THE 22@ PROJECT: StrategyTHE 22@ PROJECT: Strategy
Conclude the urban renewal of Poblenou Conclude the urban renewal of Poblenou Responding to the needs: the knowledge economyResponding to the needs: the knowledge economy
2
Metropolitan Area of Barcelona
3
4THE PROCESS OF URBAN TRANSFORMATION IN POBLENOUTHE PROCESS OF URBAN TRANSFORMATION IN POBLENOU
5
6
7
8
9THE PROCESS OF URBAN TRANSFORMATION IN POBLENOUTHE PROCESS OF URBAN TRANSFORMATION IN POBLENOU
10
THE SCALA OF TRANSFORMATION
AREA:AREA: 198.26 ha., 115 blocks, 1,159,626 m² 22@ land 198.26 ha., 115 blocks, 1,159,626 m² 22@ land
POTENTIAL MAXIMUM ROOF SPACE:POTENTIAL MAXIMUM ROOF SPACE: 4.000.000 m² approx. 4.000.000 m² approx.• Production: 3.200.000 m² approx.Production: 3.200.000 m² approx.• Other uses (facilities, housing,..): 800.000 m² approx.Other uses (facilities, housing,..): 800.000 m² approx.
HOUSING:HOUSING: • Accepted: 4.614 existing dwellings Accepted: 4.614 existing dwellings • New social housing: 4.000 approx. (minimum of at least 25% rented)New social housing: 4.000 approx. (minimum of at least 25% rented)
INCREASE IN GREEN SPACE:INCREASE IN GREEN SPACE: 75.000 m² approx. 75.000 m² approx.
NEW FACILITIES:NEW FACILITIES: 145.000 m² 145.000 m²
NEW JOBS:NEW JOBS: 100.000 / 130.000 approx. 100.000 / 130.000 approx.
INVESTMENT IN INFRASTRUCTURE PLAN:INVESTMENT IN INFRASTRUCTURE PLAN: 162.3 million Euro 162.3 million Euro
11
BASIC AIMS OF THE PROJECT
@ Activities @ Activities
Non-polluting, city friendly activities (ie. low noise levels, etc.)
Intensive use of space
Intensive use of qualified personnel
Intensive use of Information and Telecoms Technology
12
Coexistence of different usesCoexistence of different uses
– IndustryIndustry
– Technology Technology – HousingHousing– OfficesOffices– ShopsShops– HotelsHotels– Corporate apartmentsCorporate apartments
– FacilitiesFacilities
PGM’ 76PGM’ 76
BASIC AIMS OF THE PROJECT
13
32,7
2,22
0
GENERALGENERAL
PGM’ 76PGM’ 76
GENERALGENERAL
22@ Plan22@ Plan
@ ACTIVITIES@ ACTIVITIES
PUBLIC HOUSINGPUBLIC HOUSING
m²
of
roo
f p
er
m²
of
lan
dm
² o
f ro
of
pe
r m
² o
f la
nd
BASIC AIMS OF THE PROJECT
Redensification Redensification
14
MANAGING THE TRANSFORMATION
A Municipal Corporation
– Urban planning
– Urban management
– Infrastructure
– Heritage management
– In co-ordination with the urban planning authorities
– Promotion
15
PEI 22@: BASIC CONTENTS
• Infrastructures implantations criteria
• Analysis of the different systems:
– Energy
– Telecomunications
– Hidraulic Cycle
– Wastes and Cleaning
– Accesibility and Public areas
• Stage planning
• Economical Funds from Land Use Tax (+roof, +value)
16
www.bcn.es/22@bcn
ANALYSIS OF THE DIFFERENT SYSTEMS: ACCESSIBILITY AND PUBLIC SPACES
17
ANALYSIS OF THE DIFFERENT SYSTEMS: ACCESSIBILITY AND PUBLIC SPACES
• Application of the city modal split
• Public Transport Infraestructures Previsions
• Connections with the road network of the city
• Road structure hierarchy
• Intelligent systems for the traffic management
• Car park standards in the sector
18
MOBILITYPedestrian roads
proposals
19
Infrastructure’s TrainProposalsMOBILITY
20
New AccessesNew Accesses
in existing Line 4in existing Line 4
21
MOBILITY Planning
Accessibility planning.Infrastructure Director Plan (PDI 2001-10)
22
MOBILITYGeneral View
General Road Proposal
23
MOBILITY Bicycle roads proposal
24
MOBILITYPrimary & Secondary
Roads section
25
MOBILITY Road network Plan