1 Scheme Overview Function Specific Problems Allocation and Utilization reporting Duplication in allocation process Allocation not linked to utilization Delay in utilization reporting Data consolidation and sharing Storage and Movement Absence of commodity / truck tracking Unavailability of stock position across levels ssessment Phase – key findings Key Problem Areas across TPDS : Information not available on time for decision making and monitoring Leakages and diversion of grains

Upload: beverley-kelly

Post on 03-Jan-2016

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 Scheme Overview Function Specific Problems Allocation and Utilization reporting –Duplication in allocation process –Allocation not linked to utilization

1

Scheme Overview

Function Specific Problems

• Allocation and Utilization reporting– Duplication in allocation process

– Allocation not linked to utilization

– Delay in utilization reporting

– Data consolidation and sharing

•Storage and Movement– Absence of commodity / truck tracking

– Unavailability of stock position across levels

– Leakages and diversions

– Unscientific storage in State godowns

Assessment Phase – key findings

Key Problem Areas across TPDS:

• Information not available on time for decision making and monitoring

• Leakages and diversion of grains

Page 2: 1 Scheme Overview Function Specific Problems Allocation and Utilization reporting –Duplication in allocation process –Allocation not linked to utilization

Scheme Overview

• Lack of transparency in licensing and monitoring process

• Non-availability / delay in information across levels

• Absence of renewal tracking system

Licensing and Regulation

Function Specific Problems

Function Specific Problems

Grievance Redressal

Authentication

• Difficulty in tracking grievances

• Lack of proper mechanism to inform applicant about action taken

• Manual process of authentication of beneficiary

• Process not streamlined

Transaction

• Transaction process is manual

• Unavailability of FPS wise transaction details

• Lot of irregularity in distribution of the commodities

Page 3: 1 Scheme Overview Function Specific Problems Allocation and Utilization reporting –Duplication in allocation process –Allocation not linked to utilization

3

The Task Force