,000

A032 TOTAL COMMUNICATIONS 222,000 222,000 235,000

A03201 Postage and Telegraph 11,000 11,000 12,000

A03202 Telephone and Trunk call 184,000 184,000 194,000

A03205 Courier and Pilot Service 27,000 27,000 29,000

A033 TOTAL UTILITIES 592,000 176,000 652,000

Page 97: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

96

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

SB0089 SUPERINTENDING ENGINEER (WORK &SERVICE) BENAZIRABAD

A03301 Gas 9,000 9,000 10,000

A03303 Electricity 583,000 167,000 642,000

A034 TOTAL OCCUPANCY COSTS 8,000 8,000 8,000

A03407 Rates and Taxes 8,000 8,000 8,000

A038 TOTAL TRAVEL & 484,000 484,000 486,000

TRANSPORTATION

A03805 Travelling Allowance 32,000 32,000 34,000

A03807 P.O.L Charges A.planes 452,000 452,000 452,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 272,000 272,000 288,000

A03901 Stationery 110,000 110,000 116,000

A03902 Printing and Publication 31,000 31,000 33,000

A03905 Newspapers Periodicals and Books 10,000 10,000 11,000

A03970 Others 121,000 121,000 128,000

1 Others 121,000 121,000 128,000

A13 TOTAL REPAIRS AND MAINTENANCE 156,000 156,000 171,000

A130 TOTAL TRANSPORT 36,000 36,000 40,000

A13001 Transport 36,000 36,000 40,000

A131 TOTAL MACHINERY AND 87,000 87,000 96,000

EQUIPMENT

A13101 Machinery and Equipment 87,000 87,000 96,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

Page 98: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

97

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

SB0089 SUPERINTENDING ENGINEER (WORK &SERVICE) BENAZIRABAD

_______________________________________________________________________________SUPERINTENDING ENGINEER (WORK & 14,272,000 14,081,000 16,479,000

SERVICE) BENAZIRABAD

_______________________________________________________________________________

Page 99: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

98

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

SN0059 SUPERINTENDING ENGINEER (WORK &SERVICE) SANGHAR

A01 TOTAL EMPLOYEES RELATED EXPENSES. 10,029,000 7,437,000 8,420,000

A011 TOTAL PAY 15 15 6,286,000 4,704,000 5,176,000

A011-1 TOTAL PAY OF OFFICERS 3 6 2,657,000 2,710,000 2,982,000

A01101 Total Basic Pay Of Officer 3 6 2,543,000 2,552,000 2,808,000

E076 EXECUTIVE DISTRICT (BPS-19) 1 1 1,251,000 852,000 937,000 OFFICER

D262 DEPUTY DISTRICT OFFICER (BPS-17) 1 1 646,000 439,000 483,000

R045 RESEARCH OFFICER (BPS-17) 1 1 646,000 439,000 483,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 3 822,000 905,000

A01102 Personal pay 114,000 158,000 174,000

A011-2 TOTAL PAY OF OTHER STAFF 12 9 3,629,000 1,994,000 2,194,000

A01151 Total Basic Pay Other Staff 12 9 3,523,000 1,888,000 2,077,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 3 971,000

S181 STENOGRAPHER (BPS-14) 1 1 322,000 288,000 316,000

J053 JUNIOR CLERK (BPS-11) 1 238,000 261,000

A017 ACCOUNT CLERK (BPS-09) 2 2 500,000 446,000 490,000

J014 JR CLERK (BPS-07) 1 702,000

D161 DRIVER (BPS-05) 1 1 217,000 194,000 214,000

T047 TRACER (BPS-05) 1 1 217,000 194,000 214,000

C089 CHOWKIDAR (BPS-02) 1 1 198,000 176,000 194,000

N003 NAIB QASID (BPS-02) 2 2 396,000 352,000 388,000

A01152 Personal pay 106,000 106,000 117,000

A012 TOTAL ALLOWANCES 3,743,000 2,733,000 3,244,000

A012-1 TOTAL REGULAR ALLOWANCES 3,716,000 2,706,000 3,215,000

Page 100: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

99

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

SN0059 SUPERINTENDING ENGINEER (WORK &SERVICE) SANGHAR

A01202 House Rent Allowance 285,000 285,000 285,000

A01203 Conveyance Allowance 561,000 561,000 561,000

A01207 Washing Allowance 6,000 6,000 6,000

A0120D Integrated Allowance 3,000 4,000 4,000

A0120X Ad - hoc Allowance - 2010 1,156,000 734,000 734,000

A01217 Medical Allowance 491,000 491,000 491,000

A0121T Adhoc Relief Allowance 2013 62,000 62,000

A0122C Adhoc Relief Allowance - 2015 606,000 92,000 92,000

A0122M Adhoc Relief Allowance 2016 469,000 489,000

A01233 Unattractive Area Allowance 2,000 2,000 2,000

A01270 Others 606,000 489,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 27,000 27,000 29,000

A01274 Medical Charges 27,000 27,000 29,000

A03 TOTAL OPERATING EXPENSES 1,772,000 1,064,000 1,886,000

A032 TOTAL COMMUNICATIONS 209,000 209,000 220,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 200,000 200,000 210,000

A033 TOTAL UTILITIES 848,000 140,000 934,000

A03301 Gas 15,000 15,000 17,000

A03303 Electricity 833,000 125,000 917,000

A038 TOTAL TRAVEL & 576,000 576,000 584,000

TRANSPORTATION

A03805 Travelling Allowance 159,000 159,000 167,000

A03807 P.O.L Charges A.planes 417,000 417,000 417,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 139,000 139,000 148,000

Page 101: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

100

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

SN0059 SUPERINTENDING ENGINEER (WORK &SERVICE) SANGHAR

A03901 Stationery 31,000 31,000 33,000

A03902 Printing and Publication 9,000 9,000 10,000

A03905 Newspapers Periodicals and Books 31,000 31,000 33,000

A03970 Others 68,000 68,000 72,000

1 Others 68,000 68,000 72,000

A13 TOTAL REPAIRS AND MAINTENANCE 156,000 156,000 171,000

A130 TOTAL TRANSPORT 87,000 87,000 96,000

A13001 Transport 87,000 87,000 96,000

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

A13101 Machinery and Equipment 36,000 36,000 40,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

_______________________________________________________________________________SUPERINTENDING ENGINEER (WORK & 11,957,000 8,657,000 10,477,000

SERVICE) SANGHAR

_______________________________________________________________________________

Page 102: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

101

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

SQ0051 SUPERINTENDING ENGINEER (WORK &SERVICE) SHIKARPUR

A01 TOTAL EMPLOYEES RELATED EXPENSES. 9,629,000 7,227,000 8,141,000

A011 TOTAL PAY 14 14 5,800,000 4,135,000 4,549,000

A011-1 TOTAL PAY OF OFFICERS 3 5 2,831,000 1,918,000 2,110,000

A01101 Total Basic Pay Of Officer 3 5 2,759,000 1,810,000 1,991,000

E076 EXECUTIVE DISTRICT (BPS-19) 1 1 1,359,000 677,000 745,000 OFFICER

A218 ASSISTANT ENGINEER (BPS-17) 1 1 699,000 349,000 383,000

I043 INVESTIGATOR / RO (BPS-17) 1 1 701,000 349,000 384,000

A235 ASSISTANT HEAD CLERK (BPS-16) 2 435,000 479,000

A01102 Personal pay 72,000 108,000 119,000

A011-2 TOTAL PAY OF OTHER STAFF 11 9 2,969,000 2,217,000 2,439,000

A01151 Total Basic Pay Other Staff 11 9 2,962,000 2,210,000 2,431,000

A235 ASSISTANT HEAD CLERK (BPS-14) 2 816,000

S181 STENOGRAPHER (BPS-14) 1 1 272,000 338,000 372,000

J053 JUNIOR CLERK (BPS-11) 1 279,000 307,000

A017 ACCOUNT CLERK (BPS-09) 2 2 422,000 524,000 576,000

J014 JR CLERK (BPS-07) 1 592,000

T047 TRACER (BPS-05) 1 1 183,000 228,000 251,000

D161 DRIVER (BPS-04) 1 1 176,000 220,000 242,000

C089 CHOWKIDAR (BPS-02) 1 1 167,000 207,000 228,000

N003 NAIB QASID (BPS-02) 2 2 334,000 414,000 455,000

A01152 Personal pay 7,000 7,000 8,000

A012 TOTAL ALLOWANCES 3,829,000 3,092,000 3,592,000

A012-1 TOTAL REGULAR ALLOWANCES 3,266,000 2,529,000 3,000,000

Page 103: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

102

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

SQ0051 SUPERINTENDING ENGINEER (WORK &SERVICE) SHIKARPUR

A01202 House Rent Allowance 317,000 317,000 317,000

A01203 Conveyance Allowance 567,000 567,000 567,000

A01207 Washing Allowance 4,000 4,000 4,000

A0120D Integrated Allowance 3,000 3,000 3,000

A0120X Ad - hoc Allowance - 2010 909,000 679,000 679,000

A01217 Medical Allowance 398,000 398,000 398,000

A0121T Adhoc Relief Allowance 2013 67,000 67,000

A0122C Adhoc Relief Allowance - 2015 534,000 81,000 81,000

A0122M Adhoc Relief Allowance 2016 413,000 442,000

A01270 Others 534,000 442,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 563,000 563,000 592,000

A01274 Medical Charges 563,000 563,000 592,000

A03 TOTAL OPERATING EXPENSES 2,355,000 1,313,000 2,507,000

A032 TOTAL COMMUNICATIONS 214,000 214,000 225,000

A03201 Postage and Telegraph 14,000 14,000 15,000

A03202 Telephone and Trunk call 200,000 200,000 210,000

A033 TOTAL UTILITIES 1,043,000 1,000 1,148,000

A03303 Electricity 1,043,000 1,000 1,148,000

A038 TOTAL TRAVEL & 734,000 734,000 750,000

TRANSPORTATION

A03805 Travelling Allowance 317,000 317,000 333,000

A03807 P.O.L Charges A.planes 417,000 417,000 417,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 364,000 364,000 384,000

A03901 Stationery 74,000 74,000 78,000

A03902 Printing and Publication 74,000 74,000 78,000

Page 104: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

103

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

SQ0051 SUPERINTENDING ENGINEER (WORK &SERVICE) SHIKARPUR

A03905 Newspapers Periodicals and Books 37,000 37,000 39,000

A03955 Computer Stationery 58,000 58,000 61,000

A03970 Others 121,000 121,000 128,000

1 Others 121,000 121,000 128,000

A13 TOTAL REPAIRS AND MAINTENANCE 350,000 350,000 382,000

A130 TOTAL TRANSPORT 183,000 183,000 202,000

A13001 Transport 183,000 183,000 202,000

A131 TOTAL MACHINERY AND 87,000 87,000 96,000

EQUIPMENT

A13101 Machinery and Equipment 87,000 87,000 96,000

A132 TOTAL FURNITURE AND 80,000 80,000 84,000

FIXTURE

A13201 Furniture and Fixture 80,000 80,000 84,000

_______________________________________________________________________________SUPERINTENDING ENGINEER (WORK & 12,334,000 8,890,000 11,030,000

SERVICE) SHIKARPUR

_______________________________________________________________________________

Page 105: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

104

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

SY0115 SUPERINTENDING ENGINEER (WORK &SERVICE) SUKKUR

A01 TOTAL EMPLOYEES RELATED EXPENSES. 12,953,000 11,590,000 13,110,000

A011 TOTAL PAY 28 28 7,770,000 7,164,000 7,882,000

A011-1 TOTAL PAY OF OFFICERS 4 6 2,818,000 1,781,000 1,960,000

A01101 Total Basic Pay Of Officer 4 6 2,732,000 1,648,000 1,813,000

E076 EXECUTIVE DISTRICT (BPS-19) 1 1 1,161,000 517,000 568,000 OFFICER

A221 ASSISTANT ENGINEERS (BPS-17) 1 1 598,000 267,000 293,000

I042 INVESTIGATOR / RESEARCH (BPS-17) 1 1 598,000 266,000 293,000 OFFICER

S236 SUPERINTENDENT (BPS-17) 1 266,000 293,000

A119 ASSISTANT (BPS-16) 2 332,000 366,000

S236 SUPERINTENDENT (BPS-16) 1 375,000

A01102 Personal pay 86,000 133,000 147,000

A011-2 TOTAL PAY OF OTHER STAFF 24 22 4,952,000 5,383,000 5,922,000

A01151 Total Basic Pay Other Staff 24 22 4,928,000 5,346,000 5,881,000

A119 ASSISTANT (BPS-14) 2 551,000

S053 SENIOR CLERK (BPS-14) 2 541,000 595,000

S181 STENOGRAPHER (BPS-14) 1 1 277,000 327,000 360,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 257,000 307,000 338,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 4 1,082,000 1,190,000

D150 DRAUGHTSMAN (BPS-10) 2 2 443,000 524,000 576,000

A017 ACCOUNT CLERK (BPS-09) 2 2 429,000 508,000 560,000

S053 SENIOR CLERK (BPS-09) 2 429,000

J014 JR CLERK (BPS-07) 4 801,000

T050 TRACER (BPS-05) 2 2 372,000 442,000 486,000

Page 106: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

105

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

SY0115 SUPERINTENDING ENGINEER (WORK &SERVICE) SUKKUR

D161 DRIVER (BPS-04) 1 1 180,000 213,000 234,000

D003 DAFTARI (BPS-02) 1 1 169,000 200,000 220,000

N003 NAIB QASID (BPS-02) 4 4 682,000 802,000 882,000

S008 SANITARY WORKER (BPS-02) 1 1 169,000 200,000 220,000

W014 WATCHMEN (BPS-02) 1 1 169,000 200,000 220,000

A01152 Personal pay 24,000 37,000 41,000

A012 TOTAL ALLOWANCES 5,183,000 4,426,000 5,228,000

A012-1 TOTAL REGULAR ALLOWANCES 5,183,000 4,426,000 5,228,000

A01202 House Rent Allowance 740,000 740,000 740,000

A01203 Conveyance Allowance 801,000 801,000 801,000

A01207 Washing Allowance 6,000 6,000 6,000

A0120D Integrated Allowance 11,000 15,000 15,000

A0120N Special allowances @ 20% of 30,000 30,000

basic pay for Secretar

A0120X Ad - hoc Allowance - 2010 1,433,000 1,152,000 1,152,000

A01217 Medical Allowance 660,000 660,000 660,000

A0121A Ad - hoc Allowance - 2011 12,000

A0121T Adhoc Relief Allowance 2013 160,000 160,000

A0122C Adhoc Relief Allowance - 2015 766,000 126,000 126,000

A0122M Adhoc Relief Allowance 2016 705,000 769,000

A01270 Others 766,000 19,000 769,000

A03 TOTAL OPERATING EXPENSES 844,000 345,000 913,000

A032 TOTAL COMMUNICATIONS 116,000 116,000 123,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 107,000 107,000 113,000

A033 TOTAL UTILITIES 500,000 1,000 550,000

A03303 Electricity 500,000 1,000 550,000

Page 107: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

106

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

SY0115 SUPERINTENDING ENGINEER (WORK &SERVICE) SUKKUR

A034 TOTAL OCCUPANCY COSTS 8,000 8,000 8,000

A03407 Rates and Taxes 8,000 8,000 8,000

A038 TOTAL TRAVEL & 113,000 113,000 118,000

TRANSPORTATION

A03805 Travelling Allowance 84,000 84,000 89,000

A03807 P.O.L Charges A.planes 29,000 29,000 29,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 107,000 107,000 114,000

A03901 Stationery 37,000 37,000 39,000

A03902 Printing and Publication 9,000 9,000 10,000

A03905 Newspapers Periodicals and Books 9,000 9,000 10,000

A03906 Uniforms and Protective Clothing 15,000 15,000 16,000

A03970 Others 37,000 37,000 39,000

1 Others 37,000 37,000 39,000

A13 TOTAL REPAIRS AND MAINTENANCE 87,000 87,000 95,000

A130 TOTAL TRANSPORT 18,000 18,000 20,000

A13001 Transport 18,000 18,000 20,000

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

A13101 Machinery and Equipment 36,000 36,000 40,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

Page 108: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

107

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

SY0115 SUPERINTENDING ENGINEER (WORK &SERVICE) SUKKUR

_______________________________________________________________________________SUPERINTENDING ENGINEER (WORK & 13,884,000 12,022,000 14,118,000

SERVICE) SUKKUR

_______________________________________________________________________________

Page 109: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

108

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

TN0047 SUPERINTENDING ENGINEER (WORK &SERVICE) TANDO MUHAMMAD KHAN

A01 TOTAL EMPLOYEES RELATED EXPENSES. 11,541,000 9,400,000 10,634,000

A011 TOTAL PAY 20 20 6,758,000 5,563,000 6,120,000

A011-1 TOTAL PAY OF OFFICERS 5 8 3,399,000 2,010,000 2,211,000

A01101 Total Basic Pay Of Officer 5 8 3,399,000 2,010,000 2,211,000

E076 EXECUTIVE DISTRICT (BPS-19) 1 1 1,269,000 524,000 577,000 OFFICER

R041 RESEARCH ASSISTANT / R (BPS-17) 1 1 657,000 270,000 297,000 OFFICER

R045 RESEARCH OFFICER (BPS-17) 1 1 657,000 270,000 297,000

S236 SUPERINTENDENT (BPS-17) 1 270,000 297,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 3 506,000 557,000

C101 CIRCLE HEAD DRAFTSMEN (BPS-16) 1 1 408,000 170,000 186,000

S236 SUPERINTENDENT (BPS-16) 1 408,000

A011-2 TOTAL PAY OF OTHER STAFF 15 12 3,359,000 3,553,000 3,909,000

A01151 Total Basic Pay Other Staff 15 12 3,333,000 3,527,000 3,880,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 3 800,000

S181 STENOGRAPHER (BPS-14) 1 1 266,000 393,000 432,000

A029 ACCOUNTS CLERK / CASHIER (BPS-11) 1 1 440,000 325,000 357,000

J053 JUNIOR CLERK (BPS-11) 3 974,000 1,072,000

D230 DRAFTSMAN (BPS-10) 1 1 213,000 315,000 346,000

J014 JR CLERK (BPS-07) 3 581,000

T001 TRACER (BPS-07) 1 1 193,000 285,000 313,000

D161 DRIVER (BPS-05) 1 1 180,000 265,000 292,000

D003 DAFTARI (BPS-03) 1 1 168,000 248,000 273,000

C089 CHOWKIDAR (BPS-02) 1 1 163,000 241,000 265,000

Page 110: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

109

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

TN0047 SUPERINTENDING ENGINEER (WORK &SERVICE) TANDO MUHAMMAD KHAN

N003 NAIB QASID (BPS-02) 2 2 329,000 481,000 530,000

A01152 Personal pay 26,000 26,000 29,000

A012 TOTAL ALLOWANCES 4,783,000 3,837,000 4,514,000

A012-1 TOTAL REGULAR ALLOWANCES 4,528,000 3,582,000 4,246,000

A01202 House Rent Allowance 517,000 517,000 517,000

A01203 Conveyance Allowance 710,000 710,000 710,000

A01207 Washing Allowance 2,000 2,000 2,000

A0120D Integrated Allowance 12,000 14,000 14,000

A0120X Ad - hoc Allowance - 2010 1,257,000 889,000 889,000

A01217 Medical Allowance 684,000 684,000 684,000

A0121T Adhoc Relief Allowance 2013 106,000 106,000

A0122C Adhoc Relief Allowance - 2015 673,000 106,000 106,000

A0122M Adhoc Relief Allowance 2016 554,000 609,000

A01270 Others 673,000 609,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 255,000 255,000 268,000

A01274 Medical Charges 255,000 255,000 268,000

A03 TOTAL OPERATING EXPENSES 589,000 465,000 620,000

A032 TOTAL COMMUNICATIONS 80,000 80,000 84,000

A03202 Telephone and Trunk call 80,000 80,000 84,000

A033 TOTAL UTILITIES 125,000 1,000 138,000

A03303 Electricity 125,000 1,000 138,000

A038 TOTAL TRAVEL & 233,000 233,000 237,000

TRANSPORTATION

A03805 Travelling Allowance 79,000 79,000 83,000

A03807 P.O.L Charges A.planes 154,000 154,000 154,000

H.coptors S.Cars M/Cycle

Page 111: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

110

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

TN0047 SUPERINTENDING ENGINEER (WORK &SERVICE) TANDO MUHAMMAD KHAN

A039 TOTAL GENERAL 151,000 151,000 161,000

A03902 Printing and Publication 9,000 9,000 10,000

A03905 Newspapers Periodicals and Books 9,000 9,000 10,000

A03955 Computer Stationery 12,000 12,000 13,000

A03970 Others 121,000 121,000 128,000

1 Others 121,000 121,000 128,000

A13 TOTAL REPAIRS AND MAINTENANCE 143,000 143,000 157,000

A130 TOTAL TRANSPORT 74,000 74,000 82,000

A13001 Transport 74,000 74,000 82,000

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

A13101 Machinery and Equipment 36,000 36,000 40,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

_______________________________________________________________________________SUPERINTENDING ENGINEER (WORK & 12,273,000 10,008,000 11,411,000

SERVICE) TANDO MUHAMMAD KHAN

_______________________________________________________________________________

Page 112: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

111

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

TQ0041 SUPERINTENDING ENGINEER (WORK &SERVICE) TANDO ALLAH YAR

A01 TOTAL EMPLOYEES RELATED EXPENSES. 9,162,000 8,861,000 10,164,000

A011 TOTAL PAY 20 20 5,413,000 5,619,000 6,182,000

A011-1 TOTAL PAY OF OFFICERS 4 7 2,458,000 2,448,000 2,693,000

A01101 Total Basic Pay Of Officer 4 7 2,458,000 2,448,000 2,693,000

E076 EXECUTIVE DISTRICT (BPS-19) 1 1 1,043,000 697,000 767,000 OFFICER

A218 ASSISTANT ENGINEER (BPS-17) 1 1 539,000 360,000 396,000

R045 RESEARCH OFFICER (BPS-17) 1 1 539,000 359,000 395,000

S236 SUPERINTENDENT (BPS-17) 1 359,000 395,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 3 673,000 740,000

S236 SUPERINTENDENT (BPS-16) 1 337,000

A011-2 TOTAL PAY OF OTHER STAFF 16 13 2,955,000 3,171,000 3,489,000

A01151 Total Basic Pay Other Staff 16 13 2,915,000 3,131,000 3,445,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 3 713,000

S181 STENOGRAPHER (BPS-14) 1 1 237,000 326,000 359,000

J053 JUNIOR CLERK (BPS-11) 3 808,000 889,000

D150 DRAUGHTSMAN (BPS-10) 1 1 190,000 261,000 287,000

A017 ACCOUNT CLERK (BPS-09) 2 2 367,000 505,000 556,000

J014 JR CLERK (BPS-07) 3 516,000

T001 TRACER (BPS-05) 1 1 161,000 220,000 242,000

D161 DRIVER (BPS-04) 1 1 153,000 212,000 233,000

C089 CHOWKIDAR (BPS-02) 1 1 144,000 200,000 220,000

D003 DAFTARI (BPS-02) 1 1 144,000 200,000 220,000

N003 NAIB QASID (BPS-02) 2 2 290,000 399,000 439,000

A01152 Personal pay 40,000 40,000 44,000

Page 113: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

112

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

TQ0041 SUPERINTENDING ENGINEER (WORK &SERVICE) TANDO ALLAH YAR

A012 TOTAL ALLOWANCES 3,749,000 3,242,000 3,982,000

A012-1 TOTAL REGULAR ALLOWANCES 3,709,000 3,202,000 3,940,000

A01202 House Rent Allowance 403,000 403,000 403,000

A01203 Conveyance Allowance 702,000 702,000 702,000

A01207 Washing Allowance 8,000 8,000 8,000

A0120D Integrated Allowance 4,000 4,000 4,000

A0120X Ad - hoc Allowance - 2010 1,034,000 882,000 882,000

A01217 Medical Allowance 484,000 484,000 484,000

A0121T Adhoc Relief Allowance 2013 123,000 123,000

A0121Z Adhoc Relief Allowance - 2014 30,000

A0122C Adhoc Relief Allowance - 2015 537,000 106,000 106,000

A0122M Adhoc Relief Allowance 2016 455,000 614,000

A01270 Others 537,000 5,000 614,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 40,000 40,000 42,000

A01274 Medical Charges 40,000 40,000 42,000

A03 TOTAL OPERATING EXPENSES 545,000 338,000 578,000

A032 TOTAL COMMUNICATIONS 76,000 76,000 81,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 67,000 67,000 71,000

A033 TOTAL UTILITIES 208,000 1,000 229,000

A03303 Electricity 208,000 1,000 229,000

A034 TOTAL OCCUPANCY COSTS 25,000 25,000 25,000

A03407 Rates and Taxes 25,000 25,000 25,000

Page 114: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

113

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

TQ0041 SUPERINTENDING ENGINEER (WORK &SERVICE) TANDO ALLAH YAR

A038 TOTAL TRAVEL & 179,000 179,000 181,000

TRANSPORTATION

A03805 Travelling Allowance 40,000 40,000 42,000

A03807 P.O.L Charges A.planes 139,000 139,000 139,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 57,000 57,000 62,000

A03901 Stationery 25,000 25,000 27,000

A03905 Newspapers Periodicals and Books 9,000 9,000 10,000

A03906 Uniforms and Protective Clothing 8,000 8,000 9,000

A03970 Others 15,000 15,000 16,000

1 Others 15,000 15,000 16,000

A13 TOTAL REPAIRS AND MAINTENANCE 134,000 134,000 148,000

A130 TOTAL TRANSPORT 74,000 74,000 82,000

A13001 Transport 74,000 74,000 82,000

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

A13101 Machinery and Equipment 36,000 36,000 40,000

A137 TOTAL COMPUTER EQUIPMENT 24,000 24,000 26,000

A13701 Hardware 24,000 24,000 26,000

_______________________________________________________________________________SUPERINTENDING ENGINEER (WORK & 9,841,000 9,333,000 10,890,000

SERVICE) TANDO ALLAH YAR

_______________________________________________________________________________

Page 115: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

114

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

TX0069 SUPERINTENDING ENGINEER (WORK &SERVICE) THATTA

A01 TOTAL EMPLOYEES RELATED EXPENSES. 14,320,000 16,073,000 18,302,000

A011 TOTAL PAY 41 41 8,297,000 9,916,000 10,908,000

A011-1 TOTAL PAY OF OFFICERS 5 7 2,128,000 2,606,000 2,867,000

A01101 Total Basic Pay Of Officer 5 7 2,128,000 2,606,000 2,867,000

S238 SUPERINTENDENT ENGINEER (BPS-19) 1 1 795,000 742,000 817,000

A219 ASSISTANT ENGINEER / (BPS-17) 1 1 411,000 383,000 420,000 ASSISTANT DIRECTOR

I042 INVESTIGATOR / RESEARCH (BPS-17) 1 1 411,000 382,000 421,000 OFFICER

S236 SUPERINTENDENT (BPS-17) 1 382,000 421,000

A235 ASSISTANT HEAD CLERK (BPS-16) 2 478,000 525,000

C222 CHIEF HEAD DRAFTSMAN (BPS-16) 1 1 255,000 239,000 263,000

S236 SUPERINTENDENT (BPS-16) 1 256,000

A011-2 TOTAL PAY OF OTHER STAFF 36 34 6,169,000 7,310,000 8,041,000

A01151 Total Basic Pay Other Staff 36 34 6,169,000 7,310,000 8,041,000

A235 ASSISTANT HEAD CLERK (BPS-14) 2 490,000

S053 SENIOR CLERK (BPS-14) 2 482,000 531,000

S181 STENOGRAPHER (BPS-14) 1 1 245,000 292,000 321,000

A134 ASSISTANT ACCOUNTS (BPS-13) 1 1 230,000 274,000 301,000 OFFICER

J053 JUNIOR CLERK (BPS-11) 11 2,653,000 2,918,000

D230 DRAFTSMAN (BPS-10) 2 2 391,000 467,000 514,000

A017 ACCOUNT CLERK (BPS-09) 2 2 377,000 453,000 497,000

S053 SENIOR CLERK (BPS-09) 2 377,000

J014 JR CLERK (BPS-05) 11 1,813,000

T050 TRACER (BPS-05) 2 2 331,000 394,000 434,000

Page 116: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

115

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

TX0069 SUPERINTENDING ENGINEER (WORK &SERVICE) THATTA

D161 DRIVER (BPS-04) 1 1 158,000 190,000 209,000

C215 CHOWKIDAR -CUM-NAIB QASID (BPS-01) 1 1 146,000 175,000 193,000

N021 NQ / CHOWKIDAR / MALHI / (BPS-01) 10 10 1,466,000 1,755,000 1,930,000 S WORKER

S008 SANITARY WORKER (BPS-01) 1 1 145,000 175,000 193,000

A012 TOTAL ALLOWANCES 6,023,000 6,157,000 7,394,000

A012-1 TOTAL REGULAR ALLOWANCES 5,638,000 5,772,000 6,989,000

A01202 House Rent Allowance 631,000 691,000 691,000

A01203 Conveyance Allowance 1,112,000 1,237,000 1,237,000

A01207 Washing Allowance 40,000 42,000 42,000

A0120X Ad - hoc Allowance - 2010 1,497,000 1,580,000 1,580,000

A01217 Medical Allowance 797,000 797,000 797,000

A0121T Adhoc Relief Allowance 2013 283,000 283,000

A01224 Entertainment Allowance 1,000 1,000 1,000

A0122C Adhoc Relief Allowance - 2015 780,000 176,000 176,000

A0122M Adhoc Relief Allowance 2016 962,000 1,091,000

A01244 Adhoc Relief 3,000

A01270 Others 780,000 1,091,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 385,000 385,000 405,000

A01274 Medical Charges 385,000 385,000 405,000

A03 TOTAL OPERATING EXPENSES 3,042,000 1,374,000 3,248,000

A032 TOTAL COMMUNICATIONS 129,000 129,000 136,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 120,000 120,000 126,000

A033 TOTAL UTILITIES 1,669,000 1,000 1,836,000

A03303 Electricity 1,669,000 1,000 1,836,000

Page 117: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

116

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

TX0069 SUPERINTENDING ENGINEER (WORK &SERVICE) THATTA

A034 TOTAL OCCUPANCY COSTS 13,000 13,000 13,000

A03407 Rates and Taxes 13,000 13,000 13,000

A038 TOTAL TRAVEL & 865,000 865,000 877,000

TRANSPORTATION

A03805 Travelling Allowance 238,000 238,000 250,000

A03807 P.O.L Charges A.planes 627,000 627,000 627,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 366,000 366,000 386,000

A03901 Stationery 59,000 59,000 62,000

A03902 Printing and Publication 37,000 37,000 39,000

A03905 Newspapers Periodicals and Books 27,000 27,000 29,000

A03970 Others 243,000 243,000 256,000

1 Others 243,000 243,000 256,000

A13 TOTAL REPAIRS AND MAINTENANCE 370,000 370,000 407,000

A130 TOTAL TRANSPORT 292,000 292,000 322,000

A13001 Transport 292,000 292,000 322,000

A131 TOTAL MACHINERY AND 45,000 45,000 50,000

EQUIPMENT

A13101 Machinery and Equipment 45,000 45,000 50,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

Page 118: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

117

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

TX0069 SUPERINTENDING ENGINEER (WORK &SERVICE) THATTA

_______________________________________________________________________________SUPERINTENDING ENGINEER (WORK & 17,732,000 17,817,000 21,957,000

SERVICE) THATTA

_______________________________________________________________________________

Page 119: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

118

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

UT0048 SUPERINTENDING ENGINEER (WORK &SERVICE) UMERKOT

A01 TOTAL EMPLOYEES RELATED EXPENSES. 8,519,000 9,441,000 10,761,000

A011 TOTAL PAY 17 17 4,932,000 5,855,000 6,442,000

A011-1 TOTAL PAY OF OFFICERS 4 7 2,206,000 2,712,000 2,984,000

A01101 Total Basic Pay Of Officer 4 7 2,134,000 2,608,000 2,869,000

E076 EXECUTIVE DISTRICT (BPS-19) 1 1 907,000 786,000 865,000 OFFICER

A131 ASSISTANT ENGINEER (BPS-17) 1 1 466,000 405,000 445,000

R045 RESEARCH OFFICER (BPS-17) 1 1 468,000 405,000 446,000

A119 ASSISTANT (BPS-16) 3 759,000 835,000

A134 ASSISTANT ACCOUNTS (BPS-16) 1 1 293,000 253,000 278,000 OFFICER

A01102 Personal pay 72,000 104,000 115,000

A011-2 TOTAL PAY OF OTHER STAFF 13 10 2,726,000 3,143,000 3,458,000

A01151 Total Basic Pay Other Staff 13 10 2,715,000 3,128,000 3,441,000

A119 ASSISTANT (BPS-14) 3 774,000

J053 JUNIOR CLERK (BPS-11) 3 1,079,000 1,187,000

D230 DRAFTSMAN (BPS-10) 1 1 208,000 348,000 383,000

A017 ACCOUNT CLERK (BPS-09) 1 1 398,000 338,000 372,000

J014 JR CLERK (BPS-05) 3 523,000

T001 TRACER (BPS-05) 1 1 174,000 294,000 323,000

D161 DRIVER (BPS-04) 1 1 167,000 283,000 312,000

C089 CHOWKIDAR (BPS-01) 1 1 156,000 262,000 288,000

N003 NAIB QASID (BPS-01) 2 2 315,000 524,000 576,000

A01152 Personal pay 11,000 15,000 17,000

Page 120: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

119

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

UT0048 SUPERINTENDING ENGINEER (WORK &SERVICE) UMERKOT

A012 TOTAL ALLOWANCES 3,587,000 3,586,000 4,319,000

A012-1 TOTAL REGULAR ALLOWANCES 3,290,000 3,289,000 4,007,000

A01202 House Rent Allowance 350,000 350,000 350,000

A01203 Conveyance Allowance 513,000 616,000 616,000

A0120D Integrated Allowance 4,000 4,000 4,000

A0120X Ad - hoc Allowance - 2010 989,000 864,000 864,000

A01217 Medical Allowance 448,000 448,000 448,000

A0121T Adhoc Relief Allowance 2013 75,000 75,000

A0121Z Adhoc Relief Allowance - 2014 8,000

A0122C Adhoc Relief Allowance - 2015 485,000 143,000 143,000

A0122M Adhoc Relief Allowance 2016 515,000 631,000

A01233 Unattractive Area Allowance 15,000 232,000 232,000

A01238 Charge Allowance 1,000 13,000 13,000

A01244 Adhoc Relief 21,000

A01270 Others 485,000 631,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 297,000 297,000 312,000

A01274 Medical Charges 297,000 297,000 312,000

A03 TOTAL OPERATING EXPENSES 982,000 982,000 1,009,000

A032 TOTAL COMMUNICATIONS 64,000 64,000 68,000

A03201 Postage and Telegraph 18,000 18,000 19,000

A03202 Telephone and Trunk call 46,000 46,000 49,000

A038 TOTAL TRAVEL & 526,000 526,000 528,000

TRANSPORTATION

A03805 Travelling Allowance 25,000 25,000 27,000

A03807 P.O.L Charges A.planes 501,000 501,000 501,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 392,000 392,000 413,000

Page 121: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

120

SC21132 (132)Works & Services

_______________________________________________________________________________ 045101 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0451 ADMINISTRATION045101 ADMINISTRATION

UT0048 SUPERINTENDING ENGINEER (WORK &SERVICE) UMERKOT

A03901 Stationery 24,000 24,000 26,000

A03905 Newspapers Periodicals and Books 19,000 19,000 20,000

A03955 Computer Stationery 116,000 116,000 122,000

A03970 Others 233,000 233,000 245,000

1 Others 233,000 233,000 245,000

A13 TOTAL REPAIRS AND MAINTENANCE 125,000 125,000 138,000

A131 TOTAL MACHINERY AND 125,000 125,000 138,000

EQUIPMENT

A13101 Machinery and Equipment 125,000 125,000 138,000

_______________________________________________________________________________SUPERINTENDING ENGINEER (WORK & 9,626,000 10,548,000 11,908,000

SERVICE) UMERKOT

_______________________________________________________________________________

Page 122: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

121

SC21132 (132)Works & Services

_______________________________________________________________________________ 045201 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045201 ADMINISTRATION

HB0205 CHIEF ENGINEER (HIGHWAYS) SINDHHYDERABAD

A01 TOTAL EMPLOYEES RELATED EXPENSES. 51,069,000 48,636,000 55,407,000

A011 TOTAL PAY 91 91 30,625,000 30,928,000 34,023,000

A011-1 TOTAL PAY OF OFFICERS 15 29 10,751,000 9,614,000 10,577,000

A01101 Total Basic Pay Of Officer 15 29 10,579,000 9,442,000 10,387,000

C061 CHIEF ENGINEER (BPS-20) 1 1 1,482,000 829,000 912,000

S242 SUPERINTENDING ENGINEER /(BPS-19) 1 1 1,277,000 713,000 785,000 DIRECTOR

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 825,000 461,000 507,000

R076 ROAD ASSET MANAGER (BPS-18) 1 1 825,000 461,000 507,000

A066 ADMINISTRATIVE OFFICER (BPS-17) 1 1 660,000 367,000 405,000

A218 ASSISTANT ENGINEER (BPS-17) 3 3 2,632,000 1,103,000 1,213,000

S236 SUPERINTENDENT (BPS-17) 5 1,838,000 2,021,000

A235 ASSISTANT HEAD CLERK (BPS-16) 14 3,212,000 3,533,000

C080 CHIEF SENIOR / CIRCLE (BPS-16) 1 1 409,000 229,000 252,000 HEAD DRAFTSMAN

C150 COMPUTER PROGRAMMER (BPS-16) 1 1 410,000 229,000 252,000

S236 SUPERINTENDENT (BPS-16) 5 2,059,000

A01102 Personal pay 172,000 172,000 190,000

A011-2 TOTAL PAY OF OTHER STAFF 76 62 19,874,000 21,314,000 23,446,000

A01151 Total Basic Pay Other Staff 76 62 19,859,000 21,207,000 23,328,000

M049 MECHANIC (BPS-15) 4 4 1,296,000 1,851,000 2,036,000

W065 WORK SHOP FORMAN (BPS-15) 3 3 971,000 1,388,000 1,527,000

A235 ASSISTANT HEAD CLERK (BPS-14) 14 4,266,000

S053 SENIOR CLERK (BPS-14) 5 1,800,000 1,980,000

S181 STENOGRAPHER (BPS-14) 3 3 801,000 1,307,000 1,438,000

Page 123: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

122

SC21132 (132)Works & Services

_______________________________________________________________________________ 045201 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045201 ADMINISTRATION

HB0205 CHIEF ENGINEER (HIGHWAYS) SINDHHYDERABAD

D136 DIVISIONAL HEAD (BPS-13) 2 2 572,000 817,000 899,000 DRAUGHTSMAN

C146 COMPUTER OPERATOR (BPS-12) 2 2 534,000 763,000 839,000

J053 JUNIOR CLERK (BPS-11) 11 3,960,000 4,356,000

S222 SUB ENGINEER (BPS-11) 2 2 504,000 720,000 792,000

T102 TECHNICIAN (BPS-11) 2 2 504,000 720,000 792,000

D150 DRAUGHTSMAN (BPS-10) 4 4 976,000 1,395,000 1,534,000

E021 ELECTRICIAN (BPS-10) 1 1 244,000 349,000 384,000

S053 SENIOR CLERK (BPS-09) 5 1,181,000

J014 JR CLERK (BPS-07) 11 3,316,000

T050 TRACER (BPS-05) 2 2 823,000 588,000 647,000

D161 DRIVER (BPS-04) 2 2 396,000 567,000 624,000

D003 DAFTARI (BPS-02) 1 1 186,000 267,000 294,000

B004 BAHASHTI (BPS-01) 1 1 183,000 262,000 288,000

C092 CHOWKIDAR / WATCHMAN (BPS-01) 2 2 366,000 524,000 576,000

F002 FARASH (BPS-01) 1 1 183,000 262,000 288,000

F013 FERO PRINTER / KHADASI (BPS-01) 1 1 183,000 262,000 288,000

N003 NAIB QASID (BPS-01) 12 12 2,191,000 3,143,000 3,458,000

S008 SANITARY WORKER (BPS-01) 1 1 183,000 262,000 288,000

A01152 Personal pay 15,000 107,000 118,000

A012 TOTAL ALLOWANCES 20,444,000 17,708,000 21,384,000

A012-1 TOTAL REGULAR ALLOWANCES 20,444,000 17,708,000 21,384,000

A01201 Senior Post Allowance 17,000 17,000 17,000

A01202 House Rent Allowance 2,707,000 2,707,000 2,707,000

A01203 Conveyance Allowance 3,058,000 3,091,000 3,091,000

A01207 Washing Allowance 11,000 11,000 11,000

A0120D Integrated Allowance 52,000 52,000 52,000

A0120X Ad - hoc Allowance - 2010 5,953,000 4,869,000 4,869,000

Page 124: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

123

SC21132 (132)Works & Services

_______________________________________________________________________________ 045201 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045201 ADMINISTRATION

HB0205 CHIEF ENGINEER (HIGHWAYS) SINDHHYDERABAD

A01217 Medical Allowance 2,309,000 2,309,000 2,309,000

A0121T Adhoc Relief Allowance 2013 630,000 630,000

A0121Z Adhoc Relief Allowance - 2014 24,000

A01224 Entertainment Allowance 15,000 15,000 15,000

A01228 Orderly Allowance 156,000 156,000 156,000

A0122C Adhoc Relief Allowance - 2015 3,044,000 638,000 638,000

A0122M Adhoc Relief Allowance 2016 3,044,000 3,372,000

A01238 Charge Allowance 78,000 145,000 145,000

A01270 Others 3,044,000 3,372,000

A03 TOTAL OPERATING EXPENSES 2,720,000 1,868,000 2,894,000

A032 TOTAL COMMUNICATIONS 388,000 388,000 408,000

A03201 Postage and Telegraph 56,000 56,000 59,000

A03202 Telephone and Trunk call 332,000 332,000 349,000

A033 TOTAL UTILITIES 1,094,000 242,000 1,204,000

A03303 Electricity 1,094,000 242,000 1,204,000

A038 TOTAL TRAVEL & 891,000 891,000 915,000

TRANSPORTATION

A03805 Travelling Allowance 475,000 475,000 499,000

A03807 P.O.L Charges A.planes 416,000 416,000 416,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 347,000 347,000 367,000

A03901 Stationery 129,000 129,000 136,000

A03902 Printing and Publication 61,000 61,000 65,000

A03905 Newspapers Periodicals and Books 14,000 14,000 15,000

A03906 Uniforms and Protective Clothing 65,000 65,000 69,000

A03970 Others 78,000 78,000 82,000

1 Others 78,000 78,000 82,000

Page 125: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

124

SC21132 (132)Works & Services

_______________________________________________________________________________ 045201 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045201 ADMINISTRATION

HB0205 CHIEF ENGINEER (HIGHWAYS) SINDHHYDERABAD

A13 TOTAL REPAIRS AND MAINTENANCE 55,000 55,000 62,000

A130 TOTAL TRANSPORT 15,000 15,000 17,000

A13001 Transport 15,000 15,000 17,000

A131 TOTAL MACHINERY AND 21,000 21,000 24,000

EQUIPMENT

A13101 Machinery and Equipment 21,000 21,000 24,000

A132 TOTAL FURNITURE AND 11,000 11,000 12,000

FIXTURE

A13201 Furniture and Fixture 11,000 11,000 12,000

A137 TOTAL COMPUTER EQUIPMENT 8,000 8,000 9,000

A13701 Hardware 8,000 8,000 9,000

_______________________________________________________________________________CHIEF ENGINEER (HIGHWAYS) SINDH 53,844,000 50,559,000 58,363,000

HYDERABAD

_______________________________________________________________________________

Page 126: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

125

SC21132 (132)Works & Services

_______________________________________________________________________________ 045201 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045201 ADMINISTRATION

SY0113 CHIEF ENGINEER HIGHWAYS SUKKUR

A01 TOTAL EMPLOYEES RELATED EXPENSES. 17,473,000 14,881,000 16,871,000

A011 TOTAL PAY 33 33 10,322,000 8,929,000 9,823,000

A011-1 TOTAL PAY OF OFFICERS 9 10 5,761,000 4,893,000 5,383,000

A01101 Total Basic Pay Of Officer 9 10 5,727,000 4,859,000 5,345,000

C060 CHIEF ENG: FOREIGN AIDED (BPS-20) 1 1 1,052,000 942,000 1,036,000 & SPL: PROJECT

E060 EXECUTIVE ENGINEER (BPS-18) 3 3 1,753,000 1,570,000 1,727,000

A218 ASSISTANT ENGINEER (BPS-17) 2 2 1,871,000 834,000 918,000

D129 DIVISIONAL ACCOUNTS (BPS-17) 1 1 467,000 417,000 459,000 OFFICER

S236 SUPERINTENDENT (BPS-17) 2 835,000 918,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 1 261,000 287,000

S236 SUPERINTENDENT (BPS-16) 2 584,000

A01102 Personal pay 34,000 34,000 38,000

A011-2 TOTAL PAY OF OTHER STAFF 24 23 4,561,000 4,036,000 4,440,000

A01151 Total Basic Pay Other Staff 24 23 4,541,000 4,016,000 4,418,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 1 691,000

S181 STENOGRAPHER (BPS-14) 2 2 461,000 486,000 535,000

J053 JUNIOR CLERK (BPS-11) 4 803,000 884,000

D150 DRAUGHTSMAN (BPS-10) 2 2 370,000 389,000 428,000

A017 ACCOUNT CLERK (BPS-09) 2 2 359,000 378,000 415,000

J014 JR CLERK (BPS-07) 4 669,000

D161 DRIVER (BPS-04) 5 5 749,000 791,000 870,000

C089 CHOWKIDAR (BPS-01) 3 3 414,000 438,000 482,000

N003 NAIB QASID (BPS-01) 4 4 689,000 585,000 643,000

S008 SANITARY WORKER (BPS-01) 1 1 139,000 146,000 161,000

Page 127: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

126

SC21132 (132)Works & Services

_______________________________________________________________________________ 045201 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045201 ADMINISTRATION

SY0113 CHIEF ENGINEER HIGHWAYS SUKKUR

A01152 Personal pay 20,000 20,000 22,000

A012 TOTAL ALLOWANCES 7,151,000 5,952,000 7,048,000

A012-1 TOTAL REGULAR ALLOWANCES 6,638,000 5,439,000 6,509,000

A01201 Senior Post Allowance 13,000 13,000 13,000

A01202 House Rent Allowance 970,000 970,000 970,000

A01203 Conveyance Allowance 999,000 999,000 999,000

A01207 Washing Allowance 4,000 4,000 4,000

A0120D Integrated Allowance 20,000 20,000 20,000

A0120X Ad - hoc Allowance - 2010 1,815,000 1,373,000 1,373,000

A01217 Medical Allowance 786,000 786,000 786,000

A0121T Adhoc Relief Allowance 2013 122,000 122,000

A0121Z Adhoc Relief Allowance - 2014 19,000

A01224 Entertainment Allowance 7,000 8,000 8,000

A01228 Orderly Allowance 90,000 90,000

A0122C Adhoc Relief Allowance - 2015 1,012,000 172,000 172,000

A0122M Adhoc Relief Allowance 2016 863,000 976,000

A01270 Others 1,012,000 976,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 513,000 513,000 539,000

A01274 Medical Charges 513,000 513,000 539,000

A03 TOTAL OPERATING EXPENSES 4,850,000 3,105,000 5,118,000

A032 TOTAL COMMUNICATIONS 359,000 359,000 378,000

A03201 Postage and Telegraph 27,000 27,000 29,000

A03202 Telephone and Trunk call 332,000 332,000 349,000

A033 TOTAL UTILITIES 2,093,000 348,000 2,304,000

A03301 Gas 92,000 92,000 102,000

A03303 Electricity 2,001,000 256,000 2,202,000

A034 TOTAL OCCUPANCY COSTS 633,000 633,000 633,000

Page 128: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

127

SC21132 (132)Works & Services

_______________________________________________________________________________ 045201 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045201 ADMINISTRATION

SY0113 CHIEF ENGINEER HIGHWAYS SUKKUR

A03407 Rates and Taxes 633,000 633,000 633,000

A038 TOTAL TRAVEL & 1,607,000 1,607,000 1,634,000

TRANSPORTATION

A03805 Travelling Allowance 535,000 535,000 562,000

A03807 P.O.L Charges A.planes 1,072,000 1,072,000 1,072,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 158,000 158,000 169,000

A03901 Stationery 46,000 46,000 49,000

A03902 Printing and Publication 25,000 25,000 27,000

A03905 Newspapers Periodicals and Books 14,000 14,000 15,000

A03906 Uniforms and Protective Clothing 41,000 41,000 44,000

A03970 Others 32,000 32,000 34,000

1 Others 32,000 32,000 34,000

A13 TOTAL REPAIRS AND MAINTENANCE 44,000 44,000 49,000

A130 TOTAL TRANSPORT 17,000 17,000 19,000

A13001 Transport 17,000 17,000 19,000

A131 TOTAL MACHINERY AND 16,000 16,000 18,000

EQUIPMENT

A13101 Machinery and Equipment 16,000 16,000 18,000

A132 TOTAL FURNITURE AND 11,000 11,000 12,000

FIXTURE

A13201 Furniture and Fixture 11,000 11,000 12,000

_______________________________________________________________________________CHIEF ENGINEER HIGHWAYS SUKKUR 22,367,000 18,030,000 22,038,000

_______________________________________________________________________________

Page 129: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

128

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

BI0563 EXECUTIVE ENGINEER HIGHWAYS DIVISIONBADIN

A13 TOTAL REPAIRS AND MAINTENANCE 100,664,000 100,664,000 100,664,000

A131 TOTAL MACHINERY AND 586,000 586,000 586,000

EQUIPMENT

A13101 Machinery and Equipment 586,000 586,000 586,000

A136 TOTAL ROADS, HIGHWAYS AND 100,078,000 100,078,000 100,078,000

BRIDGES

A13602 Other roads 98,375,000 98,375,000 98,375,000

1 Other 98,375,000 98,375,000 98,375,000

A13604 Other bridges 1,703,000 1,703,000 1,703,000

6 Other (Fixed Charges) 1,703,000 1,703,000 1,703,000

_______________________________________________________________________________EXECUTIVE ENGINEER HIGHWAYS DIVISION 100,664,000 100,664,000 100,664,000

BADIN

_______________________________________________________________________________

Page 130: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

129

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

GO0253 EXECUTIVE ENGINEER HIGHWAYS DIVISIONGHOTKI

A13 TOTAL REPAIRS AND MAINTENANCE 49,393,000 49,393,000 49,393,000

A131 TOTAL MACHINERY AND 586,000 586,000 586,000

EQUIPMENT

A13101 Machinery and Equipment 586,000 586,000 586,000

A136 TOTAL ROADS, HIGHWAYS AND 48,807,000 48,807,000 48,807,000

BRIDGES

A13602 Other roads 47,104,000 47,104,000 47,104,000

1 Other 47,104,000 47,104,000 47,104,000

A13604 Other bridges 1,703,000 1,703,000 1,703,000

6 Other (Fixed Charges) 1,703,000 1,703,000 1,703,000

_______________________________________________________________________________EXECUTIVE ENGINEER HIGHWAYS DIVISION 49,393,000 49,393,000 49,393,000

GHOTKI

_______________________________________________________________________________

Page 131: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

130

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0629 EXECUTIVE ENGINEER HIGHWAYS DIVISIONHYDERABAD

A13 TOTAL REPAIRS AND MAINTENANCE 149,347,000 149,347,000 149,347,000

A131 TOTAL MACHINERY AND 586,000 586,000 586,000

EQUIPMENT

A13101 Machinery and Equipment 586,000 586,000 586,000

A136 TOTAL ROADS, HIGHWAYS AND 148,761,000 148,761,000 148,761,000

BRIDGES

A13602 Other roads 146,433,000 146,433,000 146,433,000

1 Other 146,433,000 146,433,000 146,433,000

A13604 Other bridges 2,328,000 2,328,000 2,328,000

6 Other (Fixed Charges) 2,328,000 2,328,000 2,328,000

_______________________________________________________________________________EXECUTIVE ENGINEER HIGHWAYS DIVISION 149,347,000 149,347,000 149,347,000

HYDERABAD

_______________________________________________________________________________

Page 132: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

131

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

JK0240 EXECUTIVE ENGINEER HIGHWAYS DIVISIONJACOBABAD

A13 TOTAL REPAIRS AND MAINTENANCE 70,594,000 70,594,000 70,594,000

A131 TOTAL MACHINERY AND 586,000 586,000 586,000

EQUIPMENT

A13101 Machinery and Equipment 586,000 586,000 586,000

A136 TOTAL ROADS, HIGHWAYS AND 70,008,000 70,008,000 70,008,000

BRIDGES

A13602 Other roads 67,736,000 67,736,000 67,736,000

1 Other 67,736,000 67,736,000 67,736,000

A13604 Other bridges 2,272,000 2,272,000 2,272,000

6 Other (Fixed Charges) 2,272,000 2,272,000 2,272,000

_______________________________________________________________________________EXECUTIVE ENGINEER HIGHWAYS DIVISION 70,594,000 70,594,000 70,594,000

JACOBABAD

_______________________________________________________________________________

Page 133: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

132

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

KK0252 EXECUTIVE ENGINEER HIGHWAYS DIVISIONKASHMORE @ KANDHKOT

A13 TOTAL REPAIRS AND MAINTENANCE 28,803,000 28,803,000 28,803,000

A131 TOTAL MACHINERY AND 586,000 586,000 586,000

EQUIPMENT

A13101 Machinery and Equipment 586,000 586,000 586,000

A136 TOTAL ROADS, HIGHWAYS AND 28,217,000 28,217,000 28,217,000

BRIDGES

A13602 Other roads 25,946,000 25,946,000 25,946,000

1 Other 25,946,000 25,946,000 25,946,000

A13604 Other bridges 2,271,000 2,271,000 2,271,000

6 Other (Fixed Charges) 2,271,000 2,271,000 2,271,000

_______________________________________________________________________________EXECUTIVE ENGINEER HIGHWAYS DIVISION 28,803,000 28,803,000 28,803,000

KASHMORE @ KANDHKOT

_______________________________________________________________________________

Page 134: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

133

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

KQ2000 EXECUTIVE ENGINEER HIGHWAYS DIVISIONKARACHI

A13 TOTAL REPAIRS AND MAINTENANCE 56,690,000 56,690,000 56,690,000

A131 TOTAL MACHINERY AND 586,000 586,000 586,000

EQUIPMENT

A13101 Machinery and Equipment 586,000 586,000 586,000

A136 TOTAL ROADS, HIGHWAYS AND 56,104,000 56,104,000 56,104,000

BRIDGES

A13602 Other roads 54,378,000 54,378,000 54,378,000

1 Other 54,378,000 54,378,000 54,378,000

A13604 Other bridges 1,726,000 1,726,000 1,726,000

6 Other (Fixed Charges) 1,726,000 1,726,000 1,726,000

_______________________________________________________________________________EXECUTIVE ENGINEER HIGHWAYS DIVISION 56,690,000 56,690,000 56,690,000

KARACHI

_______________________________________________________________________________

Page 135: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

134

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

KX0591 EXECUTIVE ENGINEER HIGHWAYS DIVISIONKHAIRPUR

A13 TOTAL REPAIRS AND MAINTENANCE 96,221,000 96,221,000 96,221,000

A131 TOTAL MACHINERY AND 586,000 586,000 586,000

EQUIPMENT

A13101 Machinery and Equipment 586,000 586,000 586,000

A136 TOTAL ROADS, HIGHWAYS AND 95,635,000 95,635,000 95,635,000

BRIDGES

A13602 Other roads 93,364,000 93,364,000 93,364,000

1 Other 93,364,000 93,364,000 93,364,000

A13604 Other bridges 2,271,000 2,271,000 2,271,000

6 Other (Fixed Charges) 2,271,000 2,271,000 2,271,000

_______________________________________________________________________________EXECUTIVE ENGINEER HIGHWAYS DIVISION 96,221,000 96,221,000 96,221,000

KHAIRPUR

_______________________________________________________________________________

Page 136: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

135

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

LN0459 EXECUTIVE ENGINEER HIGHWAYS DIVISIONLARKANA

A13 TOTAL REPAIRS AND MAINTENANCE 84,006,000 84,006,000 84,006,000

A131 TOTAL MACHINERY AND 586,000 586,000 586,000

EQUIPMENT

A13101 Machinery and Equipment 586,000 586,000 586,000

A136 TOTAL ROADS, HIGHWAYS AND 83,420,000 83,420,000 83,420,000

BRIDGES

A13602 Other roads 77,742,000 77,742,000 77,742,000

1 Other 77,742,000 77,742,000 77,742,000

A13604 Other bridges 5,678,000 5,678,000 5,678,000

6 Other (Fixed Charges) 5,678,000 5,678,000 5,678,000

_______________________________________________________________________________EXECUTIVE ENGINEER HIGHWAYS DIVISION 84,006,000 84,006,000 84,006,000

LARKANA

_______________________________________________________________________________

Page 137: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

136

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

MP0450 EXECUTIVE ENGINEER HIGHWAYS DIVISIONMIRPURKHAS

A13 TOTAL REPAIRS AND MAINTENANCE 122,383,000 122,383,000 122,383,000

A131 TOTAL MACHINERY AND 586,000 586,000 586,000

EQUIPMENT

A13101 Machinery and Equipment 586,000 586,000 586,000

A136 TOTAL ROADS, HIGHWAYS AND 121,797,000 121,797,000 121,797,000

BRIDGES

A13602 Other roads 120,036,000 120,036,000 120,036,000

1 Other 120,036,000 120,036,000 120,036,000

A13604 Other bridges 1,761,000 1,761,000 1,761,000

6 Other (Fixed Charges) 1,761,000 1,761,000 1,761,000

_______________________________________________________________________________EXECUTIVE ENGINEER HIGHWAYS DIVISION 122,383,000 122,383,000 122,383,000

MIRPURKHAS

_______________________________________________________________________________

Page 138: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

137

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

MX0350 EXECUTIVE ENGINEER HIGHWAYS DIVISIONTHARPARKAR

A13 TOTAL REPAIRS AND MAINTENANCE 42,323,000 42,323,000 42,323,000

A131 TOTAL MACHINERY AND 586,000 586,000 586,000

EQUIPMENT

A13101 Machinery and Equipment 586,000 586,000 586,000

A136 TOTAL ROADS, HIGHWAYS AND 41,737,000 41,737,000 41,737,000

BRIDGES

A13602 Other roads 39,466,000 39,466,000 39,466,000

1 Other 39,466,000 39,466,000 39,466,000

A13604 Other bridges 2,271,000 2,271,000 2,271,000

6 Other (Fixed Charges) 2,271,000 2,271,000 2,271,000

_______________________________________________________________________________EXECUTIVE ENGINEER HIGHWAYS DIVISION 42,323,000 42,323,000 42,323,000

THARPARKAR

_______________________________________________________________________________

Page 139: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

138

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

MY0215 EXECUTIVE ENGINEER HIGHWAYS DIVISIONMATIARI

A13 TOTAL REPAIRS AND MAINTENANCE 25,665,000 25,665,000 25,665,000

A131 TOTAL MACHINERY AND 586,000 586,000 586,000

EQUIPMENT

A13101 Machinery and Equipment 586,000 586,000 586,000

A136 TOTAL ROADS, HIGHWAYS AND 25,079,000 25,079,000 25,079,000

BRIDGES

A13602 Other roads 23,353,000 23,353,000 23,353,000

1 Other 23,353,000 23,353,000 23,353,000

A13604 Other bridges 1,726,000 1,726,000 1,726,000

6 Other (Fixed Charges) 1,726,000 1,726,000 1,726,000

_______________________________________________________________________________EXECUTIVE ENGINEER HIGHWAYS DIVISION 25,665,000 25,665,000 25,665,000

MATIARI

_______________________________________________________________________________

Page 140: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

139

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

NX0352 EXECUTIVE ENGINEER HIGHWAYS DIVISIONNAUSHERO FEROZE

A13 TOTAL REPAIRS AND MAINTENANCE 55,091,000 55,091,000 55,091,000

A131 TOTAL MACHINERY AND 586,000 586,000 586,000

EQUIPMENT

A13101 Machinery and Equipment 586,000 586,000 586,000

A136 TOTAL ROADS, HIGHWAYS AND 54,505,000 54,505,000 54,505,000

BRIDGES

A13602 Other roads 52,234,000 52,234,000 52,234,000

1 Other 52,234,000 52,234,000 52,234,000

A13604 Other bridges 2,271,000 2,271,000 2,271,000

6 Other (Fixed Charges) 2,271,000 2,271,000 2,271,000

_______________________________________________________________________________EXECUTIVE ENGINEER HIGHWAYS DIVISION 55,091,000 55,091,000 55,091,000

NAUSHERO FEROZE

_______________________________________________________________________________

Page 141: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

140

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

QS0279 EXECUTIVE ENGINEER HIGHWAYS DIVISIONKAMBER-SHAHDADKOT @ KAMBER

A13 TOTAL REPAIRS AND MAINTENANCE 28,235,000 28,235,000 52,289,000

A131 TOTAL MACHINERY AND 586,000 586,000 586,000

EQUIPMENT

A13101 Machinery and Equipment 586,000 586,000 586,000

A136 TOTAL ROADS, HIGHWAYS AND 27,649,000 27,649,000 51,703,000

BRIDGES

A13602 Other roads 25,946,000 25,946,000 50,000,000

1 Other 25,946,000 25,946,000 50,000,000

A13604 Other bridges 1,703,000 1,703,000 1,703,000

6 Other (Fixed Charges) 1,703,000 1,703,000 1,703,000

_______________________________________________________________________________EXECUTIVE ENGINEER HIGHWAYS DIVISION 28,235,000 28,235,000 52,289,000

KAMBER-SHAHDADKOT @ KAMBER

_______________________________________________________________________________

Page 142: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

141

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SB0421 EXECUTIVE ENGINEER HIGHWAYS DIVISIONSHAHEED BENAZIRABAD

A13 TOTAL REPAIRS AND MAINTENANCE 62,724,000 62,724,000 62,724,000

A131 TOTAL MACHINERY AND 586,000 586,000 586,000

EQUIPMENT

A13101 Machinery and Equipment 586,000 586,000 586,000

A136 TOTAL ROADS, HIGHWAYS AND 62,138,000 62,138,000 62,138,000

BRIDGES

A13602 Other roads 61,003,000 61,003,000 61,003,000

1 Other 61,003,000 61,003,000 61,003,000

A13604 Other bridges 1,135,000 1,135,000 1,135,000

6 Other (Fixed Charges) 1,135,000 1,135,000 1,135,000

_______________________________________________________________________________EXECUTIVE ENGINEER HIGHWAYS DIVISION 62,724,000 62,724,000 62,724,000

SHAHEED BENAZIRABAD

_______________________________________________________________________________

Page 143: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

142

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SL0040 EXECUTIVE ENGINEER HIGHWAYS DIVISIONSAJAWAL

A13 TOTAL REPAIRS AND MAINTENANCE 53,838,000 53,838,000

A131 TOTAL MACHINERY AND 293,000 293,000

EQUIPMENT

A13101 Machinery and Equipment 293,000 293,000

A136 TOTAL ROADS, HIGHWAYS AND 53,545,000 53,545,000

BRIDGES

A13602 Other roads 53,080,000 53,080,000

1 Other 53,080,000 53,080,000

A13604 Other bridges 465,000 465,000

6 Other (Fixed Charges) 465,000 465,000

_______________________________________________________________________________EXECUTIVE ENGINEER HIGHWAYS DIVISION 53,838,000 53,838,000

SAJAWAL

_______________________________________________________________________________

Page 144: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

143

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SN0411 EXECUTIVE ENGINEER HIGHWAYS DIVISIONSANGHAR

A13 TOTAL REPAIRS AND MAINTENANCE 99,164,000 99,164,000 99,164,000

A131 TOTAL MACHINERY AND 586,000 586,000 586,000

EQUIPMENT

A13101 Machinery and Equipment 586,000 586,000 586,000

A136 TOTAL ROADS, HIGHWAYS AND 98,578,000 98,578,000 98,578,000

BRIDGES

A13602 Other roads 97,443,000 97,443,000 97,443,000

1 Other 97,443,000 97,443,000 97,443,000

A13604 Other bridges 1,135,000 1,135,000 1,135,000

6 Other (Fixed Charges) 1,135,000 1,135,000 1,135,000

_______________________________________________________________________________EXECUTIVE ENGINEER HIGHWAYS DIVISION 99,164,000 99,164,000 99,164,000

SANGHAR

_______________________________________________________________________________

Page 145: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

144

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SQ0355 EXECUTIVE ENGINEER HIGHWAYS DIVISIONSHIKARPUR

A13 TOTAL REPAIRS AND MAINTENANCE 42,271,000 42,271,000 42,271,000

A131 TOTAL MACHINERY AND 586,000 586,000 586,000

EQUIPMENT

A13101 Machinery and Equipment 586,000 586,000 586,000

A136 TOTAL ROADS, HIGHWAYS AND 41,685,000 41,685,000 41,685,000

BRIDGES

A13602 Other roads 39,414,000 39,414,000 39,414,000

1 Other 39,414,000 39,414,000 39,414,000

A13604 Other bridges 2,271,000 2,271,000 2,271,000

6 Other (Fixed Charges) 2,271,000 2,271,000 2,271,000

_______________________________________________________________________________EXECUTIVE ENGINEER HIGHWAYS DIVISION 42,271,000 42,271,000 42,271,000

SHIKARPUR

_______________________________________________________________________________

Page 146: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

145

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SY0462 EXECUTIVE ENGINEER HIGHWAYS DIVISIONSUKKUR

A13 TOTAL REPAIRS AND MAINTENANCE 51,933,000 51,933,000 51,933,000

A131 TOTAL MACHINERY AND 586,000 586,000 586,000

EQUIPMENT

A13101 Machinery and Equipment 586,000 586,000 586,000

A136 TOTAL ROADS, HIGHWAYS AND 51,347,000 51,347,000 51,347,000

BRIDGES

A13602 Other roads 49,076,000 49,076,000 49,076,000

1 Other 49,076,000 49,076,000 49,076,000

A13604 Other bridges 2,271,000 2,271,000 2,271,000

6 Other (Fixed Charges) 2,271,000 2,271,000 2,271,000

_______________________________________________________________________________EXECUTIVE ENGINEER HIGHWAYS DIVISION 51,933,000 51,933,000 51,933,000

SUKKUR

_______________________________________________________________________________

Page 147: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

146

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

TN0212 EXECUTIVE ENGINEER HIGHWAYS DIVISIONTANDO MUHAMMAD KHAN

A13 TOTAL REPAIRS AND MAINTENANCE 25,665,000 25,665,000 25,665,000

A131 TOTAL MACHINERY AND 586,000 586,000 586,000

EQUIPMENT

A13101 Machinery and Equipment 586,000 586,000 586,000

A136 TOTAL ROADS, HIGHWAYS AND 25,079,000 25,079,000 25,079,000

BRIDGES

A13602 Other roads 23,353,000 23,353,000 23,353,000

1 Other 23,353,000 23,353,000 23,353,000

A13604 Other bridges 1,726,000 1,726,000 1,726,000

6 Other (Fixed Charges) 1,726,000 1,726,000 1,726,000

_______________________________________________________________________________EXECUTIVE ENGINEER HIGHWAYS DIVISION 25,665,000 25,665,000 25,665,000

TANDO MUHAMMAD KHAN

_______________________________________________________________________________

Page 148: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

147

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

TQ0216 EXECUTIVE ENGINEER HIGHWAYS DIVISIONTANDO ALLAH YAR

A13 TOTAL REPAIRS AND MAINTENANCE 25,665,000 25,665,000 25,665,000

A131 TOTAL MACHINERY AND 586,000 586,000 586,000

EQUIPMENT

A13101 Machinery and Equipment 586,000 586,000 586,000

A136 TOTAL ROADS, HIGHWAYS AND 25,079,000 25,079,000 25,079,000

BRIDGES

A13602 Other roads 23,353,000 23,353,000 23,353,000

1 Other 23,353,000 23,353,000 23,353,000

A13604 Other bridges 1,726,000 1,726,000 1,726,000

6 Other (Fixed Charges) 1,726,000 1,726,000 1,726,000

_______________________________________________________________________________EXECUTIVE ENGINEER HIGHWAYS DIVISION 25,665,000 25,665,000 25,665,000

TANDO ALLAH YAR

_______________________________________________________________________________

Page 149: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

148

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

TX0378 EXECUTIVE ENGINEER HIGHWAYS DIVISIONTHATTA

A13 TOTAL REPAIRS AND MAINTENANCE 53,838,000 53,838,000 53,838,000

A131 TOTAL MACHINERY AND 293,000 293,000 293,000

EQUIPMENT

A13101 Machinery and Equipment 293,000 293,000 293,000

A136 TOTAL ROADS, HIGHWAYS AND 53,545,000 53,545,000 53,545,000

BRIDGES

A13602 Other roads 53,080,000 53,080,000 53,080,000

1 Other 53,080,000 53,080,000 53,080,000

A13604 Other bridges 465,000 465,000 465,000

6 Other (Fixed Charges) 465,000 465,000 465,000

_______________________________________________________________________________EXECUTIVE ENGINEER HIGHWAYS DIVISION 53,838,000 53,838,000 53,838,000

THATTA

_______________________________________________________________________________

Page 150: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

149

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

UT0305 EXECUTIVE ENGINEER HIGHWAYS DIVISIONUMERKOT

A13 TOTAL REPAIRS AND MAINTENANCE 40,641,000 40,641,000 40,641,000

A131 TOTAL MACHINERY AND 586,000 586,000 586,000

EQUIPMENT

A13101 Machinery and Equipment 586,000 586,000 586,000

A136 TOTAL ROADS, HIGHWAYS AND 40,055,000 40,055,000 40,055,000

BRIDGES

A13602 Other roads 38,920,000 38,920,000 38,920,000

1 Other 38,920,000 38,920,000 38,920,000

A13604 Other bridges 1,135,000 1,135,000 1,135,000

6 Other (Fixed Charges) 1,135,000 1,135,000 1,135,000

_______________________________________________________________________________EXECUTIVE ENGINEER HIGHWAYS DIVISION 40,641,000 40,641,000 40,641,000

UMERKOT

_______________________________________________________________________________

Page 151: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

150

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

BI0063 HIGHWAY DIVISION BADIN

A01 TOTAL EMPLOYEES RELATED EXPENSES. 52,825,000 48,360,000 54,832,000

A011 TOTAL PAY 167 167 31,639,000 29,506,000 32,459,000

A011-1 TOTAL PAY OF OFFICERS 4 5 2,842,000 1,855,000 2,042,000

A01101 Total Basic Pay Of Officer 4 5 2,831,000 1,844,000 2,029,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 914,000 513,000 565,000

A218 ASSISTANT ENGINEER (BPS-17) 2 2 1,461,000 819,000 902,000

A235 ASSISTANT HEAD CLERK (BPS-16) 1 256,000 281,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 456,000 256,000 281,000 OFFICER

A01105 Qualification Pay 11,000 11,000 13,000

A011-2 TOTAL PAY OF OTHER STAFF 163 162 28,797,000 27,651,000 30,417,000

A01151 Total Basic Pay Other Staff 163 162 28,707,000 27,491,000 30,241,000

S053 SENIOR CLERK (BPS-14) 4 866,000 952,000

S181 STENOGRAPHER (BPS-14) 1 1 275,000 262,000 288,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 255,000 246,000 270,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 5 1,082,000 1,190,000

S222 SUB ENGINEER (BPS-11) 6 6 1,350,000 1,299,000 1,429,000

D150 DRAUGHTSMAN (BPS-10) 1 1 216,000 210,000 231,000

A017 ACCOUNT CLERK (BPS-09) 3 3 633,000 608,000 670,000

S053 SENIOR CLERK (BPS-09) 4 846,000

C042 CHARGE MAN / MECHANIC (BPS-08) 2 2 408,000 393,000 432,000

J014 JR CLERK (BPS-07) 5 988,000

R061 ROAD / WORK MISTRI / (BPS-05) 16 16 2,944,000 2,830,000 3,113,000 DAROGHA

S203 STORE ISSUER / LOG BOOK / (BPS-05) 1 1 184,000 177,000 195,000 STORE CLERK

Page 152: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

151

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

BI0063 HIGHWAY DIVISION BADIN

T047 TRACER (BPS-05) 1 1 184,000 177,000 195,000

D161 DRIVER (BPS-04) 4 4 709,000 682,000 750,000

R069 ROAD ROLLER DRIVER (BPS-04) 11 11 1,949,000 1,876,000 2,063,000

T053 TRACTOR / TRUCK / WATER (BPS-04) 3 3 531,000 512,000 563,000 VAN DRIVER

F040 FITTER / FITTER MAN (BPS-02) 1 1 167,000 160,000 176,000

R066 ROAD MATE / MOTOR MATE (BPS-02) 16 16 2,672,000 2,567,000 2,823,000

A235 ASSISTANT HEAD CLERK (BPS-01) 1 165,000

B028 BELDAR FOR COLONY (BPS-01) 55 55 8,996,000 8,662,000 9,529,000

C089 CHOWKIDAR (BPS-01) 14 14 2,453,000 2,205,000 2,426,000

C112 CLEANER / HELPER / COLI / (BPS-01) 8 8 1,309,000 1,260,000 1,386,000 WIND CLEANER

N003 NAIB QASID (BPS-01) 6 6 982,000 945,000 1,040,000

S009 SANITARY WORKER / (BPS-01) 3 3 491,000 472,000 520,000 GUTTERMAN

A01152 Personal pay 90,000 160,000 176,000

A012 TOTAL ALLOWANCES 21,186,000 18,854,000 22,373,000

A012-1 TOTAL REGULAR ALLOWANCES 21,153,000 18,821,000 22,338,000

A01202 House Rent Allowance 2,128,000 2,128,000 2,128,000

A01203 Conveyance Allowance 4,166,000 4,166,000 4,166,000

A01207 Washing Allowance 37,000 37,000 37,000

A0120D Integrated Allowance 4,000 6,000 6,000

A0120X Ad - hoc Allowance - 2010 5,315,000 4,851,000 4,851,000

A01217 Medical Allowance 3,194,000 3,194,000 3,194,000

A0121Q Audit and Accounts Allowance 86,000 86,000

A0121T Adhoc Relief Allowance 2013 822,000 822,000

A0122C Adhoc Relief Allowance - 2015 3,154,000 593,000 593,000

A0122M Adhoc Relief Allowance 2016 2,937,000 3,227,000

A01233 Unattractive Area Allowance 1,000 1,000 1,000

A01270 Others 3,154,000 3,227,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 33,000 33,000 35,000

Page 153: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

152

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

BI0063 HIGHWAY DIVISION BADIN

A01274 Medical Charges 33,000 33,000 35,000

A03 TOTAL OPERATING EXPENSES 1,017,000 497,000 1,095,000

A032 TOTAL COMMUNICATIONS 132,000 132,000 140,000

A03201 Postage and Telegraph 25,000 25,000 27,000

A03202 Telephone and Trunk call 107,000 107,000 113,000

A033 TOTAL UTILITIES 521,000 1,000 574,000

A03303 Electricity 521,000 1,000 574,000

A038 TOTAL TRAVEL & 190,000 190,000 195,000

TRANSPORTATION

A03805 Travelling Allowance 95,000 95,000 100,000

A03807 P.O.L Charges A.planes 95,000 95,000 95,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 174,000 174,000 186,000

A03901 Stationery 44,000 44,000 47,000

A03902 Printing and Publication 33,000 33,000 35,000

A03905 Newspapers Periodicals and Books 6,000 6,000 7,000

A03906 Uniforms and Protective Clothing 42,000 42,000 45,000

A03970 Others 49,000 49,000 52,000

1 Others 49,000 49,000 52,000

A13 TOTAL REPAIRS AND MAINTENANCE 45,000 45,000 50,000

A130 TOTAL TRANSPORT 17,000 17,000 19,000

A13001 Transport 17,000 17,000 19,000

A131 TOTAL MACHINERY AND 18,000 18,000 20,000

EQUIPMENT

Page 154: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

153

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

BI0063 HIGHWAY DIVISION BADIN

A13101 Machinery and Equipment 18,000 18,000 20,000

A132 TOTAL FURNITURE AND 10,000 10,000 11,000

FIXTURE

A13201 Furniture and Fixture 10,000 10,000 11,000

_______________________________________________________________________________HIGHWAY DIVISION BADIN 53,887,000 48,902,000 55,977,000

_______________________________________________________________________________

Page 155: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

154

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

BI0064 HIGHWAYS ROADS AND BRIDGES BADIN

A13 TOTAL REPAIRS AND MAINTENANCE 234,881,000 234,881,000 234,881,000

A131 TOTAL MACHINERY AND 1,366,000 1,366,000 1,366,000

EQUIPMENT

A13101 Machinery and Equipment 1,366,000 1,366,000 1,366,000

A136 TOTAL ROADS, HIGHWAYS AND 233,515,000 233,515,000 233,515,000

BRIDGES

A13602 Other roads 229,540,000 229,540,000 229,540,000

1 Other 229,540,000 229,540,000 229,540,000

A13604 Other bridges 3,975,000 3,975,000 3,975,000

6 Other (Fixed Charges) 3,975,000 3,975,000 3,975,000

_______________________________________________________________________________HIGHWAYS ROADS AND BRIDGES BADIN 234,881,000 234,881,000 234,881,000

_______________________________________________________________________________

Page 156: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

155

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

DD0065 HIGHWAY DIVISION DADU

A01 TOTAL EMPLOYEES RELATED EXPENSES. 81,246,000 82,076,000 93,172,000

A011 TOTAL PAY 289 289 46,974,000 50,594,000 55,656,000

A011-1 TOTAL PAY OF OFFICERS 7 8 3,500,000 4,154,000 4,571,000

A01101 Total Basic Pay Of Officer 7 8 3,448,000 4,102,000 4,513,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 593,000 653,000 718,000

A218 ASSISTANT ENGINEER (BPS-17) 5 5 2,379,000 2,603,000 2,864,000

D129 DIVISIONAL ACCOUNTS (BPS-17) 1 1 476,000 521,000 573,000 OFFICER

A235 ASSISTANT HEAD CLERK (BPS-16) 1 325,000 358,000

A01102 Personal pay 52,000 52,000 58,000

A011-2 TOTAL PAY OF OTHER STAFF 282 281 43,474,000 46,440,000 51,085,000

A01151 Total Basic Pay Other Staff 282 281 43,298,000 46,226,000 50,849,000

A235 ASSISTANT HEAD CLERK (BPS-14) 1 232,000

S053 SENIOR CLERK (BPS-14) 7 1,465,000 1,612,000

S181 STENOGRAPHER (BPS-14) 1 1 238,000 253,000 279,000

D133 DIVISIONAL HEAD / JR (BPS-13) 1 1 223,000 238,000 261,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 8 1,675,000 1,842,000

S222 SUB ENGINEER (BPS-11) 15 15 2,932,000 3,140,000 3,454,000

D150 DRAUGHTSMAN (BPS-10) 1 1 189,000 203,000 223,000

A017 ACCOUNT CLERK (BPS-09) 3 3 550,000 588,000 651,000

R062 ROAD INSPECTOR (BPS-09) 7 7 1,285,000 1,375,000 1,512,000

S053 SENIOR CLERK (BPS-09) 7 1,285,000

C041 CHARGE MAN / CHARGE (BPS-08) 2 2 355,000 380,000 418,000 MECHANICS

J014 JR CLERK (BPS-07) 8 1,547,000

M131 MOTOR GRADER DRIVER (BPS-06) 3 3 497,000 532,000 585,000

Page 157: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

156

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

DD0065 HIGHWAY DIVISION DADU

D145 DONKEY CARTMAN (BPS-05) 6 6 959,000 1,027,000 1,129,000

R068 ROAD MISTRY / WORK MISTRY (BPS-05) 15 15 2,397,000 2,566,000 2,823,000 / DAROGHA

T047 TRACER (BPS-05) 1 1 160,000 171,000 188,000

D161 DRIVER (BPS-04) 6 6 924,000 990,000 1,088,000

R069 ROAD ROLLER DRIVER (BPS-04) 17 17 2,617,000 2,804,000 3,084,000

S203 STORE ISSUER / LOG BOOK / (BPS-04) 1 1 154,000 165,000 181,000 STORE CLERK

T053 TRACTOR / TRUCK / WATER (BPS-04) 5 5 770,000 825,000 907,000 VAN DRIVER

F038 FITTER (BPS-02) 1 1 144,000 155,000 171,000

R065 ROAD MATE (BPS-02) 36 36 5,224,000 5,586,000 6,144,000

B026 BELDAR / COOLY (BPS-01) 93 93 13,223,000 14,167,000 15,584,000

C088 CHOWIKADAR / WATCHMAN (BPS-01) 14 14 1,991,000 2,133,000 2,346,000

C111 CLEANER / HELPER / COLI (BPS-01) 20 20 2,844,000 3,047,000 3,351,000

K006 KHALASI (BPS-01) 4 4 569,000 609,000 670,000

M020 MALHI / GARDEN ATTENDANT (BPS-01) 1 1 142,000 152,000 168,000

N003 NAIB QASID (BPS-01) 9 9 1,278,000 1,371,000 1,508,000

S008 SANITARY WORKER (BPS-01) 4 4 569,000 609,000 670,000

A01152 Personal pay 176,000 214,000 236,000

A012 TOTAL ALLOWANCES 34,272,000 31,482,000 37,516,000

A012-1 TOTAL REGULAR ALLOWANCES 34,238,000 31,448,000 37,480,000

A01202 House Rent Allowance 3,455,000 3,455,000 3,455,000

A01203 Conveyance Allowance 6,713,000 6,713,000 6,713,000

A01207 Washing Allowance 14,000 14,000 14,000

A0120D Integrated Allowance 5,000 8,000 8,000

A0120Q Fixed Daily Allowance 5,000 5,000 5,000

A0120X Ad - hoc Allowance - 2010 9,150,000 8,241,000 8,241,000

A01217 Medical Allowance 5,547,000 5,547,000 5,547,000

A0121T Adhoc Relief Allowance 2013 1,407,000 1,407,000

Page 158: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

157

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

DD0065 HIGHWAY DIVISION DADU

A0122C Adhoc Relief Allowance - 2015 4,674,000 1,016,000 1,016,000

A0122M Adhoc Relief Allowance 2016 5,040,000 5,536,000

A01233 Unattractive Area Allowance 1,000 2,000 2,000

A01270 Others 4,674,000 5,536,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 34,000 34,000 36,000

A01274 Medical Charges 34,000 34,000 36,000

A03 TOTAL OPERATING EXPENSES 1,667,000 616,000 1,814,000

A032 TOTAL COMMUNICATIONS 96,000 96,000 102,000

A03201 Postage and Telegraph 21,000 21,000 23,000

A03202 Telephone and Trunk call 75,000 75,000 79,000

A033 TOTAL UTILITIES 1,251,000 200,000 1,377,000

A03303 Electricity 1,251,000 200,000 1,377,000

A038 TOTAL TRAVEL & 172,000 172,000 176,000

TRANSPORTATION

A03805 Travelling Allowance 79,000 79,000 83,000

A03807 P.O.L Charges A.planes 93,000 93,000 93,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 148,000 148,000 159,000

A03901 Stationery 44,000 44,000 47,000

A03902 Printing and Publication 22,000 22,000 24,000

A03905 Newspapers Periodicals and Books 6,000 6,000 7,000

A03906 Uniforms and Protective Clothing 41,000 41,000 44,000

A03970 Others 35,000 35,000 37,000

1 Others 35,000 35,000 37,000

A13 TOTAL REPAIRS AND MAINTENANCE 45,000 45,000 50,000

Page 159: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

158

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

DD0065 HIGHWAY DIVISION DADU

A130 TOTAL TRANSPORT 17,000 17,000 19,000

A13001 Transport 17,000 17,000 19,000

A131 TOTAL MACHINERY AND 18,000 18,000 20,000

EQUIPMENT

A13101 Machinery and Equipment 18,000 18,000 20,000

A132 TOTAL FURNITURE AND 10,000 10,000 11,000

FIXTURE

A13201 Furniture and Fixture 10,000 10,000 11,000

_______________________________________________________________________________HIGHWAY DIVISION DADU 82,958,000 82,737,000 95,036,000

_______________________________________________________________________________

Page 160: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

159

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

DD0066 HIGHWAYS ROADS AND BRIDGES DADU

A13 TOTAL REPAIRS AND MAINTENANCE 250,092,000 250,092,000 250,092,000

A131 TOTAL MACHINERY AND 1,366,000 1,366,000 1,366,000

EQUIPMENT

A13101 Machinery and Equipment 1,366,000 1,366,000 1,366,000

A136 TOTAL ROADS, HIGHWAYS AND 248,726,000 248,726,000 248,726,000

BRIDGES

A13602 Other roads 243,426,000 243,426,000 243,426,000

1 Other 243,426,000 243,426,000 243,426,000

A13604 Other bridges 5,300,000 5,300,000 5,300,000

6 Other (Fixed Charges) 5,300,000 5,300,000 5,300,000

_______________________________________________________________________________HIGHWAYS ROADS AND BRIDGES DADU 250,092,000 250,092,000 250,092,000

_______________________________________________________________________________

Page 161: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

160

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

DD0067 HIGHWAYS ROADS AND BRIDGES JAMSHORO

A13 TOTAL REPAIRS AND MAINTENANCE 64,558,000 193,845,000 64,558,000

A131 TOTAL MACHINERY AND 1,366,000 1,366,000 1,366,000

EQUIPMENT

A13101 Machinery and Equipment 1,366,000 1,366,000 1,366,000

A136 TOTAL ROADS, HIGHWAYS AND 63,192,000 192,479,000 63,192,000

BRIDGES

A13602 Other roads 60,542,000 189,829,000 60,542,000

1 Other 60,542,000 189,829,000 60,542,000

A13604 Other bridges 2,650,000 2,650,000 2,650,000

6 Other (Fixed Charges) 2,650,000 2,650,000 2,650,000

_______________________________________________________________________________HIGHWAYS ROADS AND BRIDGES JAMSHORO 64,558,000 193,845,000 64,558,000

_______________________________________________________________________________

Page 162: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

161

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0202 HIGWAYS CIRCLE HYDERABAD

A01 TOTAL EMPLOYEES RELATED EXPENSES. 15,189,000 16,488,000 19,062,000

A011 TOTAL PAY 30 31 9,049,000 10,576,000 11,769,000

A011-1 TOTAL PAY OF OFFICERS 5 8 3,203,000 3,614,000 3,976,000

A01101 Total Basic Pay Of Officer 5 8 3,203,000 3,614,000 3,976,000

A218 ASSISTANT ENGINEER (BPS-19) 1 1 1,197,000 943,000 1,037,000

A218 ASSISTANT ENGINEER (BPS-17) 1 1 616,000 486,000 534,000

I043 INVESTIGATOR / RO (BPS-17) 1 1 616,000 486,000 535,000

S236 SUPERINTENDENT (BPS-17) 1 486,000 535,000

A235 ASSISTANT HEAD CLERK (BPS-16) 3 910,000 1,001,000

C080 CHIEF SENIOR / CIRCLE (BPS-16) 1 1 387,000 303,000 334,000 HEAD DRAFTSMAN

S236 SUPERINTENDENT (BPS-16) 1 387,000

A011-2 TOTAL PAY OF OTHER STAFF 25 23 5,846,000 6,962,000 7,793,000

A01151 Total Basic Pay Other Staff 25 23 5,830,000 6,912,000 7,738,000

A235 ASSISTANT HEAD CLERK (BPS-14) 3 861,000

S053 SENIOR CLERK (BPS-14) 3 1,042,000 1,146,000

S181 STENOGRAPHER (BPS-14) 1 1 286,000 420,000 462,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 270,000 394,000 434,000 DRAUGHTSMAN

C146 COMPUTER OPERATOR (BPS-12) 1 134,000

J053 JUNIOR CLERK (BPS-11) 3 1,042,000 1,146,000

D150 DRAUGHTSMAN (BPS-10) 2 2 460,000 673,000 740,000

A017 ACCOUNT CLERK (BPS-09) 3 3 668,000 978,000 1,077,000

S053 SENIOR CLERK (BPS-09) 3 668,000

J014 JR CLERK (BPS-07) 3 835,000

T050 TRACER (BPS-05) 2 2 388,000 568,000 625,000

Page 163: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

162

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0202 HIGWAYS CIRCLE HYDERABAD

D161 DRIVER (BPS-04) 1 1 187,000 274,000 301,000

D003 DAFTARI (BPS-02) 1 1 175,000 257,000 283,000

C092 CHOWKIDAR / WATCHMAN (BPS-01) 1 1 173,000 253,000 278,000

N003 NAIB QASID (BPS-01) 3 3 686,000 758,000 834,000

S009 SANITARY WORKER / (BPS-01) 1 1 173,000 253,000 278,000 GUTTERMAN

A01152 Personal pay 16,000 50,000 55,000

A012 TOTAL ALLOWANCES 6,140,000 5,912,000 7,293,000

A012-1 TOTAL REGULAR ALLOWANCES 6,126,000 5,898,000 7,278,000

A01202 House Rent Allowance 864,000 864,000 888,000

A01203 Conveyance Allowance 953,000 1,030,000 1,064,000

A01207 Washing Allowance 3,000 5,000 5,000

A0120D Integrated Allowance 13,000 13,000 13,000

A0120X Ad - hoc Allowance - 2010 1,754,000 1,707,000 1,733,000

A01217 Medical Allowance 726,000 726,000 743,000

A0121T Adhoc Relief Allowance 2013 254,000 254,000

A0121Z Adhoc Relief Allowance - 2014 30,000

A01224 Entertainment Allowance 7,000 7,000 7,000

A0122C Adhoc Relief Allowance - 2015 903,000 235,000 235,000

A0122M Adhoc Relief Allowance 2016 1,015,000 1,171,000

A01239 Special Allowance 7,000 7,000

A01270 Others 903,000 5,000 1,158,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 14,000 14,000 15,000

A01274 Medical Charges 14,000 14,000 15,000

A03 TOTAL OPERATING EXPENSES 951,000 368,000 1,026,000

A032 TOTAL COMMUNICATIONS 108,000 108,000 114,000

A03201 Postage and Telegraph 14,000 14,000 15,000

A03202 Telephone and Trunk call 94,000 94,000 99,000

Page 164: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

163

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0202 HIGWAYS CIRCLE HYDERABAD

A033 TOTAL UTILITIES 584,000 1,000 643,000

A03303 Electricity 584,000 1,000 643,000

A038 TOTAL TRAVEL & 181,000 181,000 184,000

TRANSPORTATION

A03805 Travelling Allowance 59,000 59,000 62,000

A03807 P.O.L Charges A.planes 122,000 122,000 122,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 78,000 78,000 85,000

A03901 Stationery 24,000 24,000 26,000

A03902 Printing and Publication 10,000 10,000 11,000

A03905 Newspapers Periodicals and Books 4,000 4,000 5,000

A03906 Uniforms and Protective Clothing 22,000 22,000 24,000

A03970 Others 18,000 18,000 19,000

1 Others 18,000 18,000 19,000

A13 TOTAL REPAIRS AND MAINTENANCE 42,000 42,000 47,000

A130 TOTAL TRANSPORT 17,000 17,000 19,000

A13001 Transport 17,000 17,000 19,000

A131 TOTAL MACHINERY AND 15,000 15,000 17,000

EQUIPMENT

A13101 Machinery and Equipment 15,000 15,000 17,000

A132 TOTAL FURNITURE AND 10,000 10,000 11,000

FIXTURE

A13201 Furniture and Fixture 10,000 10,000 11,000

_______________________________________________________________________________HIGWAYS CIRCLE HYDERABAD 16,182,000 16,898,000 20,135,000

_______________________________________________________________________________

Page 165: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

164

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0203 HIGHWAY DIVISION HYDERABAD

A01 TOTAL EMPLOYEES RELATED EXPENSES. 119,105,000 118,197,000 134,110,000

A011 TOTAL PAY 399 399 68,064,000 72,632,000 79,897,000

A011-1 TOTAL PAY OF OFFICERS 7 8 5,091,000 5,608,000 6,170,000

A01101 Total Basic Pay Of Officer 7 8 4,993,000 5,509,000 6,060,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 906,000 921,000 1,013,000

A218 ASSISTANT ENGINEER (BPS-17) 5 5 3,633,000 3,672,000 4,039,000

A119 ASSISTANT (BPS-16) 1 458,000 504,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 454,000 458,000 504,000 OFFICER

A01102 Personal pay 87,000 87,000 96,000

A01105 Qualification Pay 11,000 12,000 14,000

A011-2 TOTAL PAY OF OTHER STAFF 392 391 62,973,000 67,024,000 73,727,000

A01151 Total Basic Pay Other Staff 392 391 62,772,000 66,736,000 73,410,000

A119 ASSISTANT (BPS-14) 1 247,000

S053 SENIOR CLERK (BPS-14) 8 1,754,000 1,929,000

S181 STENOGRAPHER (BPS-14) 1 1 216,000 265,000 292,000

D137 DIVISIONAL HEAD (BPS-13) 1 1 233,000 249,000 274,000 DRAUGHTSMAN / JUNIOR

J053 JUNIOR CLERK (BPS-11) 8 1,754,000 1,929,000

S222 SUB ENGINEER (BPS-11) 15 15 3,064,000 3,288,000 3,617,000

D150 DRAUGHTSMAN (BPS-10) 1 1 197,000 212,000 234,000

A029 ACCOUNTS CLERK / CASHIER (BPS-09) 3 3 576,000 615,000 678,000

S053 SENIOR CLERK (BPS-09) 8 1,534,000

C042 CHARGE MAN / MECHANIC (BPS-08) 4 4 742,000 796,000 875,000

J014 JR CLERK (BPS-07) 8 1,796,000

R064 ROAD INSPECTOR / WORK / (BPS-06) 13 13 2,252,000 2,413,000 2,654,000 GENERAL SUPERVISOR

Page 166: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

165

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0203 HIGHWAY DIVISION HYDERABAD

