Student Hands On Training I (2009)

Construction,Integration,

and Test

Construction,Integration,

and Test

Page 2: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test

2

Hands-on: Construction and Integration

Page 3: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test

3

Hands-on: Construction and Integration

Page 4: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test

4

Hands-on: Construction and Integration

- Your team will have 2.5 hours today to do the following:

- Layout and construct BalloonSat structure- Insulate structure- Integrate and test systems- Install switches- Secure and organize wiring- Install flight string attachment tube

Page 5: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test

5

- BalloonSats are commonly made of foam core

- Foam core is a simple, low cost composite panel

- You will use hot glue and Xacto knives to create your box

- There is a OK way of building with foam core

- Cut individual pieces and glue them together

- This way works but is not the best and requires more “belts and suspenders”

Hands-on: Construction and Integration

Page 6: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test

BalloonSat Construction:

- There is a BETTER way of building with foam core- Requires algebra and geometry

- See paper in back of your course book

-

Page 7: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test

BalloonSat Construction:

- When cutting foam core, remember you are cutting through three layers

- Best to cut each layer individually

- Go slow, use metal edge ruler

- Be mindful

Page 8: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test

- Step 1: Layout box design on foam core sheet

In the interest of time, each team will be given a pre-traced foam board (black with labels)

BalloonSat Construction:

Page 9: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test
Page 10: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test

BalloonSat Construction:

- Step 2: Cut it out

Page 11: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test

BalloonSat Construction:

- Step 2: Cut it out

Page 12: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test

- Draw center lines between inner and outer lines

- All edge cuts are at 45 degree angles to the centerline

- Cut inside edges first and only through top paper and foam not bottom paper (hinge)

- Cut outside edges last but all the way through

- Go Slow and don’t cut the tables

- Please dispose of Xacto blades properly

Hands-on: Construction and Integration

Page 13: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test

Hands-on: Construction and Integration

Page 14: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test

- Cut holes for switch and camera lens

- Cut hole through center for balloon attachment tube

Hands-on: Construction and Integration

Page 15: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test

BalloonSat Construction:

- Step 3: Practice integration and make modifications

Hold box together and figure out how much insulation you want to use. Will affect how your components sit in box

Page 16: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test

BalloonSat Construction:

- Step 4: Glue it together and strengthen corners

- Your template was designed using the “Better Method”

- After gluing, cover you seams with aluminum tape

- Please don’t go overboard, weight is still an issue

Page 17: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test

BalloonSat Construction:

- Step 4: Glue it together and strengthen corners

Page 18: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test

18

BalloonSat Construction:

Things to remember: You only have one

- Switches

Page 19: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test

19

- Install switches to box and glue switches in place from back side before making electrical connections

- Keep switches on both sides and label ON/OFF positions

- Make sure to re-connect the switch

Hands-on: Construction and Integration

Page 20: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test

- Balloon attachment tube hole should run through center of box on non-opening side

- Make hole diameter as close to tube diameter as possible

- Secure with paper clip

- Make sure paper clip does not interfere with inner diameter

Hands-on: Construction and Integration

Page 21: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test

21

- Integrate camera system and verify camera settings

- Integrate Flight String attachment tube and test clearance with sample string

- American Flag

Hands-on: Construction and Integration

Page 22: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test

22

- Install Heater

- Test switch (let’s talk first)

- Tape in off position

- Team label and reward label on outside of box

- Bring to Chris for inspection and weigh in

- Have team picture taken

Hands-on: Construction and Integration

Page 23: 1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test

BalloonSat Construction:

Resources in the Room:

- Construction examples in the room- Two Soldering stations- Two weigh-in station- ½” and ¼” foam insulation- Velcro- Tape- Helpers- Peace and love