Page 1: 1 The Capability Maturity Model for Software: An Overview

1

The Capability Maturity Model for Software:

An Overview

Page 2: 1 The Capability Maturity Model for Software: An Overview

2

The Problem: too many immature software organizations

Good performance is possible - but• Requirements often misunderstood, uncontrolled• Schedules and budgets frequently missed• Progress not measured• Product content not tracked or controlled• Engineering activities nonstandard, inconsistent• Teams not coordinated, not trained• Defects proliferate• Success depends on “heroes”

“Schedules

run everything”

“Processes limit my creativity”“Processes don’t help my delivery schedule”

“Ju

st s

end

in t

he

Tig

er T

eam

Page 3: 1 The Capability Maturity Model for Software: An Overview

3

Capability Maturity Model Overview

• Developed at the DoD-sponsored Software Engineering Institute (SEI)

• Focuses on practices that are under control of the software group

• Describes common sense, efficient, proven ways of doing business (which you should already be doing) - not a radical new approach

• Presents a minimum set of recommended practices that have been shown to enhance a software development and maintenance capability– It defines the expectation (the “what”)

– Without overly constraining the implementation (the “how”)

• Used by Government and industry around the world to measure maturity of software development organizations

• Being updated in the SEI’s CMM Integration (CMMI) effort

Page 4: 1 The Capability Maturity Model for Software: An Overview

4

Objectives of the CMM

To increase customer satisfaction, by producing products according to plan while simultaneously improving the organization’s capability to produce better products

To increase software process maturity, the extent to which processes are explicitly defined, managed, measured, controlled, and effective, by:

• Establishing basic project management controls

• Standardizing the organization's software process activities

• Quantitatively analyzing processes and products for monitoring and control

• Institutionalizing process improvement

Page 5: 1 The Capability Maturity Model for Software: An Overview

5

Level 5Optimizing

Level 5Optimizing

Continuous process capability improvement

Level 4Managed

Level 4Managed

Product quality planning, tracking of measured software process

Level 3 Defined

Level 3 Defined

Software process defined and institutionalized to provide product quality control

Level 2Repeatable

Level 2Repeatable

Management oversight and tracking of project; stable planning and product baselines

Level 1Initial

Level 1Initial Ad hoc; success depends on heroes

The CMM’s Five Maturity Levels

Page 6: 1 The Capability Maturity Model for Software: An Overview

6

Process Maturity Benefits

Initial

Repeatable

Defined

Managed

Optimizing

Process is informal andad-hoc; performance is unpredictable

Project managementSystem in place;performance is repeatable

Software engineering and management processesdefined and integrated

Product and process arequantitatively controlled

Process improvementis institutionalized

Level Process Characteristics

5

Pro

ba

bil

ity

Time / $ Ta

rge

t

Pro

ba

bil

ity

Time / $

Ta

rge

t

4

Pro

ba

bil

ity

Ta

rge

t

3

Time / $

Pro

ba

bil

ity

Time / $ Ta

rge

t

2

Pro

ba

bil

ity

Time / $ Ta

rge

t

1

Predicted Performance

Page 7: 1 The Capability Maturity Model for Software: An Overview

7

CMM Building Blocks: the Maturity Levels

Institutionalize process improvement

Quantitative analysis of processes

and products for monitoring and control

Standardize the software process activities for all the organization’s projects

Establish basic project management controls

Page 8: 1 The Capability Maturity Model for Software: An Overview

8

Activity Resultsto produce

Level 1:Just do it.

Level 1 - Initial

Page 9: 1 The Capability Maturity Model for Software: An Overview

9

Activity Resultsto produce

Level 2:Think before you act,and think after you act, just to make sure you did it right.

Planning

Evaluation

input to

to improve

Level 2 - Repeatable

Page 10: 1 The Capability Maturity Model for Software: An Overview

10

Level 3 - Defined

Standards

Activity Resultsto produce

Planning

Evaluation

input to

to improveinput to

input to

Level 3:Defined Standards are used for all activities.