M131 MOTOR GRADER DRIVER (BPS-05) 2 2 334,000 358,000 394,000

O021 OPERATOR (BPS-05) 27 27 4,512,000 4,837,000 5,321,000

R068 ROAD MISTRY / WORK MISTRY (BPS-05) 16 16 2,675,000 2,866,000 3,153,000 / DAROGHA

T076 TRUCK / TRACTOR / DUMPER (BPS-05) 12 12 2,005,000 2,150,000 2,365,000 / WATER VAN DRIVER

C024 CARE TAKER (BPS-04) 1 1 162,000 173,000 190,000

D161 DRIVER (BPS-04) 10 10 1,608,000 1,727,000 1,900,000

R069 ROAD ROLLER DRIVER (BPS-04) 17 17 2,735,000 2,936,000 3,229,000

S198 STORE / TOOL / LOG BOOK (BPS-04) 4 4 643,000 691,000 760,000 CLERK

F040 FITTER / FITTER MAN (BPS-02) 1 1 152,000 162,000 179,000

G021 GATE SERGEANT (BPS-02) 3 3 456,000 487,000 536,000

R066 ROAD MATE / MOTOR MATE (BPS-02) 28 28 4,246,000 4,549,000 5,004,000

B014 BEAR ATTENDANT (BPS-01) 1 1 151,000 160,000 175,000

B026 BELDAR / COOLY (BPS-01) 135 135 20,053,000 21,533,000 23,686,000

C092 CHOWKIDAR / WATCHMAN (BPS-01) 27 27 4,158,000 4,307,000 4,737,000

C111 CLEANER / HELPER / COLI (BPS-01) 34 34 5,050,000 5,423,000 5,965,000

C167 COOK (BPS-01) 2 2 298,000 319,000 351,000

G016 GATE GAMADAR (BPS-01) 4 4 594,000 638,000 702,000

M021 MALHI / GARDEN ATTENDANT (BPS-01) 2 2 298,000 319,000 351,000 / HAED MALHI

N003 NAIB QASID (BPS-01) 8 8 1,341,000 1,276,000 1,404,000

S009 SANITARY WORKER / (BPS-01) 3 3 444,000 479,000 526,000 GUTTERMAN

A01152 Personal pay 201,000 288,000 317,000

A012 TOTAL ALLOWANCES 51,041,000 45,565,000 54,213,000

A012-1 TOTAL REGULAR ALLOWANCES 51,011,000 45,535,000 54,181,000

A01202 House Rent Allowance 6,835,000 6,835,000 6,835,000

A01203 Conveyance Allowance 9,563,000 9,563,000 9,563,000

Page 167: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

166

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0203 HIGHWAY DIVISION HYDERABAD

A01207 Washing Allowance 54,000 54,000 54,000

A0120D Integrated Allowance 33,000 33,000 33,000

A0120X Ad - hoc Allowance - 2010 13,411,000 12,037,000 12,037,000

A01217 Medical Allowance 7,563,000 6,212,000 6,212,000

A0121A Ad - hoc Allowance - 2011 8,000

A0121M Adhoc Relief Allowance - 2012 8,000

A0121Q Audit and Accounts Allowance 48,000 48,000

A0121T Adhoc Relief Allowance 2013 2,017,000 2,017,000

A0121Z Adhoc Relief Allowance - 2014 24,000

A0122C Adhoc Relief Allowance - 2015 6,776,000 1,488,000 1,488,000

A0122M Adhoc Relief Allowance 2016 7,208,000 7,947,000

A01270 Others 6,776,000 7,947,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 30,000 30,000 32,000

A01274 Medical Charges 30,000 30,000 32,000

A03 TOTAL OPERATING EXPENSES 2,034,000 367,000 2,218,000

A032 TOTAL COMMUNICATIONS 81,000 81,000 86,000

A03201 Postage and Telegraph 14,000 14,000 15,000

A03202 Telephone and Trunk call 67,000 67,000 71,000

A033 TOTAL UTILITIES 1,668,000 1,000 1,835,000

A03303 Electricity 1,668,000 1,000 1,835,000

A038 TOTAL TRAVEL & 142,000 142,000 145,000

TRANSPORTATION

A03805 Travelling Allowance 58,000 58,000 61,000

A03807 P.O.L Charges A.planes 84,000 84,000 84,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 143,000 143,000 152,000

A03901 Stationery 37,000 37,000 39,000

A03902 Printing and Publication 29,000 29,000 31,000

Page 168: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

167

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0203 HIGHWAY DIVISION HYDERABAD

A03905 Newspapers Periodicals and Books 3,000 3,000 4,000

A03906 Uniforms and Protective Clothing 37,000 37,000 39,000

A03970 Others 37,000 37,000 39,000

1 Others 37,000 37,000 39,000

A13 TOTAL REPAIRS AND MAINTENANCE 37,000 37,000 41,000

A130 TOTAL TRANSPORT 18,000 18,000 20,000

A13001 Transport 18,000 18,000 20,000

A131 TOTAL MACHINERY AND 10,000 10,000 11,000

EQUIPMENT

A13101 Machinery and Equipment 10,000 10,000 11,000

A132 TOTAL FURNITURE AND 9,000 9,000 10,000

FIXTURE

A13201 Furniture and Fixture 9,000 9,000 10,000

_______________________________________________________________________________HIGHWAY DIVISION HYDERABAD 121,176,000 118,601,000 136,369,000

_______________________________________________________________________________

Page 169: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

168

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0206 HIGHWAY DIVISION (COASTAL) HYDERABAD

A01 TOTAL EMPLOYEES RELATED EXPENSES. 30,973,000 29,966,000 34,003,000

A011 TOTAL PAY 99 99 17,766,000 18,105,000 19,917,000

A011-1 TOTAL PAY OF OFFICERS 5 6 3,032,000 3,222,000 3,545,000

A01101 Total Basic Pay Of Officer 5 6 3,021,000 3,206,000 3,527,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 775,000 730,000 804,000

A218 ASSISTANT ENGINEER (BPS-17) 3 3 1,859,000 1,748,000 1,923,000

A235 ASSISTANT HEAD CLERK (BPS-16) 1 364,000 400,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 387,000 364,000 400,000 OFFICER

A01105 Qualification Pay 11,000 16,000 18,000

A011-2 TOTAL PAY OF OTHER STAFF 94 93 14,734,000 14,883,000 16,372,000

A01151 Total Basic Pay Other Staff 94 93 14,692,000 14,837,000 16,321,000

S053 SENIOR CLERK (BPS-14) 2 402,000 443,000

S181 STENOGRAPHER (BPS-14) 1 1 243,000 243,000 268,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 228,000 228,000 251,000 DRAUGHTSMAN

D026 DATA PROCESSING ASSISTANT (BPS-12) 1 1 109,000 213,000 235,000

A235 ASSISTANT HEAD CLERK (BPS-11) 1 199,000

J053 JUNIOR CLERK (BPS-11) 5 1,006,000 1,106,000

S222 SUB ENGINEER (BPS-11) 7 7 1,400,000 1,408,000 1,549,000

A017 ACCOUNT CLERK (BPS-09) 1 1 185,000 192,000 207,000

S053 SENIOR CLERK (BPS-09) 2 376,000

J014 JR CLERK (BPS-07) 5 878,000

R064 ROAD INSPECTOR / WORK / (BPS-06) 1 1 171,000 170,000 187,000 GENERAL SUPERVISOR

R061 ROAD / WORK MISTRI / (BPS-05) 5 5 818,000 822,000 904,000 DAROGHA

Page 170: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

169

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0206 HIGHWAY DIVISION (COASTAL) HYDERABAD

T050 TRACER (BPS-05) 1 1 164,000 164,000 181,000

D161 DRIVER (BPS-04) 2 2 314,000 317,000 349,000

D003 DAFTARI (BPS-02) 1 1 149,000 149,000 164,000

R066 ROAD MATE / MOTOR MATE (BPS-02) 4 4 593,000 596,000 656,000

B028 BELDAR FOR COLONY (BPS-01) 45 45 6,540,000 6,586,000 7,245,000

C089 CHOWKIDAR (BPS-01) 6 6 872,000 878,000 966,000

C112 CLEANER / HELPER / COLI / (BPS-01) 3 3 437,000 439,000 483,000 WIND CLEANER

N003 NAIB QASID (BPS-01) 3 3 435,000 439,000 483,000

S008 SANITARY WORKER (BPS-01) 4 4 581,000 585,000 644,000

A01152 Personal pay 42,000 46,000 51,000

A012 TOTAL ALLOWANCES 13,207,000 11,861,000 14,086,000

A012-1 TOTAL REGULAR ALLOWANCES 12,959,000 11,613,000 13,825,000

A01202 House Rent Allowance 1,527,000 1,527,000 1,527,000

A01203 Conveyance Allowance 2,496,000 2,496,000 2,496,000

A01207 Washing Allowance 19,000 19,000 19,000

A0120D Integrated Allowance 5,000 7,000 7,000

A0120X Ad - hoc Allowance - 2010 3,477,000 2,968,000 2,968,000

A01217 Medical Allowance 1,876,000 1,876,000 1,876,000

A0121A Ad - hoc Allowance - 2011 10,000

A0121M Adhoc Relief Allowance - 2012 7,000

A0121Q Audit and Accounts Allowance 76,000 76,000

A0121T Adhoc Relief Allowance 2013 16,000 492,000 492,000

A0121Z Adhoc Relief Allowance - 2014 11,000 18,000

A0122C Adhoc Relief Allowance - 2015 1,771,000 393,000 393,000

A0122M Adhoc Relief Allowance 2016 1,723,000 1,985,000

A01233 Unattractive Area Allowance 1,000 1,000 1,000

A01270 Others 1,760,000 1,985,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 248,000 248,000 261,000

A01274 Medical Charges 248,000 248,000 261,000

Page 171: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

170

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0206 HIGHWAY DIVISION (COASTAL) HYDERABAD

A03 TOTAL OPERATING EXPENSES 437,000 333,000 461,000

A032 TOTAL COMMUNICATIONS 29,000 29,000 32,000

A03201 Postage and Telegraph 2,000 2,000 3,000

A03202 Telephone and Trunk call 27,000 27,000 29,000

A033 TOTAL UTILITIES 105,000 1,000 116,000

A03303 Electricity 105,000 1,000 116,000

A038 TOTAL TRAVEL & 236,000 236,000 240,000

TRANSPORTATION

A03805 Travelling Allowance 68,000 68,000 72,000

A03807 P.O.L Charges A.planes 168,000 168,000 168,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 67,000 67,000 73,000

A03901 Stationery 16,000 16,000 17,000

A03902 Printing and Publication 8,000 8,000 9,000

A03905 Newspapers Periodicals and Books 4,000 4,000 5,000

A03906 Uniforms and Protective Clothing 9,000 9,000 10,000

A03970 Others 30,000 30,000 32,000

1 Others 30,000 30,000 32,000

A09 TOTAL PHYSICAL ASSETS 12,000 12,000

A096 TOTAL PURCHASE OF PLANT & 12,000 12,000

MACHINERY

A09601 Plant and Machinery 12,000 12,000

15 One Fax Machine 12,000 12,000

A13 TOTAL REPAIRS AND MAINTENANCE 36,000 36,000 41,000

A130 TOTAL TRANSPORT 12,000 12,000 14,000

Page 172: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

171

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0206 HIGHWAY DIVISION (COASTAL) HYDERABAD

A13001 Transport 12,000 12,000 14,000

A131 TOTAL MACHINERY AND 15,000 15,000 17,000

EQUIPMENT

A13101 Machinery and Equipment 15,000 15,000 17,000

A132 TOTAL FURNITURE AND 9,000 9,000 10,000

FIXTURE

A13201 Furniture and Fixture 9,000 9,000 10,000

_______________________________________________________________________________HIGHWAY DIVISION (COASTAL) HYDERABAD 31,458,000 30,347,000 34,505,000

_______________________________________________________________________________

Page 173: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

172

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0207 HIGHWAYS ROADS AND BRIDGES HYDERABAD

A13 TOTAL REPAIRS AND MAINTENANCE 348,475,000 415,559,500 348,475,000

A131 TOTAL MACHINERY AND 1,366,000 1,366,000 1,366,000

EQUIPMENT

A13101 Machinery and Equipment 1,366,000 1,366,000 1,366,000

A136 TOTAL ROADS, HIGHWAYS AND 347,109,000 414,193,500 347,109,000

BRIDGES

A13602 Other roads 341,677,000 408,761,500 341,677,000

1 Other 341,677,000 408,761,500 341,677,000

A13604 Other bridges 5,432,000 5,432,000 5,432,000

6 Other (Fixed Charges) 5,432,000 5,432,000 5,432,000

_______________________________________________________________________________HIGHWAYS ROADS AND BRIDGES HYDERABAD 348,475,000 415,559,500 348,475,000

_______________________________________________________________________________

Page 174: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

173

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0208 PROJECT IMPLEMENTATION UNIT HYDERABAD

A01 TOTAL EMPLOYEES RELATED EXPENSES. 4,953,000 5,264,000 5,981,000

A011 TOTAL PAY 13 13 2,853,000 3,251,000 3,577,000

A011-1 TOTAL PAY OF OFFICERS 1 2 1,538,000 1,279,000 1,407,000

A01101 Total Basic Pay Of Officer 1 2 1,538,000 1,279,000 1,407,000

P221 PROJECT MANAGER (BPS-18) 1 1 1,538,000 854,000 939,000

A235 ASSISTANT HEAD CLERK (BPS-16) 1 425,000 468,000

A011-2 TOTAL PAY OF OTHER STAFF 12 11 1,315,000 1,972,000 2,170,000

A01151 Total Basic Pay Other Staff 12 11 1,315,000 1,972,000 2,170,000

S181 STENOGRAPHER (BPS-14) 1 1 153,000 247,000 272,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 143,000 232,000 255,000 DRAUGHTSMAN

A235 ASSISTANT HEAD CLERK (BPS-11) 1 127,000

J053 JUNIOR CLERK (BPS-11) 2 409,000 450,000

A017 ACCOUNT CLERK (BPS-07) 1 1 111,000 180,000 198,000

J014 JR CLERK (BPS-07) 2 222,000

D161 DRIVER (BPS-04) 1 1 99,000 161,000 177,000

C092 CHOWKIDAR / WATCHMAN (BPS-01) 2 2 183,000 297,000 327,000

N003 NAIB QASID (BPS-01) 2 2 185,000 297,000 327,000

S008 SANITARY WORKER (BPS-01) 1 1 92,000 149,000 164,000

A012 TOTAL ALLOWANCES 2,100,000 2,013,000 2,404,000

A012-1 TOTAL REGULAR ALLOWANCES 2,048,000 1,961,000 2,349,000

A01201 Senior Post Allowance 5,000 5,000 5,000

A01202 House Rent Allowance 319,000 319,000 319,000

A01203 Conveyance Allowance 294,000 335,000 335,000

A01207 Washing Allowance 6,000 6,000 6,000

A0120D Integrated Allowance 4,000 4,000

Page 175: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

174

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0208 PROJECT IMPLEMENTATION UNIT HYDERABAD

A0120X Ad - hoc Allowance - 2010 526,000 514,000 514,000

A01217 Medical Allowance 278,000 278,000 278,000

A0121T Adhoc Relief Allowance 2013 57,000 57,000

A0121Z Adhoc Relief Allowance - 2014 2,000

A01224 Entertainment Allowance 11,000 11,000 11,000

A01228 Orderly Allowance 39,000 39,000 39,000

A0122C Adhoc Relief Allowance - 2015 285,000 65,000 65,000

A0122M Adhoc Relief Allowance 2016 326,000 358,000

A01270 Others 285,000 358,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 52,000 52,000 55,000

A01274 Medical Charges 52,000 52,000 55,000

A03 TOTAL OPERATING EXPENSES 1,617,000 1,214,000 1,695,000

A032 TOTAL COMMUNICATIONS 134,000 134,000 141,000

A03201 Postage and Telegraph 14,000 14,000 15,000

A03202 Telephone and Trunk call 120,000 120,000 126,000

A033 TOTAL UTILITIES 544,000 141,000 592,000

A03301 Gas 140,000 140,000 154,000

A03302 Water 70,000 70,000

A03303 Electricity 334,000 1,000 368,000

A034 TOTAL OCCUPANCY COSTS 253,000 253,000 253,000

A03407 Rates and Taxes 253,000 253,000 253,000

A038 TOTAL TRAVEL & 468,000 468,000 478,000

TRANSPORTATION

A03805 Travelling Allowance 192,000 192,000 202,000

A03807 P.O.L Charges A.planes 276,000 276,000 276,000

H.coptors S.Cars M/Cycle

Page 176: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

175

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0208 PROJECT IMPLEMENTATION UNIT HYDERABAD

A039 TOTAL GENERAL 218,000 218,000 231,000

A03901 Stationery 102,000 102,000 108,000

A03902 Printing and Publication 35,000 35,000 37,000

A03905 Newspapers Periodicals and Books 16,000 16,000 17,000

A03906 Uniforms and Protective Clothing 16,000 16,000 17,000

A03970 Others 49,000 49,000 52,000

1 Others 49,000 49,000 52,000

A13 TOTAL REPAIRS AND MAINTENANCE 168,000 168,000 185,000

A130 TOTAL TRANSPORT 74,000 74,000 82,000

A13001 Transport 74,000 74,000 82,000

A131 TOTAL MACHINERY AND 77,000 77,000 85,000

EQUIPMENT

A13101 Machinery and Equipment 77,000 77,000 85,000

A132 TOTAL FURNITURE AND 17,000 17,000 18,000

FIXTURE

A13201 Furniture and Fixture 17,000 17,000 18,000

_______________________________________________________________________________PROJECT IMPLEMENTATION UNIT HYDERABAD 6,738,000 6,646,000 7,861,000

_______________________________________________________________________________

Page 177: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

176

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0213 HIGHWAYS ROADS AND BRIDGES KARACHI

A13 TOTAL REPAIRS AND MAINTENANCE 132,276,000 180,617,000 132,276,000

A131 TOTAL MACHINERY AND 1,366,000 1,366,000 1,366,000

EQUIPMENT

A13101 Machinery and Equipment 1,366,000 1,366,000 1,366,000

A136 TOTAL ROADS, HIGHWAYS AND 130,910,000 179,251,000 130,910,000

BRIDGES

A13602 Other roads 126,882,000 175,223,000 126,882,000

1 Other 126,882,000 175,223,000 126,882,000

A13604 Other bridges 4,028,000 4,028,000 4,028,000

6 Other (Fixed Charges) 4,028,000 4,028,000 4,028,000

_______________________________________________________________________________HIGHWAYS ROADS AND BRIDGES KARACHI 132,276,000 180,617,000 132,276,000

_______________________________________________________________________________

Page 178: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

177

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0214 HIGHWAYS ROADS AND BRIDGES TANDOMUHAMMAD KHAN

A13 TOTAL REPAIRS AND MAINTENANCE 59,882,000 209,882,000 59,882,000

A131 TOTAL MACHINERY AND 1,366,000 1,366,000 1,366,000

EQUIPMENT

A13101 Machinery and Equipment 1,366,000 1,366,000 1,366,000

A136 TOTAL ROADS, HIGHWAYS AND 58,516,000 208,516,000 58,516,000

BRIDGES

A13602 Other roads 54,488,000 204,488,000 54,488,000

1 Other 54,488,000 204,488,000 54,488,000

A13604 Other bridges 4,028,000 4,028,000 4,028,000

6 Other (Fixed Charges) 4,028,000 4,028,000 4,028,000

_______________________________________________________________________________HIGHWAYS ROADS AND BRIDGES TANDO 59,882,000 209,882,000 59,882,000

MUHAMMAD KHAN

_______________________________________________________________________________

Page 179: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

178

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0215 HIGHWAYS ROADS AND BRIDGESTANDO TANDOALLAH YAR

A13 TOTAL REPAIRS AND MAINTENANCE 59,882,000 98,882,000 59,882,000

A131 TOTAL MACHINERY AND 1,366,000 1,366,000 1,366,000

EQUIPMENT

A13101 Machinery and Equipment 1,366,000 1,366,000 1,366,000

A136 TOTAL ROADS, HIGHWAYS AND 58,516,000 97,516,000 58,516,000

BRIDGES

A13602 Other roads 54,488,000 93,488,000 54,488,000

1 Other 54,488,000 93,488,000 54,488,000

A13604 Other bridges 4,028,000 4,028,000 4,028,000

6 Other (Fixed Charges) 4,028,000 4,028,000 4,028,000

_______________________________________________________________________________HIGHWAYS ROADS AND BRIDGESTANDO TANDO 59,882,000 98,882,000 59,882,000

ALLAH YAR

_______________________________________________________________________________

Page 180: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

179

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0216 HIGHWAYS ROADS AND BRIDGES MATIARI

A13 TOTAL REPAIRS AND MAINTENANCE 59,882,000 114,009,000 59,882,000

A131 TOTAL MACHINERY AND 1,366,000 1,366,000 1,366,000

EQUIPMENT

A13101 Machinery and Equipment 1,366,000 1,366,000 1,366,000

A136 TOTAL ROADS, HIGHWAYS AND 58,516,000 112,643,000 58,516,000

BRIDGES

A13602 Other roads 54,488,000 108,615,000 54,488,000

1 Other 54,488,000 108,615,000 54,488,000

A13604 Other bridges 4,028,000 4,028,000 4,028,000

6 Other (Fixed Charges) 4,028,000 4,028,000 4,028,000

_______________________________________________________________________________HIGHWAYS ROADS AND BRIDGES MATIARI 59,882,000 114,009,000 59,882,000

_______________________________________________________________________________

Page 181: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

180

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0217 PROJECT IMPLEMENTATIONUNIT JHIRK MULLAHKHAIR BRIDGE HYDERABAD

A05 TOTAL GRANTS SUBSIDIES AND WRITE OF 6,020,000 6,020,000 6,020,000

A052 TOTAL GRANTS-DOMESTIC 6,020,000 6,020,000 6,020,000

A05270 To Others 6,020,000 6,020,000 6,020,000

1 Others 6,020,000 6,020,000 6,020,000

_______________________________________________________________________________PROJECT IMPLEMENTATIONUNIT JHIRK MULLAH 6,020,000 6,020,000 6,020,000

KHAIR BRIDGE HYDERABAD

_______________________________________________________________________________

Page 182: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

181

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0218 KARACHI THATTA DUAL CARRIAGEWAY PROJECT

A01 TOTAL EMPLOYEES RELATED EXPENSES. 12,239,000 11,012,000 13,013,000

A011 TOTAL PAY 18 18 8,383,000 7,639,000 8,405,000

A011-1 TOTAL PAY OF OFFICERS 3 4 4,717,000 4,717,000 5,190,000

A01101 Total Basic Pay Of Officer 3 4 4,685,000 4,685,000 5,154,000

A218 ASSISTANT ENGINEER (BPS-19) 1 1 2,166,000 1,887,000 2,076,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 1,398,000 1,219,000 1,341,000

A218 ASSISTANT ENGINEER (BPS-17) 1 1 1,121,000 972,000 1,069,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 1 607,000 668,000

A01102 Personal pay 32,000 32,000 36,000

A011-2 TOTAL PAY OF OTHER STAFF 15 14 3,666,000 2,922,000 3,215,000

A01151 Total Basic Pay Other Staff 15 14 3,654,000 2,910,000 3,201,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 1 361,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 338,000 269,000 296,000 DRAUGHTSMAN

C148 COMPUTER OPERATORS (BPS-12) 1 1 317,000 251,000 276,000

J053 JUNIOR CLERK (BPS-11) 2 474,000 521,000

S222 SUB ENGINEER (BPS-11) 2 2 297,000 474,000 521,000

A017 ACCOUNT CLERK (BPS-09) 1 1 279,000 221,000 244,000

J014 JR CLERK (BPS-07) 2 524,000

D161 DRIVER (BPS-04) 1 1 234,000 187,000 205,000

C092 CHOWKIDAR / WATCHMAN (BPS-01) 2 2 436,000 345,000 379,000

N003 NAIB QASID (BPS-01) 3 3 651,000 517,000 569,000

S008 SANITARY WORKER (BPS-01) 1 1 217,000 172,000 190,000

A01152 Personal pay 12,000 12,000 14,000

Page 183: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

182

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0218 KARACHI THATTA DUAL CARRIAGEWAY PROJECT

A012 TOTAL ALLOWANCES 3,856,000 3,373,000 4,608,000

A012-1 TOTAL REGULAR ALLOWANCES 3,762,000 3,279,000 4,509,000

A01202 House Rent Allowance 302,000 419,000 419,000

A01203 Conveyance Allowance 303,000 505,000 505,000

A01207 Washing Allowance 2,000 3,000 3,000

A0120D Integrated Allowance 4,000 14,000 14,000

A0120X Ad - hoc Allowance - 2010 676,000 691,000 691,000

A01217 Medical Allowance 285,000 297,000 297,000

A0121T Adhoc Relief Allowance 2013 103,000 103,000

A0121Z Adhoc Relief Allowance - 2014 13,000

A01227 Project Allowance 522,000 702,000 702,000

A0122C Adhoc Relief Allowance - 2015 834,000 103,000 103,000

A0122M Adhoc Relief Allowance 2016 429,000 836,000

A01270 Others 834,000 836,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 94,000 94,000 99,000

A01274 Medical Charges 94,000 94,000 99,000

A03 TOTAL OPERATING EXPENSES 3,613,000 31,748,000 3,875,000

A032 TOTAL COMMUNICATIONS 61,000 28,348,000 65,000

A03201 Postage and Telegraph 6,000 6,000 7,000

A03202 Telephone and Trunk call 55,000 2,575,000 58,000

A03270 Others 25,767,000

A033 TOTAL UTILITIES 300,000 54,000 330,000

A03303 Electricity 300,000 54,000 330,000

A034 TOTAL OCCUPANCY COSTS 1,969,000 1,969,000 2,155,000

A03402 Rent for Office Building 1,859,000 1,859,000 2,045,000

A03407 Rates and Taxes 110,000 110,000 110,000

Page 184: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

183

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0218 KARACHI THATTA DUAL CARRIAGEWAY PROJECT

A038 TOTAL TRAVEL & 598,000 598,000 603,000

TRANSPORTATION

A03805 Travelling Allowance 98,000 98,000 103,000

A03807 P.O.L Charges A.planes 500,000 500,000 500,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 685,000 779,000 722,000

A03901 Stationery 61,000 61,000 65,000

A03905 Newspapers Periodicals and Books 14,000 14,000 15,000

A03906 Uniforms and Protective Clothing 6,000 6,000 7,000

A03919 Payments to other for Service 94,000

Rendered

A03970 Others 604,000 604,000 635,000

1 Others 604,000 604,000 635,000

A13 TOTAL REPAIRS AND MAINTENANCE 154,000 154,000 169,000

A130 TOTAL TRANSPORT 70,000 70,000 77,000

A13001 Transport 70,000 70,000 77,000

A131 TOTAL MACHINERY AND 70,000 70,000 77,000

EQUIPMENT

A13101 Machinery and Equipment 70,000 70,000 77,000

A132 TOTAL FURNITURE AND 14,000 14,000 15,000

FIXTURE

A13201 Furniture and Fixture 14,000 14,000 15,000

_______________________________________________________________________________KARACHI THATTA DUAL CARRIAGEWAY PROJECT 16,006,000 42,914,000 17,057,000

_______________________________________________________________________________

Page 185: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

184

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0219 DIRECTOR ROAD RESEARCH LABORTARYKARACHI

A01 TOTAL EMPLOYEES RELATED EXPENSES. 31,904,000 32,292,000 36,854,000

A011 TOTAL PAY 51 51 19,627,000 20,678,000 22,748,000

A011-1 TOTAL PAY OF OFFICERS 18 19 11,179,000 13,474,000 14,823,000

A01101 Total Basic Pay Of Officer 18 19 11,070,000 13,361,000 14,698,000

D085 DIRECTOR (MONIT) / (BPS-19) 1 1 1,112,000 1,276,000 1,403,000 SUPERINTENDING ENGINEER

D186 DY DIRECTOR (MONIT / (BPS-18) 3 3 2,150,000 2,472,000 2,719,000 RESC) / EXECUTIVE ENGINEER

A189 ASSISTANT DIRECTOR (MONIT (BPS-17) 12 12 6,880,000 7,889,000 8,679,000 / RESC) / ASSISTANT ENGI

P051 PLANNING OFFICER (BPS-17) 1 1 572,000 657,000 723,000

S236 SUPERINTENDENT (BPS-17) 1 657,000 723,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 1 410,000 451,000

S236 SUPERINTENDENT (BPS-16) 1 356,000

A01102 Personal pay 109,000 113,000 125,000

A011-2 TOTAL PAY OF OTHER STAFF 33 32 8,448,000 7,204,000 7,925,000

A01151 Total Basic Pay Other Staff 33 32 8,423,000 7,179,000 7,897,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 1 373,000

S053 SENIOR CLERK (BPS-14) 1 275,000 302,000

S181 STENOGRAPHER (BPS-14) 1 1 373,000 332,000 366,000

S094 SENIOR RESEARCH ASSISTANT (BPS-11) 2 2 617,000 549,000 604,000

D150 DRAUGHTSMAN (BPS-10) 1 1 300,000 266,000 293,000

A017 ACCOUNT CLERK (BPS-09) 1 1 290,000 258,000 283,000

S053 SENIOR CLERK (BPS-09) 1 290,000

J031 JR RESEARCH ASSISTANT (BPS-08) 2 2 561,000 498,000 548,000

L010 LABORATORY ASSISTANT (BPS-05) 5 5 1,262,000 1,122,000 1,234,000

Page 186: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

185

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0219 DIRECTOR ROAD RESEARCH LABORTARYKARACHI

R063 ROAD INSPECTOR / DAROGHAS(BPS-05) 2 2 506,000 449,000 494,000

D161 DRIVER (BPS-04) 2 2 486,000 433,000 476,000

C089 CHOWKIDAR (BPS-01) 1 1 224,000 200,000 220,000

L011 LABORATORY ATTENDANT (BPS-01) 10 10 2,245,000 1,998,000 2,198,000

N003 NAIB QASID (BPS-01) 3 3 671,000 599,000 659,000

S008 SANITARY WORKER (BPS-01) 1 1 225,000 200,000 220,000

A01152 Personal pay 25,000 25,000 28,000

A012 TOTAL ALLOWANCES 12,277,000 11,614,000 14,106,000

A012-1 TOTAL REGULAR ALLOWANCES 12,222,000 11,559,000 14,048,000

A01202 House Rent Allowance 1,732,000 1,820,000 1,820,000

A01203 Conveyance Allowance 1,998,000 2,064,000 2,064,000

A01207 Washing Allowance 3,000 4,000 4,000

A0120D Integrated Allowance 12,000 12,000 12,000

A0120X Ad - hoc Allowance - 2010 3,394,000 3,311,000 3,311,000

A01217 Medical Allowance 1,492,000 1,492,000 1,492,000

A0121T Adhoc Relief Allowance 2013 309,000 309,000

A0121Z Adhoc Relief Allowance - 2014 87,000

A01224 Entertainment Allowance 3,000 7,000 7,000

A0122C Adhoc Relief Allowance - 2015 1,794,000 496,000 496,000

A0122M Adhoc Relief Allowance 2016 1,944,000 2,260,000

A01239 Special Allowance 13,000 13,000

A01270 Others 1,794,000 2,260,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 55,000 55,000 58,000

A01274 Medical Charges 55,000 55,000 58,000

A03 TOTAL OPERATING EXPENSES 358,000 306,000 383,000

A032 TOTAL COMMUNICATIONS 37,000 37,000 40,000

A03201 Postage and Telegraph 5,000 5,000 6,000

A03202 Telephone and Trunk call 32,000 32,000 34,000

Page 187: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

186

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0219 DIRECTOR ROAD RESEARCH LABORTARYKARACHI

A033 TOTAL UTILITIES 150,000 98,000 165,000

A03303 Electricity 150,000 98,000 165,000

A038 TOTAL TRAVEL & 128,000 128,000 130,000

TRANSPORTATION

A03805 Travelling Allowance 28,000 28,000 30,000

A03807 P.O.L Charges A.planes 100,000 100,000 100,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 43,000 43,000 48,000

A03901 Stationery 14,000 14,000 15,000

A03902 Printing and Publication 4,000 4,000 5,000

A03905 Newspapers Periodicals and Books 4,000 4,000 5,000

A03906 Uniforms and Protective Clothing 11,000 11,000 12,000

A03970 Others 10,000 10,000 11,000

1 Others 10,000 10,000 11,000

A09 TOTAL PHYSICAL ASSETS 2,314,000

A095 TOTAL PURCHASE OF 2,264,000

TRANSPORT

A09501 Transport 2,264,000

383 One Hilux Single Cabin 2,264,000

A097 TOTAL PURCHASE FURNITURE 50,000

& FIXTURE

A09701 Furniture and Fixtures 50,000

001 Furniture and Fixtures 50,000

A13 TOTAL REPAIRS AND MAINTENANCE 52,000 52,000 58,000

Page 188: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

187

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0219 DIRECTOR ROAD RESEARCH LABORTARYKARACHI

A130 TOTAL TRANSPORT 39,000 39,000 43,000

A13001 Transport 39,000 39,000 43,000

A131 TOTAL MACHINERY AND 9,000 9,000 10,000

EQUIPMENT

A13101 Machinery and Equipment 9,000 9,000 10,000

A132 TOTAL FURNITURE AND 4,000 4,000 5,000

FIXTURE

A13201 Furniture and Fixture 4,000 4,000 5,000

_______________________________________________________________________________DIRECTOR ROAD RESEARCH LABORTARY 32,314,000 32,650,000 39,609,000

KARACHI

_______________________________________________________________________________

Page 189: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

188

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0220 PROJECT IMPLEMENTATION UNIT HYDERABADBADIN ROAD

A01 TOTAL EMPLOYEES RELATED EXPENSES. 5,298,000 4,732,000 5,526,000

A011 TOTAL PAY 20 20 3,531,000 3,174,000 3,492,000

A011-1 TOTAL PAY OF OFFICERS 3 4 1,854,000 927,000 1,020,000

A01101 Total Basic Pay Of Officer 3 4 1,854,000 927,000 1,020,000

P221 PROJECT MANAGER (BPS-19) 1 1 853,000 373,000 411,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 556,000 241,000 265,000

A218 ASSISTANT ENGINEER (BPS-17) 1 1 445,000 193,000 212,000

A235 ASSISTANT HEAD CLERK (BPS-16) 1 120,000 132,000

A011-2 TOTAL PAY OF OTHER STAFF 17 16 1,677,000 2,247,000 2,472,000

A01151 Total Basic Pay Other Staff 17 16 1,677,000 2,247,000 2,472,000

A235 ASSISTANT HEAD CLERK (BPS-14) 1 139,000

S181 STENOGRAPHER (BPS-14) 1 1 138,000 197,000 216,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 127,000 184,000 203,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 3 487,000 536,000

A017 ACCOUNT CLERK (BPS-09) 1 1 107,000 152,000 168,000

J014 JR CLERK (BPS-07) 3 301,000

D161 DRIVER (BPS-04) 3 3 270,000 384,000 422,000

C089 CHOWKIDAR (BPS-02) 2 2 170,000 241,000 265,000

N003 NAIB QASID (BPS-02) 4 4 340,000 482,000 530,000

S008 SANITARY WORKER (BPS-02) 1 1 85,000 120,000 132,000

A012 TOTAL ALLOWANCES 1,767,000 1,558,000 2,034,000

A012-1 TOTAL REGULAR ALLOWANCES 1,715,000 1,506,000 1,979,000

A01202 House Rent Allowance 218,000 233,000 233,000

Page 190: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

189

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0220 PROJECT IMPLEMENTATION UNIT HYDERABADBADIN ROAD

A01203 Conveyance Allowance 280,000 334,000 334,000

A01207 Washing Allowance 4,000 4,000 4,000

A0120D Integrated Allowance 13,000 13,000 13,000

A0120X Ad - hoc Allowance - 2010 279,000 360,000 360,000

A01217 Medical Allowance 215,000 218,000 218,000

A0121T Adhoc Relief Allowance 2013 71,000 71,000

A0122C Adhoc Relief Allowance - 2015 353,000 48,000 48,000

A0122M Adhoc Relief Allowance 2016 225,000 349,000

A01270 Others 353,000 349,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 52,000 52,000 55,000

A01274 Medical Charges 52,000 52,000 55,000

A03 TOTAL OPERATING EXPENSES 1,942,000 1,539,000 2,042,000

A032 TOTAL COMMUNICATIONS 175,000 175,000 185,000

A03201 Postage and Telegraph 14,000 14,000 15,000

A03202 Telephone and Trunk call 134,000 134,000 141,000

A03205 Courier and Pilot Service 27,000 27,000 29,000

A033 TOTAL UTILITIES 544,000 141,000 592,000

A03301 Gas 140,000 140,000 154,000

A03302 Water 70,000 70,000

A03303 Electricity 334,000 1,000 368,000

A038 TOTAL TRAVEL & 823,000 823,000 842,000

TRANSPORTATION

A03805 Travelling Allowance 364,000 364,000 383,000

A03807 P.O.L Charges A.planes 459,000 459,000 459,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 400,000 400,000 423,000

A03901 Stationery 147,000 147,000 155,000

Page 191: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

190

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0220 PROJECT IMPLEMENTATION UNIT HYDERABADBADIN ROAD

A03902 Printing and Publication 74,000 74,000 78,000

A03905 Newspapers Periodicals and Books 29,000 29,000 31,000

A03906 Uniforms and Protective Clothing 29,000 29,000 31,000

A03970 Others 121,000 121,000 128,000

1 Others 121,000 121,000 128,000

A13 TOTAL REPAIRS AND MAINTENANCE 333,000 333,000 366,000

A130 TOTAL TRANSPORT 146,000 146,000 161,000

A13001 Transport 146,000 146,000 161,000

A131 TOTAL MACHINERY AND 146,000 146,000 161,000

EQUIPMENT

A13101 Machinery and Equipment 146,000 146,000 161,000

A132 TOTAL FURNITURE AND 41,000 41,000 44,000

FIXTURE

A13201 Furniture and Fixture 41,000 41,000 44,000

_______________________________________________________________________________PROJECT IMPLEMENTATION UNIT HYDERABAD 7,573,000 6,604,000 7,934,000

BADIN ROAD

_______________________________________________________________________________

Page 192: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

191

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0221 HIGHWAYS ROADS AND BRIDGES THATTA

A13 TOTAL REPAIRS AND MAINTENANCE 251,247,000 257,247,000 251,247,000

A131 TOTAL MACHINERY AND 1,366,000 1,366,000 1,366,000

EQUIPMENT

A13101 Machinery and Equipment 1,366,000 1,366,000 1,366,000

A136 TOTAL ROADS, HIGHWAYS AND 249,881,000 255,881,000 249,881,000

BRIDGES

A13602 Other roads 247,708,000 253,708,000 247,708,000

1 Other 247,708,000 253,708,000 247,708,000

A13604 Other bridges 2,173,000 2,173,000 2,173,000

6 Other (Fixed Charges) 2,173,000 2,173,000 2,173,000

_______________________________________________________________________________HIGHWAYS ROADS AND BRIDGES THATTA 251,247,000 257,247,000 251,247,000

_______________________________________________________________________________

Page 193: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

192

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

KQ0532 DIRECTOR GENERAL (DESIGN) SINDH KARACHIII- ROAD MANAGMENT UNIT SINDH

A01 TOTAL EMPLOYEES RELATED EXPENSES. 10,515,000 9,841,000 11,622,000

A011 TOTAL PAY 18 18 6,947,000 6,942,000 7,638,000

A011-1 TOTAL PAY OF OFFICERS 3 4 3,718,000 3,718,000 4,091,000

A01101 Total Basic Pay Of Officer 3 4 3,673,000 3,673,000 4,041,000

X001 XEN / MANAGER (BPS-18) 1 1 1,414,000 1,187,000 1,306,000

A074 AEN / ASSISTANT MANAGER (BPS-17) 2 2 2,259,000 1,895,000 2,085,000

A235 ASSISTANT HEAD CLERK (BPS-16) 1 591,000 650,000

A01102 Personal pay 45,000 45,000 50,000

A011-2 TOTAL PAY OF OTHER STAFF 15 14 3,229,000 3,224,000 3,547,000

A01151 Total Basic Pay Other Staff 15 14 3,229,000 3,224,000 3,547,000

C146 COMPUTER OPERATOR (BPS-12) 2 2 505,000 542,000 597,000

A235 ASSISTANT HEAD CLERK (BPS-11) 1 240,000

J053 JUNIOR CLERK (BPS-11) 1 256,000 281,000

S228 SUB-ENGINEER (BPS-11) 2 2 481,000 512,000 563,000

D150 DRAUGHTSMAN (BPS-10) 2 2 465,000 496,000 545,000

A017 ACCOUNT CLERK (BPS-09) 1 1 226,000 240,000 264,000

J014 JR CLERK (BPS-07) 1 210,000

D161 DRIVER (BPS-04) 4 4 756,000 806,000 887,000

C089 CHOWKIDAR (BPS-01) 1 1 174,000 186,000 205,000

N003 NAIB QASID (BPS-01) 1 1 172,000 186,000 205,000

A012 TOTAL ALLOWANCES 3,568,000 2,899,000 3,984,000

A012-1 TOTAL REGULAR ALLOWANCES 3,396,000 2,727,000 3,803,000

A01202 House Rent Allowance 418,000 418,000 418,000

A01203 Conveyance Allowance 562,000 562,000 562,000

Page 194: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

193

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

KQ0532 DIRECTOR GENERAL (DESIGN) SINDH KARACHIII- ROAD MANAGMENT UNIT SINDH

A01207 Washing Allowance 6,000 6,000 6,000

A0120X Ad - hoc Allowance - 2010 837,000 714,000 714,000

A01217 Medical Allowance 389,000 389,000 389,000

A0121T Adhoc Relief Allowance 2013 81,000 81,000

A01226 Computer Allowance 20,000 20,000 20,000

A0122C Adhoc Relief Allowance - 2015 579,000 89,000 89,000

A0122M Adhoc Relief Allowance 2016 442,000 759,000

A01237 Design Allowance 6,000 6,000 6,000

A01270 Others 579,000 759,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 172,000 172,000 181,000

A01274 Medical Charges 172,000 172,000 181,000

A03 TOTAL OPERATING EXPENSES 321,000 321,000 333,000

A032 TOTAL COMMUNICATIONS 31,000 31,000 34,000

A03201 Postage and Telegraph 8,000 8,000 9,000

A03202 Telephone and Trunk call 23,000 23,000 25,000

A038 TOTAL TRAVEL & 224,000 224,000 228,000

TRANSPORTATION

A03805 Travelling Allowance 78,000 78,000 82,000

A03807 P.O.L Charges A.planes 146,000 146,000 146,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 66,000 66,000 71,000

A03901 Stationery 17,000 17,000 18,000

A03902 Printing and Publication 17,000 17,000 18,000

A03906 Uniforms and Protective Clothing 8,000 8,000 9,000

A03970 Others 24,000 24,000 26,000

1 Others 24,000 24,000 26,000

A13 TOTAL REPAIRS AND MAINTENANCE 142,000 142,000 157,000

Page 195: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

194

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

KQ0532 DIRECTOR GENERAL (DESIGN) SINDH KARACHIII- ROAD MANAGMENT UNIT SINDH

A130 TOTAL TRANSPORT 107,000 107,000 118,000

A13001 Transport 107,000 107,000 118,000

A131 TOTAL MACHINERY AND 21,000 21,000 24,000

EQUIPMENT

A13101 Machinery and Equipment 21,000 21,000 24,000

A132 TOTAL FURNITURE AND 14,000 14,000 15,000

FIXTURE

A13201 Furniture and Fixture 14,000 14,000 15,000

_______________________________________________________________________________DIRECTOR GENERAL (DESIGN) SINDH KARACHI 10,978,000 10,304,000 12,112,000

II- ROAD MANAGMENT UNIT SINDH

_______________________________________________________________________________

Page 196: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

195

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

KQ0533 DIRECTOR GENERAL ROAD SECTORDEVELOPMENT DIRECTORATE (RSDD)SINDH

A01 TOTAL EMPLOYEES RELATED EXPENSES. 37,145,000 34,102,000 38,828,000

A011 TOTAL PAY 80 80 21,155,000 20,443,000 22,488,000

A011-1 TOTAL PAY OF OFFICERS 16 25 11,159,000 10,889,000 11,978,000

A01101 Total Basic Pay Of Officer 16 25 11,029,000 10,759,000 11,835,000

D094 DIRECTOR GENERAL (BPS-20) 1 1 1,232,000 799,000 879,000

D045 DEPUTY DIRECTOR (BPS-19) 4 4 2,739,000 2,747,000 3,022,000

D077 DIRECTOR (BPS-19) 4 4 4,247,000 2,747,000 3,022,000

C150 COMPUTER PROGRAMMER (BPS-17) 1 1 549,000 354,000 389,000

R047 RE-SETTLEMENT OFFICER (BPS-17) 1 1 549,000 354,000 389,000

S236 SUPERINTENDENT (BPS-17) 5 1,770,000 1,947,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 9 1,988,000 2,187,000

S236 SUPERINTENDENT (BPS-16) 5 1,713,000

A01102 Personal pay 130,000 130,000 143,000

A011-2 TOTAL PAY OF OTHER STAFF 64 55 9,996,000 9,554,000 10,510,000

A01151 Total Basic Pay Other Staff 64 55 9,995,000 9,553,000 10,509,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 9 1,869,000

S181 STENOGRAPHER (BPS-14) 5 5 1,038,000 1,187,000 1,306,000

C146 COMPUTER OPERATOR (BPS-12) 9 9 1,634,000 1,872,000 2,059,000

J053 JUNIOR CLERK (BPS-11) 10 1,962,000 2,158,000

J014 JR CLERK (BPS-07) 10 1,504,000

D161 DRIVER (BPS-04) 9 9 1,213,000 1,391,000 1,530,000

C089 CHOWKIDAR (BPS-01) 2 2 249,000 285,000 315,000

N003 NAIB QASID (BPS-01) 19 19 2,364,000 2,713,000 2,984,000

S008 SANITARY WORKER (BPS-01) 1 1 124,000 143,000 157,000

Page 197: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

196

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

KQ0533 DIRECTOR GENERAL ROAD SECTORDEVELOPMENT DIRECTORATE (RSDD)SINDH

A01153 Special pay 1,000 1,000 1,000

A012 TOTAL ALLOWANCES 15,990,000 13,659,000 16,340,000

A012-1 TOTAL REGULAR ALLOWANCES 15,706,000 13,375,000 16,041,000

A01202 House Rent Allowance 2,381,000 2,381,000 2,381,000

A01203 Conveyance Allowance 2,629,000 2,629,000 2,629,000

A01207 Washing Allowance 8,000 8,000 8,000

A0120D Integrated Allowance 56,000 56,000 56,000

A0120X Ad - hoc Allowance - 2010 3,889,000 3,189,000 3,189,000

A01217 Medical Allowance 1,920,000 1,920,000 1,920,000

A0121T Adhoc Relief Allowance 2013 283,000 283,000

A01224 Entertainment Allowance 7,000 7,000 7,000

A01226 Computer Allowance 92,000 92,000 92,000

A0122C Adhoc Relief Allowance - 2015 2,102,000 384,000 384,000

A0122M Adhoc Relief Allowance 2016 1,906,000 2,234,000

A01241 Utility allowance for electricity 520,000 520,000 624,000

A01270 Others 2,102,000 2,234,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 284,000 284,000 299,000

A01274 Medical Charges 284,000 284,000 299,000

A03 TOTAL OPERATING EXPENSES 6,673,000 6,673,000 7,137,000

A032 TOTAL COMMUNICATIONS 344,000 344,000 362,000

A03201 Postage and Telegraph 30,000 30,000 32,000

A03202 Telephone and Trunk call 314,000 314,000 330,000

A033 TOTAL UTILITIES 1,203,000 1,203,000 1,325,000

A03301 Gas 70,000 70,000 77,000

A03302 Water 112,000 112,000 124,000

A03303 Electricity 1,021,000 1,021,000 1,124,000

Page 198: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

197

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

KQ0533 DIRECTOR GENERAL ROAD SECTORDEVELOPMENT DIRECTORATE (RSDD)SINDH

A034 TOTAL OCCUPANCY COSTS 2,783,000 2,783,000 3,062,000

A03402 Rent for Office Building 2,783,000 3,062,000

A03407 Rates and Taxes 2,783,000

A038 TOTAL TRAVEL & 2,035,000 2,035,000 2,062,000

TRANSPORTATION

A03805 Travelling Allowance 535,000 535,000 562,000

A03807 P.O.L Charges A.planes 1,500,000 1,500,000 1,500,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 308,000 308,000 326,000

A03901 Stationery 130,000 130,000 137,000

A03902 Printing and Publication 26,000 26,000 28,000

A03905 Newspapers Periodicals and Books 43,000 43,000 46,000

A03906 Uniforms and Protective Clothing 54,000 54,000 57,000

A03970 Others 55,000 55,000 58,000

1 Others 55,000 55,000 58,000

A13 TOTAL REPAIRS AND MAINTENANCE 99,000 99,000 109,000

A130 TOTAL TRANSPORT 57,000 57,000 63,000

A13001 Transport 57,000 57,000 63,000

A131 TOTAL MACHINERY AND 26,000 26,000 29,000

EQUIPMENT

A13101 Machinery and Equipment 26,000 26,000 29,000

A132 TOTAL FURNITURE AND 16,000 16,000 17,000

FIXTURE

A13201 Furniture and Fixture 16,000 16,000 17,000

Page 199: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

198

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

KQ0533 DIRECTOR GENERAL ROAD SECTORDEVELOPMENT DIRECTORATE (RSDD)SINDH

_______________________________________________________________________________DIRECTOR GENERAL ROAD SECTOR 43,917,000 40,874,000 46,074,000

DEVELOPMENT DIRECTORATE (RSDD)

SINDH

_______________________________________________________________________________

Page 200: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

199

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

KX0080 HIGHWAYS ROADS AND BRIDGES KHAIRPUR

A13 TOTAL REPAIRS AND MAINTENANCE 224,517,000 120,591,500 224,517,000

A131 TOTAL MACHINERY AND 1,366,000 1,366,000 1,366,000

EQUIPMENT

A13101 Machinery and Equipment 1,366,000 1,366,000 1,366,000

A136 TOTAL ROADS, HIGHWAYS AND 223,151,000 119,225,500 223,151,000

BRIDGES

A13602 Other roads 217,851,000 113,925,500 217,851,000

1 Other 217,851,000 113,925,500 217,851,000

A13604 Other bridges 5,300,000 5,300,000 5,300,000

6 Other (Fixed Charges) 5,300,000 5,300,000 5,300,000

_______________________________________________________________________________HIGHWAYS ROADS AND BRIDGES KHAIRPUR 224,517,000 120,591,500 224,517,000

_______________________________________________________________________________

Page 201: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

200

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

KX0081 HIGHWAY DIVISION NAUSHERO FEROZE ATKHAIRPUR

A01 TOTAL EMPLOYEES RELATED EXPENSES. 100,651,000 102,137,000 115,886,000

A011 TOTAL PAY 347 347 57,911,000 62,802,000 69,084,000

A011-1 TOTAL PAY OF OFFICERS 8 9 3,642,000 3,883,000 4,272,000

A01101 Total Basic Pay Of Officer 8 9 3,507,000 3,748,000 4,123,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 557,000 553,000 608,000

A218 ASSISTANT ENGINEER (BPS-17) 6 6 2,672,000 2,645,000 2,909,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 1 275,000 303,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 278,000 275,000 303,000 OFFICER

A01102 Personal pay 135,000 135,000 149,000

A011-2 TOTAL PAY OF OTHER STAFF 339 338 54,269,000 58,919,000 64,812,000

A01151 Total Basic Pay Other Staff 339 338 54,091,000 58,638,000 64,502,000

R069 ROAD ROLLER DRIVER (BPS-15) 18 18 4,563,000 4,941,000 5,435,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 1 238,000

S053 SENIOR CLERK (BPS-14) 8 1,708,000 1,879,000

S181 STENOGRAPHER (BPS-14) 1 1 238,000 258,000 284,000

D133 DIVISIONAL HEAD / JR (BPS-13) 1 1 224,000 242,000 267,000 DRAUGHTSMAN

S222 SUB ENGINEER (BPS-12) 18 18 3,760,000 4,074,000 4,482,000

J053 JUNIOR CLERK (BPS-11) 12 2,563,000 2,819,000

D150 DRAUGHTSMAN (BPS-10) 1 1 190,000 207,000 228,000

A017 ACCOUNT CLERK (BPS-09) 3 3 553,000 599,000 661,000

B081 BUTMAN DRIVER / BSMAN (BPS-09) 2 2 371,000 401,000 441,000

S053 SENIOR CLERK (BPS-09) 8 1,481,000

C041 CHARGE MAN / CHARGE (BPS-08) 4 4 716,000 775,000 853,000 MECHANICS

Page 202: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

201

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

KX0081 HIGHWAY DIVISION NAUSHERO FEROZE ATKHAIRPUR

J014 JR CLERK (BPS-07) 12 2,077,000

R062 ROAD INSPECTOR (BPS-06) 1 1 167,000 181,000 199,000

M131 MOTOR GRADER DRIVER (BPS-05) 1 1 162,000 175,000 192,000

O029 OPERATORS (BPS-05) 14 14 2,255,000 2,444,000 2,688,000

R068 ROAD MISTRY / WORK MISTRY (BPS-05) 14 14 2,255,000 2,444,000 2,688,000 / DAROGHA

T050 TRACER (BPS-05) 1 1 162,000 175,000 192,000

T053 TRACTOR / TRUCK / WATER (BPS-05) 5 5 806,000 873,000 960,000 VAN DRIVER

D161 DRIVER (BPS-04) 5 5 777,000 841,000 925,000

S198 STORE / TOOL / LOG BOOK (BPS-04) 1 1 157,000 168,000 185,000 CLERK

W022 WATERMAN / TRUCK / WATER (BPS-04) 3 3 466,000 505,000 555,000 VAN DRIVER

B054 BOAT MAN (BPS-02) 10 10 1,463,000 1,583,000 1,741,000

F042 FITTER / MATE (BPS-02) 3 3 439,000 475,000 522,000

R067 ROAD MATE FITTER (BPS-02) 21 21 3,071,000 3,324,000 3,656,000

B007 BALDAR (BPS-01) 100 100 14,323,000 15,540,000 17,094,000

C089 CHOWKIDAR (BPS-01) 24 24 3,436,000 3,730,000 4,103,000

C111 CLEANER / HELPER / COLI (BPS-01) 50 50 7,162,000 7,770,000 8,547,000

D161 DRIVER (BPS-01) 6 6 859,000 932,000 1,026,000

N003 NAIB QASID (BPS-01) 9 9 1,434,000 1,399,000 1,538,000

S009 SANITARY WORKER / (BPS-01) 2 2 286,000 311,000 342,000 GUTTERMAN

A01152 Personal pay 178,000 281,000 310,000

A012 TOTAL ALLOWANCES 42,740,000 39,335,000 46,802,000

A012-1 TOTAL REGULAR ALLOWANCES 42,711,000 39,306,000 46,771,000

A01202 House Rent Allowance 4,447,000 4,447,000 4,447,000

A01203 Conveyance Allowance 8,571,000 8,571,000 8,571,000

Page 203: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

202

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

KX0081 HIGHWAY DIVISION NAUSHERO FEROZE ATKHAIRPUR

A01207 Washing Allowance 105,000 105,000 105,000

A0120D Integrated Allowance 37,000 37,000 37,000

A0120X Ad - hoc Allowance - 2010 11,344,000 10,240,000 10,240,000

A01217 Medical Allowance 6,687,000 6,687,000 6,687,000

A0121T Adhoc Relief Allowance 2013 1,667,000 1,667,000

A0121Z Adhoc Relief Allowance - 2014 18,000

A0122C Adhoc Relief Allowance - 2015 5,760,000 1,289,000 1,289,000

A0122M Adhoc Relief Allowance 2016 6,214,000 6,863,000

A01238 Charge Allowance 2,000 2,000

A01244 Adhoc Relief 29,000

A01270 Others 5,760,000 6,863,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 29,000 29,000 31,000

A01274 Medical Charges 29,000 29,000 31,000

A03 TOTAL OPERATING EXPENSES 758,000 615,000 807,000

A032 TOTAL COMMUNICATIONS 66,000 66,000 71,000

A03201 Postage and Telegraph 4,000 4,000 5,000

A03202 Telephone and Trunk call 62,000 62,000 66,000

A033 TOTAL UTILITIES 286,000 143,000 315,000

A03303 Electricity 286,000 143,000 315,000

A038 TOTAL TRAVEL & 247,000 247,000 252,000

TRANSPORTATION

A03805 Travelling Allowance 94,000 94,000 99,000

A03807 P.O.L Charges A.planes 153,000 153,000 153,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 159,000 159,000 169,000

A03901 Stationery 37,000 37,000 39,000

A03902 Printing and Publication 29,000 29,000 31,000

Page 204: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

203

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

KX0081 HIGHWAY DIVISION NAUSHERO FEROZE ATKHAIRPUR

A03905 Newspapers Periodicals and Books 3,000 3,000 4,000

A03906 Uniforms and Protective Clothing 53,000 53,000 56,000

A03970 Others 37,000 37,000 39,000

1 Others 37,000 37,000 39,000

A13 TOTAL REPAIRS AND MAINTENANCE 46,000 46,000 51,000

A130 TOTAL TRANSPORT 17,000 17,000 19,000

A13001 Transport 17,000 17,000 19,000

A131 TOTAL MACHINERY AND 18,000 18,000 20,000

EQUIPMENT

A13101 Machinery and Equipment 18,000 18,000 20,000

A132 TOTAL FURNITURE AND 11,000 11,000 12,000

FIXTURE

A13201 Furniture and Fixture 11,000 11,000 12,000

_______________________________________________________________________________HIGHWAY DIVISION NAUSHERO FEROZE AT 101,455,000 102,798,000 116,744,000

KHAIRPUR

_______________________________________________________________________________

Page 205: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

204

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

KX0082 HIGHWAYS ROADS AND BRIDGES N FEROZE

A13 TOTAL REPAIRS AND MAINTENANCE 128,545,000 205,087,500 128,545,000

A131 TOTAL MACHINERY AND 1,366,000 1,366,000 1,366,000

EQUIPMENT

A13101 Machinery and Equipment 1,366,000 1,366,000 1,366,000

A136 TOTAL ROADS, HIGHWAYS AND 127,179,000 203,721,500 127,179,000

BRIDGES

A13602 Other roads 121,879,000 198,421,500 121,879,000

1 Other 121,879,000 198,421,500 121,879,000

A13604 Other bridges 5,300,000 5,300,000 5,300,000

6 Other (Fixed Charges) 5,300,000 5,300,000 5,300,000

_______________________________________________________________________________HIGHWAYS ROADS AND BRIDGES N FEROZE 128,545,000 205,087,500 128,545,000

_______________________________________________________________________________

Page 206: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

205

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

LN0103 HIGHWAY DIVISION LARKANA

A01 TOTAL EMPLOYEES RELATED EXPENSES. 93,932,000 96,927,000 109,749,000

A011 TOTAL PAY 423 423 52,616,000 58,164,000 63,982,000

A011-1 TOTAL PAY OF OFFICERS 7 8 2,563,000 2,291,000 2,521,000

A01101 Total Basic Pay Of Officer 7 8 2,563,000 2,291,000 2,521,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 443,000 365,000 401,000

A218 ASSISTANT ENGINEER (BPS-17) 5 5 1,767,000 1,453,000 1,600,000

D129 DIVISIONAL ACCOUNTS (BPS-17) 1 1 353,000 291,000 320,000 OFFICER

A235 ASSISTANT HEAD CLERK (BPS-16) 1 182,000 200,000

A011-2 TOTAL PAY OF OTHER STAFF 416 415 50,053,000 55,873,000 61,461,000

A01151 Total Basic Pay Other Staff 416 415 49,989,000 55,779,000 61,357,000

A235 ASSISTANT HEAD CLERK (BPS-14) 1 191,000

J053 JUNIOR CLERK (BPS-14) 9 1,571,000 1,728,000

S053 SENIOR CLERK (BPS-14) 7 1,222,000 1,344,000

S181 STENOGRAPHER (BPS-14) 1 1 190,000 211,000 232,000

S222 SUB ENGINEER (BPS-13) 15 15 2,352,000 2,972,000 3,270,000

D133 DIVISIONAL HEAD / JR (BPS-11) 1 1 178,000 175,000 192,000 DRAUGHTSMAN

D150 DRAUGHTSMAN (BPS-10) 1 1 153,000 169,000 186,000

A017 ACCOUNT CLERK (BPS-09) 3 3 441,000 490,000 539,000

C042 CHARGE MAN / MECHANIC (BPS-09) 2 2 295,000 328,000 360,000

S053 SENIOR CLERK (BPS-09) 7 1,032,000

R064 ROAD INSPECTOR / WORK / (BPS-08) 3 3 427,000 475,000 523,000 GENERAL SUPERVISOR

J014 JR CLERK (BPS-07) 9 1,240,000

M131 MOTOR GRADER DRIVER (BPS-06) 1 1 133,000 148,000 163,000

Page 207: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

206

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

LN0103 HIGHWAY DIVISION LARKANA

R061 ROAD / WORK MISTRI / (BPS-05) 23 23 2,950,000 3,282,000 3,610,000 DAROGHA

D161 DRIVER (BPS-04) 6 6 740,000 825,000 908,000

R069 ROAD ROLLER DRIVER (BPS-04) 18 18 2,225,000 2,476,000 2,723,000

T053 TRACTOR / TRUCK / WATER (BPS-04) 3 3 372,000 413,000 454,000 VAN DRIVER

F040 FITTER / FITTER MAN (BPS-02) 3 3 349,000 388,000 427,000

R006 RADIOGRAPHER (BPS-02) 45 45 5,238,000 5,823,000 6,405,000

S203 STORE ISSUER / LOG BOOK / (BPS-02) 2 2 233,000 259,000 285,000 STORE CLERK

B026 BELDAR / COOLY (BPS-01) 214 214 24,404,000 27,185,000 29,903,000

C092 CHOWKIDAR / WATCHMAN (BPS-01) 14 14 1,597,000 1,778,000 1,956,000

C111 CLEANER / HELPER / COLI (BPS-01) 34 34 3,878,000 4,319,000 4,751,000

M020 MALHI / GARDEN ATTENDANT (BPS-01) 1 1 114,000 127,000 140,000

N003 NAIB QASID (BPS-01) 7 7 1,029,000 889,000 978,000

S009 SANITARY WORKER / (BPS-01) 1 1 114,000 127,000 140,000 GUTTERMAN

T047 TRACER (BPS-01) 1 1 114,000 127,000 140,000

A01152 Personal pay 64,000 94,000 104,000

A012 TOTAL ALLOWANCES 41,316,000 38,763,000 45,767,000

A012-1 TOTAL REGULAR ALLOWANCES 41,298,000 38,745,000 45,748,000

A01202 House Rent Allowance 6,288,000 6,288,000 6,288,000

A01203 Conveyance Allowance 8,037,000 8,037,000 8,037,000

A01207 Washing Allowance 16,000 19,000 19,000

A0120X Ad - hoc Allowance - 2010 10,102,000 9,335,000 9,335,000

A01217 Medical Allowance 6,505,000 6,505,000 6,505,000

A0121A Ad - hoc Allowance - 2011 19,000

A0121M Adhoc Relief Allowance - 2012 8,000

A0121T Adhoc Relief Allowance 2013 1,631,000 1,631,000

A0121Z Adhoc Relief Allowance - 2014 11,000

A0122C Adhoc Relief Allowance - 2015 5,175,000 1,157,000 1,157,000

A0122M Adhoc Relief Allowance 2016 5,718,000 6,388,000

Page 208: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

207

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

LN0103 HIGHWAY DIVISION LARKANA

A01244 Adhoc Relief 12,000

A01270 Others 5,175,000 5,000 6,388,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 18,000 18,000 19,000

A01274 Medical Charges 18,000 18,000 19,000

A03 TOTAL OPERATING EXPENSES 2,052,000 15,231,000 2,242,000

A032 TOTAL COMMUNICATIONS 125,000 125,000 132,000

A03201 Postage and Telegraph 26,000 26,000 28,000

A03202 Telephone and Trunk call 99,000 99,000 104,000

A033 TOTAL UTILITIES 1,668,000 729,000 1,835,000

A03303 Electricity 1,668,000 729,000 1,835,000

A038 TOTAL TRAVEL & 95,000 95,000 100,000

TRANSPORTATION

A03805 Travelling Allowance 95,000 95,000 100,000

A039 TOTAL GENERAL 164,000 14,282,000 175,000

A03901 Stationery 61,000 61,000 65,000

A03902 Printing and Publication 20,000 20,000 21,000

A03905 Newspapers Periodicals and Books 7,000 7,000 8,000

A03906 Uniforms and Protective Clothing 29,000 29,000 31,000

A03919 Payments to other for Service 14,118,000

Rendered

A03970 Others 47,000 47,000 50,000

1 Others 47,000 47,000 50,000

A13 TOTAL REPAIRS AND MAINTENANCE 42,000 42,000 47,000

A130 TOTAL TRANSPORT 11,000 11,000 13,000

A13001 Transport 11,000 11,000 13,000

Page 209: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

208

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

LN0103 HIGHWAY DIVISION LARKANA

A131 TOTAL MACHINERY AND 20,000 20,000 22,000

EQUIPMENT

A13101 Machinery and Equipment 20,000 20,000 22,000

A132 TOTAL FURNITURE AND 11,000 11,000 12,000

FIXTURE

A13201 Furniture and Fixture 11,000 11,000 12,000

_______________________________________________________________________________HIGHWAY DIVISION LARKANA 96,026,000 112,200,000 112,038,000

_______________________________________________________________________________

Page 210: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

209

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

LN0104 HIGHWAYS ROADS AND BRIDGES LARKANA

A13 TOTAL REPAIRS AND MAINTENANCE 196,013,000 196,013,000 196,013,000

A131 TOTAL MACHINERY AND 1,366,000 1,366,000 1,366,000

EQUIPMENT

A13101 Machinery and Equipment 1,366,000 1,366,000 1,366,000

A136 TOTAL ROADS, HIGHWAYS AND 194,647,000 194,647,000 194,647,000

BRIDGES

A13602 Other roads 181,399,000 181,399,000 181,399,000

1 Other 181,399,000 181,399,000 181,399,000

A13604 Other bridges 13,248,000 13,248,000 13,248,000

6 Other (Fixed Charges) 13,248,000 13,248,000 13,248,000

_______________________________________________________________________________HIGHWAYS ROADS AND BRIDGES LARKANA 196,013,000 196,013,000 196,013,000

_______________________________________________________________________________

Page 211: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

210

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

LN0106 HIGWAYS CIRCLE @ LARKANA

A01 TOTAL EMPLOYEES RELATED EXPENSES. 5,115,000 5,936,000 6,789,000

A011 TOTAL PAY 14 14 3,080,000 3,873,000 4,261,000

A011-1 TOTAL PAY OF OFFICERS 3 4 1,110,000 1,639,000 1,803,000

A01101 Total Basic Pay Of Officer 3 4 1,110,000 1,639,000 1,803,000

S241 SUPERINTENDING ENGINEER (BPS-19) 1 1 674,000 759,000 835,000

S236 SUPERINTENDENT (BPS-17) 1 391,000 430,000

A235 ASSISTANT HEAD CLERK (BPS-16) 1 244,000 269,000

H035 HEAD DRAFTSMAN (BPS-16) 1 1 218,000 245,000 269,000

S236 SUPERINTENDENT (BPS-16) 1 218,000

A011-2 TOTAL PAY OF OTHER STAFF 11 10 1,970,000 2,234,000 2,458,000

A01151 Total Basic Pay Other Staff 11 10 1,951,000 2,215,000 2,437,000

A235 ASSISTANT HEAD CLERK (BPS-14) 1 244,000

S053 SENIOR CLERK (BPS-14) 1 255,000 280,000

S181 STENOGRAPHER (BPS-14) 1 1 244,000 308,000 339,000

J053 JUNIOR CLERK (BPS-11) 1 255,000 280,000

A017 ACCOUNT CLERK (BPS-09) 1 1 188,000 240,000 264,000

S053 SENIOR CLERK (BPS-09) 1 188,000

J014 JR CLERK (BPS-07) 1 177,000

T050 TRACER (BPS-05) 1 1 165,000 208,000 229,000

D161 DRIVER (BPS-04) 1 1 160,000 201,000 221,000

N003 NAIB QASID (BPS-02) 2 2 292,000 378,000 416,000

C092 CHOWKIDAR / WATCHMAN (BPS-01) 1 1 146,000 185,000 204,000

S008 SANITARY WORKER (BPS-01) 1 1 147,000 185,000 204,000

A01152 Personal pay 19,000 19,000 21,000

Page 212: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

211

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

LN0106 HIGWAYS CIRCLE @ LARKANA

A012 TOTAL ALLOWANCES 2,035,000 2,063,000 2,528,000

A012-1 TOTAL REGULAR ALLOWANCES 2,008,000 2,036,000 2,499,000

A01202 House Rent Allowance 225,000 266,000 266,000

A01203 Conveyance Allowance 356,000 362,000 362,000

A01207 Washing Allowance 3,000 3,000 3,000

A0120X Ad - hoc Allowance - 2010 545,000 600,000 600,000

A01217 Medical Allowance 267,000 267,000 267,000

A0121A Ad - hoc Allowance - 2011 2,000

A0121T Adhoc Relief Allowance 2013 69,000 69,000

A01224 Entertainment Allowance 6,000 6,000 6,000

A0122C Adhoc Relief Allowance - 2015 302,000 74,000 74,000

A0122M Adhoc Relief Allowance 2016 383,000 424,000

A01233 Unattractive Area Allowance 2,000 4,000 4,000

A01270 Others 302,000 424,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 27,000 27,000 29,000

A01274 Medical Charges 27,000 27,000 29,000

A03 TOTAL OPERATING EXPENSES 883,000 634,000 952,000

A032 TOTAL COMMUNICATIONS 98,000 98,000 104,000

A03201 Postage and Telegraph 15,000 15,000 16,000

A03202 Telephone and Trunk call 83,000 83,000 88,000

A033 TOTAL UTILITIES 500,000 251,000 550,000

A03303 Electricity 500,000 251,000 550,000

A038 TOTAL TRAVEL & 176,000 176,000 181,000

TRANSPORTATION

A03805 Travelling Allowance 83,000 83,000 88,000

A03807 P.O.L Charges A.planes 93,000 93,000 93,000

H.coptors S.Cars M/Cycle

Page 213: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

212

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

LN0106 HIGWAYS CIRCLE @ LARKANA

A039 TOTAL GENERAL 109,000 109,000 117,000

A03901 Stationery 31,000 31,000 33,000

A03902 Printing and Publication 16,000 16,000 17,000

A03905 Newspapers Periodicals and Books 9,000 9,000 10,000

A03906 Uniforms and Protective Clothing 22,000 22,000 24,000

A03970 Others 31,000 31,000 33,000

1 Others 31,000 31,000 33,000

A13 TOTAL REPAIRS AND MAINTENANCE 46,000 46,000 51,000

A130 TOTAL TRANSPORT 17,000 17,000 19,000

A13001 Transport 17,000 17,000 19,000

A131 TOTAL MACHINERY AND 18,000 18,000 20,000

EQUIPMENT

A13101 Machinery and Equipment 18,000 18,000 20,000

A132 TOTAL FURNITURE AND 11,000 11,000 12,000

FIXTURE

A13201 Furniture and Fixture 11,000 11,000 12,000

_______________________________________________________________________________HIGWAYS CIRCLE @ LARKANA 6,044,000 6,616,000 7,792,000

_______________________________________________________________________________

Page 214: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

213

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

LN0110 HIGHWAYS ROADS AND BRIDGES QAMBAR

A13 TOTAL REPAIRS AND MAINTENANCE 65,883,000 65,883,000 105,341,000

A131 TOTAL MACHINERY AND 1,366,000 1,366,000 1,366,000

EQUIPMENT

A13101 Machinery and Equipment 1,366,000 1,366,000 1,366,000

A136 TOTAL ROADS, HIGHWAYS AND 64,517,000 64,517,000 103,975,000

BRIDGES

A13602 Other roads 60,542,000 60,542,000 100,000,000

1 Other 60,542,000 60,542,000 100,000,000

A13604 Other bridges 3,975,000 3,975,000 3,975,000

6 Other (Fixed Charges) 3,975,000 3,975,000 3,975,000

_______________________________________________________________________________HIGHWAYS ROADS AND BRIDGES QAMBAR 65,883,000 65,883,000 105,341,000

_______________________________________________________________________________

Page 215: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

214

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

MP0097 HIGWAYS CIRCLE MIRPURKHAS

A01 TOTAL EMPLOYEES RELATED EXPENSES. 16,004,000 16,330,000 18,875,000

A011 TOTAL PAY 34 35 9,746,000 10,561,000 11,753,000

A011-1 TOTAL PAY OF OFFICERS 5 8 2,763,000 3,452,000 3,798,000

A01101 Total Basic Pay Of Officer 5 8 2,628,000 3,269,000 3,596,000

S241 SUPERINTENDING ENGINEER (BPS-19) 1 1 981,000 853,000 938,000

A218 ASSISTANT ENGINEER (BPS-17) 1 1 506,000 439,000 485,000

I043 INVESTIGATOR / RO (BPS-17) 1 1 507,000 440,000 483,000

S236 SUPERINTENDENT (BPS-17) 1 440,000 483,000

A235 ASSISTANT HEAD CLERK (BPS-16) 3 823,000 905,000

C080 CHIEF SENIOR / CIRCLE (BPS-16) 1 1 317,000 274,000 302,000 HEAD DRAFTSMAN

S236 SUPERINTENDENT (BPS-16) 1 317,000

A01102 Personal pay 135,000 183,000 202,000

A011-2 TOTAL PAY OF OTHER STAFF 29 27 6,983,000 7,109,000 7,955,000

A01151 Total Basic Pay Other Staff 29 27 6,977,000 7,101,000 7,946,000

A235 ASSISTANT HEAD CLERK (BPS-14) 3 931,000

S053 SENIOR CLERK (BPS-14) 6 1,804,000 1,984,000

S181 STENOGRAPHER (BPS-14) 1 1 311,000 364,000 400,000

D134 DIVISIONAL HEAD / JUNIOR (BPS-13) 1 1 290,000 341,000 375,000 DRAUGHTSMAN

C146 COMPUTER OPERATOR (BPS-12) 1 134,000

J053 JUNIOR CLERK (BPS-11) 3 902,000 992,000

D150 DRAUGHTSMAN (BPS-10) 2 2 497,000 582,000 641,000

A017 ACCOUNT CLERK (BPS-09) 3 3 723,000 844,000 931,000

S053 SENIOR CLERK (BPS-09) 3 723,000

J014 JR CLERK (BPS-07) 3 900,000

Page 216: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

215

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

MP0097 HIGWAYS CIRCLE MIRPURKHAS

S053 SENIOR CLERK (BPS-07) 3 674,000

T047 TRACER (BPS-05) 2 2 417,000 491,000 540,000

D161 DRIVER (BPS-04) 1 1 202,000 237,000 260,000

D003 DAFTARI (BPS-02) 1 1 190,000 223,000 245,000

C092 CHOWKIDAR / WATCHMAN (BPS-01) 1 1 186,000 219,000 241,000

N003 NAIB QASID (BPS-01) 4 4 747,000 875,000 962,000

S009 SANITARY WORKER / (BPS-01) 1 1 186,000 219,000 241,000 GUTTERMAN

A01152 Personal pay 6,000 8,000 9,000

A012 TOTAL ALLOWANCES 6,258,000 5,769,000 7,122,000

A012-1 TOTAL REGULAR ALLOWANCES 6,231,000 5,742,000 7,093,000

A01202 House Rent Allowance 623,000 625,000 649,000

A01203 Conveyance Allowance 1,120,000 1,120,000 1,154,000

A01207 Washing Allowance 2,000 2,000 2,000

A0120D Integrated Allowance 18,000 19,000 19,000

A0120X Ad - hoc Allowance - 2010 1,782,000 1,639,000 1,665,000

A01216 Qualification Allowance 7,000 16,000 16,000

A01217 Medical Allowance 842,000 842,000 859,000

A0121T Adhoc Relief Allowance 2013 207,000 207,000

A01224 Entertainment Allowance 7,000 7,000

A0122C Adhoc Relief Allowance - 2015 918,000 218,000 218,000

A0122M Adhoc Relief Allowance 2016 1,045,000 1,154,000

A01233 Unattractive Area Allowance 1,000 2,000 2,000

A01270 Others 918,000 1,141,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 27,000 27,000 29,000

A01274 Medical Charges 27,000 27,000 29,000

A03 TOTAL OPERATING EXPENSES 767,000 442,000 824,000

A032 TOTAL COMMUNICATIONS 89,000 89,000 94,000

A03201 Postage and Telegraph 13,000 13,000 14,000

Page 217: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

216

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

MP0097 HIGWAYS CIRCLE MIRPURKHAS

A03202 Telephone and Trunk call 76,000 76,000 80,000

A033 TOTAL UTILITIES 390,000 65,000 429,000

A03303 Electricity 390,000 65,000 429,000

A038 TOTAL TRAVEL & 196,000 196,000 202,000

TRANSPORTATION

A03805 Travelling Allowance 112,000 112,000 118,000

A03807 P.O.L Charges A.planes 84,000 84,000 84,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 92,000 92,000 99,000

A03901 Stationery 32,000 32,000 34,000

A03902 Printing and Publication 8,000 8,000 9,000

A03905 Newspapers Periodicals and Books 4,000 4,000 5,000

A03906 Uniforms and Protective Clothing 17,000 17,000 18,000

A03970 Others 31,000 31,000 33,000

1 Others 31,000 31,000 33,000

A13 TOTAL REPAIRS AND MAINTENANCE 38,000 38,000 43,000

A130 TOTAL TRANSPORT 12,000 12,000 14,000

A13001 Transport 12,000 12,000 14,000

A131 TOTAL MACHINERY AND 17,000 17,000 19,000

EQUIPMENT

A13101 Machinery and Equipment 17,000 17,000 19,000

A132 TOTAL FURNITURE AND 9,000 9,000 10,000

FIXTURE

A13201 Furniture and Fixture 9,000 9,000 10,000

Page 218: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

217

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

MP0097 HIGWAYS CIRCLE MIRPURKHAS

_______________________________________________________________________________HIGWAYS CIRCLE MIRPURKHAS 16,809,000 16,810,000 19,742,000

_______________________________________________________________________________

Page 219: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

218

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

MP0098 HIGHWAY DIVISION MIRPURKHAS

A01 TOTAL EMPLOYEES RELATED EXPENSES. 59,203,000 59,488,000 67,550,000

A011 TOTAL PAY 190 190 34,627,000 37,016,000 40,720,000

A011-1 TOTAL PAY OF OFFICERS 5 6 3,334,000 2,724,000 2,997,000

A01101 Total Basic Pay Of Officer 5 6 3,207,000 2,597,000 2,857,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 822,000 592,000 651,000

A218 ASSISTANT ENGINEER (BPS-17) 3 3 1,975,000 1,415,000 1,558,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 1 295,000 324,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 410,000 295,000 324,000 OFFICER

A01102 Personal pay 117,000 117,000 129,000

A01105 Qualification Pay 10,000 10,000 11,000

A011-2 TOTAL PAY OF OTHER STAFF 185 184 31,293,000 34,292,000 37,723,000

A01151 Total Basic Pay Other Staff 185 184 31,042,000 33,921,000 37,314,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 1 262,000

S053 SENIOR CLERK (BPS-14) 5 1,148,000 1,263,000

S181 STENOGRAPHER (BPS-14) 1 1 261,000 278,000 306,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 243,000 261,000 287,000 DRAUGHTSMAN

C112 CLEANER / HELPER / COLI / (BPS-11) 11 11 1,715,000 2,526,000 2,778,000 WIND CLEANER

J053 JUNIOR CLERK (BPS-11) 7 1,607,000 1,768,000

S228 SUB-ENGINEER (BPS-11) 9 9 1,929,000 2,066,000 2,273,000

D150 DRAUGHTSMAN (BPS-10) 1 1 209,000 222,000 245,000

A017 ACCOUNT CLERK (BPS-09) 3 3 603,000 645,000 709,000

S053 SENIOR CLERK (BPS-09) 5 1,008,000

C041 CHARGE MAN / CHARGE (BPS-08) 2 2 389,000 417,000 459,000 MECHANICS

J014 JR CLERK (BPS-07) 7 1,318,000

Page 220: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

219

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

MP0098 HIGHWAY DIVISION MIRPURKHAS

M131 MOTOR GRADER DRIVER (BPS-05) 1 1 175,000 188,000 206,000

R061 ROAD / WORK MISTRI / (BPS-05) 15 15 2,631,000 2,815,000 3,097,000 DAROGHA

T047 TRACER (BPS-05) 1 1 175,000 188,000 206,000

D161 DRIVER (BPS-04) 6 6 1,014,000 1,085,000 1,194,000

R069 ROAD ROLLER DRIVER (BPS-04) 11 11 1,858,000 1,990,000 2,189,000

S198 STORE / TOOL / LOG BOOK (BPS-04) 1 1 168,000 181,000 199,000 CLERK

T077 TRUCK / TRACTOR / (BPS-04) 3 3 506,000 543,000 597,000 WATERMEN DRIVER

R065 ROAD MATE (BPS-02) 16 16 2,547,000 2,723,000 2,995,000

B007 BALDAR (BPS-01) 70 70 10,914,000 11,696,000 12,866,000

C092 CHOWKIDAR / WATCHMAN (BPS-01) 9 9 1,404,000 1,504,000 1,654,000

F038 FITTER (BPS-01) 2 2 311,000 334,000 368,000

N003 NAIB QASID (BPS-01) 7 7 1,091,000 1,170,000 1,287,000

S009 SANITARY WORKER / (BPS-01) 2 2 311,000 334,000 368,000 GUTTERMAN

A01152 Personal pay 251,000 371,000 409,000

A012 TOTAL ALLOWANCES 24,576,000 22,472,000 26,830,000

A012-1 TOTAL REGULAR ALLOWANCES 24,549,000 22,445,000 26,801,000

A01202 House Rent Allowance 2,486,000 2,486,000 2,486,000

A01203 Conveyance Allowance 4,663,000 4,663,000 4,663,000

A01207 Washing Allowance 2,000 2,000 2,000

A0120D Integrated Allowance 36,000 36,000 36,000

A0120X Ad - hoc Allowance - 2010 6,659,000 5,973,000 5,973,000

A01217 Medical Allowance 3,833,000 3,833,000 3,833,000

A0121T Adhoc Relief Allowance 2013 1,021,000 1,021,000

A0122C Adhoc Relief Allowance - 2015 3,425,000 733,000 733,000

A0122M Adhoc Relief Allowance 2016 3,678,000 4,017,000

A01233 Unattractive Area Allowance 6,000 6,000 6,000

A01238 Charge Allowance 14,000 14,000 14,000

Page 221: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

220

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

MP0098 HIGHWAY DIVISION MIRPURKHAS

A01270 Others 3,425,000 4,017,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 27,000 27,000 29,000

A01274 Medical Charges 27,000 27,000 29,000

A03 TOTAL OPERATING EXPENSES 932,000 412,000 1,004,000

A032 TOTAL COMMUNICATIONS 97,000 97,000 103,000

A03201 Postage and Telegraph 11,000 11,000 12,000

A03202 Telephone and Trunk call 86,000 86,000 91,000

A033 TOTAL UTILITIES 521,000 1,000 574,000

A03303 Electricity 521,000 1,000 574,000

A038 TOTAL TRAVEL & 162,000 162,000 166,000

TRANSPORTATION

A03805 Travelling Allowance 67,000 67,000 71,000

A03807 P.O.L Charges A.planes 95,000 95,000 95,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 152,000 152,000 161,000

A03901 Stationery 43,000 43,000 46,000

A03902 Printing and Publication 19,000 19,000 20,000

A03905 Newspapers Periodicals and Books 16,000 16,000 17,000

A03906 Uniforms and Protective Clothing 37,000 37,000 39,000

A03970 Others 37,000 37,000 39,000

1 Others 37,000 37,000 39,000

A13 TOTAL REPAIRS AND MAINTENANCE 38,000 38,000 43,000

A130 TOTAL TRANSPORT 12,000 12,000 14,000

A13001 Transport 12,000 12,000 14,000

Page 222: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

221

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

MP0098 HIGHWAY DIVISION MIRPURKHAS

A131 TOTAL MACHINERY AND 12,000 12,000 14,000

EQUIPMENT

A13101 Machinery and Equipment 12,000 12,000 14,000

A132 TOTAL FURNITURE AND 14,000 14,000 15,000

FIXTURE

A13201 Furniture and Fixture 14,000 14,000 15,000

_______________________________________________________________________________HIGHWAY DIVISION MIRPURKHAS 60,173,000 59,938,000 68,597,000

_______________________________________________________________________________

Page 223: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

222

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

MP0099 HIGHWAYS ROADS AND BRIDGES MIRPURKHAS

A13 TOTAL REPAIRS AND MAINTENANCE 285,559,000 335,618,000 285,559,000

A131 TOTAL MACHINERY AND 1,366,000 1,366,000 1,366,000

EQUIPMENT

A13101 Machinery and Equipment 1,366,000 1,366,000 1,366,000

A136 TOTAL ROADS, HIGHWAYS AND 284,193,000 334,252,000 284,193,000

BRIDGES

A13602 Other roads 280,086,000 330,145,000 280,086,000

1 Other 280,086,000 330,145,000 280,086,000

A13604 Other bridges 4,107,000 4,107,000 4,107,000

6 Other (Fixed Charges) 4,107,000 4,107,000 4,107,000

_______________________________________________________________________________HIGHWAYS ROADS AND BRIDGES MIRPURKHAS 285,559,000 335,618,000 285,559,000

_______________________________________________________________________________

Page 224: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

223

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

MP0101 MACHINERY MAINTENANCE DIVISIONMIRPURKHAS

A01 TOTAL EMPLOYEES RELATED EXPENSES. 14,345,000 13,676,000 15,534,000

A011 TOTAL PAY 43 43 8,655,000 8,442,000 9,288,000

A011-1 TOTAL PAY OF OFFICERS 4 5 1,558,000 511,000 563,000

A01101 Total Basic Pay Of Officer 4 5 1,547,000 500,000 550,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 455,000 128,000 141,000

A218 ASSISTANT ENGINEER (BPS-17) 2 2 726,000 205,000 226,000

D129 DIVISIONAL ACCOUNTS (BPS-17) 1 1 366,000 103,000 113,000 OFFICER

A235 ASSISTANT HEAD CLERK (BPS-16) 1 64,000 70,000

A01105 Qualification Pay 11,000 11,000 13,000

A011-2 TOTAL PAY OF OTHER STAFF 39 38 7,097,000 7,931,000 8,725,000

A01151 Total Basic Pay Other Staff 39 38 7,093,000 7,927,000 8,720,000

A235 ASSISTANT HEAD CLERK (BPS-14) 1 206,000

S053 SENIOR CLERK (BPS-14) 4 939,000 1,033,000

S181 STENOGRAPHER (BPS-14) 1 1 248,000 284,000 313,000

J053 JUNIOR CLERK (BPS-11) 5 1,174,000 1,292,000

S222 SUB ENGINEER (BPS-11) 6 6 1,230,000 1,409,000 1,550,000

D150 DRAUGHTSMAN (BPS-10) 1 1 198,000 227,000 250,000

A017 ACCOUNT CLERK (BPS-09) 3 3 578,000 662,000 728,000

S053 SENIOR CLERK (BPS-09) 4 771,000

J014 JR CLERK (BPS-07) 5 901,000

R068 ROAD MISTRY / WORK MISTRY (BPS-05) 3 3 484,000 576,000 633,000 / DAROGHA

T050 TRACER (BPS-05) 1 1 167,000 192,000 211,000

D161 DRIVER (BPS-04) 2 2 323,000 370,000 407,000

M131 MOTOR GRADER DRIVER (BPS-04) 2 2 336,000 370,000 407,000

Page 225: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

224

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

MP0101 MACHINERY MAINTENANCE DIVISIONMIRPURKHAS

T054 TRACTOR / TRUCK / WV (BPS-04) 1 1 162,000 185,000 204,000 DRIVER

C092 CHOWKIDAR / WATCHMAN (BPS-01) 3 3 449,000 513,000 564,000

N003 NAIB QASID (BPS-01) 5 5 890,000 855,000 940,000

S008 SANITARY WORKER (BPS-01) 1 1 150,000 171,000 188,000

A01152 Personal pay 4,000 4,000 5,000

A012 TOTAL ALLOWANCES 5,690,000 5,234,000 6,246,000

A012-1 TOTAL REGULAR ALLOWANCES 5,676,000 5,220,000 6,231,000

A01202 House Rent Allowance 609,000 615,000 615,000

A01203 Conveyance Allowance 1,198,000 1,270,000 1,270,000

A0120D Integrated Allowance 22,000 22,000 22,000

A0120X Ad - hoc Allowance - 2010 1,339,000 1,288,000 1,288,000

A01217 Medical Allowance 818,000 818,000 818,000

A0121T Adhoc Relief Allowance 2013 198,000 198,000

A0122C Adhoc Relief Allowance - 2015 845,000 166,000 166,000

A0122M Adhoc Relief Allowance 2016 843,000 927,000

A01270 Others 845,000 927,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 14,000 14,000 15,000

A01274 Medical Charges 14,000 14,000 15,000

A03 TOTAL OPERATING EXPENSES 1,000,000 417,000 1,080,000

A032 TOTAL COMMUNICATIONS 86,000 86,000 91,000

A03201 Postage and Telegraph 10,000 10,000 11,000

A03202 Telephone and Trunk call 76,000 76,000 80,000

A033 TOTAL UTILITIES 584,000 1,000 643,000

A03303 Electricity 584,000 1,000 643,000

Page 226: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

225

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

MP0101 MACHINERY MAINTENANCE DIVISIONMIRPURKHAS

A038 TOTAL TRAVEL & 165,000 165,000 169,000

TRANSPORTATION

A03805 Travelling Allowance 73,000 73,000 77,000

A03807 P.O.L Charges A.planes 92,000 92,000 92,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 165,000 165,000 177,000

A03901 Stationery 44,000 44,000 47,000

A03902 Printing and Publication 32,000 32,000 34,000

A03905 Newspapers Periodicals and Books 6,000 6,000 7,000

A03906 Uniforms and Protective Clothing 41,000 41,000 44,000

A03970 Others 42,000 42,000 45,000

1 Others 42,000 42,000 45,000

A13 TOTAL REPAIRS AND MAINTENANCE 51,000 51,000 56,000

A130 TOTAL TRANSPORT 17,000 17,000 19,000

A13001 Transport 17,000 17,000 19,000

A131 TOTAL MACHINERY AND 18,000 18,000 20,000

EQUIPMENT

A13101 Machinery and Equipment 18,000 18,000 20,000

A132 TOTAL FURNITURE AND 16,000 16,000 17,000

FIXTURE

A13201 Furniture and Fixture 16,000 16,000 17,000

_______________________________________________________________________________MACHINERY MAINTENANCE DIVISION 15,396,000 14,144,000 16,670,000

MIRPURKHAS

_______________________________________________________________________________

Page 227: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

226

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

MP0105 HIGHWAYS SUB DIVISION SHUJAABAD

A01 TOTAL EMPLOYEES RELATED EXPENSES. 3,873,000 4,172,000 4,744,000

A011 TOTAL PAY 24 24 2,270,000 2,595,000 2,855,000

A011-1 TOTAL PAY OF OFFICERS 1 1 435,000 539,000 593,000

A01101 Total Basic Pay Of Officer 1 1 435,000 539,000 593,000

A218 ASSISTANT ENGINEER (BPS-17) 1 1 435,000 539,000 593,000

A011-2 TOTAL PAY OF OTHER STAFF 23 23 1,835,000 2,056,000 2,262,000

A01151 Total Basic Pay Other Staff 23 23 1,835,000 2,056,000 2,262,000

S053 SENIOR CLERK (BPS-14) 1 108,000 119,000

J053 JUNIOR CLERK (BPS-11) 2 217,000 238,000

S228 SUB-ENGINEER (BPS-11) 3 3 294,000 325,000 357,000

S053 SENIOR CLERK (BPS-09) 1 93,000

J014 JR CLERK (BPS-07) 2 173,000

R061 ROAD / WORK MISTRI / (BPS-05) 3 3 240,000 266,000 292,000 DAROGHA

R069 ROAD ROLLER DRIVER (BPS-05) 3 3 240,000 266,000 292,000

D161 DRIVER (BPS-04) 1 1 77,000 85,000 94,000

R065 ROAD MATE (BPS-02) 1 1 73,000 80,000 88,000

B007 BALDAR (BPS-01) 3 3 214,000 236,000 261,000

C092 CHOWKIDAR / WATCHMAN (BPS-01) 1 1 72,000 79,000 87,000

C112 CLEANER / HELPER / COLI / (BPS-01) 3 3 215,000 236,000 260,000 WIND CLEANER

N003 NAIB QASID (BPS-01) 1 1 72,000 79,000 87,000

S009 SANITARY WORKER / (BPS-01) 1 1 72,000 79,000 87,000 GUTTERMAN

A012 TOTAL ALLOWANCES 1,603,000 1,577,000 1,889,000

A012-1 TOTAL REGULAR ALLOWANCES 1,603,000 1,577,000 1,889,000

Page 228: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

227

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

MP0105 HIGHWAYS SUB DIVISION SHUJAABAD

A01202 House Rent Allowance 194,000 194,000 194,000

A01203 Conveyance Allowance 358,000 358,000 358,000

A01207 Washing Allowance 4,000 4,000

A0120X Ad - hoc Allowance - 2010 379,000 404,000 404,000

A01217 Medical Allowance 241,000 241,000 241,000

A0121T Adhoc Relief Allowance 2013 62,000 62,000

A0122C Adhoc Relief Allowance - 2015 215,000 52,000 52,000

A0122M Adhoc Relief Allowance 2016 260,000 286,000

A01233 Unattractive Area Allowance 1,000 1,000

A01238 Charge Allowance 1,000 1,000 1,000

A01270 Others 215,000 286,000

_______________________________________________________________________________HIGHWAYS SUB DIVISION SHUJAABAD 3,873,000 4,172,000 4,744,000

