1 structured cabling project honolulu community college cisco academy training center semester 1...
TRANSCRIPT
1
Structured Cabling Project
Honolulu Community College
Cisco Academy Training Center
Semester 1
Version 2.1.1
2
Overview Focuses on standards for networking media.
TIA/EIA 568A - cabling standard. TIA/EIA 606 - labeling standard.
Techniques for dressing and securing the cable. RJ45 jacks, wiring sequence. Wiring closet design. Equipment found in a wiring closet.
patch panels, hubs, bridges, switches, & routers.
4
Telecommunications Outlet Telecommunications
outlets are wall mounted.
TIA/EIA 568A specifies RJ45 jack for making the connection to Cat 5 UTP.
5
RJ45 Mounting Two types of wall mounts:
Surface mounting (easier to install, concrete walls) Adhesive-backed box. Screw-mounted box.
Flush mounting. Surface mounting is generally preferred.
Faster, lower labor costs. Maybe the only option in some cases.
6
Flush Mounting Concerns Type of wall material.
Plaster tends to crumble, has wood lath backing. Wood
more solid support. Can install in baseboard, but avoid lower 5cm (2”)
-need to clear wall’s bottom plate or framing. Avoid door and window trims.
Drywall - obstructions due to studs every 18-24”. Check with small hole for obstructions. Select position 30-45cm (12-18”) above floor. Level.
7
Flush Mounting Concerns (cont.) Safety Precautions
Any time you are working in walls, ceilings, or attics, it is extremely important that you remember to turn off the power to all circuits that go to, or pass through, the work area.
8
Wires in RJ45 Jack Performance is closely linked to the quality of
the wire connections. Do not strip off any more of the jacket than
needed, about 2.5cm (1”). Removing too much jacket insulation can slow
data throughput. Arrange wires in proper order. Keep wires centered in jack.
If skewed, data throughput can decrease. Use punch tool to “punch down” wires into
jack.
9
Tips in Installing Cable Strip back cable jacket only as much as
needed (about 2.5cm or 1”). Maintain twists as close as possible to
termination (max 13mm (1/2”) for Cat 5 UTP). Min bend radius is 4 times the diameter of
cable; never exceed a 90o bend. Use cable ties to secure cable, loosely. Avoid stretching cable, 11.3kg (25 lb) of pull
max. Leave slack in cable, to reach floor and 60-
90cm (2-3 ft) in each direction.
11
Documenting Cable Runs Documentation is useful when upgrading or
modifying the network in the future. Cut Sheet - diagram of cable runs.
12
Documentation TIA/EIA 606 specifies labeling. Unique identifier required on each termination
hardware unit or on label. Cables are labeled at both ends. Use unique and descriptive labeling.
Ex. Rm 516 West Wall Labeling is designed to help diagnosis and
location of problems. All labels must meet legibility, defacement, and
adhesion requirements (UL969).
13
Cabling Runs Run all cables at once, if you need 4 cables,
use 4 rolls and pull them all at the same time. Mark each cable
end (3 times). Tape cables together
to pull string. Label cable ends
before cutting the cables.
14
Routing Cables Easiest way is to mount cables on wall.
Use tie-wraps to attach cables to walls. Adhesive tie-wraps - cannot be moved. Screw mounted tie-wraps - can be moved later.
15
Raceways Raceways - wall mounted channels with
removable covers. Two types:
Decorative raceways finished appearance for use in visible areas.
Gutter will hold several cables. Used in attics, dropped ceilings, etc.
Raceways can be adhesive-backed or screw mounted. Adhesive-backed - easy to install, easy to remove.
17
Cables in Existing Raceways Do not run cables next to power lines or in
existing raceways with power lines. Causes EMI (electro-magnetic interference).
18
Safety Precautions Turn off power to all circuits in work area.
If unsure, turn off all power. Know locations of fire extinguishers. Long pants and sleeves for protection, but avoid
baggy clothing. Survey the area - especially dropped ceiling
area. Wear eye protection. Be aware of hazards like lead, PCBs or
asbestos. Keep work area orderly and neat.
19
Building Safety and Codes Find out local building codes. Be aware of any restrictions to drilling or
cutting holes in fire walls or ceilings. Holes may need to completely filled with non-
combustible patching compounds. Fire-rated cable must be used in spaces
where air is circulated.
20
Horizontal Cabling Supports In dropped ceilings, do not lay cable on top of
ceiling. Use wall mount gutters, tie wraps or ladder
racks to support cables.
21
Other Tools Telepole
Telescoping pole used to string cables. Fish Tape
Used to run cables thru a wall. Remember to leave extra cable in the walls
and ceilings!
22
What is a Wiring Closet? Wiring closet serves as a central junction point for
the wiring and wiring equipment used to connect devices in a local area network (LAN).
Center point of star. Typical equipment:
Patch panels Hubs Bridges Switches Routers.