Page 11: 1 The Capability Maturity Model for Software: An Overview

11

Level 4 - Managed

• Standards Activity Resultsto produce

Planning

Evaluation

input to

to improve

input to

input to to forecast

Page 12: 1 The Capability Maturity Model for Software: An Overview

12

Level 5 - Optimized

Standards Activity Resultsto produce

Planning

Evaluation

input to

to improve

input to

input to to forecast

continuous improvement

Page 13: 1 The Capability Maturity Model for Software: An Overview

13

Process Categories

Management Organizational Engineering

Levels/

1 Initial

2 Repeatable

3 Defined

4 Managed

5 Optimizing

Ad Hoc Processes

•Integrated Software Management•Inter-group Coordination

•Requirements Management•Software Project Planning•Software Project Tracking and Oversight•Software Subcontract Management•Software Quality Assurance•Software Configuration Management

•Organization Process Focus•Organization Process Definition•Training Program

•Software Product Engineering•Peer Reviews

•Software Quality Management

•Quantitative Software Management

•Technology Change Management•Process Change Management

Defect Prevention

Page 14: 1 The Capability Maturity Model for Software: An Overview

14

Project Management Risks Addressed by CMM Level 2

Risks Issue

• Little agreement on technical requirements Requirements • Weak control over changes to requirements

• Weak understanding of activities, effort, and time required Plans• Sketchy plans, schedules, budgets • Program risks not identified or managed

• Weak visibility into actual progress Progress• No ability to take corrective action • Little visibility into quality of products and processes

• Weak control over contents and changes to products Control• Contractors not qualified to perform the work• Weak control over contractor activities and products

Page 15: 1 The Capability Maturity Model for Software: An Overview

15

CMM Level 2: the “Repeatable” Level - Establishing basic project management controls

• Builds a “foundation” for Process Improvement

• Actions:

– CLARIFY REQUIREMENTS

– DOCUMENT PLANS

– TRACK PROGRESS

– CONTROL PRODUCTS

Page 16: 1 The Capability Maturity Model for Software: An Overview

16

What to Do at Level 2

• Baseline the requirements allocated to software

• Estimate the project’s size, effort, costs, and resources

• Establish the project plans and processes; identify risks

• Measure actual progress to enable timely corrective action

• Verify adherence of products and activities to requirements

• Identify and control software products, changes, problem reports

• Select qualified subcontractors; manage their activities

CLARIFY REQUIREMENTS

DOCUMENT PLANS

TRACK PROGRESS

CONTROL PRODUCTS

Key Process Area

– Requirements Management (RM)

Software Project Planning (SPP)

– Software Project Tracking and Oversight (SPTO)

– Software Quality Assurance (SQA)

– Software Configuration Management (SCM)

– Software Subcontractor Management (SSM)

Page 17: 1 The Capability Maturity Model for Software: An Overview

17

Organizational Process Risks Addressed by CMM Level 3

Risks Issue

• No centralized coordination of the way we produce Processes software• No central source / repository of processes, templates, samples, lessons learned, project data

• Engineering activities unplanned, uncoordinated, inconsistent among projects• Management activities not coordinated with technical activities

• Engineering groups not coordinated, little Teamwork understanding of roles or commitments• Team members unprepared for their jobs

• Defects proliferate in products Defects

Page 18: 1 The Capability Maturity Model for Software: An Overview

18

CMM Level 3: the “Defined” Level - Standardizing the Organization’s software process activities

• Focus changes from the project level to the organization level

• Capabilities are based on practices established in Level 2

• Emphasis is on developing software across the organization

• Actions:– STANDARDIZE PROCESSES– CULTIVATE TEAMWORK– REDUCE DEFECTS

Page 19: 1 The Capability Maturity Model for Software: An Overview

19

What you see at Level 3

• Establish organizational responsibility for SPI

• Define the organization’s best practices; establish asset database

• Tailor the organization’s best practices to projects

• Establish standards for software engineering activities

• Get agreement from all parties on requirements and commitments

• Develop the skills and knowledge of team members

• Identify and remove defects early and efficiently

STANDARDIZE PROCESSES

CULTIVATE TEAMWORK

REDUCE DEFECTS

Key Process Areas

– Organizational Process Focus

(OPF) – Organizational

Process Definition (OPD)

– Integrated Software Management

(ISM) – Software Product

Engineering (SPE)

– Intergroup Coordination

(IC)– Training Program

(TP)

– Peer Reviews (PR)