_______________________________________________________________________________

Page 229: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

228

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

MX0051 HIGHWAYS ROADS AND BRIDGES MITHI

A13 TOTAL REPAIRS AND MAINTENANCE 98,752,000 52,709,000 98,752,000

A131 TOTAL MACHINERY AND 1,366,000 1,366,000 1,366,000

EQUIPMENT

A13101 Machinery and Equipment 1,366,000 1,366,000 1,366,000

A136 TOTAL ROADS, HIGHWAYS AND 97,386,000 51,343,000 97,386,000

BRIDGES

A13602 Other roads 92,086,000 46,043,000 92,086,000

1 Other 92,086,000 46,043,000 92,086,000

A13604 Other bridges 5,300,000 5,300,000 5,300,000

6 Other (Fixed Charges) 5,300,000 5,300,000 5,300,000

_______________________________________________________________________________HIGHWAYS ROADS AND BRIDGES MITHI 98,752,000 52,709,000 98,752,000

_______________________________________________________________________________

Page 230: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

229

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

MX0052 HIGHWAY DIVISION THAR AT MITHI

A01 TOTAL EMPLOYEES RELATED EXPENSES. 16,568,000 14,785,000 17,156,000

A011 TOTAL PAY 27 27 10,007,000 9,638,000 10,603,000

A011-1 TOTAL PAY OF OFFICERS 4 5 3,071,000 2,702,000 2,973,000

A01101 Total Basic Pay Of Officer 4 5 3,014,000 2,645,000 2,910,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 972,000 736,000 810,000

A218 ASSISTANT ENGINEER (BPS-17) 2 2 1,556,000 1,175,000 1,293,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 1 2 486,000 734,000 807,000

A01102 Personal pay 50,000 50,000 55,000

A01105 Qualification Pay 7,000 7,000 8,000

A011-2 TOTAL PAY OF OTHER STAFF 23 22 6,936,000 6,936,000 7,630,000

A01151 Total Basic Pay Other Staff 23 22 6,899,000 6,899,000 7,589,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 1 416,000

S053 SENIOR CLERK (BPS-14) 1 356,000 391,000

S181 STENOGRAPHER (BPS-14) 1 1 415,000 431,000 474,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 388,000 404,000 444,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 3 1,067,000 1,174,000

S222 SUB ENGINEER (BPS-11) 4 4 1,367,000 1,423,000 1,566,000

S053 SENIOR CLERK (BPS-09) 1 320,000

A017 ACCOUNT CLERK (BPS-07) 1 1 300,000 311,000 344,000

J014 JR CLERK (BPS-07) 3 902,000

T047 TRACER (BPS-05) 1 1 279,000 291,000 320,000

D161 DRIVER (BPS-04) 1 1 268,000 280,000 308,000

D003 DAFTARI (BPS-02) 1 1 254,000 264,000 290,000

C092 CHOWKIDAR / WATCHMAN (BPS-01) 3 3 744,000 777,000 854,000

N003 NAIB QASID (BPS-01) 2 2 500,000 518,000 570,000

Page 231: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

230

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

MX0052 HIGHWAY DIVISION THAR AT MITHI

S008 SANITARY WORKER (BPS-01) 3 3 746,000 777,000 854,000

A01152 Personal pay 37,000 37,000 41,000

A012 TOTAL ALLOWANCES 6,561,000 5,147,000 6,553,000

A012-1 TOTAL REGULAR ALLOWANCES 6,534,000 5,120,000 6,524,000

A01202 House Rent Allowance 569,000 569,000 569,000

A01203 Conveyance Allowance 1,087,000 1,087,000 1,087,000

A01207 Washing Allowance 10,000 23,000 23,000

A0120D Integrated Allowance 20,000 20,000 20,000

A0120X Ad - hoc Allowance - 2010 1,927,000 1,158,000 1,158,000

A01217 Medical Allowance 893,000 893,000 893,000

A0121T Adhoc Relief Allowance 2013 135,000 135,000

A0122C Adhoc Relief Allowance - 2015 991,000 141,000 141,000

A0122M Adhoc Relief Allowance 2016 696,000 1,050,000

A01233 Unattractive Area Allowance 46,000 398,000 398,000

A01270 Others 991,000 1,050,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 27,000 27,000 29,000

A01274 Medical Charges 27,000 27,000 29,000

A03 TOTAL OPERATING EXPENSES 628,000 386,000 671,000

A032 TOTAL COMMUNICATIONS 73,000 73,000 77,000

A03201 Postage and Telegraph 15,000 15,000 16,000

A03202 Telephone and Trunk call 58,000 58,000 61,000

A033 TOTAL UTILITIES 251,000 9,000 277,000

A03303 Electricity 251,000 9,000 277,000

A038 TOTAL TRAVEL & 180,000 180,000 185,000

TRANSPORTATION

A03805 Travelling Allowance 88,000 88,000 93,000

Page 232: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

231

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

MX0052 HIGHWAY DIVISION THAR AT MITHI

A03807 P.O.L Charges A.planes 92,000 92,000 92,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 124,000 124,000 132,000

A03901 Stationery 33,000 33,000 35,000

A03902 Printing and Publication 16,000 16,000 17,000

A03905 Newspapers Periodicals and Books 7,000 7,000 8,000

A03906 Uniforms and Protective Clothing 37,000 37,000 39,000

A03970 Others 31,000 31,000 33,000

1 Others 31,000 31,000 33,000

A13 TOTAL REPAIRS AND MAINTENANCE 42,000 42,000 47,000

A130 TOTAL TRANSPORT 15,000 15,000 17,000

A13001 Transport 15,000 15,000 17,000

A131 TOTAL MACHINERY AND 16,000 16,000 18,000

EQUIPMENT

A13101 Machinery and Equipment 16,000 16,000 18,000

A132 TOTAL FURNITURE AND 11,000 11,000 12,000

FIXTURE

A13201 Furniture and Fixture 11,000 11,000 12,000

_______________________________________________________________________________HIGHWAY DIVISION THAR AT MITHI 17,238,000 15,213,000 17,874,000

_______________________________________________________________________________

Page 233: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

232

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SB0083 HIGHWAY DIVISION BENAZIRABAD

A01 TOTAL EMPLOYEES RELATED EXPENSES. 40,291,000 41,661,000 47,582,000

A011 TOTAL PAY 135 136 23,303,000 25,722,000 28,428,000

A011-1 TOTAL PAY OF OFFICERS 5 6 3,620,000 4,020,000 4,421,000

A01101 Total Basic Pay Of Officer 5 6 3,610,000 4,009,000 4,410,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 925,000 913,000 1,005,000

A218 ASSISTANT ENGINEER (BPS-17) 3 3 2,222,000 2,186,000 2,405,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 1 455,000 500,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 463,000 455,000 500,000 OFFICER

A01103 Special pay 10,000 11,000 11,000

A011-2 TOTAL PAY OF OTHER STAFF 130 130 19,683,000 21,702,000 24,007,000

A01151 Total Basic Pay Other Staff 130 130 19,661,000 21,645,000 23,944,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 1 228,000

S053 SENIOR CLERK (BPS-14) 5 1,040,000 1,144,000

S181 STENOGRAPHER (BPS-14) 1 1 229,000 252,000 277,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 216,000 236,000 260,000 DRAUGHTSMAN

C146 COMPUTER OPERATOR (BPS-12) 1 134,000

J053 JUNIOR CLERK (BPS-11) 7 1,456,000 1,602,000

S222 SUB ENGINEER (BPS-11) 9 9 1,701,000 1,873,000 2,060,000

D150 DRAUGHTSMAN (BPS-10) 1 1 183,000 202,000 222,000

A017 ACCOUNT CLERK (BPS-09) 3 3 532,000 586,000 642,000

S053 SENIOR CLERK (BPS-09) 5 887,000

C041 CHARGE MAN / CHARGE (BPS-08) 2 2 343,000 378,000 415,000 MECHANICS

J014 JR CLERK (BPS-07) 7 1,162,000

Page 234: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

233

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SB0083 HIGHWAY DIVISION BENAZIRABAD

W044 WORK / GENERAL SUPERVISOR(BPS-06) 1 1 161,000 176,000 194,000 / ROAD INSPECTOR

E021 ELECTRICIAN (BPS-05) 1 1 154,000 170,000 187,000

R068 ROAD MISTRY / WORK MISTRY (BPS-05) 11 11 1,701,000 1,871,000 2,058,000 / DAROGHA

T050 TRACER (BPS-05) 1 1 154,000 170,000 187,000

D161 DRIVER (BPS-04) 6 6 892,000 983,000 1,082,000

R069 ROAD ROLLER DRIVER (BPS-04) 7 7 1,042,000 1,147,000 1,262,000

T052 TRACTOR / TRUCK / WATER (BPS-04) 2 2 298,000 328,000 361,000 MAN / DUMPER DRIVER

F038 FITTER (BPS-02) 1 1 140,000 154,000 170,000

R056 REWINDER HELPER (BPS-02) 9 9 1,262,000 1,388,000 1,527,000

B026 BELDAR / COOLY (BPS-01) 30 30 4,120,000 4,542,000 4,996,000

C089 CHOWKIDAR (BPS-01) 14 14 1,923,000 2,120,000 2,332,000

C111 CLEANER / HELPER / COLI (BPS-01) 8 8 1,100,000 1,211,000 1,332,000

M020 MALHI / GARDEN ATTENDANT (BPS-01) 1 1 136,000 151,000 167,000

N003 NAIB QASID (BPS-01) 7 7 961,000 1,060,000 1,166,000

S008 SANITARY WORKER (BPS-01) 1 1 136,000 151,000 167,000

A01152 Personal pay 22,000 57,000 63,000

A012 TOTAL ALLOWANCES 16,988,000 15,939,000 19,154,000

A012-1 TOTAL REGULAR ALLOWANCES 16,981,000 15,932,000 19,146,000

A01202 House Rent Allowance 1,714,000 1,774,000 1,798,000

A01203 Conveyance Allowance 3,422,000 3,548,000 3,582,000

A01207 Washing Allowance 19,000 19,000 19,000

A0120D Integrated Allowance 26,000 26,000 26,000

A0120X Ad - hoc Allowance - 2010 4,489,000 4,146,000 4,172,000

A01217 Medical Allowance 2,647,000 2,647,000 2,664,000

A0121Q Audit and Accounts Allowance 51,000 51,000

A0121T Adhoc Relief Allowance 2013 641,000 641,000

A0122C Adhoc Relief Allowance - 2015 2,327,000 526,000 526,000

A0122M Adhoc Relief Allowance 2016 2,544,000 2,835,000

Page 235: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

234

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SB0083 HIGHWAY DIVISION BENAZIRABAD

A01233 Unattractive Area Allowance 8,000 8,000 8,000

A01238 Charge Allowance 2,000 2,000 2,000

A01270 Others 2,327,000 2,822,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 7,000 7,000 8,000

A01274 Medical Charges 7,000 7,000 8,000

A03 TOTAL OPERATING EXPENSES 272,000 56,000 298,000

A033 TOTAL UTILITIES 217,000 1,000 239,000

A03303 Electricity 217,000 1,000 239,000

A039 TOTAL GENERAL 55,000 55,000 59,000

A03906 Uniforms and Protective Clothing 42,000 42,000 45,000

A03970 Others 13,000 13,000 14,000

1 Others 13,000 13,000 14,000

_______________________________________________________________________________HIGHWAY DIVISION BENAZIRABAD 40,563,000 41,717,000 47,880,000

_______________________________________________________________________________

Page 236: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

235

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SB0084 HIGHWAYS ROADS AND BRIDGES BENAZIRABAD

A13 TOTAL REPAIRS AND MAINTENANCE 146,357,000 152,357,000 146,357,000

A131 TOTAL MACHINERY AND 1,366,000 1,366,000 1,366,000

EQUIPMENT

A13101 Machinery and Equipment 1,366,000 1,366,000 1,366,000

A136 TOTAL ROADS, HIGHWAYS AND 144,991,000 150,991,000 144,991,000

BRIDGES

A13602 Other roads 142,341,000 148,341,000 142,341,000

1 Other 142,341,000 148,341,000 142,341,000

A13604 Other bridges 2,650,000 2,650,000 2,650,000

6 Other (Fixed Charges) 2,650,000 2,650,000 2,650,000

_______________________________________________________________________________HIGHWAYS ROADS AND BRIDGES BENAZIRABAD 146,357,000 152,357,000 146,357,000

_______________________________________________________________________________

Page 237: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

236

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SN0062 HIGHWAY DIVISION SANGHAR

A01 TOTAL EMPLOYEES RELATED EXPENSES. 65,211,000 66,985,000 76,110,000

A011 TOTAL PAY 220 220 38,491,000 41,999,000 46,200,000

A011-1 TOTAL PAY OF OFFICERS 6 7 3,017,000 2,312,000 2,544,000

A01101 Total Basic Pay Of Officer 6 7 2,981,000 2,276,000 2,504,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 634,000 439,000 483,000

A218 ASSISTANT ENGINEER (BPS-17) 4 4 2,029,000 1,399,000 1,541,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 1 219,000 240,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 318,000 219,000 240,000 OFFICER

A01102 Personal pay 36,000 36,000 40,000

A011-2 TOTAL PAY OF OTHER STAFF 214 213 35,474,000 39,687,000 43,656,000

A01151 Total Basic Pay Other Staff 214 213 35,258,000 39,267,000 43,194,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 1 255,000

S053 SENIOR CLERK (BPS-14) 6 1,401,000 1,541,000

S181 STENOGRAPHER (BPS-14) 1 1 254,000 283,000 311,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 237,000 265,000 292,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 8 1,868,000 2,055,000

S222 SUB ENGINEER (BPS-11) 12 12 2,506,000 2,802,000 3,082,000

D150 DRAUGHTSMAN (BPS-10) 1 1 204,000 226,000 249,000

A017 ACCOUNT CLERK (BPS-09) 3 3 589,000 657,000 723,000

S053 SENIOR CLERK (BPS-09) 6 1,178,000

C041 CHARGE MAN / CHARGE (BPS-08) 2 2 380,000 424,000 466,000 MECHANICS

J014 JR CLERK (BPS-07) 8 1,469,000

M131 MOTOR GRADER DRIVER (BPS-05) 1 1 171,000 191,000 210,000

Page 238: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

237

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SN0062 HIGHWAY DIVISION SANGHAR

R068 ROAD MISTRY / WORK MISTRY (BPS-05) 25 25 4,272,000 4,771,000 5,248,000 / DAROGHA

T050 TRACER (BPS-05) 1 1 171,000 191,000 210,000

D161 DRIVER (BPS-04) 5 5 822,000 920,000 1,012,000

R069 ROAD ROLLER DRIVER (BPS-04) 14 14 2,305,000 2,575,000 2,833,000

T052 TRACTOR / TRUCK / WATER (BPS-04) 3 3 494,000 552,000 607,000 MAN / DUMPER DRIVER

F038 FITTER (BPS-02) 1 1 155,000 173,000 190,000

R056 REWINDER HELPER (BPS-02) 16 16 2,482,000 2,769,000 3,046,000

B026 BELDAR / COOLY (BPS-01) 88 88 13,369,000 14,952,000 16,447,000

C089 CHOWKIDAR (BPS-01) 9 9 1,519,000 1,529,000 1,682,000

C111 CLEANER / HELPER / COLI (BPS-01) 6 6 912,000 1,019,000 1,121,000

N003 NAIB QASID (BPS-01) 8 8 1,210,000 1,359,000 1,495,000

S009 SANITARY WORKER / (BPS-01) 2 2 304,000 340,000 374,000 GUTTERMAN

A01152 Personal pay 216,000 420,000 462,000

A012 TOTAL ALLOWANCES 26,720,000 24,986,000 29,910,000

A012-1 TOTAL REGULAR ALLOWANCES 26,678,000 24,944,000 29,865,000

A01202 House Rent Allowance 2,757,000 2,757,000 2,757,000

A01203 Conveyance Allowance 4,910,000 4,910,000 4,910,000

A01207 Washing Allowance 10,000 10,000 10,000

A0120X Ad - hoc Allowance - 2010 7,205,000 6,871,000 6,871,000

A01217 Medical Allowance 4,154,000 4,154,000 4,154,000

A0121M Adhoc Relief Allowance - 2012 24,000

A0121T Adhoc Relief Allowance 2013 1,192,000 1,192,000

A0121Z Adhoc Relief Allowance - 2014 10,000

A0122C Adhoc Relief Allowance - 2015 3,820,000 829,000 829,000

A0122M Adhoc Relief Allowance 2016 4,151,000 4,570,000

A01233 Unattractive Area Allowance 2,000 2,000 2,000

A01244 Adhoc Relief 34,000

A01270 Others 3,820,000 4,570,000

Page 239: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

238

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SN0062 HIGHWAY DIVISION SANGHAR

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 42,000 42,000 45,000

A01274 Medical Charges 42,000 42,000 45,000

A03 TOTAL OPERATING EXPENSES 1,435,000 1,019,000 1,534,000

A032 TOTAL COMMUNICATIONS 182,000 182,000 192,000

A03201 Postage and Telegraph 26,000 26,000 28,000

A03202 Telephone and Trunk call 156,000 156,000 164,000

A033 TOTAL UTILITIES 667,000 251,000 734,000

A03303 Electricity 667,000 251,000 734,000

A038 TOTAL TRAVEL & 308,000 308,000 314,000

TRANSPORTATION

A03805 Travelling Allowance 109,000 109,000 115,000

A03807 P.O.L Charges A.planes 199,000 199,000 199,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 278,000 278,000 294,000

A03901 Stationery 75,000 75,000 79,000

A03902 Printing and Publication 51,000 51,000 54,000

A03905 Newspapers Periodicals and Books 9,000 9,000 10,000

A03906 Uniforms and Protective Clothing 73,000 73,000 77,000

A03970 Others 70,000 70,000 74,000

1 Others 70,000 70,000 74,000

A13 TOTAL REPAIRS AND MAINTENANCE 58,000 58,000 65,000

A130 TOTAL TRANSPORT 21,000 21,000 24,000

A13001 Transport 21,000 21,000 24,000

Page 240: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

239

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SN0062 HIGHWAY DIVISION SANGHAR

A131 TOTAL MACHINERY AND 21,000 21,000 24,000

EQUIPMENT

A13101 Machinery and Equipment 21,000 21,000 24,000

A132 TOTAL FURNITURE AND 16,000 16,000 17,000

FIXTURE

A13201 Furniture and Fixture 16,000 16,000 17,000

_______________________________________________________________________________HIGHWAY DIVISION SANGHAR 66,704,000 68,062,000 77,709,000

_______________________________________________________________________________

Page 241: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

240

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SN0063 HIGHWAYS ROADS AND BRIDGES SANGHAR

A13 TOTAL REPAIRS AND MAINTENANCE 231,382,000 503,355,000 231,382,000

A131 TOTAL MACHINERY AND 1,366,000 1,366,000 1,366,000

EQUIPMENT

A13101 Machinery and Equipment 1,366,000 1,366,000 1,366,000

A136 TOTAL ROADS, HIGHWAYS AND 230,016,000 501,989,000 230,016,000

BRIDGES

A13602 Other roads 227,366,000 499,339,000 227,366,000

1 Other 227,366,000 499,339,000 227,366,000

A13604 Other bridges 2,650,000 2,650,000 2,650,000

6 Other (Fixed Charges) 2,650,000 2,650,000 2,650,000

_______________________________________________________________________________HIGHWAYS ROADS AND BRIDGES SANGHAR 231,382,000 503,355,000 231,382,000

_______________________________________________________________________________

Page 242: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

241

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SQ0054 HIGHWAYS ROADS AND BRIDGES SHIKARPUR

A13 TOTAL REPAIRS AND MAINTENANCE 98,630,000 52,648,000 98,630,000

A131 TOTAL MACHINERY AND 1,366,000 1,366,000 1,366,000

EQUIPMENT

A13101 Machinery and Equipment 1,366,000 1,366,000 1,366,000

A136 TOTAL ROADS, HIGHWAYS AND 97,264,000 51,282,000 97,264,000

BRIDGES

A13602 Other roads 91,964,000 45,982,000 91,964,000

1 Other 91,964,000 45,982,000 91,964,000

A13604 Other bridges 5,300,000 5,300,000 5,300,000

6 Other (Fixed Charges) 5,300,000 5,300,000 5,300,000

_______________________________________________________________________________HIGHWAYS ROADS AND BRIDGES SHIKARPUR 98,630,000 52,648,000 98,630,000

_______________________________________________________________________________

Page 243: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

242

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SQ0055 MACHINERY MAINTENANCE DIVISION KHAIRPURAT SHIKARPUR

A01 TOTAL EMPLOYEES RELATED EXPENSES. 48,296,000 47,574,000 54,084,000

A011 TOTAL PAY 22 22 28,570,000 29,727,000 32,700,000

A011-1 TOTAL PAY OF OFFICERS 3 4 2,625,000 2,588,000 2,846,000

A01101 Total Basic Pay Of Officer 3 4 2,467,000 2,430,000 2,673,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 1,073,000 870,000 957,000

P051 PLANNING OFFICER (BPS-17) 1 1 858,000 694,000 763,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 1 433,000 476,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 536,000 433,000 477,000 OFFICER

A01102 Personal pay 143,000 143,000 158,000

A01103 Special pay 15,000 15,000 15,000

A011-2 TOTAL PAY OF OTHER STAFF 19 18 25,945,000 27,139,000 29,854,000

A01151 Total Basic Pay Other Staff 19 18 25,868,000 27,062,000 29,769,000

S053 SENIOR CLERK (BPS-14) 2 3,436,000 3,780,000

S181 STENOGRAPHER (BPS-14) 1 1 1,912,000 2,079,000 2,287,000

A129 ASSISTANT / HEAD CLERK (BPS-11) 1 1,579,000

J053 JUNIOR CLERK (BPS-11) 2 3,436,000 3,780,000

D150 DRAUGHTSMAN (BPS-10) 1 1 1,530,000 1,664,000 1,830,000

A017 ACCOUNT CLERK (BPS-09) 3 3 4,446,000 4,836,000 5,318,000

S053 SENIOR CLERK (BPS-09) 2 2,966,000

J014 JR CLERK (BPS-07) 2 2,773,000

T047 TRACER (BPS-05) 1 1 1,291,000 1,404,000 1,545,000

D161 DRIVER (BPS-04) 1 1 1,243,000 1,353,000 1,489,000

L080 LOG BOOK CLERK / STORE (BPS-04) 1 1 1,243,000 1,353,000 1,489,000 ISSUER

C092 CHOWKIDAR / WATCHMAN (BPS-01) 1 1 1,148,000 1,250,000 1,375,000

Page 244: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

243

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SQ0055 MACHINERY MAINTENANCE DIVISION KHAIRPURAT SHIKARPUR

N003 NAIB QASID (BPS-01) 4 4 4,590,000 5,001,000 5,501,000

S008 SANITARY WORKER (BPS-01) 1 1 1,147,000 1,250,000 1,375,000

A01152 Personal pay 77,000 77,000 85,000

A012 TOTAL ALLOWANCES 19,726,000 17,847,000 21,384,000

A012-1 TOTAL REGULAR ALLOWANCES 19,722,000 17,843,000 21,379,000

A01202 House Rent Allowance 1,929,000 1,929,000 1,929,000

A01203 Conveyance Allowance 3,747,000 3,747,000 3,747,000

A01207 Washing Allowance 17,000 17,000 17,000

A0120X Ad - hoc Allowance - 2010 5,328,000 4,785,000 4,785,000

A01210 Risk Allowance 14,000 14,000 14,000

A01216 Qualification Allowance 35,000 35,000 35,000

A01217 Medical Allowance 2,986,000 2,986,000 2,986,000

A0121A Ad - hoc Allowance - 2011 7,000

A0121T Adhoc Relief Allowance 2013 797,000 797,000

A0121Z Adhoc Relief Allowance - 2014 5,000

A0122C Adhoc Relief Allowance - 2015 2,833,000 581,000 581,000

A0122M Adhoc Relief Allowance 2016 2,920,000 3,244,000

A01244 Adhoc Relief 20,000

A01270 Others 2,833,000 3,244,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 4,000 4,000 5,000

A01274 Medical Charges 4,000 4,000 5,000

A03 TOTAL OPERATING EXPENSES 690,000 310,000 743,000

A032 TOTAL COMMUNICATIONS 55,000 55,000 59,000

A03201 Postage and Telegraph 13,000 13,000 14,000

A03202 Telephone and Trunk call 42,000 42,000 45,000

A033 TOTAL UTILITIES 390,000 10,000 429,000

A03303 Electricity 390,000 10,000 429,000

Page 245: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

244

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SQ0055 MACHINERY MAINTENANCE DIVISION KHAIRPURAT SHIKARPUR

A038 TOTAL TRAVEL & 141,000 141,000 143,000

TRANSPORTATION

A03805 Travelling Allowance 40,000 40,000 42,000

A03807 P.O.L Charges A.planes 101,000 101,000 101,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 104,000 104,000 112,000

A03901 Stationery 37,000 37,000 39,000

A03902 Printing and Publication 22,000 22,000 24,000

A03905 Newspapers Periodicals and Books 3,000 3,000 4,000

A03906 Uniforms and Protective Clothing 18,000 18,000 19,000

A03970 Others 24,000 24,000 26,000

1 Others 24,000 24,000 26,000

A13 TOTAL REPAIRS AND MAINTENANCE 37,000 37,000 42,000

A130 TOTAL TRANSPORT 11,000 11,000 13,000

A13001 Transport 11,000 11,000 13,000

A131 TOTAL MACHINERY AND 18,000 18,000 20,000

EQUIPMENT

A13101 Machinery and Equipment 18,000 18,000 20,000

A132 TOTAL FURNITURE AND 8,000 8,000 9,000

FIXTURE

A13201 Furniture and Fixture 8,000 8,000 9,000

_______________________________________________________________________________MACHINERY MAINTENANCE DIVISION KHAIRPUR 49,023,000 47,921,000 54,869,000

AT SHIKARPUR

_______________________________________________________________________________

Page 246: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

245

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SQ0056 HIGHWAYS ROADS AND BRIDGES JACOBABAD

A13 TOTAL REPAIRS AND MAINTENANCE 164,718,000 164,777,000 164,718,000

A131 TOTAL MACHINERY AND 1,366,000 1,366,000 1,366,000

EQUIPMENT

A13101 Machinery and Equipment 1,366,000 1,366,000 1,366,000

A136 TOTAL ROADS, HIGHWAYS AND 163,352,000 163,411,000 163,352,000

BRIDGES

A13602 Other roads 158,052,000 158,111,000 158,052,000

1 Other 158,052,000 158,111,000 158,052,000

A13604 Other bridges 5,300,000 5,300,000 5,300,000

6 Other (Fixed Charges) 5,300,000 5,300,000 5,300,000

_______________________________________________________________________________HIGHWAYS ROADS AND BRIDGES JACOBABAD 164,718,000 164,777,000 164,718,000

_______________________________________________________________________________

Page 247: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

246

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SQ0057 HIGHWAYS ROADS AND BRIDGES KASHMORE

A13 TOTAL REPAIRS AND MAINTENANCE 67,208,000 36,937,000 67,208,000

A131 TOTAL MACHINERY AND 1,366,000 1,366,000 1,366,000

EQUIPMENT

A13101 Machinery and Equipment 1,366,000 1,366,000 1,366,000

A136 TOTAL ROADS, HIGHWAYS AND 65,842,000 35,571,000 65,842,000

BRIDGES

A13602 Other roads 60,542,000 30,271,000 60,542,000

1 Other 60,542,000 30,271,000 60,542,000

A13604 Other bridges 5,300,000 5,300,000 5,300,000

6 Other (Fixed Charges) 5,300,000 5,300,000 5,300,000

_______________________________________________________________________________HIGHWAYS ROADS AND BRIDGES KASHMORE 67,208,000 36,937,000 67,208,000

_______________________________________________________________________________

Page 248: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

247

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SY0105 HIGHWAY DIVISION SUKKUR

A01 TOTAL EMPLOYEES RELATED EXPENSES. 47,894,000 47,363,000 53,620,000

A011 TOTAL PAY 234 234 27,396,000 28,586,000 31,446,000

A011-1 TOTAL PAY OF OFFICERS 6 7 3,087,000 1,902,000 2,093,000

A01101 Total Basic Pay Of Officer 6 7 3,028,000 1,834,000 2,018,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 605,000 334,000 368,000

A218 ASSISTANT ENGINEER (BPS-17) 4 4 1,939,000 1,067,000 1,174,000

D129 DIVISIONAL ACCOUNTS (BPS-17) 1 1 484,000 267,000 293,000 OFFICER

A235 ASSISTANT HEAD CLERK (BPS-16) 1 166,000 183,000

A01102 Personal pay 49,000 58,000 64,000

A01105 Qualification Pay 10,000 10,000 11,000

A011-2 TOTAL PAY OF OTHER STAFF 228 227 24,309,000 26,684,000 29,353,000

A01151 Total Basic Pay Other Staff 228 227 24,229,000 26,574,000 29,232,000

A235 ASSISTANT HEAD CLERK (BPS-14) 1 165,000

S053 SENIOR CLERK (BPS-14) 6 900,000 990,000

S181 STENOGRAPHER (BPS-14) 1 1 165,000 181,000 200,000

D133 DIVISIONAL HEAD / JR (BPS-13) 1 1 155,000 170,000 187,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 8 1,200,000 1,320,000

S222 SUB ENGINEER (BPS-11) 12 12 1,642,000 1,800,000 1,980,000

D150 DRAUGHTSMAN (BPS-10) 1 1 133,000 145,000 160,000

A017 ACCOUNT CLERK (BPS-09) 3 3 385,000 422,000 462,000

S053 SENIOR CLERK (BPS-09) 6 772,000

C041 CHARGE MAN / CHARGE (BPS-08) 2 2 248,000 272,000 299,000 MECHANICS

J014 JR CLERK (BPS-07) 8 964,000

M131 MOTOR GRADER DRIVER (BPS-06) 1 1 116,000 127,000 140,000

Page 249: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

248

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SY0105 HIGHWAY DIVISION SUKKUR

O021 OPERATOR (BPS-05) 1 1 112,000 123,000 135,000

R068 ROAD MISTRY / WORK MISTRY (BPS-05) 12 12 1,342,000 1,471,000 1,618,000 / DAROGHA

T050 TRACER (BPS-05) 1 1 112,000 123,000 135,000

D161 DRIVER (BPS-04) 5 5 540,000 591,000 650,000

R069 ROAD ROLLER DRIVER (BPS-04) 11 11 1,187,000 1,300,000 1,430,000

T053 TRACTOR / TRUCK / WATER (BPS-04) 3 3 323,000 354,000 390,000 VAN DRIVER

F038 FITTER (BPS-02) 1 1 100,000 111,000 122,000

R065 ROAD MATE (BPS-02) 21 21 2,133,000 2,334,000 2,568,000

B026 BELDAR / COOLY (BPS-01) 82 82 8,162,000 8,948,000 9,844,000

C092 CHOWKIDAR / WATCHMAN (BPS-01) 21 21 2,089,000 2,292,000 2,521,000

C111 CLEANER / HELPER / COLI (BPS-01) 23 23 2,290,000 2,510,000 2,761,000

C167 COOK (BPS-01) 1 1 99,000 109,000 120,000

M020 MALHI / GARDEN ATTENDANT (BPS-01) 1 1 99,000 109,000 120,000

N003 NAIB QASID (BPS-01) 8 8 797,000 873,000 960,000

S008 SANITARY WORKER (BPS-01) 1 1 99,000 109,000 120,000

A01152 Personal pay 80,000 110,000 121,000

A012 TOTAL ALLOWANCES 20,498,000 18,777,000 22,174,000

A012-1 TOTAL REGULAR ALLOWANCES 20,480,000 18,759,000 22,155,000

A01202 House Rent Allowance 2,758,000 2,758,000 2,758,000

A01203 Conveyance Allowance 3,953,000 3,953,000 3,953,000

A01207 Washing Allowance 57,000 57,000 57,000

A0120D Integrated Allowance 21,000 21,000 21,000

A0120Q Fixed Daily Allowance 2,000 2,000 2,000

A0120X Ad - hoc Allowance - 2010 5,179,000 4,657,000 4,657,000

A01217 Medical Allowance 3,058,000 3,058,000 3,058,000

A0121Q Audit and Accounts Allowance 47,000 47,000

A0121T Adhoc Relief Allowance 2013 761,000 761,000

A0122C Adhoc Relief Allowance - 2015 2,726,000 591,000 591,000

A0122M Adhoc Relief Allowance 2016 2,854,000 3,125,000

Page 250: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

249

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SY0105 HIGHWAY DIVISION SUKKUR

A01270 Others 2,726,000 3,125,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 18,000 18,000 19,000

A01274 Medical Charges 18,000 18,000 19,000

A03 TOTAL OPERATING EXPENSES 771,000 511,000 820,000

A032 TOTAL COMMUNICATIONS 110,000 110,000 116,000

A03201 Postage and Telegraph 10,000 10,000 11,000

A03202 Telephone and Trunk call 100,000 100,000 105,000

A033 TOTAL UTILITIES 261,000 1,000 288,000

A03303 Electricity 261,000 1,000 288,000

A038 TOTAL TRAVEL & 232,000 232,000 236,000

TRANSPORTATION

A03805 Travelling Allowance 79,000 79,000 83,000

A03807 P.O.L Charges A.planes 153,000 153,000 153,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 168,000 168,000 180,000

A03901 Stationery 52,000 52,000 55,000

A03902 Printing and Publication 24,000 24,000 26,000

A03905 Newspapers Periodicals and Books 4,000 4,000 5,000

A03906 Uniforms and Protective Clothing 41,000 41,000 44,000

A03970 Others 47,000 47,000 50,000

1 Others 47,000 47,000 50,000

A13 TOTAL REPAIRS AND MAINTENANCE 42,000 42,000 47,000

A130 TOTAL TRANSPORT 16,000 16,000 18,000

A13001 Transport 16,000 16,000 18,000

Page 251: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

250

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SY0105 HIGHWAY DIVISION SUKKUR

A131 TOTAL MACHINERY AND 16,000 16,000 18,000

EQUIPMENT

A13101 Machinery and Equipment 16,000 16,000 18,000

A132 TOTAL FURNITURE AND 10,000 10,000 11,000

FIXTURE

A13201 Furniture and Fixture 10,000 10,000 11,000

_______________________________________________________________________________HIGHWAY DIVISION SUKKUR 48,707,000 47,916,000 54,487,000

_______________________________________________________________________________

Page 252: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

251

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SY0107 HIGWAYS CIRCLE SUKKUR

A01 TOTAL EMPLOYEES RELATED EXPENSES. 14,545,000 14,570,000 16,585,000

A011 TOTAL PAY 32 32 8,569,000 9,215,000 10,138,000

A011-1 TOTAL PAY OF OFFICERS 6 9 3,033,000 3,502,000 3,853,000

A01101 Total Basic Pay Of Officer 6 9 2,981,000 3,430,000 3,773,000

S241 SUPERINTENDING ENGINEER (BPS-19) 1 1 930,000 789,000 868,000

A218 ASSISTANT ENGINEER (BPS-17) 1 1 481,000 405,000 448,000

I043 INVESTIGATOR / RO (BPS-17) 1 1 483,000 407,000 447,000

P051 PLANNING OFFICER (BPS-17) 1 1 483,000 407,000 447,000

S236 SUPERINTENDENT (BPS-17) 1 407,000 447,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 3 761,000 837,000

C080 CHIEF SENIOR / CIRCLE (BPS-16) 1 1 301,000 254,000 279,000 HEAD DRAFTSMAN

S236 SUPERINTENDENT (BPS-16) 1 303,000

A01102 Personal pay 52,000 72,000 80,000

A011-2 TOTAL PAY OF OTHER STAFF 26 23 5,536,000 5,713,000 6,285,000

A01151 Total Basic Pay Other Staff 26 23 5,528,000 5,705,000 6,276,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 3 860,000

S053 SENIOR CLERK (BPS-14) 3 838,000 922,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 270,000 317,000 349,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 4 1,118,000 1,230,000

D150 DRAUGHTSMAN (BPS-10) 2 2 459,000 541,000 595,000

A017 ACCOUNT CLERK (BPS-09) 3 3 666,000 788,000 865,000

S053 SENIOR CLERK (BPS-09) 3 666,000

J014 JR CLERK (BPS-07) 4 831,000

T047 TRACER (BPS-05) 2 2 386,000 457,000 502,000

Page 253: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

252

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SY0107 HIGWAYS CIRCLE SUKKUR

D161 DRIVER (BPS-04) 1 1 185,000 220,000 242,000

D003 DAFTARI (BPS-02) 1 1 175,000 207,000 228,000

C092 CHOWKIDAR / WATCHMAN (BPS-01) 1 1 174,000 203,000 224,000

N003 NAIB QASID (BPS-01) 4 4 685,000 813,000 895,000

S008 SANITARY WORKER (BPS-01) 1 1 171,000 203,000 224,000

A01152 Personal pay 8,000 8,000 9,000

A012 TOTAL ALLOWANCES 5,976,000 5,355,000 6,447,000

A012-1 TOTAL REGULAR ALLOWANCES 5,949,000 5,328,000 6,418,000

A01202 House Rent Allowance 845,000 845,000 845,000

A01203 Conveyance Allowance 999,000 999,000 999,000

A01207 Washing Allowance 5,000 5,000 5,000

A0120D Integrated Allowance 20,000 20,000 20,000

A0120X Ad - hoc Allowance - 2010 1,643,000 1,449,000 1,449,000

A01217 Medical Allowance 735,000 735,000 735,000

A0121T Adhoc Relief Allowance 2013 170,000 170,000

A0122C Adhoc Relief Allowance - 2015 851,000 185,000 185,000

A0122M Adhoc Relief Allowance 2016 920,000 1,005,000

A01270 Others 851,000 1,005,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 27,000 27,000 29,000

A01274 Medical Charges 27,000 27,000 29,000

A03 TOTAL OPERATING EXPENSES 647,000 388,000 691,000

A032 TOTAL COMMUNICATIONS 92,000 92,000 97,000

A03201 Postage and Telegraph 16,000 16,000 17,000

A03202 Telephone and Trunk call 76,000 76,000 80,000

A033 TOTAL UTILITIES 260,000 1,000 286,000

A03303 Electricity 260,000 1,000 286,000

Page 254: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

253

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SY0107 HIGWAYS CIRCLE SUKKUR

A038 TOTAL TRAVEL & 202,000 202,000 207,000

TRANSPORTATION

A03805 Travelling Allowance 95,000 95,000 100,000

A03807 P.O.L Charges A.planes 107,000 107,000 107,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 93,000 93,000 101,000

A03901 Stationery 29,000 29,000 31,000

A03902 Printing and Publication 9,000 9,000 10,000

A03905 Newspapers Periodicals and Books 4,000 4,000 5,000

A03906 Uniforms and Protective Clothing 24,000 24,000 26,000

A03970 Others 27,000 27,000 29,000

1 Others 27,000 27,000 29,000

A13 TOTAL REPAIRS AND MAINTENANCE 42,000 42,000 47,000

A130 TOTAL TRANSPORT 18,000 18,000 20,000

A13001 Transport 18,000 18,000 20,000

A131 TOTAL MACHINERY AND 15,000 15,000 17,000

EQUIPMENT

A13101 Machinery and Equipment 15,000 15,000 17,000

A132 TOTAL FURNITURE AND 9,000 9,000 10,000

FIXTURE

A13201 Furniture and Fixture 9,000 9,000 10,000

_______________________________________________________________________________HIGWAYS CIRCLE SUKKUR 15,234,000 15,000,000 17,323,000

_______________________________________________________________________________

Page 255: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

254

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SY0108 HIGHWAYS ROADS AND BRIDGES SUKKUR

A13 TOTAL REPAIRS AND MAINTENANCE 121,175,000 121,175,000 121,175,000

A131 TOTAL MACHINERY AND 1,366,000 1,366,000 1,366,000

EQUIPMENT

A13101 Machinery and Equipment 1,366,000 1,366,000 1,366,000

A136 TOTAL ROADS, HIGHWAYS AND 119,809,000 119,809,000 119,809,000

BRIDGES

A13602 Other roads 114,509,000 114,509,000 114,509,000

1 Other 114,509,000 114,509,000 114,509,000

A13604 Other bridges 5,300,000 5,300,000 5,300,000

6 Other (Fixed Charges) 5,300,000 5,300,000 5,300,000

_______________________________________________________________________________HIGHWAYS ROADS AND BRIDGES SUKKUR 121,175,000 121,175,000 121,175,000

_______________________________________________________________________________

Page 256: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

255

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SY0112 HIGHWAYS ROADS AND BRIDGES GHOTKI

A13 TOTAL REPAIRS AND MAINTENANCE 115,250,000 60,295,500 115,250,000

A131 TOTAL MACHINERY AND 1,366,000 1,366,000 1,366,000

EQUIPMENT

A13101 Machinery and Equipment 1,366,000 1,366,000 1,366,000

A136 TOTAL ROADS, HIGHWAYS AND 113,884,000 58,929,500 113,884,000

BRIDGES

A13602 Other roads 109,909,000 54,954,500 109,909,000

1 Other 109,909,000 54,954,500 109,909,000

A13604 Other bridges 3,975,000 3,975,000 3,975,000

6 Other (Fixed Charges) 3,975,000 3,975,000 3,975,000

_______________________________________________________________________________HIGHWAYS ROADS AND BRIDGES GHOTKI 115,250,000 60,295,500 115,250,000

_______________________________________________________________________________

Page 257: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

256

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

UT0047 HIGHWAYS ROADS AND BRIDGES UMERKOT

A13 TOTAL REPAIRS AND MAINTENANCE 94,832,000 204,408,000 94,832,000

A131 TOTAL MACHINERY AND 1,366,000 1,366,000 1,366,000

EQUIPMENT

A13101 Machinery and Equipment 1,366,000 1,366,000 1,366,000

A136 TOTAL ROADS, HIGHWAYS AND 93,466,000 203,042,000 93,466,000

BRIDGES

A13602 Other roads 90,816,000 200,392,000 90,816,000

1 Other 90,816,000 200,392,000 90,816,000

A13604 Other bridges 2,650,000 2,650,000 2,650,000

6 Other (Fixed Charges) 2,650,000 2,650,000 2,650,000

_______________________________________________________________________________HIGHWAYS ROADS AND BRIDGES UMERKOT 94,832,000 204,408,000 94,832,000

_______________________________________________________________________________

Page 258: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

257

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

BI0062 EXECTIVE ENGINEER HIGHWAYS DIVISIONBADIN

A01 TOTAL EMPLOYEES RELATED EXPENSES. 47,463,000 48,049,000 54,524,000

A011 TOTAL PAY 163 163 27,422,000 29,625,000 32,590,000

A011-1 TOTAL PAY OF OFFICERS 7 8 4,053,000 4,303,000 4,735,000

A01101 Total Basic Pay Of Officer 7 8 3,985,000 4,194,000 4,614,000

D259 DISTRICT OFFICER (BPS-18) 1 1 725,000 701,000 771,000

D262 DEPUTY DISTRICT OFFICER (BPS-17) 5 5 2,899,000 2,795,000 3,075,000

A235 ASSISTANT HEAD CLERK (BPS-16) 1 349,000 384,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 361,000 349,000 384,000 OFFICER

A01102 Personal pay 62,000 103,000 114,000

A01105 Qualification Pay 6,000 6,000 7,000

A011-2 TOTAL PAY OF OTHER STAFF 156 155 23,369,000 25,322,000 27,855,000

A01151 Total Basic Pay Other Staff 156 155 23,262,000 25,180,000 27,698,000

A235 ASSISTANT HEAD CLERK (BPS-14) 1 223,000

S053 SENIOR CLERK (BPS-14) 2 404,000 444,000

S181 STENOGRAPHER (BPS-14) 1 1 223,000 244,000 269,000

D136 DIVISIONAL HEAD (BPS-11) 1 1 185,000 202,000 222,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 9 1,817,000 1,999,000

S222 SUB ENGINEER (BPS-11) 15 15 2,762,000 3,029,000 3,332,000

D150 DRAUGHTSMAN (BPS-09) 1 1 173,000 189,000 208,000

S053 SENIOR CLERK (BPS-09) 2 344,000

A017 ACCOUNT CLERK (BPS-07) 2 2 325,000 355,000 390,000

C042 CHARGE MAN / MECHANIC (BPS-07) 1 1 162,000 177,000 195,000

J053 JUNIOR CLERK (BPS-07) 9 1,456,000

T047 TRACER (BPS-05) 1 1 151,000 165,000 182,000

Page 259: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

258

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

BI0062 EXECTIVE ENGINEER HIGHWAYS DIVISIONBADIN

W045 WORK MESTRY / DAROGHA (BPS-05) 14 14 2,110,000 2,311,000 2,542,000

D161 DRIVER (BPS-04) 4 4 581,000 636,000 700,000

R069 ROAD ROLLER DRIVER (BPS-04) 7 7 1,015,000 1,114,000 1,225,000

S205 STORE ISSURE (BPS-04) 2 2 289,000 318,000 350,000

B085 BELDAR (BPS-02) 60 60 8,204,000 8,980,000 9,878,000

C092 CHOWKIDAR / WATCHMAN (BPS-02) 7 7 1,093,000 1,048,000 1,152,000

C111 CLEANER / HELPER / COLI (BPS-02) 12 12 1,641,000 1,796,000 1,976,000

F038 FITTER (BPS-02) 1 1 136,000 150,000 165,000

M020 MALHI / GARDEN ATTENDANT (BPS-02) 1 1 136,000 150,000 165,000

N003 NAIB QASID (BPS-02) 7 7 1,095,000 1,048,000 1,152,000

R065 ROAD MATE (BPS-02) 5 5 684,000 748,000 823,000

T053 TRACTOR / TRUCK / WATER (BPS-02) 2 2 274,000 299,000 329,000 VAN DRIVER

A01152 Personal pay 107,000 142,000 157,000

A012 TOTAL ALLOWANCES 20,041,000 18,424,000 21,934,000

A012-1 TOTAL REGULAR ALLOWANCES 20,041,000 18,424,000 21,934,000

A01202 House Rent Allowance 1,956,000 1,956,000 1,956,000

A01203 Conveyance Allowance 4,135,000 4,135,000 4,135,000

A01207 Washing Allowance 55,000 55,000 55,000

A0120X Ad - hoc Allowance - 2010 5,285,000 4,765,000 4,765,000

A01217 Medical Allowance 3,160,000 3,160,000 3,160,000

A0121T Adhoc Relief Allowance 2013 773,000 773,000

A0121Z Adhoc Relief Allowance - 2014 32,000

A0122C Adhoc Relief Allowance - 2015 2,725,000 628,000 628,000

A0122M Adhoc Relief Allowance 2016 2,920,000 3,231,000

A01270 Others 2,725,000 3,231,000

A03 TOTAL OPERATING EXPENSES 1,413,000 913,000 1,496,000

Page 260: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

259

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

BI0062 EXECTIVE ENGINEER HIGHWAYS DIVISIONBADIN

A032 TOTAL COMMUNICATIONS 143,000 143,000 151,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 134,000 134,000 141,000

A033 TOTAL UTILITIES 501,000 1,000 552,000

A03303 Electricity 501,000 1,000 552,000

A038 TOTAL TRAVEL & 506,000 506,000 514,000

TRANSPORTATION

A03805 Travelling Allowance 159,000 159,000 167,000

A03807 P.O.L Charges A.planes 347,000 347,000 347,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 263,000 263,000 279,000

A03901 Stationery 87,000 87,000 92,000

A03902 Printing and Publication 31,000 31,000 33,000

A03905 Newspapers Periodicals and Books 24,000 24,000 26,000

A03970 Others 121,000 121,000 128,000

1 Others 121,000 121,000 128,000

A13 TOTAL REPAIRS AND MAINTENANCE 263,000 263,000 286,000

A130 TOTAL TRANSPORT 146,000 146,000 161,000

A13001 Transport 146,000 146,000 161,000

A131 TOTAL MACHINERY AND 38,000 38,000 42,000

EQUIPMENT

A13101 Machinery and Equipment 38,000 38,000 42,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

Page 261: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

260

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

BI0062 EXECTIVE ENGINEER HIGHWAYS DIVISIONBADIN

A13201 Furniture and Fixture 33,000 33,000 35,000

A137 TOTAL COMPUTER EQUIPMENT 46,000 46,000 48,000

A13701 Hardware 30,000 30,000 32,000

A13702 Software 16,000 16,000 16,000

_______________________________________________________________________________EXECTIVE ENGINEER HIGHWAYS DIVISION 49,139,000 49,225,000 56,306,000

BADIN

_______________________________________________________________________________

Page 262: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

261

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

DD0063 EXECTIVE ENGINEER HIGHWAYS DIVISIONDADU

A01 TOTAL EMPLOYEES RELATED EXPENSES. 55,761,000 58,600,000 66,607,000

A011 TOTAL PAY 190 190 32,532,000 36,475,000 40,122,000

A011-1 TOTAL PAY OF OFFICERS 6 6 3,289,000 4,059,000 4,463,000

A01101 Total Basic Pay Of Officer 6 6 3,150,000 3,920,000 4,312,000

D259 DISTRICT OFFICER (BPS-18) 1 1 632,000 786,000 864,000

D129 DIVISIONAL ACCOUNTS (BPS-17) 1 1 503,000 627,000 690,000 OFFICER

D262 DEPUTY DISTRICT OFFICER (BPS-17) 4 4 2,015,000 2,507,000 2,758,000

A01102 Personal pay 91,000 91,000 101,000

A01105 Qualification Pay 11,000 11,000 13,000

A01150 Others 37,000 37,000 37,000

A011-2 TOTAL PAY OF OTHER STAFF 184 184 29,243,000 32,416,000 35,659,000

A01151 Total Basic Pay Other Staff 184 184 29,172,000 32,305,000 35,536,000

D135 DIVISIONAL HEAD CLERK (BPS-14) 1 1 240,000 263,000 289,000

S053 SENIOR CLERK (BPS-14) 2 434,000 478,000

S181 STENOGRAPHER (BPS-14) 1 1 240,000 263,000 289,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 226,000 246,000 271,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 12 2,605,000 2,865,000

S222 SUB ENGINEER (BPS-11) 12 12 2,374,000 2,605,000 2,865,000

D230 DRAFTSMAN (BPS-10) 1 1 193,000 210,000 231,000

A017 ACCOUNT CLERK (BPS-09) 2 2 373,000 409,000 447,000

S053 SENIOR CLERK (BPS-09) 2 373,000

C042 CHARGE MAN / MECHANIC (BPS-07) 2 2 348,000 381,000 419,000

J014 JR CLERK (BPS-07) 12 2,086,000

M131 MOTOR GRADER DRIVER (BPS-06) 1 1 168,000 184,000 202,000

Page 263: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

262

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

DD0063 EXECTIVE ENGINEER HIGHWAYS DIVISIONDADU

R062 ROAD INSPECTOR (BPS-06) 2 2 337,000 368,000 404,000

D143 DONKEY CART MAN (BPS-05) 2 2 325,000 355,000 390,000

J003 JEEP DRIVER (BPS-05) 3 3 485,000 532,000 585,000

R061 ROAD / WORK MISTRI / (BPS-05) 11 11 1,780,000 1,951,000 2,147,000 DAROGHA

R069 ROAD ROLLER DRIVER (BPS-05) 16 16 2,591,000 2,838,000 3,122,000

T050 TRACER (BPS-05) 1 1 162,000 177,000 195,000

T052 TRACTOR / TRUCK / WATER (BPS-05) 1 1 162,000 177,000 195,000 MAN / DUMPER DRIVER

F038 FITTER (BPS-03) 1 1 151,000 166,000 183,000

R065 ROAD MATE (BPS-03) 24 24 3,633,000 3,985,000 4,384,000

B085 BELDAR (BPS-02) 47 47 6,905,000 7,561,000 8,318,000

C100 CHOWKIDARS / WATCHMEN (BPS-02) 5 5 735,000 804,000 885,000

C111 CLEANER / HELPER / COLI (BPS-02) 13 13 1,911,000 2,091,000 2,301,000

H064 HELPER (BPS-02) 13 13 1,911,000 2,091,000 2,301,000

N003 NAIB QASID (BPS-02) 10 10 1,463,000 1,609,000 1,770,000

A01152 Personal pay 71,000 111,000 123,000

A012 TOTAL ALLOWANCES 23,229,000 22,125,000 26,485,000

A012-1 TOTAL REGULAR ALLOWANCES 23,229,000 22,125,000 26,485,000

A01202 House Rent Allowance 2,294,000 2,325,000 2,325,000

A01203 Conveyance Allowance 4,596,000 4,805,000 4,805,000

A01207 Washing Allowance 27,000 27,000 27,000

A0120D Integrated Allowance 4,000 4,000 4,000

A0120X Ad - hoc Allowance - 2010 6,217,000 5,896,000 5,896,000

A01217 Medical Allowance 3,647,000 3,647,000 3,647,000

A0121Q Audit and Accounts Allowance 73,000 73,000

A0121T Adhoc Relief Allowance 2013 1,023,000 1,023,000

A0122C Adhoc Relief Allowance - 2015 3,222,000 714,000 714,000

A0122M Adhoc Relief Allowance 2016 3,610,000 3,985,000

A01233 Unattractive Area Allowance 1,000 1,000

Page 264: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

263

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

DD0063 EXECTIVE ENGINEER HIGHWAYS DIVISIONDADU

A01270 Others 3,222,000 3,985,000

A03 TOTAL OPERATING EXPENSES 766,000 297,000 832,000

A032 TOTAL COMMUNICATIONS 124,000 124,000 131,000

A03201 Postage and Telegraph 10,000 10,000 11,000

A03202 Telephone and Trunk call 114,000 114,000 120,000

A033 TOTAL UTILITIES 470,000 1,000 517,000

A03303 Electricity 470,000 1,000 517,000

A038 TOTAL TRAVEL & 59,000 59,000 62,000

TRANSPORTATION

A03805 Travelling Allowance 42,000 42,000 45,000

A03807 P.O.L Charges A.planes 17,000 17,000 17,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 113,000 113,000 122,000

A03901 Stationery 24,000 24,000 26,000

A03902 Printing and Publication 15,000 15,000 16,000

A03905 Newspapers Periodicals and Books 9,000 9,000 10,000

A03906 Uniforms and Protective Clothing 42,000 42,000 45,000

A03970 Others 23,000 23,000 25,000

1 Others 23,000 23,000 25,000

A13 TOTAL REPAIRS AND MAINTENANCE 96,000 96,000 105,000

A130 TOTAL TRANSPORT 27,000 27,000 30,000

A13001 Transport 27,000 27,000 30,000

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

Page 265: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

264

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

DD0063 EXECTIVE ENGINEER HIGHWAYS DIVISIONDADU

A13101 Machinery and Equipment 36,000 36,000 40,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

_______________________________________________________________________________EXECTIVE ENGINEER HIGHWAYS DIVISION 56,623,000 58,993,000 67,544,000

DADU

_______________________________________________________________________________

Page 266: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

265

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

DD0374 EXECTIVE ENGINEER HIGHWAYS DIVISION DADU

A13 TOTAL REPAIRS AND MAINTENANCE 107,183,000 107,183,000 107,183,000

A131 TOTAL MACHINERY AND 586,000 586,000 586,000

EQUIPMENT

A13101 Machinery and Equipment 586,000 586,000 586,000

A136 TOTAL ROADS, HIGHWAYS AND 106,597,000 106,597,000 106,597,000

BRIDGES

A13602 Other roads 104,326,000 90,826,000 104,326,000

1 Other 104,326,000 90,826,000 104,326,000

A13604 Other bridges 2,271,000 15,771,000 2,271,000

6 Other (Fixed Charges) 2,271,000 15,771,000 2,271,000

_______________________________________________________________________________EXECTIVE ENGINEER HIGHWAYS DIVISION DADU 107,183,000 107,183,000 107,183,000

_______________________________________________________________________________

Page 267: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

266

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

GO0057 EXECTIVE ENGINEER HIGHWAYS DIVISIONGHOTKI

A01 TOTAL EMPLOYEES RELATED EXPENSES. 58,039,000 58,711,000 66,602,000

A011 TOTAL PAY 196 196 33,560,000 36,170,000 39,788,000

A011-1 TOTAL PAY OF OFFICERS 7 8 4,346,000 4,166,000 4,583,000

A01101 Total Basic Pay Of Officer 7 8 4,287,000 4,107,000 4,518,000

D259 DISTRICT OFFICER (BPS-18) 1 1 780,000 686,000 755,000

A218 ASSISTANT ENGINEER (BPS-17) 5 5 3,118,000 2,737,000 3,011,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 1 342,000 376,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 389,000 342,000 376,000 OFFICER

A01102 Personal pay 59,000 59,000 65,000

A011-2 TOTAL PAY OF OTHER STAFF 189 188 29,214,000 32,004,000 35,205,000

A01151 Total Basic Pay Other Staff 189 188 29,190,000 31,956,000 35,152,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 1 235,000

S053 SENIOR CLERK (BPS-14) 2 424,000 466,000

S181 STENOGRAPHER (BPS-14) 1 1 234,000 256,000 282,000

D133 DIVISIONAL HEAD / JR (BPS-13) 1 1 222,000 240,000 265,000 DRAUGHTSMAN

C148 COMPUTER OPERATORS (BPS-12) 1 1 206,000 225,000 247,000

J053 JUNIOR CLERK (BPS-11) 11 2,330,000 2,563,000

S222 SUB ENGINEER (BPS-11) 15 15 2,905,000 3,177,000 3,495,000

D230 DRAFTSMAN (BPS-10) 1 1 189,000 205,000 226,000

A017 ACCOUNT CLERK (BPS-09) 2 2 363,000 398,000 438,000

S053 SENIOR CLERK (BPS-09) 2 363,000

C041 CHARGE MAN / CHARGE (BPS-07) 2 2 340,000 372,000 409,000 MECHANICS

J014 JR CLERK (BPS-07) 11 1,871,000

Page 268: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

267

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

GO0057 EXECTIVE ENGINEER HIGHWAYS DIVISIONGHOTKI

D161 DRIVER (BPS-05) 4 4 634,000 693,000 762,000

M131 MOTOR GRADER DRIVER (BPS-05) 1 1 157,000 173,000 190,000

N042 NEPROLOGIST (BPS-05) 1 1 157,000 173,000 190,000

R061 ROAD / WORK MISTRI / (BPS-05) 10 10 1,583,000 1,731,000 1,904,000 DAROGHA

R069 ROAD ROLLER DRIVER (BPS-05) 8 8 1,267,000 1,385,000 1,524,000

T047 TRACER (BPS-05) 1 1 157,000 173,000 190,000

F038 FITTER (BPS-03) 1 1 147,000 162,000 178,000

R065 ROAD MATE (BPS-03) 11 11 1,628,000 1,783,000 1,961,000

B085 BELDAR (BPS-02) 75 75 10,780,000 11,776,000 12,953,000

C092 CHOWKIDAR / WATCHMAN (BPS-02) 15 15 2,156,000 2,355,000 2,591,000

C111 CLEANER / HELPER / COLI (BPS-02) 15 15 2,156,000 2,355,000 2,591,000

M022 MALI (BPS-02) 1 1 144,000 157,000 173,000

N003 NAIB QASID (BPS-02) 9 9 1,296,000 1,413,000 1,554,000

A01152 Personal pay 24,000 48,000 53,000

A012 TOTAL ALLOWANCES 24,479,000 22,541,000 26,814,000

A012-1 TOTAL REGULAR ALLOWANCES 24,401,000 22,463,000 26,732,000

A01202 House Rent Allowance 2,532,000 2,532,000 2,532,000

A01203 Conveyance Allowance 4,823,000 4,823,000 4,823,000

A01207 Washing Allowance 6,000 6,000 6,000

A0120D Integrated Allowance 30,000 30,000 30,000

A0120Q Fixed Daily Allowance 2,000 2,000 2,000

A0120X Ad - hoc Allowance - 2010 6,518,000 5,893,000 5,893,000

A01217 Medical Allowance 3,794,000 3,794,000 3,794,000

A0121A Ad - hoc Allowance - 2011 6,000

A0121T Adhoc Relief Allowance 2013 908,000 908,000

A0121Z Adhoc Relief Allowance - 2014 52,000

A0122C Adhoc Relief Allowance - 2015 3,348,000 810,000 810,000

A0122M Adhoc Relief Allowance 2016 3,537,000 3,967,000

A01244 Adhoc Relief 70,000

Page 269: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

268

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

GO0057 EXECTIVE ENGINEER HIGHWAYS DIVISIONGHOTKI

A01270 Others 3,348,000 3,967,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 78,000 78,000 82,000

A01274 Medical Charges 78,000 78,000 82,000

A03 TOTAL OPERATING EXPENSES 1,074,000 580,000 1,159,000

A032 TOTAL COMMUNICATIONS 30,000 30,000 33,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 21,000 21,000 23,000

A033 TOTAL UTILITIES 660,000 166,000 726,000

A03303 Electricity 660,000 166,000 726,000

A038 TOTAL TRAVEL & 169,000 169,000 173,000

TRANSPORTATION

A03805 Travelling Allowance 48,000 48,000 51,000

A03806 Transportation of Goods 16,000 16,000 17,000

A03807 P.O.L Charges A.planes 105,000 105,000 105,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 215,000 215,000 227,000

A03901 Stationery 15,000 15,000 16,000

A03902 Printing and Publication 14,000 14,000 15,000

A03905 Newspapers Periodicals and Books 9,000 9,000 10,000

A03906 Uniforms and Protective Clothing 140,000 140,000 147,000

A03970 Others 37,000 37,000 39,000

1 Others 37,000 37,000 39,000

A13 TOTAL REPAIRS AND MAINTENANCE 107,000 107,000 117,000

A130 TOTAL TRANSPORT 38,000 38,000 42,000

Page 270: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

269

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

GO0057 EXECTIVE ENGINEER HIGHWAYS DIVISIONGHOTKI

A13001 Transport 38,000 38,000 42,000

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

A13101 Machinery and Equipment 36,000 36,000 40,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

_______________________________________________________________________________EXECTIVE ENGINEER HIGHWAYS DIVISION 59,220,000 59,398,000 67,878,000

GHOTKI

_______________________________________________________________________________

Page 271: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

270

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0223 EXECTIVE ENGINEER HIGHWAYS DIVISIONHYDERABAD

A01 TOTAL EMPLOYEES RELATED EXPENSES. 41,422,000 42,967,000 48,617,000

A011 TOTAL PAY 129 129 23,273,000 25,836,000 28,422,000

A011-1 TOTAL PAY OF OFFICERS 6 7 3,736,000 4,545,000 5,001,000

A01101 Total Basic Pay Of Officer 6 7 3,715,000 4,326,000 4,759,000

D259 DISTRICT OFFICER (BPS-18) 1 1 744,000 788,000 867,000

A031 ACCOUNTS OFFICER (BPS-17) 1 1 594,000 629,000 692,000

D262 DEPUTY DISTRICT OFFICER (BPS-17) 4 4 2,377,000 2,516,000 2,768,000

A235 ASSISTANT HEAD CLERK (BPS-16) 1 393,000 432,000

A01102 Personal pay 19,000 203,000 224,000

A01105 Qualification Pay 2,000 16,000 18,000

A011-2 TOTAL PAY OF OTHER STAFF 123 122 19,537,000 21,291,000 23,421,000

A01151 Total Basic Pay Other Staff 123 122 19,529,000 21,278,000 23,406,000

A235 ASSISTANT HEAD CLERK (BPS-14) 1 234,000

S053 SENIOR CLERK (BPS-14) 2 426,000 469,000

S181 STENOGRAPHER (BPS-14) 1 1 233,000 258,000 284,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 217,000 242,000 266,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 10 2,130,000 2,343,000

S222 SUB ENGINEER (BPS-11) 12 12 2,295,000 2,556,000 2,812,000

D230 DRAFTSMAN (BPS-10) 1 1 185,000 206,000 227,000

J014 JR CLERK (BPS-10) 10 1,683,000

A017 ACCOUNT CLERK (BPS-09) 2 2 359,000 400,000 439,000

S053 SENIOR CLERK (BPS-09) 2 359,000

C040 CHARGE MAN (BPS-07) 1 1 167,000 187,000 206,000

R062 ROAD INSPECTOR (BPS-06) 2 2 325,000 361,000 397,000

Page 272: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

271

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0223 EXECTIVE ENGINEER HIGHWAYS DIVISIONHYDERABAD

R061 ROAD / WORK MISTRI / (BPS-05) 12 12 1,878,000 2,089,000 2,298,000 DAROGHA

D161 DRIVER (BPS-04) 5 5 754,000 839,000 923,000

M131 MOTOR GRADER DRIVER (BPS-04) 1 1 150,000 168,000 185,000

R069 ROAD ROLLER DRIVER (BPS-04) 4 4 602,000 671,000 738,000

T080 TRUCK DRIVER (BPS-04) 1 1 150,000 168,000 185,000

B085 BELDAR (BPS-02) 32 32 4,544,000 5,053,000 5,558,000

C089 CHOWKIDAR (BPS-02) 5 5 710,000 789,000 868,000

C111 CLEANER / HELPER / COLI (BPS-02) 13 13 1,846,000 2,053,000 2,258,000

F038 FITTER (BPS-02) 1 1 142,000 158,000 174,000

N003 NAIB QASID (BPS-02) 3 3 852,000 474,000 521,000

R065 ROAD MATE (BPS-02) 12 12 1,705,000 1,895,000 2,084,000

S008 SANITARY WORKER (BPS-01) 1 1 139,000 155,000 171,000

A01152 Personal pay 8,000 13,000 15,000

A012 TOTAL ALLOWANCES 18,149,000 17,131,000 20,195,000

A012-1 TOTAL REGULAR ALLOWANCES 17,995,000 16,977,000 20,033,000

A01202 House Rent Allowance 2,693,000 2,693,000 2,693,000

A01203 Conveyance Allowance 3,655,000 3,655,000 3,655,000

A01207 Washing Allowance 19,000 20,000 20,000

A0120D Integrated Allowance 11,000 11,000 11,000

A0120Q Fixed Daily Allowance 3,000 3,000 3,000

A0120X Ad - hoc Allowance - 2010 4,433,000 4,169,000 4,169,000

A01217 Medical Allowance 2,562,000 2,562,000 2,562,000

A0121M Adhoc Relief Allowance - 2012 2,000

A0121T Adhoc Relief Allowance 2013 626,000 626,000

A0121Z Adhoc Relief Allowance - 2014 20,000

A01227 Project Allowance 9,000 9,000 9,000

A0122C Adhoc Relief Allowance - 2015 2,304,000 532,000 532,000

A0122M Adhoc Relief Allowance 2016 2,555,000 2,817,000

A01233 Unattractive Area Allowance 2,000 2,000 2,000

A01239 Special Allowance 117,000 117,000

Page 273: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

272

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0223 EXECTIVE ENGINEER HIGHWAYS DIVISIONHYDERABAD

A01270 Others 2,304,000 1,000 2,817,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 154,000 154,000 162,000

A01274 Medical Charges 154,000 154,000 162,000

A03 TOTAL OPERATING EXPENSES 774,000 515,000 823,000

A032 TOTAL COMMUNICATIONS 156,000 156,000 165,000

A03201 Postage and Telegraph 10,000 10,000 11,000

A03202 Telephone and Trunk call 146,000 146,000 154,000

A033 TOTAL UTILITIES 260,000 1,000 286,000

A03303 Electricity 260,000 1,000 286,000

A038 TOTAL TRAVEL & 164,000 164,000 166,000

TRANSPORTATION

A03805 Travelling Allowance 25,000 25,000 27,000

A03807 P.O.L Charges A.planes 139,000 139,000 139,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 194,000 194,000 206,000

A03901 Stationery 87,000 87,000 92,000

A03902 Printing and Publication 24,000 24,000 26,000

A03905 Newspapers Periodicals and Books 10,000 10,000 11,000

A03970 Others 73,000 73,000 77,000

1 Others 73,000 73,000 77,000

A13 TOTAL REPAIRS AND MAINTENANCE 87,000 87,000 95,000

A130 TOTAL TRANSPORT 18,000 18,000 20,000

A13001 Transport 18,000 18,000 20,000

Page 274: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

273

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

HB0223 EXECTIVE ENGINEER HIGHWAYS DIVISIONHYDERABAD

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

A13101 Machinery and Equipment 36,000 36,000 40,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

_______________________________________________________________________________EXECTIVE ENGINEER HIGHWAYS DIVISION 42,283,000 43,569,000 49,535,000

HYDERABAD

_______________________________________________________________________________

Page 275: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

274

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

JK0054 EXECTIVE ENGINEER HIGHWAYS DIVISIONJACOBABAD

A01 TOTAL EMPLOYEES RELATED EXPENSES. 47,751,000 49,319,000 55,986,000

A011 TOTAL PAY 177 177 27,772,000 30,463,000 33,511,000

A011-1 TOTAL PAY OF OFFICERS 5 6 1,205,000 1,605,000 1,766,000

A01101 Total Basic Pay Of Officer 5 6 1,205,000 1,605,000 1,766,000

D259 DISTRICT OFFICER (BPS-18) 1 1 307,000 366,000 402,000

D262 DEPUTY DISTRICT OFFICER (BPS-17) 3 3 742,000 875,000 963,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 1 182,000 200,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 156,000 182,000 201,000 OFFICER

A011-2 TOTAL PAY OF OTHER STAFF 172 171 26,567,000 28,858,000 31,745,000

A01151 Total Basic Pay Other Staff 172 171 26,486,000 28,721,000 31,594,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 1 232,000

D133 DIVISIONAL HEAD / JR (BPS-14) 1 1 232,000 250,000 275,000 DRAUGHTSMAN

S053 SENIOR CLERK (BPS-14) 2 414,000 455,000

S181 STENOGRAPHER (BPS-14) 1 1 232,000 250,000 275,000

S222 SUB ENGINEER (BPS-14) 9 9 2,080,000 2,253,000 2,479,000

J053 JUNIOR CLERK (BPS-11) 10 2,069,000 2,276,000

D230 DRAFTSMAN (BPS-10) 1 1 187,000 200,000 220,000

A017 ACCOUNT CLERK (BPS-09) 2 2 358,000 390,000 427,000

S053 SENIOR CLERK (BPS-09) 2 358,000

C041 CHARGE MAN / CHARGE (BPS-08) 1 1 173,000 188,000 207,000 MECHANICS

J014 JR CLERK (BPS-07) 10 1,675,000

L079 LOG BOOK CLERK (BPS-07) 3 3 503,000 544,000 599,000

R062 ROAD INSPECTOR (BPS-07) 1 1 167,000 181,000 200,000

Page 276: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

275

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

JK0054 EXECTIVE ENGINEER HIGHWAYS DIVISIONJACOBABAD

R068 ROAD MISTRY / WORK MISTRY (BPS-07) 8 8 1,340,000 1,452,000 1,597,000 / DAROGHA

T047 TRACER (BPS-07) 1 1 167,000 181,000 200,000

D161 DRIVER (BPS-05) 10 10 1,559,000 1,691,000 1,860,000

S205 STORE ISSURE (BPS-05) 1 1 156,000 169,000 186,000

F038 FITTER (BPS-03) 4 4 583,000 633,000 696,000

R065 ROAD MATE (BPS-03) 14 14 2,042,000 2,216,000 2,437,000

B085 BELDAR (BPS-02) 60 60 8,493,000 9,200,000 10,120,000

C092 CHOWKIDAR / WATCHMAN (BPS-02) 11 11 1,558,000 1,687,000 1,855,000

C111 CLEANER / HELPER / COLI (BPS-02) 23 23 3,256,000 3,527,000 3,880,000

F012 FERO PRINTER (BPS-02) 1 1 143,000 153,000 169,000

N003 NAIB QASID (BPS-02) 7 7 992,000 1,073,000 1,181,000

A01152 Personal pay 81,000 137,000 151,000

A012 TOTAL ALLOWANCES 19,979,000 18,856,000 22,475,000

A012-1 TOTAL REGULAR ALLOWANCES 19,979,000 18,856,000 22,475,000

A01202 House Rent Allowance 2,062,000 2,062,000 2,062,000

A01203 Conveyance Allowance 4,048,000 4,048,000 4,048,000

A01207 Washing Allowance 53,000 53,000 53,000

A0120D Integrated Allowance 22,000 26,000 26,000

A0120X Ad - hoc Allowance - 2010 5,228,000 4,944,000 4,944,000

A01216 Qualification Allowance 11,000 11,000

A01217 Medical Allowance 3,210,000 3,210,000 3,210,000

A0121A Ad - hoc Allowance - 2011 5,000

A0121M Adhoc Relief Allowance - 2012 5,000

A0121T Adhoc Relief Allowance 2013 839,000 839,000

A0122C Adhoc Relief Allowance - 2015 2,678,000 610,000 610,000

A0122M Adhoc Relief Allowance 2016 3,043,000 3,336,000

A01270 Others 2,678,000 3,336,000

Page 277: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

276

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

JK0054 EXECTIVE ENGINEER HIGHWAYS DIVISIONJACOBABAD

A03 TOTAL OPERATING EXPENSES 244,000 244,000 259,000

A032 TOTAL COMMUNICATIONS 62,000 62,000 66,000

A03201 Postage and Telegraph 4,000 4,000 5,000

A03202 Telephone and Trunk call 58,000 58,000 61,000

A038 TOTAL TRAVEL & 121,000 121,000 126,000

TRANSPORTATION

A03805 Travelling Allowance 84,000 84,000 89,000

A03807 P.O.L Charges A.planes 37,000 37,000 37,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 61,000 61,000 67,000

A03901 Stationery 10,000 10,000 11,000

A03902 Printing and Publication 6,000 6,000 7,000

A03905 Newspapers Periodicals and Books 3,000 3,000 4,000

A03906 Uniforms and Protective Clothing 19,000 19,000 20,000

A03970 Others 23,000 23,000 25,000

1 Others 23,000 23,000 25,000

A13 TOTAL REPAIRS AND MAINTENANCE 78,000 78,000 86,000

A130 TOTAL TRANSPORT 27,000 27,000 30,000

A13001 Transport 27,000 27,000 30,000

A131 TOTAL MACHINERY AND 27,000 27,000 30,000

EQUIPMENT

A13101 Machinery and Equipment 27,000 27,000 30,000

A132 TOTAL FURNITURE AND 24,000 24,000 26,000

FIXTURE

A13201 Furniture and Fixture 24,000 24,000 26,000

Page 278: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

277

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

JK0054 EXECTIVE ENGINEER HIGHWAYS DIVISIONJACOBABAD

_______________________________________________________________________________EXECTIVE ENGINEER HIGHWAYS DIVISION 48,073,000 49,641,000 56,331,000

JACOBABAD

_______________________________________________________________________________

Page 279: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

278

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

JO0056 EXECTIVE ENGINEER HIGHWAYS DIVISIONJAMSHORO

A01 TOTAL EMPLOYEES RELATED EXPENSES. 43,557,000 45,039,000 51,048,000

A011 TOTAL PAY 157 157 24,894,000 27,559,000 30,316,000

A011-1 TOTAL PAY OF OFFICERS 5 6 2,348,000 2,733,000 3,007,000

A01101 Total Basic Pay Of Officer 5 6 2,348,000 2,733,000 3,007,000

S259 SURVEYOR (BPS-18) 1 1 602,000 623,000 685,000

D262 DEPUTY DISTRICT OFFICER (BPS-17) 3 3 1,445,000 1,490,000 1,640,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 1 310,000 341,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 301,000 310,000 341,000 OFFICER

A011-2 TOTAL PAY OF OTHER STAFF 152 151 22,546,000 24,826,000 27,309,000

A01151 Total Basic Pay Other Staff 152 151 22,418,000 24,520,000 26,972,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 1 227,000

S053 SENIOR CLERK (BPS-14) 2 406,000 447,000

S181 STENOGRAPHER (BPS-14) 1 1 224,000 246,000 270,000

H035 HEAD DRAFTSMAN (BPS-13) 1 1 212,000 231,000 254,000

J053 JUNIOR CLERK (BPS-11) 9 1,829,000 2,011,000

S222 SUB ENGINEER (BPS-11) 9 9 1,669,000 1,829,000 2,011,000

J022 JR DRAFTSMAN (BPS-10) 1 1 178,000 197,000 216,000

A017 ACCOUNT CLERK (BPS-09) 2 2 349,000 380,000 419,000

S053 SENIOR CLERK (BPS-09) 2 349,000

C042 CHARGE MAN / MECHANIC (BPS-08) 2 2 336,000 369,000 406,000

J014 JR CLERK (BPS-07) 9 1,469,000

R062 ROAD INSPECTOR (BPS-06) 2 2 315,000 344,000 379,000

D018 DAROGA (BPS-05) 9 9 1,365,000 1,494,000 1,644,000

D161 DRIVER (BPS-05) 4 4 607,000 664,000 731,000

Page 280: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

279

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

JO0056 EXECTIVE ENGINEER HIGHWAYS DIVISIONJAMSHORO

M042 MASSAN MISTRY (BPS-05) 1 1 152,000 166,000 183,000

T047 TRACER (BPS-05) 1 1 152,000 166,000 183,000

R069 ROAD ROLLER DRIVER (BPS-04) 6 6 877,000 960,000 1,056,000

S205 STORE ISSURE (BPS-04) 1 1 147,000 160,000 176,000

T077 TRUCK / TRACTOR / (BPS-04) 2 2 293,000 320,000 352,000 WATERMEN DRIVER

B007 BALDAR (BPS-02) 59 59 8,127,000 8,885,000 9,773,000

C089 CHOWKIDAR (BPS-02) 4 4 552,000 602,000 663,000

D143 DONKEY CART MAN (BPS-02) 1 1 139,000 151,000 166,000

F038 FITTER (BPS-02) 1 1 139,000 151,000 166,000

H066 HELPER COOLLY (BPS-02) 10 10 1,376,000 1,506,000 1,656,000

N003 NAIB QASID (BPS-02) 6 6 823,000 904,000 994,000

R065 ROAD MATE (BPS-02) 16 16 2,202,000 2,409,000 2,650,000

S008 SANITARY WORKER (BPS-02) 1 1 139,000 151,000 166,000

A01152 Personal pay 128,000 306,000 337,000

A012 TOTAL ALLOWANCES 18,663,000 17,480,000 20,732,000

A012-1 TOTAL REGULAR ALLOWANCES 18,663,000 17,480,000 20,732,000

A01202 House Rent Allowance 2,347,000 2,347,000 2,347,000

A01203 Conveyance Allowance 3,665,000 3,665,000 3,665,000

A01207 Washing Allowance 14,000 15,000 15,000

A0120D Integrated Allowance 18,000 19,000 19,000

A0120X Ad - hoc Allowance - 2010 4,800,000 4,457,000 4,457,000

A01217 Medical Allowance 2,838,000 2,838,000 2,838,000

A0121Q Audit and Accounts Allowance 31,000 31,000

A0121T Adhoc Relief Allowance 2013 757,000 757,000

A0121Z Adhoc Relief Allowance - 2014 27,000

A0122C Adhoc Relief Allowance - 2015 2,477,000 570,000 570,000

A0122M Adhoc Relief Allowance 2016 2,695,000 2,998,000

A01233 Unattractive Area Allowance 27,000 37,000 37,000

Page 281: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

280

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

JO0056 EXECTIVE ENGINEER HIGHWAYS DIVISIONJAMSHORO

A01244 Adhoc Relief 22,000

A01270 Others 2,477,000 2,998,000

A03 TOTAL OPERATING EXPENSES 1,077,000 968,000 1,137,000

A032 TOTAL COMMUNICATIONS 76,000 76,000 81,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 67,000 67,000 71,000

A033 TOTAL UTILITIES 135,000 26,000 149,000

A03301 Gas 9,000 9,000 10,000

A03302 Water 10,000 10,000 11,000

A03303 Electricity 116,000 7,000 128,000

A034 TOTAL OCCUPANCY COSTS 217,000 217,000 238,000

A03402 Rent for Office Building 209,000 209,000 230,000

A03407 Rates and Taxes 8,000 8,000 8,000

A038 TOTAL TRAVEL & 357,000 357,000 361,000

TRANSPORTATION

A03805 Travelling Allowance 79,000 79,000 83,000

A03807 P.O.L Charges A.planes 278,000 278,000 278,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 292,000 292,000 308,000

A03901 Stationery 68,000 68,000 72,000

A03902 Printing and Publication 74,000 74,000 78,000

A03905 Newspapers Periodicals and Books 15,000 15,000 16,000

A03970 Others 135,000 135,000 142,000

1 Others 135,000 135,000 142,000

A13 TOTAL REPAIRS AND MAINTENANCE 385,000 385,000 420,000

Page 282: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

281

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

JO0056 EXECTIVE ENGINEER HIGHWAYS DIVISIONJAMSHORO

A130 TOTAL TRANSPORT 219,000 219,000 241,000

A13001 Transport 219,000 219,000 241,000

A131 TOTAL MACHINERY AND 87,000 87,000 96,000

EQUIPMENT

A13101 Machinery and Equipment 87,000 87,000 96,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

A137 TOTAL COMPUTER EQUIPMENT 46,000 46,000 48,000

A13701 Hardware 30,000 30,000 32,000

A13702 Software 16,000 16,000 16,000

_______________________________________________________________________________EXECTIVE ENGINEER HIGHWAYS DIVISION 45,019,000 46,392,000 52,605,000

JAMSHORO

_______________________________________________________________________________

Page 283: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

282

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

JO0057 EXECUTIVE ENGINEER HIGHWAYS DIVISIONJAMSHORO

A13 TOTAL REPAIRS AND MAINTENANCE 27,667,000 214,468,000 27,667,000

A131 TOTAL MACHINERY AND 586,000 586,000 586,000

EQUIPMENT

A13101 Machinery and Equipment 586,000 586,000 586,000

A136 TOTAL ROADS, HIGHWAYS AND 27,081,000 213,882,000 27,081,000

BRIDGES

A13602 Other roads 25,946,000 212,747,000 25,946,000

1 Other 25,946,000 212,747,000 25,946,000

A13604 Other bridges 1,135,000 1,135,000 1,135,000

6 Other (Fixed Charges) 1,135,000 1,135,000 1,135,000

_______________________________________________________________________________EXECUTIVE ENGINEER HIGHWAYS DIVISION 27,667,000 214,468,000 27,667,000

JAMSHORO

_______________________________________________________________________________

Page 284: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

283

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

KK0047 EXECTIVE ENGINEER HIGHWAYS DIVISIONKASHMOR

A01 TOTAL EMPLOYEES RELATED EXPENSES. 42,242,000 41,968,000 47,549,000

A011 TOTAL PAY 161 161 24,233,000 25,658,000 28,226,000

A011-1 TOTAL PAY OF OFFICERS 4 5 2,506,000 1,528,000 1,682,000

A01101 Total Basic Pay Of Officer 4 5 2,213,000 1,235,000 1,359,000

D259 DISTRICT OFFICER (BPS-18) 1 1 714,000 344,000 378,000

D262 DEPUTY DISTRICT OFFICER (BPS-17) 2 2 1,142,000 549,000 604,000

A235 ASSISTANT HEAD CLERK (BPS-16) 1 171,000 188,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 357,000 171,000 189,000 OFFICER

A01102 Personal pay 293,000 293,000 323,000

A011-2 TOTAL PAY OF OTHER STAFF 157 156 21,727,000 24,130,000 26,544,000

A01151 Total Basic Pay Other Staff 157 156 21,540,000 23,943,000 26,338,000

A235 ASSISTANT HEAD CLERK (BPS-14) 1 208,000

S053 SENIOR CLERK (BPS-14) 2 387,000 426,000

S181 STENOGRAPHER (BPS-14) 1 1 209,000 234,000 258,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 197,000 220,000 242,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 12 2,322,000 2,554,000

S222 SUB ENGINEER (BPS-11) 6 6 1,041,000 1,161,000 1,277,000

D230 DRAFTSMAN (BPS-10) 1 1 168,000 187,000 206,000

A017 ACCOUNT CLERK (BPS-09) 2 2 329,000 363,000 400,000

S053 SENIOR CLERK (BPS-09) 2 326,000

C040 CHARGE MAN (BPS-07) 2 2 304,000 340,000 373,000

J014 JR CLERK (BPS-07) 12 1,829,000

M042 MASSAN MISTRY (BPS-05) 1 1 142,000 158,000 174,000

R062 ROAD INSPECTOR (BPS-05) 1 1 142,000 158,000 174,000

Page 285: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

284

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

KK0047 EXECTIVE ENGINEER HIGHWAYS DIVISIONKASHMOR

T073 TRESSOR (BPS-05) 1 1 142,000 158,000 174,000

W045 WORK MESTRY / DAROGHA (BPS-05) 12 12 1,704,000 1,898,000 2,088,000

J003 JEEP DRIVER (BPS-04) 2 2 410,000 305,000 335,000

R069 ROAD ROLLER DRIVER (BPS-04) 8 8 1,093,000 1,220,000 1,342,000

S205 STORE ISSURE (BPS-04) 1 1 138,000 152,000 168,000

T054 TRACTOR / TRUCK / WV (BPS-04) 2 2 274,000 305,000 335,000 DRIVER

F038 FITTER (BPS-03) 3 3 399,000 444,000 489,000

R065 ROAD MATE (BPS-03) 18 18 2,390,000 2,665,000 2,931,000

B007 BALDAR (BPS-01) 50 50 6,309,000 7,041,000 7,745,000

C111 CLEANER / HELPER / COLI (BPS-01) 14 14 1,768,000 1,971,000 2,169,000

C215 CHOWKIDAR -CUM-NAIB QASID (BPS-01) 8 8 1,010,000 1,127,000 1,239,000

D143 DONKEY CART MAN (BPS-01) 1 1 127,000 141,000 155,000

N003 NAIB QASID (BPS-01) 7 7 881,000 986,000 1,084,000

A01152 Personal pay 187,000 187,000 206,000

A012 TOTAL ALLOWANCES 18,009,000 16,310,000 19,323,000

A012-1 TOTAL REGULAR ALLOWANCES 18,009,000 16,310,000 19,323,000

A01202 House Rent Allowance 1,897,000 1,897,000 1,897,000

A01203 Conveyance Allowance 3,602,000 3,602,000 3,602,000

A01207 Washing Allowance 52,000 52,000 52,000

A01208 Dress Allowance 2,000 2,000 2,000

A0120X Ad - hoc Allowance - 2010 4,751,000 4,084,000 4,084,000

A01217 Medical Allowance 2,955,000 2,955,000 2,955,000

A0121T Adhoc Relief Allowance 2013 685,000 685,000

A0122C Adhoc Relief Allowance - 2015 2,375,000 506,000 506,000

A0122M Adhoc Relief Allowance 2016 2,527,000 2,770,000

A01270 Others 2,375,000 2,770,000

Page 286: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

285

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

KK0047 EXECTIVE ENGINEER HIGHWAYS DIVISIONKASHMOR

A03 TOTAL OPERATING EXPENSES 967,000 491,000 1,036,000

A032 TOTAL COMMUNICATIONS 40,000 40,000 42,000

A03202 Telephone and Trunk call 40,000 40,000 42,000

A033 TOTAL UTILITIES 477,000 1,000 525,000

A03303 Electricity 477,000 1,000 525,000

A038 TOTAL TRAVEL & 209,000 209,000 215,000

TRANSPORTATION

A03805 Travelling Allowance 112,000 112,000 118,000

A03807 P.O.L Charges A.planes 97,000 97,000 97,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 241,000 241,000 254,000

A03901 Stationery 37,000 37,000 39,000

A03902 Printing and Publication 15,000 15,000 16,000

A03906 Uniforms and Protective Clothing 140,000 140,000 147,000

A03970 Others 49,000 49,000 52,000

1 Others 49,000 49,000 52,000

A13 TOTAL REPAIRS AND MAINTENANCE 143,000 143,000 157,000

A130 TOTAL TRANSPORT 74,000 74,000 82,000

A13001 Transport 74,000 74,000 82,000

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

A13101 Machinery and Equipment 36,000 36,000 40,000

Page 287: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

286

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

KK0047 EXECTIVE ENGINEER HIGHWAYS DIVISIONKASHMOR

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

_______________________________________________________________________________EXECTIVE ENGINEER HIGHWAYS DIVISION 43,352,000 42,602,000 48,742,000

KASHMOR

_______________________________________________________________________________

Page 288: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

287

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

KQ0549 EXECTIVE ENGINEER HIGHWAYS DIVISIONKARACHI

A01 TOTAL EMPLOYEES RELATED EXPENSES. 34,582,000 32,898,000 37,174,000

A011 TOTAL PAY 100 100 19,880,000 19,687,000 21,657,000

A011-1 TOTAL PAY OF OFFICERS 5 6 2,788,000 2,737,000 3,012,000

A01101 Total Basic Pay Of Officer 5 6 2,746,000 2,538,000 2,792,000

D259 DISTRICT OFFICER (BPS-18) 1 1 652,000 541,000 595,000

A218 ASSISTANT ENGINEER (BPS-17) 3 3 1,570,000 1,295,000 1,425,000

D129 DIVISIONAL ACCOUNTS (BPS-17) 1 1 524,000 432,000 475,000 OFFICER

A235 ASSISTANT HEAD CLERK (BPS-16) 1 270,000 297,000

A01102 Personal pay 42,000 183,000 202,000

A01105 Qualification Pay 16,000 18,000

A011-2 TOTAL PAY OF OTHER STAFF 95 94 17,092,000 16,950,000 18,645,000

A01151 Total Basic Pay Other Staff 95 94 17,068,000 16,899,000 18,589,000

A235 ASSISTANT HEAD CLERK (BPS-14) 1 265,000

S053 SENIOR CLERK (BPS-14) 2 436,000 480,000

D134 DIVISIONAL HEAD / JUNIOR (BPS-13) 1 1 250,000 248,000 272,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 9 1,963,000 2,159,000

S222 SUB ENGINEER (BPS-11) 9 9 1,981,000 1,963,000 2,159,000

D150 DRAUGHTSMAN (BPS-10) 1 1 213,000 211,000 232,000

A017 ACCOUNT CLERK (BPS-09) 2 2 414,000 408,000 451,000

S053 SENIOR CLERK (BPS-09) 2 414,000

C041 CHARGE MAN / CHARGE (BPS-08) 1 1 200,000 198,000 218,000 MECHANICS

J014 JR CLERK (BPS-07) 9 1,740,000

W063 WORKSHOP SUPERINTENDENT (BPS-07) 1 1 193,000 191,000 210,000

Page 289: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

288

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

KQ0549 EXECTIVE ENGINEER HIGHWAYS DIVISIONKARACHI

E021 ELECTRICIAN (BPS-05) 2 2 360,000 357,000 392,000

R061 ROAD / WORK MISTRI / (BPS-05) 11 11 1,981,000 1,961,000 2,157,000 DAROGHA

D161 DRIVER (BPS-04) 4 4 693,000 687,000 756,000

R069 ROAD ROLLER DRIVER (BPS-04) 2 2 347,000 344,000 378,000

T053 TRACTOR / TRUCK / WATER (BPS-04) 1 1 175,000 172,000 189,000 VAN DRIVER

B007 BALDAR (BPS-02) 23 23 3,757,000 3,718,000 4,090,000

C088 CHOWIKADAR / WATCHMAN (BPS-02) 5 5 816,000 808,000 889,000

C111 CLEANER / HELPER / COLI (BPS-02) 6 6 980,000 970,000 1,067,000

N003 NAIB QASID (BPS-02) 7 7 1,146,000 1,132,000 1,245,000

R065 ROAD MATE (BPS-02) 6 6 980,000 970,000 1,067,000

S008 SANITARY WORKER (BPS-02) 1 1 163,000 162,000 178,000

A01152 Personal pay 23,000 50,000 55,000

A01153 Special pay 1,000 1,000 1,000

A012 TOTAL ALLOWANCES 14,702,000 13,211,000 15,517,000

A012-1 TOTAL REGULAR ALLOWANCES 14,684,000 13,193,000 15,498,000

A01202 House Rent Allowance 2,120,000 2,120,000 2,120,000

A01203 Conveyance Allowance 2,782,000 2,782,000 2,782,000

A01207 Washing Allowance 1,000 1,000 1,000

A01208 Dress Allowance 3,000 3,000 3,000

A0120D Integrated Allowance 29,000 29,000 29,000

A0120X Ad - hoc Allowance - 2010 3,771,000 3,243,000 3,243,000

A01217 Medical Allowance 2,016,000 2,016,000 2,016,000

A0121Q Audit and Accounts Allowance 123,000 123,000

A0121T Adhoc Relief Allowance 2013 508,000 508,000

A0121Z Adhoc Relief Allowance - 2014 5,000

A0122C Adhoc Relief Allowance - 2015 1,981,000 390,000 390,000

A0122M Adhoc Relief Allowance 2016 1,961,000 2,138,000

A01244 Adhoc Relief 5,000

A01264 Technical Allowance 7,000 7,000

Page 290: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

289

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

KQ0549 EXECTIVE ENGINEER HIGHWAYS DIVISIONKARACHI

A01270 Others 1,981,000 2,138,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 18,000 18,000 19,000