23
MDFs and IDFs Networks can have several wiring closets
(extended star topology). One is designated as the MDF, main distribution
facility. Other wiring closets are the IDFs, intermediate
distribution facilities. IDFs are connected to the MDF, and are
dependent on it. IDFs connect to MDF by backbone cabling.
25
Patch Panels Provides pin locations and ports.
Pin locations on back (wires are punched down). Ports (RJ45) on the front of panel. Wires are color coded, not interchangeable.
Act as switchboard where horizontal cabling from workstation can be connected to other workstations or devices.
26
Patch Panels (cont.) Poor connections can cause slower data rates. Arrange wires in ascending order.
Logical sequence of wires from work area. Make use of cut sheet.
Keep wires centered in jack. If skewed, data rate will decrease.
Avoid exposing too much wire (strip off about 38-50 mm (1 1/2” to 2”) of jacket).
Don’t untwist wire pairs more than necessary. Use punch tool.
27
Patch Panel Mounting Most common is distribution rack.
Easy access to front and back. Need to provide 30-45mm (12” - 18”) in
back for physical access. Standard size of distribution rack is .48m
or 19”.
28
Testing Your Network 1. Break the system into smaller logical groups or
elements. 2. Test each group or element. 3. Note any symptoms or problems. 4. Determine what the most likely problem
element is. 5. Use substitution or additional testing to
determine if the likely element is in fact the problem.
6. If not, proceed to the next most likely element you suspect.
29
After finding the problem 7. When the dysfunctional element is found,
repair it if possible. 8. If it is not possible to repair, then replace it.
30
Network Operations Testing IEEE & TIA/EIA have established standards to
test whether your network is operating at an acceptable level. use this measurement as baseline. baseline is a record of your network's starting
point or newly installed performance capabilities. Continue to test your network on a regular basis
in order to ensure that it performs at its peak. Can spot problems that may be caused by aging,
poor maintenance practices, weather, etc.
31
Cable Testers Cable testers certify cables to
IEEE & TIA/EIA standards. Basic features, can measure:
Cable Distances Connectivity Wire maps for crossed pairs. Split pairs. Signal Attenuation. Near-end crosstalk (NEXT). Noise level tests.
32
Measuring Distances Max cable lengths are given by TIA/EIA 568A. Cable testers use time domain reflectometry to
measure the distance to open or shorted end. TDR sends a signal and times its reflection back
from the end of the cable. Accurate to within 61 cm (2ft).
33
Connection Tests Distance measurements can determine whether
the connections at the patch panels, or at the telecommunications outlets, are good.
34
Correct Wiring Wire map shows which
wire pair connections to what pins.
12 36 45 78 12 36 45 78
Correct Wiring
(Near End)
(Far End)
35
Crossed Pairs Crossed pairs are
connected in reverse order on one end.
Wire map: 12 36 45 78 21 36 45 78
Correct Wiring
Crossed Pair.
36
Split Pairs Split pairs occurs when wires used for a
circuit are not from the same pair. Can be detected by visual inspection or by
crosstalk measurements. Split pairs do not have
self-shielding. Cannot be detected by
wire map.
Split Pairs.
37
Signal Attenuation Attenuation is due to loss of energy in the
signal (less power). Cable testers measure signal from a signal
injector, attached at far end of the cable. Attenuation generally measured at several
frequencies. For CAT 5 cable - up to 100 MHz.
TIA/EIA 568A specifies allowable losses in various types of cables.
38
Near-end Crosstalk Causes of near-end crosstalk.
Crossed pairs - most common. Untwisting of wire pairs, usually at patch panel. Cables too tightly pulled (causing untwisting). Too sharp corners (bends) - pairs change
positions. Split pairs.
Cable testers measure a series of frequencies up to 100Mhz - higher values are better, low values indicate problem.
39
Noise Level Test Sources of Interference:
Fluorescent lights, televisions, monitors, motors, power lines, welders, auto ignitions.
Radio stations, radar, transmitters. Interference sources can be detected by
knowing the frequency of interference (from noise level test).
Locating sources of outside interference: Measure noise on cable (disconnected from
computer equipment). Trial and error method of turning off electrical
devices to see which produces the interference.
40
Summary Installing RJ45 jacks.
Surface mount with adhesive backed or screw box. Max untwisting is 13mm (1/2”). In punching down, jacket should be within 6.4mm
(1/4”) of pins. Poor wire connections can affect performance.
Safety concerns: 1.Turn off power to area. 2.Long sleeves, long pants, but not baggy. 3.Fire extinguisher locations. 4.Eye protection. 5.Neatness.
41
Summary (cont.) Documentation.
Cut sheet - location of cable runs. Label cables and terminations. UL 969 - legibility, defacement, adhesion.
Cable installation: MDF and IDFs (wiring closets). Mount cables with tie wraps, velcro; no staples. Avoid sharp bends; No stretching. Leave slack, service loops.
Patch panels. Acts as switchboard for horizontal cabling. Usually mounted on distribution rack.