Page 20: 1 The Capability Maturity Model for Software: An Overview

20

Quantitative Management Risks Addressed by CMM Level 4

Risks Issue

• No controls or expectations of process performance Goals

• No ability to set and achieve quality goals for products

• Limited understanding of the performance of a project’s Progress processes• Limited measures of the quality of software products

Page 21: 1 The Capability Maturity Model for Software: An Overview

21

CMM Level 4: the “Managed” Level - Quantitative analysis of processes and products

for monitoring and control

• Measurements taken at previous levels are used to manage both products and processes

• Actions:– SET GOALS– MANAGE PROGRESS QUANTITATIVELY

Page 22: 1 The Capability Maturity Model for Software: An Overview

22

A few things more at Level 4

• Set numeric goals for process performance

• Set quality goals for the software products

• Measure the performance of the software processes

• Measure progress toward product quality goals

SET GOALS

MANAGE PROGRESS QUANTITATIVELY

Key Process Areas

– Quantitative ProcessManagement

(QPM)– Software Quality

Management(SQM)

– Quantitative ProcessManagement

(QPM)– Software Quality

Management(SQM)

Page 23: 1 The Capability Maturity Model for Software: An Overview

23

Continuous Improvement Risks Addressed by CMM Level 5

Risks Issue

• Defects keep recurring, causes are not known Performance

• Process improvement activities are not uniform or fully institutionalized

• New technologies (tools, methods, processes) are not New recognized or adopted Technologies

Page 24: 1 The Capability Maturity Model for Software: An Overview

24

CMM Level 5: the “Optimizing” Level - Institutionalizing process improvement

• Actions:

– OPTIMIZE PERFORMANCE

– ADAPT NEW TECHNOLOGIES

• The organization is focused on continuous process improvement

Page 25: 1 The Capability Maturity Model for Software: An Overview

25

How to thrive at Level 5

• Identify and eliminate

the cause of defects• Continually improve quality,

productivity, cycle times

• Identify new technologies;

transition them to use

OPTIMIZE PERFORMANCE

ADAPT NEW TECHNOLOGIES

Key Process Areas

– Defect Prevention(DP)

– Process Change Management

(PCM)

– Technology ChangeManagement

(TCM)

Page 26: 1 The Capability Maturity Model for Software: An Overview

26

Results, Needs, and Activities the CMM Supports

Results Needs (Actions) Activities (steps)

Level 2: Clarify requirements Establish Document plans basic project management Track progress processes

Control products

Level 3: Standardize processes Standardize the organization’s software process Cultivate teamwork activities

Reduce defects

Level 4: Analyze Set goalsprocesses &products Manage progress for monitoring, quantitativelycontrol Level 5:Institutionalize Optimizeprocess performance improvement Adapt new technologies

KPA

Baseline the requirements allocated to software RMEstimate project size, effort, cost, resources SPPEstablish project plans, estimates, processes, risks SPPMeasure actual progress for timely action SPTOVerify adherence of products and activities to reqts. SQAIdentify & control products, changes, problems SCMSelect qualified contractors, manage their activities SSM

Establish organizational responsibility for SPI OPFDefine the org’s best practices, set asset database OPDEstablish standards for software engrg. activities SPETailor the org’s best practices to projects ISMGet agreement from all on reqts. and commitments ICDevelop skills and knowledge of team members TPIdentify & remove defects early and efficiently PR

Set numeric goals for process performance QPMSet quality goals for the software products SQMMeasure the performance of the software processes QPMMeasure progress toward product quality goals SQM

Identify and eliminate the cause of defects DPContinually improve quality, productivity, cycle times PCMIdentify new technologies, transition them to use TCM

Page 27: 1 The Capability Maturity Model for Software: An Overview

27

Top Management

Middle Management

Dept. BDept. B

The OrganizationThe Organization

Dept. ADept. A Dept. CDept. C

Project 1

Div. BBDiv. AA

Project 4Project 3Project 2Projects

Processes

Sample Level 1 Software Organizationfew processes in place

Page 28: 1 The Capability Maturity Model for Software: An Overview

28

Top Management

Middle Management

Dept. BDept. B

The OrganizationThe Organization

Dept. ADept. A Dept. CDept. C

Project 1

Div. BBDiv. AA

Project 4Project 3Project 2Projects

Processes

Sample Level 2 Software Organizationmany processes in place; but they are project-specific