A01274 Medical Charges 18,000 18,000 19,000

_______________________________________________________________________________EXECTIVE ENGINEER HIGHWAYS DIVISION 34,582,000 32,898,000 37,174,000

KARACHI

_______________________________________________________________________________

Page 291: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

290

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

KX0084 EXECTIVE ENGINEER HIGHWAYS DIVISIONKHAIRPUR

A01 TOTAL EMPLOYEES RELATED EXPENSES. 100,398,000 105,902,000 120,416,000

A011 TOTAL PAY 358 358 58,546,000 66,003,000 72,604,000

A011-1 TOTAL PAY OF OFFICERS 8 9 4,453,000 4,806,000 5,287,000

A01101 Total Basic Pay Of Officer 8 9 4,453,000 4,806,000 5,287,000

D259 DISTRICT OFFICER (BPS-18) 1 1 707,000 709,000 780,000

D262 DEPUTY DISTRICT OFFICER (BPS-17) 6 6 3,392,000 3,392,000 3,731,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 1 353,000 388,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 354,000 352,000 388,000 OFFICER

A011-2 TOTAL PAY OF OTHER STAFF 350 349 54,093,000 61,197,000 67,317,000

A01151 Total Basic Pay Other Staff 350 349 54,018,000 61,079,000 67,187,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 1 263,000

S053 SENIOR CLERK (BPS-14) 2 445,000 489,000

S181 STENOGRAPHER (BPS-14) 1 1 260,000 269,000 296,000

D134 DIVISIONAL HEAD / JUNIOR (BPS-13) 1 1 243,000 252,000 278,000 DRAUGHTSMAN

D026 DATA PROCESSING ASSISTANT (BPS-12) 1 1 109,000 236,000 259,000

J053 JUNIOR CLERK (BPS-11) 15 3,337,000 3,670,000

S222 SUB ENGINEER (BPS-11) 18 18 3,847,000 4,004,000 4,404,000

D230 DRAFTSMAN (BPS-10) 1 1 206,000 215,000 237,000

A017 ACCOUNT CLERK (BPS-09) 2 2 402,000 419,000 459,000

S053 SENIOR CLERK (BPS-09) 2 402,000

C041 CHARGE MAN / CHARGE (BPS-07) 2 2 375,000 390,000 429,000 MECHANICS

J020 JR CLERK (BPS-07) 15 2,817,000

R062 ROAD INSPECTOR (BPS-07) 2 2 375,000 390,000 429,000

Page 292: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

291

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

KX0084 EXECTIVE ENGINEER HIGHWAYS DIVISIONKHAIRPUR

D161 DRIVER (BPS-05) 5 5 875,000 909,000 1,000,000

M131 MOTOR GRADER DRIVER (BPS-05) 1 1 175,000 182,000 200,000

R069 ROAD ROLLER DRIVER (BPS-05) 40 40 6,119,000 7,272,000 8,000,000

T047 TRACER (BPS-05) 1 1 175,000 182,000 200,000

R068 ROAD MISTRY / WORK MISTRY (BPS-04) 18 18 3,031,000 3,154,000 3,470,000 / DAROGHA

S195 STOOR ISSURE (BPS-04) 1 1 168,000 175,000 193,000

W022 WATERMAN / TRUCK / WATER (BPS-04) 1 1 168,000 175,000 193,000 VAN DRIVER

B085 BELDAR (BPS-02) 126 126 19,833,000 20,774,000 22,852,000

C092 CHOWKIDAR / WATCHMAN (BPS-02) 27 27 3,968,000 4,452,000 4,897,000

C111 CLEANER / HELPER / COLI (BPS-02) 38 38 3,490,000 6,265,000 6,892,000

F038 FITTER (BPS-02) 3 3 317,000 495,000 544,000

M020 MALHI / GARDEN ATTENDANT (BPS-02) 2 2 317,000 330,000 363,000

N003 NAIB QASID (BPS-02) 10 10 1,584,000 1,649,000 1,814,000

R065 ROAD MATE (BPS-02) 30 30 4,444,000 4,946,000 5,441,000

S008 SANITARY WORKER (BPS-01) 1 1 55,000 162,000 178,000

A01152 Personal pay 75,000 118,000 130,000

A012 TOTAL ALLOWANCES 41,852,000 39,899,000 47,812,000

A012-1 TOTAL REGULAR ALLOWANCES 41,852,000 39,899,000 47,812,000

A01202 House Rent Allowance 4,293,000 4,337,000 4,337,000

A01203 Conveyance Allowance 8,013,000 8,519,000 8,519,000

A01207 Washing Allowance 84,000 108,000 108,000

A0120D Integrated Allowance 37,000 37,000 37,000

A0120X Ad - hoc Allowance - 2010 11,397,000 10,984,000 10,984,000

A01217 Medical Allowance 6,397,000 6,397,000 6,397,000

A0121T Adhoc Relief Allowance 2013 16,000 1,589,000 1,589,000

A0121Z Adhoc Relief Allowance - 2014 11,000 11,000

A01226 Computer Allowance 7,000 7,000

Page 293: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

292

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

KX0084 EXECTIVE ENGINEER HIGHWAYS DIVISIONKHAIRPUR

A0122C Adhoc Relief Allowance - 2015 5,804,000 1,333,000 1,333,000

A0122M Adhoc Relief Allowance 2016 6,555,000 7,247,000

A01233 Unattractive Area Allowance 2,000 2,000 2,000

A01238 Charge Allowance 5,000 5,000 5,000

A01244 Adhoc Relief 15,000

A01270 Others 5,793,000 7,247,000

A03 TOTAL OPERATING EXPENSES 2,493,000 1,483,000 2,626,000

A032 TOTAL COMMUNICATIONS 178,000 178,000 188,000

A03201 Postage and Telegraph 15,000 15,000 16,000

A03202 Telephone and Trunk call 163,000 163,000 172,000

A033 TOTAL UTILITIES 1,011,000 1,000 1,113,000

A03303 Electricity 1,011,000 1,000 1,113,000

A034 TOTAL OCCUPANCY COSTS 89,000 89,000 89,000

A03407 Rates and Taxes 89,000 89,000 89,000

A038 TOTAL TRAVEL & 894,000 894,000 897,000

TRANSPORTATION

A03805 Travelling Allowance 59,000 59,000 62,000

A03807 P.O.L Charges A.planes 835,000 835,000 835,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 321,000 321,000 339,000

A03901 Stationery 105,000 105,000 111,000

A03902 Printing and Publication 87,000 87,000 92,000

A03905 Newspapers Periodicals and Books 10,000 10,000 11,000

A03970 Others 119,000 119,000 125,000

1 Others 119,000 119,000 125,000

Page 294: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

293

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

KX0084 EXECTIVE ENGINEER HIGHWAYS DIVISIONKHAIRPUR

A13 TOTAL REPAIRS AND MAINTENANCE 105,000 105,000 115,000

A130 TOTAL TRANSPORT 36,000 36,000 40,000

A13001 Transport 36,000 36,000 40,000

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

A13101 Machinery and Equipment 36,000 36,000 40,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

_______________________________________________________________________________EXECTIVE ENGINEER HIGHWAYS DIVISION 102,996,000 107,490,000 123,157,000

KHAIRPUR

_______________________________________________________________________________

Page 295: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

294

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

LN0112 EXECTIVE ENGINEER HIGHWAYS DIVISIONLARKANA

A01 TOTAL EMPLOYEES RELATED EXPENSES. 71,142,000 72,051,000 81,762,000

A011 TOTAL PAY 249 249 40,504,000 43,842,000 48,228,000

A011-1 TOTAL PAY OF OFFICERS 5 6 3,118,000 3,253,000 3,579,000

A01101 Total Basic Pay Of Officer 5 6 3,118,000 3,253,000 3,579,000

D259 DISTRICT OFFICER (BPS-18) 1 1 800,000 741,000 815,000

D262 DEPUTY DISTRICT OFFICER (BPS-17) 3 3 1,919,000 1,774,000 1,951,000

A119 ASSISTANT (BPS-16) 1 369,000 406,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 399,000 369,000 407,000 OFFICER

A011-2 TOTAL PAY OF OTHER STAFF 244 243 37,386,000 40,589,000 44,649,000

A01151 Total Basic Pay Other Staff 244 243 37,377,000 40,575,000 44,633,000

A119 ASSISTANT (BPS-14) 1 237,000

S053 SENIOR CLERK (BPS-14) 2 425,000 467,000

S181 STENOGRAPHER (BPS-14) 1 1 237,000 257,000 283,000

D130 DIVISIONAL DRAUGHTSMAN (BPS-13) 1 1 222,000 241,000 265,000

J053 JUNIOR CLERK (BPS-11) 9 1,911,000 2,102,000

S228 SUB-ENGINEER (BPS-11) 9 9 1,758,000 1,911,000 2,102,000

J022 JR DRAFTSMAN (BPS-10) 1 1 187,000 206,000 226,000

A018 ACCOUNT CLERK / (BPS-09) 2 2 367,000 396,000 436,000 SUB-ACCOUNT

S053 SENIOR CLERK (BPS-09) 2 367,000

C042 CHARGE MAN / MECHANIC (BPS-08) 2 2 356,000 385,000 424,000

J014 JR CLERK (BPS-07) 9 1,546,000

R062 ROAD INSPECTOR (BPS-06) 1 1 165,000 180,000 198,000

D161 DRIVER (BPS-05) 4 4 640,000 694,000 763,000

Page 296: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

295

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

LN0112 EXECTIVE ENGINEER HIGHWAYS DIVISIONLARKANA

E021 ELECTRICIAN (BPS-05) 1 1 160,000 174,000 191,000

M042 MASSAN MISTRY (BPS-05) 1 1 160,000 174,000 191,000

R069 ROAD ROLLER DRIVER (BPS-05) 16 16 2,559,000 2,776,000 3,054,000

S206 STORE KEEPER (BPS-05) 3 3 480,000 521,000 573,000

T047 TRACER (BPS-05) 1 1 160,000 174,000 191,000

T054 TRACTOR / TRUCK / WV (BPS-05) 4 4 640,000 694,000 763,000 DRIVER

W045 WORK MESTRY / DAROGHA (BPS-05) 10 10 1,598,000 1,735,000 1,909,000

F038 FITTER (BPS-03) 3 3 449,000 487,000 536,000

R065 ROAD MATE (BPS-03) 34 34 5,081,000 5,521,000 6,074,000

B085 BELDAR (BPS-02) 88 88 12,763,000 13,846,000 15,231,000

C089 CHOWKIDAR (BPS-02) 6 6 870,000 944,000 1,038,000

C111 CLEANER / HELPER / COLI (BPS-02) 34 34 4,930,000 5,350,000 5,885,000

M020 MALHI / GARDEN ATTENDANT (BPS-02) 2 2 289,000 315,000 346,000

N003 NAIB QASID (BPS-02) 7 7 1,012,000 1,101,000 1,212,000

S008 SANITARY WORKER (BPS-02) 1 1 144,000 157,000 173,000

A01152 Personal pay 9,000 14,000 16,000

A012 TOTAL ALLOWANCES 30,638,000 28,209,000 33,534,000

A012-1 TOTAL REGULAR ALLOWANCES 30,638,000 28,209,000 33,534,000

A01202 House Rent Allowance 4,228,000 4,228,000 4,228,000

A01203 Conveyance Allowance 5,635,000 5,635,000 5,635,000

A01207 Washing Allowance 11,000 12,000 12,000

A01208 Dress Allowance 12,000 12,000 12,000

A0120D Integrated Allowance 21,000 21,000 21,000

A0120X Ad - hoc Allowance - 2010 8,022,000 7,202,000 7,202,000

A01217 Medical Allowance 4,623,000 4,623,000 4,623,000

A0121T Adhoc Relief Allowance 2013 1,274,000 1,274,000

A0121Z Adhoc Relief Allowance - 2014 34,000

A0122C Adhoc Relief Allowance - 2015 4,043,000 884,000 884,000

Page 297: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

296

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

LN0112 EXECTIVE ENGINEER HIGHWAYS DIVISIONLARKANA

A0122M Adhoc Relief Allowance 2016 4,283,000 4,821,000

A01260 Ration Allowance 1,000 1,000

A01270 Others 4,043,000 4,821,000

A03 TOTAL OPERATING EXPENSES 6,060,000 39,714,000 6,603,000

A032 TOTAL COMMUNICATIONS 148,000 148,000 156,000

A03201 Postage and Telegraph 14,000 14,000 15,000

A03202 Telephone and Trunk call 134,000 134,000 141,000

A033 TOTAL UTILITIES 5,143,000 141,000 5,658,000

A03301 Gas 140,000 140,000 154,000

A03303 Electricity 5,003,000 1,000 5,504,000

A034 TOTAL OCCUPANCY COSTS 76,000 76,000 76,000

A03407 Rates and Taxes 76,000 76,000 76,000

A038 TOTAL TRAVEL & 387,000 387,000 389,000

TRANSPORTATION

A03805 Travelling Allowance 40,000 40,000 42,000

A03807 P.O.L Charges A.planes 347,000 347,000 347,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 306,000 38,962,000 324,000

A03901 Stationery 70,000 70,000 74,000

A03902 Printing and Publication 31,000 31,000 33,000

A03905 Newspapers Periodicals and Books 18,000 18,000 19,000

A03906 Uniforms and Protective Clothing 161,000 161,000 170,000

A03919 Payments to other for Service 38,656,000

Rendered

A03970 Others 26,000 26,000 28,000

1 Others 26,000 26,000 28,000

Page 298: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

297

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

LN0112 EXECTIVE ENGINEER HIGHWAYS DIVISIONLARKANA

A13 TOTAL REPAIRS AND MAINTENANCE 555,000 555,000 609,000

A130 TOTAL TRANSPORT 435,000 435,000 479,000

A13001 Transport 435,000 435,000 479,000

A131 TOTAL MACHINERY AND 52,000 52,000 58,000

EQUIPMENT

A13101 Machinery and Equipment 52,000 52,000 58,000

A132 TOTAL FURNITURE AND 68,000 68,000 72,000

FIXTURE

A13201 Furniture and Fixture 68,000 68,000 72,000

_______________________________________________________________________________EXECTIVE ENGINEER HIGHWAYS DIVISION 77,757,000 112,320,000 88,974,000

LARKANA

_______________________________________________________________________________

Page 299: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

298

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

MP0093 EXECTIVE ENGINEER HIGHWAYS DIVISIONMIRPURKHAS

A01 TOTAL EMPLOYEES RELATED EXPENSES. 37,755,000 36,908,000 41,974,000

A011 TOTAL PAY 113 113 22,938,000 23,181,000 25,502,000

A011-1 TOTAL PAY OF OFFICERS 8 9 4,548,000 2,949,000 3,245,000

A01101 Total Basic Pay Of Officer 8 9 4,518,000 2,891,000 3,181,000

D259 DISTRICT OFFICER (BPS-18) 1 1 685,000 408,000 449,000

D129 DIVISIONAL ACCOUNTS (BPS-17) 1 1 547,000 326,000 358,000 OFFICER

D262 DEPUTY DISTRICT OFFICER (BPS-17) 6 6 3,286,000 1,954,000 2,150,000

A235 ASSISTANT HEAD CLERK (BPS-16) 1 203,000 224,000

A01102 Personal pay 30,000 58,000 64,000

A011-2 TOTAL PAY OF OTHER STAFF 105 104 18,390,000 20,232,000 22,257,000

A01151 Total Basic Pay Other Staff 105 104 18,348,000 20,151,000 22,167,000

A235 ASSISTANT HEAD CLERK (BPS-14) 1 266,000

S053 SENIOR CLERK (BPS-14) 2 482,000 530,000

S181 STENOGRAPHER (BPS-14) 1 1 265,000 291,000 321,000

H035 HEAD DRAFTSMAN (BPS-13) 1 1 248,000 273,000 301,000

J053 JUNIOR CLERK (BPS-11) 6 1,445,000 1,589,000

S222 SUB ENGINEER (BPS-11) 9 9 1,965,000 2,167,000 2,384,000

D150 DRAUGHTSMAN (BPS-10) 1 1 211,000 233,000 257,000

A017 ACCOUNT CLERK (BPS-09) 2 2 410,000 451,000 497,000

S053 SENIOR CLERK (BPS-09) 2 410,000

C040 CHARGE MAN (BPS-08) 1 1 197,000 219,000 240,000

J014 JR CLERK (BPS-07) 6 1,152,000

T001 TRACER (BPS-05) 1 1 178,000 197,000 216,000

W046 WORK MISTRY (BPS-05) 6 6 1,070,000 1,181,000 1,299,000

Page 300: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

299

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

MP0093 EXECTIVE ENGINEER HIGHWAYS DIVISIONMIRPURKHAS

D161 DRIVER (BPS-04) 4 4 690,000 759,000 835,000

R069 ROAD ROLLER DRIVER (BPS-04) 6 6 1,032,000 1,138,000 1,252,000

T054 TRACTOR / TRUCK / WV (BPS-04) 2 2 344,000 379,000 417,000 DRIVER

R065 ROAD MATE (BPS-03) 8 8 1,337,000 1,474,000 1,621,000

B085 BELDAR (BPS-01) 36 36 5,718,000 6,308,000 6,939,000

C089 CHOWKIDAR (BPS-01) 6 6 952,000 1,051,000 1,156,000

C111 CLEANER / HELPER / COLI (BPS-01) 5 5 794,000 876,000 964,000

N003 NAIB QASID (BPS-01) 7 7 1,109,000 1,227,000 1,349,000

A01152 Personal pay 42,000 81,000 90,000

A012 TOTAL ALLOWANCES 14,817,000 13,727,000 16,472,000

A012-1 TOTAL REGULAR ALLOWANCES 14,663,000 13,573,000 16,310,000

A01202 House Rent Allowance 1,442,000 1,442,000 1,442,000

A01203 Conveyance Allowance 2,821,000 2,821,000 2,821,000

A0120D Integrated Allowance 25,000 25,000 25,000

A0120X Ad - hoc Allowance - 2010 4,088,000 3,766,000 3,766,000

A01217 Medical Allowance 2,101,000 2,101,000 2,101,000

A0121A Ad - hoc Allowance - 2011 35,000

A0121T Adhoc Relief Allowance 2013 591,000 591,000

A0121Z Adhoc Relief Allowance - 2014 2,000

A0122C Adhoc Relief Allowance - 2015 2,093,000 494,000 494,000

A0122M Adhoc Relief Allowance 2016 2,288,000 2,535,000

A01244 Adhoc Relief 8,000

A01270 Others 2,093,000 2,535,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 154,000 154,000 162,000

A01274 Medical Charges 154,000 154,000 162,000

A03 TOTAL OPERATING EXPENSES 431,000 287,000 461,000

Page 301: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

300

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

MP0093 EXECTIVE ENGINEER HIGHWAYS DIVISIONMIRPURKHAS

A032 TOTAL COMMUNICATIONS 57,000 57,000 61,000

A03201 Postage and Telegraph 10,000 10,000 11,000

A03202 Telephone and Trunk call 47,000 47,000 50,000

A033 TOTAL UTILITIES 145,000 1,000 160,000

A03303 Electricity 145,000 1,000 160,000

A038 TOTAL TRAVEL & 103,000 103,000 106,000

TRANSPORTATION

A03805 Travelling Allowance 48,000 48,000 51,000

A03807 P.O.L Charges A.planes 55,000 55,000 55,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 126,000 126,000 134,000

A03901 Stationery 31,000 31,000 33,000

A03902 Printing and Publication 17,000 17,000 18,000

A03906 Uniforms and Protective Clothing 22,000 22,000 24,000

A03970 Others 56,000 56,000 59,000

1 Others 56,000 56,000 59,000

A13 TOTAL REPAIRS AND MAINTENANCE 93,000 93,000 102,000

A130 TOTAL TRANSPORT 24,000 24,000 27,000

A13001 Transport 24,000 24,000 27,000

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

A13101 Machinery and Equipment 36,000 36,000 40,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

Page 302: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

301

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

MP0093 EXECTIVE ENGINEER HIGHWAYS DIVISIONMIRPURKHAS

A13201 Furniture and Fixture 33,000 33,000 35,000

_______________________________________________________________________________EXECTIVE ENGINEER HIGHWAYS DIVISION 38,279,000 37,288,000 42,537,000

MIRPURKHAS

_______________________________________________________________________________

Page 303: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

302

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

MX0050 EXECTIVE ENGINEER HIGHWAYS DIVISIONMITHI

A01 TOTAL EMPLOYEES RELATED EXPENSES. 36,089,000 36,514,000 41,233,000

A011 TOTAL PAY 115 115 20,824,000 21,474,000 23,623,000

A011-1 TOTAL PAY OF OFFICERS 5 6 3,362,000 2,503,000 2,754,000

A01101 Total Basic Pay Of Officer 5 6 3,328,000 2,469,000 2,716,000

D259 DISTRICT OFFICER (BPS-18) 1 1 854,000 563,000 619,000

D262 DEPUTY DISTRICT OFFICER (BPS-17) 3 3 2,047,000 1,346,000 1,481,000

A130 ASSISTANT / HEAD CLERK / (BPS-16) 1 280,000 308,000 DIV HEAD CLERK

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 427,000 280,000 308,000 OFFICER

A01102 Personal pay 34,000 34,000 38,000

A011-2 TOTAL PAY OF OTHER STAFF 110 109 17,462,000 18,971,000 20,869,000

A01151 Total Basic Pay Other Staff 110 109 17,434,000 18,943,000 20,838,000

A130 ASSISTANT / HEAD CLERK / (BPS-14) 1 240,000 DIV HEAD CLERK

S053 SENIOR CLERK (BPS-14) 2 432,000 476,000

D132 DIVISIONAL H-D / MAN (BPS-13) 1 1 222,000 245,000 270,000

J053 JUNIOR CLERK (BPS-11) 5 1,081,000 1,189,000

S228 SUB-ENGINEER (BPS-11) 9 9 1,761,000 1,945,000 2,140,000

D130 DIVISIONAL DRAUGHTSMAN (BPS-10) 1 1 191,000 209,000 230,000

A029 ACCOUNTS CLERK / CASHIER (BPS-09) 2 2 366,000 405,000 447,000

S053 SENIOR CLERK (BPS-09) 2 366,000

W056 WORK SUPERVISOR (BPS-09) 2 2 366,000 406,000 446,000

C040 CHARGE MAN (BPS-07) 1 1 172,000 190,000 209,000

J014 JR CLERK (BPS-07) 5 1,032,000

D018 DAROGA (BPS-05) 9 9 1,441,000 1,590,000 1,749,000

Page 304: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

303

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

MX0050 EXECTIVE ENGINEER HIGHWAYS DIVISIONMITHI

T050 TRACER (BPS-05) 1 1 160,000 177,000 194,000

T055 TRACTOR DRIVER (BPS-05) 1 1 160,000 177,000 194,000

D161 DRIVER (BPS-04) 4 4 615,000 681,000 749,000

R069 ROAD ROLLER DRIVER (BPS-04) 3 3 463,000 511,000 562,000

B085 BELDAR (BPS-02) 40 40 5,811,000 6,408,000 7,049,000

C089 CHOWKIDAR (BPS-02) 4 4 582,000 641,000 705,000

C113 CLEANER / HELPER / COOK / (BPS-02) 9 9 1,307,000 1,442,000 1,586,000 WINDOW CLEANER

N003 NAIB QASID (BPS-02) 6 6 872,000 961,000 1,057,000

R065 ROAD MATE (BPS-02) 9 9 1,307,000 1,442,000 1,586,000

A01152 Personal pay 28,000 28,000 31,000

A012 TOTAL ALLOWANCES 15,265,000 15,040,000 17,610,000

A012-1 TOTAL REGULAR ALLOWANCES 15,135,000 14,910,000 17,473,000

A01202 House Rent Allowance 1,467,000 1,467,000 1,467,000

A01203 Conveyance Allowance 2,931,000 2,931,000 2,931,000

A01207 Washing Allowance 13,000 16,000 16,000

A0120D Integrated Allowance 25,000 25,000 25,000

A0120X Ad - hoc Allowance - 2010 4,029,000 3,432,000 3,432,000

A01217 Medical Allowance 2,398,000 2,398,000 2,398,000

A0121Q Audit and Accounts Allowance 75,000 75,000

A0121T Adhoc Relief Allowance 2013 532,000 532,000

A0121Z Adhoc Relief Allowance - 2014 9,000

A0122C Adhoc Relief Allowance - 2015 2,076,000 445,000 445,000

A0122M Adhoc Relief Allowance 2016 2,125,000 2,355,000

A01233 Unattractive Area Allowance 120,000 1,442,000 1,442,000

A01244 Adhoc Relief 13,000

A01270 Others 2,076,000 2,355,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 130,000 130,000 137,000

A01274 Medical Charges 130,000 130,000 137,000

Page 305: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

304

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

MX0050 EXECTIVE ENGINEER HIGHWAYS DIVISIONMITHI

A03 TOTAL OPERATING EXPENSES 1,304,000 1,278,000 1,377,000

A032 TOTAL COMMUNICATIONS 94,000 94,000 99,000

A03201 Postage and Telegraph 14,000 14,000 15,000

A03202 Telephone and Trunk call 80,000 80,000 84,000

A033 TOTAL UTILITIES 520,000 494,000 572,000

A03303 Electricity 520,000 494,000 572,000

A038 TOTAL TRAVEL & 496,000 496,000 500,000

TRANSPORTATION

A03805 Travelling Allowance 79,000 79,000 83,000

A03807 P.O.L Charges A.planes 417,000 417,000 417,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 194,000 194,000 206,000

A03901 Stationery 74,000 74,000 78,000

A03902 Printing and Publication 44,000 44,000 47,000

A03905 Newspapers Periodicals and Books 14,000 14,000 15,000

A03970 Others 62,000 62,000 66,000

1 Others 62,000 62,000 66,000

A13 TOTAL REPAIRS AND MAINTENANCE 253,000 253,000 278,000

A130 TOTAL TRANSPORT 146,000 146,000 161,000

A13001 Transport 146,000 146,000 161,000

A131 TOTAL MACHINERY AND 74,000 74,000 82,000

EQUIPMENT

A13101 Machinery and Equipment 74,000 74,000 82,000

Page 306: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

305

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

MX0050 EXECTIVE ENGINEER HIGHWAYS DIVISIONMITHI

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

_______________________________________________________________________________EXECTIVE ENGINEER HIGHWAYS DIVISION 37,646,000 38,045,000 42,888,000

MITHI

_______________________________________________________________________________

Page 307: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

306

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

MY0055 EXECTIVE ENGINEER HIGHWAYS DIVISIONMATIARI

A01 TOTAL EMPLOYEES RELATED EXPENSES. 33,489,000 33,599,000 37,952,000

A011 TOTAL PAY 116 116 19,669,000 20,520,000 22,573,000

A011-1 TOTAL PAY OF OFFICERS 4 5 1,873,000 1,284,000 1,413,000

A01101 Total Basic Pay Of Officer 4 5 1,859,000 1,207,000 1,328,000

D259 DISTRICT OFFICER (BPS-18) 1 1 546,000 310,000 341,000

D129 DIVISIONAL ACCOUNTS (BPS-17) 1 1 438,000 248,000 272,000 OFFICER

D262 DEPUTY DISTRICT OFFICER (BPS-17) 2 2 875,000 495,000 545,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 1 154,000 170,000

A01102 Personal pay 14,000 77,000 85,000

A011-2 TOTAL PAY OF OTHER STAFF 112 111 17,796,000 19,236,000 21,160,000

A01151 Total Basic Pay Other Staff 112 111 17,750,000 19,159,000 21,075,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 1 232,000

S053 SENIOR CLERK (BPS-14) 2 425,000 467,000

S181 STENOGRAPHER (BPS-14) 1 1 237,000 257,000 283,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 223,000 241,000 265,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 11 2,335,000 2,568,000

S228 SUB-ENGINEER (BPS-11) 5 5 977,000 1,061,000 1,167,000

D150 DRAUGHTSMAN (BPS-10) 1 1 190,000 206,000 226,000

A017 ACCOUNT CLERK (BPS-09) 2 2 367,000 400,000 438,000

S053 SENIOR CLERK (BPS-09) 2 367,000

C042 CHARGE MAN / MECHANIC (BPS-08) 2 2 355,000 385,000 424,000

J014 JR CLERK (BPS-07) 11 1,888,000

R062 ROAD INSPECTOR (BPS-06) 1 1 166,000 180,000 198,000

Page 308: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

307

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

MY0055 EXECTIVE ENGINEER HIGHWAYS DIVISIONMATIARI

R061 ROAD / WORK MISTRI / (BPS-05) 12 12 1,917,000 2,082,000 2,290,000 DAROGHA

T001 TRACER (BPS-05) 1 1 160,000 173,000 191,000

C080 CHIEF SENIOR / CIRCLE (BPS-04) 1 1 154,000 167,000 184,000 HEAD DRAFTSMAN

D161 DRIVER (BPS-04) 2 2 308,000 334,000 368,000

M042 MASSAN MISTRY (BPS-04) 1 1 154,000 167,000 184,000

R069 ROAD ROLLER DRIVER (BPS-04) 4 4 617,000 669,000 736,000

S205 STORE ISSURE (BPS-04) 1 1 154,000 167,000 184,000

B026 BELDAR / COOLY (BPS-02) 32 32 4,642,000 5,034,000 5,538,000

C089 CHOWKIDAR (BPS-02) 2 2 433,000 315,000 346,000

C111 CLEANER / HELPER / COLI (BPS-02) 4 4 580,000 629,000 692,000

D145 DONKEY CARTMAN (BPS-02) 1 1 146,000 157,000 173,000

F038 FITTER (BPS-02) 1 1 146,000 157,000 173,000

N003 NAIB QASID (BPS-02) 7 7 1,015,000 1,101,000 1,211,000

R065 ROAD MATE (BPS-02) 15 15 2,176,000 2,360,000 2,596,000

S008 SANITARY WORKER (BPS-02) 1 1 146,000 157,000 173,000

A01152 Personal pay 46,000 77,000 85,000

A012 TOTAL ALLOWANCES 13,820,000 13,079,000 15,379,000

A012-1 TOTAL REGULAR ALLOWANCES 13,820,000 13,079,000 15,379,000

A01202 House Rent Allowance 1,484,000 1,484,000 1,484,000

A01203 Conveyance Allowance 2,790,000 2,790,000 2,790,000

A01207 Washing Allowance 4,000 5,000 5,000

A0120D Integrated Allowance 9,000 9,000 9,000

A0120X Ad - hoc Allowance - 2010 3,637,000 3,351,000 3,351,000

A01217 Medical Allowance 2,166,000 2,166,000 2,166,000

A0121M Adhoc Relief Allowance - 2012 15,000

A0121Q Audit and Accounts Allowance 51,000 51,000

A0121T Adhoc Relief Allowance 2013 582,000 582,000

A0121Z Adhoc Relief Allowance - 2014 102,000

Page 309: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

308

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

MY0055 EXECTIVE ENGINEER HIGHWAYS DIVISIONMATIARI

A01228 Orderly Allowance 4,000 4,000 4,000

A0122C Adhoc Relief Allowance - 2015 1,863,000 457,000 457,000

A0122M Adhoc Relief Allowance 2016 2,013,000 2,240,000

A01244 Adhoc Relief 50,000

A01270 Others 1,863,000 2,240,000

A03 TOTAL OPERATING EXPENSES 1,144,000 741,000 1,217,000

A032 TOTAL COMMUNICATIONS 49,000 49,000 52,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 40,000 40,000 42,000

A033 TOTAL UTILITIES 517,000 114,000 569,000

A03302 Water 17,000 17,000 19,000

A03303 Electricity 500,000 97,000 550,000

A038 TOTAL TRAVEL & 374,000 374,000 379,000

TRANSPORTATION

A03805 Travelling Allowance 95,000 95,000 100,000

A03807 P.O.L Charges A.planes 279,000 279,000 279,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 204,000 204,000 217,000

A03901 Stationery 31,000 31,000 33,000

A03902 Printing and Publication 15,000 15,000 16,000

A03905 Newspapers Periodicals and Books 9,000 9,000 10,000

A03906 Uniforms and Protective Clothing 28,000 28,000 30,000

A03970 Others 121,000 121,000 128,000

1 Others 121,000 121,000 128,000

A13 TOTAL REPAIRS AND MAINTENANCE 107,000 107,000 117,000

A130 TOTAL TRANSPORT 38,000 38,000 42,000

Page 310: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

309

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

MY0055 EXECTIVE ENGINEER HIGHWAYS DIVISIONMATIARI

A13001 Transport 38,000 38,000 42,000

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

A13101 Machinery and Equipment 36,000 36,000 40,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

_______________________________________________________________________________EXECTIVE ENGINEER HIGHWAYS DIVISION 34,740,000 34,447,000 39,286,000

MATIARI

_______________________________________________________________________________

Page 311: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

310

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

NX0055 EXECTIVE ENGINEER HIGHWAYS DIVISIONNOSHEROFEROZ

A01 TOTAL EMPLOYEES RELATED EXPENSES. 71,448,000 73,000,000 82,907,000

A011 TOTAL PAY 237 237 41,702,000 45,271,000 49,800,000

A011-1 TOTAL PAY OF OFFICERS 6 7 3,706,000 3,693,000 4,063,000

A01101 Total Basic Pay Of Officer 6 7 3,706,000 3,693,000 4,063,000

D259 DISTRICT OFFICER (BPS-18) 1 1 741,000 673,000 741,000

D129 DIVISIONAL ACCOUNTS (BPS-17) 1 1 593,000 537,000 590,000 OFFICER

D262 DEPUTY DISTRICT OFFICER (BPS-17) 4 4 2,372,000 2,148,000 2,363,000

A119 ASSISTANT (BPS-16) 1 335,000 369,000

A011-2 TOTAL PAY OF OTHER STAFF 231 230 37,996,000 41,578,000 45,737,000

A01151 Total Basic Pay Other Staff 231 230 37,824,000 41,221,000 45,344,000

A119 ASSISTANT (BPS-14) 1 251,000

S053 SENIOR CLERK (BPS-14) 2 454,000 499,000

S181 STENOGRAPHER (BPS-14) 1 1 251,000 275,000 302,000

J022 JR DRAFTSMAN (BPS-13) 1 1 237,000 258,000 283,000

J053 JUNIOR CLERK (BPS-11) 11 2,495,000 2,745,000

S228 SUB-ENGINEER (BPS-11) 12 12 2,478,000 2,722,000 2,995,000

D230 DRAFTSMAN (BPS-10) 1 1 200,000 220,000 242,000

A017 ACCOUNT CLERK (BPS-09) 2 2 387,000 426,000 468,000

S053 SENIOR CLERK (BPS-09) 2 387,000

C042 CHARGE MAN / MECHANIC (BPS-08) 2 2 374,000 412,000 453,000

J014 JR CLERK (BPS-07) 11 1,997,000

R062 ROAD INSPECTOR (BPS-06) 1 1 175,000 192,000 211,000

D161 DRIVER (BPS-05) 4 4 677,000 742,000 816,000

D229 DAROGHA (BPS-05) 10 10 1,690,000 1,854,000 2,040,000

Page 312: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

311

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

NX0055 EXECTIVE ENGINEER HIGHWAYS DIVISIONNOSHEROFEROZ

M173 MISTRY (BPS-05) 1 1 168,000 185,000 204,000

P006 PAINTER (BPS-05) 1 1 168,000 185,000 204,000

R069 ROAD ROLLER DRIVER (BPS-05) 13 13 2,197,000 2,410,000 2,651,000

S195 STOOR ISSURE (BPS-05) 1 1 168,000 185,000 204,000

T052 TRACTOR / TRUCK / WATER (BPS-05) 1 1 168,000 185,000 204,000 MAN / DUMPER DRIVER

T073 TRESSOR (BPS-05) 1 1 168,000 185,000 204,000

F038 FITTER (BPS-03) 1 1 158,000 174,000 191,000

R065 ROAD MATE (BPS-03) 16 16 2,529,000 2,777,000 3,054,000

B085 BELDAR (BPS-02) 100 100 15,330,000 16,814,000 18,496,000

C089 CHOWKIDAR (BPS-02) 15 15 2,300,000 2,522,000 2,774,000

C109 CLEANER (BPS-02) 25 25 3,832,000 4,204,000 4,624,000

N003 NAIB QASID (BPS-02) 7 7 1,381,000 1,177,000 1,295,000

S008 SANITARY WORKER (BPS-02) 1 1 153,000 168,000 185,000

A01152 Personal pay 172,000 357,000 393,000

A012 TOTAL ALLOWANCES 29,746,000 27,729,000 33,107,000

A012-1 TOTAL REGULAR ALLOWANCES 29,746,000 27,729,000 33,107,000

A01202 House Rent Allowance 2,863,000 2,937,000 2,937,000

A01203 Conveyance Allowance 5,878,000 5,878,000 5,878,000

A01207 Washing Allowance 23,000 23,000 23,000

A0120D Integrated Allowance 5,000 5,000 5,000

A0120Q Fixed Daily Allowance 7,000 7,000 7,000

A0120X Ad - hoc Allowance - 2010 8,030,000 7,640,000 7,640,000

A01217 Medical Allowance 4,634,000 4,634,000 4,634,000

A0121A Ad - hoc Allowance - 2011 97,000

A0121T Adhoc Relief Allowance 2013 1,212,000 1,212,000

A0122C Adhoc Relief Allowance - 2015 4,153,000 882,000 882,000

A0122M Adhoc Relief Allowance 2016 4,406,000 4,941,000

A01233 Unattractive Area Allowance 1,000 1,000

Page 313: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

312

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

NX0055 EXECTIVE ENGINEER HIGHWAYS DIVISIONNOSHEROFEROZ

A01260 Ration Allowance 6,000 6,000

A01270 Others 4,153,000 1,000 4,941,000

A03 TOTAL OPERATING EXPENSES 804,000 597,000 845,000

A032 TOTAL COMMUNICATIONS 43,000 43,000 46,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 34,000 34,000 36,000

A033 TOTAL UTILITIES 208,000 1,000 229,000

A03303 Electricity 208,000 1,000 229,000

A034 TOTAL OCCUPANCY COSTS 28,000 28,000 28,000

A03407 Rates and Taxes 28,000 28,000 28,000

A038 TOTAL TRAVEL & 447,000 447,000 459,000

TRANSPORTATION

A03805 Travelling Allowance 238,000 238,000 250,000

A03807 P.O.L Charges A.planes 209,000 209,000 209,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 78,000 78,000 83,000

A03901 Stationery 37,000 37,000 39,000

A03902 Printing and Publication 17,000 17,000 18,000

A03905 Newspapers Periodicals and Books 9,000 9,000 10,000

A03970 Others 15,000 15,000 16,000

1 Others 15,000 15,000 16,000

A13 TOTAL REPAIRS AND MAINTENANCE 252,000 252,000 277,000

A130 TOTAL TRANSPORT 45,000 45,000 50,000

A13001 Transport 45,000 45,000 50,000

Page 314: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

313

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

NX0055 EXECTIVE ENGINEER HIGHWAYS DIVISIONNOSHEROFEROZ

A131 TOTAL MACHINERY AND 174,000 174,000 192,000

EQUIPMENT

A13101 Machinery and Equipment 174,000 174,000 192,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

_______________________________________________________________________________EXECTIVE ENGINEER HIGHWAYS DIVISION 72,504,000 73,849,000 84,029,000

NOSHEROFEROZ

_______________________________________________________________________________

Page 315: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

314

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

QS0057 EXECTIVE ENGINEER HIGHWAYS DIVISIONSHAHDADKOT

A01 TOTAL EMPLOYEES RELATED EXPENSES. 13,207,000 12,785,000 14,521,000

A011 TOTAL PAY 32 32 7,889,000 7,964,000 8,762,000

A011-1 TOTAL PAY OF OFFICERS 2 3 2,228,000 2,148,000 2,364,000

A01101 Total Basic Pay Of Officer 2 3 2,171,000 2,084,000 2,293,000

D259 DISTRICT OFFICER (BPS-18) 1 1 1,447,000 1,044,000 1,149,000

A119 ASSISTANT (BPS-16) 1 520,000 572,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 724,000 520,000 572,000 OFFICER

A01102 Personal pay 39,000 46,000 51,000

A01104 Technical pay 18,000 18,000 20,000

A011-2 TOTAL PAY OF OTHER STAFF 30 29 5,661,000 5,816,000 6,398,000

A01151 Total Basic Pay Other Staff 30 29 5,652,000 5,807,000 6,388,000

A119 ASSISTANT (BPS-14) 1 268,000

S055 SENIOR CLERK / ACCOUNT (BPS-14) 2 471,000 518,000 CLERK

S181 STENOGRAPHER (BPS-14) 1 1 268,000 285,000 314,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 250,000 267,000 294,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 1 236,000 259,000

J022 JR DRAFTSMAN (BPS-10) 1 1 212,000 228,000 251,000

A017 ACCOUNT CLERK (BPS-09) 2 2 411,000 439,000 487,000

S055 SENIOR CLERK / ACCOUNT (BPS-09) 2 411,000 CLERK

C041 CHARGE MAN / CHARGE (BPS-08) 2 2 402,000 428,000 470,000 MECHANICS

J014 JR CLERK (BPS-07) 1 194,000

R062 ROAD INSPECTOR (BPS-06) 2 2 374,000 399,000 439,000

Page 316: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

315

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

QS0057 EXECTIVE ENGINEER HIGHWAYS DIVISIONSHAHDADKOT

T100 TEACHER TRAINER (BPS-05) 1 1 180,000 192,000 212,000

J003 JEEP DRIVER (BPS-04) 1 1 175,000 186,000 204,000

M042 MASSAN MISTRY (BPS-04) 1 1 175,000 186,000 204,000

S205 STORE ISSURE (BPS-04) 3 3 521,000 557,000 612,000

T054 TRACTOR / TRUCK / WV (BPS-04) 1 1 175,000 186,000 204,000 DRIVER

C089 CHOWKIDAR (BPS-02) 2 2 328,000 349,000 384,000

D145 DONKEY CARTMAN (BPS-02) 3 3 491,000 524,000 576,000

F038 FITTER (BPS-02) 3 3 491,000 524,000 576,000

N003 NAIB QASID (BPS-02) 1 1 164,000 175,000 192,000

S008 SANITARY WORKER (BPS-02) 1 1 162,000 175,000 192,000

A01152 Personal pay 9,000 9,000 10,000

A012 TOTAL ALLOWANCES 5,318,000 4,821,000 5,759,000

A012-1 TOTAL REGULAR ALLOWANCES 5,285,000 4,788,000 5,724,000

A01202 House Rent Allowance 578,000 578,000 578,000

A01203 Conveyance Allowance 979,000 979,000 979,000

A01207 Washing Allowance 3,000 3,000 3,000

A0120X Ad - hoc Allowance - 2010 1,391,000 1,286,000 1,286,000

A01217 Medical Allowance 770,000 770,000 770,000

A0121A Ad - hoc Allowance - 2011 28,000

A0121M Adhoc Relief Allowance - 2012 29,000

A0121Q Audit and Accounts Allowance 48,000 48,000

A0121T Adhoc Relief Allowance 2013 172,000 172,000

A0121Z Adhoc Relief Allowance - 2014 44,000

A0122C Adhoc Relief Allowance - 2015 782,000 152,000 152,000

A0122M Adhoc Relief Allowance 2016 641,000 868,000

A01244 Adhoc Relief 58,000

A01270 Others 782,000 868,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 33,000 33,000 35,000

Page 317: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

316

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

QS0057 EXECTIVE ENGINEER HIGHWAYS DIVISIONSHAHDADKOT

A01274 Medical Charges 33,000 33,000 35,000

A03 TOTAL OPERATING EXPENSES 420,000 316,000 441,000

A032 TOTAL COMMUNICATIONS 40,000 40,000 42,000

A03202 Telephone and Trunk call 40,000 40,000 42,000

A033 TOTAL UTILITIES 105,000 1,000 116,000

A03303 Electricity 105,000 1,000 116,000

A038 TOTAL TRAVEL & 215,000 215,000 218,000

TRANSPORTATION

A03805 Travelling Allowance 48,000 48,000 51,000

A03807 P.O.L Charges A.planes 167,000 167,000 167,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 60,000 60,000 65,000

A03901 Stationery 15,000 15,000 16,000

A03902 Printing and Publication 9,000 9,000 10,000

A03905 Newspapers Periodicals and Books 9,000 9,000 10,000

A03970 Others 27,000 27,000 29,000

1 Others 27,000 27,000 29,000

A13 TOTAL REPAIRS AND MAINTENANCE 93,000 93,000 102,000

A130 TOTAL TRANSPORT 24,000 24,000 27,000

A13001 Transport 24,000 24,000 27,000

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

A13101 Machinery and Equipment 36,000 36,000 40,000

Page 318: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

317

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

QS0057 EXECTIVE ENGINEER HIGHWAYS DIVISIONSHAHDADKOT

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

_______________________________________________________________________________EXECTIVE ENGINEER HIGHWAYS DIVISION 13,720,000 13,194,000 15,064,000

SHAHDADKOT

_______________________________________________________________________________

Page 319: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

318

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

QS0058 ASSISTANT ENGINEER-II SHAHDADKOT

A01 TOTAL EMPLOYEES RELATED EXPENSES. 16,944,000 16,841,000 19,140,000

A011 TOTAL PAY 67 67 9,561,000 10,188,000 11,208,000

A011-1 TOTAL PAY OF OFFICERS 1 1 422,000 422,000 465,000

A01101 Total Basic Pay Of Officer 1 1 422,000 422,000 465,000

D262 DEPUTY DISTRICT OFFICER (BPS-16) 1 1 422,000 422,000 465,000

A011-2 TOTAL PAY OF OTHER STAFF 66 66 9,139,000 9,766,000 10,743,000

A01151 Total Basic Pay Other Staff 66 66 9,113,000 9,740,000 10,714,000

J053 JUNIOR CLERK (BPS-11) 4 761,000 837,000

S338 SUB-ENGINEER (CIVIL) (BPS-11) 3 3 536,000 570,000 628,000

J014 JR CLERK (BPS-07) 4 630,000

W046 WORK MISTRY (BPS-05) 4 4 587,000 622,000 684,000

R069 ROAD ROLLER DRIVER (BPS-04) 4 4 567,000 599,000 659,000

B007 BALDAR (BPS-02) 30 30 3,994,000 4,228,000 4,651,000

C089 CHOWKIDAR (BPS-02) 2 2 266,000 282,000 310,000

C111 CLEANER / HELPER / COLI (BPS-02) 6 6 800,000 846,000 930,000

N003 NAIB QASID (BPS-02) 2 2 269,000 282,000 310,000

R065 ROAD MATE (BPS-02) 11 11 1,464,000 1,550,000 1,705,000

A01152 Personal pay 26,000 26,000 29,000

A012 TOTAL ALLOWANCES 7,383,000 6,653,000 7,932,000

A012-1 TOTAL REGULAR ALLOWANCES 7,365,000 6,635,000 7,913,000

A01202 House Rent Allowance 817,000 817,000 817,000

A01203 Conveyance Allowance 1,538,000 1,538,000 1,538,000

A01207 Washing Allowance 3,000 3,000 3,000

A0120X Ad - hoc Allowance - 2010 1,898,000 1,621,000 1,621,000

A01217 Medical Allowance 1,219,000 1,219,000 1,219,000

Page 320: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

319

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

QS0058 ASSISTANT ENGINEER-II SHAHDADKOT

A0121T Adhoc Relief Allowance 2013 277,000 277,000

A0122C Adhoc Relief Allowance - 2015 945,000 202,000 202,000

A0122M Adhoc Relief Allowance 2016 958,000 1,118,000

A01270 Others 945,000 1,118,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 18,000 18,000 19,000

A01274 Medical Charges 18,000 18,000 19,000

A03 TOTAL OPERATING EXPENSES 338,000 234,000 354,000

A033 TOTAL UTILITIES 105,000 1,000 116,000

A03303 Electricity 105,000 1,000 116,000

A038 TOTAL TRAVEL & 186,000 186,000 187,000

TRANSPORTATION

A03805 Travelling Allowance 19,000 19,000 20,000

A03807 P.O.L Charges A.planes 167,000 167,000 167,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 47,000 47,000 51,000

A03901 Stationery 14,000 14,000 15,000

A03902 Printing and Publication 9,000 9,000 10,000

A03905 Newspapers Periodicals and Books 9,000 9,000 10,000

A03970 Others 15,000 15,000 16,000

1 Others 15,000 15,000 16,000

A13 TOTAL REPAIRS AND MAINTENANCE 87,000 87,000 95,000

A130 TOTAL TRANSPORT 18,000 18,000 20,000

A13001 Transport 18,000 18,000 20,000

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

Page 321: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

320

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

QS0058 ASSISTANT ENGINEER-II SHAHDADKOT

A13101 Machinery and Equipment 36,000 36,000 40,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

_______________________________________________________________________________ASSISTANT ENGINEER-II SHAHDADKOT 17,369,000 17,162,000 19,589,000

_______________________________________________________________________________

Page 322: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

321

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

QS0059 ASSISTANT ENGINEER-IIWARAH DISTRICTSHAHDADKOT

A01 TOTAL EMPLOYEES RELATED EXPENSES. 15,960,000 17,303,000 19,592,000

A011 TOTAL PAY 67 67 9,075,000 10,430,000 11,474,000

A011-1 TOTAL PAY OF OFFICERS 1 1 592,000 463,000 510,000

A01101 Total Basic Pay Of Officer 1 1 592,000 463,000 510,000

D262 DEPUTY DISTRICT OFFICER (BPS-16) 1 1 592,000 463,000 510,000

A011-2 TOTAL PAY OF OTHER STAFF 66 66 8,483,000 9,967,000 10,964,000

A01151 Total Basic Pay Other Staff 66 66 8,483,000 9,967,000 10,964,000

J053 JUNIOR CLERK (BPS-11) 4 778,000 856,000

S338 SUB-ENGINEER (CIVIL) (BPS-11) 3 3 499,000 584,000 642,000

J014 JR CLERK (BPS-07) 4 585,000

W046 WORK MISTRY (BPS-05) 4 4 546,000 636,000 700,000

R069 ROAD ROLLER DRIVER (BPS-04) 4 4 527,000 613,000 675,000

B007 BALDAR (BPS-02) 31 31 3,844,000 4,473,000 4,918,000

C089 CHOWKIDAR (BPS-02) 2 2 248,000 288,000 317,000

C111 CLEANER / HELPER / COLI (BPS-02) 6 6 744,000 865,000 952,000

N003 NAIB QASID (BPS-02) 2 2 250,000 288,000 317,000

R065 ROAD MATE (BPS-02) 10 10 1,240,000 1,442,000 1,587,000

A012 TOTAL ALLOWANCES 6,885,000 6,873,000 8,118,000

A012-1 TOTAL REGULAR ALLOWANCES 6,867,000 6,855,000 8,099,000

A01202 House Rent Allowance 793,000 828,000 828,000

A01203 Conveyance Allowance 1,489,000 1,606,000 1,606,000

A01207 Washing Allowance 2,000 2,000 2,000

A0120X Ad - hoc Allowance - 2010 1,681,000 1,694,000 1,694,000

A01217 Medical Allowance 1,184,000 1,184,000 1,184,000

A0121A Ad - hoc Allowance - 2011 7,000

Page 323: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

322

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

QS0059 ASSISTANT ENGINEER-IIWARAH DISTRICTSHAHDADKOT

A0121T Adhoc Relief Allowance 2013 284,000 284,000

A0122C Adhoc Relief Allowance - 2015 859,000 206,000 206,000

A0122M Adhoc Relief Allowance 2016 1,043,000 1,147,000

A01260 Ration Allowance 1,000 1,000

A01270 Others 859,000 1,147,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 18,000 18,000 19,000

A01274 Medical Charges 18,000 18,000 19,000

A03 TOTAL OPERATING EXPENSES 338,000 234,000 354,000

A033 TOTAL UTILITIES 105,000 1,000 116,000

A03303 Electricity 105,000 1,000 116,000

A038 TOTAL TRAVEL & 186,000 186,000 187,000

TRANSPORTATION

A03805 Travelling Allowance 19,000 19,000 20,000

A03807 P.O.L Charges A.planes 167,000 167,000 167,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 47,000 47,000 51,000

A03901 Stationery 14,000 14,000 15,000

A03902 Printing and Publication 9,000 9,000 10,000

A03905 Newspapers Periodicals and Books 9,000 9,000 10,000

A03970 Others 15,000 15,000 16,000

1 Others 15,000 15,000 16,000

A13 TOTAL REPAIRS AND MAINTENANCE 87,000 87,000 95,000

A130 TOTAL TRANSPORT 18,000 18,000 20,000

A13001 Transport 18,000 18,000 20,000

Page 324: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

323

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

QS0059 ASSISTANT ENGINEER-IIWARAH DISTRICTSHAHDADKOT

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

A13101 Machinery and Equipment 36,000 36,000 40,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

_______________________________________________________________________________ASSISTANT ENGINEER-IIWARAH DISTRICT 16,385,000 17,624,000 20,041,000

SHAHDADKOT

_______________________________________________________________________________

Page 325: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

324

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

QS0060 ASSISTANT ENGINEER-IIKAMBAR DISTRICTSHAHDADKOT

A01 TOTAL EMPLOYEES RELATED EXPENSES. 16,059,000 16,085,000 18,246,000

A011 TOTAL PAY 66 66 9,148,000 9,772,000 10,750,000

A011-1 TOTAL PAY OF OFFICERS 1 1 728,000 724,000 797,000

A01101 Total Basic Pay Of Officer 1 1 728,000 724,000 797,000

D262 DEPUTY DISTRICT OFFICER (BPS-18) 1 1 728,000 724,000 797,000

A011-2 TOTAL PAY OF OTHER STAFF 65 65 8,420,000 9,048,000 9,953,000

A01151 Total Basic Pay Other Staff 65 65 8,395,000 9,009,000 9,910,000

J053 JUNIOR CLERK (BPS-11) 3 538,000 592,000

S238 SUPERINTENDENT ENGINEER (BPS-11) 3 3 505,000 538,000 592,000

J014 JR CLERK (BPS-07) 3 442,000

W046 WORK MISTRY (BPS-05) 4 4 550,000 586,000 645,000

R069 ROAD ROLLER DRIVER (BPS-04) 4 4 530,000 565,000 622,000

B007 BALDAR (BPS-02) 30 30 3,744,000 3,989,000 4,386,000

C089 CHOWKIDAR (BPS-02) 2 2 251,000 266,000 293,000

C111 CLEANER / HELPER / COLI (BPS-02) 6 6 748,000 798,000 878,000

N003 NAIB QASID (BPS-02) 2 2 251,000 266,000 293,000

R065 ROAD MATE (BPS-02) 11 11 1,374,000 1,463,000 1,609,000

A01152 Personal pay 25,000 39,000 43,000

A012 TOTAL ALLOWANCES 6,911,000 6,313,000 7,496,000

A012-1 TOTAL REGULAR ALLOWANCES 6,878,000 6,280,000 7,461,000

A01202 House Rent Allowance 744,000 744,000 744,000

A01203 Conveyance Allowance 1,371,000 1,371,000 1,371,000

A01207 Washing Allowance 3,000 3,000 3,000

A0120X Ad - hoc Allowance - 2010 1,816,000 1,599,000 1,599,000

Page 326: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

325

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

QS0060 ASSISTANT ENGINEER-IIKAMBAR DISTRICTSHAHDADKOT

A01217 Medical Allowance 1,120,000 1,120,000 1,120,000

A0121T Adhoc Relief Allowance 2013 276,000 276,000

A0122C Adhoc Relief Allowance - 2015 912,000 206,000 206,000

A0122M Adhoc Relief Allowance 2016 961,000 1,071,000

A01270 Others 912,000 1,071,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 33,000 33,000 35,000

A01274 Medical Charges 33,000 33,000 35,000

A03 TOTAL OPERATING EXPENSES 338,000 234,000 354,000

A033 TOTAL UTILITIES 105,000 1,000 116,000

A03303 Electricity 105,000 1,000 116,000

A038 TOTAL TRAVEL & 186,000 186,000 187,000

TRANSPORTATION

A03805 Travelling Allowance 19,000 19,000 20,000

A03807 P.O.L Charges A.planes 167,000 167,000 167,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 47,000 47,000 51,000

A03901 Stationery 14,000 14,000 15,000

A03902 Printing and Publication 9,000 9,000 10,000

A03905 Newspapers Periodicals and Books 9,000 9,000 10,000

A03970 Others 15,000 15,000 16,000

1 Others 15,000 15,000 16,000

A13 TOTAL REPAIRS AND MAINTENANCE 87,000 87,000 95,000

A130 TOTAL TRANSPORT 18,000 18,000 20,000

A13001 Transport 18,000 18,000 20,000

Page 327: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

326

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

QS0060 ASSISTANT ENGINEER-IIKAMBAR DISTRICTSHAHDADKOT

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

A13101 Machinery and Equipment 36,000 36,000 40,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

_______________________________________________________________________________ASSISTANT ENGINEER-IIKAMBAR DISTRICT 16,484,000 16,406,000 18,695,000

SHAHDADKOT

_______________________________________________________________________________

Page 328: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

327

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

QS0061 ASSISTANT ENGINEER MIROKHAN DISTRICTSHAHDADKOT

A01 TOTAL EMPLOYEES RELATED EXPENSES. 18,192,000 17,605,000 19,911,000

A011 TOTAL PAY 68 68 10,464,000 10,469,000 11,517,000

A011-1 TOTAL PAY OF OFFICERS 1 1 949,000 362,000 399,000

A01101 Total Basic Pay Of Officer 1 1 949,000 362,000 399,000

D262 DEPUTY DISTRICT OFFICER (BPS-16) 1 1 949,000 362,000 399,000

A011-2 TOTAL PAY OF OTHER STAFF 67 67 9,515,000 10,107,000 11,118,000

A01151 Total Basic Pay Other Staff 67 67 9,515,000 10,107,000 11,118,000

J053 JUNIOR CLERK (BPS-11) 4 778,000 856,000

S338 SUB-ENGINEER (CIVIL) (BPS-11) 3 3 553,000 584,000 642,000

J014 JR CLERK (BPS-07) 4 649,000

W046 WORK MISTRY (BPS-05) 4 4 605,000 636,000 699,000

R069 ROAD ROLLER DRIVER (BPS-04) 4 4 582,000 613,000 674,000

B007 BALDAR (BPS-02) 31 31 4,248,000 4,469,000 4,917,000

C089 CHOWKIDAR (BPS-02) 2 2 275,000 288,000 317,000

C111 CLEANER / HELPER / COLI (BPS-02) 6 6 823,000 865,000 952,000

N003 NAIB QASID (BPS-02) 2 2 272,000 288,000 317,000

R065 ROAD MATE (BPS-02) 11 11 1,508,000 1,586,000 1,744,000

A012 TOTAL ALLOWANCES 7,728,000 7,136,000 8,394,000

A012-1 TOTAL REGULAR ALLOWANCES 7,728,000 7,136,000 8,394,000

A01202 House Rent Allowance 828,000 828,000 828,000

A01203 Conveyance Allowance 1,673,000 1,673,000 1,673,000

A01207 Washing Allowance 3,000 3,000 3,000

A0120X Ad - hoc Allowance - 2010 1,981,000 1,787,000 1,787,000

A01217 Medical Allowance 1,283,000 1,283,000 1,283,000

A0121T Adhoc Relief Allowance 2013 303,000 303,000

Page 329: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

328

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

QS0061 ASSISTANT ENGINEER MIROKHAN DISTRICTSHAHDADKOT

A0122C Adhoc Relief Allowance - 2015 980,000 212,000 212,000

A0122M Adhoc Relief Allowance 2016 1,046,000 1,152,000

A01260 Ration Allowance 1,000 1,000

A01270 Others 980,000 1,152,000

A03 TOTAL OPERATING EXPENSES 338,000 234,000 354,000

A033 TOTAL UTILITIES 105,000 1,000 116,000

A03303 Electricity 105,000 1,000 116,000

A038 TOTAL TRAVEL & 186,000 186,000 187,000

TRANSPORTATION

A03805 Travelling Allowance 19,000 19,000 20,000

A03807 P.O.L Charges A.planes 167,000 167,000 167,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 47,000 47,000 51,000

A03901 Stationery 14,000 14,000 15,000

A03902 Printing and Publication 9,000 9,000 10,000

A03905 Newspapers Periodicals and Books 9,000 9,000 10,000

A03970 Others 15,000 15,000 16,000

1 Others 15,000 15,000 16,000

A13 TOTAL REPAIRS AND MAINTENANCE 87,000 87,000 95,000

A130 TOTAL TRANSPORT 18,000 18,000 20,000

A13001 Transport 18,000 18,000 20,000

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

A13101 Machinery and Equipment 36,000 36,000 40,000

Page 330: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

329

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

QS0061 ASSISTANT ENGINEER MIROKHAN DISTRICTSHAHDADKOT

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

_______________________________________________________________________________ASSISTANT ENGINEER MIROKHAN DISTRICT 18,617,000 17,926,000 20,360,000

SHAHDADKOT

_______________________________________________________________________________

Page 331: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

330

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SB0091 EXECTIVE ENGINEER HIGHWAYS DIVISIONBENAZIRABAD

A01 TOTAL EMPLOYEES RELATED EXPENSES. 46,327,000 46,133,000 52,422,000

A011 TOTAL PAY 154 154 27,158,000 28,707,000 31,580,000

A011-1 TOTAL PAY OF OFFICERS 5 6 2,503,000 3,023,000 3,326,000

A01101 Total Basic Pay Of Officer 5 6 2,503,000 3,023,000 3,326,000

D259 DISTRICT OFFICER (BPS-18) 1 1 641,000 689,000 758,000

D262 DEPUTY DISTRICT OFFICER (BPS-17) 3 3 1,542,000 1,648,000 1,814,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 1 343,000 377,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 320,000 343,000 377,000 OFFICER

A011-2 TOTAL PAY OF OTHER STAFF 149 148 24,655,000 25,684,000 28,254,000

A01151 Total Basic Pay Other Staff 149 148 24,598,000 25,573,000 28,131,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 1 249,000

S053 SENIOR CLERK (BPS-14) 2 432,000 476,000

S181 STENOGRAPHER (BPS-14) 1 1 251,000 262,000 288,000

D132 DIVISIONAL H-D / MAN (BPS-13) 1 1 237,000 245,000 270,000

J053 JUNIOR CLERK (BPS-11) 9 1,945,000 2,140,000

S228 SUB-ENGINEER (BPS-11) 9 9 1,855,000 1,945,000 2,140,000

A017 ACCOUNT CLERK (BPS-09) 2 2 388,000 408,000 446,000

D230 DRAFTSMAN (BPS-09) 1 1 194,000 203,000 223,000

S053 SENIOR CLERK (BPS-09) 2 388,000

C041 CHARGE MAN / CHARGE (BPS-08) 2 2 375,000 392,000 432,000 MECHANICS

J014 JR CLERK (BPS-07) 9 1,631,000

R062 ROAD INSPECTOR (BPS-06) 1 1 175,000 183,000 201,000

T001 TRACER (BPS-05) 1 1 168,000 177,000 194,000

Page 332: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

331

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SB0091 EXECTIVE ENGINEER HIGHWAYS DIVISIONBENAZIRABAD

W045 WORK MESTRY / DAROGHA (BPS-05) 12 12 2,026,000 2,120,000 2,332,000

J003 JEEP DRIVER (BPS-04) 4 4 651,000 681,000 749,000

R069 ROAD ROLLER DRIVER (BPS-04) 6 6 976,000 1,022,000 1,124,000

T080 TRUCK DRIVER (BPS-04) 1 1 164,000 170,000 187,000

W022 WATERMAN / TRUCK / WATER (BPS-04) 1 1 164,000 170,000 187,000 VAN DRIVER

B046 BLEDAR (BPS-02) 60 60 9,193,000 9,612,000 10,574,000

C092 CHOWKIDAR / WATCHMAN (BPS-02) 5 5 920,000 801,000 881,000

C111 CLEANER / HELPER / COLI (BPS-02) 10 10 1,531,000 1,602,000 1,762,000

N003 NAIB QASID (BPS-02) 7 7 1,070,000 1,121,000 1,234,000

R065 ROAD MATE (BPS-02) 12 12 1,838,000 1,922,000 2,115,000

S008 SANITARY WORKER (BPS-02) 1 1 154,000 160,000 176,000

A01152 Personal pay 57,000 111,000 123,000

A012 TOTAL ALLOWANCES 19,169,000 17,426,000 20,842,000

A012-1 TOTAL REGULAR ALLOWANCES 19,169,000 17,426,000 20,842,000

A01202 House Rent Allowance 1,878,000 1,878,000 1,878,000

A01203 Conveyance Allowance 3,695,000 3,695,000 3,695,000

A01207 Washing Allowance 26,000 26,000 26,000

A0120D Integrated Allowance 24,000 26,000 26,000

A0120Q Fixed Daily Allowance 6,000 6,000 6,000

A0120X Ad - hoc Allowance - 2010 5,266,000 4,670,000 4,670,000

A01217 Medical Allowance 2,912,000 2,912,000 2,912,000

A0121T Adhoc Relief Allowance 2013 758,000 758,000

A0121Z Adhoc Relief Allowance - 2014 20,000

A0122C Adhoc Relief Allowance - 2015 2,681,000 579,000 579,000

A0122M Adhoc Relief Allowance 2016 2,828,000 3,146,000

A01244 Adhoc Relief 28,000

A01270 Others 2,681,000 3,146,000

A03 TOTAL OPERATING EXPENSES 651,000 517,000 689,000

Page 333: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

332

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SB0091 EXECTIVE ENGINEER HIGHWAYS DIVISIONBENAZIRABAD

A032 TOTAL COMMUNICATIONS 75,000 75,000 80,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 66,000 66,000 70,000

A033 TOTAL UTILITIES 270,000 136,000 297,000

A03303 Electricity 270,000 136,000 297,000

A034 TOTAL OCCUPANCY COSTS 8,000 8,000 8,000

A03407 Rates and Taxes 8,000 8,000 8,000

A038 TOTAL TRAVEL & 247,000 247,000 249,000

TRANSPORTATION

A03805 Travelling Allowance 25,000 25,000 27,000

A03807 P.O.L Charges A.planes 222,000 222,000 222,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 51,000 51,000 55,000

A03901 Stationery 18,000 18,000 19,000

A03902 Printing and Publication 9,000 9,000 10,000

A03905 Newspapers Periodicals and Books 9,000 9,000 10,000

A03970 Others 15,000 15,000 16,000

1 Others 15,000 15,000 16,000

_______________________________________________________________________________EXECTIVE ENGINEER HIGHWAYS DIVISION 46,978,000 46,650,000 53,111,000

BENAZIRABAD

_______________________________________________________________________________

Page 334: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

333

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SL0009 EXECUTIVE ENGINEER HIGHWAYS DIVIONSUJAWAL

A01 TOTAL EMPLOYEES RELATED EXPENSES. 2,575,000 2,415,000 2,682,000

A011 TOTAL PAY 13 13 1,628,000 1,535,000 1,690,000

A011-1 TOTAL PAY OF OFFICERS 3 4 891,000 729,000 803,000

A01101 Total Basic Pay Of Officer 3 4 844,000 682,000 751,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 325,000 220,000 243,000

A218 ASSISTANT ENGINEER (BPS-17) 1 1 259,000 176,000 193,000

D129 DIVISIONAL ACCOUNTS (BPS-17) 1 1 260,000 176,000 194,000 OFFICER

A119 ASSISTANT (BPS-16) 1 110,000 121,000

A01102 Personal pay 47,000 47,000 52,000

A011-2 TOTAL PAY OF OTHER STAFF 10 9 737,000 806,000 887,000

A01151 Total Basic Pay Other Staff 10 9 729,000 798,000 878,000

A119 ASSISTANT (BPS-14) 1 103,000

S181 STENOGRAPHER (BPS-14) 1 1 103,000 117,000 129,000

D026 DATA PROCESSING ASSISTANT (BPS-12) 1 1 89,000 103,000 113,000

J053 JUNIOR CLERK (BPS-11) 1 97,000 107,000

S222 SUB ENGINEER (BPS-11) 1 1 84,000 97,000 107,000

D230 DRAFTSMAN (BPS-10) 1 1 82,000 94,000 103,000

J014 JR CLERK (BPS-07) 1 74,000

T050 TRACER (BPS-05) 1 1 53,000 79,000 87,000

C089 CHOWKIDAR (BPS-01) 1 1 48,000 71,000 76,000

N003 NAIB QASID (BPS-01) 1 1 45,000 70,000 78,000

S009 SANITARY WORKER / (BPS-01) 1 1 48,000 70,000 78,000 GUTTERMAN

A01152 Personal pay 8,000 8,000 9,000

Page 335: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

334

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SL0009 EXECUTIVE ENGINEER HIGHWAYS DIVIONSUJAWAL

A012 TOTAL ALLOWANCES 947,000 880,000 992,000

A012-1 TOTAL REGULAR ALLOWANCES 947,000 880,000 992,000

A01202 House Rent Allowance 97,000 97,000 97,000

A01203 Conveyance Allowance 170,000 170,000 170,000

A0120D Integrated Allowance 3,000 3,000 3,000

A0120X Ad - hoc Allowance - 2010 242,000 225,000 225,000

A01217 Medical Allowance 129,000 129,000 129,000

A0121T Adhoc Relief Allowance 2013 19,000 19,000

A0122C Adhoc Relief Allowance - 2015 153,000 23,000 23,000

A0122M Adhoc Relief Allowance 2016 124,000 163,000

A01243 Special Travelling Allowance 90,000

A01270 Others 153,000 163,000

_______________________________________________________________________________EXECUTIVE ENGINEER HIGHWAYS DIVION 2,575,000 2,415,000 2,682,000

SUJAWAL

_______________________________________________________________________________

Page 336: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

335

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SN0061 EXECTIVE ENGINEER HIGHWAYS DIVISIONSANGHAR

A01 TOTAL EMPLOYEES RELATED EXPENSES. 84,800,000 79,530,000 90,333,000

A011 TOTAL PAY 273 273 49,592,000 49,495,000 54,447,000

A011-1 TOTAL PAY OF OFFICERS 8 9 5,584,000 4,831,000 5,316,000

A01101 Total Basic Pay Of Officer 8 9 5,514,000 4,737,000 5,211,000

D259 DISTRICT OFFICER (BPS-18) 1 1 875,000 698,000 768,000

D262 DEPUTY DISTRICT OFFICER (BPS-17) 6 6 4,202,000 3,343,000 3,678,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 1 348,000 383,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 437,000 348,000 382,000 OFFICER

A01102 Personal pay 59,000 83,000 92,000

A01105 Qualification Pay 11,000 11,000 13,000

A011-2 TOTAL PAY OF OTHER STAFF 265 264 44,008,000 44,664,000 49,131,000

A01151 Total Basic Pay Other Staff 265 264 43,796,000 44,317,000 48,749,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 1 250,000

S053 SENIOR CLERK (BPS-14) 2 421,000 463,000

S181 STENOGRAPHER (BPS-14) 1 1 251,000 254,000 280,000

H035 HEAD DRAFTSMAN (BPS-13) 1 1 237,000 239,000 263,000

J053 JUNIOR CLERK (BPS-11) 14 2,944,000 3,238,000

S222 SUB ENGINEER (BPS-11) 18 18 3,732,000 3,785,000 4,164,000

D230 DRAFTSMAN (BPS-10) 1 1 201,000 204,000 224,000

A017 ACCOUNT CLERK (BPS-09) 2 2 391,000 394,000 434,000

S053 SENIOR CLERK (BPS-09) 2 391,000

C041 CHARGE MAN / CHARGE (BPS-08) 1 1 189,000 191,000 210,000 MECHANICS

J014 JR CLERK (BPS-07) 14 2,732,000

D161 DRIVER (BPS-05) 4 4 679,000 687,000 756,000

Page 337: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

336

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SN0061 EXECTIVE ENGINEER HIGHWAYS DIVISIONSANGHAR

R061 ROAD / WORK MISTRI / (BPS-05) 29 29 4,918,000 4,984,000 5,483,000 DAROGHA

R069 ROAD ROLLER DRIVER (BPS-05) 15 15 2,543,000 2,578,000 2,836,000

S195 STOOR ISSURE (BPS-05) 1 1 168,000 172,000 189,000

T047 TRACER (BPS-05) 1 1 168,000 172,000 189,000

T054 TRACTOR / TRUCK / WV (BPS-05) 2 2 339,000 344,000 378,000 DRIVER

F038 FITTER (BPS-03) 1 1 160,000 161,000 177,000

R065 ROAD MATE (BPS-03) 27 27 4,283,000 4,343,000 4,778,000

B085 BELDAR (BPS-02) 115 115 17,700,000 17,924,000 19,716,000

C089 CHOWKIDAR (BPS-02) 12 12 1,848,000 1,870,000 2,057,000

H064 HELPER (BPS-02) 7 7 1,078,000 1,091,000 1,200,000

N003 NAIB QASID (BPS-02) 10 10 1,538,000 1,559,000 1,714,000

A01152 Personal pay 212,000 347,000 382,000

A012 TOTAL ALLOWANCES 35,208,000 30,035,000 35,886,000

A012-1 TOTAL REGULAR ALLOWANCES 35,141,000 29,968,000 35,815,000

A01202 House Rent Allowance 3,449,000 3,449,000 3,449,000

A01203 Conveyance Allowance 6,632,000 6,632,000 6,632,000

A01207 Washing Allowance 10,000 10,000 10,000

A0120D Integrated Allowance 2,000 2,000 2,000

A0120X Ad - hoc Allowance - 2010 9,759,000 8,128,000 8,128,000

A01217 Medical Allowance 5,425,000 4,411,000 4,411,000

A0121Q Audit and Accounts Allowance 80,000 80,000

A0121T Adhoc Relief Allowance 2013 1,327,000 1,327,000

A0121Z Adhoc Relief Allowance - 2014 24,000

A0122C Adhoc Relief Allowance - 2015 4,931,000 982,000 982,000

A0122M Adhoc Relief Allowance 2016 4,912,000 5,396,000

A01233 Unattractive Area Allowance 2,000 2,000 2,000

A01244 Adhoc Relief 8,000

A01270 Others 4,931,000 1,000 5,396,000

Page 338: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

337

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SN0061 EXECTIVE ENGINEER HIGHWAYS DIVISIONSANGHAR

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 67,000 67,000 71,000

A01274 Medical Charges 67,000 67,000 71,000

A03 TOTAL OPERATING EXPENSES 882,000 675,000 935,000

A032 TOTAL COMMUNICATIONS 143,000 143,000 151,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 134,000 134,000 141,000

A033 TOTAL UTILITIES 208,000 1,000 229,000

A03303 Electricity 208,000 1,000 229,000

A034 TOTAL OCCUPANCY COSTS 105,000 105,000 116,000

A03402 Rent for Office Building 105,000 105,000 116,000

A038 TOTAL TRAVEL & 368,000 368,000 376,000

TRANSPORTATION

A03805 Travelling Allowance 159,000 159,000 167,000

A03807 P.O.L Charges A.planes 209,000 209,000 209,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 58,000 58,000 63,000

A03901 Stationery 24,000 24,000 26,000

A03902 Printing and Publication 10,000 10,000 11,000

A03905 Newspapers Periodicals and Books 9,000 9,000 10,000

A03970 Others 15,000 15,000 16,000

1 Others 15,000 15,000 16,000

A13 TOTAL REPAIRS AND MAINTENANCE 189,000 189,000 207,000

A130 TOTAL TRANSPORT 118,000 118,000 130,000

Page 339: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

338

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SN0061 EXECTIVE ENGINEER HIGHWAYS DIVISIONSANGHAR

A13001 Transport 118,000 118,000 130,000

A131 TOTAL MACHINERY AND 38,000 38,000 42,000

EQUIPMENT

A13101 Machinery and Equipment 38,000 38,000 42,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

_______________________________________________________________________________EXECTIVE ENGINEER HIGHWAYS DIVISION 85,871,000 80,394,000 91,475,000

SANGHAR

_______________________________________________________________________________

Page 340: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

339

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SQ0053 EXECTIVE ENGINEER HIGHWAYS DIVISIONSHIKARPUR

A01 TOTAL EMPLOYEES RELATED EXPENSES. 67,493,000 68,916,000 78,303,000

A011 TOTAL PAY 223 223 39,776,000 42,818,000 47,101,000

A011-1 TOTAL PAY OF OFFICERS 6 6 3,355,000 2,237,000 2,461,000

A01101 Total Basic Pay Of Officer 6 6 3,355,000 2,237,000 2,461,000

D259 DISTRICT OFFICER (BPS-18) 1 1 671,000 448,000 493,000

D129 DIVISIONAL ACCOUNTS (BPS-17) 1 1 537,000 358,000 394,000 OFFICER

D262 DEPUTY DISTRICT OFFICER (BPS-17) 4 4 2,147,000 1,431,000 1,574,000

A011-2 TOTAL PAY OF OTHER STAFF 217 217 36,421,000 40,581,000 44,640,000

A01151 Total Basic Pay Other Staff 217 217 36,313,000 40,413,000 44,455,000

S053 SENIOR CLERK (BPS-14) 2 474,000 521,000

S181 STENOGRAPHER (BPS-14) 1 1 259,000 287,000 315,000

J022 JR DRAFTSMAN (BPS-13) 1 1 245,000 269,000 296,000

J053 JUNIOR CLERK (BPS-11) 11 2,605,000 2,865,000

S222 SUB ENGINEER (BPS-11) 12 12 2,573,000 2,842,000 3,126,000

D230 DRAFTSMAN (BPS-10) 1 1 209,000 229,000 252,000

A017 ACCOUNT CLERK (BPS-09) 2 2 403,000 442,000 489,000

S053 SENIOR CLERK (BPS-09) 2 403,000

C042 CHARGE MAN / MECHANIC (BPS-08) 2 2 389,000 430,000 473,000

J014 JR CLERK (BPS-07) 11 2,071,000

R062 ROAD INSPECTOR (BPS-06) 2 2 363,000 401,000 441,000

D018 DAROGA (BPS-05) 9 9 1,578,000 1,742,000 1,916,000

T047 TRACER (BPS-05) 1 1 176,000 194,000 213,000

D161 DRIVER (BPS-04) 4 4 676,000 746,000 821,000

R069 ROAD ROLLER DRIVER (BPS-04) 7 7 1,183,000 1,306,000 1,437,000

Page 341: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

340

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SQ0053 EXECTIVE ENGINEER HIGHWAYS DIVISIONSHIKARPUR

S205 STORE ISSURE (BPS-04) 1 1 168,000 187,000 205,000

B085 BELDAR (BPS-02) 95 95 15,117,000 16,674,000 18,342,000

C089 CHOWKIDAR (BPS-02) 17 17 2,706,000 2,984,000 3,282,000

C111 CLEANER / HELPER / COLI (BPS-02) 13 13 2,068,000 2,282,000 2,510,000

C167 COOK (BPS-02) 1 1 158,000 176,000 193,000

F038 FITTER (BPS-02) 2 2 318,000 351,000 386,000

N003 NAIB QASID (BPS-02) 8 8 1,273,000 1,404,000 1,545,000

O015 OIL MAN (BPS-02) 1 1 158,000 176,000 193,000

R065 ROAD MATE (BPS-02) 24 24 3,819,000 4,212,000 4,634,000

A01152 Personal pay 108,000 168,000 185,000

A012 TOTAL ALLOWANCES 27,717,000 26,098,000 31,202,000

A012-1 TOTAL REGULAR ALLOWANCES 27,587,000 25,968,000 31,065,000

A01202 House Rent Allowance 2,720,000 2,720,000 2,720,000

A01203 Conveyance Allowance 5,422,000 5,422,000 5,422,000

A01207 Washing Allowance 48,000 48,000 48,000

A0120X Ad - hoc Allowance - 2010 7,346,000 7,080,000 7,080,000

A01210 Risk Allowance 22,000 22,000 22,000

A01217 Medical Allowance 4,333,000 4,333,000 4,333,000

A0121A Ad - hoc Allowance - 2011 7,000

A0121M Adhoc Relief Allowance - 2012 1,000

A0121T Adhoc Relief Allowance 2013 1,194,000 1,194,000

A0121Z Adhoc Relief Allowance - 2014 4,000

A0122C Adhoc Relief Allowance - 2015 3,848,000 862,000 862,000

A0122M Adhoc Relief Allowance 2016 4,275,000 4,692,000

A01270 Others 3,848,000 4,692,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 130,000 130,000 137,000

A01274 Medical Charges 130,000 130,000 137,000

Page 342: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

341

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SQ0053 EXECTIVE ENGINEER HIGHWAYS DIVISIONSHIKARPUR

A03 TOTAL OPERATING EXPENSES 2,101,000 1,059,000 2,244,000

A032 TOTAL COMMUNICATIONS 128,000 128,000 135,000

A03201 Postage and Telegraph 14,000 14,000 15,000

A03202 Telephone and Trunk call 114,000 114,000 120,000

A033 TOTAL UTILITIES 1,043,000 1,000 1,148,000

A03303 Electricity 1,043,000 1,000 1,148,000

A038 TOTAL TRAVEL & 585,000 585,000 597,000

TRANSPORTATION

A03805 Travelling Allowance 238,000 238,000 250,000

A03807 P.O.L Charges A.planes 347,000 347,000 347,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 345,000 345,000 364,000

A03901 Stationery 146,000 146,000 154,000

A03902 Printing and Publication 31,000 31,000 33,000

A03905 Newspapers Periodicals and Books 37,000 37,000 39,000

A03955 Computer Stationery 58,000 58,000 61,000

A03970 Others 73,000 73,000 77,000

1 Others 73,000 73,000 77,000

A13 TOTAL REPAIRS AND MAINTENANCE 288,000 288,000 315,000

A130 TOTAL TRANSPORT 146,000 146,000 161,000

A13001 Transport 146,000 146,000 161,000

A131 TOTAL MACHINERY AND 74,000 74,000 82,000

EQUIPMENT

A13101 Machinery and Equipment 74,000 74,000 82,000

Page 343: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

342

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SQ0053 EXECTIVE ENGINEER HIGHWAYS DIVISIONSHIKARPUR

A132 TOTAL FURNITURE AND 68,000 68,000 72,000

FIXTURE

A13201 Furniture and Fixture 68,000 68,000 72,000

_______________________________________________________________________________EXECTIVE ENGINEER HIGHWAYS DIVISION 69,882,000 70,263,000 80,862,000

SHIKARPUR

_______________________________________________________________________________

Page 344: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

343

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SY0116 EXECTIVE ENGINEER HIGHWAYS DIVISIONSUKKUR

A01 TOTAL EMPLOYEES RELATED EXPENSES. 47,786,000 47,286,000 53,547,000

A011 TOTAL PAY 156 156 27,254,000 28,484,000 31,334,000

A011-1 TOTAL PAY OF OFFICERS 5 6 3,195,000 2,500,000 2,751,000

A01101 Total Basic Pay Of Officer 5 6 3,195,000 2,449,000 2,694,000

D259 DISTRICT OFFICER (BPS-18) 1 1 818,000 558,000 614,000

A221 ASSISTANT ENGINEERS (BPS-17) 3 3 1,967,000 1,335,000 1,468,000

A119 ASSISTANT (BPS-16) 1 278,000 306,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 410,000 278,000 306,000 OFFICER

A01102 Personal pay 51,000 57,000

A011-2 TOTAL PAY OF OTHER STAFF 151 150 24,059,000 25,984,000 28,583,000

A01151 Total Basic Pay Other Staff 151 150 24,037,000 25,940,000 28,534,000

A119 ASSISTANT (BPS-14) 1 242,000

S053 SENIOR CLERK (BPS-14) 2 434,000 477,000

S181 STENOGRAPHER (BPS-14) 1 1 243,000 263,000 289,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 229,000 246,000 271,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 9 1,953,000 2,148,000

S222 SUB ENGINEER (BPS-11) 9 9 1,808,000 1,953,000 2,148,000

D158 DRILL MEN (BPS-10) 1 1 197,000 210,000 231,000

A017 ACCOUNT CLERK (BPS-09) 2 2 378,000 407,000 449,000

S053 SENIOR CLERK (BPS-09) 2 378,000

C041 CHARGE MAN / CHARGE (BPS-08) 2 2 365,000 394,000 433,000 MECHANICS

J014 JR CLERK (BPS-07) 9 1,588,000

T050 TRACER (BPS-05) 1 1 164,000 177,000 195,000

Page 345: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

344

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SY0116 EXECTIVE ENGINEER HIGHWAYS DIVISIONSUKKUR

W046 WORK MISTRY (BPS-05) 12 12 1,971,000 2,128,000 2,341,000

D161 DRIVER (BPS-04) 4 4 633,000 684,000 752,000

R069 ROAD ROLLER DRIVER (BPS-04) 4 4 633,000 684,000 752,000

B085 BELDAR (BPS-02) 60 60 8,946,000 9,651,000 10,616,000

C167 COOK (BPS-02) 1 1 150,000 161,000 177,000

F038 FITTER (BPS-02) 1 1 150,000 161,000 177,000

H064 HELPER (BPS-02) 7 7 1,045,000 1,126,000 1,239,000

N003 NAIB QASID (BPS-02) 7 7 1,040,000 1,126,000 1,239,000

R065 ROAD MATE (BPS-02) 14 14 2,087,000 2,252,000 2,477,000

S008 SANITARY WORKER (BPS-02) 1 1 150,000 161,000 177,000

W014 WATCHMEN (BPS-02) 11 11 1,640,000 1,769,000 1,946,000

A01152 Personal pay 21,000 43,000 48,000

A01153 Special pay 1,000 1,000 1,000

A012 TOTAL ALLOWANCES 20,532,000 18,802,000 22,213,000

A012-1 TOTAL REGULAR ALLOWANCES 20,532,000 18,802,000 22,213,000

A01202 House Rent Allowance 2,795,000 2,795,000 2,795,000

A01203 Conveyance Allowance 3,924,000 3,924,000 3,924,000

A01207 Washing Allowance 28,000 28,000 28,000

A0120D Integrated Allowance 27,000 27,000 27,000

A0120Q Fixed Daily Allowance 3,000 3,000 3,000

A0120X Ad - hoc Allowance - 2010 5,250,000 4,585,000 4,585,000

A01217 Medical Allowance 3,134,000 3,134,000 3,134,000

A0121Q Audit and Accounts Allowance 110,000 110,000

A0121T Adhoc Relief Allowance 2013 759,000 759,000

A0122C Adhoc Relief Allowance - 2015 2,685,000 570,000 570,000

A0122M Adhoc Relief Allowance 2016 2,835,000 3,123,000

A01233 Unattractive Area Allowance 1,000 1,000 1,000

A01239 Special Allowance 18,000 18,000

A01260 Ration Allowance 13,000 13,000

A01270 Others 2,685,000 3,123,000

Page 346: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

345

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SY0116 EXECTIVE ENGINEER HIGHWAYS DIVISIONSUKKUR

A03 TOTAL OPERATING EXPENSES 225,000 121,000 245,000

A032 TOTAL COMMUNICATIONS 36,000 36,000 39,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 27,000 27,000 29,000

A033 TOTAL UTILITIES 105,000 1,000 116,000

A03303 Electricity 105,000 1,000 116,000

A038 TOTAL TRAVEL & 42,000 42,000 44,000

TRANSPORTATION

A03805 Travelling Allowance 25,000 25,000 27,000

A03807 P.O.L Charges A.planes 17,000 17,000 17,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 42,000 42,000 46,000

A03901 Stationery 9,000 9,000 10,000

A03902 Printing and Publication 9,000 9,000 10,000

A03905 Newspapers Periodicals and Books 9,000 9,000 10,000

A03970 Others 15,000 15,000 16,000

1 Others 15,000 15,000 16,000

A13 TOTAL REPAIRS AND MAINTENANCE 99,000 99,000 108,000

A130 TOTAL TRANSPORT 30,000 30,000 33,000

A13001 Transport 30,000 30,000 33,000

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

A13101 Machinery and Equipment 36,000 36,000 40,000

Page 347: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

346

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

SY0116 EXECTIVE ENGINEER HIGHWAYS DIVISIONSUKKUR

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

_______________________________________________________________________________EXECTIVE ENGINEER HIGHWAYS DIVISION 48,110,000 47,506,000 53,900,000

SUKKUR

_______________________________________________________________________________

Page 348: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

347

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

TN0048 EXECTIVE ENGINEER HIGHWAYS DIVISIONTANDO MUHAMMAD KHAN

A01 TOTAL EMPLOYEES RELATED EXPENSES. 30,656,000 33,225,000 37,714,000

A011 TOTAL PAY 107 107 17,676,000 20,639,000 22,705,000

A011-1 TOTAL PAY OF OFFICERS 3 4 1,618,000 3,170,000 3,488,000

A01101 Total Basic Pay Of Officer 3 4 1,609,000 3,161,000 3,478,000

D259 DISTRICT OFFICER (BPS-18) 1 1 700,000 1,131,000 1,245,000

D262 DEPUTY DISTRICT OFFICER (BPS-17) 1 1 561,000 903,000 993,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 1 563,000 620,000

D128 DIVISIONAL ACCOUNTANT (BPS-16) 1 1 348,000 564,000 620,000

A01102 Personal pay 9,000 9,000 10,000

A011-2 TOTAL PAY OF OTHER STAFF 104 103 16,058,000 17,469,000 19,217,000

A01151 Total Basic Pay Other Staff 104 103 16,034,000 17,428,000 19,171,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 1 237,000

S053 SENIOR CLERK (BPS-14) 2 419,000 461,000

S181 STENOGRAPHER (BPS-14) 1 1 235,000 253,000 279,000

D132 DIVISIONAL H-D / MAN (BPS-13) 1 1 220,000 238,000 261,000

J053 JUNIOR CLERK (BPS-11) 11 2,303,000 2,533,000

S222 SUB ENGINEER (BPS-11) 3 3 579,000 628,000 691,000

J022 JR DRAFTSMAN (BPS-10) 1 1 188,000 203,000 223,000

A017 ACCOUNT CLERK (BPS-09) 2 2 363,000 393,000 432,000

S053 SENIOR CLERK (BPS-09) 2 363,000

C041 CHARGE MAN / CHARGE (BPS-08) 2 2 351,000 380,000 418,000 MECHANICS

J014 JR CLERK (BPS-07) 11 1,867,000

R062 ROAD INSPECTOR (BPS-06) 1 1 164,000 177,000 195,000

M043 MASSON (BPS-05) 1 1 158,000 171,000 188,000

Page 349: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

348

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

TN0048 EXECTIVE ENGINEER HIGHWAYS DIVISIONTANDO MUHAMMAD KHAN

R061 ROAD / WORK MISTRI / (BPS-05) 10 10 1,580,000 1,711,000 1,882,000 DAROGHA

T001 TRACER (BPS-05) 1 1 158,000 171,000 188,000

J003 JEEP DRIVER (BPS-04) 2 2 304,000 330,000 363,000

R069 ROAD ROLLER DRIVER (BPS-04) 4 4 608,000 660,000 726,000

S205 STORE ISSURE (BPS-04) 1 1 151,000 165,000 181,000

T080 TRUCK DRIVER (BPS-04) 1 1 149,000 165,000 181,000

F038 FITTER (BPS-02) 1 1 144,000 155,000 171,000

N024 NQASID / CHOWKIDAR (BPS-02) 13 13 1,862,000 2,017,000 2,219,000

R065 ROAD MATE (BPS-02) 12 12 1,719,000 1,862,000 2,048,000

B007 BALDAR (BPS-01) 28 28 3,931,000 4,266,000 4,692,000

C111 CLEANER / HELPER / COLI (BPS-01) 3 3 421,000 457,000 503,000

D143 DONKEY CART MAN (BPS-01) 1 1 141,000 152,000 168,000

S261 SWEEPER (BPS-01) 1 1 141,000 152,000 168,000

A01152 Personal pay 24,000 41,000 46,000

A012 TOTAL ALLOWANCES 12,980,000 12,586,000 15,009,000

A012-1 TOTAL REGULAR ALLOWANCES 12,980,000 12,586,000 15,009,000

A01202 House Rent Allowance 1,350,000 1,401,000 1,401,000

A01203 Conveyance Allowance 2,584,000 2,666,000 2,666,000

A01207 Washing Allowance 12,000 13,000 13,000

A0120D Integrated Allowance 17,000 18,000 18,000

A0120X Ad - hoc Allowance - 2010 3,430,000 3,357,000 3,357,000

A01217 Medical Allowance 2,063,000 2,063,000 2,063,000

A0121Q Audit and Accounts Allowance 60,000 60,000

A0121T Adhoc Relief Allowance 2013 487,000 487,000

A0121Z Adhoc Relief Allowance - 2014 19,000

A0122C Adhoc Relief Allowance - 2015 1,762,000 414,000 414,000

A0122M Adhoc Relief Allowance 2016 2,020,000 2,265,000

A01244 Adhoc Relief 68,000

A01270 Others 1,762,000 2,265,000

Page 350: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

349

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

TN0048 EXECTIVE ENGINEER HIGHWAYS DIVISIONTANDO MUHAMMAD KHAN

A03 TOTAL OPERATING EXPENSES 586,000 317,000 628,000

A032 TOTAL COMMUNICATIONS 40,000 40,000 42,000

A03202 Telephone and Trunk call 40,000 40,000 42,000

A033 TOTAL UTILITIES 270,000 1,000 297,000

A03303 Electricity 270,000 1,000 297,000

A038 TOTAL TRAVEL & 197,000 197,000 204,000

TRANSPORTATION

A03805 Travelling Allowance 127,000 127,000 134,000

A03807 P.O.L Charges A.planes 70,000 70,000 70,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 79,000 79,000 85,000