Page 29: 1 The Capability Maturity Model for Software: An Overview

29

Sample Higher-Level Organizationprocesses based on organization’s Process Asset Library (PAL)

Div. AA

The OrganizationThe Organization

Dept. ADept. A Dept. CDept. C

Div. BB

Projects

Processes

Project 1 Project 2

Dept. B

Project 3

Project 4

SEPOSEPO

Process Asset Library Approved life cycles Standard processes Tailoring guidelines Process database Related documents

Page 30: 1 The Capability Maturity Model for Software: An Overview

30

SEI Capability Maturity Model

Result

Level Characteristic

Optimizing Continuous process Process change management (5) capability improvement Technology change management Defect prevention

Managed (4)

Defined Software process defined (3) and institutionalized to provide product quality control

Repeatable (2)

Initial (1)

Product quality planning; Software quality managementtracking of measured Quantitative process managementsoftware process

Management oversightand tracking project;stable planning andproduct baselines

Key Process Areas

Ad hoc(success depends on heroes)

"People"

Software configuration management Software quality assurance Software subcontract management Software project tracking & oversightSoftware project planningRequirements management

Peer reviews Intergroup coordinationSoftware product engineering Integrated software managementTraining programOrganization process definitionOrganization process focus

RiskRisk

Productivity& Quality

Productivity& Quality

Page 31: 1 The Capability Maturity Model for Software: An Overview

31

Key Process Area (KPA) Structure

Each of the 18 CMM Key Process Areas (KPAs) has:

• Purpose

• Goals

• Common Features:

- Commitment to perform: sponsorship and policies

- Ability to perform: resources, organization, training

- Activities to perform

- Measurement of performance

- Verification of performance

Page 32: 1 The Capability Maturity Model for Software: An Overview

32

Example: Structure of the Software Project Planning KPA

Purpose • Establish reasonable plans for softwareengineering and managing the project

Goals • Software estimates are documented and used • Activities and commitments are documented • Groups agree to their commitments

Commitments • A project software manager is designated • An organizational policy for planning is followed

Abilities • Resources and funding are provided • Training in estimating and planning is provided

Activities • Estimate project parameters- size, effort, cost, schedules, risks

• Plan software activities- goals, life cycle, processes, standards

• Get agreements to commitments- from practitioners, management, others

Measurements • Track planning status

Verifications • Review plans with management • Conduct independent review of planning

Page 33: 1 The Capability Maturity Model for Software: An Overview

33

CMM Structure

Maturity Levels

KeyProcess Areas

Goals

Common Features

KeyPractices

2 3 4 5

RM PP PT SM CMQA

Commitment to Perform

Ability to Perform

Activities Performed

Measurement and Analysis

Verifying Implementation

Page 34: 1 The Capability Maturity Model for Software: An Overview

34

How is a Maturity Level determined?

The Software Capability Evaluation (SCE)

• Description: A structured CMM-Based Appraisal in which a trained team examines an organization’s current software practices. It consists of interviews, questionnaires, and analysis designed to identify the current process capability.

• Evaluators: A team of 4-6 SCE-trained people, external or internal to the organization

• Process: Typically one week of preparation off-site, then one week of on-site interviews and analysis, using the SCE process (see guidelines on SSC San Diego PAL)

• Results: Comprehensive verbal and written findings of strengths, weaknesses, and areas to improve. Can optionally result in a validated maturity level.