A03905 Newspapers Periodicals and Books 9,000 9,000 10,000

A03955 Computer Stationery 8,000 8,000 9,000

A03970 Others 62,000 62,000 66,000

1 Others 62,000 62,000 66,000

A13 TOTAL REPAIRS AND MAINTENANCE 205,000 205,000 224,000

A130 TOTAL TRANSPORT 146,000 146,000 161,000

A13001 Transport 146,000 146,000 161,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

A137 TOTAL COMPUTER EQUIPMENT 26,000 26,000 28,000

Page 351: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

350

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

TN0048 EXECTIVE ENGINEER HIGHWAYS DIVISIONTANDO MUHAMMAD KHAN

A13701 Hardware 26,000 26,000 28,000

_______________________________________________________________________________EXECTIVE ENGINEER HIGHWAYS DIVISION 31,447,000 33,747,000 38,566,000

TANDO MUHAMMAD KHAN

_______________________________________________________________________________

Page 352: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

351

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

TQ0042 EXECTIVE ENGINEER HIGHWAYS DIVISIONTANDO ALLAH YAR

A01 TOTAL EMPLOYEES RELATED EXPENSES. 27,832,000 28,334,000 32,179,000

A011 TOTAL PAY 99 99 15,976,000 17,383,000 19,123,000

A011-1 TOTAL PAY OF OFFICERS 3 4 1,724,000 1,235,000 1,359,000

A01101 Total Basic Pay Of Officer 3 4 1,724,000 1,235,000 1,359,000

D259 DISTRICT OFFICER (BPS-18) 1 1 664,000 399,000 439,000

D129 DIVISIONAL ACCOUNTS (BPS-17) 1 1 530,000 319,000 351,000 OFFICER

D262 DEPUTY DISTRICT OFFICER (BPS-17) 1 1 530,000 318,000 350,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 1 199,000 219,000

A011-2 TOTAL PAY OF OTHER STAFF 96 95 14,252,000 16,148,000 17,764,000

A01151 Total Basic Pay Other Staff 96 95 14,233,000 16,095,000 17,705,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 1 227,000

S053 SENIOR CLERK (BPS-14) 2 415,000 456,000

S181 STENOGRAPHER (BPS-14) 1 1 222,000 251,000 276,000

H035 HEAD DRAFTSMAN (BPS-13) 1 1 208,000 235,000 259,000

J053 JUNIOR CLERK (BPS-11) 11 2,280,000 2,508,000

S222 SUB ENGINEER (BPS-11) 3 3 551,000 622,000 684,000

D150 DRAUGHTSMAN (BPS-10) 1 1 175,000 201,000 221,000

A017 ACCOUNT CLERK (BPS-09) 2 2 347,000 388,000 427,000

S053 SENIOR CLERK (BPS-09) 2 347,000

C042 CHARGE MAN / MECHANIC (BPS-07) 2 2 322,000 364,000 400,000

J014 JR CLERK (BPS-07) 11 1,774,000

R063 ROAD INSPECTOR / DAROGHAS(BPS-06) 1 1 156,000 176,000 193,000

D229 DAROGHA (BPS-05) 10 10 1,504,000 1,694,000 1,863,000

M042 MASSAN MISTRY (BPS-05) 1 1 150,000 169,000 186,000

Page 353: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

352

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

TQ0042 EXECTIVE ENGINEER HIGHWAYS DIVISIONTANDO ALLAH YAR

T001 TRACER (BPS-05) 1 1 150,000 169,000 186,000

D161 DRIVER (BPS-04) 1 1 145,000 163,000 180,000

R069 ROAD ROLLER DRIVER (BPS-04) 4 4 579,000 653,000 718,000

S205 STORE ISSURE (BPS-04) 1 1 145,000 163,000 180,000

T080 TRUCK DRIVER (BPS-04) 1 1 145,000 163,000 180,000

B007 BALDAR (BPS-02) 27 27 3,681,000 4,148,000 4,563,000

C089 CHOWKIDAR (BPS-02) 4 4 546,000 614,000 676,000

D145 DONKEY CARTMAN (BPS-02) 1 1 135,000 154,000 169,000

F038 FITTER (BPS-02) 1 1 135,000 154,000 169,000

H066 HELPER COOLLY (BPS-02) 1 1 135,000 154,000 169,000

N003 NAIB QASID (BPS-02) 5 5 684,000 768,000 845,000

R065 ROAD MATE (BPS-02) 12 12 1,635,000 1,843,000 2,028,000

S008 SANITARY WORKER (BPS-02) 1 1 135,000 154,000 169,000

A01152 Personal pay 19,000 53,000 59,000

A012 TOTAL ALLOWANCES 11,856,000 10,951,000 13,056,000

A012-1 TOTAL REGULAR ALLOWANCES 11,834,000 10,929,000 13,032,000

A01202 House Rent Allowance 1,281,000 1,281,000 1,281,000

A01203 Conveyance Allowance 2,381,000 2,381,000 2,381,000

A01207 Washing Allowance 11,000 14,000 14,000

A0120D Integrated Allowance 5,000 5,000 5,000

A0120X Ad - hoc Allowance - 2010 3,081,000 2,786,000 2,786,000

A01216 Qualification Allowance 4,000 4,000 4,000

A01217 Medical Allowance 1,879,000 1,879,000 1,879,000

A0121Q Audit and Accounts Allowance 32,000 32,000

A0121T Adhoc Relief Allowance 2013 492,000 492,000

A0121Z Adhoc Relief Allowance - 2014 14,000

A0122C Adhoc Relief Allowance - 2015 1,596,000 346,000 346,000

A0122M Adhoc Relief Allowance 2016 1,695,000 1,906,000

A01270 Others 1,596,000 1,906,000

Page 354: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

353

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

TQ0042 EXECTIVE ENGINEER HIGHWAYS DIVISIONTANDO ALLAH YAR

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 22,000 22,000 24,000

A01274 Medical Charges 22,000 22,000 24,000

A03 TOTAL OPERATING EXPENSES 654,000 527,000 700,000

A032 TOTAL COMMUNICATIONS 76,000 76,000 81,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 67,000 67,000 71,000

A033 TOTAL UTILITIES 334,000 207,000 368,000

A03303 Electricity 334,000 207,000 368,000

A038 TOTAL TRAVEL & 179,000 179,000 181,000

TRANSPORTATION

A03805 Travelling Allowance 40,000 40,000 42,000

A03807 P.O.L Charges A.planes 139,000 139,000 139,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 65,000 65,000 70,000

A03901 Stationery 15,000 15,000 16,000

A03902 Printing and Publication 9,000 9,000 10,000

A03905 Newspapers Periodicals and Books 9,000 9,000 10,000

A03970 Others 32,000 32,000 34,000

1 Others 32,000 32,000 34,000

A13 TOTAL REPAIRS AND MAINTENANCE 143,000 143,000 157,000

A130 TOTAL TRANSPORT 74,000 74,000 82,000

A13001 Transport 74,000 74,000 82,000

Page 355: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

354

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

TQ0042 EXECTIVE ENGINEER HIGHWAYS DIVISIONTANDO ALLAH YAR

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

A13101 Machinery and Equipment 36,000 36,000 40,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

_______________________________________________________________________________EXECTIVE ENGINEER HIGHWAYS DIVISION 28,629,000 29,004,000 33,036,000

TANDO ALLAH YAR

_______________________________________________________________________________

Page 356: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

355

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

TX0071 EXECTIVE ENGINEER HIGHWAYS DIVISION\THATTA

A01 TOTAL EMPLOYEES RELATED EXPENSES. 75,588,000 74,669,000 84,753,000

A011 TOTAL PAY 235 235 44,193,000 46,212,000 50,835,000

A011-1 TOTAL PAY OF OFFICERS 9 10 4,826,000 4,062,000 4,469,000

A01101 Total Basic Pay Of Officer 9 10 4,758,000 3,994,000 4,394,000

D259 DISTRICT OFFICER (BPS-18) 1 1 642,000 507,000 558,000

A218 ASSISTANT ENGINEER (BPS-17) 7 7 3,603,000 2,831,000 3,113,000

D129 DIVISIONAL ACCOUNTS (BPS-17) 1 1 513,000 404,000 445,000 OFFICER

A235 ASSISTANT HEAD CLERK (BPS-16) 1 252,000 278,000

A01102 Personal pay 68,000 68,000 75,000

A011-2 TOTAL PAY OF OTHER STAFF 226 225 39,367,000 42,150,000 46,366,000

A01151 Total Basic Pay Other Staff 226 225 39,103,000 41,809,000 45,990,000

S273 SENIOR CLERK / SUB (BPS-14) 2 485,000 534,000 DIVISIONAL CLERK

D132 DIVISIONAL H-D / MAN (BPS-13) 1 1 255,000 275,000 303,000

A235 ASSISTANT HEAD CLERK (BPS-11) 1 227,000

J053 JUNIOR CLERK (BPS-11) 14 3,396,000 3,735,000

S228 SUB-ENGINEER (BPS-11) 2 2 452,000 485,000 534,000

A017 ACCOUNT CLERK (BPS-09) 2 2 425,000 457,000 501,000

C040 CHARGE MAN (BPS-08) 1 1 206,000 220,000 242,000

J014 JR CLERK (BPS-07) 14 2,783,000

S273 SENIOR CLERK / SUB (BPS-07) 2 399,000 DIVISIONAL CLERK

P006 PAINTER (BPS-05) 1 1 184,000 198,000 218,000

W045 WORK MESTRY / DAROGHA (BPS-05) 18 18 3,330,000 3,568,000 3,925,000

D161 DRIVER (BPS-04) 5 5 891,000 955,000 1,051,000

Page 357: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

356

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

TX0071 EXECTIVE ENGINEER HIGHWAYS DIVISION\THATTA

R069 ROAD ROLLER DRIVER (BPS-04) 7 7 1,248,000 1,338,000 1,471,000

S205 STORE ISSURE (BPS-04) 2 2 356,000 382,000 420,000

T053 TRACTOR / TRUCK / WATER (BPS-04) 1 1 178,000 191,000 210,000 VAN DRIVER

F038 FITTER (BPS-02) 1 1 168,000 180,000 198,000

R065 ROAD MATE (BPS-02) 9 9 1,513,000 1,618,000 1,780,000

B026 BELDAR / COOLY (BPS-01) 97 97 15,958,000 17,120,000 18,832,000

C112 CLEANER / HELPER / COLI / (BPS-01) 9 9 1,480,000 1,588,000 1,747,000 WIND CLEANER

C167 COOK (BPS-01) 1 1 166,000 176,000 194,000

C215 CHOWKIDAR -CUM-NAIB QASID (BPS-01)17 17 2,796,000 3,000,000 3,300,000

M020 MALHI / GARDEN ATTENDANT (BPS-01) 2 2 329,000 353,000 388,000

N021 NQ / CHOWKIDAR / MALHI / (BPS-01) 33 33 5,759,000 5,824,000 6,407,000 S WORKER

A01152 Personal pay 264,000 341,000 376,000

A012 TOTAL ALLOWANCES 31,395,000 28,457,000 33,918,000

A012-1 TOTAL REGULAR ALLOWANCES 31,265,000 28,327,000 33,781,000

A01202 House Rent Allowance 3,030,000 3,030,000 3,030,000

A01203 Conveyance Allowance 6,029,000 6,029,000 6,029,000

A01207 Washing Allowance 33,000 35,000 35,000

A0120D Integrated Allowance 88,000 88,000 88,000

A0120X Ad - hoc Allowance - 2010 8,590,000 7,556,000 7,556,000

A01217 Medical Allowance 4,805,000 4,805,000 4,805,000

A0121T Adhoc Relief Allowance 2013 1,238,000 1,238,000

A0122C Adhoc Relief Allowance - 2015 4,345,000 924,000 924,000

A0122M Adhoc Relief Allowance 2016 4,616,000 5,038,000

A01244 Adhoc Relief 6,000

A01270 Others 4,345,000 5,038,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 130,000 130,000 137,000

A01274 Medical Charges 130,000 130,000 137,000

Page 358: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

357

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

TX0071 EXECTIVE ENGINEER HIGHWAYS DIVISION\THATTA

A03 TOTAL OPERATING EXPENSES 1,889,000 1,133,000 1,993,000

A032 TOTAL COMMUNICATIONS 301,000 301,000 317,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 292,000 292,000 307,000

A033 TOTAL UTILITIES 757,000 1,000 833,000

A03303 Electricity 757,000 1,000 833,000

A034 TOTAL OCCUPANCY COSTS 8,000 8,000 8,000

A03407 Rates and Taxes 8,000 8,000 8,000

A038 TOTAL TRAVEL & 686,000 686,000 690,000

TRANSPORTATION

A03805 Travelling Allowance 73,000 73,000 77,000

A03807 P.O.L Charges A.planes 613,000 613,000 613,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 137,000 137,000 145,000

A03901 Stationery 37,000 37,000 39,000

A03905 Newspapers Periodicals and Books 27,000 27,000 29,000

A03970 Others 73,000 73,000 77,000

1 Others 73,000 73,000 77,000

A13 TOTAL REPAIRS AND MAINTENANCE 180,000 180,000 198,000

A130 TOTAL TRANSPORT 94,000 94,000 104,000

A13001 Transport 94,000 94,000 104,000

Page 359: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

358

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

TX0071 EXECTIVE ENGINEER HIGHWAYS DIVISION\THATTA

A131 TOTAL MACHINERY AND 45,000 45,000 50,000

EQUIPMENT

A13101 Machinery and Equipment 45,000 45,000 50,000

A132 TOTAL FURNITURE AND 41,000 41,000 44,000

FIXTURE

A13201 Furniture and Fixture 41,000 41,000 44,000

_______________________________________________________________________________EXECTIVE ENGINEER HIGHWAYS DIVISION\ 77,657,000 75,982,000 86,944,000

THATTA

_______________________________________________________________________________

Page 360: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

359

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

TX0072 EXECUTIVE ENGINEER HIGHWAYS DIVISIONSAJ

A13 TOTAL REPAIRS AND MAINTENANCE 53,838,000

A131 TOTAL MACHINERY AND 293,000

EQUIPMENT

A13101 Machinery and Equipment 293,000

A136 TOTAL ROADS, HIGHWAYS AND 53,545,000

BRIDGES

A13602 Other roads 53,080,000

1 Other 53,080,000

A13604 Other bridges 465,000

6 Other (Fixed Charges) 465,000

_______________________________________________________________________________EXECUTIVE ENGINEER HIGHWAYS DIVISION 53,838,000

SAJ

_______________________________________________________________________________

Page 361: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

360

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

UT0050 EXECTIVE ENGINEER HIGHWAYS DIVISIONUMERKOT

A01 TOTAL EMPLOYEES RELATED EXPENSES. 45,365,000 45,996,000 52,041,000

A011 TOTAL PAY 167 167 26,472,000 27,517,000 30,270,000

A011-1 TOTAL PAY OF OFFICERS 6 6 2,941,000 986,000 1,085,000

A01101 Total Basic Pay Of Officer 6 6 2,941,000 986,000 1,085,000

D259 DISTRICT OFFICER (BPS-18) 1 1 589,000 198,000 217,000

A218 ASSISTANT ENGINEER (BPS-17) 4 4 1,882,000 630,000 694,000

D129 DIVISIONAL ACCOUNTS (BPS-17) 1 1 470,000 158,000 174,000 OFFICER

A011-2 TOTAL PAY OF OTHER STAFF 161 161 23,531,000 26,531,000 29,185,000

A01151 Total Basic Pay Other Staff 161 161 23,488,000 26,488,000 29,137,000

S053 SENIOR CLERK (BPS-14) 2 405,000 446,000

S181 STENOGRAPHER (BPS-14) 1 1 221,000 245,000 270,000

D235 DIRECTOR EXAMINATION AND (BPS-13) 1 1 208,000 230,000 253,000 RESERACH

D230 DRAFTSMAN (BPS-12) 1 1 195,000 215,000 236,000

H029 HEAD CLERK / ASSISTANT (BPS-11) 1 1 184,000 203,000 223,000

J053 JUNIOR CLERK (BPS-11) 16 3,244,000 3,568,000

S222 SUB ENGINEER (BPS-11) 12 12 2,197,000 2,433,000 2,676,000

A029 ACCOUNTS CLERK / CASHIER (BPS-09) 2 2 345,000 378,000 419,000

C042 CHARGE MAN / MECHANIC (BPS-08) 2 2 333,000 368,000 405,000

S053 SENIOR CLERK (BPS-07) 2 322,000

R062 ROAD INSPECTOR (BPS-06) 1 1 155,000 172,000 189,000

W046 WORK MISTRY (BPS-06) 14 14 2,175,000 2,404,000 2,644,000

J014 JR CLERK (BPS-05) 16 2,397,000

M042 MASSAN MISTRY (BPS-05) 1 1 149,000 166,000 182,000

Page 362: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

361

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

UT0050 EXECTIVE ENGINEER HIGHWAYS DIVISIONUMERKOT

J003 JEEP DRIVER (BPS-04) 1 1 145,000 160,000 176,000

R069 ROAD ROLLER DRIVER (BPS-04) 10 10 1,444,000 1,597,000 1,757,000

S115 SEWERAGE MAN (BPS-04) 1 1 145,000 160,000 176,000

T080 TRUCK DRIVER (BPS-04) 1 1 145,000 160,000 176,000

F038 FITTER (BPS-02) 1 1 136,000 150,000 165,000

N003 NAIB QASID (BPS-02) 9 9 1,222,000 1,352,000 1,488,000

R065 ROAD MATE (BPS-02) 19 19 2,583,000 2,855,000 3,141,000

C064 CHIEF ENVIRONMENT (BPS-01) 4 4 529,000 590,000 649,000

C089 CHOWKIDAR (BPS-01) 5 5 798,000 738,000 811,000

D007 DAFTRI / DISPEACH RIDER (BPS-01) 54 54 7,192,000 7,967,000 8,763,000

D143 DONKEY CART MAN (BPS-01) 1 1 134,000 148,000 162,000

S008 SANITARY WORKER (BPS-01) 1 1 134,000 148,000 162,000

A01152 Personal pay 43,000 43,000 48,000

A012 TOTAL ALLOWANCES 18,893,000 18,479,000 21,771,000

A012-1 TOTAL REGULAR ALLOWANCES 18,893,000 18,479,000 21,771,000

A01202 House Rent Allowance 2,095,000 2,095,000 2,095,000

A01203 Conveyance Allowance 3,890,000 3,926,000 3,926,000

A01207 Washing Allowance 12,000 13,000 13,000

A0120D Integrated Allowance 5,000 5,000 5,000

A0120X Ad - hoc Allowance - 2010 4,800,000 4,419,000 4,419,000

A01217 Medical Allowance 3,061,000 3,061,000 3,061,000

A0121T Adhoc Relief Allowance 2013 742,000 742,000

A0122C Adhoc Relief Allowance - 2015 2,491,000 549,000 549,000

A0122M Adhoc Relief Allowance 2016 2,752,000 3,022,000

A01233 Unattractive Area Allowance 29,000 898,000 898,000

A01238 Charge Allowance 19,000 19,000 19,000

A01270 Others 2,491,000 3,022,000

A03 TOTAL OPERATING EXPENSES 386,000 386,000 404,000

Page 363: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

362

SC21132 (132)Works & Services

_______________________________________________________________________________ 045202 HIGHWAYS, ROADS AND BRIDGES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0452 ROAD TRANSPORT045202 HIGHWAYS, ROADS AND BRIDGES

UT0050 EXECTIVE ENGINEER HIGHWAYS DIVISIONUMERKOT

A032 TOTAL COMMUNICATIONS 54,000 54,000 57,000

A03201 Postage and Telegraph 14,000 14,000 15,000

A03202 Telephone and Trunk call 40,000 40,000 42,000

A034 TOTAL OCCUPANCY COSTS 63,000 63,000 63,000

A03407 Rates and Taxes 63,000 63,000 63,000

A038 TOTAL TRAVEL & 67,000 67,000 69,000

TRANSPORTATION

A03805 Travelling Allowance 32,000 32,000 34,000

A03807 P.O.L Charges A.planes 35,000 35,000 35,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 202,000 202,000 215,000

A03901 Stationery 31,000 31,000 33,000

A03902 Printing and Publication 31,000 31,000 33,000

A03905 Newspapers Periodicals and Books 9,000 9,000 10,000

A03955 Computer Stationery 69,000 69,000 73,000

A03970 Others 62,000 62,000 66,000

1 Others 62,000 62,000 66,000

A13 TOTAL REPAIRS AND MAINTENANCE 36,000 36,000 40,000

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

A13101 Machinery and Equipment 36,000 36,000 40,000

_______________________________________________________________________________EXECTIVE ENGINEER HIGHWAYS DIVISION 45,787,000 46,418,000 52,485,000

UMERKOT

_______________________________________________________________________________

Page 364: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

363

SC21132 (132)Works & Services

_______________________________________________________________________________ 045701 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045701 ADMINISTRATION

HB0197 CHIEF ENGINEER BUILDINGS SINDHHYDERABAD

A01 TOTAL EMPLOYEES RELATED EXPENSES. 38,967,000 36,566,000 41,574,000

A011 TOTAL PAY 82 82 22,937,000 22,724,000 24,998,000

A011-1 TOTAL PAY OF OFFICERS 14 29 7,709,000 6,797,000 7,478,000

A01101 Total Basic Pay Of Officer 14 29 7,653,000 6,732,000 7,406,000

C061 CHIEF ENGINEER (BPS-20) 1 1 1,137,000 576,000 634,000

D503 DIRECTOR (ESTATE & (BPS-19) 1 1 980,000 495,000 545,000 MANGEMENT)

S241 SUPERINTENDING ENGINEER (BPS-19) 1 1 980,000 495,000 545,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 633,000 320,000 352,000

A066 ADMINISTRATIVE OFFICER (BPS-17) 1 1 507,000 256,000 279,000

A131 ASSISTANT ENGINEER (BPS-17) 2 2 1,012,000 510,000 562,000

B071 BUDGET ACCOUNT OFFICER (BPS-17) 1 1 507,000 255,000 281,000

S236 SUPERINTENDENT (BPS-17) 5 1,276,000 1,404,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 15 2,390,000 2,629,000

C052 CHIEF / CIRCLE HEAD (BPS-16) 1 1 316,000 159,000 175,000 DRAFTSMAN

S236 SUPERINTENDENT (BPS-16) 5 1,581,000

A01102 Personal pay 56,000 65,000 72,000

A011-2 TOTAL PAY OF OTHER STAFF 68 53 15,228,000 15,927,000 17,520,000

A01151 Total Basic Pay Other Staff 68 53 15,213,000 15,898,000 17,488,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 15 4,337,000

S053 SENIOR CLERK (BPS-14) 5 1,665,000 1,831,000

S181 STENOGRAPHER (BPS-14) 3 3 867,000 1,209,000 1,330,000

D136 DIVISIONAL HEAD (BPS-13) 2 2 541,000 756,000 832,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 15 4,995,000 5,494,000

Page 365: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

364

SC21132 (132)Works & Services

_______________________________________________________________________________ 045701 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045701 ADMINISTRATION

HB0197 CHIEF ENGINEER BUILDINGS SINDHHYDERABAD

D150 DRAUGHTSMAN (BPS-10) 4 4 923,000 1,290,000 1,419,000

S053 SENIOR CLERK (BPS-09) 5 1,120,000

J014 JR CLERK (BPS-07) 15 3,143,000

T047 TRACER (BPS-05) 4 4 780,000 1,089,000 1,197,000

D161 DRIVER (BPS-04) 2 2 376,000 525,000 577,000

D003 DAFTARI (BPS-02) 2 2 354,000 494,000 543,000

C092 CHOWKIDAR / WATCHMAN (BPS-01) 2 2 347,000 483,000 533,000

F013 FERO PRINTER / KHADASI (BPS-01) 1 1 173,000 242,000 267,000

N003 NAIB QASID (BPS-01) 12 12 2,079,000 2,908,000 3,198,000

S008 SANITARY WORKER (BPS-01) 1 1 173,000 242,000 267,000

A01152 Personal pay 15,000 29,000 32,000

A012 TOTAL ALLOWANCES 16,030,000 13,842,000 16,576,000

A012-1 TOTAL REGULAR ALLOWANCES 15,363,000 13,175,000 15,875,000

A01201 Senior Post Allowance 2,000 2,000 2,000

A01202 House Rent Allowance 2,051,000 2,051,000 2,051,000

A01203 Conveyance Allowance 2,443,000 2,443,000 2,443,000

A01207 Washing Allowance 17,000 17,000 17,000

A0120D Integrated Allowance 50,000 50,000 50,000

A0120X Ad - hoc Allowance - 2010 4,428,000 3,629,000 3,629,000

A01217 Medical Allowance 1,769,000 1,769,000 1,769,000

A0121M Adhoc Relief Allowance - 2012 15,000

A0121T Adhoc Relief Allowance 2013 451,000 451,000

A01224 Entertainment Allowance 15,000 15,000 15,000

A01228 Orderly Allowance 14,000 14,000 14,000

A0122C Adhoc Relief Allowance - 2015 2,287,000 456,000 456,000

A0122M Adhoc Relief Allowance 2016 2,263,000 2,489,000

A01270 Others 2,287,000 2,489,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 667,000 667,000 701,000

A01274 Medical Charges 667,000 667,000 701,000

Page 366: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

365

SC21132 (132)Works & Services

_______________________________________________________________________________ 045701 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045701 ADMINISTRATION

HB0197 CHIEF ENGINEER BUILDINGS SINDHHYDERABAD

A03 TOTAL OPERATING EXPENSES 3,889,000 2,723,000 4,101,000

A032 TOTAL COMMUNICATIONS 532,000 532,000 560,000

A03201 Postage and Telegraph 66,000 66,000 70,000

A03202 Telephone and Trunk call 466,000 466,000 490,000

A033 TOTAL UTILITIES 1,167,000 1,000 1,284,000

A03303 Electricity 1,167,000 1,000 1,284,000

A038 TOTAL TRAVEL & 1,611,000 1,611,000 1,646,000

TRANSPORTATION

A03805 Travelling Allowance 692,000 692,000 727,000

A03807 P.O.L Charges A.planes 919,000 919,000 919,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 579,000 579,000 611,000

A03901 Stationery 202,000 202,000 213,000

A03902 Printing and Publication 101,000 101,000 107,000

A03905 Newspapers Periodicals and Books 28,000 28,000 30,000

A03906 Uniforms and Protective Clothing 96,000 96,000 101,000

A03970 Others 152,000 152,000 160,000

1 Others 152,000 152,000 160,000

A09 TOTAL PHYSICAL ASSETS 194,000

A092 TOTAL COMPUTER EQUIPMENT 194,000

A09201 Hardware 194,000

120 Two Printers 70,000

TC2 Two Computer with LCD Monitor 94,000

UP6 Two UPS for Computer 30,000

Page 367: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

366

SC21132 (132)Works & Services

_______________________________________________________________________________ 045701 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045701 ADMINISTRATION

HB0197 CHIEF ENGINEER BUILDINGS SINDHHYDERABAD

A13 TOTAL REPAIRS AND MAINTENANCE 157,000 157,000 173,000

A130 TOTAL TRANSPORT 68,000 68,000 75,000

A13001 Transport 68,000 68,000 75,000

A131 TOTAL MACHINERY AND 72,000 72,000 80,000

EQUIPMENT

A13101 Machinery and Equipment 72,000 72,000 80,000

A132 TOTAL FURNITURE AND 17,000 17,000 18,000

FIXTURE

A13201 Furniture and Fixture 17,000 17,000 18,000

_______________________________________________________________________________CHIEF ENGINEER BUILDINGS SINDH 43,013,000 39,446,000 46,042,000

HYDERABAD

_______________________________________________________________________________

Page 368: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

367

SC21132 (132)Works & Services

_______________________________________________________________________________ 045701 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045701 ADMINISTRATION

HB0198 CHEIF ARCHITECT BUILDINGS SINDHHYDERABAD

A01 TOTAL EMPLOYEES RELATED EXPENSES. 19,396,000 22,176,000 25,198,000

A011 TOTAL PAY 42 42 11,332,000 14,152,000 15,569,000

A011-1 TOTAL PAY OF OFFICERS 12 13 5,937,000 8,420,000 9,263,000

A01101 Total Basic Pay Of Officer 12 13 5,824,000 8,075,000 8,883,000

C269 CHIEF CONSULTING (BPS-20) 1 1 1,127,000 1,487,000 1,636,000 ARCHITECT

A165 ASSISTANT CONSULTING (BPS-18) 1 1 625,000 826,000 909,000 ARCHITECT

A106 ARCHITECTURAL ASSISTANT (BPS-17) 5 5 2,505,000 3,295,000 3,624,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 1 411,000 452,000

S062 SENIOR DRAUGHTSMAN (BPS-16) 5 5 1,567,000 2,056,000 2,262,000

A01102 Personal pay 113,000 345,000 380,000

A011-2 TOTAL PAY OF OTHER STAFF 30 29 5,395,000 5,732,000 6,306,000

A01151 Total Basic Pay Other Staff 30 29 5,372,000 5,694,000 6,264,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 1 239,000

S053 SENIOR CLERK (BPS-14) 2 429,000 472,000

S181 STENOGRAPHER (BPS-14) 1 1 240,000 260,000 286,000

J022 JR DRAFTSMAN (BPS-13) 5 5 1,114,000 1,219,000 1,341,000

C146 COMPUTER OPERATOR (BPS-12) 1 1 208,000 228,000 250,000

D150 DRAUGHTSMAN (BPS-12) 3 3 624,000 683,000 751,000

J053 JUNIOR CLERK (BPS-11) 2 429,000 472,000

S053 SENIOR CLERK (BPS-09) 2 367,000

J014 JR CLERK (BPS-07) 2 344,000

T047 TRACER (BPS-05) 4 4 641,000 702,000 772,000

D161 DRIVER (BPS-04) 2 2 309,000 338,000 372,000

C089 CHOWKIDAR (BPS-01) 1 1 144,000 157,000 173,000

Page 369: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

368

SC21132 (132)Works & Services

_______________________________________________________________________________ 045701 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045701 ADMINISTRATION

HB0198 CHEIF ARCHITECT BUILDINGS SINDHHYDERABAD

F013 FERO PRINTER / KHADASI (BPS-01) 2 2 285,000 312,000 344,000

N003 NAIB QASID (BPS-01) 5 5 714,000 781,000 859,000

S008 SANITARY WORKER (BPS-01) 1 1 143,000 156,000 172,000

A01152 Personal pay 23,000 38,000 42,000

A012 TOTAL ALLOWANCES 8,064,000 8,024,000 9,629,000

A012-1 TOTAL REGULAR ALLOWANCES 7,806,000 7,766,000 9,358,000

A01201 Senior Post Allowance 17,000 17,000 17,000

A01202 House Rent Allowance 899,000 957,000 957,000

A01203 Conveyance Allowance 1,177,000 1,285,000 1,285,000

A01207 Washing Allowance 3,000 3,000 3,000

A0120D Integrated Allowance 20,000 20,000 20,000

A0120X Ad - hoc Allowance - 2010 2,263,000 2,379,000 2,379,000

A01217 Medical Allowance 982,000 982,000 982,000

A0121A Ad - hoc Allowance - 2011 10,000

A0121T Adhoc Relief Allowance 2013 177,000 177,000

A0121Z Adhoc Relief Allowance - 2014 30,000

A01224 Entertainment Allowance 8,000 8,000 8,000

A01226 Computer Allowance 10,000 10,000 10,000

A01228 Orderly Allowance 156,000 156,000 156,000

A0122C Adhoc Relief Allowance - 2015 1,119,000 298,000 298,000

A0122M Adhoc Relief Allowance 2016 1,384,000 1,515,000

A01237 Design Allowance 33,000 36,000 36,000

A01270 Others 1,119,000 14,000 1,515,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 258,000 258,000 271,000

A01274 Medical Charges 258,000 258,000 271,000

A03 TOTAL OPERATING EXPENSES 2,668,000 1,628,000 2,834,000

A032 TOTAL COMMUNICATIONS 127,000 127,000 135,000

A03201 Postage and Telegraph 25,000 25,000 27,000

Page 370: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

369

SC21132 (132)Works & Services

_______________________________________________________________________________ 045701 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045701 ADMINISTRATION

HB0198 CHEIF ARCHITECT BUILDINGS SINDHHYDERABAD

A03202 Telephone and Trunk call 102,000 102,000 108,000

A033 TOTAL UTILITIES 1,251,000 211,000 1,377,000

A03303 Electricity 1,251,000 211,000 1,377,000

A038 TOTAL TRAVEL & 1,006,000 1,006,000 1,022,000

TRANSPORTATION

A03805 Travelling Allowance 317,000 317,000 333,000

A03807 P.O.L Charges A.planes 689,000 689,000 689,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 284,000 284,000 300,000

A03901 Stationery 43,000 43,000 46,000

A03902 Printing and Publication 15,000 15,000 16,000

A03906 Uniforms and Protective Clothing 17,000 17,000 18,000

A03970 Others 209,000 209,000 220,000

1 Others 209,000 209,000 220,000

A13 TOTAL REPAIRS AND MAINTENANCE 68,000 68,000 76,000

A130 TOTAL TRANSPORT 22,000 22,000 25,000

A13001 Transport 22,000 22,000 25,000

A131 TOTAL MACHINERY AND 22,000 22,000 25,000

EQUIPMENT

A13101 Machinery and Equipment 22,000 22,000 25,000

A132 TOTAL FURNITURE AND 15,000 15,000 16,000

FIXTURE

A13201 Furniture and Fixture 15,000 15,000 16,000

Page 371: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

370

SC21132 (132)Works & Services

_______________________________________________________________________________ 045701 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045701 ADMINISTRATION

HB0198 CHEIF ARCHITECT BUILDINGS SINDHHYDERABAD

A137 TOTAL COMPUTER EQUIPMENT 9,000 9,000 10,000

A13701 Hardware 9,000 9,000 10,000

_______________________________________________________________________________CHEIF ARCHITECT BUILDINGS SINDH 22,132,000 23,872,000 28,108,000

HYDERABAD

_______________________________________________________________________________

Page 372: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

371

SC21132 (132)Works & Services

_______________________________________________________________________________ 045701 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045701 ADMINISTRATION

SY0114 CHIEF ENGINEER BUILDING SUKKUR

A01 TOTAL EMPLOYEES RELATED EXPENSES. 19,984,000 12,422,000 14,428,000

A011 TOTAL PAY 23 23 13,972,000 8,357,000 9,194,000

A011-1 TOTAL PAY OF OFFICERS 8 8 10,503,000 5,503,000 6,054,000

A01101 Total Basic Pay Of Officer 8 8 10,466,000 5,466,000 6,013,000

C063 CHIEF ENGINEER / DIRECTOR (BPS-20) 1 1 1,611,000 1,279,000 1,407,000 GEN: (MONITORING)

D186 DY DIRECTOR (MONIT / (BPS-18) 3 3 2,683,000 2,132,000 2,345,000 RESC) / EXECUTIVE ENGINEER

A189 ASSISTANT DIRECTOR (MONIT (BPS-17) 2 2 5,009,000 1,134,000 1,247,000 / RESC) / ASSISTANT ENGI

S095 SENIOR RESEARCH OFFICER (BPS-17) 1 1 715,000 567,000 624,000

A066 ADMINISTRATIVE OFFICER (BPS-16) 1 1 448,000 354,000 390,000

A01102 Personal pay 37,000 37,000 41,000

A011-2 TOTAL PAY OF OTHER STAFF 15 15 3,469,000 2,854,000 3,140,000

A01151 Total Basic Pay Other Staff 15 15 3,469,000 2,854,000 3,140,000

S053 SENIOR CLERK (BPS-14) 2 421,000 463,000

S181 STENOGRAPHER (BPS-14) 1 1 318,000 254,000 280,000

J053 JUNIOR CLERK (BPS-11) 2 421,000 463,000

S228 SUB-ENGINEER (BPS-11) 2 2 526,000 421,000 463,000

D150 DRAUGHTSMAN (BPS-10) 1 1 256,000 204,000 224,000

S053 SENIOR CLERK (BPS-09) 2 494,000

J014 JR CLERK (BPS-07) 2 462,000

T047 TRACER (BPS-05) 2 2 430,000 344,000 378,000

D161 DRIVER (BPS-04) 2 2 414,000 331,000 365,000

C089 CHOWKIDAR (BPS-01) 1 1 192,000 152,000 167,000

N003 NAIB QASID (BPS-01) 2 2 377,000 306,000 337,000

Page 373: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

372

SC21132 (132)Works & Services

_______________________________________________________________________________ 045701 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045701 ADMINISTRATION

SY0114 CHIEF ENGINEER BUILDING SUKKUR

A012 TOTAL ALLOWANCES 6,012,000 4,065,000 5,234,000

A012-1 TOTAL REGULAR ALLOWANCES 5,929,000 3,982,000 5,146,000

A01202 House Rent Allowance 703,000 703,000 703,000

A01203 Conveyance Allowance 793,000 793,000 793,000

A01207 Washing Allowance 2,000 2,000 2,000

A0120X Ad - hoc Allowance - 2010 1,074,000 1,031,000 1,031,000

A01217 Medical Allowance 564,000 564,000 564,000

A0121T Adhoc Relief Allowance 2013 99,000 99,000

A0121Z Adhoc Relief Allowance - 2014 24,000

A0122C Adhoc Relief Allowance - 2015 1,393,000 122,000 122,000

A0122M Adhoc Relief Allowance 2016 642,000 915,000

A01237 Design Allowance 2,000 2,000 2,000

A01241 Utility allowance for electricity 5,000

A01270 Others 1,393,000 915,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 83,000 83,000 88,000

A01274 Medical Charges 83,000 83,000 88,000

A03 TOTAL OPERATING EXPENSES 691,000 324,000 741,000

A032 TOTAL COMMUNICATIONS 59,000 59,000 63,000

A03201 Postage and Telegraph 8,000 8,000 9,000

A03202 Telephone and Trunk call 51,000 51,000 54,000

A033 TOTAL UTILITIES 368,000 1,000 405,000

A03303 Electricity 368,000 1,000 405,000

A038 TOTAL TRAVEL & 201,000 201,000 204,000

TRANSPORTATION

A03805 Travelling Allowance 43,000 43,000 46,000

A03807 P.O.L Charges A.planes 158,000 158,000 158,000

H.coptors S.Cars M/Cycle

Page 374: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

373

SC21132 (132)Works & Services

_______________________________________________________________________________ 045701 ADMINISTRATION_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045701 ADMINISTRATION

SY0114 CHIEF ENGINEER BUILDING SUKKUR

A039 TOTAL GENERAL 63,000 63,000 69,000

A03901 Stationery 22,000 22,000 24,000

A03902 Printing and Publication 5,000 5,000 6,000

A03905 Newspapers Periodicals and Books 3,000 3,000 4,000

A03906 Uniforms and Protective Clothing 17,000 17,000 18,000

A03970 Others 16,000 16,000 17,000

1 Others 16,000 16,000 17,000

A13 TOTAL REPAIRS AND MAINTENANCE 79,000 79,000 88,000

A130 TOTAL TRANSPORT 58,000 58,000 64,000

A13001 Transport 58,000 58,000 64,000

A131 TOTAL MACHINERY AND 15,000 15,000 17,000

EQUIPMENT

A13101 Machinery and Equipment 15,000 15,000 17,000

A132 TOTAL FURNITURE AND 6,000 6,000 7,000

FIXTURE

A13201 Furniture and Fixture 6,000 6,000 7,000

_______________________________________________________________________________CHIEF ENGINEER BUILDING SUKKUR 20,754,000 12,825,000 15,257,000

_______________________________________________________________________________

Page 375: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

374

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

BI0564 EXECUTIVE ENGINEER BUILDINGS DIVISIONBADIN

A13 TOTAL REPAIRS AND MAINTENANCE 4,156,000 4,156,000 4,156,000

A133 TOTAL BUILDINGS AND 4,156,000 4,156,000 4,156,000

STRUCTURE

A13301 Office Buildings 2,512,000 2,512,000 2,512,000

1 Office Buildings 2,512,000 2,512,000

A13302 Residential Buildings 1,644,000 1,644,000 1,644,000

_______________________________________________________________________________EXECUTIVE ENGINEER BUILDINGS DIVISION 4,156,000 4,156,000 4,156,000

BADIN

_______________________________________________________________________________

Page 376: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

375

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

DD0372 EXECUTIVE ENGINEER BUILDINGS DIVISIONDADU

A13 TOTAL REPAIRS AND MAINTENANCE 6,728,000 6,728,000 6,728,000

A133 TOTAL BUILDINGS AND 6,728,000 6,728,000 6,728,000

STRUCTURE

A13301 Office Buildings 4,607,000 4,607,000 4,607,000

1 Office Buildings 4,607,000 4,607,000

A13302 Residential Buildings 2,121,000 2,121,000 2,121,000

_______________________________________________________________________________EXECUTIVE ENGINEER BUILDINGS DIVISION 6,728,000 6,728,000 6,728,000

DADU

_______________________________________________________________________________

Page 377: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

376

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

GO0254 EXECUTIVE ENGINEER BUILDINGS DIVISIONGHOTKI

A13 TOTAL REPAIRS AND MAINTENANCE 3,255,000 3,255,000 3,255,000

A133 TOTAL BUILDINGS AND 3,255,000 3,255,000 3,255,000

STRUCTURE

A13301 Office Buildings 2,426,000 2,426,000 2,426,000

1 Office Buildings 2,426,000 2,426,000

A13302 Residential Buildings 829,000 829,000 829,000

_______________________________________________________________________________EXECUTIVE ENGINEER BUILDINGS DIVISION 3,255,000 3,255,000 3,255,000

GHOTKI

_______________________________________________________________________________

Page 378: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

377

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

HB0630 EXECUTIVE ENGINEER BUILDINGS DIVISIONHYDERABAD

A13 TOTAL REPAIRS AND MAINTENANCE 73,350,000 73,350,000 73,350,000

A133 TOTAL BUILDINGS AND 73,350,000 73,350,000 73,350,000

STRUCTURE

A13301 Office Buildings 48,790,000 48,790,000 48,790,000

1 Office Buildings 48,790,000 48,790,000

A13302 Residential Buildings 24,560,000 24,560,000 24,560,000

_______________________________________________________________________________EXECUTIVE ENGINEER BUILDINGS DIVISION 73,350,000 73,350,000 73,350,000

HYDERABAD

_______________________________________________________________________________

Page 379: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

378

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

JK0241 EXECUTIVE ENGINEER BUILDINGS DIVISIONJACOBABAD

A13 TOTAL REPAIRS AND MAINTENANCE 6,298,000 6,298,000 6,298,000

A133 TOTAL BUILDINGS AND 6,298,000 6,298,000 6,298,000

STRUCTURE

A13301 Office Buildings 4,110,000 4,110,000 4,110,000

1 Office Buildings 4,110,000 4,110,000

A13302 Residential Buildings 2,188,000 2,188,000 2,188,000

_______________________________________________________________________________EXECUTIVE ENGINEER BUILDINGS DIVISION 6,298,000 6,298,000 6,298,000

JACOBABAD

_______________________________________________________________________________

Page 380: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

379

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

JO0252 EXECUTIVE ENGINEER BUILDINGS DIVISIONJAMSHORO

A13 TOTAL REPAIRS AND MAINTENANCE 14,146,000 14,146,000 14,146,000

A133 TOTAL BUILDINGS AND 14,146,000 14,146,000 14,146,000

STRUCTURE

A13301 Office Buildings 12,316,000 12,316,000 12,316,000

1 Office Buildings 12,316,000 12,316,000

A13302 Residential Buildings 1,830,000 1,830,000 1,830,000

_______________________________________________________________________________EXECUTIVE ENGINEER BUILDINGS DIVISION 14,146,000 14,146,000 14,146,000

JAMSHORO

_______________________________________________________________________________

Page 381: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

380

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KK0253 EXECUTIVE ENGINEER BUILDINGS DIVISIONKASHMORE @ KANDHKOT

A13 TOTAL REPAIRS AND MAINTENANCE 1,485,000 4,130,000 1,485,000

A133 TOTAL BUILDINGS AND 1,485,000 4,130,000 1,485,000

STRUCTURE

A13301 Office Buildings 1,485,000 4,130,000 1,485,000

1 Office Buildings 4,130,000 1,485,000

_______________________________________________________________________________EXECUTIVE ENGINEER BUILDINGS DIVISION 1,485,000 4,130,000 1,485,000

KASHMORE @ KANDHKOT

_______________________________________________________________________________

Page 382: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

381

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ2001 EXECUTIVE ENGINEER BUILDINGS DIVISION-IKARACHI

A13 TOTAL REPAIRS AND MAINTENANCE 54,730,000 54,730,000 54,730,000

A133 TOTAL BUILDINGS AND 54,730,000 54,730,000 54,730,000

STRUCTURE

A13301 Office Buildings 19,646,000 19,646,000 19,646,000

1 Office Buildings 19,646,000 19,646,000

A13302 Residential Buildings 35,084,000 35,084,000 35,084,000

_______________________________________________________________________________EXECUTIVE ENGINEER BUILDINGS DIVISION-I 54,730,000 54,730,000 54,730,000

KARACHI

_______________________________________________________________________________

Page 383: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

382

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ2002 EXECUTIVE ENGINEER BUILDINGS DIVISION-IIKARACHI

A13 TOTAL REPAIRS AND MAINTENANCE 36,121,000 36,121,000 36,121,000

A133 TOTAL BUILDINGS AND 36,121,000 36,121,000 36,121,000

STRUCTURE

A13301 Office Buildings 33,993,000 33,993,000 33,993,000

1 Office Buildings 33,993,000 33,993,000

A13302 Residential Buildings 2,128,000 2,128,000 2,128,000

_______________________________________________________________________________EXECUTIVE ENGINEER BUILDINGS DIVISION-II 36,121,000 36,121,000 36,121,000

KARACHI

_______________________________________________________________________________

Page 384: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

383

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ2003 EXECUTIVE ENGINEER BUILDINGS DIVISIONIIIKARACHI

A13 TOTAL REPAIRS AND MAINTENANCE 54,180,000 54,180,000 54,180,000

A133 TOTAL BUILDINGS AND 54,180,000 54,180,000 54,180,000

STRUCTURE

A13301 Office Buildings 13,933,000 13,933,000 13,933,000

1 Office Buildings 13,933,000 13,933,000

A13302 Residential Buildings 40,247,000 40,247,000 40,247,000

_______________________________________________________________________________EXECUTIVE ENGINEER BUILDINGS DIVISIONIII 54,180,000 54,180,000 54,180,000

KARACHI

_______________________________________________________________________________

Page 385: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

384

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KX0592 EXECUTIVE ENGINEER BUILDINGS DIVISIONKHAIRPUR

A13 TOTAL REPAIRS AND MAINTENANCE 12,860,000 12,860,000 12,860,000

A133 TOTAL BUILDINGS AND 12,860,000 12,860,000 12,860,000

STRUCTURE

A13301 Office Buildings 9,698,000 9,698,000 9,698,000

1 Office Buildings 9,698,000 9,698,000

A13302 Residential Buildings 3,162,000 3,162,000 3,162,000

_______________________________________________________________________________EXECUTIVE ENGINEER BUILDINGS DIVISION 12,860,000 12,860,000 12,860,000

KHAIRPUR

_______________________________________________________________________________

Page 386: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

385

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

LN0460 EXECUTIVE ENGINEER BUILDINGS DIVISIONLARKANA

A13 TOTAL REPAIRS AND MAINTENANCE 20,616,000 20,616,000 20,616,000

A133 TOTAL BUILDINGS AND 20,616,000 20,616,000 20,616,000

STRUCTURE

A13301 Office Buildings 14,358,000 14,358,000 14,358,000

1 Office Buildings 14,358,000 14,358,000

A13302 Residential Buildings 6,258,000 6,258,000 6,258,000

_______________________________________________________________________________EXECUTIVE ENGINEER BUILDINGS DIVISION 20,616,000 20,616,000 20,616,000

LARKANA

_______________________________________________________________________________

Page 387: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

386

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

MP0451 EXECUTIVE ENGINEER BUILDINGS DIVISIONMIRPURKHAS

A13 TOTAL REPAIRS AND MAINTENANCE 6,012,000 6,012,000 6,012,000

A133 TOTAL BUILDINGS AND 6,012,000 6,012,000 6,012,000

STRUCTURE

A13301 Office Buildings 3,652,000 3,652,000 3,652,000

1 Office Buildings 3,652,000 3,652,000

A13302 Residential Buildings 2,360,000 2,360,000 2,360,000

_______________________________________________________________________________EXECUTIVE ENGINEER BUILDINGS DIVISION 6,012,000 6,012,000 6,012,000

MIRPURKHAS

_______________________________________________________________________________

Page 388: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

387

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

MX0351 EXECUTIVE ENGINEER BUILDINGS DIVISIONTHARPARKAR

A13 TOTAL REPAIRS AND MAINTENANCE 2,884,000 2,884,000 2,884,000

A133 TOTAL BUILDINGS AND 2,884,000 2,884,000 2,884,000

STRUCTURE

A13301 Office Buildings 1,266,000 1,266,000 1,266,000

1 Office Buildings 1,266,000 1,266,000

A13302 Residential Buildings 1,618,000 1,618,000 1,618,000

_______________________________________________________________________________EXECUTIVE ENGINEER BUILDINGS DIVISION 2,884,000 2,884,000 2,884,000

THARPARKAR

_______________________________________________________________________________

Page 389: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

388

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

MY0216 EXECUTIVE ENGINEER BUILDINGS DIVISIONMATIARI

A13 TOTAL REPAIRS AND MAINTENANCE 2,579,000 2,579,000 2,579,000

A133 TOTAL BUILDINGS AND 2,579,000 2,579,000 2,579,000

STRUCTURE

A13301 Office Buildings 2,161,000 2,161,000 2,161,000

1 Office Buildings 2,161,000 2,161,000

A13302 Residential Buildings 418,000 418,000 418,000

_______________________________________________________________________________EXECUTIVE ENGINEER BUILDINGS DIVISION 2,579,000 2,579,000 2,579,000

MATIARI

_______________________________________________________________________________

Page 390: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

389

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

NX0353 EXECUTIVE ENGINEER BUILDINGS DIVISIONNAUSHERO FEROZE

A13 TOTAL REPAIRS AND MAINTENANCE 4,892,000 13,381,000 4,892,000

A133 TOTAL BUILDINGS AND 4,892,000 13,381,000 4,892,000

STRUCTURE

A13301 Office Buildings 3,328,000 3,328,000 3,328,000

1 Office Buildings 3,328,000 3,328,000

A13302 Residential Buildings 1,564,000 10,053,000 1,564,000

_______________________________________________________________________________EXECUTIVE ENGINEER BUILDINGS DIVISION 4,892,000 13,381,000 4,892,000

NAUSHERO FEROZE

_______________________________________________________________________________

Page 391: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

390

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

QS0280 EXECUTIVE ENGINEER BUILDINGS DIVISIONKAMBER-SHAHDADKOT @ KAMBER

A13 TOTAL REPAIRS AND MAINTENANCE 2,207,000 2,207,000 15,000,000

A133 TOTAL BUILDINGS AND 2,207,000 2,207,000 15,000,000

STRUCTURE

A13301 Office Buildings 2,101,000 2,101,000 10,000,000

1 Office Buildings 2,101,000 10,000,000

A13302 Residential Buildings 106,000 106,000 5,000,000

_______________________________________________________________________________EXECUTIVE ENGINEER BUILDINGS DIVISION 2,207,000 2,207,000 15,000,000

KAMBER-SHAHDADKOT @ KAMBER

_______________________________________________________________________________

Page 392: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

391

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SB0422 EXECUTIVE ENGINEER BUILDINGS DIVISIONSHAHEED BENAZIRABAD

A13 TOTAL REPAIRS AND MAINTENANCE 13,473,000 15,963,000 13,473,000

A133 TOTAL BUILDINGS AND 13,473,000 15,963,000 13,473,000

STRUCTURE

A13301 Office Buildings 8,286,000 8,286,000 8,286,000

1 Office Buildings 8,286,000 8,286,000

A13302 Residential Buildings 5,187,000 7,677,000 5,187,000

_______________________________________________________________________________EXECUTIVE ENGINEER BUILDINGS DIVISION 13,473,000 15,963,000 13,473,000

SHAHEED BENAZIRABAD

_______________________________________________________________________________

Page 393: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

392

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SL0041 EXECUTIVE ENGINEER BUILDINGS DIVISIONSAJAWAL

A13 TOTAL REPAIRS AND MAINTENANCE 2,027,000 2,027,000 2,027,000

A133 TOTAL BUILDINGS AND 2,027,000 2,027,000 2,027,000

STRUCTURE

A13301 Office Buildings 1,188,000 1,188,000 1,188,000

1 Office Buildings 1,188,000 1,188,000

A13302 Residential Buildings 839,000 839,000 839,000

_______________________________________________________________________________EXECUTIVE ENGINEER BUILDINGS DIVISION 2,027,000 2,027,000 2,027,000

SAJAWAL

_______________________________________________________________________________

Page 394: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

393

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SN0412 EXECUTIVE ENGINEER BUILDINGS DIVISIONSANGHAR

A13 TOTAL REPAIRS AND MAINTENANCE 5,191,000 15,982,000 5,191,000

A133 TOTAL BUILDINGS AND 5,191,000 15,982,000 5,191,000

STRUCTURE

A13301 Office Buildings 3,056,000 3,056,000 3,056,000

1 Office Buildings 3,056,000 3,056,000

A13302 Residential Buildings 2,135,000 12,926,000 2,135,000

_______________________________________________________________________________EXECUTIVE ENGINEER BUILDINGS DIVISION 5,191,000 15,982,000 5,191,000

SANGHAR

_______________________________________________________________________________

Page 395: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

394

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SQ0356 EXECUTIVE ENGINEER BUILDINGS DIVISIONSHIKARPUR

A13 TOTAL REPAIRS AND MAINTENANCE 5,329,000 5,329,000 5,329,000

A133 TOTAL BUILDINGS AND 5,329,000 5,329,000 5,329,000

STRUCTURE

A13301 Office Buildings 4,096,000 4,096,000 4,096,000

1 Office Buildings 4,096,000 4,096,000

A13302 Residential Buildings 1,233,000 1,233,000 1,233,000

_______________________________________________________________________________EXECUTIVE ENGINEER BUILDINGS DIVISION 5,329,000 5,329,000 5,329,000

SHIKARPUR

_______________________________________________________________________________

Page 396: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

395

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SY0463 EXECUTIVE ENGINEER BUILDINGS DIVISIONSUKKUR

A13 TOTAL REPAIRS AND MAINTENANCE 12,317,000 12,317,000 12,317,000

A133 TOTAL BUILDINGS AND 12,317,000 12,317,000 12,317,000

STRUCTURE

A13301 Office Buildings 7,849,000 7,849,000 7,849,000

1 Office Buildings 7,849,000 7,849,000

A13302 Residential Buildings 4,468,000 4,468,000 4,468,000

_______________________________________________________________________________EXECUTIVE ENGINEER BUILDINGS DIVISION 12,317,000 12,317,000 12,317,000

SUKKUR

_______________________________________________________________________________

Page 397: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

396

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

TN0213 EXECUTIVE ENGINEER BUILDINGS DIVISIONTANDO MUHAMMAD KHAN

A13 TOTAL REPAIRS AND MAINTENANCE 2,598,000 2,598,000 2,598,000

A133 TOTAL BUILDINGS AND 2,598,000 2,598,000 2,598,000

STRUCTURE

A13301 Office Buildings 1,498,000 1,498,000 1,498,000

1 Office Buildings 1,498,000 1,498,000

A13302 Residential Buildings 1,100,000 1,100,000 1,100,000

_______________________________________________________________________________EXECUTIVE ENGINEER BUILDINGS DIVISION 2,598,000 2,598,000 2,598,000

TANDO MUHAMMAD KHAN

_______________________________________________________________________________

Page 398: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

397

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

TQ0217 EXECUTIVE ENGINEER BUILDINGS DIVISIONTANDO ALLAH YAR

A13 TOTAL REPAIRS AND MAINTENANCE 3,779,000 3,779,000 3,779,000

A133 TOTAL BUILDINGS AND 3,779,000 3,779,000 3,779,000

STRUCTURE

A13301 Office Buildings 1,439,000 1,439,000 1,439,000

1 Office Buildings 1,439,000 1,439,000

A13302 Residential Buildings 2,340,000 2,340,000 2,340,000

_______________________________________________________________________________EXECUTIVE ENGINEER BUILDINGS DIVISION 3,779,000 3,779,000 3,779,000

TANDO ALLAH YAR

_______________________________________________________________________________

Page 399: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

398

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

TX0379 EXECUTIVE ENGINEER BUILDINGS DIVISIONTHATTA

A13 TOTAL REPAIRS AND MAINTENANCE 2,027,000 2,027,000 2,027,000

A133 TOTAL BUILDINGS AND 2,027,000 2,027,000 2,027,000

STRUCTURE

A13301 Office Buildings 1,188,000 1,188,000 1,188,000

1 Office Buildings 1,188,000 1,188,000

A13302 Residential Buildings 839,000 839,000 839,000

_______________________________________________________________________________EXECUTIVE ENGINEER BUILDINGS DIVISION 2,027,000 2,027,000 2,027,000

THATTA

_______________________________________________________________________________

Page 400: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

399

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

UT0306 EXECUTIVE ENGINEER BUILDINGS DIVISIONUMERKOT

A13 TOTAL REPAIRS AND MAINTENANCE 2,923,000 2,923,000 2,923,000

A133 TOTAL BUILDINGS AND 2,923,000 2,923,000 2,923,000

STRUCTURE

A13301 Office Buildings 1,995,000 1,995,000 1,995,000

1 Office Buildings 1,995,000 1,995,000

A13302 Residential Buildings 928,000 928,000 928,000

_______________________________________________________________________________EXECUTIVE ENGINEER BUILDINGS DIVISION 2,923,000 2,923,000 2,923,000

UMERKOT

_______________________________________________________________________________

Page 401: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

400

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

HB0199 BUILDINGS CIRCLE HYDERABAD

A01 TOTAL EMPLOYEES RELATED EXPENSES. 15,414,000 15,223,000 17,331,000

A011 TOTAL PAY 32 32 9,254,000 9,713,000 10,685,000

A011-1 TOTAL PAY OF OFFICERS 5 8 3,465,000 3,667,000 4,034,000

A01101 Total Basic Pay Of Officer 5 8 3,393,000 3,559,000 3,915,000

S241 SUPERINTENDING ENGINEER (BPS-19) 1 1 1,269,000 929,000 1,022,000

A218 ASSISTANT ENGINEER (BPS-17) 1 1 653,000 477,000 526,000

P051 PLANNING OFFICER (BPS-17) 1 1 655,000 479,000 526,000

S236 SUPERINTENDENT (BPS-17) 1 479,000 526,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 3 896,000 986,000

C101 CIRCLE HEAD DRAFTSMEN (BPS-16) 1 1 408,000 299,000 329,000

S236 SUPERINTENDENT (BPS-16) 1 408,000

A01102 Personal pay 72,000 108,000 119,000

A011-2 TOTAL PAY OF OTHER STAFF 27 24 5,789,000 6,046,000 6,651,000

A01151 Total Basic Pay Other Staff 27 24 5,780,000 6,027,000 6,630,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 3 818,000

S053 SENIOR CLERK (BPS-14) 3 827,000 910,000

S181 STENOGRAPHER (BPS-14) 1 1 273,000 334,000 367,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 256,000 313,000 344,000 DRAUGHTSMAN

C146 COMPUTER OPERATOR (BPS-12) 1 1 240,000 292,000 322,000

J053 JUNIOR CLERK (BPS-11) 4 1,103,000 1,213,000

D150 DRAUGHTSMAN (BPS-10) 2 2 437,000 534,000 588,000

A017 ACCOUNT CLERK (BPS-09) 3 3 635,000 777,000 853,000

S053 SENIOR CLERK (BPS-09) 3 635,000

J014 JR CLERK (BPS-07) 4 791,000

T047 TRACER (BPS-05) 1 1 368,000 225,000 248,000

Page 402: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

401

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

HB0199 BUILDINGS CIRCLE HYDERABAD

D161 DRIVER (BPS-04) 1 1 178,000 217,000 239,000

C092 CHOWKIDAR / WATCHMAN (BPS-01) 1 1 166,000 201,000 221,000

N003 NAIB QASID (BPS-01) 5 5 819,000 1,003,000 1,104,000

S008 SANITARY WORKER (BPS-01) 1 1 164,000 201,000 221,000

A01152 Personal pay 9,000 19,000 21,000

A012 TOTAL ALLOWANCES 6,160,000 5,510,000 6,646,000

A012-1 TOTAL REGULAR ALLOWANCES 6,146,000 5,496,000 6,631,000

A01202 House Rent Allowance 837,000 837,000 837,000

A01203 Conveyance Allowance 984,000 984,000 984,000

A01207 Washing Allowance 10,000 10,000 10,000

A0120D Integrated Allowance 15,000 15,000 15,000

A0120X Ad - hoc Allowance - 2010 1,694,000 1,528,000 1,528,000

A01217 Medical Allowance 772,000 772,000 772,000

A0121T Adhoc Relief Allowance 2013 180,000 180,000

A0121Z Adhoc Relief Allowance - 2014 3,000

A0122C Adhoc Relief Allowance - 2015 917,000 195,000 195,000

A0122M Adhoc Relief Allowance 2016 972,000 1,055,000

A01270 Others 917,000 1,055,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 14,000 14,000 15,000

A01274 Medical Charges 14,000 14,000 15,000

A03 TOTAL OPERATING EXPENSES 1,401,000 484,000 1,513,000

A032 TOTAL COMMUNICATIONS 139,000 139,000 147,000

A03201 Postage and Telegraph 11,000 11,000 12,000

A03202 Telephone and Trunk call 128,000 128,000 135,000

A033 TOTAL UTILITIES 918,000 1,000 1,010,000

A03303 Electricity 918,000 1,000 1,010,000

Page 403: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

402

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

HB0199 BUILDINGS CIRCLE HYDERABAD

A038 TOTAL TRAVEL & 242,000 242,000 247,000

TRANSPORTATION

A03805 Travelling Allowance 87,000 87,000 92,000

A03807 P.O.L Charges A.planes 155,000 155,000 155,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 102,000 102,000 109,000

A03901 Stationery 31,000 31,000 33,000

A03902 Printing and Publication 10,000 10,000 11,000

A03906 Uniforms and Protective Clothing 20,000 20,000 21,000

A03970 Others 41,000 41,000 44,000

1 Others 41,000 41,000 44,000

A13 TOTAL REPAIRS AND MAINTENANCE 54,000 54,000 60,000

A130 TOTAL TRANSPORT 26,000 26,000 29,000

A13001 Transport 26,000 26,000 29,000

A131 TOTAL MACHINERY AND 18,000 18,000 20,000

EQUIPMENT

A13101 Machinery and Equipment 18,000 18,000 20,000

A132 TOTAL FURNITURE AND 10,000 10,000 11,000

FIXTURE

A13201 Furniture and Fixture 10,000 10,000 11,000

_______________________________________________________________________________BUILDINGS CIRCLE HYDERABAD 16,869,000 15,761,000 18,904,000

_______________________________________________________________________________

Page 404: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

403

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

HB0200 BUILDING DIVISION HYDERABAD

A01 TOTAL EMPLOYEES RELATED EXPENSES. 122,811,000 129,395,000 146,647,000

A011 TOTAL PAY 411 411 70,223,000 79,428,000 87,373,000

A011-1 TOTAL PAY OF OFFICERS 6 7 4,467,000 4,789,000 5,269,000

A01101 Total Basic Pay Of Officer 6 7 4,386,000 4,631,000 5,095,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 933,000 893,000 982,000

A218 ASSISTANT ENGINEER (BPS-17) 4 4 2,988,000 2,848,000 3,135,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 1 445,000 489,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 465,000 445,000 489,000 OFFICER

A01102 Personal pay 81,000 158,000 174,000

A011-2 TOTAL PAY OF OTHER STAFF 405 404 65,756,000 74,639,000 82,104,000

A01151 Total Basic Pay Other Staff 405 404 65,548,000 74,246,000 81,671,000

S053 SENIOR CLERK (BPS-14) 7 1,641,000 1,805,000

S181 STENOGRAPHER (BPS-14) 1 1 248,000 284,000 312,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 234,000 266,000 293,000 DRAUGHTSMAN

A129 ASSISTANT / HEAD CLERK (BPS-11) 1 210,000

J053 JUNIOR CLERK (BPS-11) 8 1,875,000 2,063,000

S228 SUB-ENGINEER (BPS-11) 12 12 2,472,000 2,813,000 3,094,000

D150 DRAUGHTSMAN (BPS-10) 1 1 200,000 227,000 250,000

A017 ACCOUNT CLERK (BPS-09) 2 2 579,000 438,000 482,000

P026 PESH IMAM (BPS-09) 3 3 581,000 660,000 726,000

S053 SENIOR CLERK (BPS-09) 7 1,355,000

C041 CHARGE MAN / CHARGE (BPS-08) 1 1 188,000 213,000 234,000 MECHANICS

J014 JR CLERK (BPS-07) 8 1,448,000

P061 PLUMBER (BPS-06) 17 17 2,972,000 3,375,000 3,712,000

Page 405: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

404

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

HB0200 BUILDING DIVISION HYDERABAD

C136 COMPLAINT RECEIVER (BPS-05) 1 1 169,000 192,000 211,000

E021 ELECTRICIAN (BPS-05) 24 24 4,046,000 4,598,000 5,058,000

G010 GARDEN SUPERINTENDENT (BPS-05) 1 1 169,000 192,000 211,000

T022 TELEPHONE OPERATOR (BPS-05) 1 1 169,000 192,000 211,000

T047 TRACER (BPS-05) 1 1 169,000 192,000 211,000

W040 WIREMAN / LINEMAN (BPS-05) 7 7 1,180,000 1,341,000 1,475,000

W045 WORK MESTRY / DAROGHA (BPS-05) 35 35 5,900,000 6,706,000 7,377,000

C019 CARPAINTER (BPS-04) 10 10 1,624,000 1,847,000 2,032,000

C024 CARE TAKER (BPS-04) 2 2 323,000 369,000 406,000

D161 DRIVER (BPS-04) 5 5 812,000 923,000 1,016,000

F003 FARASH / HAMAL (BPS-04) 1 1 163,000 185,000 203,000

M024 MALI / KOTAR (BPS-04) 10 10 1,624,000 1,847,000 2,032,000

P168 PUMP OPERATOR (BPS-04) 43 43 7,143,000 7,941,000 8,736,000

S211 STORE MUNSHI (BPS-04) 2 2 323,000 369,000 406,000

C048 CHEMICAL MIXARER (BPS-02) 2 2 306,000 348,000 382,000

S006 SANITARY MATE (BPS-02) 8 8 1,223,000 1,390,000 1,529,000

V004 VALVE MAN (BPS-02) 14 14 2,142,000 2,433,000 2,676,000

B004 BAHASHTI (BPS-01) 1 1 150,000 171,000 188,000

B007 BALDAR (BPS-01) 3 3 449,000 512,000 563,000

B016 BEARER / ATTENDANT (BPS-01) 6 6 900,000 1,024,000 1,126,000

C092 CHOWKIDAR / WATCHMAN (BPS-01) 36 36 5,396,000 6,141,000 6,755,000

C111 CLEANER / HELPER / COLI (BPS-01) 65 65 9,741,000 11,088,000 12,197,000

C167 COOK (BPS-01) 3 3 449,000 512,000 563,000

D068 DHOBI / WASHER MAN (BPS-01) 2 2 300,000 341,000 375,000

F041 FITTER / FITTER MATE (BPS-01) 1 1 150,000 171,000 188,000

M020 MALHI / GARDEN ATTENDANT (BPS-01) 15 15 2,248,000 2,559,000 2,815,000

N003 NAIB QASID (BPS-01) 9 9 1,348,000 1,535,000 1,689,000

S008 SANITARY WORKER (BPS-01) 43 43 6,445,000 7,335,000 8,069,000

Page 406: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

405

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

HB0200 BUILDING DIVISION HYDERABAD

A01152 Personal pay 208,000 393,000 433,000

A012 TOTAL ALLOWANCES 52,588,000 49,967,000 59,274,000

A012-1 TOTAL REGULAR ALLOWANCES 52,574,000 49,953,000 59,259,000

A01202 House Rent Allowance 6,839,000 6,839,000 6,839,000

A01203 Conveyance Allowance 9,989,000 9,989,000 9,989,000

A01207 Washing Allowance 119,000 119,000 119,000

A0120D Integrated Allowance 34,000 34,000 34,000

A0120X Ad - hoc Allowance - 2010 13,919,000 13,155,000 13,155,000

A01216 Qualification Allowance 11,000 11,000 11,000

A01217 Medical Allowance 7,677,000 7,677,000 7,677,000

A0121A Ad - hoc Allowance - 2011 105,000

A0121M Adhoc Relief Allowance - 2012 2,000

A0121Q Audit and Accounts Allowance 66,000 66,000

A0121T Adhoc Relief Allowance 2013 2,346,000 2,346,000

A0121Z Adhoc Relief Allowance - 2014 72,000

A0122C Adhoc Relief Allowance - 2015 6,993,000 1,669,000 1,669,000

A0122M Adhoc Relief Allowance 2016 7,869,000 8,677,000

A01270 Others 6,993,000 8,677,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 14,000 14,000 15,000

A01274 Medical Charges 14,000 14,000 15,000

A03 TOTAL OPERATING EXPENSES 33,379,000 5,539,000 36,690,000

A032 TOTAL COMMUNICATIONS 65,000 65,000 69,000

A03201 Postage and Telegraph 14,000 14,000 15,000

A03202 Telephone and Trunk call 51,000 51,000 54,000

A033 TOTAL UTILITIES 32,939,000 5,099,000 36,234,000

A03301 Gas 1,670,000 1,670,000 1,837,000

A03302 Water 2,088,000 2,088,000 2,297,000

A03303 Electricity 29,181,000 1,341,000 32,100,000

Page 407: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

406

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

HB0200 BUILDING DIVISION HYDERABAD

A038 TOTAL TRAVEL & 216,000 216,000 218,000

TRANSPORTATION

A03805 Travelling Allowance 32,000 32,000 34,000

A03807 P.O.L Charges A.planes 184,000 184,000 184,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 159,000 159,000 169,000

A03901 Stationery 24,000 24,000 26,000

A03902 Printing and Publication 19,000 19,000 20,000

A03905 Newspapers Periodicals and Books 28,000 28,000 30,000

A03906 Uniforms and Protective Clothing 32,000 32,000 34,000

A03970 Others 56,000 56,000 59,000

1 Others 56,000 56,000 59,000

A13 TOTAL REPAIRS AND MAINTENANCE 52,000 52,000 57,000

A130 TOTAL TRANSPORT 9,000 9,000 10,000

A13001 Transport 9,000 9,000 10,000

A131 TOTAL MACHINERY AND 27,000 27,000 30,000

EQUIPMENT

A13101 Machinery and Equipment 27,000 27,000 30,000

A132 TOTAL FURNITURE AND 16,000 16,000 17,000

FIXTURE

A13201 Furniture and Fixture 16,000 16,000 17,000

_______________________________________________________________________________BUILDING DIVISION HYDERABAD 156,242,000 134,986,000 183,394,000

_______________________________________________________________________________

Page 408: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

407

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

HB0201 PROVINCIAL BUILDINGS DIVISION HYDERABAD

A13 TOTAL REPAIRS AND MAINTENANCE 726,813,000 494,150,000 861,844,000

A131 TOTAL MACHINERY AND 76,000 76,000 76,000

EQUIPMENT

A13101 Machinery and Equipment 76,000 76,000 76,000

A133 TOTAL BUILDINGS AND 726,737,000 494,074,000 861,768,000

STRUCTURE

A13301 Office Buildings 483,020,000 251,618,000 618,051,000

115 Office Buildings Services Hospital(HEALTH) 2,886,000 2,886,000 2,886,000

129 Office Building Shamsul Ulma Daudpota Library Hyd 39,376,000 39,376,000

135 Office Building Bhitshah Cultural Complex 105,001,000 105,001,000

136 Office Building Mehran Arts Council Latifabad Hyd 65,626,000 65,626,000

137 Office Building Sindh Provincial Museum Hyd 52,501,000 52,501,000

138 Office Buildings Other Hospital / Health Institutions (Health) 64,969,000 64,969,000 200,000,000

140 Office Buildings Agriculture Department 5,053,000 5,053,000 5,053,000

170 Office Buildings Livestock and Veterinary Department 433,000 433,000 433,000

191 Office Buildings District / Lower Courts (CIVIL WORKS) 14,439,000 14,439,000 14,439,000

192 Office Buildings Shahbaz Building (CIVIL WORKS) 72,189,000 72,189,000 72,189,000

193 Office Buildings Chief Engineer(B)(CIVIL WORKS) 3,465,000 3,465,000 3,465,000

231 Office Buildings Bureau of Statistics(P & D) 919,000 919,000 919,000

250 Office Buildings Other Department (C&W) 4,332,000 4,332,000 4,332,000

270 Office Buildings A.D.C Works 2,166,000 2,166,000 2,166,000

34 Office Buildings (Sindh Public Service Commission) 2,021,000 2,021,000 2,021,000

39 Office Buildings Others (G.A) 2,886,000 2,886,000 2,886,000

70 Office Buildings Food Department 14,439,000 14,439,000 14,439,000

91 Office Buildings Central Jails (J & C SETT ) 19,687,000 19,687,000 19,687,000

92 Office Buildings District Jails (J & C) 8,663,000 8,663,000 8,663,000

93 Office Buildings Lockups (J & C) 1,969,000 1,969,000 1,969,000

99 Office Buildings ATC Courts (Block Allocation) 31,102,000

A13302 Residential Buildings 243,717,000 242,456,000 243,717,000

110 Residential Buildings Health Services 28,876,000 28,876,000 28,876,000

13 Residential Buildings GOR Colony (G.A) 92,450,000 92,450,000 92,450,000

14 Residential Buildings Wahdet Colony (G.A) 50,533,000 50,533,000 50,533,000

15 Residential Buildings Peon Colony (G.A) 21,657,000 21,657,000 21,657,000

169 Residential Buildings Others (Agriculture) 5,053,000 5,053,000 5,053,000

170 Residential Buildings Livestock and Veterinary Department 2,886,000 2,886,000 2,886,000

Page 409: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

408

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

HB0201 PROVINCIAL BUILDINGS DIVISION HYDERABAD

190 Residential Buildings Civil Works 11,945,000 11,945,000 11,945,000

250 Residential Buildings Other Department (C&W) 2,886,000 2,886,000 2,886,000

251 Residential Buildings Rest/Circuit House (C & W) 4,332,000 4,332,000 4,332,000

270 Residential Buildings A.D.C Works 4,332,000 4,332,000 4,332,000

69 Residential Buildings Others (G.A) 4,332,000 4,332,000 4,332,000

70 Residential Buildings Food Department 2,886,000 1,625,000 2,886,000

90 Residential Buildings Jail and Convicts Settlement 11,549,000 11,549,000 11,549,000

_______________________________________________________________________________PROVINCIAL BUILDINGS DIVISION HYDERABAD 726,813,000 494,150,000 861,844,000

_______________________________________________________________________________

Page 410: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

409

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

HB0209 PROVINCIAL BUILDING DIVISION HYDERABADDISTRICT TANDO ALLAHYAR

A13 TOTAL REPAIRS AND MAINTENANCE 37,405,000 34,517,000 37,405,000

A133 TOTAL BUILDINGS AND 37,405,000 34,517,000 37,405,000

STRUCTURE

A13301 Office Buildings 14,241,000 12,075,000 14,241,000

140 Office Buildings Agriculture Department 5,579,000 5,579,000 5,579,000

190 Office Buildings Civil Works 1,444,000 1,444,000 1,444,000

250 Office Buildings Other Department (C&W) 2,886,000 2,886,000 2,886,000

71 Office Buildings Grain Godowns (FOOD) 4,332,000 2,166,000 4,332,000

A13302 Residential Buildings 23,164,000 22,442,000 23,164,000

140 Residential Buildings Agriculture Department 17,390,000 17,390,000 17,390,000

190 Residential Buildings Civil Works 2,886,000 2,886,000 2,886,000

250 Residential Buildings Other Department (C&W) 1,444,000 1,444,000 1,444,000

70 Residential Buildings Food Department 1,444,000 722,000 1,444,000

_______________________________________________________________________________PROVINCIAL BUILDING DIVISION HYDERABAD 37,405,000 34,517,000 37,405,000

DISTRICT TANDO ALLAHYAR

_______________________________________________________________________________

Page 411: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

410

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

HB0210 PROVINCIAL BUILDING DIVISION HYDERABADDISTRICT MATIARI

A13 TOTAL REPAIRS AND MAINTENANCE 25,530,000 17,852,000 25,530,000

A133 TOTAL BUILDINGS AND 25,530,000 17,852,000 25,530,000

STRUCTURE

A13301 Office Buildings 21,396,000 14,177,000 21,396,000

140 Office Buildings Agriculture Department 3,544,000 3,544,000 3,544,000

190 Office Buildings Civil Works 1,444,000 1,444,000 1,444,000

71 Office Buildings Grain Godowns (FOOD) 14,439,000 7,220,000 14,439,000

93 Office Buildings Lockups (J & C) 1,969,000 1,969,000 1,969,000

A13302 Residential Buildings 4,134,000 3,675,000 4,134,000

140 Residential Buildings Agriculture Department 722,000 722,000 722,000

190 Residential Buildings Civil Works 1,049,000 1,049,000 1,049,000

70 Residential Buildings Food Department 919,000 460,000 919,000

90 Residential Buildings Jail and Convicts Settlement 1,444,000 1,444,000 1,444,000

_______________________________________________________________________________PROVINCIAL BUILDING DIVISION HYDERABAD 25,530,000 17,852,000 25,530,000

DISTRICT MATIARI

_______________________________________________________________________________

Page 412: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

411

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

HB0211 PROVINCIAL BUILDING DIVISION HYDERABADDISTRICT JAMSHORO

A13 TOTAL REPAIRS AND MAINTENANCE 140,050,000 33,340,000 140,050,000

A133 TOTAL BUILDINGS AND 140,050,000 33,340,000 140,050,000

STRUCTURE

A13301 Office Buildings 121,935,000 15,619,000 121,935,000

130 Office Building Lal Shahbaz Qalandar Govt. Library 14,439,000 14,439,000

138 Office Buildings Other Hospital / Health Institutions (Health) 7,218,000 7,218,000 7,218,000

141 Office Building Lal Shahbaz Qalandar Museum 39,376,000 39,376,000

142 Office Building Lal Shahbaz Qalandar Oper Air Theatre 52,501,000 52,501,000

191 Office Buildings District / Lower Courts (CIVIL WORKS) 2,625,000 2,625,000 2,625,000

250 Office Buildings Other Department (C&W) 1,444,000 1,444,000 1,444,000

71 Office Buildings Grain Godowns (FOOD) 4,332,000 4,332,000 4,332,000

A13302 Residential Buildings 18,115,000 17,721,000 18,115,000

110 Residential Buildings Health Services 14,439,000 14,439,000 14,439,000

190 Residential Buildings Civil Works 1,444,000 1,444,000 1,444,000

251 Residential Buildings Rest/Circuit House (C & W) 1,444,000 1,444,000 1,444,000

70 Residential Buildings Food Department 788,000 394,000 788,000

_______________________________________________________________________________PROVINCIAL BUILDING DIVISION HYDERABAD 140,050,000 33,340,000 140,050,000

DISTRICT JAMSHORO

_______________________________________________________________________________

Page 413: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

412

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

HB0212 PROVINCIAL BUILDING DIVISION HYDERABADDISTRICT DADU

A13 TOTAL REPAIRS AND MAINTENANCE 66,632,000 44,122,000 66,632,000

A131 TOTAL MACHINERY AND 20,000 20,000 20,000

EQUIPMENT

A13101 Machinery and Equipment 20,000 20,000 20,000

A133 TOTAL BUILDINGS AND 66,612,000 44,102,000 66,612,000

STRUCTURE

A13301 Office Buildings 45,612,000 24,218,000 45,612,000

134 Office Building Allama I.I Qazi Public Library Dadu 17,063,000 17,063,000

140 Office Buildings Agriculture Department 788,000 788,000 788,000

191 Office Buildings District / Lower Courts (CIVIL WORKS) 5,776,000 5,776,000 5,776,000

250 Office Buildings Other Department (C&W) 2,166,000 2,166,000 2,166,000

71 Office Buildings Grain Godowns (FOOD) 8,663,000 4,332,000 8,663,000

92 Office Buildings District Jails (J & C) 9,187,000 9,187,000 9,187,000

93 Office Buildings Lockups (J & C) 1,969,000 1,969,000 1,969,000

A13302 Residential Buildings 21,000,000 19,884,000 21,000,000

140 Residential Buildings Agriculture Department 1,444,000 1,444,000 1,444,000

190 Residential Buildings Civil Works 7,218,000 7,218,000 7,218,000

250 Residential Buildings Other Department (C&W) 1,444,000 1,444,000 1,444,000

251 Residential Buildings Rest/Circuit House (C & W) 4,332,000 4,332,000 4,332,000

69 Residential Buildings Others (G.A) 1,444,000 1,444,000 1,444,000

70 Residential Buildings Food Department 2,232,000 1,116,000 2,232,000

90 Residential Buildings Jail and Convicts Settlement 2,886,000 2,886,000 2,886,000

_______________________________________________________________________________PROVINCIAL BUILDING DIVISION HYDERABAD 66,632,000 44,122,000 66,632,000

DISTRICT DADU

_______________________________________________________________________________

Page 414: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

413

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0531 PROVINCIAL BUILDINGS CIRCLE KARACHI

A01 TOTAL EMPLOYEES RELATED EXPENSES. 15,907,000 13,573,000 15,370,000

A011 TOTAL PAY 34 34 9,286,000 8,166,000 8,986,000

A011-1 TOTAL PAY OF OFFICERS 5 8 2,763,000 1,883,000 2,073,000

A01101 Total Basic Pay Of Officer 5 8 2,742,000 1,862,000 2,049,000

S241 SUPERINTENDING ENGINEER (BPS-19) 1 1 1,025,000 486,000 535,000

A131 ASSISTANT ENGINEER (BPS-17) 1 1 529,000 251,000 276,000

P051 PLANNING OFFICER (BPS-17) 1 1 528,000 250,000 275,000

S236 SUPERINTENDENT (BPS-17) 1 250,000 275,000

A235 ASSISTANT HEAD CLERK (BPS-16) 3 469,000 516,000

C101 CIRCLE HEAD DRAFTSMEN (BPS-16) 1 1 330,000 156,000 172,000

S236 SUPERINTENDENT (BPS-16) 1 330,000

A01102 Personal pay 21,000 21,000 24,000

A011-2 TOTAL PAY OF OTHER STAFF 29 26 6,523,000 6,283,000 6,913,000

A01151 Total Basic Pay Other Staff 29 26 6,514,000 6,271,000 6,899,000

S053 SENIOR CLERK (BPS-14) 3 799,000 879,000

S181 STENOGRAPHER (BPS-14) 1 1 311,000 322,000 355,000

D132 DIVISIONAL H-D / MAN (BPS-13) 1 1 294,000 302,000 333,000

C146 COMPUTER OPERATOR (BPS-12) 1 1 274,000 282,000 311,000

D026 DATA PROCESSING ASSISTANT (BPS-12) 1 1 101,000 282,000 311,000

A235 ASSISTANT HEAD CLERK (BPS-11) 3 776,000

J053 JUNIOR CLERK (BPS-11) 4 1,066,000 1,172,000

D150 DRAUGHTSMAN (BPS-10) 2 2 502,000 516,000 568,000

A017 ACCOUNT CLERK (BPS-09) 2 2 486,000 502,000 550,000

S053 SENIOR CLERK (BPS-09) 3 729,000

J014 JR CLERK (BPS-07) 4 909,000

Page 415: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

414

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0531 PROVINCIAL BUILDINGS CIRCLE KARACHI

T047 TRACER (BPS-05) 2 2 422,000 436,000 479,000

D161 DRIVER (BPS-04) 1 1 205,000 210,000 231,000

D003 DAFTARI (BPS-02) 1 1 194,000 197,000 217,000

C092 CHOWKIDAR / WATCHMAN (BPS-01) 1 1 187,000 194,000 213,000

N003 NAIB QASID (BPS-01) 5 5 937,000 969,000 1,067,000

S008 SANITARY WORKER (BPS-01) 1 1 187,000 194,000 213,000

A01152 Personal pay 9,000 12,000 14,000

A012 TOTAL ALLOWANCES 6,621,000 5,407,000 6,384,000

A012-1 TOTAL REGULAR ALLOWANCES 6,591,000 5,377,000 6,352,000

A01202 House Rent Allowance 938,000 938,000 938,000

A01203 Conveyance Allowance 1,135,000 1,135,000 1,135,000

A0120D Integrated Allowance 21,000 22,000 22,000

A0120X Ad - hoc Allowance - 2010 1,834,000 1,318,000 1,318,000

A01217 Medical Allowance 796,000 796,000 796,000

A0121T Adhoc Relief Allowance 2013 172,000 172,000

A01224 Entertainment Allowance 7,000 7,000 7,000

A01226 Computer Allowance 10,000 10,000 10,000

A0122C Adhoc Relief Allowance - 2015 925,000 164,000 164,000

A0122M Adhoc Relief Allowance 2016 815,000 895,000

A01270 Others 925,000 895,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 30,000 30,000 32,000

A01274 Medical Charges 30,000 30,000 32,000

A03 TOTAL OPERATING EXPENSES 509,000 509,000 530,000

A032 TOTAL COMMUNICATIONS 129,000 129,000 136,000

A03201 Postage and Telegraph 11,000 11,000 12,000

A03202 Telephone and Trunk call 118,000 118,000 124,000

Page 416: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

415

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0531 PROVINCIAL BUILDINGS CIRCLE KARACHI

A038 TOTAL TRAVEL & 262,000 262,000 268,000

TRANSPORTATION

A03805 Travelling Allowance 107,000 107,000 113,000

A03807 P.O.L Charges A.planes 155,000 155,000 155,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 118,000 118,000 126,000

A03901 Stationery 29,000 29,000 31,000

A03902 Printing and Publication 11,000 11,000 12,000

A03905 Newspapers Periodicals and Books 4,000 4,000 5,000

A03906 Uniforms and Protective Clothing 36,000 36,000 38,000

A03970 Others 38,000 38,000 40,000

1 Others 38,000 38,000 40,000

A09 TOTAL PHYSICAL ASSETS 567,000 567,000

A092 TOTAL COMPUTER EQUIPMENT 247,000 247,000

A09201 Hardware 247,000 247,000

120 Two Printers 70,000 70,000

TC2 Two Computer with LCD Monitor 160,000 160,000

UP6 Two UPS for Computer 17,000 17,000

A095 TOTAL PURCHASE OF 70,000 70,000

TRANSPORT

A09501 Transport 70,000 70,000

OM1 One Motorcycle (70cc) 70,000 70,000

A097 TOTAL PURCHASE FURNITURE 250,000 250,000

& FIXTURE

A09701 Furniture and Fixtures 250,000 250,000

001 Furniture and Fixtures 250,000 250,000

A13 TOTAL REPAIRS AND MAINTENANCE 49,000 49,000 55,000

Page 417: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

416

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0531 PROVINCIAL BUILDINGS CIRCLE KARACHI

A130 TOTAL TRANSPORT 16,000 16,000 18,000

A13001 Transport 16,000 16,000 18,000

A131 TOTAL MACHINERY AND 16,000 16,000 18,000

EQUIPMENT

A13101 Machinery and Equipment 16,000 16,000 18,000

A132 TOTAL FURNITURE AND 9,000 9,000 10,000

FIXTURE

A13201 Furniture and Fixture 9,000 9,000 10,000

A137 TOTAL COMPUTER EQUIPMENT 8,000 8,000 9,000

A13701 Hardware 8,000 8,000 9,000

_______________________________________________________________________________PROVINCIAL BUILDINGS CIRCLE KARACHI 17,032,000 14,698,000 15,955,000

_______________________________________________________________________________

Page 418: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

417

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0534 BUILDING DIVISION KARACHI-I

A01 TOTAL EMPLOYEES RELATED EXPENSES. 85,957,000 84,442,000 95,536,000

A011 TOTAL PAY 279 279 49,601,000 51,459,000 56,606,000

A011-1 TOTAL PAY OF OFFICERS 6 7 3,279,000 3,671,000 4,039,000

A01101 Total Basic Pay Of Officer 6 7 3,249,000 3,526,000 3,879,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 651,000 643,000 707,000

A218 ASSISTANT ENGINEER (BPS-17) 3 3 1,560,000 1,537,000 1,692,000

C140 COMPTROLLER (BPS-17) 1 1 519,000 513,000 564,000

D129 DIVISIONAL ACCOUNTS (BPS-17) 1 1 519,000 513,000 564,000 OFFICER

A235 ASSISTANT HEAD CLERK (BPS-16) 1 320,000 352,000

A01102 Personal pay 30,000 145,000 160,000

A011-2 TOTAL PAY OF OTHER STAFF 273 272 46,322,000 47,788,000 52,567,000

A01151 Total Basic Pay Other Staff 273 272 45,900,000 47,139,000 51,853,000

A235 ASSISTANT HEAD CLERK (BPS-14) 1 250,000

S053 SENIOR CLERK (BPS-14) 7 1,501,000 1,652,000

S181 STENOGRAPHER (BPS-14) 1 1 252,000 260,000 286,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 237,000 243,000 268,000 DRAUGHTSMAN

D026 DATA PROCESSING ASSISTANT (BPS-12) 1 1 109,000 227,000 250,000

L065 LIFT TUBE-WELL / (BPS-12) 12 12 2,643,000 2,728,000 3,001,000 GENERATOR OPERATOR

J053 JUNIOR CLERK (BPS-11) 5 1,072,000 1,180,000

S228 SUB-ENGINEER (BPS-11) 10 10 2,077,000 2,145,000 2,359,000

D150 DRAUGHTSMAN (BPS-10) 1 1 202,000 208,000 229,000

A017 ACCOUNT CLERK (BPS-09) 1 1 195,000 201,000 221,000

S053 SENIOR CLERK (BPS-09) 7 1,364,000

J014 JR CLERK (BPS-07) 5 1,096,000

Page 419: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

418

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0534 BUILDING DIVISION KARACHI-I

M050 MECHANIC / ELM SUPERVISOR (BPS-07) 3 3 549,000 565,000 621,000

A011 AC MECHANIC (BPS-06) 1 1 80,000 184,000 195,000

C020 CAR PAINTER / CUM PAINTER (BPS-06) 2 2 353,000 363,000 400,000

P061 PLUMBER (BPS-06) 10 10 1,762,000 1,816,000 1,998,000

W043 WORK / GEN SUPERVISOR (BPS-06) 11 11 1,938,000 1,998,000 2,198,000

E021 ELECTRICIAN (BPS-05) 4 4 679,000 701,000 771,000

E041 ENQUIRY CLERK (BPS-05) 5 5 849,000 877,000 964,000

G036 GENERATOR OPERATOR (BPS-05) 1 1 81,000 175,000 193,000

G041 GLAZIER (BPS-05) 1 1 169,000 175,000 193,000

T050 TRACER (BPS-05) 1 1 169,000 175,000 193,000

W038 WIRE MAN (BPS-05) 15 15 2,549,000 2,630,000 2,893,000

W045 WORK MESTRY / DAROGHA (BPS-05) 6 6 1,019,000 1,052,000 1,157,000

C024 CARE TAKER (BPS-04) 1 1 164,000 169,000 186,000

C027 CARPENTER (BPS-04) 3 3 491,000 507,000 558,000

C173 COOKS (BPS-04) 2 2 328,000 338,000 372,000

D161 DRIVER (BPS-04) 3 3 818,000 507,000 558,000

M042 MASSAN MISTRY (BPS-04) 5 5 818,000 845,000 929,000

M089 METER READER (BPS-04) 1 1 164,000 169,000 186,000

P006 PAINTER (BPS-04) 2 2 328,000 338,000 372,000

P169 PUMP OPERATOR / DRIVER (BPS-04) 46 46 7,527,000 7,773,000 8,551,000

G079 GENERATOR /PUMP OPERATOR (BPS-03) 2 2 319,000 328,000 361,000

D003 DAFTARI (BPS-02) 1 1 154,000 159,000 175,000

E021 ELECTRICIAN (BPS-02) 3 3 462,000 477,000 525,000

B016 BEARER / ATTENDANT (BPS-01) 4 4 603,000 624,000 687,000

B026 BELDAR / COOLY (BPS-01) 24 24 3,625,000 3,746,000 4,121,000

B105 BELDAR/ HELPER (BPS-01) 2 2 303,000 312,000 343,000

C089 CHOWKIDAR (BPS-01) 14 14 2,114,000 2,185,000 2,404,000

C111 CLEANER / HELPER / COLI (BPS-01) 7 7 1,057,000 1,093,000 1,202,000

Page 420: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

419

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0534 BUILDING DIVISION KARACHI-I