Page 35: 1 The Capability Maturity Model for Software: An Overview

35

Process Maturity Profile of Software Community

Maturity Level 1994 1995 1996 1997 1998 1999 2000

1- Initial 71% 67% 64% 58% 52% 43% 35%

2- Repeatable 19% 20% 21% 25% 28% 34% 38%

3- Defined 10% 11% 13% 14% 17% 17% 19%

4- Managed 0% 1% 2% 2% 3% 4% 6%

5- Optimizing 1% 0% 0% 0% 1% 1% 3%

Organizationsreporting to SEI

156 353 458 541 621 734 901

Source: http://www.sei.cmu.edu/sema/profile.html

0

200

400

600

800

1000

Org

an

iza

tio

ns

1994 1995 1996 1997 1998 1999 2000

5-Optimizing

4-Managed

3-Defined

2-Repeatable

1-Initial

Page 36: 1 The Capability Maturity Model for Software: An Overview

36

Know Thy Competition

Some Organizations at CMM Level 4 or 5

BFL Software Boeing CG-Smith SoftwareCiticorp Overseas Cognizant Tech CSC Defense GroupCSC Civil Group DCM Tech DSQ TechFuture Software HCL Perot Systems HoneywellHughes IBM Global Services Int. ComputersLitton PRC Lockheed Martin MotorolaNCR Network Systems Northrop GrummanOracle Raytheon Satyam ComputerSiemens Info Systems Silverline Tech Tata ConsultancyTelcordia Tech United Space Alliance USAF Hill AFBUSAF Tinker AFB USA CECOM USN FMSOUSN NAWC China Lake Wipro GE Med Systems

Page 37: 1 The Capability Maturity Model for Software: An Overview

37

SW-CMM Capability Maturity Model for Software

T-CMM Trusted CMM

SSE-CMM Systems Security Engineering CMM

SE-CMM Systems Engineering CMM

P-CMM People CMM

SA-CMM Software Acquisition CMM

IPD-CMM Integrated Product Development CMM

FAA-iCMM FAA’s integrated CMM (SW-CMM, SE-CMM, SA-CMM)

CMMI CMM Integration (SW-CMM, SE-CMM, SA-CMM, IPD-CMM)

Some CMM Variants

Page 38: 1 The Capability Maturity Model for Software: An Overview

38

Points to Remember!

• CMM Level 2 focuses on basic management practices of the _______________

• CMM Level 3 concentrates on standard software processes of the _______________

• Most software organizations today are at CMM Level _____

• The primary objective of the CMM is

___________________________________________

• The CMM was developed by _________

Page 39: 1 The Capability Maturity Model for Software: An Overview

39

Describing The CMM: Summary

The “Business Case” for using the CMM was addressed in an Air Force Institute of Technology (AFIT) study:

• The aim was to determine any correlation between the CMM rating and software development success• Observed improved cost and schedule performance with increased process maturity.

– Less mature organizations were likely to have difficulty adhering to cost and schedule baselines– More mature organizations were likely to meet cost and schedules

Conclusion: Validated a statistical correlation between project success and CMM ratings

CrossTalk, September 1995

Page 40: 1 The Capability Maturity Model for Software: An Overview

40

CMM References

• Capability Maturity Model (CMM) for Software, Version 1.1. CMU/SEI-93-TR-24 & 25 , February 1993

– http://sepo.spawar.navy.mil/sepo/CMMinfo.html

• Benefits of CMM-Based Software Process Improvement: Initial Results. CMU/SEI-94-TR-13, August 1994

– http://www.sei.cmu.edu/publications/documents/94.reports/94.tr.013.html

• A Software Process Framework for the SEI CMM, Handbook. CMU/SEI-94-HB-01, September 1994

– http://www.sei.cmu.edu/publications/documents/94.reports/94.hb.001.html• Article: The Capability Maturity Model for Software. Mark C. Paulk, Bill Curtis,

Mary Beth Chrissis, Charles V. Weber. (in Section 7 of SME Guidebook)

– http://www.sei.cmu.edu/publications/documents/96.reports/96.ar.cmm.v1.1.html

• SEI CMM Level 5: For the Right Reasons. George Yamamura and Gary Wigle, Boeing Defense & Space Group. CrossTalk, August 1997.

– http://www.stsc.hill.af.mil/CrossTalk/1997/aug/seicmm5.html• SEPO’s Power Point presentation on “The Capability Maturity Model: an

Overview” http://sepo.spawar.navy.mil/sepo/CMMinfo.html• Key Process Area flow charts, at http://sepo.spawar.navy.mil/sepo/CMMinfo.html

Page 41: 1 The Capability Maturity Model for Software: An Overview

41

Backup CMM Material

• Key Process Areas of each Maturity Level

• Level 1 Processes and results

• Goals, Artifacts, and Training requirements of each KPA at Levels 2, 3, 4, 5

Page 42: 1 The Capability Maturity Model for Software: An Overview

42