C167 COOK (BPS-01) 6 6 906,000 937,000 1,030,000

D068 DHOBI / WASHER MAN (BPS-01) 1 1 151,000 156,000 172,000

F003 FARASH / HAMAL (BPS-01) 1 1 151,000 156,000 172,000

M021 MALHI / GARDEN ATTENDANT (BPS-01) 11 11 1,662,000 1,717,000 1,889,000 / HAED MALHI

M022 MALI (BPS-01) 1 1 151,000 156,000 172,000

M044 MATE (BPS-01) 8 8 1,209,000 1,249,000 1,374,000

N003 NAIB QASID (BPS-01) 6 6 904,000 937,000 1,030,000

S008 SANITARY WORKER (BPS-01) 4 4 603,000 624,000 687,000

S009 SANITARY WORKER / (BPS-01) 15 15 2,266,000 2,341,000 2,575,000 GUTTERMAN

A01152 Personal pay 421,000 645,000 710,000

A01153 Special pay 1,000 1,000 1,000

A01170 Others 3,000 3,000

A012 TOTAL ALLOWANCES 36,356,000 32,983,000 38,930,000

A012-1 TOTAL REGULAR ALLOWANCES 36,342,000 32,969,000 38,915,000

A01202 House Rent Allowance 4,926,000 4,926,000 4,926,000

A01203 Conveyance Allowance 6,698,000 6,698,000 6,698,000

A01207 Washing Allowance 2,000 2,000 2,000

A0120D Integrated Allowance 27,000 27,000 27,000

A0120X Ad - hoc Allowance - 2010 9,827,000 8,545,000 8,545,000

A01217 Medical Allowance 5,016,000 5,016,000 5,016,000

A0121M Adhoc Relief Allowance - 2012 9,000

A0121Q Audit and Accounts Allowance 89,000 89,000

A0121T Adhoc Relief Allowance 2013 16,000 1,411,000 1,411,000

A0121Z Adhoc Relief Allowance - 2014 11,000 56,000

A0122C Adhoc Relief Allowance - 2015 4,915,000 1,051,000 1,051,000

A0122M Adhoc Relief Allowance 2016 5,104,000 5,573,000

A01239 Special Allowance 4,000 4,000

A01244 Adhoc Relief 31,000

A01270 Others 4,904,000 5,573,000

Page 421: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

420

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0534 BUILDING DIVISION KARACHI-I

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 14,000 14,000 15,000

A01274 Medical Charges 14,000 14,000 15,000

A03 TOTAL OPERATING EXPENSES 38,639,000 38,659,000 42,112,000

A032 TOTAL COMMUNICATIONS 75,000 75,000 80,000

A03201 Postage and Telegraph 8,000 8,000 9,000

A03202 Telephone and Trunk call 67,000 67,000 71,000

A033 TOTAL UTILITIES 34,464,000 34,464,000 37,911,000

A03301 Gas 1,114,000 1,114,000 1,226,000

A03303 Electricity 33,350,000 33,350,000 36,685,000

A036 TOTAL MOTOR VEHICLES 20,000

A03603 Registration 20,000

A038 TOTAL TRAVEL & 249,000 249,000 254,000

TRANSPORTATION

A03805 Travelling Allowance 88,000 88,000 93,000

A03807 P.O.L Charges A.planes 161,000 161,000 161,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 3,851,000 3,851,000 3,867,000

A03901 Stationery 62,000 62,000 66,000

A03902 Printing and Publication 35,000 35,000 37,000

A03905 Newspapers Periodicals and Books 33,000 33,000 35,000

A03906 Uniforms and Protective Clothing 76,000 76,000 80,000

A03919 Payments to other for Service 3,582,000 3,582,000 3,582,000

Rendered

1 Others 282,000 282,000 282,000

274 Emergent Janitorial Services at GOR-I Karachi (GA) 3,300,000 3,300,000 3,300,000

A03970 Others 63,000 63,000 67,000

1 Others 63,000 63,000 67,000

Page 422: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

421

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0534 BUILDING DIVISION KARACHI-I

A09 TOTAL PHYSICAL ASSETS 1,039,000 1,144,000

A095 TOTAL PURCHASE OF 1,039,000 1,144,000

TRANSPORT

A09501 Transport 1,039,000 1,144,000

003 One Suzuki Cultus (1000 CC ) 1,039,000

3 Two Cars (800 CC) CNG 1,144,000

A13 TOTAL REPAIRS AND MAINTENANCE 49,000 49,000 55,000

A130 TOTAL TRANSPORT 21,000 21,000 24,000

A13001 Transport 21,000 21,000 24,000

A131 TOTAL MACHINERY AND 18,000 18,000 20,000

EQUIPMENT

A13101 Machinery and Equipment 18,000 18,000 20,000

A132 TOTAL FURNITURE AND 10,000 10,000 11,000

FIXTURE

A13201 Furniture and Fixture 10,000 10,000 11,000

_______________________________________________________________________________BUILDING DIVISION KARACHI-I 125,684,000 124,294,000 137,703,000

_______________________________________________________________________________

Page 423: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

422

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0535 BUILDING DIVISION KARACHI-II

A01 TOTAL EMPLOYEES RELATED EXPENSES. 77,313,000 79,647,000 90,411,000

A011 TOTAL PAY 228 215 45,446,000 49,985,000 54,984,000

A011-1 TOTAL PAY OF OFFICERS 6 7 4,897,000 5,858,000 6,445,000

A01101 Total Basic Pay Of Officer 6 7 4,796,000 5,757,000 6,333,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 959,000 1,049,000 1,154,000

A218 ASSISTANT ENGINEER (BPS-17) 4 4 3,070,000 3,349,000 3,683,000

D129 DIVISIONAL ACCOUNTS (BPS-17) 1 1 767,000 837,000 921,000 OFFICER

A129 ASSISTANT / HEAD CLERK (BPS-16) 1 522,000 575,000

A01102 Personal pay 101,000 101,000 112,000

A011-2 TOTAL PAY OF OTHER STAFF 222 208 40,549,000 44,127,000 48,539,000

A01151 Total Basic Pay Other Staff 222 208 40,113,000 43,465,000 47,812,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 1 264,000

S053 SENIOR CLERK (BPS-14) 7 1,692,000 1,861,000

S181 STENOGRAPHER (BPS-14) 1 1 264,000 293,000 322,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 250,000 274,000 302,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 7 1,692,000 1,861,000

S228 SUB-ENGINEER (BPS-11) 12 12 2,630,000 2,900,000 3,190,000

D150 DRAUGHTSMAN (BPS-10) 1 1 211,000 234,000 258,000

A017 ACCOUNT CLERK (BPS-09) 2 2 411,000 454,000 499,000

S053 SENIOR CLERK (BPS-09) 7 1,441,000

J014 JR CLERK (BPS-07) 7 1,541,000

M050 MECHANIC / ELM SUPERVISOR (BPS-07) 2 2 386,000 424,000 466,000

A011 AC MECHANIC (BPS-06) 3 3 558,000 611,000 676,000

E021 ELECTRICIAN (BPS-06) 1 1 186,000 205,000 225,000

Page 424: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

423

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0535 BUILDING DIVISION KARACHI-II

E022 ELECTRICIAN / HEAD (BPS-06) 11 11 2,046,000 2,251,000 2,477,000 ELECTRICIAN

F054 FOREMEN (BPS-06) 1 1 186,000 205,000 225,000

P061 PLUMBER (BPS-06) 10 10 1,859,000 2,047,000 2,251,000

W057 WORK SUPERVISOR / GENERAL(BPS-06) 13 13 2,418,000 2,661,000 2,927,000 SUPERVISOR / ROAD INSPEC

C027 CARPENTER (BPS-05) 1 1 179,000 198,000 217,000

E041 ENQUIRY CLERK (BPS-05) 4 4 717,000 790,000 869,000

L065 LIFT TUBE-WELL / (BPS-05) 12 12 2,151,000 2,371,000 2,608,000 GENERATOR OPERATOR

M135 MOTOR MECHANIC (BPS-05) 1 1 179,000 198,000 217,000

T047 TRACER (BPS-05) 2 2 359,000 395,000 435,000

W040 WIREMAN / LINEMAN (BPS-05) 3 3 539,000 593,000 652,000

W045 WORK MESTRY / DAROGHA (BPS-05) 7 7 1,255,000 1,383,000 1,521,000

C027 CARPENTER (BPS-04) 4 4 865,000 762,000 838,000

D161 DRIVER (BPS-04) 4 4 865,000 762,000 838,000

F003 FARASH / HAMAL (BPS-04) 4 3 690,000 762,000 838,000

L065 LIFT TUBE-WELL / (BPS-04) 4 4 690,000 762,000 838,000 GENERATOR OPERATOR

M042 MASSAN MISTRY (BPS-04) 2 2 345,000 381,000 419,000

P006 PAINTER (BPS-04) 2 2 345,000 381,000 419,000

P169 PUMP OPERATOR / DRIVER (BPS-04) 25 25 4,316,000 4,760,000 5,236,000

G012 GARDNER (BPS-02) 1 1 164,000 179,000 197,000

M044 MATE (BPS-02) 2 2 326,000 358,000 394,000

B004 BAHASHTI (BPS-01) 5 5 796,000 879,000 967,000

B026 BELDAR / COOLY (BPS-01) 9 9 1,433,000 1,583,000 1,741,000

C089 CHOWKIDAR (BPS-01) 7 7 1,117,000 1,231,000 1,354,000

C111 CLEANER / HELPER / COLI (BPS-01) 12 12 1,912,000 2,111,000 2,322,000

M020 MALHI / GARDEN ATTENDANT (BPS-01) 5 3 957,000 879,000 967,000

N003 NAIB QASID (BPS-01) 8 8 1,278,000 1,407,000 1,548,000

Page 425: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

424

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0535 BUILDING DIVISION KARACHI-II

S008 SANITARY WORKER (BPS-01) 25 15 3,984,000 4,397,000 4,837,000

A01152 Personal pay 435,000 660,000 726,000

A01153 Special pay 1,000 1,000 1,000

A01154 Good conduct pay 1,000

A012 TOTAL ALLOWANCES 31,867,000 29,662,000 35,427,000

A012-1 TOTAL REGULAR ALLOWANCES 31,804,000 29,599,000 35,360,000

A01202 House Rent Allowance 4,126,000 4,126,000 4,126,000

A01203 Conveyance Allowance 5,485,000 5,485,000 5,485,000

A01207 Washing Allowance 33,000 33,000 33,000

A0120D Integrated Allowance 25,000 27,000 27,000

A0120X Ad - hoc Allowance - 2010 9,065,000 8,322,000 8,322,000

A01217 Medical Allowance 4,088,000 4,088,000 4,088,000

A0121A Ad - hoc Allowance - 2011 16,000

A0121M Adhoc Relief Allowance - 2012 12,000

A0121Q Audit and Accounts Allowance 89,000 89,000

A0121T Adhoc Relief Allowance 2013 1,285,000 1,285,000

A0121Z Adhoc Relief Allowance - 2014 86,000

A0122C Adhoc Relief Allowance - 2015 4,491,000 1,075,000 1,075,000

A0122M Adhoc Relief Allowance 2016 4,865,000 5,415,000

A01244 Adhoc Relief 90,000

A01270 Others 4,491,000 5,415,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 63,000 63,000 67,000

A01274 Medical Charges 63,000 63,000 67,000

A03 TOTAL OPERATING EXPENSES 8,820,000 17,420,000 18,045,000

A032 TOTAL COMMUNICATIONS 104,000 104,000 110,000

A03201 Postage and Telegraph 10,000 10,000 11,000

A03202 Telephone and Trunk call 94,000 94,000 99,000

A033 TOTAL UTILITIES 5,003,000 5,003,000 5,504,000

A03303 Electricity 5,003,000 5,003,000 5,504,000

Page 426: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

425

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0535 BUILDING DIVISION KARACHI-II

A036 TOTAL MOTOR VEHICLES 20,000

A03603 Registration 20,000

A038 TOTAL TRAVEL & 202,000 202,000 207,000

TRANSPORTATION

A03805 Travelling Allowance 87,000 87,000 92,000

A03807 P.O.L Charges A.planes 115,000 115,000 115,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 3,511,000 12,091,000 12,224,000

A03901 Stationery 73,000 73,000 77,000

A03902 Printing and Publication 35,000 35,000 37,000

A03905 Newspapers Periodicals and Books 4,000 4,000 5,000

A03906 Uniforms and Protective Clothing 44,000 44,000 47,000

A03919 Payments to other for Service 3,300,000 11,880,000 12,000,000

Rendered

293 Cleaning & jantorial Services Sindh Sectt: 3,300,000 11,880,000 12,000,000

A03970 Others 55,000 55,000 58,000

1 Others 55,000 55,000 58,000

A09 TOTAL PHYSICAL ASSETS 1,300,000 1,405,000

A092 TOTAL COMPUTER EQUIPMENT 247,000 247,000

A09201 Hardware 247,000 247,000

120 Two Printers 70,000 70,000

TC2 Two Computer with LCD Monitor 160,000 160,000

UP6 Two UPS for Computer 17,000 17,000

A095 TOTAL PURCHASE OF 1,039,000 1,144,000

TRANSPORT

A09501 Transport 1,039,000 1,144,000

003 One Suzuki Cultus (1000 CC ) 1,039,000

3 Two Cars (800 CC) CNG 1,144,000

Page 427: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

426

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0535 BUILDING DIVISION KARACHI-II

A096 TOTAL PURCHASE OF PLANT & 14,000 14,000

MACHINERY

A09601 Plant and Machinery 14,000 14,000

365 One Water Dispenser 14,000 14,000

A13 TOTAL REPAIRS AND MAINTENANCE 7,635,000 7,635,000 7,640,000

A130 TOTAL TRANSPORT 12,000 12,000 14,000

A13001 Transport 12,000 12,000 14,000

A131 TOTAL MACHINERY AND 7,615,000 7,615,000 7,617,000

EQUIPMENT

A13101 Machinery and Equipment 15,000 15,000 17,000

A13199 Others 7,600,000 7,600,000 7,600,000

148 Operation & Maintenance Of lifts at Sindh Sectt.I.II.III & FD 4,300,000 4,300,000 4,300,000

149 Operation & Maintenance of Generators at Sindh Sectt I,II & III 3,300,000 3,300,000 3,300,000

A132 TOTAL FURNITURE AND 8,000 8,000 9,000

FIXTURE

A13201 Furniture and Fixture 8,000 8,000 9,000

_______________________________________________________________________________BUILDING DIVISION KARACHI-II 95,068,000 106,107,000 116,096,000

_______________________________________________________________________________

Page 428: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

427

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0536 BUILDING DIVISION KARACHI-III

A01 TOTAL EMPLOYEES RELATED EXPENSES. 84,372,000 78,300,000 87,343,000

A011 TOTAL PAY 254 254 47,961,000 46,382,000 51,021,000

A011-1 TOTAL PAY OF OFFICERS 6 7 3,456,000 4,046,000 4,452,000

A01101 Total Basic Pay Of Officer 6 7 3,445,000 4,017,000 4,419,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 690,000 732,000 805,000

A131 ASSISTANT ENGINEER (BPS-17) 4 4 2,204,000 2,336,000 2,570,000

D129 DIVISIONAL ACCOUNTS (BPS-17) 1 1 551,000 584,000 643,000 OFFICER

A129 ASSISTANT / HEAD CLERK (BPS-16) 1 365,000 401,000

A01102 Personal pay 13,000 15,000

A01105 Qualification Pay 11,000 16,000 18,000

A011-2 TOTAL PAY OF OTHER STAFF 248 247 44,505,000 42,336,000 46,569,000

A01151 Total Basic Pay Other Staff 248 247 44,157,000 41,670,000 45,837,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 1 296,000

S053 SENIOR CLERK (BPS-14) 7 1,449,000 1,594,000

S181 STENOGRAPHER (BPS-14) 1 1 294,000 251,000 276,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 276,000 235,000 259,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 8 1,656,000 1,822,000

S222 SUB ENGINEER (BPS-11) 12 12 2,919,000 2,484,000 2,733,000

D150 DRAUGHTSMAN (BPS-10) 1 1 235,000 201,000 221,000

A017 ACCOUNT CLERK (BPS-09) 3 3 687,000 583,000 641,000

S053 SENIOR CLERK (BPS-09) 7 1,600,000

W057 WORK SUPERVISOR / GENERAL(BPS-08) 9 9 1,991,000 1,691,000 1,860,000 SUPERVISOR / ROAD INSPEC

A011 AC MECHANIC (BPS-07) 3 3 642,000 545,000 599,000

J014 JR CLERK (BPS-07) 8 1,710,000

Page 429: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

428

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0536 BUILDING DIVISION KARACHI-III

K013 KEY BOARD OPERATOR (BPS-07) 1 1 213,000 182,000 200,000

M049 MECHANIC (BPS-07) 1 1 213,000 182,000 200,000

E021 ELECTRICIAN (BPS-06) 4 4 694,000 701,000 771,000

P061 PLUMBER (BPS-06) 13 13 2,205,000 2,279,000 2,507,000

A011 AC MECHANIC (BPS-05) 1 1 168,000 169,000 185,000

C027 CARPENTER (BPS-05) 9 9 1,666,000 1,523,000 1,676,000

E021 ELECTRICIAN (BPS-05) 5 5 996,000 846,000 931,000

E041 ENQUIRY CLERK (BPS-05) 4 4 797,000 677,000 745,000

L065 LIFT TUBE-WELL / (BPS-05) 10 10 1,991,000 1,692,000 1,861,000 GENERATOR OPERATOR

W040 WIREMAN / LINEMAN (BPS-05) 14 14 2,788,000 2,369,000 2,606,000

W045 WORK MESTRY / DAROGHA (BPS-05) 5 5 996,000 846,000 931,000

W057 WORK SUPERVISOR / GENERAL(BPS-05) 3 3 503,000 508,000 558,000 SUPERVISOR / ROAD INSPEC

D161 DRIVER (BPS-04) 5 5 958,000 816,000 897,000

L065 LIFT TUBE-WELL / (BPS-04) 13 13 932,000 2,120,000 2,333,000 GENERATOR OPERATOR

M042 MASSAN MISTRY (BPS-04) 3 3 575,000 489,000 538,000

P006 PAINTER (BPS-04) 2 2 383,000 326,000 359,000

P069 POLISHER (BPS-04) 1 1 192,000 163,000 179,000

P168 PUMP OPERATOR (BPS-04) 31 31 5,500,000 5,056,000 5,562,000

W057 WORK SUPERVISOR / GENERAL(BPS-04) 2 2 162,000 326,000 359,000 SUPERVISOR / ROAD INSPEC

T047 TRACER (BPS-02) 2 2 361,000 307,000 338,000

B026 BELDAR / COOLY (BPS-01) 23 23 3,864,000 3,465,000 3,811,000

C092 CHOWKIDAR / WATCHMAN (BPS-01) 7 7 1,238,000 1,055,000 1,160,000

C111 CLEANER / HELPER / COLI (BPS-01) 4 4 501,000 602,000 662,000

G036 GENERATOR OPERATOR (BPS-01) 1 1 178,000 151,000 166,000

M044 MATE (BPS-01) 1 1 178,000 151,000 166,000

N003 NAIB QASID (BPS-01) 8 8 1,412,000 1,205,000 1,326,000

Page 430: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

429

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0536 BUILDING DIVISION KARACHI-III

S008 SANITARY WORKER (BPS-01) 17 17 3,007,000 2,561,000 2,817,000

S009 SANITARY WORKER / (BPS-01) 12 12 836,000 1,808,000 1,988,000 GUTTERMAN

A01152 Personal pay 346,000 663,000 730,000

A01153 Special pay 2,000 2,000 2,000

A01154 Good conduct pay 1,000

A012 TOTAL ALLOWANCES 36,411,000 31,918,000 36,322,000

A012-1 TOTAL REGULAR ALLOWANCES 33,856,000 28,642,000 33,641,000

A01202 House Rent Allowance 4,345,000 4,345,000 4,345,000

A01203 Conveyance Allowance 5,332,000 5,332,000 5,332,000

A01207 Washing Allowance 5,000 5,000 5,000

A0120D Integrated Allowance 33,000 33,000 33,000

A0120X Ad - hoc Allowance - 2010 10,159,000 7,715,000 7,715,000

A01217 Medical Allowance 3,871,000 3,871,000 3,871,000

A0121Q Audit and Accounts Allowance 95,000 95,000

A0121T Adhoc Relief Allowance 2013 649,000 1,235,000 1,235,000

A0121Z Adhoc Relief Allowance - 2014 433,000 433,000

A0122C Adhoc Relief Allowance - 2015 4,731,000 937,000 937,000

A0122M Adhoc Relief Allowance 2016 4,578,000 5,026,000

A01244 Adhoc Relief 42,000

A01264 Technical Allowance 21,000 21,000

A01270 Others 4,298,000 5,026,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 2,555,000 3,276,000 2,681,000

A01273 Honoraria 1,042,000 1,763,000 1,042,000

A01274 Medical Charges 513,000 513,000 539,000

A01282 Session Allowance 1,000,000 1,000,000 1,100,000

A03 TOTAL OPERATING EXPENSES 7,107,000 7,127,000 7,791,000

A032 TOTAL COMMUNICATIONS 42,000 42,000 45,000

A03201 Postage and Telegraph 8,000 8,000 9,000

A03202 Telephone and Trunk call 34,000 34,000 36,000

Page 431: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

430

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0536 BUILDING DIVISION KARACHI-III

A033 TOTAL UTILITIES 6,670,000 6,670,000 7,337,000

A03303 Electricity 6,670,000 6,670,000 7,337,000

A036 TOTAL MOTOR VEHICLES 20,000

A03603 Registration 20,000

A038 TOTAL TRAVEL & 233,000 233,000 237,000

TRANSPORTATION

A03805 Travelling Allowance 80,000 80,000 84,000

A03807 P.O.L Charges A.planes 153,000 153,000 153,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 162,000 162,000 172,000

A03901 Stationery 44,000 44,000 47,000

A03902 Printing and Publication 36,000 36,000 38,000

A03906 Uniforms and Protective Clothing 31,000 31,000 33,000

A03970 Others 51,000 51,000 54,000

1 Others 51,000 51,000 54,000

A09 TOTAL PHYSICAL ASSETS 1,039,000 1,144,000

A095 TOTAL PURCHASE OF 1,039,000 1,144,000

TRANSPORT

A09501 Transport 1,039,000 1,144,000

003 One Suzuki Cultus (1000 CC ) 1,039,000

3 Two Cars (800 CC) CNG 1,144,000

A13 TOTAL REPAIRS AND MAINTENANCE 99,000 99,000 109,000

A130 TOTAL TRANSPORT 34,000 34,000 38,000

A13001 Transport 34,000 34,000 38,000

Page 432: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

431

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0536 BUILDING DIVISION KARACHI-III

A131 TOTAL MACHINERY AND 35,000 35,000 39,000

EQUIPMENT

A13101 Machinery and Equipment 35,000 35,000 39,000

A132 TOTAL FURNITURE AND 30,000 30,000 32,000

FIXTURE

A13201 Furniture and Fixture 30,000 30,000 32,000

_______________________________________________________________________________BUILDING DIVISION KARACHI-III 92,617,000 86,670,000 95,243,000

_______________________________________________________________________________

Page 433: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

432

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0537 COMP: SINDH HOUSE ISLAMABAD/MURREE

A01 TOTAL EMPLOYEES RELATED EXPENSES. 24,421,000 25,497,000 29,946,000

A011 TOTAL PAY 101 104 13,154,000 14,674,000 16,831,000

A011-1 TOTAL PAY OF OFFICERS 4 7 1,355,000 1,594,000 2,442,000

A01101 Total Basic Pay Of Officer 4 7 1,355,000 1,594,000 2,442,000

C140 COMPTROLLER (BPS-18) 1 1 484,000 444,000 488,000

P131 PROTOCOL OFFICER (BPS-18) 1 383,000

C024 CARE TAKER (BPS-17) 1 305,000

P131 PROTOCOL OFFICER (BPS-17) 1 2 387,000 708,000 779,000

C024 CARE TAKER (BPS-16) 2 2 484,000 442,000 487,000

A011-2 TOTAL PAY OF OTHER STAFF 97 97 11,799,000 13,080,000 14,389,000

A01151 Total Basic Pay Other Staff 97 97 11,715,000 12,932,000 14,226,000

C134 COMP OPERATOR (BPS-12) 1 1 164,000 178,000 196,000

I201 I.T TECH (BPS-12) 1 1 162,000 178,000 196,000

J053 JUNIOR CLERK (BPS-11) 1 168,000 185,000

H104 HEAD CHEFF (BPS-09) 1 1 143,000 157,000 173,000

P026 PESH IMAM (BPS-09) 1 1 143,000 157,000 173,000

A017 ACCOUNT CLERK (BPS-07) 1 1 135,000 149,000 159,000

J014 JR CLERK (BPS-07) 1 133,000

P090 PRESSURE PIPE MISTRY (BPS-07) 2 2 268,000 294,000 324,000

M130 MOTOR FLEET SUPERVISOR (BPS-06) 1 1 129,000 142,000 156,000

T022 TELEPHONE OPERATOR (BPS-06) 2 2 257,000 284,000 313,000

B080 BUTLER (BPS-05) 10 10 1,245,000 1,371,000 1,508,000

C111 CLEANER / HELPER / COLI (BPS-05) 5 5 622,000 686,000 754,000

C167 COOK (BPS-05) 5 5 622,000 686,000 754,000

C220 CHEFF (BPS-05) 2 2 249,000 274,000 302,000

Page 434: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

433

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0537 COMP: SINDH HOUSE ISLAMABAD/MURREE

M142 MOUZIN (BPS-05) 1 1 125,000 137,000 151,000

R016 RECEPTIONIST (BPS-05) 6 6 747,000 823,000 905,000

S206 STORE KEEPER (BPS-05) 2 2 249,000 274,000 302,000

T022 TELEPHONE OPERATOR (BPS-05) 4 4 497,000 548,000 603,000

B015 BEAREAR (BPS-04) 2 2 240,000 264,000 291,000

C167 COOK (BPS-04) 2 2 240,000 264,000 291,000

D161 DRIVER (BPS-04) 16 16 1,917,000 2,115,000 2,326,000

C092 CHOWKIDAR / WATCHMAN (BPS-01) 7 7 774,000 855,000 940,000

D068 DHOBI / WASHER MAN (BPS-01) 2 2 221,000 244,000 269,000

D109 DISH WASHER (BPS-01) 6 6 662,000 732,000 806,000

H008 HAMAL / FARSH (BPS-01) 1 1 110,000 122,000 134,000

J002 JANITOR (BPS-01) 3 3 332,000 366,000 403,000

N003 NAIB QASID (BPS-01) 2 2 223,000 244,000 269,000

S008 SANITARY WORKER (BPS-01) 3 3 332,000 366,000 403,000

S191 STEWARD (BPS-01) 2 2 221,000 244,000 269,000

S261 SWEEPER (BPS-01) 5 5 553,000 610,000 671,000

A01152 Personal pay 84,000 148,000 163,000

A012 TOTAL ALLOWANCES 11,267,000 10,823,000 13,115,000

A012-1 TOTAL REGULAR ALLOWANCES 10,283,000 9,839,000 12,131,000

A01202 House Rent Allowance 1,592,000 1,592,000 1,715,000

A01203 Conveyance Allowance 1,953,000 1,953,000 2,073,000

A01207 Washing Allowance 95,000 95,000 95,000

A0120D Integrated Allowance 4,000 4,000 4,000

A0120X Ad - hoc Allowance - 2010 2,417,000 2,313,000 2,450,000

A01217 Medical Allowance 1,569,000 1,569,000 1,621,000

A0121T Adhoc Relief Allowance 2013 397,000 397,000

A0122C Adhoc Relief Allowance - 2015 1,307,000 360,000 374,000

A0122M Adhoc Relief Allowance 2016 1,442,000 1,667,000

A01241 Utility allowance for electricity 39,000 114,000 137,000

A01270 Others 1,307,000 1,598,000

Page 435: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

434

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0537 COMP: SINDH HOUSE ISLAMABAD/MURREE

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 984,000 984,000 984,000

A01271 Overtime Allowance 269,000 269,000 269,000

A01273 Honoraria 715,000 715,000 715,000

A03 TOTAL OPERATING EXPENSES 38,873,000 40,793,000 43,184,000

A032 TOTAL COMMUNICATIONS 997,000 997,000 1,048,000

A03201 Postage and Telegraph 14,000 14,000 15,000

A03202 Telephone and Trunk call 983,000 983,000 1,033,000

A033 TOTAL UTILITIES 27,748,000 28,698,000 31,569,000

A03301 Gas 12,524,000 12,524,000 13,777,000

A03302 Water 550,000 1,500,000 1,650,000

A03303 Electricity 14,674,000 14,674,000 16,142,000

A038 TOTAL TRAVEL & 5,377,000 5,510,000 5,533,000

TRANSPORTATION

A03805 Travelling Allowance 317,000 450,000 473,000

A03807 P.O.L Charges A.planes 5,060,000 5,060,000 5,060,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 4,751,000 5,588,000 5,034,000

A03901 Stationery 74,000 74,000 78,000

A03902 Printing and Publication 29,000 29,000 31,000

A03905 Newspapers Periodicals and Books 16,000 16,000 17,000

A03906 Uniforms and Protective Clothing 348,000 450,000 473,000

A03919 Payments to other for Service 1,265,000 2,000,000 1,265,000

Rendered

1 Others 2,000,000 1,265,000

A03970 Others 3,019,000 3,019,000 3,170,000

1 Others 3,019,000 3,019,000 3,170,000

Page 436: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

435

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0537 COMP: SINDH HOUSE ISLAMABAD/MURREE

A09 TOTAL PHYSICAL ASSETS 9,500,000

A095 TOTAL PURCHASE OF 9,500,000

TRANSPORT

A09501 Transport 9,500,000

A13 TOTAL REPAIRS AND MAINTENANCE 1,479,000 2,174,000 1,625,000

A130 TOTAL TRANSPORT 1,305,000 2,000,000 1,436,000

A13001 Transport 1,305,000 2,000,000 1,436,000

A131 TOTAL MACHINERY AND 93,000 93,000 103,000

EQUIPMENT

A13101 Machinery and Equipment 93,000 93,000 103,000

A132 TOTAL FURNITURE AND 81,000 81,000 86,000

FIXTURE

A13201 Furniture and Fixture 81,000 81,000 86,000

_______________________________________________________________________________COMP: SINDH HOUSE ISLAMABAD/MURREE 64,773,000 77,964,000 74,755,000

_______________________________________________________________________________

Page 437: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

436

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0538 RESIDENT ENGINEER SPECIAL PROJECT SINDHHOUSE ISLAMABAD

A01 TOTAL EMPLOYEES RELATED EXPENSES. 10,621,000 10,489,000 14,612,000

A011 TOTAL PAY 35 47 6,033,000 6,257,000 8,320,000

A011-1 TOTAL PAY OF OFFICERS 3 4 939,000 872,000 1,151,000

A01101 Total Basic Pay Of Officer 3 4 939,000 872,000 1,151,000

R049 RESIDENTIAL ENGINEER / (BPS-18) 1 1 407,000 380,000 418,000 EXECUTIVE ENGINEER

A218 ASSISTANT ENGINEER (BPS-17) 1 1 327,000 303,000 334,000

A119 ASSISTANT (BPS-16) 1 191,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 205,000 189,000 208,000 OFFICER

A011-2 TOTAL PAY OF OTHER STAFF 32 43 5,094,000 5,385,000 7,169,000

A01151 Total Basic Pay Other Staff 32 43 5,065,000 5,329,000 7,107,000

C148 COMPUTER OPERATORS (BPS-12) 1 134,000

J053 JUNIOR CLERK (BPS-11) 3 200,000 472,000

S222 SUB ENGINEER (BPS-11) 1 2 183,000 200,000 346,000

D150 DRAUGHTSMAN (BPS-10) 1 134,000

A010 AC ELECTRICIAN (BPS-07) 1 1 168,000 177,000 193,000

A012 AC OPERATOR (BPS-07) 6 6 1,006,000 1,053,000 1,158,000

A017 ACCOUNT CLERK (BPS-07) 1 1 168,000 175,000 193,000

J014 JR CLERK (BPS-07) 1 168,000

C027 CARPENTER (BPS-05) 1 1 156,000 163,000 180,000

E021 ELECTRICIAN (BPS-05) 1 107,000

E022 ELECTRICIAN / HEAD (BPS-05) 1 1 156,000 163,000 180,000 ELECTRICIAN

G036 GENERATOR OPERATOR (BPS-05) 1 103,000

Page 438: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

437

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0538 RESIDENT ENGINEER SPECIAL PROJECT SINDHHOUSE ISLAMABAD

M021 MALHI / GARDEN ATTENDANT (BPS-05) 12 12 1,875,000 1,962,000 2,158,000 / HAED MALHI

M043 MASSON (BPS-05) 1 1 156,000 163,000 180,000

P006 PAINTER (BPS-05) 1 1 156,000 163,000 180,000

P061 PLUMBER (BPS-05) 1 2 156,000 163,000 283,000

P168 PUMP OPERATOR (BPS-05) 1 1 156,000 163,000 180,000

D161 DRIVER (BPS-04) 1 99,000

N003 NAIB QASID (BPS-02) 2 187,000

A266 ASSISTANT PLUMBER (BPS-01) 1 1 141,000 146,000 160,000

C092 CHOWKIDAR / WATCHMAN (BPS-01) 1 1 140,000 146,000 160,000

C111 CLEANER / HELPER / COLI (BPS-01) 1 1 140,000 146,000 160,000

S008 SANITARY WORKER (BPS-01) 1 1 140,000 146,000 160,000

A01152 Personal pay 29,000 56,000 62,000

A012 TOTAL ALLOWANCES 4,588,000 4,232,000 6,292,000

A012-1 TOTAL REGULAR ALLOWANCES 4,302,000 3,946,000 6,006,000

A01202 House Rent Allowance 612,000 612,000 863,000

A01203 Conveyance Allowance 819,000 819,000 1,184,000

A01207 Washing Allowance 34,000 34,000 38,000

A0120X Ad - hoc Allowance - 2010 1,102,000 992,000 1,271,000

A01217 Medical Allowance 601,000 601,000 796,000

A0121M Adhoc Relief Allowance - 2012 144,000

A0121T Adhoc Relief Allowance 2013 140,000 179,000

A0122C Adhoc Relief Allowance - 2015 567,000 138,000 167,000

A0122M Adhoc Relief Allowance 2016 606,000 682,000

A01270 Others 567,000 4,000 682,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 286,000 286,000 286,000

A01273 Honoraria 286,000 286,000 286,000

Page 439: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

438

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0538 RESIDENT ENGINEER SPECIAL PROJECT SINDHHOUSE ISLAMABAD

A03 TOTAL OPERATING EXPENSES 3,110,000 34,621,000 3,132,000

A032 TOTAL COMMUNICATIONS 8,000 8,000 9,000

A03201 Postage and Telegraph 8,000 8,000 9,000

A033 TOTAL UTILITIES 2,500,000 2,500,000 2,500,000

A03305 POL for Generator 2,500,000 2,500,000 2,500,000

A035 TOTAL OPERATING LEASES 31,491,000

A03502 Buildings 31,491,000

A036 TOTAL MOTOR VEHICLES 20,000

A03603 Registration 20,000

A038 TOTAL TRAVEL & 481,000 481,000 494,000

TRANSPORTATION

A03805 Travelling Allowance 250,000 250,000 263,000

A03807 P.O.L Charges A.planes 231,000 231,000 231,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 121,000 121,000 129,000

A03901 Stationery 28,000 28,000 30,000

A03902 Printing and Publication 14,000 14,000 15,000

A03906 Uniforms and Protective Clothing 53,000 53,000 56,000

A03970 Others 26,000 26,000 28,000

1 Others 26,000 26,000 28,000

A09 TOTAL PHYSICAL ASSETS 1,039,000 1,144,000

A095 TOTAL PURCHASE OF 1,039,000 1,144,000

TRANSPORT

Page 440: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

439

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0538 RESIDENT ENGINEER SPECIAL PROJECT SINDHHOUSE ISLAMABAD

A09501 Transport 1,039,000 1,144,000

003 One Suzuki Cultus (1000 CC ) 1,039,000

3 Two Cars (800 CC) CNG 1,144,000

A13 TOTAL REPAIRS AND MAINTENANCE 20,000 20,000 23,000

A131 TOTAL MACHINERY AND 12,000 12,000 14,000

EQUIPMENT

A13101 Machinery and Equipment 12,000 12,000 14,000

A132 TOTAL FURNITURE AND 8,000 8,000 9,000

FIXTURE

A13201 Furniture and Fixture 8,000 8,000 9,000

_______________________________________________________________________________RESIDENT ENGINEER SPECIAL PROJECT SINDH 14,790,000 46,274,000 17,767,000

HOUSE ISLAMABAD

_______________________________________________________________________________

Page 441: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

440

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0539 PROVINCIAL BUILDINGS DIVISION-IIKARACHI

A13 TOTAL REPAIRS AND MAINTENANCE 357,598,000 340,719,000 357,598,000

A133 TOTAL BUILDINGS AND 357,598,000 340,719,000 357,598,000

STRUCTURE

A13301 Office Buildings 336,532,000 322,653,000 336,532,000

10 Office Buildings (Secretariat Building No-I)(G.A) 53,626,000 48,626,000 53,626,000

11 Office Buildings (Secretariat Building No-2)(G.A) 31,151,000 29,151,000 31,151,000

115 Office Buildings Services Hospital(HEALTH) 42,282,000 42,282,000 42,282,000

12 Office Buildings (Secretariat Building No-3)(G.A) 28,256,000 26,256,000 28,256,000

15 Office Buildings (Secretariat Building No-4 B)(G.A) 31,576,000 29,576,000 31,576,000

151 Office Buildings (Secretariat Buildings 4A)(GA) 32,813,000 29,813,000 32,813,000

16 Office Buildings (Secretariat Building No-5 )(G.A) 28,256,000 15,176,000 28,256,000

17 Office Buildings (Secretariat Building No-6)(G.A) 46,496,000 41,496,000 46,496,000

20 Office Buildings Finance Complex (A.K Lodhi Block) 9,900,000 17,882,000 9,900,000

250 Office Buildings Other Department (C&W) 3,500,000

91 Office Buildings Central Jails (J & C SETT ) 23,513,000 23,513,000 23,513,000

92 Office Buildings District Jails (J & C) 8,663,000 8,663,000 8,663,000

99 Office Buildings ATC Courts (Block Allocation) 6,719,000

A13302 Residential Buildings 21,066,000 18,066,000 21,066,000

210 Residential Buildings Requisitioned (Buildings) 4,332,000 4,332,000 4,332,000

7 Residential Buildings Jacobline Flats (G.A) 11,681,000 8,681,000 11,681,000

90 Residential Buildings Jail and Convicts Settlement 5,053,000 5,053,000 5,053,000

_______________________________________________________________________________PROVINCIAL BUILDINGS DIVISION-II 357,598,000 340,719,000 357,598,000

KARACHI

_______________________________________________________________________________

Page 442: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

441

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0540 PROVINCIAL BUILDINGS DIVISION-I KARACHI

A13 TOTAL REPAIRS AND MAINTENANCE 1,133,033,000 624,209,000 1,333,033,000

A133 TOTAL BUILDINGS AND 1,133,033,000 624,209,000 1,333,033,000

STRUCTURE

A13301 Office Buildings 535,081,000 215,313,000 735,081,000

002 M&R-HANGER OF HELICOPTERS OF CM FLIGHT(BLOCK ALLOCATION) 58,433,000 58,433,000 58,433,000

127 Office Building Liaquat Memorial Library Karachi 76,526,000 18,093,000 76,526,000

138 Office Buildings Other Hospital / Health Institutions (Health) 121,460,000 116,460,000 121,460,000

229 Office Buildings Others (Civil Works) 5,053,000 5,053,000 5,053,000

250 Office Buildings Other Department (C&W) 3,609,000 3,609,000 3,609,000

333 Ofice Buildings Treasuary office (Block Allocation) 40,000,000 9,137,000 40,000,000

8 Office Buildngs-LSP (Unforeseen & Emergent M&R Works) 200,000,000

99 Office Buildings ATC Courts (Block Allocation) 30,000,000 4,364,000 30,000,000

LH1 Office Building (Health Institutions) LSP for M&R 200,000,000

LS1 Office Buildngs-LSP (Unforeseen & Emergent M&R Works) 164,000 200,000,000

A13302 Residential Buildings 597,952,000 408,896,000 597,952,000

10 Residential Buildings Chief Minister House 68,063,000 63,010,000 68,063,000

11 Residential Buildings Chief Secretary House 5,776,000 15,776,000 5,776,000

110 Residential Buildings Health Services 34,032,000 29,032,000 34,032,000

119 Residential Buildings Secretaries Flats at C-112 Clifton Karachi 2,940,000 5,243,000 2,940,000

12 Residential Buildings GOR - III 41,251,000 39,251,000 41,251,000

22 Residential Buildings Dar-ul-Aman & Dar-ul-Atfal (Block Allocation) 250,000,000 73,370,000 250,000,000

251 Residential Buildings Rest/Circuit House (C & W) 7,218,000 7,218,000 7,218,000

253 Residential Building Circuit House-II KYC (C&W) 7,218,000 7,218,000 7,218,000

268 Residential Buildings Others (C & W) 2,886,000 2,886,000 2,886,000

4 Residential Buildings Minister / Advisors (G.A) 26,814,000 26,814,000 26,814,000

5 Residential Buildings GOR-I (G.A) 149,686,000 137,010,000 149,686,000

69 Residential Buildings Others (G.A) 2,068,000 2,068,000 2,068,000

_______________________________________________________________________________PROVINCIAL BUILDINGS DIVISION-I KARACHI 1,133,033,000 624,209,000 1,333,033,000

_______________________________________________________________________________

Page 443: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

442

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0541 PROVINCIAL BUILDINGS DIVISION-IIIKARACH

A13 TOTAL REPAIRS AND MAINTENANCE 516,781,000 546,787,000 516,781,000

A133 TOTAL BUILDINGS AND 516,781,000 546,787,000 516,781,000

STRUCTURE

A13301 Office Buildings 118,335,000 165,841,000 118,335,000

128 Office Building-M&R Buildings of Distt/Lower Court(Block Allocation) 1,000,000 1,000,000 1,000,000

140 Office Buildings Agriculture Department 5,776,000 5,776,000 5,776,000

152 Office Buildings-Commissioner Office Kyc 30,377,000 30,377,000 30,377,000

170 Office Buildings Livestock and Veterinary Department 6,498,000 6,498,000 6,498,000

190 Office Buildings Civil Works 3,627,000

191 Office Buildings District / Lower Courts (CIVIL WORKS) 50,533,000 80,533,000 50,533,000

231 Office Buildings Bureau of Statistics(P & D) 4,332,000 4,332,000 4,332,000

33 Office Buildings (Treasury Offices)(GA) 4,332,000 4,332,000 4,332,000

70 Office Buildings Food Department 11,549,000 6,549,000 11,549,000

91 Office Buildings Central Jails (J & C SETT ) 13,731,000

93 Office Buildings Lockups (J & C) 3,938,000 3,938,000 3,938,000

99 Office Buildings ATC Courts (Block Allocation) 5,148,000

A13302 Residential Buildings 398,446,000 380,946,000 398,446,000

140 Residential Buildings Agriculture Department 6,498,000 6,498,000 6,498,000

151 Residential Buildings-Commissioner House Kyc (i/c Staff Quarters & Garrages) 38,095,000 38,095,000 38,095,000

170 Residential Buildings Livestock and Veterinary Department 5,776,000 5,776,000 5,776,000

190 Residential Buildings Civil Works 1,444,000 1,444,000 1,444,000

191 Residential Buildings District and Session Judges (CIVIL WORKS) 49,500,000 49,500,000 49,500,000

6 Residential Buildings Shadman Town (G.A) 78,376,000 73,376,000 78,376,000

7 Residential Buildings Jacobline Flats (G.A) 11,681,000 9,181,000 11,681,000

70 Residential Buildings Food Department 2,886,000 2,886,000 2,886,000

8 Residential Buildings GOR -II (G.A) 119,626,000 109,626,000 119,626,000

9 Residential Buildings Humayoon House (G.A) 84,564,000 84,564,000 84,564,000

_______________________________________________________________________________PROVINCIAL BUILDINGS DIVISION-III 516,781,000 546,787,000 516,781,000

KARACH

_______________________________________________________________________________

Page 444: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

443

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0542 RESIDENT ENGINEER / SPECIAL PROJECTSINDH HOUSE ISLAMABAD

A13 TOTAL REPAIRS AND MAINTENANCE 92,804,000 77,804,000 92,804,000

A133 TOTAL BUILDINGS AND 92,804,000 77,804,000 92,804,000

STRUCTURE

A13302 Residential Buildings 92,804,000 77,804,000 92,804,000

269 Residential Buildings Sindh House Islamabad/Murree (C&W) 92,804,000 77,804,000 92,804,000

_______________________________________________________________________________RESIDENT ENGINEER / SPECIAL PROJECT 92,804,000 77,804,000 92,804,000

SINDH HOUSE ISLAMABAD

_______________________________________________________________________________

Page 445: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

444

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

LN0102 BUILDING DIVISION LARKANA

A01 TOTAL EMPLOYEES RELATED EXPENSES. 44,708,000 45,938,000 52,113,000

A011 TOTAL PAY 151 151 25,730,000 28,161,000 30,980,000

A011-1 TOTAL PAY OF OFFICERS 6 7 2,665,000 2,927,000 3,221,000

A01101 Total Basic Pay Of Officer 6 7 2,660,000 2,922,000 3,215,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 566,000 563,000 620,000

A218 ASSISTANT ENGINEER (BPS-17) 4 4 1,811,000 1,797,000 1,977,000

A235 ASSISTANT HEAD CLERK (BPS-16) 1 281,000 309,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 283,000 281,000 309,000 OFFICER

A01102 Personal pay 5,000 5,000 6,000

A011-2 TOTAL PAY OF OTHER STAFF 145 144 23,065,000 25,234,000 27,759,000

A01151 Total Basic Pay Other Staff 145 144 22,901,000 24,982,000 27,481,000

A235 ASSISTANT HEAD CLERK (BPS-14) 1 238,000

S053 SENIOR CLERK (BPS-14) 7 1,480,000 1,628,000

S181 STENOGRAPHER (BPS-14) 1 1 233,000 256,000 281,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 219,000 240,000 264,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 7 1,480,000 1,628,000

S222 SUB ENGINEER (BPS-11) 12 12 2,309,000 2,536,000 2,790,000

D150 DRAUGHTSMAN (BPS-10) 1 1 186,000 205,000 225,000

A017 ACCOUNT CLERK (BPS-09) 3 3 542,000 592,000 652,000

P026 PESH IMAM (BPS-09) 1 1 182,000 198,000 218,000

S053 SENIOR CLERK (BPS-09) 7 1,266,000

J014 JR CLERK (BPS-07) 7 1,353,000

M175 MECHANIC / SUPERVISOR (BPS-07) 1 1 168,000 185,000 204,000

C024 CARE TAKER (BPS-06) 1 1 163,000 179,000 197,000

Page 446: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

445

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

LN0102 BUILDING DIVISION LARKANA

E021 ELECTRICIAN (BPS-06) 1 1 945,000 179,000 197,000

P061 PLUMBER (BPS-06) 6 6 980,000 1,074,000 1,181,000

C024 CARE TAKER (BPS-05) 2 2 315,000 346,000 380,000

E021 ELECTRICIAN (BPS-05) 6 6 163,000 1,037,000 1,140,000

T050 TRACER (BPS-05) 1 1 157,000 173,000 190,000

W040 WIREMAN / LINEMAN (BPS-05) 1 1 157,000 173,000 190,000

W045 WORK MESTRY / DAROGHA (BPS-05) 18 18 2,833,000 3,110,000 3,421,000

C027 CARPENTER (BPS-04) 3 3 453,000 500,000 550,000

D161 DRIVER (BPS-04) 5 5 757,000 833,000 916,000

M043 MASSON (BPS-04) 3 3 453,000 500,000 550,000

C088 CHOWIKADAR / WATCHMAN (BPS-02) 2 2 286,000 313,000 345,000

M022 MALI (BPS-02) 2 2 286,000 313,000 345,000

S008 SANITARY WORKER (BPS-02) 2 2 286,000 313,000 345,000

B016 BEARER / ATTENDANT (BPS-01) 3 3 420,000 461,000 508,000

C089 CHOWKIDAR (BPS-01) 10 10 1,398,000 1,538,000 1,692,000

C111 CLEANER / HELPER / COLI (BPS-01) 10 10 1,398,000 1,538,000 1,692,000

C167 COOK (BPS-01) 6 6 839,000 923,000 1,015,000

D068 DHOBI / WASHER MAN (BPS-01) 2 2 279,000 308,000 338,000

M021 MALHI / GARDEN ATTENDANT (BPS-01) 12 12 1,680,000 1,846,000 2,030,000 / HAED MALHI

N003 NAIB QASID (BPS-01) 8 8 1,118,000 1,230,000 1,354,000

S008 SANITARY WORKER (BPS-01) 6 6 839,000 923,000 1,015,000

A01152 Personal pay 164,000 252,000 278,000

A012 TOTAL ALLOWANCES 18,978,000 17,777,000 21,133,000

A012-1 TOTAL REGULAR ALLOWANCES 18,951,000 17,750,000 21,104,000

A01202 House Rent Allowance 2,533,000 2,533,000 2,533,000

A01203 Conveyance Allowance 3,794,000 3,794,000 3,794,000

A01207 Washing Allowance 10,000 14,000 14,000

Page 447: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

446

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

LN0102 BUILDING DIVISION LARKANA

A0120D Integrated Allowance 13,000 13,000 13,000

A0120Q Fixed Daily Allowance 33,000 33,000

A0120X Ad - hoc Allowance - 2010 4,912,000 4,574,000 4,574,000

A01217 Medical Allowance 2,675,000 2,675,000 2,675,000

A0121T Adhoc Relief Allowance 2013 765,000 765,000

A0121Z Adhoc Relief Allowance - 2014 4,000

A0122C Adhoc Relief Allowance - 2015 2,506,000 561,000 561,000

A0122M Adhoc Relief Allowance 2016 2,775,000 3,070,000

A01238 Charge Allowance 2,000 2,000 2,000

A01244 Adhoc Relief 7,000

A01270 Others 2,506,000 3,070,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 27,000 27,000 29,000

A01274 Medical Charges 27,000 27,000 29,000

A03 TOTAL OPERATING EXPENSES 25,429,000 8,622,000 27,888,000

A032 TOTAL COMMUNICATIONS 131,000 131,000 139,000

A03201 Postage and Telegraph 24,000 24,000 26,000

A03202 Telephone and Trunk call 107,000 107,000 113,000

A033 TOTAL UTILITIES 24,301,000 7,494,000 26,732,000

A03301 Gas 956,000 956,000 1,052,000

A03303 Electricity 23,345,000 6,538,000 25,680,000

A038 TOTAL TRAVEL & 761,000 761,000 766,000

TRANSPORTATION

A03805 Travelling Allowance 94,000 94,000 99,000

A03807 P.O.L Charges A.planes 667,000 667,000 667,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 236,000 236,000 251,000

A03901 Stationery 61,000 61,000 65,000

A03902 Printing and Publication 40,000 40,000 42,000

Page 448: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

447

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

LN0102 BUILDING DIVISION LARKANA

A03905 Newspapers Periodicals and Books 6,000 6,000 7,000

A03906 Uniforms and Protective Clothing 61,000 61,000 65,000

A03970 Others 68,000 68,000 72,000

1 Others 68,000 68,000 72,000

A13 TOTAL REPAIRS AND MAINTENANCE 57,000 57,000 64,000

A130 TOTAL TRANSPORT 24,000 24,000 27,000

A13001 Transport 24,000 24,000 27,000

A131 TOTAL MACHINERY AND 22,000 22,000 25,000

EQUIPMENT

A13101 Machinery and Equipment 22,000 22,000 25,000

A132 TOTAL FURNITURE AND 11,000 11,000 12,000

FIXTURE

A13201 Furniture and Fixture 11,000 11,000 12,000

_______________________________________________________________________________BUILDING DIVISION LARKANA 70,194,000 54,617,000 80,065,000

_______________________________________________________________________________

Page 449: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

448

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

LN0105 PROVINCIAL BUILDINGS DIVISION LARKANA

A13 TOTAL REPAIRS AND MAINTENANCE 204,112,000 177,352,000 168,018,000

A131 TOTAL MACHINERY AND 15,000 15,000 15,000

EQUIPMENT

A13101 Machinery and Equipment 15,000 15,000 15,000

A133 TOTAL BUILDINGS AND 204,097,000 177,337,000 168,003,000

STRUCTURE

A13301 Office Buildings 142,145,000 119,716,000 106,051,000

123 Office Buildings C.M.C. Larkana 36,094,000 36,094,000

133 Office Building Sir Shahnawaz Bhutto Public Library 39,376,000 39,376,000

140 Office Buildings Agriculture Department 8,663,000 8,663,000 8,663,000

147 Office Building Shah Abdul Latif Sindh Govt. Public Library 7,876,000 7,876,000

191 Office Buildings District / Lower Courts (CIVIL WORKS) 7,218,000 16,214,000 7,218,000

2 Office Buildings General Administration 788,000 788,000 788,000

229 Office Buildings Others (Civil Works) 5,906,000 21,733,000 5,906,000

250 Office Buildings Other Department (C&W) 2,886,000 2,886,000 2,886,000

33 Office Buildings (Treasury Offices)(GA) 1,444,000 1,444,000 1,444,000

71 Office Buildings Grain Godowns (FOOD) 11,549,000 11,549,000 11,549,000

91 Office Buildings Central Jails (J & C SETT ) 14,439,000 14,439,000 14,439,000

92 Office Buildings District Jails (J & C) 5,906,000 5,906,000 5,906,000

A13302 Residential Buildings 61,952,000 57,621,000 61,952,000

110 Residential Buildings Health Services 36,094,000 36,094,000 36,094,000

140 Residential Buildings Agriculture Department 4,332,000 4,332,000 4,332,000

190 Residential Buildings Civil Works 8,663,000 4,332,000 8,663,000

2 Residential Buildings General Administration 1,444,000 1,444,000 1,444,000

251 Residential Buildings Rest/Circuit House (C & W) 4,594,000 4,594,000 4,594,000

70 Residential Buildings Food Department 919,000 919,000 919,000

90 Residential Buildings Jail and Convicts Settlement 5,906,000 5,906,000 5,906,000

_______________________________________________________________________________PROVINCIAL BUILDINGS DIVISION LARKANA 204,112,000 177,352,000 168,018,000

_______________________________________________________________________________

Page 450: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

449

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

LN0107 PROVINCIAL BUILDINGS DIVISION LARKANADISTRICT SHAHDADPUR AT KAMBAR

A13 TOTAL REPAIRS AND MAINTENANCE 21,855,000 24,808,000 21,855,000

A133 TOTAL BUILDINGS AND 21,855,000 24,808,000 21,855,000

STRUCTURE

A13301 Office Buildings 20,805,000 23,758,000 20,805,000

191 Office Buildings District / Lower Courts (CIVIL WORKS) 5,906,000 8,859,000 5,906,000

229 Office Buildings Others (Civil Works) 460,000 460,000 460,000

71 Office Buildings Grain Godowns (FOOD) 14,439,000 14,439,000 14,439,000

A13302 Residential Buildings 1,050,000 1,050,000 1,050,000

140 Residential Buildings Agriculture Department 590,000 590,000 590,000

70 Residential Buildings Food Department 460,000 460,000 460,000

_______________________________________________________________________________PROVINCIAL BUILDINGS DIVISION LARKANA 21,855,000 24,808,000 21,855,000

DISTRICT SHAHDADPUR AT KAMBAR

_______________________________________________________________________________

Page 451: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

450

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

LN0108 PROVINCIAL BUILDINGS DIVISION LARKANADISTRICT JABCOBABAD

A13 TOTAL REPAIRS AND MAINTENANCE 62,347,000 64,972,000 62,347,000

A133 TOTAL BUILDINGS AND 62,347,000 64,972,000 62,347,000

STRUCTURE

A13301 Office Buildings 40,689,000 43,314,000 40,689,000

110 Office Buildings Health Services 4,332,000 4,332,000 4,332,000

140 Office Buildings Agriculture Department 3,609,000 3,609,000 3,609,000

191 Office Buildings District / Lower Courts (CIVIL WORKS) 5,250,000 7,875,000 5,250,000

2 Office Buildings General Administration 3,609,000 3,609,000 3,609,000

229 Office Buildings Others (Civil Works) 4,332,000 4,332,000 4,332,000

71 Office Buildings Grain Godowns (FOOD) 10,107,000 10,107,000 10,107,000

92 Office Buildings District Jails (J & C) 9,450,000 9,450,000 9,450,000

A13302 Residential Buildings 21,658,000 21,658,000 21,658,000

110 Residential Buildings Health Services 1,444,000 1,444,000 1,444,000

140 Residential Buildings Agriculture Department 1,444,000 1,444,000 1,444,000

190 Residential Buildings Civil Works 4,332,000 4,332,000 4,332,000

2 Residential Buildings General Administration 2,886,000 2,886,000 2,886,000

251 Residential Buildings Rest/Circuit House (C & W) 4,594,000 4,594,000 4,594,000

291 Residential Building Treasury Office (GA) 1,444,000 1,444,000 1,444,000

70 Residential Buildings Food Department 2,232,000 2,232,000 2,232,000

90 Residential Buildings Jail and Convicts Settlement 3,282,000 3,282,000 3,282,000

_______________________________________________________________________________PROVINCIAL BUILDINGS DIVISION LARKANA 62,347,000 64,972,000 62,347,000

DISTRICT JABCOBABAD

_______________________________________________________________________________

Page 452: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

451

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

LN0109 PROVINCIAL BUILDINGS DIVISION LARKANADISTRICT KASHMORE

A13 TOTAL REPAIRS AND MAINTENANCE 14,701,000 18,998,000 14,701,000

A133 TOTAL BUILDINGS AND 14,701,000 18,998,000 14,701,000

STRUCTURE

A13301 Office Buildings 14,701,000 18,998,000 14,701,000

191 Office Buildings District / Lower Courts (CIVIL WORKS) 4,594,000 8,891,000 4,594,000

71 Office Buildings Grain Godowns (FOOD) 10,107,000 10,107,000 10,107,000

_______________________________________________________________________________PROVINCIAL BUILDINGS DIVISION LARKANA 14,701,000 18,998,000 14,701,000

DISTRICT KASHMORE

_______________________________________________________________________________

Page 453: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

452

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

MP0096 BUILDING DIVISION MIRPURKHAS

A01 TOTAL EMPLOYEES RELATED EXPENSES. 43,829,000 43,906,000 49,812,000

A011 TOTAL PAY 138 138 25,868,000 27,372,000 30,111,000

A011-1 TOTAL PAY OF OFFICERS 6 7 3,440,000 3,150,000 3,466,000

A01101 Total Basic Pay Of Officer 6 7 3,407,000 3,117,000 3,429,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 725,000 601,000 661,000

A218 ASSISTANT ENGINEER (BPS-17) 4 4 2,320,000 1,918,000 2,110,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 1 299,000 329,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 362,000 299,000 329,000 OFFICER

A01102 Personal pay 33,000 33,000 37,000

A011-2 TOTAL PAY OF OTHER STAFF 132 131 22,428,000 24,222,000 26,645,000

A01151 Total Basic Pay Other Staff 132 131 22,332,000 24,053,000 26,459,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 1 245,000

S053 SENIOR CLERK (BPS-14) 6 1,349,000 1,484,000

S181 STENOGRAPHER (BPS-14) 1 1 248,000 272,000 299,000

D136 DIVISIONAL HEAD (BPS-12) 1 1 217,000 238,000 262,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 8 1,798,000 1,978,000

S222 SUB ENGINEER (BPS-11) 12 12 2,450,000 2,698,000 2,968,000

D150 DRAUGHTSMAN (BPS-10) 1 1 199,000 218,000 240,000

A017 ACCOUNT CLERK (BPS-09) 3 3 575,000 633,000 695,000

S053 SENIOR CLERK (BPS-09) 6 1,342,000

J014 JR CLERK (BPS-07) 8 1,434,000

P061 PLUMBER (BPS-06) 2 2 347,000 381,000 419,000

E022 ELECTRICIAN / HEAD (BPS-05) 6 6 1,001,000 1,102,000 1,213,000 ELECTRICIAN

T001 TRACER (BPS-05) 1 1 167,000 184,000 202,000

Page 454: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

453

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

MP0096 BUILDING DIVISION MIRPURKHAS

W045 WORK MESTRY / DAROGHA (BPS-05) 15 15 2,506,000 2,756,000 3,032,000

C024 CARE TAKER (BPS-04) 2 2 322,000 354,000 390,000

C027 CARPENTER (BPS-04) 2 2 322,000 354,000 390,000

D161 DRIVER (BPS-04) 3 3 804,000 531,000 584,000

M043 MASSON (BPS-04) 3 3 483,000 531,000 584,000

P168 PUMP OPERATOR (BPS-04) 1 1 161,000 177,000 195,000

S006 SANITARY MATE (BPS-02) 1 1 152,000 167,000 183,000

V004 VALVE MAN (BPS-02) 1 1 152,000 167,000 183,000

B007 BALDAR (BPS-01) 1 1 146,000 164,000 180,000

B016 BEARER / ATTENDANT (BPS-01) 4 4 593,000 654,000 720,000

C089 CHOWKIDAR (BPS-01) 17 17 2,524,000 2,781,000 3,059,000

C111 CLEANER / HELPER / COLI (BPS-01) 12 12 1,782,000 1,963,000 2,159,000

C167 COOK (BPS-01) 5 5 744,000 818,000 900,000

D068 DHOBI / WASHER MAN (BPS-01) 1 1 149,000 164,000 180,000

M021 MALHI / GARDEN ATTENDANT (BPS-01) 7 7 1,040,000 1,145,000 1,260,000 / HAED MALHI

M044 MATE (BPS-01) 2 2 297,000 327,000 360,000

N003 NAIB QASID (BPS-01) 8 8 1,186,000 1,309,000 1,440,000

S008 SANITARY WORKER (BPS-01) 5 5 744,000 818,000 900,000

A01152 Personal pay 96,000 169,000 186,000

A012 TOTAL ALLOWANCES 17,961,000 16,534,000 19,701,000

A012-1 TOTAL REGULAR ALLOWANCES 17,921,000 16,494,000 19,659,000

A01202 House Rent Allowance 1,715,000 1,715,000 1,715,000

A01203 Conveyance Allowance 3,553,000 3,553,000 3,553,000

A01207 Washing Allowance 2,000 2,000 2,000

A0120D Integrated Allowance 29,000 29,000 29,000

A0120X Ad - hoc Allowance - 2010 4,791,000 4,431,000 4,431,000

A01217 Medical Allowance 2,683,000 2,683,000 2,683,000

Page 455: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

454

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

MP0096 BUILDING DIVISION MIRPURKHAS

A0121A Ad - hoc Allowance - 2011 22,000

A0121M Adhoc Relief Allowance - 2012 4,000

A0121T Adhoc Relief Allowance 2013 684,000 684,000

A0121Z Adhoc Relief Allowance - 2014 21,000

A0122C Adhoc Relief Allowance - 2015 2,574,000 581,000 581,000

A0122M Adhoc Relief Allowance 2016 2,700,000 2,989,000

A01233 Unattractive Area Allowance 3,000 3,000

A01244 Adhoc Relief 66,000

A01270 Others 2,574,000 2,989,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 40,000 40,000 42,000

A01274 Medical Charges 40,000 40,000 42,000

A03 TOTAL OPERATING EXPENSES 4,526,000 1,496,000 4,960,000

A032 TOTAL COMMUNICATIONS 81,000 81,000 86,000

A03201 Postage and Telegraph 14,000 14,000 15,000

A03202 Telephone and Trunk call 67,000 67,000 71,000

A033 TOTAL UTILITIES 4,170,000 1,140,000 4,588,000

A03301 Gas 835,000 835,000 919,000

A03303 Electricity 3,335,000 305,000 3,669,000

A038 TOTAL TRAVEL & 139,000 139,000 141,000

TRANSPORTATION

A03805 Travelling Allowance 29,000 29,000 31,000

A03807 P.O.L Charges A.planes 110,000 110,000 110,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 136,000 136,000 145,000

A03901 Stationery 32,000 32,000 34,000

A03902 Printing and Publication 24,000 24,000 26,000

A03906 Uniforms and Protective Clothing 29,000 29,000 31,000

A03970 Others 51,000 51,000 54,000

Page 456: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

455

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

MP0096 BUILDING DIVISION MIRPURKHAS

1 Others 51,000 51,000 54,000

A13 TOTAL REPAIRS AND MAINTENANCE 36,000 36,000 40,000

A131 TOTAL MACHINERY AND 21,000 21,000 24,000

EQUIPMENT

A13101 Machinery and Equipment 21,000 21,000 24,000

A132 TOTAL FURNITURE AND 15,000 15,000 16,000

FIXTURE

A13201 Furniture and Fixture 15,000 15,000 16,000

_______________________________________________________________________________BUILDING DIVISION MIRPURKHAS 48,391,000 45,438,000 54,812,000

_______________________________________________________________________________

Page 457: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

456

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

MP0100 PROVINCIAL BUILDINGS DIVISIONMIRPURKHAS

A13 TOTAL REPAIRS AND MAINTENANCE 59,559,000 60,954,000 59,559,000

A131 TOTAL MACHINERY AND 38,000 38,000 38,000

EQUIPMENT

A13101 Machinery and Equipment 38,000 38,000 38,000

A133 TOTAL BUILDINGS AND 59,521,000 60,916,000 59,521,000

STRUCTURE

A13301 Office Buildings 36,157,000 37,552,000 36,157,000

140 Office Buildings Agriculture Department 8,663,000 8,663,000 8,663,000

191 Office Buildings District / Lower Courts (CIVIL WORKS) 5,906,000 5,906,000 5,906,000

2 Office Buildings General Administration 2,886,000 2,886,000 2,886,000

231 Office Buildings Bureau of Statistics(P & D) 590,000 590,000 590,000

250 Office Buildings Other Department (C&W) 2,886,000 2,886,000 2,886,000

71 Office Buildings Grain Godowns (FOOD) 8,663,000 8,663,000 8,663,000

92 Office Buildings District Jails (J & C) 6,563,000 6,563,000 6,563,000

99 Office Buildings ATC Courts (Block Allocation) 1,395,000

A13302 Residential Buildings 23,364,000 23,364,000 23,364,000

140 Residential Buildings Agriculture Department 5,776,000 5,776,000 5,776,000

190 Residential Buildings Civil Works 7,218,000 7,218,000 7,218,000

2 Residential Buildings General Administration 2,886,000 2,886,000 2,886,000

230 Residential Buildings Other Department (P&D) 788,000 788,000 788,000

251 Residential Buildings Rest/Circuit House (C & W) 4,594,000 4,594,000 4,594,000

70 Residential Buildings Food Department 1,183,000 1,183,000 1,183,000

90 Residential Buildings Jail and Convicts Settlement 919,000 919,000 919,000

_______________________________________________________________________________PROVINCIAL BUILDINGS DIVISION 59,559,000 60,954,000 59,559,000

MIRPURKHAS

_______________________________________________________________________________

Page 458: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

457

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

MP0102 PROVINCIAL BUILDINGS DIVISION MIPURKHASDISTRICT SANGHAR

A13 TOTAL REPAIRS AND MAINTENANCE 51,386,000 51,386,000 51,386,000

A133 TOTAL BUILDINGS AND 51,386,000 51,386,000 51,386,000

STRUCTURE

A13301 Office Buildings 30,254,000 30,254,000 30,254,000

140 Office Buildings Agriculture Department 2,166,000 2,166,000 2,166,000

190 Office Buildings Civil Works 8,663,000 8,663,000 8,663,000

2 Office Buildings General Administration 1,444,000 1,444,000 1,444,000

231 Office Buildings Bureau of Statistics(P & D) 788,000 788,000 788,000

250 Office Buildings Other Department (C&W) 788,000 788,000 788,000

71 Office Buildings Grain Godowns (FOOD) 7,218,000 7,218,000 7,218,000

92 Office Buildings District Jails (J & C) 7,218,000 7,218,000 7,218,000

93 Office Buildings Lockups (J & C) 1,969,000 1,969,000 1,969,000

A13302 Residential Buildings 21,132,000 21,132,000 21,132,000

140 Residential Buildings Agriculture Department 788,000 788,000 788,000

190 Residential Buildings Civil Works 5,906,000 5,906,000 5,906,000

2 Residential Buildings General Administration 1,444,000 1,444,000 1,444,000

230 Residential Buildings Other Department (P&D) 788,000 788,000 788,000

250 Residential Buildings Other Department (C&W) 2,886,000 2,886,000 2,886,000

251 Residential Buildings Rest/Circuit House (C & W) 4,594,000 4,594,000 4,594,000

70 Residential Buildings Food Department 1,444,000 1,444,000 1,444,000

90 Residential Buildings Jail and Convicts Settlement 3,282,000 3,282,000 3,282,000

_______________________________________________________________________________PROVINCIAL BUILDINGS DIVISION MIPURKHAS 51,386,000 51,386,000 51,386,000

DISTRICT SANGHAR

_______________________________________________________________________________

Page 459: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

458

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

MP0103 PROVINCIAL BUILDINGS DIVISION MIPURKHASDISTRICT UMERKOT

A13 TOTAL REPAIRS AND MAINTENANCE 28,938,000 28,938,000 28,938,000

A133 TOTAL BUILDINGS AND 28,938,000 28,938,000 28,938,000

STRUCTURE

A13301 Office Buildings 19,752,000 19,752,000 19,752,000

140 Office Buildings Agriculture Department 2,886,000 2,886,000 2,886,000

191 Office Buildings District / Lower Courts (CIVIL WORKS) 2,886,000 2,886,000 2,886,000

2 Office Buildings General Administration 2,166,000 2,166,000 2,166,000

229 Office Buildings Others (Civil Works) 1,444,000 1,444,000 1,444,000

231 Office Buildings Bureau of Statistics(P & D) 263,000 263,000 263,000

71 Office Buildings Grain Godowns (FOOD) 10,107,000 10,107,000 10,107,000

A13302 Residential Buildings 9,186,000 9,186,000 9,186,000

190 Residential Buildings Civil Works 2,886,000 2,886,000 2,886,000

230 Residential Buildings Other Department (P&D) 657,000 657,000 657,000

250 Residential Buildings Other Department (C&W) 2,297,000 2,297,000 2,297,000

251 Residential Buildings Rest/Circuit House (C & W) 460,000 460,000 460,000

70 Residential Buildings Food Department 2,886,000 2,886,000 2,886,000

_______________________________________________________________________________PROVINCIAL BUILDINGS DIVISION MIPURKHAS 28,938,000 28,938,000 28,938,000

DISTRICT UMERKOT

_______________________________________________________________________________

Page 460: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

459

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

MP0104 PROVINCIAL BUILDINGS DIVISION MIPURKHASDISTRICT MITHI

A13 TOTAL REPAIRS AND MAINTENANCE 39,549,000 39,549,000 39,549,000

A133 TOTAL BUILDINGS AND 39,549,000 39,549,000 39,549,000

STRUCTURE

A13301 Office Buildings 23,533,000 23,533,000 23,533,000

138 Office Buildings Other Hospital / Health Institutions (Health) 11,000,000 11,000,000 11,000,000

190 Office Buildings Civil Works 1,444,000 1,444,000 1,444,000

2 Office Buildings General Administration 2,886,000 2,886,000 2,886,000

250 Office Buildings Other Department (C&W) 3,609,000 3,609,000 3,609,000

71 Office Buildings Grain Godowns (FOOD) 4,594,000 4,594,000 4,594,000

A13302 Residential Buildings 16,016,000 16,016,000 16,016,000

170 Residential Buildings Livestock and Veterinary Department 788,000 788,000 788,000

190 Residential Buildings Civil Works 1,444,000 1,444,000 1,444,000

2 Residential Buildings General Administration 1,444,000 1,444,000 1,444,000

250 Residential Buildings Other Department (C&W) 6,563,000 6,563,000 6,563,000

251 Residential Buildings Rest/Circuit House (C & W) 4,594,000 4,594,000 4,594,000

70 Residential Buildings Food Department 1,183,000 1,183,000 1,183,000

_______________________________________________________________________________PROVINCIAL BUILDINGS DIVISION MIPURKHAS 39,549,000 39,549,000 39,549,000

DISTRICT MITHI

_______________________________________________________________________________

Page 461: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

460

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SB0085 BUILDING DIVISION BENAZIRABAD

A01 TOTAL EMPLOYEES RELATED EXPENSES. 48,621,000 49,730,000 56,452,000

A011 TOTAL PAY 166 166 28,358,000 30,926,000 34,021,000

A011-1 TOTAL PAY OF OFFICERS 6 7 2,567,000 2,482,000 2,732,000

A01101 Total Basic Pay Of Officer 6 7 2,556,000 2,471,000 2,719,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 511,000 450,000 496,000

A218 ASSISTANT ENGINEER (BPS-17) 4 4 1,636,000 1,438,000 1,581,000

D129 DIVISIONAL ACCOUNTS (BPS-17) 1 1 409,000 359,000 395,000 OFFICER

A235 ASSISTANT HEAD CLERK (BPS-16) 1 224,000 247,000

A01102 Personal pay 11,000 11,000 13,000

A011-2 TOTAL PAY OF OTHER STAFF 160 159 25,791,000 28,444,000 31,289,000

A01151 Total Basic Pay Other Staff 160 159 25,693,000 28,264,000 31,091,000

A235 ASSISTANT HEAD CLERK (BPS-14) 1 240,000

S053 SENIOR CLERK (BPS-14) 7 1,536,000 1,690,000

S181 STENOGRAPHER (BPS-14) 1 1 240,000 266,000 292,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 226,000 249,000 274,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 7 1,536,000 1,690,000

S222 SUB ENGINEER (BPS-11) 12 12 2,379,000 2,633,000 2,897,000

D150 DRAUGHTSMAN (BPS-10) 1 1 193,000 213,000 234,000

A017 ACCOUNT CLERK (BPS-09) 3 3 558,000 617,000 679,000

S053 SENIOR CLERK (BPS-09) 7 1,304,000

J014 JR CLERK (BPS-07) 7 1,394,000

C024 CARE TAKER (BPS-06) 1 1 168,000 186,000 204,000

P061 PLUMBER (BPS-06) 6 6 1,008,000 1,115,000 1,227,000

E021 ELECTRICIAN (BPS-05) 6 6 974,000 1,076,000 1,184,000

Page 462: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

461

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SB0085 BUILDING DIVISION BENAZIRABAD

T050 TRACER (BPS-05) 1 1 163,000 179,000 197,000

W040 WIREMAN / LINEMAN (BPS-05) 1 1 163,000 179,000 197,000

W045 WORK MESTRY / DAROGHA (BPS-05) 18 18 2,919,000 3,229,000 3,551,000

C024 CARE TAKER (BPS-04) 3 3 469,000 519,000 571,000

C027 CARPENTER (BPS-04) 2 2 312,000 346,000 380,000

C167 COOK (BPS-04) 1 1 155,000 173,000 190,000

D161 DRIVER (BPS-04) 5 5 781,000 864,000 951,000

M043 MASSON (BPS-04) 3 3 469,000 519,000 571,000

P168 PUMP OPERATOR (BPS-04) 4 4 624,000 692,000 761,000

B007 BALDAR (BPS-01) 5 5 723,000 798,000 878,000

B016 BEARER / ATTENDANT (BPS-01) 9 9 1,298,000 1,437,000 1,581,000

C089 CHOWKIDAR (BPS-01) 1 1 145,000 160,000 176,000

C092 CHOWKIDAR / WATCHMAN (BPS-01) 14 14 2,019,000 2,236,000 2,459,000

C111 CLEANER / HELPER / COLI (BPS-01) 13 13 1,873,000 2,076,000 2,284,000

C167 COOK (BPS-01) 6 6 865,000 958,000 1,054,000

D068 DHOBI / WASHER MAN (BPS-01) 1 1 145,000 160,000 176,000

F012 FERO PRINTER (BPS-01) 2 2 288,000 319,000 351,000

M021 MALHI / GARDEN ATTENDANT (BPS-01) 7 7 1,008,000 1,118,000 1,230,000 / HAED MALHI

M022 MALI (BPS-01) 1 1 145,000 160,000 176,000

N003 NAIB QASID (BPS-01) 9 9 1,291,000 1,437,000 1,581,000

S008 SANITARY WORKER (BPS-01) 8 8 1,154,000 1,278,000 1,405,000

A01152 Personal pay 98,000 180,000 198,000

A012 TOTAL ALLOWANCES 20,263,000 18,804,000 22,431,000

A012-1 TOTAL REGULAR ALLOWANCES 20,245,000 18,786,000 22,412,000

A01202 House Rent Allowance 2,066,000 2,066,000 2,066,000

A01203 Conveyance Allowance 3,979,000 3,979,000 3,979,000

A01207 Washing Allowance 20,000 20,000 20,000

Page 463: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

462

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SB0085 BUILDING DIVISION BENAZIRABAD

A01209 Special Additional Allowance 4,000

A0120D Integrated Allowance 33,000 37,000 37,000

A0120Q Fixed Daily Allowance 8,000 8,000 8,000

A0120X Ad - hoc Allowance - 2010 5,508,000 5,036,000 5,036,000

A01217 Medical Allowance 3,033,000 3,033,000 3,033,000

A0121A Ad - hoc Allowance - 2011 20,000

A0121M Adhoc Relief Allowance - 2012 7,000

A0121T Adhoc Relief Allowance 2013 850,000 850,000

A0121Z Adhoc Relief Allowance - 2014 7,000

A0122C Adhoc Relief Allowance - 2015 2,799,000 612,000 612,000

A0122M Adhoc Relief Allowance 2016 3,054,000 3,381,000

A01239 Special Allowance 9,000 9,000

A01244 Adhoc Relief 44,000

A01270 Others 2,799,000 3,381,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 18,000 18,000 19,000

A01274 Medical Charges 18,000 18,000 19,000

A03 TOTAL OPERATING EXPENSES 11,360,000 3,399,000 12,468,000

A032 TOTAL COMMUNICATIONS 123,000 123,000 130,000

A03201 Postage and Telegraph 16,000 16,000 17,000

A03202 Telephone and Trunk call 107,000 107,000 113,000

A033 TOTAL UTILITIES 10,841,000 2,880,000 11,926,000

A03301 Gas 1,670,000 1,670,000 1,837,000

A03303 Electricity 9,171,000 1,210,000 10,089,000

A038 TOTAL TRAVEL & 220,000 220,000 224,000

TRANSPORTATION

A03805 Travelling Allowance 79,000 79,000 83,000

A03807 P.O.L Charges A.planes 141,000 141,000 141,000

H.coptors S.Cars M/Cycle

Page 464: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

463

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SB0085 BUILDING DIVISION BENAZIRABAD

A039 TOTAL GENERAL 176,000 176,000 188,000

A03901 Stationery 43,000 43,000 46,000

A03902 Printing and Publication 29,000 29,000 31,000

A03905 Newspapers Periodicals and Books 3,000 3,000 4,000

A03906 Uniforms and Protective Clothing 46,000 46,000 49,000

A03970 Others 55,000 55,000 58,000

1 Others 55,000 55,000 58,000

A13 TOTAL REPAIRS AND MAINTENANCE 43,000 43,000 48,000

A130 TOTAL TRANSPORT 17,000 17,000 19,000

A13001 Transport 17,000 17,000 19,000

A131 TOTAL MACHINERY AND 16,000 16,000 18,000

EQUIPMENT

A13101 Machinery and Equipment 16,000 16,000 18,000

A132 TOTAL FURNITURE AND 10,000 10,000 11,000

FIXTURE

A13201 Furniture and Fixture 10,000 10,000 11,000

_______________________________________________________________________________BUILDING DIVISION BENAZIRABAD 60,024,000 53,172,000 68,968,000

_______________________________________________________________________________

Page 465: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

464

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SB0086 PROVINCIAL BUILDINGS DIVISIONBENAZIRABAD

A13 TOTAL REPAIRS AND MAINTENANCE 133,393,000 90,574,000 97,299,000

A131 TOTAL MACHINERY AND 16,000 16,000 16,000

EQUIPMENT

A13101 Machinery and Equipment 16,000 16,000 16,000

A133 TOTAL BUILDINGS AND 133,377,000 90,558,000 97,283,000

STRUCTURE

A13301 Office Buildings 82,031,000 44,463,000 45,937,000

121 Office Buildings Peoples Medical college (Health) 36,094,000 18,047,000

138 Office Buildings Other Hospital / Health Institutions (Health) 13,125,000 6,563,000 13,125,000

140 Office Buildings Agriculture Department 8,663,000 4,332,000 8,663,000

191 Office Buildings District / Lower Courts (CIVIL WORKS) 3,282,000 3,282,000 3,282,000

2 Office Buildings General Administration 2,886,000 1,443,000 2,886,000

229 Office Buildings Others (Civil Works) 2,166,000 1,083,000 2,166,000

231 Office Buildings Bureau of Statistics(P & D) 657,000 329,000 657,000

71 Office Buildings Grain Godowns (FOOD) 11,549,000 5,775,000 11,549,000

92 Office Buildings District Jails (J & C) 3,609,000 3,609,000 3,609,000

A13302 Residential Buildings 51,346,000 46,095,000 51,346,000

110 Residential Buildings Health Services 36,094,000 30,947,000 36,094,000

140 Residential Buildings Agriculture Department 2,886,000 1,443,000 2,886,000

190 Residential Buildings Civil Works 5,053,000 5,053,000 5,053,000

2 Residential Buildings General Administration 1,444,000 722,000 1,444,000

230 Residential Buildings Other Department (P&D) 223,000 112,000 223,000

251 Residential Buildings Rest/Circuit House (C & W) 3,282,000 5,782,000 3,282,000

70 Residential Buildings Food Department 657,000 329,000 657,000

90 Residential Buildings Jail and Convicts Settlement 1,707,000 1,707,000 1,707,000

_______________________________________________________________________________PROVINCIAL BUILDINGS DIVISION 133,393,000 90,574,000 97,299,000

BENAZIRABAD

_______________________________________________________________________________

Page 466: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

465

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SB0087 PROVINCIAL BUILDINGS DIVISION NAWABSHAHDISTRICT NAUSHERO FEROZE

A13 TOTAL REPAIRS AND MAINTENANCE 48,430,000 36,733,000 48,430,000

A133 TOTAL BUILDINGS AND 48,430,000 36,733,000 48,430,000

STRUCTURE

A13301 Office Buildings 32,942,000 23,593,000 32,942,000

140 Office Buildings Agriculture Department 3,609,000 1,805,000 3,609,000

170 Office Buildings Livestock and Veterinary Department 460,000 230,000 460,000

191 Office Buildings District / Lower Courts (CIVIL WORKS) 7,218,000 7,218,000 7,218,000

2 Office Buildings General Administration 2,166,000 1,083,000 2,166,000

229 Office Buildings Others (Civil Works) 4,332,000 2,166,000 4,332,000

231 Office Buildings Bureau of Statistics(P & D) 722,000 361,000 722,000

250 Office Buildings Other Department (C&W) 2,886,000 1,443,000 2,886,000

71 Office Buildings Grain Godowns (FOOD) 11,549,000 5,775,000 11,549,000

92 Office Buildings District Jails (J & C) 3,512,000

A13302 Residential Buildings 15,488,000 13,140,000 15,488,000

140 Residential Buildings Agriculture Department 2,886,000 1,443,000 2,886,000

170 Residential Buildings Livestock and Veterinary Department 460,000 230,000 460,000

190 Residential Buildings Civil Works 5,906,000 5,906,000 5,906,000

2 Residential Buildings General Administration 1,183,000 592,000 1,183,000

250 Residential Buildings Other Department (C&W) 2,886,000 1,443,000 2,886,000

251 Residential Buildings Rest/Circuit House (C & W) 1,707,000 1,707,000 1,707,000

70 Residential Buildings Food Department 460,000 230,000 460,000

90 Residential Buildings Jail and Convicts Settlement 1,589,000

_______________________________________________________________________________PROVINCIAL BUILDINGS DIVISION NAWABSHAH 48,430,000 36,733,000 48,430,000

DISTRICT NAUSHERO FEROZE

_______________________________________________________________________________

Page 467: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

466

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SB0088 PROVINCIAL BUILDINGS DIVISION NAWABSHAHDISTRICT KHAIRPUR

A13 TOTAL REPAIRS AND MAINTENANCE 127,314,000 76,496,000 127,314,000

A133 TOTAL BUILDINGS AND 127,314,000 76,496,000 127,314,000

STRUCTURE

A13301 Office Buildings 96,011,000 50,962,000 96,011,000

110 Office Buildings Health Services 2,886,000 3,381,000 2,886,000

131 Office Building Sachal Sarmast Public Library Khairpur 26,250,000 9,213,000 26,250,000

140 Office Buildings Agriculture Department 3,609,000 3,000,000 3,609,000

143 Office Building Sachal Acedemy Khairpur 26,250,000 3,220,000 26,250,000

145 Office Building Atta Muhammad Hami Library Khairpur 5,250,000 5,250,000

191 Office Buildings District / Lower Courts (CIVIL WORKS) 3,609,000 4,238,000 3,609,000

2 Office Buildings General Administration 2,166,000 1,083,000 2,166,000

250 Office Buildings Other Department (C&W) 5,776,000 2,888,000 5,776,000

71 Office Buildings Grain Godowns (FOOD) 5,776,000 5,241,000 5,776,000

91 Office Buildings Central Jails (J & C SETT ) 14,439,000 18,698,000 14,439,000

A13302 Residential Buildings 31,303,000 25,534,000 31,303,000

110 Residential Buildings Health Services 2,166,000 1,083,000 2,166,000

140 Residential Buildings Agriculture Department 2,886,000 1,443,000 2,886,000

190 Residential Buildings Civil Works 4,332,000 5,420,000 4,332,000

2 Residential Buildings General Administration 7,218,000 3,609,000 7,218,000

251 Residential Buildings Rest/Circuit House (C & W) 8,663,000 8,663,000 8,663,000

70 Residential Buildings Food Department 1,444,000 722,000 1,444,000

90 Residential Buildings Jail and Convicts Settlement 4,594,000 4,594,000 4,594,000

_______________________________________________________________________________PROVINCIAL BUILDINGS DIVISION NAWABSHAH 127,314,000 76,496,000 127,314,000

DISTRICT KHAIRPUR

_______________________________________________________________________________

Page 468: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

467

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SY0104 BUILDING DIVISION SUKKUR

A01 TOTAL EMPLOYEES RELATED EXPENSES. 52,964,000 53,090,000 60,289,000

A011 TOTAL PAY 154 154 31,086,000 32,955,000 36,253,000

A011-1 TOTAL PAY OF OFFICERS 6 7 2,837,000 2,163,000 2,380,000

A01101 Total Basic Pay Of Officer 6 7 2,837,000 2,157,000 2,373,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 604,000 416,000 457,000

A218 ASSISTANT ENGINEER (BPS-17) 4 4 1,933,000 1,327,000 1,460,000

A235 ASSISTANT HEAD CLERK (BPS-16) 1 207,000 228,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 300,000 207,000 228,000 OFFICER

A01105 Qualification Pay 6,000 7,000

A011-2 TOTAL PAY OF OTHER STAFF 148 147 28,249,000 30,792,000 33,873,000

A01151 Total Basic Pay Other Staff 148 147 28,087,000 30,549,000 33,604,000

A235 ASSISTANT HEAD CLERK (BPS-14) 1 276,000

S053 SENIOR CLERK (BPS-14) 7 1,738,000 1,912,000

S181 STENOGRAPHER (BPS-14) 1 1 274,000 301,000 331,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 257,000 282,000 310,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 7 1,738,000 1,912,000

S222 SUB ENGINEER (BPS-11) 12 12 2,720,000 2,980,000 3,278,000

D150 DRAUGHTSMAN (BPS-10) 1 1 221,000 241,000 265,000

A017 ACCOUNT CLERK (BPS-09) 3 3 638,000 696,000 766,000

S053 SENIOR CLERK (BPS-09) 7 1,492,000

W045 WORK MESTRY / DAROGHA (BPS-08) 18 18 3,710,000 4,057,000 4,463,000

W056 WORK SUPERVISOR (BPS-08) 1 1 207,000 225,000 248,000

J014 JR CLERK (BPS-07) 7 1,593,000

C024 CARE TAKER (BPS-06) 1 1 194,000 210,000 231,000

Page 469: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

468

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SY0104 BUILDING DIVISION SUKKUR

E021 ELECTRICIAN (BPS-06) 6 6 1,154,000 1,262,000 1,388,000

P026 PESH IMAM (BPS-06) 1 1 194,000 210,000 231,000

P061 PLUMBER (BPS-06) 9 9 1,731,000 1,892,000 2,082,000

T050 TRACER (BPS-05) 1 1 184,000 203,000 223,000

W040 WIREMAN / LINEMAN (BPS-05) 8 8 1,483,000 1,624,000 1,786,000

C024 CARE TAKER (BPS-04) 1 1 179,000 196,000 215,000

C027 CARPENTER (BPS-04) 1 1 179,000 196,000 215,000

C173 COOKS (BPS-04) 2 2 356,000 391,000 430,000

D161 DRIVER (BPS-04) 5 5 893,000 978,000 1,076,000

M043 MASSON (BPS-04) 3 3 537,000 587,000 646,000

P168 PUMP OPERATOR (BPS-04) 4 4 714,000 783,000 861,000

B016 BEARER / ATTENDANT (BPS-01) 4 4 661,000 723,000 795,000

C089 CHOWKIDAR (BPS-01) 1 1 165,000 181,000 199,000

C092 CHOWKIDAR / WATCHMAN (BPS-01) 10 10 1,649,000 1,807,000 1,988,000

C111 CLEANER / HELPER / COLI (BPS-01) 10 10 1,649,000 1,807,000 1,988,000

C167 COOK (BPS-01) 6 6 989,000 1,084,000 1,193,000

D068 DHOBI / WASHER MAN (BPS-01) 2 2 330,000 361,000 398,000

M021 MALHI / GARDEN ATTENDANT (BPS-01) 8 8 1,319,000 1,446,000 1,590,000 / HAED MALHI

M022 MALI (BPS-01) 1 1 165,000 181,000 199,000

N003 NAIB QASID (BPS-01) 8 8 1,315,000 1,446,000 1,590,000

S008 SANITARY WORKER (BPS-01) 4 4 659,000 723,000 795,000

A01152 Personal pay 151,000 232,000 256,000

A01155 Qualification Pay 11,000 11,000 13,000

A012 TOTAL ALLOWANCES 21,878,000 20,135,000 24,036,000

A012-1 TOTAL REGULAR ALLOWANCES 21,878,000 20,135,000 24,036,000

A01202 House Rent Allowance 2,846,000 2,846,000 2,846,000

A01203 Conveyance Allowance 4,028,000 4,028,000 4,028,000

Page 470: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

469

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SY0104 BUILDING DIVISION SUKKUR

A01207 Washing Allowance 18,000 18,000 18,000

A0120D Integrated Allowance 32,000 32,000 32,000

A0120Q Fixed Daily Allowance 34,000 34,000 34,000

A0120X Ad - hoc Allowance - 2010 5,911,000 5,347,000 5,347,000

A01217 Medical Allowance 2,997,000 2,997,000 2,997,000

A0121Q Audit and Accounts Allowance 33,000 33,000

A0121T Adhoc Relief Allowance 2013 852,000 852,000

A0122C Adhoc Relief Allowance - 2015 3,006,000 653,000 653,000

A0122M Adhoc Relief Allowance 2016 3,295,000 3,598,000

A01270 Others 3,006,000 3,598,000

A03 TOTAL OPERATING EXPENSES 69,474,000 2,817,000 76,378,000

A032 TOTAL COMMUNICATIONS 125,000 125,000 132,000

A03201 Postage and Telegraph 18,000 18,000 19,000

A03202 Telephone and Trunk call 107,000 107,000 113,000

A033 TOTAL UTILITIES 68,872,000 2,215,000 75,751,000

A03301 Gas 2,088,000 2,088,000 2,297,000

A03303 Electricity 66,700,000 43,000 73,370,000

A03305 POL for Generator 84,000 84,000 84,000

A038 TOTAL TRAVEL & 286,000 286,000 291,000

TRANSPORTATION

A03805 Travelling Allowance 95,000 95,000 100,000

A03807 P.O.L Charges A.planes 191,000 191,000 191,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 191,000 191,000 204,000

A03901 Stationery 49,000 49,000 52,000

A03902 Printing and Publication 44,000 44,000 47,000

A03905 Newspapers Periodicals and Books 6,000 6,000 7,000

A03906 Uniforms and Protective Clothing 41,000 41,000 44,000

A03970 Others 51,000 51,000 54,000

1 Others 51,000 51,000 54,000

Page 471: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

470

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SY0104 BUILDING DIVISION SUKKUR

A13 TOTAL REPAIRS AND MAINTENANCE 49,000 49,000 54,000

A130 TOTAL TRANSPORT 18,000 18,000 20,000

A13001 Transport 18,000 18,000 20,000

A131 TOTAL MACHINERY AND 20,000 20,000 22,000

EQUIPMENT

A13101 Machinery and Equipment 20,000 20,000 22,000

A132 TOTAL FURNITURE AND 11,000 11,000 12,000

FIXTURE

A13201 Furniture and Fixture 11,000 11,000 12,000

_______________________________________________________________________________BUILDING DIVISION SUKKUR 122,487,000 55,956,000 136,721,000

_______________________________________________________________________________

Page 472: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

471

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SY0106 BUILDING CIRCLE SUKKUR

A01 TOTAL EMPLOYEES RELATED EXPENSES. 13,887,000 13,937,000 15,847,000

A011 TOTAL PAY 32 32 8,184,000 8,778,000 9,657,000

A011-1 TOTAL PAY OF OFFICERS 5 6 2,288,000 1,963,000 2,160,000

A01101 Total Basic Pay Of Officer 5 6 2,288,000 1,963,000 2,160,000

S238 SUPERINTENDENT ENGINEER (BPS-19) 1 1 857,000 616,000 677,000

A218 ASSISTANT ENGINEER (BPS-17) 1 1 440,000 317,000 349,000

P051 PLANNING OFFICER (BPS-17) 1 1 441,000 317,000 349,000

S236 SUPERINTENDENT (BPS-17) 1 317,000 349,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 1 198,000 218,000

C101 CIRCLE HEAD DRAFTSMEN (BPS-16) 1 1 275,000 198,000 218,000

S236 SUPERINTENDENT (BPS-16) 1 275,000

A011-2 TOTAL PAY OF OTHER STAFF 27 26 5,896,000 6,815,000 7,497,000

A01151 Total Basic Pay Other Staff 27 26 5,815,000 6,706,000 7,377,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 1 804,000

S053 SENIOR CLERK (BPS-14) 3 859,000 945,000

S181 STENOGRAPHER (BPS-14) 1 1 266,000 347,000 381,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 250,000 325,000 358,000 DRAUGHTSMAN

C146 COMPUTER OPERATOR (BPS-12) 1 1 233,000 304,000 334,000

J053 JUNIOR CLERK (BPS-11) 4 1,146,000 1,260,000

D150 DRAUGHTSMAN (BPS-10) 2 2 427,000 555,000 610,000

A017 ACCOUNT CLERK (BPS-09) 3 3 622,000 806,000 888,000

S053 SENIOR CLERK (BPS-09) 3 622,000

J014 JR CLERK (BPS-07) 4 773,000

T001 TRACER (BPS-05) 2 2 360,000 468,000 515,000

D161 DRIVER (BPS-04) 1 1 173,000 226,000 248,000

Page 473: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

472

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SY0106 BUILDING CIRCLE SUKKUR

D003 DAFTARI (BPS-02) 1 1 162,000 212,000 234,000

C092 CHOWKIDAR / WATCHMAN (BPS-01) 1 1 163,000 208,000 229,000

N003 NAIB QASID (BPS-01) 5 5 799,000 1,042,000 1,146,000

S008 SANITARY WORKER (BPS-01) 1 1 161,000 208,000 229,000

A01152 Personal pay 81,000 109,000 120,000

A012 TOTAL ALLOWANCES 5,703,000 5,159,000 6,190,000

A012-1 TOTAL REGULAR ALLOWANCES 5,689,000 5,145,000 6,175,000

A01202 House Rent Allowance 838,000 838,000 838,000

A01203 Conveyance Allowance 895,000 895,000 895,000

A0120D Integrated Allowance 20,000 20,000 20,000

A0120X Ad - hoc Allowance - 2010 1,602,000 1,421,000 1,421,000

A01217 Medical Allowance 707,000 707,000 707,000

A0121T Adhoc Relief Allowance 2013 204,000 204,000

A01224 Entertainment Allowance 7,000 7,000 7,000

A0122C Adhoc Relief Allowance - 2015 810,000 175,000 175,000

A0122M Adhoc Relief Allowance 2016 878,000 954,000

A01270 Others 810,000 954,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 14,000 14,000 15,000

A01274 Medical Charges 14,000 14,000 15,000

A03 TOTAL OPERATING EXPENSES 981,000 619,000 1,052,000

A032 TOTAL COMMUNICATIONS 134,000 134,000 142,000

A03201 Postage and Telegraph 27,000 27,000 29,000

A03202 Telephone and Trunk call 107,000 107,000 113,000

A033 TOTAL UTILITIES 500,000 138,000 550,000

A03303 Electricity 500,000 138,000 550,000

Page 474: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

473

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SY0106 BUILDING CIRCLE SUKKUR

A038 TOTAL TRAVEL & 233,000 233,000 238,000

TRANSPORTATION

A03805 Travelling Allowance 88,000 88,000 93,000

A03807 P.O.L Charges A.planes 145,000 145,000 145,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 114,000 114,000 122,000

A03901 Stationery 35,000 35,000 37,000

A03902 Printing and Publication 11,000 11,000 12,000

A03905 Newspapers Periodicals and Books 18,000 18,000 19,000

A03906 Uniforms and Protective Clothing 22,000 22,000 24,000

A03970 Others 28,000 28,000 30,000

1 Others 28,000 28,000 30,000

A13 TOTAL REPAIRS AND MAINTENANCE 42,000 42,000 47,000

A130 TOTAL TRANSPORT 26,000 26,000 29,000

A13001 Transport 26,000 26,000 29,000

A131 TOTAL MACHINERY AND 10,000 10,000 11,000

EQUIPMENT

A13101 Machinery and Equipment 10,000 10,000 11,000

A132 TOTAL FURNITURE AND 6,000 6,000 7,000

FIXTURE

A13201 Furniture and Fixture 6,000 6,000 7,000

_______________________________________________________________________________BUILDING CIRCLE SUKKUR 14,910,000 14,598,000 16,946,000

_______________________________________________________________________________

Page 475: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

474

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SY0109 PROVINCIAL BILDINGS DIVISION SUKKUR

A13 TOTAL REPAIRS AND MAINTENANCE 121,936,000 131,594,000 121,936,000

A133 TOTAL BUILDINGS AND 121,936,000 131,594,000 121,936,000

STRUCTURE

A13301 Office Buildings 77,703,000 87,361,000 77,703,000

110 Office Buildings Health Services 12,207,000 6,104,000 12,207,000

140 Office Buildings Agriculture Department 5,053,000 2,527,000 5,053,000

160 Office Buildings Fisheries Department 4,332,000 2,166,000 4,332,000

170 Office Buildings Livestock and Veterinary Department 2,166,000 1,083,000 2,166,000

191 Office Buildings District / Lower Courts (CIVIL WORKS) 7,218,000 10,218,000 7,218,000

229 Office Buildings Others (Civil Works) 5,776,000 38,372,000 5,776,000

270 Office Buildings A.D.C Works 5,776,000 2,888,000 5,776,000

71 Office Buildings Grain Godowns (FOOD) 11,549,000 5,775,000 11,549,000

91 Office Buildings Central Jails (J & C SETT ) 23,626,000 11,813,000 23,626,000

99 Office Buildings ATC Courts (Block Allocation) 6,415,000

A13302 Residential Buildings 44,233,000 44,233,000 44,233,000

110 Residential Buildings Health Services 2,886,000 2,886,000 2,886,000

140 Residential Buildings Agriculture Department 2,886,000 2,886,000 2,886,000

160 Residential Buildings Fisheries Department 1,183,000 1,183,000 1,183,000

170 Residential Buildings Livestock and Veterinary Department 1,183,000 1,183,000 1,183,000

190 Residential Buildings Civil Works 7,218,000 7,218,000 7,218,000

251 Residential Buildings Rest/Circuit House (C & W) 4,332,000 4,332,000 4,332,000

270 Residential Buildings A.D.C Works 14,439,000 14,439,000 14,439,000

70 Residential Buildings Food Department 919,000 919,000 919,000

90 Residential Buildings Jail and Convicts Settlement 9,187,000 9,187,000 9,187,000

_______________________________________________________________________________PROVINCIAL BILDINGS DIVISION SUKKUR 121,936,000 131,594,000 121,936,000

_______________________________________________________________________________

Page 476: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

475

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SY0110 PROVINCIAL BUILDINGS DIVISION SUKKURDISTRICT GHOTKI

A13 TOTAL REPAIRS AND MAINTENANCE 32,219,000 39,009,000 32,219,000

A133 TOTAL BUILDINGS AND 32,219,000 39,009,000 32,219,000

STRUCTURE

A13301 Office Buildings 24,017,000 28,091,000 24,017,000

140 Office Buildings Agriculture Department 6,563,000 6,563,000 6,563,000

191 Office Buildings District / Lower Courts (CIVIL WORKS) 5,906,000 5,906,000 5,906,000

229 Office Buildings Others (Civil Works) 2,886,000 2,886,000 2,886,000

250 Office Buildings Other Department (C&W) 1,444,000 1,444,000 1,444,000

71 Office Buildings Grain Godowns (FOOD) 7,218,000 7,218,000 7,218,000

92 Office Buildings District Jails (J & C) 4,074,000

A13302 Residential Buildings 8,202,000 10,918,000 8,202,000

140 Residential Buildings Agriculture Department 2,886,000 2,886,000 2,886,000

190 Residential Buildings Civil Works 3,609,000 3,609,000 3,609,000

250 Residential Buildings Other Department (C&W) 788,000 788,000 788,000

70 Residential Buildings Food Department 919,000 919,000 919,000

90 Residential Buildings Jail and Convicts Settlement 2,716,000

_______________________________________________________________________________PROVINCIAL BUILDINGS DIVISION SUKKUR 32,219,000 39,009,000 32,219,000

DISTRICT GHOTKI

_______________________________________________________________________________

Page 477: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

476

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SY0111 PROVINCIAL BUILDINGS DIVISION SUKKURDISTRICT SHIKARPUR

A13 TOTAL REPAIRS AND MAINTENANCE 52,758,000 36,767,000 52,758,000

A133 TOTAL BUILDINGS AND 52,758,000 36,767,000 52,758,000

STRUCTURE

A13301 Office Buildings 40,552,000 24,561,000 40,552,000

132 Office Building Kadir Bux Bedal Public Library Shikarpur 15,750,000 15,750,000

140 Office Buildings Agriculture Department 2,886,000 2,886,000 2,886,000

191 Office Buildings District / Lower Courts (CIVIL WORKS) 4,594,000 4,594,000 4,594,000

229 Office Buildings Others (Civil Works) 2,886,000 2,645,000 2,886,000

71 Office Buildings Grain Godowns (FOOD) 7,218,000 7,218,000 7,218,000

92 Office Buildings District Jails (J & C) 7,218,000 7,218,000 7,218,000

A13302 Residential Buildings 12,206,000 12,206,000 12,206,000

140 Residential Buildings Agriculture Department 1,444,000 1,444,000 1,444,000

190 Residential Buildings Civil Works 4,332,000 4,332,000 4,332,000

250 Residential Buildings Other Department (C&W) 2,886,000 2,886,000 2,886,000

70 Residential Buildings Food Department 919,000 919,000 919,000

90 Residential Buildings Jail and Convicts Settlement 2,625,000 2,625,000 2,625,000

_______________________________________________________________________________PROVINCIAL BUILDINGS DIVISION SUKKUR 52,758,000 36,767,000 52,758,000

DISTRICT SHIKARPUR

_______________________________________________________________________________

Page 478: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

477

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

TX0065 BUILDING DIVISION THATTA

A01 TOTAL EMPLOYEES RELATED EXPENSES. 38,488,000 38,736,000 44,029,000

A011 TOTAL PAY 125 125 22,756,000 24,185,000 26,606,000

A011-1 TOTAL PAY OF OFFICERS 6 7 3,421,000 2,674,000 2,943,000

A01101 Total Basic Pay Of Officer 6 7 3,339,000 2,592,000 2,852,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 668,000 472,000 520,000

A218 ASSISTANT ENGINEER (BPS-17) 4 4 2,136,000 1,508,000 1,658,000

D129 DIVISIONAL ACCOUNTS (BPS-17) 1 1 535,000 377,000 415,000 OFFICER

A235 ASSISTANT HEAD CLERK (BPS-16) 1 235,000 259,000

A01102 Personal pay 74,000 74,000 82,000

A01105 Qualification Pay 8,000 8,000 9,000

A011-2 TOTAL PAY OF OTHER STAFF 119 118 19,335,000 21,511,000 23,663,000

A01151 Total Basic Pay Other Staff 119 118 19,285,000 21,410,000 23,551,000

A235 ASSISTANT HEAD CLERK (BPS-14) 1 239,000

S053 SENIOR CLERK (BPS-14) 7 1,540,000 1,694,000

S181 STENOGRAPHER (BPS-14) 1 1 241,000 266,000 293,000

D136 DIVISIONAL HEAD (BPS-12) 1 1 210,000 233,000 257,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 8 1,760,000 1,936,000

S222 SUB ENGINEER (BPS-11) 12 12 2,384,000 2,640,000 2,904,000

D150 DRAUGHTSMAN (BPS-10) 1 1 193,000 213,000 234,000

A017 ACCOUNT CLERK (BPS-09) 2 2 373,000 415,000 456,000

S053 SENIOR CLERK (BPS-09) 7 1,306,000

J014 JR CLERK (BPS-07) 8 1,395,000

C024 CARE TAKER (BPS-06) 1 1 168,000 186,000 205,000

P061 PLUMBER (BPS-06) 2 2 339,000 373,000 410,000

T050 TRACER (BPS-05) 1 1 163,000 180,000 198,000

Page 479: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

478

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

TX0065 BUILDING DIVISION THATTA

W040 WIREMAN / LINEMAN (BPS-05) 3 3 486,000 539,000 593,000

W045 WORK MESTRY / DAROGHA (BPS-05) 9 9 1,462,000 1,618,000 1,780,000

C027 CARPENTER (BPS-04) 2 2 312,000 347,000 381,000

C173 COOKS (BPS-04) 2 2 312,000 347,000 381,000

D161 DRIVER (BPS-04) 7 7 1,097,000 1,213,000 1,335,000

E022 ELECTRICIAN / HEAD (BPS-04) 4 4 625,000 693,000 763,000 ELECTRICIAN

M043 MASSON (BPS-04) 1 1 157,000 173,000 191,000

P168 PUMP OPERATOR (BPS-04) 2 2 312,000 347,000 381,000

S006 SANITARY MATE (BPS-02) 1 1 149,000 163,000 179,000

B007 BALDAR (BPS-01) 6 6 868,000 961,000 1,057,000

B016 BEARER / ATTENDANT (BPS-01) 2 2 289,000 320,000 352,000

C089 CHOWKIDAR (BPS-01) 1 1 145,000 160,000 176,000

C092 CHOWKIDAR / WATCHMAN (BPS-01) 12 12 1,733,000 1,921,000 2,113,000

C167 COOK (BPS-01) 1 1 145,000 160,000 176,000

D068 DHOBI / WASHER MAN (BPS-01) 1 1 145,000 160,000 176,000

M002 MUCCADUM (BPS-01) 1 1 145,000 160,000 176,000

M021 MALHI / GARDEN ATTENDANT (BPS-01) 6 6 867,000 961,000 1,057,000 / HAED MALHI

M044 MATE (BPS-01) 3 3 432,000 480,000 528,000

N003 NAIB QASID (BPS-01) 14 14 2,017,000 2,241,000 2,465,000

S008 SANITARY WORKER (BPS-01) 4 4 576,000 640,000 704,000

A01152 Personal pay 50,000 101,000 112,000

A012 TOTAL ALLOWANCES 15,732,000 14,551,000 17,423,000

A012-1 TOTAL REGULAR ALLOWANCES 15,718,000 14,537,000 17,408,000

A01202 House Rent Allowance 1,566,000 1,566,000 1,566,000

A01203 Conveyance Allowance 3,175,000 3,175,000 3,175,000

A01207 Washing Allowance 17,000 17,000 17,000

Page 480: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

479

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

TX0065 BUILDING DIVISION THATTA

A0120D Integrated Allowance 13,000 39,000 39,000

A0120X Ad - hoc Allowance - 2010 4,266,000 3,924,000 3,924,000

A01217 Medical Allowance 2,321,000 2,321,000 2,321,000

A0121T Adhoc Relief Allowance 2013 594,000 594,000

A0122C Adhoc Relief Allowance - 2015 2,180,000 480,000 480,000

A0122M Adhoc Relief Allowance 2016 2,409,000 2,640,000

A01257 RC Allowance 12,000 12,000

A01270 Others 2,180,000 2,640,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 14,000 14,000 15,000

A01274 Medical Charges 14,000 14,000 15,000

A03 TOTAL OPERATING EXPENSES 2,619,000 2,488,000 2,852,000

A032 TOTAL COMMUNICATIONS 102,000 102,000 108,000

A03201 Postage and Telegraph 8,000 8,000 9,000

A03202 Telephone and Trunk call 94,000 94,000 99,000

A033 TOTAL UTILITIES 2,089,000 1,958,000 2,299,000

A03301 Gas 87,000 87,000 96,000

A03302 Water 835,000 835,000 919,000

A03303 Electricity 1,167,000 1,036,000 1,284,000

A038 TOTAL TRAVEL & 235,000 235,000 240,000

TRANSPORTATION

A03805 Travelling Allowance 88,000 88,000 93,000

A03807 P.O.L Charges A.planes 147,000 147,000 147,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 193,000 193,000 205,000

A03901 Stationery 51,000 51,000 54,000

A03902 Printing and Publication 6,000 6,000 7,000

A03905 Newspapers Periodicals and Books 29,000 29,000 31,000

A03906 Uniforms and Protective Clothing 51,000 51,000 54,000

Page 481: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

480

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

TX0065 BUILDING DIVISION THATTA

A03970 Others 56,000 56,000 59,000

1 Others 56,000 56,000 59,000

A13 TOTAL REPAIRS AND MAINTENANCE 99,000 99,000 109,000

A130 TOTAL TRANSPORT 34,000 34,000 38,000

A13001 Transport 34,000 34,000 38,000

A131 TOTAL MACHINERY AND 35,000 35,000 39,000

EQUIPMENT

A13101 Machinery and Equipment 35,000 35,000 39,000

A132 TOTAL FURNITURE AND 30,000 30,000 32,000

FIXTURE

A13201 Furniture and Fixture 30,000 30,000 32,000

_______________________________________________________________________________BUILDING DIVISION THATTA 41,206,000 41,323,000 46,990,000

_______________________________________________________________________________

Page 482: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

481

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

TX0066 PROVINCIAL BUILDINGS DIVISION THATTA

A13 TOTAL REPAIRS AND MAINTENANCE 40,139,000 37,973,000 40,139,000

A131 TOTAL MACHINERY AND 16,000 16,000 16,000

EQUIPMENT

A13101 Machinery and Equipment 16,000 16,000 16,000

A133 TOTAL BUILDINGS AND 40,123,000 37,957,000 40,123,000

STRUCTURE

A13301 Office Buildings 23,519,000 21,353,000 23,519,000

140 Office Buildings Agriculture Department 223,000 223,000 223,000

160 Office Buildings Fisheries Department 2,886,000 2,886,000 2,886,000

170 Office Buildings Livestock and Veterinary Department 1,772,000 1,772,000 1,772,000

191 Office Buildings District / Lower Courts (CIVIL WORKS) 5,906,000 5,906,000 5,906,000

2 Office Buildings General Administration 2,166,000 2,166,000 2,166,000

229 Office Buildings Others (Civil Works) 2,886,000 2,886,000 2,886,000

231 Office Buildings Bureau of Statistics(P & D) 460,000 460,000 460,000

250 Office Buildings Other Department (C&W) 1,444,000 1,444,000 1,444,000

71 Office Buildings Grain Godowns (FOOD) 4,332,000 2,166,000 4,332,000

93 Office Buildings Lockups (J & C) 1,444,000 1,444,000 1,444,000

A13302 Residential Buildings 16,604,000 16,604,000 16,604,000

140 Residential Buildings Agriculture Department 3,609,000 3,609,000 3,609,000

160 Residential Buildings Fisheries Department 1,444,000 1,444,000 1,444,000

190 Residential Buildings Civil Works 4,332,000 4,332,000 4,332,000

2 Residential Buildings General Administration 853,000 853,000 853,000

230 Residential Buildings Other Department (P&D) 590,000 590,000 590,000

251 Residential Buildings Rest/Circuit House (C & W) 4,332,000 4,332,000 4,332,000

268 Residential Buildings Others (C & W) 1,444,000 1,444,000 1,444,000

_______________________________________________________________________________PROVINCIAL BUILDINGS DIVISION THATTA 40,139,000 37,973,000 40,139,000

_______________________________________________________________________________

Page 483: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

482

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

TX0067 PROVINCIAL BUILDING DIVISION THATTADISTRICT TANDO MUHAMMAD KHAN

A13 TOTAL REPAIRS AND MAINTENANCE 25,719,000 21,913,000 25,719,000

A133 TOTAL BUILDINGS AND 25,719,000 21,913,000 25,719,000

STRUCTURE

A13301 Office Buildings 14,830,000 11,221,000 14,830,000

170 Office Buildings Livestock and Veterinary Department 394,000 394,000 394,000

190 Office Buildings Civil Works 2,886,000 2,886,000 2,886,000

39 Office Buildings Others (G.A) 4,332,000 4,332,000 4,332,000

71 Office Buildings Grain Godowns (FOOD) 7,218,000 3,609,000 7,218,000

A13302 Residential Buildings 10,889,000 10,692,000 10,889,000

170 Residential Buildings Livestock and Veterinary Department 2,886,000 2,886,000 2,886,000

190 Residential Buildings Civil Works 1,837,000 1,837,000 1,837,000

250 Residential Buildings Other Department (C&W) 2,886,000 2,886,000 2,886,000

69 Residential Buildings Others (G.A) 2,886,000 2,886,000 2,886,000

70 Residential Buildings Food Department 394,000 197,000 394,000

_______________________________________________________________________________PROVINCIAL BUILDING DIVISION THATTA 25,719,000 21,913,000 25,719,000

DISTRICT TANDO MUHAMMAD KHAN

_______________________________________________________________________________

Page 484: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

483

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

TX0068 PROVINCIAL BUILDING DIVISION THATTADISTRICT BADIN

A13 TOTAL REPAIRS AND MAINTENANCE 41,146,000 37,898,000 41,146,000

A133 TOTAL BUILDINGS AND 41,146,000 37,898,000 41,146,000

STRUCTURE

A13301 Office Buildings 24,872,000 22,346,000 24,872,000

140 Office Buildings Agriculture Department 1,772,000 1,772,000 1,772,000

160 Office Buildings Fisheries Department 1,772,000 1,772,000 1,772,000

191 Office Buildings District / Lower Courts (CIVIL WORKS) 5,250,000 5,250,000 5,250,000

2 Office Buildings General Administration 1,183,000 1,183,000 1,183,000

229 Office Buildings Others (Civil Works) 2,886,000 2,886,000 2,886,000

231 Office Buildings Bureau of Statistics(P & D) 590,000 590,000 590,000

250 Office Buildings Other Department (C&W) 1,444,000 1,444,000 1,444,000

270 Office Buildings A.D.C Works 328,000 328,000 328,000

71 Office Buildings Grain Godowns (FOOD) 5,053,000 2,527,000 5,053,000

92 Office Buildings District Jails (J & C) 4,594,000 4,594,000 4,594,000

A13302 Residential Buildings 16,274,000 15,552,000 16,274,000

140 Residential Buildings Agriculture Department 722,000 722,000 722,000

160 Residential Buildings Fisheries Department 722,000 722,000 722,000

190 Residential Buildings Civil Works 4,332,000 4,332,000 4,332,000

2 Residential Buildings General Administration 919,000 919,000 919,000

230 Residential Buildings Other Department (P&D) 590,000 590,000 590,000

251 Residential Buildings Rest/Circuit House (C & W) 2,886,000 2,886,000 2,886,000

268 Residential Buildings Others (C & W) 2,166,000 2,166,000 2,166,000

270 Residential Buildings A.D.C Works 1,444,000 1,444,000 1,444,000

71 Residential Buildings Grain Godowns (Food) 1,444,000 722,000 1,444,000

90 Residential Buildings Jail and Convicts Settlement 1,049,000 1,049,000 1,049,000

_______________________________________________________________________________PROVINCIAL BUILDING DIVISION THATTA 41,146,000 37,898,000 41,146,000

DISTRICT BADIN

_______________________________________________________________________________

Page 485: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

484

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

BI0061 EXECTIVE ENGINEER BUILDINGS DIVISIONBADIN

A01 TOTAL EMPLOYEES RELATED EXPENSES. 20,310,000 23,010,000 26,011,000

A011 TOTAL PAY 65 65 11,928,000 14,374,000 15,813,000

A011-1 TOTAL PAY OF OFFICERS 6 7 2,635,000 4,011,000 4,413,000

A01101 Total Basic Pay Of Officer 6 7 2,522,000 3,849,000 4,234,000

D259 DISTRICT OFFICER (BPS-18) 1 1 537,000 742,000 816,000

D262 DEPUTY DISTRICT OFFICER (BPS-17) 4 4 1,717,000 2,368,000 2,605,000

A235 ASSISTANT HEAD CLERK (BPS-16) 1 370,000 406,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 268,000 369,000 407,000 OFFICER

A01102 Personal pay 113,000 162,000 179,000

A011-2 TOTAL PAY OF OTHER STAFF 59 58 9,293,000 10,363,000 11,400,000

A01151 Total Basic Pay Other Staff 59 58 9,255,000 10,293,000 11,323,000

A235 ASSISTANT HEAD CLERK (BPS-14) 1 216,000

S053 SENIOR CLERK (BPS-14) 2 414,000 456,000

D136 DIVISIONAL HEAD (BPS-11) 1 1 184,000 207,000 228,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 10 2,072,000 2,279,000

S222 SUB ENGINEER (BPS-11) 8 8 1,440,000 1,657,000 1,823,000

D150 DRAUGHTSMAN (BPS-09) 1 1 169,000 194,000 214,000

S053 SENIOR CLERK (BPS-09) 2 507,000

A017 ACCOUNT CLERK (BPS-07) 1 1 316,000 184,000 200,000

J053 JUNIOR CLERK (BPS-07) 10 1,581,000

E021 ELECTRICIAN (BPS-05) 1 1 147,000 169,000 186,000

P061 PLUMBER (BPS-05) 1 1 147,000 169,000 186,000

T047 TRACER (BPS-05) 1 1 147,000 169,000 186,000

W045 WORK MESTRY / DAROGHA (BPS-05) 8 8 1,179,000 1,354,000 1,490,000

Page 486: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

485

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

BI0061 EXECTIVE ENGINEER BUILDINGS DIVISIONBADIN

D161 DRIVER (BPS-04) 2 2 284,000 326,000 359,000

C092 CHOWKIDAR / WATCHMAN (BPS-02) 5 5 668,000 768,000 845,000

C111 CLEANER / HELPER / COLI (BPS-02) 8 8 1,068,000 1,228,000 1,351,000

M020 MALHI / GARDEN ATTENDANT (BPS-02) 1 1 133,000 154,000 169,000

N003 NAIB QASID (BPS-02) 6 6 803,000 921,000 1,013,000

S008 SANITARY WORKER (BPS-02) 2 2 266,000 307,000 338,000

A01152 Personal pay 38,000 70,000 77,000

A012 TOTAL ALLOWANCES 8,382,000 8,636,000 10,198,000

A012-1 TOTAL REGULAR ALLOWANCES 8,382,000 8,636,000 10,198,000

A01202 House Rent Allowance 698,000 765,000 765,000

A01203 Conveyance Allowance 1,695,000 1,695,000 1,695,000

A01207 Washing Allowance 39,000 39,000 39,000

A0120D Integrated Allowance 4,000 4,000 4,000

A0120X Ad - hoc Allowance - 2010 2,331,000 2,521,000 2,521,000

A01217 Medical Allowance 1,259,000 1,259,000 1,259,000

A0121A Ad - hoc Allowance - 2011 43,000

A0121M Adhoc Relief Allowance - 2012 105,000

A0121T Adhoc Relief Allowance 2013 461,000 461,000

A0121Z Adhoc Relief Allowance - 2014 122,000

A0122C Adhoc Relief Allowance - 2015 1,178,000 342,000 342,000

A0122M Adhoc Relief Allowance 2016 1,280,000 1,556,000

A01270 Others 1,178,000 1,556,000

A03 TOTAL OPERATING EXPENSES 2,774,000 1,395,000 2,990,000

A032 TOTAL COMMUNICATIONS 76,000 76,000 81,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 67,000 67,000 71,000

A033 TOTAL UTILITIES 1,859,000 480,000 2,046,000

Page 487: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

486

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

BI0061 EXECTIVE ENGINEER BUILDINGS DIVISIONBADIN

A03301 Gas 15,000 15,000 17,000

A03302 Water 10,000 10,000 11,000

A03303 Electricity 1,834,000 455,000 2,018,000

A038 TOTAL TRAVEL & 576,000 576,000 584,000

TRANSPORTATION

A03805 Travelling Allowance 159,000 159,000 167,000

A03807 P.O.L Charges A.planes 417,000 417,000 417,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 263,000 263,000 279,000

A03901 Stationery 87,000 87,000 92,000

A03902 Printing and Publication 31,000 31,000 33,000

A03905 Newspapers Periodicals and Books 24,000 24,000 26,000

A03970 Others 121,000 121,000 128,000

1 Others 121,000 121,000 128,000

A13 TOTAL REPAIRS AND MAINTENANCE 252,000 252,000 274,000

A130 TOTAL TRANSPORT 146,000 146,000 161,000

A13001 Transport 146,000 146,000 161,000

A131 TOTAL MACHINERY AND 38,000 38,000 42,000

EQUIPMENT

A13101 Machinery and Equipment 38,000 38,000 42,000

A132 TOTAL FURNITURE AND 34,000 34,000 36,000

FIXTURE

A13201 Furniture and Fixture 34,000 34,000 36,000

A137 TOTAL COMPUTER EQUIPMENT 34,000 34,000 35,000

A13701 Hardware 18,000 18,000 19,000

Page 488: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

487

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

BI0061 EXECTIVE ENGINEER BUILDINGS DIVISIONBADIN

A13702 Software 16,000 16,000 16,000

_______________________________________________________________________________EXECTIVE ENGINEER BUILDINGS DIVISION 23,336,000 24,657,000 29,275,000

BADIN

_______________________________________________________________________________

Page 489: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

488

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

DD0064 EXECTIVE ENGINEER BUILDINGS DIVISIONDADU

A01 TOTAL EMPLOYEES RELATED EXPENSES. 30,481,000 31,601,000 35,876,000

A011 TOTAL PAY 97 97 17,981,000 19,792,000 21,773,000

A011-1 TOTAL PAY OF OFFICERS 5 6 2,308,000 2,126,000 2,340,000

A01101 Total Basic Pay Of Officer 5 6 2,292,000 1,887,000 2,322,000

D259 DISTRICT OFFICER (BPS-18) 1 1 587,000 430,000 719,000

D262 DEPUTY DISTRICT OFFICER (BPS-17) 3 3 1,410,000 1,029,000 1,132,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 1 214,000 236,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 295,000 214,000 235,000 OFFICER

A01102 Personal pay 16,000 16,000 18,000

A01107 Index Pay 223,000

A011-2 TOTAL PAY OF OTHER STAFF 92 91 15,673,000 17,666,000 19,433,000

A01151 Total Basic Pay Other Staff 92 91 15,537,000 17,467,000 19,214,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 1 242,000

S053 SENIOR CLERK (BPS-14) 3 691,000 760,000

D228 DRAUGHTSMAN (BPS-11) 1 1 202,000 230,000 253,000

J053 JUNIOR CLERK (BPS-11) 8 1,843,000 2,027,000

S222 SUB ENGINEER (BPS-11) 9 9 1,823,000 2,073,000 2,280,000

A017 ACCOUNT CLERK (BPS-09) 2 2 381,000 430,000 477,000

S053 SENIOR CLERK (BPS-09) 3 570,000

J014 JR CLERK (BPS-07) 8 1,424,000

C027 CARPENTER (BPS-05) 1 1 166,000 188,000 207,000

D161 DRIVER (BPS-05) 3 3 498,000 565,000 621,000

E021 ELECTRICIAN (BPS-05) 3 3 498,000 565,000 621,000

M042 MASSAN MISTRY (BPS-05) 2 2 330,000 377,000 414,000

Page 490: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

489

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

DD0064 EXECTIVE ENGINEER BUILDINGS DIVISIONDADU

P061 PLUMBER (BPS-05) 1 1 166,000 188,000 207,000

P168 PUMP OPERATOR (BPS-05) 7 7 1,161,000 1,318,000 1,450,000

T050 TRACER (BPS-05) 1 1 166,000 188,000 207,000

W046 WORK MISTRY (BPS-05) 14 14 2,321,000 2,636,000 2,899,000

M020 MALHI / GARDEN ATTENDANT (BPS-03) 5 5 775,000 881,000 969,000

C089 CHOWKIDAR (BPS-02) 5 5 751,000 854,000 939,000

C111 CLEANER / HELPER / COLI (BPS-02) 9 9 1,353,000 1,537,000 1,690,000

N003 NAIB QASID (BPS-02) 16 16 2,409,000 2,732,000 3,005,000

S008 SANITARY WORKER (BPS-02) 1 1 301,000 171,000 188,000

A01152 Personal pay 136,000 199,000 219,000

A012 TOTAL ALLOWANCES 12,500,000 11,809,000 14,103,000

A012-1 TOTAL REGULAR ALLOWANCES 12,500,000 11,809,000 14,103,000

A01202 House Rent Allowance 1,259,000 1,259,000 1,259,000

A01203 Conveyance Allowance 2,436,000 2,534,000 2,534,000

A01207 Washing Allowance 29,000 29,000 29,000

A0120X Ad - hoc Allowance - 2010 3,409,000 3,212,000 3,212,000

A01217 Medical Allowance 1,853,000 1,853,000 1,853,000

A0121T Adhoc Relief Allowance 2013 541,000 541,000

A0122C Adhoc Relief Allowance - 2015 1,757,000 417,000 417,000

A0122M Adhoc Relief Allowance 2016 1,964,000 2,129,000

A01270 Others 1,757,000 2,129,000

A03 TOTAL OPERATING EXPENSES 519,000 312,000 556,000

A032 TOTAL COMMUNICATIONS 76,000 76,000 81,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 67,000 67,000 71,000

A033 TOTAL UTILITIES 208,000 1,000 229,000

Page 491: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

490

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

DD0064 EXECTIVE ENGINEER BUILDINGS DIVISIONDADU

A03303 Electricity 208,000 1,000 229,000

A038 TOTAL TRAVEL & 110,000 110,000 113,000

TRANSPORTATION

A03805 Travelling Allowance 55,000 55,000 58,000

A03807 P.O.L Charges A.planes 55,000 55,000 55,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 125,000 125,000 133,000

A03901 Stationery 16,000 16,000 17,000

A03902 Printing and Publication 16,000 16,000 17,000

A03905 Newspapers Periodicals and Books 10,000 10,000 11,000

A03906 Uniforms and Protective Clothing 57,000 57,000 60,000

A03970 Others 26,000 26,000 28,000

1 Others 26,000 26,000 28,000

A13 TOTAL REPAIRS AND MAINTENANCE 96,000 96,000 105,000

A130 TOTAL TRANSPORT 27,000 27,000 30,000

A13001 Transport 27,000 27,000 30,000

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

A13101 Machinery and Equipment 36,000 36,000 40,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

_______________________________________________________________________________EXECTIVE ENGINEER BUILDINGS DIVISION 31,096,000 32,009,000 36,537,000

DADU

_______________________________________________________________________________

Page 492: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

491

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

GO0056 EXECTIVE ENGINEER BUILDINGS DIVISIONGHOTKI

A01 TOTAL EMPLOYEES RELATED EXPENSES. 18,940,000 21,661,000 24,628,000

A011 TOTAL PAY 75 75 10,881,000 13,579,000 14,939,000

A011-1 TOTAL PAY OF OFFICERS 6 7 2,421,000 4,227,000 4,651,000

A01101 Total Basic Pay Of Officer 6 7 2,404,000 4,151,000 4,567,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 513,000 800,000 880,000

A218 ASSISTANT ENGINEER (BPS-17) 4 4 1,636,000 2,553,000 2,811,000

A235 ASSISTANT HEAD CLERK (BPS-16) 1 399,000 438,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 255,000 399,000 438,000 OFFICER

A01102 Personal pay 17,000 76,000 84,000

A011-2 TOTAL PAY OF OTHER STAFF 69 68 8,460,000 9,352,000 10,288,000

A01151 Total Basic Pay Other Staff 69 68 8,448,000 9,332,000 10,266,000

A235 ASSISTANT HEAD CLERK (BPS-14) 1 174,000

S053 SENIOR CLERK (BPS-14) 2 320,000 352,000

S181 STENOGRAPHER (BPS-14) 1 1 154,000 194,000 213,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 164,000 182,000 200,000 DRAUGHTSMAN

C024 CARE TAKER (BPS-11) 1 1 146,000 160,000 176,000

J053 JUNIOR CLERK (BPS-11) 10 1,599,000 1,759,000

S222 SUB ENGINEER (BPS-11) 8 8 1,163,000 1,279,000 1,407,000

D230 DRAFTSMAN (BPS-10) 1 1 140,000 155,000 170,000

A017 ACCOUNT CLERK (BPS-09) 2 2 277,000 297,000 329,000

S053 SENIOR CLERK (BPS-09) 2 274,000

J014 JR CLERK (BPS-07) 10 1,277,000

D161 DRIVER (BPS-05) 1 1 118,000 131,000 144,000

Page 493: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

492

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

GO0056 EXECTIVE ENGINEER BUILDINGS DIVISIONGHOTKI

E022 ELECTRICIAN / HEAD (BPS-05) 1 1 118,000 131,000 144,000 ELECTRICIAN

P026 PESH IMAM (BPS-05) 1 1 118,000 131,000 144,000

T047 TRACER (BPS-05) 1 1 118,000 131,000 144,000

W045 WORK MESTRY / DAROGHA (BPS-05) 9 9 1,069,000 1,176,000 1,294,000

P061 PLUMBER (BPS-04) 1 1 115,000 126,000 139,000

B015 BEAREAR (BPS-02) 4 4 431,000 474,000 522,000

C092 CHOWKIDAR / WATCHMAN (BPS-02) 7 7 757,000 830,000 913,000

C111 CLEANER / HELPER / COLI (BPS-02) 3 3 325,000 356,000 391,000

C167 COOK (BPS-02) 2 2 216,000 237,000 261,000

M022 MALI (BPS-02) 2 2 216,000 237,000 261,000

N003 NAIB QASID (BPS-02) 6 6 645,000 711,000 782,000

P061 PLUMBER (BPS-02) 1 1 108,000 119,000 130,000

S008 SANITARY WORKER (BPS-02) 3 3 325,000 356,000 391,000

A01152 Personal pay 12,000 20,000 22,000

A012 TOTAL ALLOWANCES 8,059,000 8,082,000 9,689,000

A012-1 TOTAL REGULAR ALLOWANCES 7,839,000 7,862,000 9,458,000

A01202 House Rent Allowance 809,000 877,000 877,000

A01203 Conveyance Allowance 1,600,000 1,600,000 1,600,000

A01207 Washing Allowance 6,000 6,000 6,000

A0120D Integrated Allowance 13,000 14,000 14,000

A0120X Ad - hoc Allowance - 2010 2,103,000 2,181,000 2,181,000

A01216 Qualification Allowance 11,000 11,000 11,000

A01217 Medical Allowance 1,127,000 1,127,000 1,127,000

A0121Q Audit and Accounts Allowance 89,000 89,000

A0121T Adhoc Relief Allowance 2013 294,000 294,000

A0121Z Adhoc Relief Allowance - 2014 19,000

A0122C Adhoc Relief Allowance - 2015 1,085,000 293,000 293,000

A0122M Adhoc Relief Allowance 2016 1,328,000 1,483,000

A01244 Adhoc Relief 23,000

Page 494: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

493

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

GO0056 EXECTIVE ENGINEER BUILDINGS DIVISIONGHOTKI

A01270 Others 1,085,000 1,483,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 220,000 220,000 231,000

A01274 Medical Charges 220,000 220,000 231,000

A03 TOTAL OPERATING EXPENSES 1,684,000 851,000 1,802,000

A032 TOTAL COMMUNICATIONS 49,000 49,000 52,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 40,000 40,000 42,000

A033 TOTAL UTILITIES 851,000 18,000 937,000

A03301 Gas 17,000 17,000 19,000

A03303 Electricity 834,000 1,000 918,000

A038 TOTAL TRAVEL & 580,000 580,000 596,000

TRANSPORTATION

A03805 Travelling Allowance 285,000 285,000 300,000

A03806 Transportation of Goods 16,000 16,000 17,000

A03807 P.O.L Charges A.planes 279,000 279,000 279,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 204,000 204,000 217,000

A03901 Stationery 74,000 74,000 78,000

A03902 Printing and Publication 31,000 31,000 33,000

A03905 Newspapers Periodicals and Books 9,000 9,000 10,000

A03906 Uniforms and Protective Clothing 28,000 28,000 30,000

A03970 Others 62,000 62,000 66,000

1 Others 62,000 62,000 66,000

A13 TOTAL REPAIRS AND MAINTENANCE 160,000 160,000 176,000

Page 495: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

494

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

GO0056 EXECTIVE ENGINEER BUILDINGS DIVISIONGHOTKI

A130 TOTAL TRANSPORT 74,000 74,000 82,000

A13001 Transport 74,000 74,000 82,000

A131 TOTAL MACHINERY AND 45,000 45,000 50,000

EQUIPMENT

A13101 Machinery and Equipment 45,000 45,000 50,000

A132 TOTAL FURNITURE AND 41,000 41,000 44,000

FIXTURE

A13201 Furniture and Fixture 41,000 41,000 44,000

_______________________________________________________________________________EXECTIVE ENGINEER BUILDINGS DIVISION 20,784,000 22,672,000 26,606,000

GHOTKI

_______________________________________________________________________________

Page 496: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

495

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

HB0225 EXECTIVE ENGINEER BUILDINGS DIVISIONHYDERABAD

A01 TOTAL EMPLOYEES RELATED EXPENSES. 32,410,000 35,844,000 40,803,000

A011 TOTAL PAY 92 92 19,097,000 22,546,000 24,803,000

A011-1 TOTAL PAY OF OFFICERS 6 7 3,263,000 4,569,000 5,027,000

A01101 Total Basic Pay Of Officer 6 7 3,247,000 4,449,000 4,894,000

D259 DISTRICT OFFICER (BPS-18) 1 1 649,000 811,000 892,000

A031 ACCOUNTS OFFICER (BPS-17) 1 1 521,000 647,000 712,000

D262 DEPUTY DISTRICT OFFICER (BPS-17) 4 4 2,077,000 2,587,000 2,846,000

A119 ASSISTANT (BPS-16) 1 404,000 444,000

A01102 Personal pay 5,000 104,000 115,000

A01105 Qualification Pay 11,000 16,000 18,000

A011-2 TOTAL PAY OF OTHER STAFF 86 85 15,834,000 17,977,000 19,776,000

A01151 Total Basic Pay Other Staff 86 85 15,803,000 17,876,000 19,664,000

A119 ASSISTANT (BPS-14) 1 260,000

S053 SENIOR CLERK (BPS-14) 3 736,000 810,000

S181 STENOGRAPHER (BPS-14) 1 1 257,000 297,000 327,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 242,000 278,000 306,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 10 2,453,000 2,699,000

S222 SUB ENGINEER (BPS-11) 12 12 2,551,000 2,944,000 3,238,000

D150 DRAUGHTSMAN (BPS-10) 1 1 206,000 238,000 261,000

A017 ACCOUNT CLERK (BPS-09) 2 2 399,000 459,000 508,000

S053 SENIOR CLERK (BPS-09) 3 598,000

J014 JR CLERK (BPS-07) 10 1,869,000

P061 PLUMBER (BPS-06) 4 4 722,000 831,000 914,000

E021 ELECTRICIAN (BPS-05) 4 4 695,000 802,000 882,000

Page 497: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

496

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

HB0225 EXECTIVE ENGINEER BUILDINGS DIVISIONHYDERABAD

M042 MASSAN MISTRY (BPS-05) 2 2 348,000 401,000 441,000

T047 TRACER (BPS-05) 1 1 175,000 201,000 221,000

W045 WORK MESTRY / DAROGHA (BPS-05) 7 7 1,218,000 1,404,000 1,544,000

C027 CARPENTER (BPS-04) 2 2 336,000 387,000 425,000

D161 DRIVER (BPS-04) 3 3 838,000 580,000 638,000

P168 PUMP OPERATOR (BPS-04) 4 4 671,000 773,000 850,000

C089 CHOWKIDAR (BPS-02) 5 5 789,000 909,000 1,000,000

C111 CLEANER / HELPER / COLI (BPS-02) 13 13 2,053,000 2,364,000 2,600,000

M022 MALI (BPS-02) 2 2 316,000 364,000 400,000

N003 NAIB QASID (BPS-02) 6 6 944,000 1,091,000 1,200,000

S008 SANITARY WORKER (BPS-02) 2 2 316,000 364,000 400,000

A01152 Personal pay 31,000 101,000 112,000

A012 TOTAL ALLOWANCES 13,313,000 13,298,000 16,000,000

A012-1 TOTAL REGULAR ALLOWANCES 13,313,000 13,298,000 16,000,000

A01202 House Rent Allowance 1,807,000 1,925,000 1,925,000

A01203 Conveyance Allowance 2,505,000 2,643,000 2,643,000

A01207 Washing Allowance 8,000 8,000 8,000

A0120D Integrated Allowance 5,000 8,000 8,000

A0120X Ad - hoc Allowance - 2010 3,548,000 3,660,000 3,660,000

A01217 Medical Allowance 1,756,000 1,756,000 1,756,000

A0121Q Audit and Accounts Allowance 89,000 89,000

A0121T Adhoc Relief Allowance 2013 516,000 516,000

A0122C Adhoc Relief Allowance - 2015 1,842,000 483,000 483,000

A0122M Adhoc Relief Allowance 2016 2,210,000 2,456,000

A01270 Others 1,842,000 2,456,000

A03 TOTAL OPERATING EXPENSES 1,557,000 515,000 1,683,000

A032 TOTAL COMMUNICATIONS 213,000 213,000 225,000

A03201 Postage and Telegraph 67,000 67,000 71,000

Page 498: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

497

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

HB0225 EXECTIVE ENGINEER BUILDINGS DIVISIONHYDERABAD

A03202 Telephone and Trunk call 146,000 146,000 154,000

A033 TOTAL UTILITIES 1,043,000 1,000 1,148,000

A03303 Electricity 1,043,000 1,000 1,148,000

A038 TOTAL TRAVEL & 138,000 138,000 138,000

TRANSPORTATION

A03807 P.O.L Charges A.planes 138,000 138,000 138,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 163,000 163,000 172,000

A03901 Stationery 37,000 37,000 39,000

A03902 Printing and Publication 74,000 74,000 78,000

A03905 Newspapers Periodicals and Books 15,000 15,000 16,000

A03970 Others 37,000 37,000 39,000

1 Others 37,000 37,000 39,000

A13 TOTAL REPAIRS AND MAINTENANCE 126,000 126,000 134,000

A131 TOTAL MACHINERY AND 38,000 38,000 42,000

EQUIPMENT

A13101 Machinery and Equipment 38,000 38,000 42,000

A132 TOTAL FURNITURE AND 34,000 34,000 36,000

FIXTURE

A13201 Furniture and Fixture 34,000 34,000 36,000

A137 TOTAL COMPUTER EQUIPMENT 54,000 54,000 56,000

A13701 Hardware 38,000 38,000 40,000

A13702 Software 16,000 16,000 16,000

Page 499: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

498

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

HB0225 EXECTIVE ENGINEER BUILDINGS DIVISIONHYDERABAD

_______________________________________________________________________________EXECTIVE ENGINEER BUILDINGS DIVISION 34,093,000 36,485,000 42,620,000

HYDERABAD

_______________________________________________________________________________

Page 500: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

499

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

JK0055 EXECTIVE ENGINEER BUILDINGS DIVISIONJACOBABAD

A01 TOTAL EMPLOYEES RELATED EXPENSES. 20,191,000 21,676,000 24,673,000

A011 TOTAL PAY 63 63 12,005,000 13,808,000 15,191,000

A011-1 TOTAL PAY OF OFFICERS 5 5 1,803,000 2,047,000 2,253,000

A01101 Total Basic Pay Of Officer 5 5 1,722,000 1,966,000 2,163,000

D259 DISTRICT OFFICER (BPS-18) 1 1 441,000 505,000 556,000

D262 DEPUTY DISTRICT OFFICER (BPS-17) 3 3 1,060,000 1,209,000 1,330,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 221,000 252,000 277,000 OFFICER

A01102 Personal pay 81,000 81,000 90,000

A011-2 TOTAL PAY OF OTHER STAFF 58 58 10,202,000 11,761,000 12,938,000

A01151 Total Basic Pay Other Staff 58 58 10,080,000 11,586,000 12,745,000

D133 DIVISIONAL HEAD / JR (BPS-14) 1 1 235,000 265,000 291,000 DRAUGHTSMAN

S053 SENIOR CLERK (BPS-14) 3 656,000 722,000

S181 STENOGRAPHER (BPS-14) 1 1 235,000 265,000 291,000

S228 SUB-ENGINEER (BPS-14) 8 8 1,884,000 2,118,000 2,330,000

J053 JUNIOR CLERK (BPS-11) 8 1,750,000 1,925,000

D230 DRAFTSMAN (BPS-10) 1 1 190,000 212,000 233,000

A017 ACCOUNT CLERK (BPS-09) 2 2 365,000 409,000 452,000

S053 SENIOR CLERK (BPS-09) 3 547,000

E021 ELECTRICIAN (BPS-07) 4 4 682,000 768,000 844,000

J014 JR CLERK (BPS-07) 8 1,367,000

T047 TRACER (BPS-07) 1 1 171,000 192,000 211,000

W045 WORK MESTRY / DAROGHA (BPS-07) 7 7 1,196,000 1,343,000 1,478,000

P061 PLUMBER (BPS-06) 1 1 164,000 185,000 204,000

D161 DRIVER (BPS-05) 1 1 160,000 179,000 197,000

Page 501: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

500

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

JK0055 EXECTIVE ENGINEER BUILDINGS DIVISIONJACOBABAD

C092 CHOWKIDAR / WATCHMAN (BPS-02) 4 4 578,000 649,000 713,000

C111 CLEANER / HELPER / COLI (BPS-02) 5 5 721,000 811,000 892,000

M020 MALHI / GARDEN ATTENDANT (BPS-02) 4 4 578,000 649,000 713,000

N003 NAIB QASID (BPS-02) 5 5 719,000 811,000 892,000

S008 SANITARY WORKER (BPS-02) 2 2 288,000 324,000 357,000

A01152 Personal pay 122,000 175,000 193,000

A012 TOTAL ALLOWANCES 8,186,000 7,868,000 9,482,000

A012-1 TOTAL REGULAR ALLOWANCES 8,186,000 7,868,000 9,482,000

A01202 House Rent Allowance 777,000 777,000 777,000

A01203 Conveyance Allowance 1,528,000 1,639,000 1,639,000

A01207 Washing Allowance 3,000 3,000 3,000

A0120D Integrated Allowance 17,000 17,000 17,000

A0120X Ad - hoc Allowance - 2010 2,338,000 2,218,000 2,218,000

A01217 Medical Allowance 1,163,000 1,163,000 1,163,000

A0121T Adhoc Relief Allowance 2013 342,000 342,000

A01225 Instruction Allowance 65,000 65,000

A0122C Adhoc Relief Allowance - 2015 1,180,000 276,000 276,000

A0122M Adhoc Relief Allowance 2016 1,368,000 1,491,000

A01270 Others 1,180,000 1,491,000

A03 TOTAL OPERATING EXPENSES 114,000 114,000 123,000

A032 TOTAL COMMUNICATIONS 22,000 22,000 24,000

A03201 Postage and Telegraph 4,000 4,000 5,000

A03202 Telephone and Trunk call 18,000 18,000 19,000

A038 TOTAL TRAVEL & 59,000 59,000 61,000

TRANSPORTATION

A03805 Travelling Allowance 22,000 22,000 24,000

Page 502: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

501

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

JK0055 EXECTIVE ENGINEER BUILDINGS DIVISIONJACOBABAD

A03807 P.O.L Charges A.planes 37,000 37,000 37,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 33,000 33,000 38,000

A03901 Stationery 8,000 8,000 9,000

A03902 Printing and Publication 8,000 8,000 9,000

A03905 Newspapers Periodicals and Books 3,000 3,000 4,000

A03906 Uniforms and Protective Clothing 4,000 4,000 5,000

A03970 Others 10,000 10,000 11,000

1 Others 10,000 10,000 11,000

A13 TOTAL REPAIRS AND MAINTENANCE 50,000 50,000 55,000

A130 TOTAL TRANSPORT 17,000 17,000 19,000

A13001 Transport 17,000 17,000 19,000

A131 TOTAL MACHINERY AND 17,000 17,000 19,000

EQUIPMENT

A13101 Machinery and Equipment 17,000 17,000 19,000

A132 TOTAL FURNITURE AND 16,000 16,000 17,000

FIXTURE

A13201 Furniture and Fixture 16,000 16,000 17,000

_______________________________________________________________________________EXECTIVE ENGINEER BUILDINGS DIVISION 20,355,000 21,840,000 24,851,000

JACOBABAD

_______________________________________________________________________________

Page 503: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

502

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

JO0055 EXECTIVE ENGINEER BUILDINGS DIVISIONJAMSHORO

A01 TOTAL EMPLOYEES RELATED EXPENSES. 23,950,000 23,521,000 26,685,000

A011 TOTAL PAY 57 57 13,958,000 14,489,000 15,940,000

A011-1 TOTAL PAY OF OFFICERS 4 5 2,389,000 2,385,000 2,625,000

A01101 Total Basic Pay Of Officer 4 5 2,389,000 2,352,000 2,588,000

D259 DISTRICT OFFICER (BPS-18) 1 1 702,000 604,000 665,000

D129 DIVISIONAL ACCOUNTS (BPS-17) 1 1 562,000 483,000 531,000 OFFICER

D262 DEPUTY DISTRICT OFFICER (BPS-17) 2 2 1,125,000 964,000 1,061,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 1 301,000 331,000

A01102 Personal pay 33,000 37,000

A011-2 TOTAL PAY OF OTHER STAFF 53 52 11,569,000 12,104,000 13,315,000

A01151 Total Basic Pay Other Staff 53 52 11,530,000 12,056,000 13,262,000

S053 SENIOR CLERK (BPS-14) 3 768,000 845,000

S181 STENOGRAPHER (BPS-14) 1 1 289,000 310,000 341,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 273,000 291,000 320,000 DRAUGHTSMAN

A129 ASSISTANT / HEAD CLERK (BPS-11) 1 240,000

J053 JUNIOR CLERK (BPS-11) 7 1,792,000 1,971,000

S222 SUB ENGINEER (BPS-11) 14 14 3,360,000 3,583,000 3,941,000

J022 JR DRAFTSMAN (BPS-10) 1 1 233,000 248,000 273,000

A017 ACCOUNT CLERK (BPS-09) 1 1 453,000 239,000 263,000

S053 SENIOR CLERK (BPS-09) 3 677,000

J014 JR CLERK (BPS-07) 7 1,475,000

P061 PLUMBER (BPS-06) 1 1 205,000 217,000 238,000

D018 DAROGA (BPS-05) 8 8 1,570,000 1,673,000 1,841,000

D161 DRIVER (BPS-05) 2 2 394,000 418,000 460,000

Page 504: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

503

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

JO0055 EXECTIVE ENGINEER BUILDINGS DIVISIONJAMSHORO

E021 ELECTRICIAN (BPS-05) 1 1 195,000 209,000 230,000

T047 TRACER (BPS-05) 1 1 195,000 209,000 230,000

C019 CARPAINTER (BPS-04) 1 1 188,000 202,000 222,000

C089 CHOWKIDAR (BPS-02) 3 3 535,000 569,000 626,000

H066 HELPER COOLLY (BPS-02) 2 2 355,000 379,000 417,000

N003 NAIB QASID (BPS-02) 4 4 715,000 759,000 835,000

S008 SANITARY WORKER (BPS-02) 1 1 178,000 190,000 209,000

A01152 Personal pay 39,000 48,000 53,000

A012 TOTAL ALLOWANCES 9,992,000 9,032,000 10,745,000

A012-1 TOTAL REGULAR ALLOWANCES 9,992,000 9,032,000 10,745,000

A01202 House Rent Allowance 1,313,000 1,313,000 1,313,000

A01203 Conveyance Allowance 1,830,000 1,858,000 1,858,000

A01207 Washing Allowance 8,000 10,000 10,000

A0120D Integrated Allowance 6,000 8,000 8,000

A0120X Ad - hoc Allowance - 2010 2,692,000 2,341,000 2,341,000

A01217 Medical Allowance 1,359,000 1,359,000 1,359,000

A0121T Adhoc Relief Allowance 2013 382,000 382,000

A0121Z Adhoc Relief Allowance - 2014 12,000

A0122C Adhoc Relief Allowance - 2015 1,392,000 304,000 304,000

A0122M Adhoc Relief Allowance 2016 1,430,000 1,585,000

A01244 Adhoc Relief 15,000

A01270 Others 1,392,000 1,585,000

A03 TOTAL OPERATING EXPENSES 936,000 652,000 996,000

A032 TOTAL COMMUNICATIONS 89,000 89,000 94,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 80,000 80,000 84,000

A033 TOTAL UTILITIES 436,000 152,000 480,000

Page 505: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

504

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

JO0055 EXECTIVE ENGINEER BUILDINGS DIVISIONJAMSHORO

A03301 Gas 9,000 9,000 10,000

A03302 Water 10,000 10,000 11,000

A03303 Electricity 417,000 133,000 459,000

A034 TOTAL OCCUPANCY COSTS 8,000 8,000 8,000

A03407 Rates and Taxes 8,000 8,000 8,000

A038 TOTAL TRAVEL & 241,000 241,000 243,000

TRANSPORTATION

A03805 Travelling Allowance 32,000 32,000 34,000

A03807 P.O.L Charges A.planes 209,000 209,000 209,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 162,000 162,000 171,000

A03901 Stationery 59,000 59,000 62,000

A03902 Printing and Publication 9,000 9,000 10,000

A03905 Newspapers Periodicals and Books 15,000 15,000 16,000

A03970 Others 79,000 79,000 83,000

1 Others 79,000 79,000 83,000

A13 TOTAL REPAIRS AND MAINTENANCE 239,000 239,000 263,000

A130 TOTAL TRANSPORT 146,000 146,000 161,000

A13001 Transport 146,000 146,000 161,000

A131 TOTAL MACHINERY AND 52,000 52,000 58,000

EQUIPMENT

A13101 Machinery and Equipment 52,000 52,000 58,000

A132 TOTAL FURNITURE AND 41,000 41,000 44,000

FIXTURE

A13201 Furniture and Fixture 41,000 41,000 44,000

Page 506: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

505

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

JO0055 EXECTIVE ENGINEER BUILDINGS DIVISIONJAMSHORO

_______________________________________________________________________________EXECTIVE ENGINEER BUILDINGS DIVISION 25,125,000 24,412,000 27,944,000

JAMSHORO

_______________________________________________________________________________

Page 507: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

506

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KK0046 EXECTIVE ENGINEER BUILDINGS DIVISIONKASHMOR

A01 TOTAL EMPLOYEES RELATED EXPENSES. 22,650,000 22,630,000 25,649,000

A011 TOTAL PAY 65 65 13,008,000 13,859,000 15,246,000

A011-1 TOTAL PAY OF OFFICERS 5 6 2,026,000 2,711,000 2,983,000

A01101 Total Basic Pay Of Officer 5 6 2,021,000 2,706,000 2,977,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 518,000 617,000 678,000

D262 DEPUTY DISTRICT OFFICER (BPS-17) 3 3 1,243,000 1,475,000 1,623,000

A235 ASSISTANT HEAD CLERK (BPS-16) 1 307,000 338,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 260,000 307,000 338,000 OFFICER

A01102 Personal pay 5,000 5,000 6,000

A011-2 TOTAL PAY OF OTHER STAFF 60 59 10,982,000 11,148,000 12,263,000

A01151 Total Basic Pay Other Staff 60 59 10,884,000 11,050,000 12,155,000

A235 ASSISTANT HEAD CLERK (BPS-14) 1 244,000

S053 SENIOR CLERK (BPS-14) 3 634,000 698,000

S181 STENOGRAPHER (BPS-14) 1 1 243,000 256,000 281,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 229,000 240,000 264,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 7 1,480,000 1,628,000

S222 SUB ENGINEER (BPS-11) 13 13 2,610,000 2,748,000 3,023,000

D230 DRAFTSMAN (BPS-10) 2 2 389,000 409,000 450,000

A017 ACCOUNT CLERK (BPS-09) 2 2 377,000 396,000 436,000

S053 SENIOR CLERK (BPS-09) 3 565,000

J014 JR CLERK (BPS-07) 7 1,587,000

E021 ELECTRICIAN (BPS-05) 2 2 329,000 346,000 380,000

T073 TRESSOR (BPS-05) 1 1 164,000 173,000 190,000

W045 WORK MESTRY / DAROGHA (BPS-05) 8 8 1,313,000 1,382,000 1,520,000

Page 508: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

507

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KK0046 EXECTIVE ENGINEER BUILDINGS DIVISIONKASHMOR

D161 DRIVER (BPS-04) 3 3 475,000 500,000 550,000

P061 PLUMBER (BPS-04) 2 2 316,000 333,000 366,000

C100 CHOWKIDARS / WATCHMEN (BPS-01) 3 3 436,000 461,000 508,000

C111 CLEANER / HELPER / COLI (BPS-01) 3 3 438,000 461,000 508,000

M020 MALHI / GARDEN ATTENDANT (BPS-01) 2 2 292,000 308,000 338,000

N003 NAIB QASID (BPS-01) 5 5 731,000 769,000 846,000

S008 SANITARY WORKER (BPS-01) 1 1 146,000 154,000 169,000

A01152 Personal pay 98,000 98,000 108,000

A012 TOTAL ALLOWANCES 9,642,000 8,771,000 10,403,000

A012-1 TOTAL REGULAR ALLOWANCES 9,642,000 8,771,000 10,403,000

A01202 House Rent Allowance 1,051,000 1,051,000 1,051,000

A01203 Conveyance Allowance 1,890,000 1,890,000 1,890,000

A01207 Washing Allowance 129,000 129,000 129,000

A01208 Dress Allowance 58,000 179,000 179,000

A0120Q Fixed Daily Allowance 8,000 8,000 8,000

A0120X Ad - hoc Allowance - 2010 2,472,000 2,118,000 2,118,000

A01217 Medical Allowance 1,454,000 1,454,000 1,454,000

A0121A Ad - hoc Allowance - 2011 24,000

A0121T Adhoc Relief Allowance 2013 300,000 300,000

A0122C Adhoc Relief Allowance - 2015 1,290,000 248,000 248,000

A0122M Adhoc Relief Allowance 2016 1,239,000 1,513,000

A01244 Adhoc Relief 131,000

A01270 Others 1,290,000 1,513,000

A03 TOTAL OPERATING EXPENSES 637,000 462,000 674,000

A032 TOTAL COMMUNICATIONS 27,000 27,000 29,000

A03202 Telephone and Trunk call 27,000 27,000 29,000

A033 TOTAL UTILITIES 176,000 1,000 194,000

Page 509: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

508

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KK0046 EXECTIVE ENGINEER BUILDINGS DIVISIONKASHMOR

A03303 Electricity 176,000 1,000 194,000

A038 TOTAL TRAVEL & 298,000 298,000 306,000

TRANSPORTATION

A03805 Travelling Allowance 159,000 159,000 167,000

A03807 P.O.L Charges A.planes 139,000 139,000 139,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 136,000 136,000 145,000

A03901 Stationery 31,000 31,000 33,000

A03902 Printing and Publication 15,000 15,000 16,000

A03906 Uniforms and Protective Clothing 28,000 28,000 30,000

A03970 Others 62,000 62,000 66,000

1 Others 62,000 62,000 66,000

A13 TOTAL REPAIRS AND MAINTENANCE 41,000 41,000 44,000

A132 TOTAL FURNITURE AND 41,000 41,000 44,000

FIXTURE

A13201 Furniture and Fixture 41,000 41,000 44,000

_______________________________________________________________________________EXECTIVE ENGINEER BUILDINGS DIVISION 23,328,000 23,133,000 26,367,000

KASHMOR

_______________________________________________________________________________

Page 510: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

509

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0543 EXECTIVE ENGINEER ELECTRICAL/ENERGY -IIKARACHI

A01 TOTAL EMPLOYEES RELATED EXPENSES. 22,277,000 14,400,000 17,368,000

A011 TOTAL PAY 48 47 13,133,000 8,362,000 10,047,000

A011-1 TOTAL PAY OF OFFICERS 5 5 3,037,000 2,266,000 3,341,000

A01101 Total Basic Pay Of Officer 5 5 2,818,000 2,047,000 3,100,000

D259 DISTRICT OFFICER (BPS-18) 1 671,000

A218 ASSISTANT ENGINEER (BPS-17) 3 3 1,610,000 1,328,000 2,012,000

D129 DIVISIONAL ACCOUNTS (BPS-17) 1 1 537,000 443,000 670,000 OFFICER

A130 ASSISTANT / HEAD CLERK / (BPS-16) 1 276,000 418,000 DIV HEAD CLERK

A01102 Personal pay 219,000 219,000 241,000

A011-2 TOTAL PAY OF OTHER STAFF 43 42 10,096,000 6,096,000 6,706,000

A01151 Total Basic Pay Other Staff 43 42 10,092,000 6,092,000 6,702,000

A130 ASSISTANT / HEAD CLERK / (BPS-14) 1 321,000 DIV HEAD CLERK

S053 SENIOR CLERK (BPS-14) 3 483,000 532,000

S181 STENOGRAPHER (BPS-14) 1 1 322,000 195,000 215,000

D150 DRAUGHTSMAN (BPS-11) 1 1 265,000 161,000 177,000

J053 JUNIOR CLERK (BPS-11) 7 1,128,000 1,241,000

S222 SUB ENGINEER (BPS-11) 9 9 2,389,000 1,450,000 1,595,000

A017 ACCOUNT CLERK (BPS-09) 2 2 498,000 302,000 332,000

S053 SENIOR CLERK (BPS-09) 3 748,000

J014 JR CLERK (BPS-07) 7 1,634,000

P169 PUMP OPERATOR / DRIVER (BPS-05) 5 5 1,086,000 658,000 724,000

T047 TRACER (BPS-05) 1 1 218,000 132,000 145,000

D161 DRIVER (BPS-04) 4 4 836,000 508,000 559,000

Page 511: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

510

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0543 EXECTIVE ENGINEER ELECTRICAL/ENERGY -IIKARACHI

C092 CHOWKIDAR / WATCHMAN (BPS-02) 4 4 787,000 478,000 525,000

N003 NAIB QASID (BPS-02) 5 5 988,000 597,000 657,000

A01153 Special pay 4,000 4,000 4,000

A012 TOTAL ALLOWANCES 9,144,000 6,038,000 7,321,000

A012-1 TOTAL REGULAR ALLOWANCES 9,126,000 6,020,000 7,302,000

A01202 House Rent Allowance 1,208,000 1,208,000 1,208,000

A01203 Conveyance Allowance 1,584,000 1,584,000 1,584,000

A01207 Washing Allowance 7,000 7,000 7,000

A0120D Integrated Allowance 27,000 27,000 27,000

A0120X Ad - hoc Allowance - 2010 2,554,000 1,041,000 1,041,000

A01217 Medical Allowance 1,164,000 1,164,000 1,164,000

A0121T Adhoc Relief Allowance 2013 151,000 151,000

A0121Z Adhoc Relief Allowance - 2014 30,000

A0122C Adhoc Relief Allowance - 2015 1,291,000 160,000 160,000

A0122M Adhoc Relief Allowance 2016 607,000 980,000

A01244 Adhoc Relief 41,000

A01270 Others 1,291,000 980,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 18,000 18,000 19,000

A01274 Medical Charges 18,000 18,000 19,000

_______________________________________________________________________________EXECTIVE ENGINEER ELECTRICAL/ENERGY -II 22,277,000 14,400,000 17,368,000

KARACHI

_______________________________________________________________________________

Page 512: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

511

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0544 EXECTIVE ENGINEER BUILDINGS -IIDIVISION KARACHI

A01 TOTAL EMPLOYEES RELATED EXPENSES. 30,559,000 28,766,000 32,961,000

A011 TOTAL PAY 66 66 17,919,000 18,213,000 20,036,000

A011-1 TOTAL PAY OF OFFICERS 8 9 6,150,000 6,155,000 6,772,000

A01101 Total Basic Pay Of Officer 8 9 5,997,000 5,997,000 6,597,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 909,000 847,000 931,000

A218 ASSISTANT ENGINEER (BPS-17) 6 6 4,360,000 4,052,000 4,459,000

D129 DIVISIONAL ACCOUNTS (BPS-17) 1 1 728,000 676,000 743,000 OFFICER

A130 ASSISTANT / HEAD CLERK / (BPS-16) 1 422,000 464,000 DIV HEAD CLERK

A01102 Personal pay 142,000 142,000 157,000

A01105 Qualification Pay 11,000 16,000 18,000

A011-2 TOTAL PAY OF OTHER STAFF 58 57 11,769,000 12,058,000 13,264,000

A01151 Total Basic Pay Other Staff 58 57 11,735,000 12,000,000 13,200,000

A130 ASSISTANT / HEAD CLERK / (BPS-14) 1 276,000 DIV HEAD CLERK

S053 SENIOR CLERK (BPS-14) 2 463,000 510,000

S181 STENOGRAPHER (BPS-14) 1 1 274,000 280,000 308,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 256,000 263,000 289,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 14 3,244,000 3,568,000

S222 SUB ENGINEER (BPS-11) 12 12 2,710,000 2,781,000 3,059,000

D150 DRAUGHTSMAN (BPS-10) 2 2 437,000 449,000 494,000

A017 ACCOUNT CLERK (BPS-09) 1 1 213,000 220,000 240,000

S053 SENIOR CLERK (BPS-09) 2 424,000

J014 JR CLERK (BPS-07) 14 2,779,000

E021 ELECTRICIAN (BPS-05) 1 1 185,000 189,000 208,000

Page 513: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

512

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0544 EXECTIVE ENGINEER BUILDINGS -IIDIVISION KARACHI

T047 TRACER (BPS-05) 1 1 185,000 189,000 208,000

W040 WIREMAN / LINEMAN (BPS-05) 1 1 185,000 189,000 208,000

W045 WORK MESTRY / DAROGHA (BPS-05) 6 6 1,109,000 1,136,000 1,250,000

D161 DRIVER (BPS-04) 2 2 356,000 365,000 402,000

C092 CHOWKIDAR / WATCHMAN (BPS-02) 3 3 502,000 515,000 567,000

N003 NAIB QASID (BPS-02) 7 7 1,342,000 1,202,000 1,322,000

S008 SANITARY WORKER (BPS-02) 3 3 502,000 515,000 567,000

A01152 Personal pay 34,000 57,000 63,000

A01153 Special pay 1,000 1,000

A012 TOTAL ALLOWANCES 12,640,000 10,553,000 12,925,000

A012-1 TOTAL REGULAR ALLOWANCES 12,622,000 10,535,000 12,906,000

A01202 House Rent Allowance 1,692,000 1,692,000 1,692,000

A01203 Conveyance Allowance 2,207,000 2,207,000 2,207,000

A01207 Washing Allowance 2,000 2,000 2,000

A0120D Integrated Allowance 45,000 45,000 45,000

A0120P Adhoc Relief 2009 3,000

A0120X Ad - hoc Allowance - 2010 3,378,000 2,539,000 2,539,000

A01217 Medical Allowance 1,713,000 1,713,000 1,713,000

A0121A Ad - hoc Allowance - 2011 8,000

A0121M Adhoc Relief Allowance - 2012 5,000

A0121Q Audit and Accounts Allowance 76,000 76,000

A0121T Adhoc Relief Allowance 2013 339,000 339,000

A0121Z Adhoc Relief Allowance - 2014 4,000

A0122C Adhoc Relief Allowance - 2015 1,773,000 316,000 316,000

A0122M Adhoc Relief Allowance 2016 1,562,000 1,980,000

A01236 Deputation Allowance 12,000 12,000

A01239 Special Allowance 1,000 1,000

A01241 Utility allowance for electricity 39,000 3,000 4,000

A01244 Adhoc Relief 8,000

A01270 Others 1,773,000 1,980,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 18,000 18,000 19,000

Page 514: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

513

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0544 EXECTIVE ENGINEER BUILDINGS -IIDIVISION KARACHI

A01274 Medical Charges 18,000 18,000 19,000

_______________________________________________________________________________EXECTIVE ENGINEER BUILDINGS -II 30,559,000 28,766,000 32,961,000

DIVISION KARACHI

_______________________________________________________________________________

Page 515: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

514

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0545 EXECTIVE ENGINEER BUILDINGS -IIIDIVISION KARACHI

A01 TOTAL EMPLOYEES RELATED EXPENSES. 25,064,000 20,315,000 22,905,000

A011 TOTAL PAY 58 58 14,570,000 11,758,000 12,935,000

A011-1 TOTAL PAY OF OFFICERS 8 9 4,203,000 2,383,000 2,622,000

A01101 Total Basic Pay Of Officer 8 9 4,196,000 2,376,000 2,614,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 636,000 335,000 369,000

A218 ASSISTANT ENGINEER (BPS-17) 6 6 3,051,000 1,606,000 1,767,000

D129 DIVISIONAL ACCOUNTS (BPS-17) 1 1 509,000 268,000 294,000 OFFICER

A130 ASSISTANT / HEAD CLERK / (BPS-16) 1 167,000 184,000 DIV HEAD CLERK

A01102 Personal pay 7,000 7,000 8,000

A011-2 TOTAL PAY OF OTHER STAFF 50 49 10,367,000 9,375,000 10,313,000

A01151 Total Basic Pay Other Staff 50 49 10,346,000 9,348,000 10,283,000

A130 ASSISTANT / HEAD CLERK / (BPS-14) 1 266,000 DIV HEAD CLERK

S053 SENIOR CLERK (BPS-14) 2 411,000 452,000

S181 STENOGRAPHER (BPS-14) 1 1 267,000 249,000 274,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 250,000 233,000 257,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 14 2,878,000 3,166,000

S222 SUB ENGINEER (BPS-11) 12 12 2,634,000 2,467,000 2,713,000

D150 DRAUGHTSMAN (BPS-10) 2 2 424,000 398,000 438,000

A017 ACCOUNT CLERK (BPS-09) 1 1 206,000 193,000 212,000

S053 SENIOR CLERK (BPS-09) 2 412,000

J014 JR CLERK (BPS-07) 14 2,702,000

T047 TRACER (BPS-05) 1 1 180,000 168,000 185,000

W045 WORK MESTRY / DAROGHA (BPS-05) 3 3 539,000 504,000 554,000

Page 516: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

515

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0545 EXECTIVE ENGINEER BUILDINGS -IIIDIVISION KARACHI

D161 DRIVER (BPS-04) 2 2 346,000 324,000 356,000

C092 CHOWKIDAR / WATCHMAN (BPS-02) 3 3 489,000 457,000 503,000

N003 NAIB QASID (BPS-02) 4 4 1,142,000 609,000 670,000

S008 SANITARY WORKER (BPS-02) 3 3 489,000 457,000 503,000

A01152 Personal pay 21,000 27,000 30,000

A012 TOTAL ALLOWANCES 10,494,000 8,557,000 9,970,000

A012-1 TOTAL REGULAR ALLOWANCES 10,476,000 8,539,000 9,951,000

A01202 House Rent Allowance 1,471,000 1,471,000 1,471,000

A01203 Conveyance Allowance 2,060,000 2,060,000 2,060,000

A01207 Washing Allowance 2,000 2,000 2,000

A01208 Dress Allowance 4,000 4,000 4,000

A0120D Integrated Allowance 28,000 28,000 28,000

A0120X Ad - hoc Allowance - 2010 2,635,000 1,864,000 1,864,000

A01217 Medical Allowance 1,368,000 1,368,000 1,368,000

A0121Q Audit and Accounts Allowance 53,000 53,000

A0121T Adhoc Relief Allowance 2013 281,000 281,000

A0121Z Adhoc Relief Allowance - 2014 6,000

A0122C Adhoc Relief Allowance - 2015 1,454,000 240,000 240,000

A0122M Adhoc Relief Allowance 2016 1,153,000 1,290,000

A01244 Adhoc Relief 9,000

A01270 Others 1,454,000 1,290,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 18,000 18,000 19,000

A01274 Medical Charges 18,000 18,000 19,000

_______________________________________________________________________________EXECTIVE ENGINEER BUILDINGS -III 25,064,000 20,315,000 22,905,000

DIVISION KARACHI

_______________________________________________________________________________

Page 517: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

516

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0546 EXECTIVE ENGINEER ELECTRICAL/ENERGY - IKARACHI

A01 TOTAL EMPLOYEES RELATED EXPENSES. 15,598,000 19,975,000 22,698,000

A011 TOTAL PAY 36 36 9,427,000 12,772,000 14,052,000

A011-1 TOTAL PAY OF OFFICERS 5 5 2,809,000 5,182,000 5,702,000

A01101 Total Basic Pay Of Officer 5 5 2,655,000 5,014,000 5,516,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 631,000 1,196,000 1,316,000

A218 ASSISTANT ENGINEER (BPS-17) 3 3 1,519,000 2,864,000 3,150,000

D129 DIVISIONAL ACCOUNTS (BPS-17) 1 1 505,000 954,000 1,050,000 OFFICER

A01102 Personal pay 152,000 152,000 168,000

A01105 Qualification Pay 2,000 16,000 18,000

A011-2 TOTAL PAY OF OTHER STAFF 31 31 6,618,000 7,590,000 8,350,000

A01151 Total Basic Pay Other Staff 31 31 6,604,000 7,558,000 8,314,000

S053 SENIOR CLERK (BPS-14) 1 280,000 308,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 274,000 318,000 350,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 4 1,120,000 1,232,000

S222 SUB ENGINEER (BPS-11) 6 6 1,446,000 1,680,000 1,848,000

D150 DRAUGHTSMAN (BPS-10) 2 2 468,000 542,000 597,000

A017 ACCOUNT CLERK (BPS-09) 1 1 226,000 260,000 289,000

S053 SENIOR CLERK (BPS-09) 1 453,000

J014 JR CLERK (BPS-07) 4 846,000

T047 TRACER (BPS-05) 1 1 197,000 229,000 252,000

D161 DRIVER (BPS-04) 1 1 189,000 221,000 243,000

C092 CHOWKIDAR / WATCHMAN (BPS-02) 1 1 179,000 208,000 228,000

C111 CLEANER / HELPER / COLI (BPS-02) 3 3 536,000 623,000 685,000

D003 DAFTARI (BPS-02) 1 1 179,000 208,000 228,000

Page 518: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

517

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0546 EXECTIVE ENGINEER ELECTRICAL/ENERGY - IKARACHI

F012 FERO PRINTER (BPS-02) 1 1 179,000 208,000 228,000

N003 NAIB QASID (BPS-02) 5 5 896,000 1,038,000 1,141,000

S008 SANITARY WORKER (BPS-02) 3 3 536,000 623,000 685,000

A01152 Personal pay 14,000 32,000 36,000

A012 TOTAL ALLOWANCES 6,171,000 7,203,000 8,646,000

A012-1 TOTAL REGULAR ALLOWANCES 6,153,000 7,185,000 8,627,000

A01202 House Rent Allowance 784,000 1,007,000 1,007,000

A01203 Conveyance Allowance 1,062,000 1,173,000 1,173,000

A01207 Washing Allowance 4,000 4,000

A0120D Integrated Allowance 31,000 31,000 31,000

A0120X Ad - hoc Allowance - 2010 1,657,000 2,098,000 2,098,000

A01217 Medical Allowance 767,000 916,000 916,000

A0121A Ad - hoc Allowance - 2011 5,000

A0121M Adhoc Relief Allowance - 2012 7,000

A0121Q Audit and Accounts Allowance 95,000 95,000

A0121T Adhoc Relief Allowance 2013 215,000 215,000

A0121Z Adhoc Relief Allowance - 2014 67,000

A0122C Adhoc Relief Allowance - 2015 926,000 322,000 322,000

A0122M Adhoc Relief Allowance 2016 1,168,000 1,383,000

A01244 Adhoc Relief 77,000

A01270 Others 926,000 1,383,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 18,000 18,000 19,000

A01274 Medical Charges 18,000 18,000 19,000

_______________________________________________________________________________EXECTIVE ENGINEER ELECTRICAL/ENERGY - I 15,598,000 19,975,000 22,698,000

KARACHI

_______________________________________________________________________________

Page 519: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

518

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0548 EXECTIVE ENGINEER BUILDINGS -I DIVISIONKARACHI

A01 TOTAL EMPLOYEES RELATED EXPENSES. 24,538,000 21,287,000 24,105,000

A011 TOTAL PAY 59 59 14,955,000 13,059,000 14,367,000

A011-1 TOTAL PAY OF OFFICERS 8 8 3,780,000 3,639,000 4,004,000

A01101 Total Basic Pay Of Officer 8 8 3,634,000 3,436,000 3,780,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 551,000 522,000 574,000

A218 ASSISTANT ENGINEER (BPS-17) 6 6 2,643,000 2,498,000 2,748,000

D129 DIVISIONAL ACCOUNTS (BPS-17) 1 1 440,000 416,000 458,000 OFFICER

A01102 Personal pay 135,000 187,000 206,000

A01105 Qualification Pay 11,000 16,000 18,000

A011-2 TOTAL PAY OF OTHER STAFF 51 51 11,175,000 9,420,000 10,363,000

A01151 Total Basic Pay Other Staff 51 51 11,138,000 9,358,000 10,294,000

S053 SENIOR CLERK (BPS-14) 2 401,000 442,000

S181 STENOGRAPHER (BPS-14) 1 1 294,000 243,000 267,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 277,000 228,000 251,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 13 2,609,000 2,870,000

S222 SUB ENGINEER (BPS-11) 12 12 2,925,000 2,408,000 2,649,000

D150 DRAUGHTSMAN (BPS-10) 2 2 474,000 389,000 428,000

A017 ACCOUNT CLERK (BPS-09) 1 1 229,000 189,000 207,000

S053 SENIOR CLERK (BPS-09) 2 457,000

J014 JR CLERK (BPS-07) 13 2,785,000

T047 TRACER (BPS-05) 1 1 200,000 164,000 180,000

W045 WORK MESTRY / DAROGHA (BPS-05) 2 2 399,000 328,000 361,000

D161 DRIVER (BPS-04) 2 2 383,000 316,000 348,000

C092 CHOWKIDAR / WATCHMAN (BPS-02) 3 3 543,000 446,000 491,000

Page 520: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

519

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KQ0548 EXECTIVE ENGINEER BUILDINGS -I DIVISIONKARACHI

C111 CLEANER / HELPER / COLI (BPS-02) 2 2 361,000 298,000 327,000

N003 NAIB QASID (BPS-02) 6 6 1,268,000 893,000 982,000

S008 SANITARY WORKER (BPS-02) 3 3 543,000 446,000 491,000

A01152 Personal pay 37,000 62,000 69,000

A012 TOTAL ALLOWANCES 9,583,000 8,228,000 9,738,000

A012-1 TOTAL REGULAR ALLOWANCES 9,565,000 8,210,000 9,719,000

A01202 House Rent Allowance 1,263,000 1,263,000 1,263,000

A01203 Conveyance Allowance 1,626,000 1,626,000 1,626,000

A01207 Washing Allowance 4,000 4,000 4,000

A0120D Integrated Allowance 32,000 32,000 32,000

A0120X Ad - hoc Allowance - 2010 2,568,000 2,164,000 2,164,000

A01217 Medical Allowance 1,164,000 1,164,000 1,164,000

A0121Q Audit and Accounts Allowance 124,000 124,000

A0121T Adhoc Relief Allowance 2013 275,000 275,000

A0122C Adhoc Relief Allowance - 2015 1,454,000 253,000 253,000

A0122M Adhoc Relief Allowance 2016 1,305,000 1,407,000

A01270 Others 1,454,000 1,407,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 18,000 18,000 19,000

A01274 Medical Charges 18,000 18,000 19,000

_______________________________________________________________________________EXECTIVE ENGINEER BUILDINGS -I DIVISION 24,538,000 21,287,000 24,105,000

KARACHI

_______________________________________________________________________________

Page 521: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

520

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KX0085 EXECTIVE ENGINEER BUILDINGS DIVISIONKHAIRPUR

A01 TOTAL EMPLOYEES RELATED EXPENSES. 49,202,000 49,327,000 56,216,000

A011 TOTAL PAY 122 122 29,639,000 31,581,000 34,741,000

A011-1 TOTAL PAY OF OFFICERS 9 10 5,399,000 5,186,000 5,706,000

A01101 Total Basic Pay Of Officer 9 10 5,288,000 5,075,000 5,583,000

D259 DISTRICT OFFICER (BPS-18) 1 1 745,000 670,000 737,000

D262 DEPUTY DISTRICT OFFICER (BPS-17) 7 7 4,173,000 3,739,000 4,113,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 1 333,000 367,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 370,000 333,000 366,000 OFFICER

A01102 Personal pay 109,000 109,000 120,000

A01105 Qualification Pay 2,000 2,000 3,000

A011-2 TOTAL PAY OF OTHER STAFF 113 112 24,240,000 26,395,000 29,035,000

A01151 Total Basic Pay Other Staff 113 112 24,132,000 26,210,000 28,831,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 1 303,000

S053 SENIOR CLERK (BPS-14) 3 806,000 887,000

S181 STENOGRAPHER (BPS-14) 1 1 301,000 325,000 358,000

D134 DIVISIONAL HEAD / JUNIOR (BPS-13) 1 1 284,000 305,000 336,000 DRAUGHTSMAN

D026 DATA PROCESSING ASSISTANT (BPS-12) 1 1 106,000 285,000 313,000

J053 JUNIOR CLERK (BPS-11) 15 4,031,000 4,434,000

S222 SUB ENGINEER (BPS-11) 21 21 5,228,000 5,644,000 6,208,000

D230 DRAFTSMAN (BPS-10) 1 1 241,000 260,000 286,000

A017 ACCOUNT CLERK (BPS-09) 2 2 468,000 506,000 556,000

S053 SENIOR CLERK (BPS-09) 3 701,000

J020 JR CLERK (BPS-07) 15 3,501,000

D161 DRIVER (BPS-06) 4 4 814,000 910,000 1,001,000

Page 522: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

521

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KX0085 EXECTIVE ENGINEER BUILDINGS DIVISIONKHAIRPUR

P062 PLUMBER / HELPER (BPS-06) 2 2 422,000 455,000 501,000

E021 ELECTRICIAN (BPS-05) 1 1 204,000 220,000 242,000

T047 TRACER (BPS-05) 1 1 204,000 220,000 242,000

W045 WORK MESTRY / DAROGHA (BPS-05) 24 24 4,888,000 5,272,000 5,799,000

C027 CARPENTER (BPS-02) 2 2 370,000 398,000 438,000

C092 CHOWKIDAR / WATCHMAN (BPS-02) 8 8 1,478,000 1,594,000 1,753,000

C111 CLEANER / HELPER / COLI (BPS-02) 10 10 1,848,000 1,992,000 2,191,000

M020 MALHI / GARDEN ATTENDANT (BPS-02) 2 2 370,000 398,000 438,000

M042 MASSAN MISTRY (BPS-02) 2 2 370,000 398,000 438,000

N003 NAIB QASID (BPS-02) 9 9 1,661,000 1,793,000 1,972,000

S008 SANITARY WORKER (BPS-02) 2 2 370,000 398,000 438,000

A01152 Personal pay 108,000 185,000 204,000

A012 TOTAL ALLOWANCES 19,563,000 17,746,000 21,475,000

A012-1 TOTAL REGULAR ALLOWANCES 19,563,000 17,746,000 21,475,000

A01202 House Rent Allowance 1,651,000 1,651,000 1,651,000

A01203 Conveyance Allowance 3,603,000 3,821,000 3,821,000

A01207 Washing Allowance 12,000 12,000 12,000

A0120D Integrated Allowance 33,000 33,000 33,000

A0120X Ad - hoc Allowance - 2010 5,790,000 5,114,000 5,114,000

A01216 Qualification Allowance 2,000 2,000 2,000

A01217 Medical Allowance 2,572,000 2,572,000 2,572,000

A0121M Adhoc Relief Allowance - 2012 1,000

A0121T Adhoc Relief Allowance 2013 746,000 746,000

A0121Z Adhoc Relief Allowance - 2014 2,000

A01226 Computer Allowance 10,000 10,000 10,000

A0122C Adhoc Relief Allowance - 2015 2,942,000 626,000 626,000

A0122M Adhoc Relief Allowance 2016 3,142,000 3,441,000

A01238 Charge Allowance 6,000 6,000 6,000

A01244 Adhoc Relief 8,000

A01270 Others 2,942,000 3,441,000

Page 523: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

522

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KX0085 EXECTIVE ENGINEER BUILDINGS DIVISIONKHAIRPUR

A03 TOTAL OPERATING EXPENSES 1,073,000 657,000 1,138,000

A032 TOTAL COMMUNICATIONS 97,000 97,000 103,000

A03201 Postage and Telegraph 16,000 16,000 17,000

A03202 Telephone and Trunk call 81,000 81,000 86,000

A033 TOTAL UTILITIES 417,000 1,000 459,000

A03303 Electricity 417,000 1,000 459,000

A034 TOTAL OCCUPANCY COSTS 89,000 89,000 89,000

A03407 Rates and Taxes 89,000 89,000 89,000

A038 TOTAL TRAVEL & 264,000 264,000 269,000

TRANSPORTATION

A03805 Travelling Allowance 95,000 95,000 100,000

A03807 P.O.L Charges A.planes 169,000 169,000 169,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 206,000 206,000 218,000

A03901 Stationery 54,000 54,000 57,000

A03902 Printing and Publication 36,000 36,000 38,000

A03905 Newspapers Periodicals and Books 36,000 36,000 38,000

A03906 Uniforms and Protective Clothing 57,000 57,000 60,000

A03970 Others 23,000 23,000 25,000

1 Others 23,000 23,000 25,000

A13 TOTAL REPAIRS AND MAINTENANCE 105,000 105,000 115,000

A130 TOTAL TRANSPORT 36,000 36,000 40,000

A13001 Transport 36,000 36,000 40,000

Page 524: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

523

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

KX0085 EXECTIVE ENGINEER BUILDINGS DIVISIONKHAIRPUR

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

A13101 Machinery and Equipment 36,000 36,000 40,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

_______________________________________________________________________________EXECTIVE ENGINEER BUILDINGS DIVISION 50,380,000 50,089,000 57,469,000

KHAIRPUR

_______________________________________________________________________________

Page 525: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

524

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

LN0113 EXECTIVE ENGINEER BUILDINGS DIVISIONLARKANA

A01 TOTAL EMPLOYEES RELATED EXPENSES. 26,076,000 25,053,000 28,412,000

A011 TOTAL PAY 72 72 15,427,000 15,417,000 16,961,000

A011-1 TOTAL PAY OF OFFICERS 6 7 3,058,000 2,521,000 2,774,000

A01101 Total Basic Pay Of Officer 6 7 3,058,000 2,495,000 2,745,000

D259 DISTRICT OFFICER (BPS-18) 1 1 650,000 481,000 529,000

D262 DEPUTY DISTRICT OFFICER (BPS-17) 4 4 2,080,000 1,535,000 1,689,000

A119 ASSISTANT (BPS-16) 1 240,000 264,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 328,000 239,000 263,000 OFFICER

A01102 Personal pay 26,000 29,000

A011-2 TOTAL PAY OF OTHER STAFF 66 65 12,369,000 12,896,000 14,187,000

A01151 Total Basic Pay Other Staff 66 65 12,297,000 12,771,000 14,049,000

A119 ASSISTANT (BPS-14) 1 270,000

S053 SENIOR CLERK (BPS-14) 3 688,000 757,000

S181 STENOGRAPHER (BPS-14) 1 1 268,000 277,000 305,000

D130 DIVISIONAL DRAUGHTSMAN (BPS-13) 1 1 252,000 260,000 286,000

J053 JUNIOR CLERK (BPS-11) 10 2,293,000 2,522,000

S228 SUB-ENGINEER (BPS-11) 6 6 1,328,000 1,376,000 1,513,000

D230 DRAFTSMAN (BPS-10) 1 1 213,000 222,000 244,000

A018 ACCOUNT CLERK / (BPS-09) 2 2 416,000 429,000 473,000 SUB-ACCOUNT

S053 SENIOR CLERK (BPS-09) 3 623,000

J014 JR CLERK (BPS-07) 10 1,945,000

D161 DRIVER (BPS-05) 4 4 725,000 749,000 824,000

T047 TRACER (BPS-05) 1 1 179,000 187,000 206,000

W045 WORK MESTRY / DAROGHA (BPS-05) 10 10 1,811,000 1,874,000 2,061,000

Page 526: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

525

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

LN0113 EXECTIVE ENGINEER BUILDINGS DIVISIONLARKANA

C089 CHOWKIDAR (BPS-02) 5 5 821,000 850,000 935,000

C111 CLEANER / HELPER / COLI (BPS-02) 12 12 1,971,000 2,039,000 2,243,000

N003 NAIB QASID (BPS-02) 6 6 986,000 1,020,000 1,122,000

S261 SWEEPER (BPS-02) 2 2 328,000 340,000 374,000

E021 ELECTRICIAN (BPS-01) 1 1 161,000 167,000 184,000

A01152 Personal pay 72,000 125,000 138,000

A012 TOTAL ALLOWANCES 10,649,000 9,636,000 11,451,000

A012-1 TOTAL REGULAR ALLOWANCES 10,454,000 9,441,000 11,246,000

A01202 House Rent Allowance 1,341,000 1,341,000 1,341,000

A01203 Conveyance Allowance 1,895,000 1,895,000 1,895,000

A01207 Washing Allowance 5,000 5,000 5,000

A0120D Integrated Allowance 21,000 21,000 21,000

A0120X Ad - hoc Allowance - 2010 2,862,000 2,489,000 2,489,000

A01217 Medical Allowance 1,394,000 1,394,000 1,394,000

A0121A Ad - hoc Allowance - 2011 13,000

A0121M Adhoc Relief Allowance - 2012 3,000

A0121Q Audit and Accounts Allowance 51,000 51,000

A0121T Adhoc Relief Allowance 2013 354,000 354,000

A0121Z Adhoc Relief Allowance - 2014 6,000

A0122C Adhoc Relief Allowance - 2015 1,468,000 336,000 336,000

A0122M Adhoc Relief Allowance 2016 1,524,000 1,679,000

A01237 Design Allowance 2,000 2,000

A01244 Adhoc Relief 4,000

A01270 Others 1,468,000 3,000 1,679,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 195,000 195,000 205,000

A01274 Medical Charges 195,000 195,000 205,000

A03 TOTAL OPERATING EXPENSES 2,265,000 1,467,000 2,403,000

Page 527: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

526

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

LN0113 EXECTIVE ENGINEER BUILDINGS DIVISIONLARKANA

A032 TOTAL COMMUNICATIONS 169,000 169,000 178,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 160,000 160,000 168,000

A033 TOTAL UTILITIES 1,001,000 203,000 1,102,000

A03303 Electricity 1,001,000 203,000 1,102,000

A034 TOTAL OCCUPANCY COSTS 63,000 63,000 63,000

A03407 Rates and Taxes 63,000 63,000 63,000

A038 TOTAL TRAVEL & 682,000 682,000 689,000

TRANSPORTATION

A03805 Travelling Allowance 127,000 127,000 134,000

A03807 P.O.L Charges A.planes 555,000 555,000 555,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 350,000 350,000 371,000

A03901 Stationery 127,000 127,000 134,000

A03902 Printing and Publication 93,000 93,000 98,000

A03905 Newspapers Periodicals and Books 26,000 26,000 28,000

A03906 Uniforms and Protective Clothing 42,000 42,000 45,000

A03970 Others 62,000 62,000 66,000

1 Others 62,000 62,000 66,000

A13 TOTAL REPAIRS AND MAINTENANCE 540,000 540,000 588,000

A130 TOTAL TRANSPORT 240,000 240,000 264,000

A13001 Transport 240,000 240,000 264,000

A131 TOTAL MACHINERY AND 159,000 159,000 175,000

EQUIPMENT

Page 528: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

527

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

LN0113 EXECTIVE ENGINEER BUILDINGS DIVISIONLARKANA

A13101 Machinery and Equipment 159,000 159,000 175,000

A132 TOTAL FURNITURE AND 141,000 141,000 149,000

FIXTURE

A13201 Furniture and Fixture 141,000 141,000 149,000

_______________________________________________________________________________EXECTIVE ENGINEER BUILDINGS DIVISION 28,881,000 27,060,000 31,403,000

LARKANA

_______________________________________________________________________________

Page 529: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

528

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

MP0094 EXECTIVE ENGINEER BUILDINGS DIVISIONMIRPURKHAS

A01 TOTAL EMPLOYEES RELATED EXPENSES. 23,321,000 23,550,000 26,772,000

A011 TOTAL PAY 59 59 13,979,000 14,573,000 16,032,000

A011-1 TOTAL PAY OF OFFICERS 8 9 3,443,000 2,931,000 3,225,000

A01101 Total Basic Pay Of Officer 8 9 3,427,000 2,858,000 3,144,000

D259 DISTRICT OFFICER (BPS-18) 1 1 544,000 421,000 464,000

D262 DEPUTY DISTRICT OFFICER (BPS-17) 6 6 2,611,000 2,017,000 2,219,000

A119 ASSISTANT (BPS-16) 1 210,000 231,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 272,000 210,000 230,000 OFFICER

A01102 Personal pay 14,000 58,000 64,000

A01105 Qualification Pay 2,000 15,000 17,000

A011-2 TOTAL PAY OF OTHER STAFF 51 50 10,536,000 11,642,000 12,807,000

A01151 Total Basic Pay Other Staff 51 50 10,523,000 11,615,000 12,777,000

A119 ASSISTANT (BPS-14) 1 272,000

S053 SENIOR CLERK (BPS-14) 1 264,000 291,000

S181 STENOGRAPHER (BPS-14) 1 1 269,000 320,000 352,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 251,000 300,000 330,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 9 2,380,000 2,618,000

S222 SUB ENGINEER (BPS-11) 9 9 1,989,000 2,380,000 2,618,000

D230 DRAFTSMAN (BPS-10) 1 1 215,000 256,000 282,000

A017 ACCOUNT CLERK (BPS-09) 1 1 415,000 251,000 273,000

S053 SENIOR CLERK (BPS-09) 1 623,000

J014 JR CLERK (BPS-07) 9 1,747,000

T050 TRACER (BPS-05) 1 1 180,000 216,000 238,000

W038 WIRE MAN (BPS-05) 1 1 180,000 216,000 238,000

Page 530: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

529

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

MP0094 EXECTIVE ENGINEER BUILDINGS DIVISIONMIRPURKHAS

W046 WORK MISTRY (BPS-05) 6 6 1,084,000 1,297,000 1,427,000

D161 DRIVER (BPS-04) 3 3 696,000 625,000 688,000

P061 PLUMBER (BPS-04) 1 1 175,000 208,000 229,000

P168 PUMP OPERATOR (BPS-04) 1 1 175,000 208,000 229,000

C089 CHOWKIDAR (BPS-01) 4 4 646,000 770,000 847,000

H064 HELPER (BPS-01) 3 3 483,000 577,000 635,000

N003 NAIB QASID (BPS-01) 6 6 962,000 1,155,000 1,270,000

S008 SANITARY WORKER (BPS-01) 1 1 161,000 192,000 212,000

A01152 Personal pay 13,000 27,000 30,000

A012 TOTAL ALLOWANCES 9,342,000 8,977,000 10,740,000

A012-1 TOTAL REGULAR ALLOWANCES 8,702,000 8,337,000 10,068,000

A01202 House Rent Allowance 869,000 869,000 869,000

A01203 Conveyance Allowance 1,693,000 1,746,000 1,746,000

A0120D Integrated Allowance 24,000 24,000 24,000

A0120X Ad - hoc Allowance - 2010 2,392,000 2,336,000 2,336,000

A01217 Medical Allowance 1,192,000 1,192,000 1,192,000

A0121Q Audit and Accounts Allowance 108,000 108,000

A0121T Adhoc Relief Allowance 2013 335,000 335,000

A0122C Adhoc Relief Allowance - 2015 1,266,000 274,000 274,000

A0122M Adhoc Relief Allowance 2016 1,453,000 1,592,000

A01270 Others 1,266,000 1,592,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 640,000 640,000 672,000

A01274 Medical Charges 640,000 640,000 672,000

A03 TOTAL OPERATING EXPENSES 580,000 270,000 629,000

A032 TOTAL COMMUNICATIONS 56,000 56,000 60,000

A03201 Postage and Telegraph 9,000 9,000 10,000

Page 531: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

530

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

MP0094 EXECTIVE ENGINEER BUILDINGS DIVISIONMIRPURKHAS

A03202 Telephone and Trunk call 47,000 47,000 50,000

A033 TOTAL UTILITIES 334,000 24,000 368,000

A03303 Electricity 334,000 24,000 368,000

A038 TOTAL TRAVEL & 61,000 61,000 63,000

TRANSPORTATION

A03805 Travelling Allowance 32,000 32,000 34,000

A03807 P.O.L Charges A.planes 29,000 29,000 29,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 129,000 129,000 138,000

A03901 Stationery 25,000 25,000 27,000

A03902 Printing and Publication 15,000 15,000 16,000

A03905 Newspapers Periodicals and Books 24,000 24,000 26,000

A03906 Uniforms and Protective Clothing 28,000 28,000 30,000

A03970 Others 37,000 37,000 39,000

1 Others 37,000 37,000 39,000

A13 TOTAL REPAIRS AND MAINTENANCE 93,000 93,000 102,000

A130 TOTAL TRANSPORT 24,000 24,000 27,000

A13001 Transport 24,000 24,000 27,000

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

A13101 Machinery and Equipment 36,000 36,000 40,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

Page 532: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

531

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

MP0094 EXECTIVE ENGINEER BUILDINGS DIVISIONMIRPURKHAS

_______________________________________________________________________________EXECTIVE ENGINEER BUILDINGS DIVISION 23,994,000 23,913,000 27,503,000

MIRPURKHAS

_______________________________________________________________________________

Page 533: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

532

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

MP0095 ASSISTANT ENGINEER BUILDING SUBDIVISIONAL TALUKA SHUJJABAD MPK

A01 TOTAL EMPLOYEES RELATED EXPENSES. 744,000 1,033,000 1,186,000

A011 TOTAL PAY 7 7 559,000 691,000 761,000

A011-1 TOTAL PAY OF OFFICERS 1 1 205,000 665,000 732,000

A01101 Total Basic Pay Of Officer 1 1 205,000 665,000 732,000

A218 ASSISTANT ENGINEER (BPS-17) 1 1 205,000 665,000 732,000

A011-2 TOTAL PAY OF OTHER STAFF 6 6 354,000 26,000 29,000

A01151 Total Basic Pay Other Staff 6 6 354,000 26,000 29,000

J053 JUNIOR CLERK (BPS-11) 1 5,000 6,000

S222 SUB ENGINEER (BPS-11) 1 1 83,000 5,000 6,000

J014 JR CLERK (BPS-07) 1 73,000

W045 WORK MESTRY / DAROGHA (BPS-05) 1 1 52,000 4,000 5,000

C089 CHOWKIDAR (BPS-01) 1 1 49,000 4,000 4,000

N003 NAIB QASID (BPS-01) 1 1 48,000 4,000 4,000

S009 SANITARY WORKER / (BPS-01) 1 1 49,000 4,000 4,000 GUTTERMAN

A012 TOTAL ALLOWANCES 185,000 342,000 425,000

A012-1 TOTAL REGULAR ALLOWANCES 185,000 342,000 425,000

A01202 House Rent Allowance 15,000 43,000 43,000

A01203 Conveyance Allowance 27,000 73,000 73,000

A0120X Ad - hoc Allowance - 2010 12,000 101,000 101,000

A01217 Medical Allowance 19,000 40,000 40,000

A0121T Adhoc Relief Allowance 2013 2,000 2,000

A0122C Adhoc Relief Allowance - 2015 56,000 14,000 14,000

A0122M Adhoc Relief Allowance 2016 69,000 76,000

A01270 Others 56,000 76,000

Page 534: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

533

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

MP0095 ASSISTANT ENGINEER BUILDING SUBDIVISIONAL TALUKA SHUJJABAD MPK

_______________________________________________________________________________ASSISTANT ENGINEER BUILDING SUB 744,000 1,033,000 1,186,000

DIVISIONAL TALUKA SHUJJABAD MPK

_______________________________________________________________________________

Page 535: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

534

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

MX0049 EXECTIVE ENGINEER BUILDINGS DIVISIONMITHI

A01 TOTAL EMPLOYEES RELATED EXPENSES. 23,169,000 30,429,000 34,315,000

A011 TOTAL PAY 73 73 13,312,000 18,455,000 20,303,000

A011-1 TOTAL PAY OF OFFICERS 6 7 2,472,000 5,237,000 5,762,000

A01101 Total Basic Pay Of Officer 6 7 2,258,000 4,988,000 5,487,000

D259 DISTRICT OFFICER (BPS-18) 1 1 481,000 962,000 1,058,000

D262 DEPUTY DISTRICT OFFICER (BPS-17) 4 4 1,537,000 3,069,000 3,376,000

A130 ASSISTANT / HEAD CLERK / (BPS-16) 1 479,000 527,000 DIV HEAD CLERK

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 240,000 478,000 526,000 OFFICER

A01102 Personal pay 203,000 233,000 257,000

A01105 Qualification Pay 11,000 16,000 18,000

A011-2 TOTAL PAY OF OTHER STAFF 67 66 10,840,000 13,218,000 14,541,000

A01151 Total Basic Pay Other Staff 67 66 10,822,000 13,194,000 14,514,000

A130 ASSISTANT / HEAD CLERK / (BPS-14) 1 235,000 DIV HEAD CLERK

S053 SENIOR CLERK (BPS-14) 2 473,000 521,000

D132 DIVISIONAL H-D / MAN (BPS-13) 1 1 218,000 269,000 296,000

J053 JUNIOR CLERK (BPS-11) 10 2,367,000 2,604,000

S222 SUB ENGINEER (BPS-11) 8 8 1,536,000 1,894,000 2,083,000

A029 ACCOUNTS CLERK / CASHIER (BPS-09) 2 2 364,000 449,000 489,000

S053 SENIOR CLERK (BPS-09) 2 361,000

J014 JR CLERK (BPS-07) 10 1,688,000

C024 CARE TAKER (BPS-05) 3 3 472,000 580,000 638,000

D018 DAROGA (BPS-05) 4 4 628,000 774,000 851,000

M042 MASSAN MISTRY (BPS-05) 1 1 156,000 193,000 213,000

Page 536: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

535

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

MX0049 EXECTIVE ENGINEER BUILDINGS DIVISIONMITHI

T050 TRACER (BPS-05) 1 1 156,000 193,000 213,000

W040 WIREMAN / LINEMAN (BPS-05) 1 1 156,000 193,000 213,000

D161 DRIVER (BPS-04) 2 2 302,000 373,000 410,000

A313 ATTENDANT (BPS-02) 5 5 711,000 877,000 965,000

C027 CARPENTER (BPS-02) 1 1 141,000 175,000 193,000

C089 CHOWKIDAR (BPS-02) 7 7 997,000 1,228,000 1,351,000

C113 CLEANER / HELPER / COOK / (BPS-02) 2 2 286,000 351,000 386,000 WINDOW CLEANER

C167 COOK (BPS-02) 3 3 427,000 526,000 579,000

E021 ELECTRICIAN (BPS-02) 1 1 141,000 175,000 193,000

G036 GENERATOR OPERATOR (BPS-02) 1 1 141,000 175,000 193,000

M020 MALHI / GARDEN ATTENDANT (BPS-02) 1 1 141,000 175,000 193,000

N003 NAIB QASID (BPS-02) 4 4 713,000 702,000 772,000

P061 PLUMBER (BPS-02) 1 1 141,000 175,000 193,000

S008 SANITARY WORKER (BPS-02) 5 5 711,000 877,000 965,000

A01152 Personal pay 18,000 24,000 27,000

A012 TOTAL ALLOWANCES 9,857,000 11,974,000 14,012,000

A012-1 TOTAL REGULAR ALLOWANCES 9,727,000 11,844,000 13,875,000

A01202 House Rent Allowance 968,000 1,124,000 1,124,000

A01203 Conveyance Allowance 2,040,000 2,212,000 2,212,000

A01207 Washing Allowance 16,000 22,000 22,000

A0120D Integrated Allowance 18,000 18,000 18,000

A0120X Ad - hoc Allowance - 2010 2,482,000 3,025,000 3,025,000

A01217 Medical Allowance 1,512,000 1,566,000 1,566,000

A0121A Ad - hoc Allowance - 2011 139,000

A0121M Adhoc Relief Allowance - 2012 94,000

A0121Q Audit and Accounts Allowance 76,000 76,000

A0121T Adhoc Relief Allowance 2013 430,000 430,000

A0121Z Adhoc Relief Allowance - 2014 38,000

A0122C Adhoc Relief Allowance - 2015 1,308,000 379,000 379,000

Page 537: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

536

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

MX0049 EXECTIVE ENGINEER BUILDINGS DIVISIONMITHI

A0122M Adhoc Relief Allowance 2016 1,654,000 2,000,000

A01233 Unattractive Area Allowance 75,000 1,023,000 1,023,000

A01244 Adhoc Relief 44,000

A01270 Others 1,308,000 2,000,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 130,000 130,000 137,000

A01274 Medical Charges 130,000 130,000 137,000

A03 TOTAL OPERATING EXPENSES 14,642,000 2,794,000 16,043,000

A032 TOTAL COMMUNICATIONS 175,000 175,000 185,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 166,000 166,000 175,000

A033 TOTAL UTILITIES 13,582,000 1,734,000 14,941,000

A03303 Electricity 13,582,000 1,734,000 14,941,000

A038 TOTAL TRAVEL & 358,000 358,000 362,000

TRANSPORTATION

A03805 Travelling Allowance 79,000 79,000 83,000

A03807 P.O.L Charges A.planes 279,000 279,000 279,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 527,000 527,000 555,000

A03901 Stationery 129,000 129,000 136,000

A03902 Printing and Publication 77,000 77,000 81,000

A03905 Newspapers Periodicals and Books 16,000 16,000 17,000

A03970 Others 305,000 305,000 321,000

1 Others 305,000 305,000 321,000

A13 TOTAL REPAIRS AND MAINTENANCE 254,000 254,000 279,000

Page 538: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

537

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

MX0049 EXECTIVE ENGINEER BUILDINGS DIVISIONMITHI

A130 TOTAL TRANSPORT 74,000 74,000 82,000

A13001 Transport 74,000 74,000 82,000

A131 TOTAL MACHINERY AND 146,000 146,000 161,000

EQUIPMENT

A13101 Machinery and Equipment 146,000 146,000 161,000

A132 TOTAL FURNITURE AND 34,000 34,000 36,000

FIXTURE

A13201 Furniture and Fixture 34,000 34,000 36,000

_______________________________________________________________________________EXECTIVE ENGINEER BUILDINGS DIVISION 38,065,000 33,477,000 50,637,000

MITHI

_______________________________________________________________________________

Page 539: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

538

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

MY0056 EXECTIVE ENGINEER BUILDINGS DIVISIONMATIARI

A01 TOTAL EMPLOYEES RELATED EXPENSES. 19,234,000 18,128,000 20,464,000

A011 TOTAL PAY 59 59 11,095,000 10,901,000 11,992,000

A011-1 TOTAL PAY OF OFFICERS 3 4 1,470,000 1,247,000 1,372,000

A01101 Total Basic Pay Of Officer 3 4 1,470,000 1,247,000 1,372,000

D259 DISTRICT OFFICER (BPS-18) 1 1 640,000 446,000 491,000

D262 DEPUTY DISTRICT OFFICER (BPS-17) 1 1 511,000 356,000 392,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 1 222,000 245,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 319,000 223,000 244,000 OFFICER

A011-2 TOTAL PAY OF OTHER STAFF 56 55 9,625,000 9,654,000 10,620,000

A01151 Total Basic Pay Other Staff 56 55 9,616,000 9,636,000 10,600,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 1 266,000

S053 SENIOR CLERK (BPS-14) 3 600,000 661,000

S181 STENOGRAPHER (BPS-14) 1 1 266,000 242,000 266,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 250,000 227,000 250,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 5 1,001,000 1,101,000

S228 SUB-ENGINEER (BPS-11) 11 11 2,414,000 2,202,000 2,422,000

D150 DRAUGHTSMAN (BPS-10) 1 1 210,000 194,000 213,000

A017 ACCOUNT CLERK (BPS-09) 2 2 411,000 376,000 415,000

S053 SENIOR CLERK (BPS-09) 3 617,000

J014 JR CLERK (BPS-07) 5 965,000

C024 CARE TAKER (BPS-06) 1 1 67,000 169,000 186,000

D018 DAROGA (BPS-05) 5 5 898,000 818,000 900,000

M042 MASSAN MISTRY (BPS-05) 5 5 898,000 818,000 900,000

Page 540: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

539

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

MY0056 EXECTIVE ENGINEER BUILDINGS DIVISIONMATIARI

T001 TRACER (BPS-05) 1 1 180,000 164,000 180,000

C173 COOKS (BPS-04) 1 1 62,000 158,000 173,000

D161 DRIVER (BPS-04) 2 2 348,000 315,000 347,000

C089 CHOWKIDAR (BPS-02) 2 2 326,000 297,000 326,000

C111 CLEANER / HELPER / COLI (BPS-02) 2 2 326,000 297,000 326,000

N003 NAIB QASID (BPS-02) 3 3 488,000 445,000 490,000

S008 SANITARY WORKER (BPS-02) 1 1 163,000 148,000 163,000

C089 CHOWKIDAR (BPS-01) 2 2 115,000 291,000 320,000

C111 CLEANER / HELPER / COLI (BPS-01) 3 3 173,000 437,000 481,000

M021 MALHI / GARDEN ATTENDANT (BPS-01) 1 1 58,000 146,000 160,000 / HAED MALHI

S008 SANITARY WORKER (BPS-01) 2 2 115,000 291,000 320,000

A01152 Personal pay 9,000 18,000 20,000

A012 TOTAL ALLOWANCES 8,139,000 7,227,000 8,472,000

A012-1 TOTAL REGULAR ALLOWANCES 8,139,000 7,227,000 8,472,000

A01202 House Rent Allowance 1,030,000 1,030,000 1,030,000

A01203 Conveyance Allowance 1,643,000 1,643,000 1,643,000

A01207 Washing Allowance 1,000 1,000

A0120D Integrated Allowance 40,000 40,000 40,000

A0120X Ad - hoc Allowance - 2010 2,015,000 1,723,000 1,723,000

A01217 Medical Allowance 1,163,000 1,163,000 1,163,000

A0121T Adhoc Relief Allowance 2013 258,000 258,000

A0121Z Adhoc Relief Allowance - 2014 89,000 59,000

A0122C Adhoc Relief Allowance - 2015 1,109,000 219,000 219,000

A0122M Adhoc Relief Allowance 2016 1,090,000 1,197,000

A01233 Unattractive Area Allowance 1,000 1,000

A01270 Others 1,050,000 1,197,000

A03 TOTAL OPERATING EXPENSES 865,000 536,000 916,000

Page 541: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

540

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

MY0056 EXECTIVE ENGINEER BUILDINGS DIVISIONMATIARI

A032 TOTAL COMMUNICATIONS 49,000 49,000 52,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 40,000 40,000 42,000

A033 TOTAL UTILITIES 347,000 18,000 382,000

A03302 Water 17,000 17,000 19,000

A03303 Electricity 330,000 1,000 363,000

A038 TOTAL TRAVEL & 330,000 330,000 334,000

TRANSPORTATION

A03805 Travelling Allowance 79,000 79,000 83,000

A03807 P.O.L Charges A.planes 251,000 251,000 251,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 139,000 139,000 148,000

A03901 Stationery 31,000 31,000 33,000

A03902 Printing and Publication 15,000 15,000 16,000

A03905 Newspapers Periodicals and Books 31,000 31,000 33,000

A03970 Others 62,000 62,000 66,000

1 Others 62,000 62,000 66,000

A13 TOTAL REPAIRS AND MAINTENANCE 107,000 107,000 117,000

A130 TOTAL TRANSPORT 38,000 38,000 42,000

A13001 Transport 38,000 38,000 42,000

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

A13101 Machinery and Equipment 36,000 36,000 40,000

Page 542: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

541

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

MY0056 EXECTIVE ENGINEER BUILDINGS DIVISIONMATIARI

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

_______________________________________________________________________________EXECTIVE ENGINEER BUILDINGS DIVISION 20,206,000 18,771,000 21,497,000

MATIARI

_______________________________________________________________________________

Page 543: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

542

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

NX0056 EXECTIVE ENGINEER BUILDINGS DIVISIONNOSHEROFEROZ

A01 TOTAL EMPLOYEES RELATED EXPENSES. 30,700,000 32,628,000 37,254,000

A011 TOTAL PAY 82 82 18,656,000 21,118,000 23,232,000

A011-1 TOTAL PAY OF OFFICERS 7 8 3,308,000 4,254,000 4,680,000

A01101 Total Basic Pay Of Officer 7 8 3,308,000 4,254,000 4,680,000

D259 DISTRICT OFFICER (BPS-18) 1 1 570,000 677,000 745,000

D129 DIVISIONAL ACCOUNTS (BPS-17) 1 1 457,000 540,000 594,000 OFFICER

D262 DEPUTY DISTRICT OFFICER (BPS-17) 5 5 2,281,000 2,700,000 2,970,000

A119 ASSISTANT (BPS-16) 1 337,000 371,000

A011-2 TOTAL PAY OF OTHER STAFF 75 74 15,348,000 16,864,000 18,552,000

A01151 Total Basic Pay Other Staff 75 74 15,233,000 16,681,000 18,350,000

A119 ASSISTANT (BPS-14) 1 283,000

S053 SENIOR CLERK (BPS-14) 3 764,000 841,000

S181 STENOGRAPHER (BPS-14) 1 1 284,000 308,000 339,000

S136 SO (TECH) (BPS-13) 1 1 265,000 289,000 318,000

J053 JUNIOR CLERK (BPS-11) 12 3,056,000 3,362,000

S228 SUB-ENGINEER (BPS-11) 15 15 3,510,000 3,820,000 4,203,000

D230 DRAFTSMAN (BPS-10) 1 1 228,000 247,000 271,000

A017 ACCOUNT CLERK (BPS-09) 2 2 439,000 477,000 525,000

S053 SENIOR CLERK (BPS-09) 3 658,000

J014 JR CLERK (BPS-07) 12 2,466,000

P061 PLUMBER (BPS-06) 1 1 198,000 216,000 237,000

D161 DRIVER (BPS-05) 4 4 766,000 833,000 916,000

T073 TRESSOR (BPS-05) 1 1 191,000 208,000 229,000

W046 WORK MISTRY (BPS-05) 12 12 2,297,000 2,498,000 2,748,000

Page 544: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

543

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

NX0056 EXECTIVE ENGINEER BUILDINGS DIVISIONNOSHEROFEROZ

C089 CHOWKIDAR (BPS-02) 6 6 1,042,000 1,133,000 1,246,000

C109 CLEANER (BPS-02) 5 5 868,000 944,000 1,038,000

M022 MALI (BPS-02) 1 1 173,000 189,000 208,000

N003 NAIB QASID (BPS-02) 7 7 1,217,000 1,321,000 1,454,000

S008 SANITARY WORKER (BPS-02) 2 2 348,000 378,000 415,000

A01152 Personal pay 115,000 183,000 202,000

A012 TOTAL ALLOWANCES 12,044,000 11,510,000 14,022,000

A012-1 TOTAL REGULAR ALLOWANCES 12,044,000 11,510,000 14,022,000

A01202 House Rent Allowance 1,058,000 1,211,000 1,211,000

A01203 Conveyance Allowance 2,259,000 2,401,000 2,401,000

A01207 Washing Allowance 29,000 29,000 29,000

A01209 Special Additional Allowance 6,000

A0120D Integrated Allowance 3,000 4,000 4,000

A0120X Ad - hoc Allowance - 2010 3,403,000 3,303,000 3,303,000

A01217 Medical Allowance 1,584,000 1,584,000 1,584,000

A0121T Adhoc Relief Allowance 2013 473,000 473,000

A0122C Adhoc Relief Allowance - 2015 1,854,000 411,000 411,000

A0122M Adhoc Relief Allowance 2016 2,059,000 2,303,000

A01244 Adhoc Relief 29,000

A01270 Others 1,854,000 2,303,000

A03 TOTAL OPERATING EXPENSES 809,000 655,000 862,000

A032 TOTAL COMMUNICATIONS 76,000 76,000 81,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 67,000 67,000 71,000

A033 TOTAL UTILITIES 313,000 159,000 345,000

A03303 Electricity 313,000 159,000 345,000

Page 545: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

544

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

NX0056 EXECTIVE ENGINEER BUILDINGS DIVISIONNOSHEROFEROZ

A034 TOTAL OCCUPANCY COSTS 10,000 10,000 10,000

A03407 Rates and Taxes 10,000 10,000 10,000

A038 TOTAL TRAVEL & 297,000 297,000 305,000

TRANSPORTATION

A03805 Travelling Allowance 159,000 159,000 167,000

A03807 P.O.L Charges A.planes 138,000 138,000 138,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 113,000 113,000 121,000

A03901 Stationery 27,000 27,000 29,000

A03902 Printing and Publication 15,000 15,000 16,000

A03905 Newspapers Periodicals and Books 9,000 9,000 10,000

A03970 Others 62,000 62,000 66,000

1 Others 62,000 62,000 66,000

A13 TOTAL REPAIRS AND MAINTENANCE 136,000 136,000 149,000

A130 TOTAL TRANSPORT 58,000 58,000 64,000

A13001 Transport 58,000 58,000 64,000

A131 TOTAL MACHINERY AND 45,000 45,000 50,000

EQUIPMENT

A13101 Machinery and Equipment 45,000 45,000 50,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

Page 546: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

545

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

NX0056 EXECTIVE ENGINEER BUILDINGS DIVISIONNOSHEROFEROZ

_______________________________________________________________________________EXECTIVE ENGINEER BUILDINGS DIVISION 31,645,000 33,419,000 38,265,000

NOSHEROFEROZ

_______________________________________________________________________________

Page 547: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

546

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

QS0053 EXECTIVE ENGINEER BUILDINGS DIVISIONSHAHDADKOT

A01 TOTAL EMPLOYEES RELATED EXPENSES. 9,841,000 8,531,000 9,613,000

A011 TOTAL PAY 23 23 5,804,000 5,133,000 5,648,000

A011-1 TOTAL PAY OF OFFICERS 2 2 2,028,000 873,000 961,000

A01101 Total Basic Pay Of Officer 2 2 2,028,000 873,000 961,000

D259 DISTRICT OFFICER (BPS-18) 1 1 1,129,000 486,000 535,000

D129 DIVISIONAL ACCOUNTS (BPS-17) 1 1 899,000 387,000 426,000 OFFICER

A011-2 TOTAL PAY OF OTHER STAFF 21 21 3,776,000 4,260,000 4,687,000

A01151 Total Basic Pay Other Staff 21 21 3,715,000 4,199,000 4,619,000

S053 SENIOR CLERK (BPS-14) 3 675,000 742,000

S181 STENOGRAPHER (BPS-14) 1 1 243,000 272,000 300,000

H053 HEAD WARDER (BPS-13) 1 1 230,000 255,000 281,000

S222 SUB ENGINEER (BPS-11) 2 2 402,000 450,000 495,000

D230 DRAFTSMAN (BPS-10) 1 1 198,000 218,000 240,000

A017 ACCOUNT CLERK (BPS-09) 2 2 377,000 423,000 464,000

S053 SENIOR CLERK (BPS-09) 3 565,000

T047 TRACER (BPS-05) 1 1 164,000 184,000 202,000

W045 WORK MESTRY / DAROGHA (BPS-05) 2 2 328,000 368,000 405,000

D161 DRIVER (BPS-04) 2 2 318,000 354,000 390,000

C089 CHOWKIDAR (BPS-02) 1 1 149,000 167,000 183,000

C126 COLI (BPS-02) 2 2 296,000 333,000 367,000

N003 NAIB QASID (BPS-02) 2 2 296,000 333,000 367,000

S261 SWEEPER (BPS-02) 1 1 149,000 167,000 183,000

A01152 Personal pay 61,000 61,000 68,000

Page 548: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

547

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

QS0053 EXECTIVE ENGINEER BUILDINGS DIVISIONSHAHDADKOT

A012 TOTAL ALLOWANCES 4,037,000 3,398,000 3,965,000

A012-1 TOTAL REGULAR ALLOWANCES 3,907,000 3,268,000 3,828,000

A01202 House Rent Allowance 389,000 389,000 389,000

A01203 Conveyance Allowance 696,000 696,000 696,000

A01207 Washing Allowance 1,000 1,000 1,000

A0120X Ad - hoc Allowance - 2010 1,125,000 818,000 818,000

A01217 Medical Allowance 548,000 548,000 548,000

A0121A Ad - hoc Allowance - 2011 19,000

A0121M Adhoc Relief Allowance - 2012 30,000

A0121T Adhoc Relief Allowance 2013 117,000 117,000

A0122C Adhoc Relief Allowance - 2015 574,000 101,000 101,000

A0122M Adhoc Relief Allowance 2016 496,000 558,000

A01239 Special Allowance 42,000 42,000

A01244 Adhoc Relief 11,000

A01270 Others 574,000 558,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 130,000 130,000 137,000

A01274 Medical Charges 130,000 130,000 137,000

A03 TOTAL OPERATING EXPENSES 490,000 419,000 511,000

A032 TOTAL COMMUNICATIONS 54,000 54,000 57,000

A03201 Postage and Telegraph 14,000 14,000 15,000

A03202 Telephone and Trunk call 40,000 40,000 42,000

A033 TOTAL UTILITIES 72,000 1,000 80,000

A03303 Electricity 72,000 1,000 80,000

A034 TOTAL OCCUPANCY COSTS 13,000 13,000 13,000

A03407 Rates and Taxes 13,000 13,000 13,000

Page 549: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

548

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

QS0053 EXECTIVE ENGINEER BUILDINGS DIVISIONSHAHDADKOT

A038 TOTAL TRAVEL & 257,000 257,000 260,000

TRANSPORTATION

A03805 Travelling Allowance 48,000 48,000 51,000

A03807 P.O.L Charges A.planes 209,000 209,000 209,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 94,000 94,000 101,000

A03901 Stationery 31,000 31,000 33,000

A03902 Printing and Publication 24,000 24,000 26,000

A03905 Newspapers Periodicals and Books 24,000 24,000 26,000

A03970 Others 15,000 15,000 16,000

1 Others 15,000 15,000 16,000

A13 TOTAL REPAIRS AND MAINTENANCE 93,000 93,000 102,000

A130 TOTAL TRANSPORT 24,000 24,000 27,000

A13001 Transport 24,000 24,000 27,000

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

A13101 Machinery and Equipment 36,000 36,000 40,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

_______________________________________________________________________________EXECTIVE ENGINEER BUILDINGS DIVISION 10,424,000 9,043,000 10,226,000

SHAHDADKOT

_______________________________________________________________________________

Page 550: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

549

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

QS0054 ASSISTANT ENGINEER-I SHAHDADKOT

A01 TOTAL EMPLOYEES RELATED EXPENSES. 4,124,000 4,787,000 5,387,000

A011 TOTAL PAY 14 14 2,527,000 2,816,000 3,099,000

A011-1 TOTAL PAY OF OFFICERS 1 1 457,000 713,000 785,000

A01101 Total Basic Pay Of Officer 1 1 457,000 713,000 785,000

D262 DEPUTY DISTRICT OFFICER (BPS-17) 1 1 457,000 713,000 785,000

A011-2 TOTAL PAY OF OTHER STAFF 13 13 2,070,000 2,103,000 2,314,000

A01151 Total Basic Pay Other Staff 13 13 2,070,000 2,103,000 2,314,000

J053 JUNIOR CLERK (BPS-11) 3 565,000 622,000

S338 SUB-ENGINEER (CIVIL) (BPS-11) 2 2 385,000 377,000 415,000

J014 JR CLERK (BPS-07) 3 505,000

W046 WORK MISTRY (BPS-05) 3 3 470,000 462,000 508,000

C114 CLEANER CUM ATTENDANT (BPS-02) 1 1 142,000 140,000 154,000

C126 COLI (BPS-02) 3 3 426,000 419,000 461,000

N003 NAIB QASID (BPS-02) 1 1 142,000 140,000 154,000

A012 TOTAL ALLOWANCES 1,597,000 1,971,000 2,288,000

A012-1 TOTAL REGULAR ALLOWANCES 1,574,000 1,948,000 2,263,000

A01202 House Rent Allowance 150,000 228,000 228,000

A01203 Conveyance Allowance 343,000 479,000 479,000

A0120X Ad - hoc Allowance - 2010 400,000 489,000 489,000

A01217 Medical Allowance 245,000 327,000 327,000

A0121A Ad - hoc Allowance - 2011 12,000

A0121M Adhoc Relief Allowance - 2012 26,000

A0121T Adhoc Relief Allowance 2013 63,000 63,000

A0121Z Adhoc Relief Allowance - 2014 6,000

A0122C Adhoc Relief Allowance - 2015 218,000 57,000 57,000

A0122M Adhoc Relief Allowance 2016 222,000 310,000

A01244 Adhoc Relief 39,000

Page 551: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

550

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

QS0054 ASSISTANT ENGINEER-I SHAHDADKOT

A01270 Others 218,000 310,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 23,000 23,000 25,000

A01274 Medical Charges 23,000 23,000 25,000

A03 TOTAL OPERATING EXPENSES 220,000 191,000 228,000

A033 TOTAL UTILITIES 30,000 1,000 33,000

A03303 Electricity 30,000 1,000 33,000

A038 TOTAL TRAVEL & 148,000 148,000 149,000

TRANSPORTATION

A03805 Travelling Allowance 19,000 19,000 20,000

A03807 P.O.L Charges A.planes 129,000 129,000 129,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 42,000 42,000 46,000

A03901 Stationery 9,000 9,000 10,000

A03902 Printing and Publication 9,000 9,000 10,000

A03905 Newspapers Periodicals and Books 9,000 9,000 10,000

A03970 Others 15,000 15,000 16,000

1 Others 15,000 15,000 16,000

A13 TOTAL REPAIRS AND MAINTENANCE 87,000 87,000 95,000

A130 TOTAL TRANSPORT 18,000 18,000 20,000

A13001 Transport 18,000 18,000 20,000

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

A13101 Machinery and Equipment 36,000 36,000 40,000

Page 552: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

551

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

QS0054 ASSISTANT ENGINEER-I SHAHDADKOT

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

_______________________________________________________________________________ASSISTANT ENGINEER-I SHAHDADKOT 4,431,000 5,065,000 5,710,000

_______________________________________________________________________________

Page 553: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

552

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

QS0055 ASSISTANT ENGINEER-IWARAH DISTRICTSHAHDADKOT

A01 TOTAL EMPLOYEES RELATED EXPENSES. 3,973,000 3,723,000 4,279,000

A011 TOTAL PAY 14 14 2,268,000 2,302,000 2,534,000

A011-1 TOTAL PAY OF OFFICERS 1 1 471,000 471,000 519,000

A01101 Total Basic Pay Of Officer 1 1 471,000 471,000 519,000

D262 DEPUTY DISTRICT OFFICER (BPS-17) 1 1 471,000 471,000 519,000

A011-2 TOTAL PAY OF OTHER STAFF 13 13 1,797,000 1,831,000 2,015,000

A01151 Total Basic Pay Other Staff 13 13 1,797,000 1,831,000 2,015,000

J053 JUNIOR CLERK (BPS-11) 3 492,000 542,000

S122 SHOP ASSISTANT (BPS-11) 2 2 335,000 328,000 361,000

J014 JR CLERK (BPS-07) 3 438,000

W046 WORK MISTRY (BPS-05) 3 3 408,000 402,000 443,000

C089 CHOWKIDAR (BPS-02) 1 1 123,000 122,000 133,000

C126 COLI (BPS-02) 3 3 370,000 365,000 402,000

N003 NAIB QASID (BPS-02) 1 1 123,000 122,000 134,000

A012 TOTAL ALLOWANCES 1,705,000 1,421,000 1,745,000

A012-1 TOTAL REGULAR ALLOWANCES 1,671,000 1,387,000 1,709,000

A01202 House Rent Allowance 186,000 186,000 186,000

A01203 Conveyance Allowance 371,000 371,000 371,000

A0120X Ad - hoc Allowance - 2010 419,000 291,000 291,000

A01217 Medical Allowance 263,000 263,000 263,000

A0121T Adhoc Relief Allowance 2013 55,000 55,000

A0122C Adhoc Relief Allowance - 2015 216,000 37,000 37,000

A0122M Adhoc Relief Allowance 2016 184,000 253,000

A01270 Others 216,000 253,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 34,000 34,000 36,000

Page 554: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

553

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

QS0055 ASSISTANT ENGINEER-IWARAH DISTRICTSHAHDADKOT

A01274 Medical Charges 34,000 34,000 36,000

A03 TOTAL OPERATING EXPENSES 188,000 159,000 196,000

A033 TOTAL UTILITIES 30,000 1,000 33,000

A03303 Electricity 30,000 1,000 33,000

A038 TOTAL TRAVEL & 116,000 116,000 117,000

TRANSPORTATION

A03805 Travelling Allowance 19,000 19,000 20,000

A03807 P.O.L Charges A.planes 97,000 97,000 97,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 42,000 42,000 46,000

A03901 Stationery 9,000 9,000 10,000

A03902 Printing and Publication 9,000 9,000 10,000

A03905 Newspapers Periodicals and Books 9,000 9,000 10,000

A03970 Others 15,000 15,000 16,000

1 Others 15,000 15,000 16,000

A13 TOTAL REPAIRS AND MAINTENANCE 87,000 87,000 95,000

A130 TOTAL TRANSPORT 18,000 18,000 20,000

A13001 Transport 18,000 18,000 20,000

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

A13101 Machinery and Equipment 36,000 36,000 40,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

Page 555: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

554

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

QS0055 ASSISTANT ENGINEER-IWARAH DISTRICTSHAHDADKOT

A13201 Furniture and Fixture 33,000 33,000 35,000

_______________________________________________________________________________ASSISTANT ENGINEER-IWARAH DISTRICT 4,248,000 3,969,000 4,570,000

SHAHDADKOT

_______________________________________________________________________________

Page 556: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

555

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

QS0056 ASSISTANT ENGINEER-IKAMBAR DISTRICTSHAHDADKOT

A01 TOTAL EMPLOYEES RELATED EXPENSES. 4,563,000 4,257,000 4,814,000

A011 TOTAL PAY 14 14 2,643,000 2,520,000 2,773,000

A011-1 TOTAL PAY OF OFFICERS 1 1 607,000 728,000 801,000

A01101 Total Basic Pay Of Officer 1 1 607,000 728,000 801,000

D262 DEPUTY DISTRICT OFFICER (BPS-17) 1 1 607,000 728,000 801,000

A011-2 TOTAL PAY OF OTHER STAFF 13 13 2,036,000 1,792,000 1,972,000

A01151 Total Basic Pay Other Staff 13 13 2,033,000 1,789,000 1,968,000

J053 JUNIOR CLERK (BPS-11) 3 481,000 529,000

S122 SHOP ASSISTANT (BPS-11) 2 2 376,000 321,000 353,000

J014 JR CLERK (BPS-07) 3 496,000

W046 WORK MISTRY (BPS-05) 3 3 461,000 393,000 432,000

C089 CHOWKIDAR (BPS-02) 1 1 140,000 118,000 131,000

C126 COLI (BPS-02) 3 3 420,000 357,000 392,000

N003 NAIB QASID (BPS-02) 1 1 140,000 119,000 131,000

A01152 Personal pay 3,000 3,000 4,000

A012 TOTAL ALLOWANCES 1,920,000 1,737,000 2,041,000

A012-1 TOTAL REGULAR ALLOWANCES 1,897,000 1,714,000 2,016,000

A01202 House Rent Allowance 214,000 214,000 214,000

A01203 Conveyance Allowance 414,000 431,000 431,000

A0120X Ad - hoc Allowance - 2010 467,000 388,000 388,000

A01217 Medical Allowance 300,000 300,000 300,000

A0121T Adhoc Relief Allowance 2013 78,000 78,000

A0122C Adhoc Relief Allowance - 2015 251,000 51,000 51,000

A0122M Adhoc Relief Allowance 2016 252,000 277,000

A01270 Others 251,000 277,000

Page 557: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

556

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

QS0056 ASSISTANT ENGINEER-IKAMBAR DISTRICTSHAHDADKOT

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 23,000 23,000 25,000

A01274 Medical Charges 23,000 23,000 25,000

A03 TOTAL OPERATING EXPENSES 225,000 198,000 234,000

A033 TOTAL UTILITIES 28,000 1,000 31,000

A03303 Electricity 28,000 1,000 31,000

A038 TOTAL TRAVEL & 136,000 136,000 137,000

TRANSPORTATION

A03805 Travelling Allowance 19,000 19,000 20,000

A03807 P.O.L Charges A.planes 117,000 117,000 117,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 61,000 61,000 66,000

A03901 Stationery 16,000 16,000 17,000

A03902 Printing and Publication 9,000 9,000 10,000

A03905 Newspapers Periodicals and Books 9,000 9,000 10,000

A03970 Others 27,000 27,000 29,000

1 Others 27,000 27,000 29,000

A13 TOTAL REPAIRS AND MAINTENANCE 87,000 87,000 95,000

A130 TOTAL TRANSPORT 18,000 18,000 20,000

A13001 Transport 18,000 18,000 20,000

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

A13101 Machinery and Equipment 36,000 36,000 40,000

Page 558: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

557

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

QS0056 ASSISTANT ENGINEER-IKAMBAR DISTRICTSHAHDADKOT

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

_______________________________________________________________________________ASSISTANT ENGINEER-IKAMBAR DISTRICT 4,875,000 4,542,000 5,143,000

SHAHDADKOT

_______________________________________________________________________________

Page 559: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

558

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SB0090 EXECTIVE ENGINEER BUILDINGS DIVISIONBENAZIRABAD

A01 TOTAL EMPLOYEES RELATED EXPENSES. 20,077,000 21,452,000 24,497,000

A011 TOTAL PAY 63 63 11,783,000 13,630,000 14,996,000

A011-1 TOTAL PAY OF OFFICERS 6 6 3,313,000 4,435,000 4,880,000

A01101 Total Basic Pay Of Officer 6 6 3,300,000 4,408,000 4,849,000

D259 DISTRICT OFFICER (BPS-18) 1 1 702,000 940,000 1,034,000

D262 DEPUTY DISTRICT OFFICER (BPS-17) 4 4 2,247,000 3,000,000 3,300,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 351,000 468,000 515,000 OFFICER

A01102 Personal pay 13,000 13,000 15,000

A01105 Qualification Pay 14,000 16,000

A011-2 TOTAL PAY OF OTHER STAFF 57 57 8,470,000 9,195,000 10,116,000

A01151 Total Basic Pay Other Staff 57 57 8,426,000 9,151,000 10,067,000

S053 SENIOR CLERK (BPS-14) 2 361,000 397,000

S181 STENOGRAPHER (BPS-14) 1 1 203,000 218,000 240,000

D132 DIVISIONAL H-D / MAN (BPS-13) 1 1 190,000 205,000 225,000

D230 DRAFTSMAN (BPS-11) 1 1 167,000 180,000 198,000

J053 JUNIOR CLERK (BPS-11) 10 1,804,000 1,984,000

S228 SUB-ENGINEER (BPS-11) 12 12 2,008,000 2,164,000 2,381,000

A017 ACCOUNT CLERK (BPS-09) 2 2 314,000 341,000 375,000

S053 SENIOR CLERK (BPS-09) 2 471,000

J014 JR CLERK (BPS-07) 10 1,471,000

P061 PLUMBER (BPS-05) 1 1 137,000 147,000 162,000

T001 TRACER (BPS-05) 1 1 137,000 147,000 162,000

C224 CARPENTER (BPS-04) 1 1 132,000 142,000 156,000

D161 DRIVER (BPS-04) 3 3 395,000 426,000 469,000

Page 560: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

559

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SB0090 EXECTIVE ENGINEER BUILDINGS DIVISIONBENAZIRABAD

W045 WORK MESTRY / DAROGHA (BPS-04) 9 9 1,186,000 1,279,000 1,407,000

C089 CHOWKIDAR (BPS-02) 5 5 622,000 668,000 735,000

N003 NAIB QASID (BPS-02) 6 6 744,000 802,000 882,000

S008 SANITARY WORKER (BPS-02) 2 2 249,000 267,000 294,000

A01152 Personal pay 44,000 44,000 49,000

A012 TOTAL ALLOWANCES 8,294,000 7,822,000 9,501,000

A012-1 TOTAL REGULAR ALLOWANCES 8,276,000 7,804,000 9,482,000

A01202 House Rent Allowance 894,000 894,000 894,000

A01203 Conveyance Allowance 1,579,000 1,647,000 1,647,000

A01207 Washing Allowance 8,000 8,000 8,000

A0120D Integrated Allowance 18,000 18,000 18,000

A0120X Ad - hoc Allowance - 2010 2,273,000 2,131,000 2,131,000

A01216 Qualification Allowance 11,000 11,000 11,000

A01217 Medical Allowance 1,147,000 1,147,000 1,147,000

A0121Q Audit and Accounts Allowance 86,000 86,000

A0121T Adhoc Relief Allowance 2013 279,000 279,000

A0122C Adhoc Relief Allowance - 2015 1,173,000 264,000 264,000

A0122M Adhoc Relief Allowance 2016 1,306,000 1,492,000

A01233 Unattractive Area Allowance 13,000 13,000

A01270 Others 1,173,000 1,492,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 18,000 18,000 19,000

A01274 Medical Charges 18,000 18,000 19,000

A03 TOTAL OPERATING EXPENSES 462,000 303,000 491,000

A032 TOTAL COMMUNICATIONS 75,000 75,000 80,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 66,000 66,000 70,000

Page 561: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

560

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SB0090 EXECTIVE ENGINEER BUILDINGS DIVISIONBENAZIRABAD

A033 TOTAL UTILITIES 190,000 31,000 209,000

A03303 Electricity 190,000 31,000 209,000

A038 TOTAL TRAVEL & 155,000 155,000 157,000

TRANSPORTATION

A03805 Travelling Allowance 23,000 23,000 25,000

A03807 P.O.L Charges A.planes 132,000 132,000 132,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 42,000 42,000 45,000

A03901 Stationery 15,000 15,000 16,000

A03970 Others 27,000 27,000 29,000

1 Others 27,000 27,000 29,000

A13 TOTAL REPAIRS AND MAINTENANCE 36,000 36,000 40,000

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

A13101 Machinery and Equipment 36,000 36,000 40,000

_______________________________________________________________________________EXECTIVE ENGINEER BUILDINGS DIVISION 20,575,000 21,791,000 25,028,000

BENAZIRABAD

_______________________________________________________________________________

Page 562: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

561

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SL0010 EXECUTIVE ENGINEER BUILDING DIVIONSUJAWAL

A01 TOTAL EMPLOYEES RELATED EXPENSES. 1,776,000 1,988,000 2,317,000

A011 TOTAL PAY 13 13 1,394,000 1,420,000 1,564,000

A011-1 TOTAL PAY OF OFFICERS 3 4 665,000 945,000 1,041,000

A01101 Total Basic Pay Of Officer 3 4 665,000 891,000 981,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 263,000 288,000 317,000

A218 ASSISTANT ENGINEER (BPS-17) 1 1 201,000 230,000 253,000

D129 DIVISIONAL ACCOUNTS (BPS-17) 1 1 201,000 230,000 253,000 OFFICER

A119 ASSISTANT (BPS-16) 1 143,000 158,000

A01102 Personal pay 54,000 60,000

A011-2 TOTAL PAY OF OTHER STAFF 10 9 729,000 475,000 523,000

A01151 Total Basic Pay Other Staff 10 9 729,000 475,000 523,000

A119 ASSISTANT (BPS-14) 1 102,000

S181 STENOGRAPHER (BPS-14) 1 1 102,000 70,000 77,000

D026 DATA PROCESSING ASSISTANT (BPS-12) 1 1 87,000 61,000 67,000

J053 JUNIOR CLERK (BPS-11) 1 58,000 63,000

S222 SUB ENGINEER (BPS-11) 1 1 83,000 58,000 63,000

D230 DRAFTSMAN (BPS-10) 1 1 83,000 56,000 61,000

J014 JR CLERK (BPS-07) 1 73,000

T050 TRACER (BPS-05) 1 1 53,000 47,000 52,000

C089 CHOWKIDAR (BPS-01) 1 1 49,000 41,000 48,000

N003 NAIB QASID (BPS-01) 1 1 48,000 42,000 46,000

S009 SANITARY WORKER / (BPS-01) 1 1 49,000 42,000 46,000 GUTTERMAN

A012 TOTAL ALLOWANCES 382,000 568,000 753,000

Page 563: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

562

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SL0010 EXECUTIVE ENGINEER BUILDING DIVIONSUJAWAL

A012-1 TOTAL REGULAR ALLOWANCES 382,000 568,000 753,000

A01202 House Rent Allowance 14,000 62,000 62,000

A01203 Conveyance Allowance 26,000 85,000 85,000

A0120D Integrated Allowance 3,000 4,000 4,000

A0120X Ad - hoc Allowance - 2010 40,000 189,000 189,000

A01217 Medical Allowance 21,000 78,000 78,000

A0121T Adhoc Relief Allowance 2013 11,000 11,000

A0122C Adhoc Relief Allowance - 2015 139,000 24,000 24,000

A0122M Adhoc Relief Allowance 2016 115,000 150,000

A01270 Others 139,000 150,000

_______________________________________________________________________________EXECUTIVE ENGINEER BUILDING DIVION 1,776,000 1,988,000 2,317,000

SUJAWAL

_______________________________________________________________________________

Page 564: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

563

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SN0060 EXECTIVE ENGINEER BUILDINGS DIVISIONSANGHAR

A01 TOTAL EMPLOYEES RELATED EXPENSES. 32,940,000 31,321,000 35,495,000

A011 TOTAL PAY 93 93 19,537,000 19,535,000 21,491,000

A011-1 TOTAL PAY OF OFFICERS 8 8 4,744,000 3,767,000 4,145,000

A01101 Total Basic Pay Of Officer 8 8 4,680,000 3,684,000 4,053,000

D259 DISTRICT OFFICER (BPS-18) 1 1 710,000 560,000 616,000

D129 DIVISIONAL ACCOUNTS (BPS-17) 1 1 567,000 446,000 491,000 OFFICER

D262 DEPUTY DISTRICT OFFICER (BPS-17) 6 6 3,403,000 2,678,000 2,946,000

A01102 Personal pay 64,000 83,000 92,000

A011-2 TOTAL PAY OF OTHER STAFF 85 85 14,793,000 15,768,000 17,346,000

A01151 Total Basic Pay Other Staff 85 85 14,692,000 15,621,000 17,184,000

S053 SENIOR CLERK (BPS-14) 2 424,000 467,000

S181 STENOGRAPHER (BPS-14) 1 1 247,000 257,000 283,000

H035 HEAD DRAFTSMAN (BPS-13) 1 1 233,000 241,000 265,000

J053 JUNIOR CLERK (BPS-11) 12 2,547,000 2,802,000

S222 SUB ENGINEER (BPS-11) 12 12 2,446,000 2,547,000 2,802,000

D230 DRAFTSMAN (BPS-10) 1 1 198,000 206,000 226,000

A017 ACCOUNT CLERK (BPS-09) 2 2 383,000 399,000 437,000

S053 SENIOR CLERK (BPS-09) 2 383,000

J014 JR CLERK (BPS-07) 12 2,150,000

P061 PLUMBER (BPS-06) 1 1 172,000 180,000 198,000

D161 DRIVER (BPS-05) 5 5 833,000 867,000 954,000

E021 ELECTRICIAN (BPS-05) 2 2 333,000 347,000 382,000

P168 PUMP OPERATOR (BPS-05) 3 3 501,000 520,000 572,000

R061 ROAD / WORK MISTRI / (BPS-05) 18 18 3,002,000 3,122,000 3,435,000 DAROGHA

Page 565: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

564

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SN0060 EXECTIVE ENGINEER BUILDINGS DIVISIONSANGHAR

T047 TRACER (BPS-05) 1 1 166,000 173,000 191,000

W038 WIRE MAN (BPS-05) 1 1 166,000 173,000 191,000

C089 CHOWKIDAR (BPS-02) 7 7 1,058,000 1,101,000 1,211,000

H064 HELPER (BPS-02) 6 6 909,000 944,000 1,038,000

N003 NAIB QASID (BPS-02) 8 8 1,210,000 1,258,000 1,384,000

S008 SANITARY WORKER (BPS-02) 2 2 302,000 315,000 346,000

A01152 Personal pay 101,000 147,000 162,000

A012 TOTAL ALLOWANCES 13,403,000 11,786,000 14,004,000

A012-1 TOTAL REGULAR ALLOWANCES 13,403,000 11,786,000 14,004,000

A01202 House Rent Allowance 1,301,000 1,301,000 1,301,000

A01203 Conveyance Allowance 2,521,000 2,521,000 2,521,000

A01207 Washing Allowance 10,000 10,000 10,000

A0120X Ad - hoc Allowance - 2010 3,800,000 3,184,000 3,184,000

A01217 Medical Allowance 1,897,000 1,897,000 1,897,000

A0121A Ad - hoc Allowance - 2011 25,000

A0121M Adhoc Relief Allowance - 2012 27,000

A0121T Adhoc Relief Allowance 2013 427,000 427,000

A0121Z Adhoc Relief Allowance - 2014 34,000

A0122C Adhoc Relief Allowance - 2015 1,937,000 416,000 416,000

A0122M Adhoc Relief Allowance 2016 1,884,000 2,124,000

A01244 Adhoc Relief 60,000

A01270 Others 1,937,000 2,124,000

A03 TOTAL OPERATING EXPENSES 782,000 505,000 827,000

A032 TOTAL COMMUNICATIONS 68,000 68,000 72,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 59,000 59,000 62,000

A033 TOTAL UTILITIES 278,000 1,000 306,000

Page 566: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

565

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SN0060 EXECTIVE ENGINEER BUILDINGS DIVISIONSANGHAR

A03303 Electricity 278,000 1,000 306,000

A038 TOTAL TRAVEL & 368,000 368,000 376,000

TRANSPORTATION

A03805 Travelling Allowance 159,000 159,000 167,000

A03807 P.O.L Charges A.planes 209,000 209,000 209,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 68,000 68,000 73,000

A03901 Stationery 28,000 28,000 30,000

A03902 Printing and Publication 16,000 16,000 17,000

A03905 Newspapers Periodicals and Books 9,000 9,000 10,000

A03970 Others 15,000 15,000 16,000

1 Others 15,000 15,000 16,000

A13 TOTAL REPAIRS AND MAINTENANCE 226,000 226,000 248,000

A130 TOTAL TRANSPORT 129,000 129,000 142,000

A13001 Transport 129,000 129,000 142,000

A131 TOTAL MACHINERY AND 63,000 63,000 70,000

EQUIPMENT

A13101 Machinery and Equipment 63,000 63,000 70,000

A132 TOTAL FURNITURE AND 34,000 34,000 36,000

FIXTURE

A13201 Furniture and Fixture 34,000 34,000 36,000

_______________________________________________________________________________EXECTIVE ENGINEER BUILDINGS DIVISION 33,948,000 32,052,000 36,570,000

SANGHAR

_______________________________________________________________________________

Page 567: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

566

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SQ0052 EXECTIVE ENGINEER BUILDINGS DIVISIONSHIKARPUR

A01 TOTAL EMPLOYEES RELATED EXPENSES. 23,821,000 25,359,000 28,893,000

A011 TOTAL PAY 67 67 14,763,000 16,112,000 17,725,000

A011-1 TOTAL PAY OF OFFICERS 6 7 3,131,000 3,134,000 3,449,000

A01101 Total Basic Pay Of Officer 6 7 3,131,000 3,031,000 3,335,000

D259 DISTRICT OFFICER (BPS-18) 1 1 664,000 584,000 643,000

A218 ASSISTANT ENGINEER (BPS-17) 4 4 2,134,000 1,865,000 2,052,000

A235 ASSISTANT HEAD CLERK (BPS-16) 1 291,000 320,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 333,000 291,000 320,000 OFFICER

A01102 Personal pay 103,000 114,000

A011-2 TOTAL PAY OF OTHER STAFF 61 60 11,632,000 12,978,000 14,276,000

A01151 Total Basic Pay Other Staff 61 60 11,548,000 12,830,000 14,113,000

A235 ASSISTANT HEAD CLERK (BPS-14) 1 264,000

S053 SENIOR CLERK (BPS-14) 3 732,000 805,000

S181 STENOGRAPHER (BPS-14) 1 1 266,000 295,000 325,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 250,000 277,000 305,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 10 2,440,000 2,684,000

S222 SUB ENGINEER (BPS-11) 8 8 1,762,000 1,952,000 2,147,000

D230 DRAFTSMAN (BPS-10) 1 1 215,000 236,000 260,000

A017 ACCOUNT CLERK (BPS-09) 2 2 414,000 460,000 503,000

S053 SENIOR CLERK (BPS-09) 3 620,000

J014 JR CLERK (BPS-07) 10 1,936,000

D018 DAROGA (BPS-05) 12 12 2,163,000 2,393,000 2,633,000

E021 ELECTRICIAN (BPS-05) 2 2 360,000 399,000 439,000

T047 TRACER (BPS-05) 1 1 180,000 199,000 219,000

Page 568: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

567

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SQ0052 EXECTIVE ENGINEER BUILDINGS DIVISIONSHIKARPUR

D161 DRIVER (BPS-04) 1 1 174,000 192,000 211,000

C089 CHOWKIDAR (BPS-02) 5 5 817,000 904,000 995,000

H066 HELPER COOLLY (BPS-02) 5 5 817,000 904,000 995,000

N003 NAIB QASID (BPS-02) 6 6 982,000 1,085,000 1,194,000

S008 SANITARY WORKER (BPS-02) 2 2 328,000 362,000 398,000

A01152 Personal pay 84,000 148,000 163,000

A012 TOTAL ALLOWANCES 9,058,000 9,247,000 11,168,000

A012-1 TOTAL REGULAR ALLOWANCES 8,803,000 8,992,000 10,900,000

A01202 House Rent Allowance 820,000 890,000 890,000

A01203 Conveyance Allowance 1,610,000 1,894,000 1,894,000

A01207 Washing Allowance 23,000 28,000 28,000

A0120D Integrated Allowance 1,000 3,000 3,000

A0120Q Fixed Daily Allowance 50,000 50,000 50,000

A0120X Ad - hoc Allowance - 2010 2,504,000 2,621,000 2,621,000

A01217 Medical Allowance 1,205,000 1,205,000 1,205,000

A0121T Adhoc Relief Allowance 2013 407,000 407,000

A0122C Adhoc Relief Allowance - 2015 1,295,000 312,000 312,000

A0122M Adhoc Relief Allowance 2016 1,582,000 1,745,000

A01270 Others 1,295,000 1,745,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 255,000 255,000 268,000

A01274 Medical Charges 255,000 255,000 268,000

A03 TOTAL OPERATING EXPENSES 2,101,000 1,059,000 2,244,000

A032 TOTAL COMMUNICATIONS 128,000 128,000 135,000

A03201 Postage and Telegraph 14,000 14,000 15,000

A03202 Telephone and Trunk call 114,000 114,000 120,000

Page 569: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

568

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SQ0052 EXECTIVE ENGINEER BUILDINGS DIVISIONSHIKARPUR

A033 TOTAL UTILITIES 1,043,000 1,000 1,148,000

A03303 Electricity 1,043,000 1,000 1,148,000

A038 TOTAL TRAVEL & 585,000 585,000 597,000

TRANSPORTATION

A03805 Travelling Allowance 238,000 238,000 250,000

A03807 P.O.L Charges A.planes 347,000 347,000 347,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 345,000 345,000 364,000

A03901 Stationery 146,000 146,000 154,000

A03902 Printing and Publication 31,000 31,000 33,000

A03905 Newspapers Periodicals and Books 37,000 37,000 39,000

A03955 Computer Stationery 58,000 58,000 61,000

A03970 Others 73,000 73,000 77,000

1 Others 73,000 73,000 77,000

A13 TOTAL REPAIRS AND MAINTENANCE 288,000 288,000 315,000

A130 TOTAL TRANSPORT 146,000 146,000 161,000

A13001 Transport 146,000 146,000 161,000

A131 TOTAL MACHINERY AND 74,000 74,000 82,000

EQUIPMENT

A13101 Machinery and Equipment 74,000 74,000 82,000

A132 TOTAL FURNITURE AND 68,000 68,000 72,000

FIXTURE

A13201 Furniture and Fixture 68,000 68,000 72,000

Page 570: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

569

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SQ0052 EXECTIVE ENGINEER BUILDINGS DIVISIONSHIKARPUR

_______________________________________________________________________________EXECTIVE ENGINEER BUILDINGS DIVISION 26,210,000 26,706,000 31,452,000

SHIKARPUR

_______________________________________________________________________________

Page 571: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

570

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SY0117 EXECTIVE ENGINEER BUILDINGS DIVISIONSUKKUR

A01 TOTAL EMPLOYEES RELATED EXPENSES. 29,955,000 34,684,000 39,483,000

A011 TOTAL PAY 80 80 17,689,000 22,155,000 24,372,000

A011-1 TOTAL PAY OF OFFICERS 6 7 2,833,000 4,273,000 4,701,000

A01101 Total Basic Pay Of Officer 6 7 2,833,000 4,273,000 4,701,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 603,000 824,000 906,000

A221 ASSISTANT ENGINEERS (BPS-17) 4 4 1,928,000 2,629,000 2,893,000

A119 ASSISTANT (BPS-16) 1 410,000 451,000

D129 DIVISIONAL ACCOUNTS (BPS-16) 1 1 302,000 410,000 451,000 OFFICER

A011-2 TOTAL PAY OF OTHER STAFF 74 73 14,856,000 17,882,000 19,671,000

A01151 Total Basic Pay Other Staff 74 73 14,792,000 17,778,000 19,556,000

A119 ASSISTANT (BPS-14) 1 281,000

S053 SENIOR CLERK (BPS-14) 3 833,000 917,000

S181 STENOGRAPHER (BPS-14) 1 1 281,000 336,000 370,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 263,000 315,000 347,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 10 2,777,000 3,055,000

S222 SUB ENGINEER (BPS-11) 12 12 2,779,000 3,333,000 3,666,000

D150 DRAUGHTSMAN (BPS-10) 1 1 224,000 269,000 296,000

A017 ACCOUNT CLERK (BPS-09) 2 2 436,000 522,000 571,000

S053 SENIOR CLERK (BPS-09) 3 653,000

J014 JR CLERK (BPS-07) 10 2,035,000

W038 WIRE MAN (BPS-07) 1 1 202,000 244,000 268,000

P061 PLUMBER (BPS-06) 1 1 197,000 235,000 259,000

M042 MASSAN MISTRY (BPS-05) 1 1 189,000 227,000 250,000

Page 572: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

571

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SY0117 EXECTIVE ENGINEER BUILDINGS DIVISIONSUKKUR

T050 TRACER (BPS-05) 1 1 189,000 227,000 250,000

W046 WORK MISTRY (BPS-05) 18 18 3,412,000 4,086,000 4,494,000

D161 DRIVER (BPS-04) 3 3 547,000 656,000 722,000

P168 PUMP OPERATOR (BPS-04) 1 1 182,000 219,000 241,000

H064 HELPER (BPS-02) 4 4 688,000 823,000 906,000

N003 NAIB QASID (BPS-02) 6 6 1,033,000 1,235,000 1,359,000

S008 SANITARY WORKER (BPS-02) 2 2 342,000 412,000 453,000

W014 WATCHMEN (BPS-02) 5 5 859,000 1,029,000 1,132,000

A01152 Personal pay 64,000 104,000 115,000

A012 TOTAL ALLOWANCES 12,266,000 12,529,000 15,111,000

A012-1 TOTAL REGULAR ALLOWANCES 12,266,000 12,529,000 15,111,000

A01202 House Rent Allowance 1,561,000 1,700,000 1,700,000

A01203 Conveyance Allowance 2,182,000 2,438,000 2,438,000

A01207 Washing Allowance 10,000 10,000 10,000

A0120D Integrated Allowance 18,000 18,000 18,000

A0120Q Fixed Daily Allowance 2,000 2,000 2,000

A0120X Ad - hoc Allowance - 2010 3,393,000 3,546,000 3,546,000

A01217 Medical Allowance 1,580,000 1,580,000 1,580,000

A0121T Adhoc Relief Allowance 2013 508,000 508,000

A0121Z Adhoc Relief Allowance - 2014 22,000

A0122C Adhoc Relief Allowance - 2015 1,760,000 457,000 457,000

A0122M Adhoc Relief Allowance 2016 2,178,000 2,426,000

A01270 Others 1,760,000 70,000 2,426,000

A03 TOTAL OPERATING EXPENSES 994,000 207,000 1,089,000

A032 TOTAL COMMUNICATIONS 52,000 52,000 56,000

A03201 Postage and Telegraph 4,000 4,000 5,000

A03202 Telephone and Trunk call 48,000 48,000 51,000

Page 573: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

572

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SY0117 EXECTIVE ENGINEER BUILDINGS DIVISIONSUKKUR

A033 TOTAL UTILITIES 834,000 47,000 918,000

A03303 Electricity 834,000 47,000 918,000

A038 TOTAL TRAVEL & 60,000 60,000 62,000

TRANSPORTATION

A03805 Travelling Allowance 32,000 32,000 34,000

A03807 P.O.L Charges A.planes 28,000 28,000 28,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 48,000 48,000 53,000

A03901 Stationery 8,000 8,000 9,000

A03902 Printing and Publication 8,000 8,000 9,000

A03905 Newspapers Periodicals and Books 3,000 3,000 4,000

A03906 Uniforms and Protective Clothing 16,000 16,000 17,000

A03970 Others 13,000 13,000 14,000

1 Others 13,000 13,000 14,000

A13 TOTAL REPAIRS AND MAINTENANCE 54,000 54,000 59,000

A130 TOTAL TRANSPORT 30,000 30,000 33,000

A13001 Transport 30,000 30,000 33,000

A131 TOTAL MACHINERY AND 9,000 9,000 10,000

EQUIPMENT

A13101 Machinery and Equipment 9,000 9,000 10,000

A132 TOTAL FURNITURE AND 15,000 15,000 16,000

FIXTURE

A13201 Furniture and Fixture 15,000 15,000 16,000

Page 574: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

573

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

SY0117 EXECTIVE ENGINEER BUILDINGS DIVISIONSUKKUR

_______________________________________________________________________________EXECTIVE ENGINEER BUILDINGS DIVISION 31,003,000 34,945,000 40,631,000

SUKKUR

_______________________________________________________________________________

Page 575: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

574

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

TN0049 EXECTIVE ENGINEER BUILDINGS DIVISIONTANDO MUHAMMAD KHAN

A01 TOTAL EMPLOYEES RELATED EXPENSES. 15,113,000 16,187,000 18,364,000

A011 TOTAL PAY 47 47 8,856,000 10,041,000 11,046,000

A011-1 TOTAL PAY OF OFFICERS 3 4 1,022,000 1,350,000 1,485,000

A01101 Total Basic Pay Of Officer 3 4 1,022,000 1,350,000 1,485,000

D259 DISTRICT OFFICER (BPS-18) 1 1 445,000 483,000 532,000

D262 DEPUTY DISTRICT OFFICER (BPS-17) 1 1 354,000 385,000 424,000

A417 ASSISTANT DIVISONAL HEAD (BPS-16) 1 241,000 265,000 CLERK

D128 DIVISIONAL ACCOUNTANT (BPS-16) 1 1 223,000 241,000 264,000

A011-2 TOTAL PAY OF OTHER STAFF 44 43 7,834,000 8,691,000 9,561,000

A01151 Total Basic Pay Other Staff 44 43 7,809,000 8,659,000 9,525,000

S053 SENIOR CLERK (BPS-14) 3 660,000 726,000

S181 STENOGRAPHER (BPS-14) 1 1 239,000 266,000 293,000

D132 DIVISIONAL H-D / MAN (BPS-13) 1 1 224,000 250,000 275,000

A417 ASSISTANT DIVISONAL HEAD (BPS-11) 1 198,000 CLERK

J053 JUNIOR CLERK (BPS-11) 5 1,100,000 1,210,000

S222 SUB ENGINEER (BPS-11) 11 11 2,169,000 2,419,000 2,661,000

D230 DRAFTSMAN (BPS-10) 1 1 191,000 213,000 234,000

A017 ACCOUNT CLERK (BPS-09) 2 2 371,000 412,000 454,000

S053 SENIOR CLERK (BPS-09) 3 554,000

B097 BUILDING MISTRY (BPS-07) 5 5 866,000 965,000 1,061,000

J014 JR CLERK (BPS-07) 5 866,000

D161 DRIVER (BPS-05) 2 2 323,000 360,000 395,000

R061 ROAD / WORK MISTRI / (BPS-05) 3 3 484,000 539,000 593,000 DAROGHA

Page 576: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

575

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

TN0049 EXECTIVE ENGINEER BUILDINGS DIVISIONTANDO MUHAMMAD KHAN

T001 TRACER (BPS-05) 1 1 161,000 180,000 198,000

C089 CHOWKIDAR (BPS-02) 2 2 294,000 326,000 359,000

N003 NAIB QASID (BPS-02) 3 3 440,000 489,000 538,000

H064 HELPER (BPS-01) 2 2 286,000 320,000 352,000

S261 SWEEPER (BPS-01) 1 1 143,000 160,000 176,000

A01152 Personal pay 25,000 32,000 36,000

A012 TOTAL ALLOWANCES 6,257,000 6,146,000 7,318,000

A012-1 TOTAL REGULAR ALLOWANCES 6,257,000 6,146,000 7,318,000

A01202 House Rent Allowance 698,000 711,000 711,000

A01203 Conveyance Allowance 1,364,000 1,364,000 1,364,000

A01207 Washing Allowance 8,000 8,000 8,000

A0120D Integrated Allowance 12,000 14,000 14,000

A0120X Ad - hoc Allowance - 2010 1,585,000 1,611,000 1,611,000

A01217 Medical Allowance 924,000 924,000 924,000

A0121A Ad - hoc Allowance - 2011 15,000

A0121M Adhoc Relief Allowance - 2012 10,000

A0121T Adhoc Relief Allowance 2013 256,000 256,000

A0121Z Adhoc Relief Allowance - 2014 10,000

A0122C Adhoc Relief Allowance - 2015 833,000 228,000 228,000

A0122M Adhoc Relief Allowance 2016 972,000 1,101,000

A01244 Adhoc Relief 23,000

A01270 Others 833,000 1,101,000

A03 TOTAL OPERATING EXPENSES 371,000 309,000 395,000

A032 TOTAL COMMUNICATIONS 80,000 80,000 84,000

A03202 Telephone and Trunk call 80,000 80,000 84,000

A033 TOTAL UTILITIES 125,000 63,000 138,000

A03303 Electricity 125,000 63,000 138,000

Page 577: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

576

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

TN0049 EXECTIVE ENGINEER BUILDINGS DIVISIONTANDO MUHAMMAD KHAN

A038 TOTAL TRAVEL & 77,000 77,000 77,000

TRANSPORTATION

A03807 P.O.L Charges A.planes 77,000 77,000 77,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 89,000 89,000 96,000

A03901 Stationery 9,000 9,000 10,000

A03902 Printing and Publication 9,000 9,000 10,000

A03905 Newspapers Periodicals and Books 9,000 9,000 10,000

A03970 Others 62,000 62,000 66,000

1 Others 62,000 62,000 66,000

_______________________________________________________________________________EXECTIVE ENGINEER BUILDINGS DIVISION 15,484,000 16,496,000 18,759,000

TANDO MUHAMMAD KHAN

_______________________________________________________________________________

Page 578: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

577

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

TQ0043 EXECTIVE ENGINEER BUILDINGS DIVISIONTANDO ALLAH YAR

A01 TOTAL EMPLOYEES RELATED EXPENSES. 15,786,000 14,880,000 16,801,000

A011 TOTAL PAY 45 45 9,221,000 8,911,000 9,802,000

A011-1 TOTAL PAY OF OFFICERS 3 4 1,336,000 805,000 885,000

A01101 Total Basic Pay Of Officer 3 4 1,331,000 800,000 880,000

D259 DISTRICT OFFICER (BPS-18) 1 1 513,000 259,000 284,000

D262 DEPUTY DISTRICT OFFICER (BPS-17) 1 1 408,000 206,000 227,000

S129 SKILLED HELPER (BPS-17) 1 1 410,000 206,000 227,000

A129 ASSISTANT / HEAD CLERK (BPS-16) 1 129,000 142,000

A01103 Special pay 5,000 5,000 5,000

A011-2 TOTAL PAY OF OTHER STAFF 42 41 7,885,000 8,106,000 8,917,000

A01151 Total Basic Pay Other Staff 42 41 7,852,000 8,069,000 8,876,000

A129 ASSISTANT / HEAD CLERK (BPS-14) 1 250,000

S053 SENIOR CLERK (BPS-14) 2 433,000 476,000

S181 STENOGRAPHER (BPS-14) 1 1 244,000 262,000 288,000

D136 DIVISIONAL HEAD (BPS-13) 1 1 231,000 246,000 270,000 DRAUGHTSMAN

J053 JUNIOR CLERK (BPS-11) 5 1,083,000 1,191,000

S222 SUB ENGINEER (BPS-11) 11 11 2,232,000 2,382,000 2,620,000

D150 DRAUGHTSMAN (BPS-10) 1 1 194,000 210,000 231,000

A017 ACCOUNT CLERK (BPS-09) 2 2 381,000 406,000 447,000

S053 SENIOR CLERK (BPS-09) 2 571,000

J014 JR CLERK (BPS-07) 5 891,000

M042 MASSAN MISTRY (BPS-05) 5 5 828,000 885,000 973,000

T001 TRACER (BPS-05) 1 1 166,000 177,000 195,000

W045 WORK MESTRY / DAROGHA (BPS-05) 3 3 498,000 531,000 584,000

Page 579: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

578

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

TQ0043 EXECTIVE ENGINEER BUILDINGS DIVISIONTANDO ALLAH YAR

D161 DRIVER (BPS-04) 1 1 160,000 171,000 188,000

C089 CHOWKIDAR (BPS-02) 2 2 300,000 321,000 353,000

H066 HELPER COOLLY (BPS-02) 2 2 300,000 321,000 353,000

N003 NAIB QASID (BPS-02) 3 3 456,000 481,000 530,000

S008 SANITARY WORKER (BPS-02) 1 1 150,000 160,000 177,000

A01152 Personal pay 33,000 37,000 41,000

A012 TOTAL ALLOWANCES 6,565,000 5,969,000 6,999,000

A012-1 TOTAL REGULAR ALLOWANCES 6,565,000 5,969,000 6,999,000

A01202 House Rent Allowance 728,000 728,000 728,000

A01203 Conveyance Allowance 1,472,000 1,472,000 1,472,000

A01207 Washing Allowance 11,000 11,000 11,000

A0120D Integrated Allowance 4,000 4,000 4,000

A0120Q Fixed Daily Allowance 33,000 33,000 33,000

A0120X Ad - hoc Allowance - 2010 1,690,000 1,449,000 1,449,000

A01217 Medical Allowance 943,000 943,000 943,000

A0121A Ad - hoc Allowance - 2011 55,000

A0121T Adhoc Relief Allowance 2013 234,000 234,000

A0121Z Adhoc Relief Allowance - 2014 20,000

A0122C Adhoc Relief Allowance - 2015 842,000 169,000 169,000

A0122M Adhoc Relief Allowance 2016 847,000 976,000

A01233 Unattractive Area Allowance 4,000 4,000

A01270 Others 842,000 976,000

A03 TOTAL OPERATING EXPENSES 511,000 374,000 541,000

A032 TOTAL COMMUNICATIONS 76,000 76,000 81,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 67,000 67,000 71,000

A033 TOTAL UTILITIES 168,000 31,000 185,000

A03303 Electricity 168,000 31,000 185,000

Page 580: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

579

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

TQ0043 EXECTIVE ENGINEER BUILDINGS DIVISIONTANDO ALLAH YAR

A038 TOTAL TRAVEL & 179,000 179,000 181,000

TRANSPORTATION

A03805 Travelling Allowance 40,000 40,000 42,000

A03807 P.O.L Charges A.planes 139,000 139,000 139,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 88,000 88,000 94,000

A03901 Stationery 18,000 18,000 19,000

A03902 Printing and Publication 14,000 14,000 15,000

A03905 Newspapers Periodicals and Books 9,000 9,000 10,000

A03906 Uniforms and Protective Clothing 15,000 15,000 16,000

A03970 Others 32,000 32,000 34,000

1 Others 32,000 32,000 34,000

A13 TOTAL REPAIRS AND MAINTENANCE 143,000 143,000 157,000

A130 TOTAL TRANSPORT 74,000 74,000 82,000

A13001 Transport 74,000 74,000 82,000

A131 TOTAL MACHINERY AND 36,000 36,000 40,000

EQUIPMENT

A13101 Machinery and Equipment 36,000 36,000 40,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

_______________________________________________________________________________EXECTIVE ENGINEER BUILDINGS DIVISION 16,440,000 15,397,000 17,499,000

TANDO ALLAH YAR

_______________________________________________________________________________

Page 581: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

580

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

TX0070 EXECTIVE ENGINEER BUILDINGS DIVISIONTHATTA

A01 TOTAL EMPLOYEES RELATED EXPENSES. 29,984,000 29,991,000 34,039,000

A011 TOTAL PAY 96 96 17,577,000 18,538,000 20,394,000

A011-1 TOTAL PAY OF OFFICERS 7 11 3,116,000 2,081,000 2,290,000

A01101 Total Basic Pay Of Officer 7 11 3,074,000 1,998,000 2,198,000

E060 EXECUTIVE ENGINEER (BPS-18) 1 1 560,000 238,000 262,000

A218 ASSISTANT ENGINEER (BPS-17) 5 5 2,236,000 951,000 1,046,000

S237 SUPERINTENDENT (COMPUTER (BPS-17) 3 571,000 628,000 LITERATE)

A235 ASSISTANT HEAD CLERK (BPS-16) 1 119,000 131,000

D219 D.I.G.P. (Admn.) (BPS-16) 1 1 278,000 119,000 131,000

A01102 Personal pay 42,000 83,000 92,000

A011-2 TOTAL PAY OF OTHER STAFF 89 85 14,461,000 16,457,000 18,104,000

A01151 Total Basic Pay Other Staff 89 85 14,139,000 16,135,000 17,749,000

S181 STENOGRAPHER (BPS-14) 1 1 238,000 277,000 305,000

D132 DIVISIONAL H-D / MAN (BPS-13) 1 1 220,000 260,000 286,000

A235 ASSISTANT HEAD CLERK (BPS-11) 1 195,000

J053 JUNIOR CLERK (BPS-11) 12 2,747,000 3,022,000

S228 SUB-ENGINEER (BPS-11) 10 10 1,946,000 2,289,000 2,518,000

D230 DRAFTSMAN (BPS-10) 1 1 190,000 222,000 244,000

A017 ACCOUNT CLERK (BPS-09) 2 2 365,000 430,000 472,000

S237 SUPERINTENDENT (COMPUTER (BPS-07) 3 514,000 LITERATE)

P061 PLUMBER (BPS-06) 1 1 165,000 194,000 213,000

E021 ELECTRICIAN (BPS-05) 1 1 160,000 187,000 206,000

J014 JR CLERK (BPS-05) 12 1,910,000

T050 TRACER (BPS-05) 1 1 160,000 187,000 206,000

Page 582: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

581

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

TX0070 EXECTIVE ENGINEER BUILDINGS DIVISIONTHATTA

W045 WORK MESTRY / DAROGHA (BPS-05) 4 4 638,000 748,000 823,000

C019 CARPAINTER (BPS-04) 1 1 152,000 180,000 198,000

D161 DRIVER (BPS-04) 2 2 306,000 361,000 397,000

F053 FORAMENS (BPS-04) 1 1 152,000 180,000 198,000

M042 MASSAN MISTRY (BPS-04) 1 1 152,000 180,000 198,000

P168 PUMP OPERATOR (BPS-04) 2 2 306,000 361,000 397,000

D003 DAFTARI (BPS-02) 1 1 144,000 170,000 187,000

C112 CLEANER / HELPER / COLI / (BPS-01) 3 3 426,000 500,000 550,000 WIND CLEANER

C215 CHOWKIDAR -CUM-NAIB QASID (BPS-01) 6 6 849,000 999,000 1,099,000

M020 MALHI / GARDEN ATTENDANT (BPS-01) 4 4 565,000 666,000 733,000

N021 NQ / CHOWKIDAR / MALHI / (BPS-01) 28 28 3,962,000 4,664,000 5,131,000 S WORKER

S008 SANITARY WORKER (BPS-01) 2 2 424,000 333,000 366,000

A01152 Personal pay 322,000 322,000 355,000

A012 TOTAL ALLOWANCES 12,407,000 11,453,000 13,645,000

A012-1 TOTAL REGULAR ALLOWANCES 11,893,000 10,939,000 13,105,000

A01202 House Rent Allowance 1,121,000 1,121,000 1,121,000

A01203 Conveyance Allowance 2,253,000 2,279,000 2,279,000

A01207 Washing Allowance 36,000 60,000 60,000

A0120D Integrated Allowance 52,000 81,000 81,000

A0120X Ad - hoc Allowance - 2010 3,358,000 2,944,000 2,944,000

A01217 Medical Allowance 1,748,000 1,748,000 1,748,000

A0121M Adhoc Relief Allowance - 2012 13,000

A0121T Adhoc Relief Allowance 2013 497,000 497,000

A0121Z Adhoc Relief Allowance - 2014 55,000

A0122C Adhoc Relief Allowance - 2015 1,662,000 384,000 384,000

A0122M Adhoc Relief Allowance 2016 1,683,000 1,995,000

A01233 Unattractive Area Allowance 1,000 1,000 1,000

A01244 Adhoc Relief 73,000

Page 583: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

582

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

TX0070 EXECTIVE ENGINEER BUILDINGS DIVISIONTHATTA

A01270 Others 1,662,000 1,995,000

A012-2 TOTAL OTHER ALLOWANCES(EXCLUDING TA) 514,000 514,000 540,000

A01274 Medical Charges 514,000 514,000 540,000

A03 TOTAL OPERATING EXPENSES 2,025,000 1,193,000 2,147,000

A032 TOTAL COMMUNICATIONS 209,000 209,000 220,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 200,000 200,000 210,000

A033 TOTAL UTILITIES 833,000 1,000 917,000

A03303 Electricity 833,000 1,000 917,000

A038 TOTAL TRAVEL & 726,000 726,000 738,000

TRANSPORTATION

A03805 Travelling Allowance 238,000 238,000 250,000

A03807 P.O.L Charges A.planes 488,000 488,000 488,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 257,000 257,000 272,000

A03901 Stationery 74,000 74,000 78,000

A03902 Printing and Publication 31,000 31,000 33,000

A03905 Newspapers Periodicals and Books 31,000 31,000 33,000

A03970 Others 121,000 121,000 128,000

1 Others 121,000 121,000 128,000

A13 TOTAL REPAIRS AND MAINTENANCE 288,000 288,000 315,000

A130 TOTAL TRANSPORT 146,000 146,000 161,000

A13001 Transport 146,000 146,000 161,000

Page 584: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

583

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

TX0070 EXECTIVE ENGINEER BUILDINGS DIVISIONTHATTA

A131 TOTAL MACHINERY AND 74,000 74,000 82,000

EQUIPMENT

A13101 Machinery and Equipment 74,000 74,000 82,000

A132 TOTAL FURNITURE AND 68,000 68,000 72,000

FIXTURE

A13201 Furniture and Fixture 68,000 68,000 72,000

_______________________________________________________________________________EXECTIVE ENGINEER BUILDINGS DIVISION 32,297,000 31,472,000 36,501,000

THATTA

_______________________________________________________________________________

Page 585: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

584

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

UT0049 EXECTIVE ENGINEER BUILDINGS DIVISIONUMERKOT

A01 TOTAL EMPLOYEES RELATED EXPENSES. 18,467,000 18,638,000 21,123,000

A011 TOTAL PAY 55 55 11,005,000 11,233,000 12,358,000

A011-1 TOTAL PAY OF OFFICERS 4 4 1,835,000 1,204,000 1,325,000

A01101 Total Basic Pay Of Officer 4 4 1,835,000 1,204,000 1,325,000

D259 DISTRICT OFFICER (BPS-18) 1 1 541,000 355,000 390,000

D129 DIVISIONAL ACCOUNTS (BPS-17) 1 1 431,000 283,000 312,000 OFFICER

D262 DEPUTY DISTRICT OFFICER (BPS-17) 2 2 863,000 566,000 623,000

A011-2 TOTAL PAY OF OTHER STAFF 51 51 9,170,000 10,029,000 11,033,000

A01151 Total Basic Pay Other Staff 51 51 9,150,000 9,998,000 10,998,000

S181 STENOGRAPHER (BPS-14) 1 1 246,000 267,000 294,000

H035 HEAD DRAFTSMAN (BPS-13) 1 1 231,000 250,000 275,000

H029 HEAD CLERK / ASSISTANT (BPS-11) 1 1 201,000 221,000 243,000

J053 JUNIOR CLERK (BPS-11) 8 1,765,000 1,941,000

S053 SENIOR CLERK (BPS-11) 3 662,000 728,000

S222 SUB ENGINEER (BPS-11) 8 8 1,617,000 1,765,000 1,941,000

D230 DRAFTSMAN (BPS-10) 1 1 196,000 214,000 235,000

A029 ACCOUNTS CLERK / CASHIER (BPS-09) 1 1 380,000 206,000 228,000

S053 SENIOR CLERK (BPS-07) 3 532,000

B097 BUILDING MISTRY (BPS-06) 9 9 1,542,000 1,681,000 1,849,000

J014 JR CLERK (BPS-05) 8 1,486,000

T047 TRACER (BPS-05) 1 1 166,000 180,000 198,000

D161 DRIVER (BPS-04) 3 3 479,000 521,000 574,000

N003 NAIB QASID (BPS-02) 6 6 897,000 981,000 1,079,000

C089 CHOWKIDAR (BPS-01) 3 3 441,000 482,000 530,000

Page 586: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

585

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

UT0049 EXECTIVE ENGINEER BUILDINGS DIVISIONUMERKOT

H064 HELPER (BPS-01) 4 4 589,000 642,000 706,000

S263 SWEEPER / SANITARY WORKER (BPS-01) 1 1 147,000 161,000 177,000

A01152 Personal pay 20,000 31,000 35,000

A012 TOTAL ALLOWANCES 7,462,000 7,405,000 8,765,000

A012-1 TOTAL REGULAR ALLOWANCES 7,462,000 7,405,000 8,765,000

A01202 House Rent Allowance 790,000 790,000 790,000

A01203 Conveyance Allowance 1,539,000 1,539,000 1,539,000

A01207 Washing Allowance 2,000 2,000 2,000

A0120D Integrated Allowance 13,000 13,000 13,000

A0120X Ad - hoc Allowance - 2010 1,950,000 1,772,000 1,772,000

A01217 Medical Allowance 1,097,000 1,097,000 1,097,000

A0121T Adhoc Relief Allowance 2013 293,000 293,000

A0122C Adhoc Relief Allowance - 2015 1,013,000 219,000 219,000

A0122M Adhoc Relief Allowance 2016 1,104,000 1,232,000

A01233 Unattractive Area Allowance 43,000 574,000 574,000

A01238 Charge Allowance 2,000 2,000 2,000

A01270 Others 1,013,000 1,232,000

A03 TOTAL OPERATING EXPENSES 687,000 168,000 749,000

A032 TOTAL COMMUNICATIONS 43,000 43,000 46,000

A03201 Postage and Telegraph 9,000 9,000 10,000

A03202 Telephone and Trunk call 34,000 34,000 36,000

A033 TOTAL UTILITIES 520,000 1,000 572,000

A03303 Electricity 520,000 1,000 572,000

A038 TOTAL TRAVEL & 64,000 64,000 66,000

TRANSPORTATION

A03805 Travelling Allowance 29,000 29,000 31,000

Page 587: wsdsindh.comwsdsindh.com/wp-content/uploads/2017/10/SC21132-Works-Services.pdf1 SC21132 (132) Works & Services BUDGET ESTIMATES 2017-2018 _______________________________________________________________________________

586

SC21132 (132)Works & Services

_______________________________________________________________________________ 045702 BUILDINGS AND STRUCTURES_______________________________________________________________________________

FUNCTIONAL CUM OBJECT CLASSIFICATION NUMBER OF BUDGET REVISED BUDGET

AND PARTICULARS OF THE SCHEME POSTS ESTIMATES ESTIMATES ESTIMATES

2016-2017 2017-2018 2016-2017 2016-2017 2017-2018

_______________________________________________________________________________ Rs Rs Rs

04 ECONOMIC AFFAIRS045 CONSTRUCTION AND TRANSPORT0457 CONSTRUCTION (WORKS)045702 BUILDINGS AND STRUCTURES

UT0049 EXECTIVE ENGINEER BUILDINGS DIVISIONUMERKOT

A03807 P.O.L Charges A.planes 35,000 35,000 35,000

H.coptors S.Cars M/Cycle

A039 TOTAL GENERAL 60,000 60,000 65,000

A03901 Stationery 9,000 9,000 10,000

A03902 Printing and Publication 9,000 9,000 10,000

A03905 Newspapers Periodicals and Books 9,000 9,000 10,000

A03955 Computer Stationery 18,000 18,000 19,000

A03970 Others 15,000 15,000 16,000

1 Others 15,000 15,000 16,000

A13 TOTAL REPAIRS AND MAINTENANCE 207,000 207,000 227,000

A131 TOTAL MACHINERY AND 174,000 174,000 192,000

EQUIPMENT

A13101 Machinery and Equipment 174,000 174,000 192,000

A132 TOTAL FURNITURE AND 33,000 33,000 35,000

FIXTURE

A13201 Furniture and Fixture 33,000 33,000 35,000

_______________________________________________________________________________EXECTIVE ENGINEER BUILDINGS DIVISION 19,361,000 19,013,000 22,099,000

UMERKOT

_______________________________________________________________________________