1 uas integration & frequency spectrum mike lissone eurocontrol uas focal point 2nd eu uas panel...

12
1 UAS INTEGRATION & FREQUENCY UAS INTEGRATION & FREQUENCY SPECTRUM SPECTRUM Mike Lissone EUROCONTROL UAS FOCAL POINT 2nd EU UAS PANEL WORKSHOP 2011 September 13 - 14, 2011

Upload: jose-gallegos

Post on 27-Mar-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 UAS INTEGRATION & FREQUENCY SPECTRUM Mike Lissone EUROCONTROL UAS FOCAL POINT 2nd EU UAS PANEL WORKSHOP 2011 September 13 - 14, 2011

1

UAS INTEGRATION & FREQUENCY UAS INTEGRATION & FREQUENCY SPECTRUMSPECTRUM

Mike LissoneEUROCONTROL

UAS FOCAL POINT

2nd EU UAS PANEL WORKSHOP

2011

September 13 - 14, 2011

Page 2: 1 UAS INTEGRATION & FREQUENCY SPECTRUM Mike Lissone EUROCONTROL UAS FOCAL POINT 2nd EU UAS PANEL WORKSHOP 2011 September 13 - 14, 2011

EUROCONTROL Business Objectives - the UAS fit

Objectives

Match capacity with

air transport growthCAPACITY

improve ATM safety whilst

accommodating traffic growthSAFETY

EFFICIENCYIncrease ATM network

efficiency

SECURITY Strengthen ATM Security

ENVIRONMENTReduce aircraft noise

and emission levels

UAS

UAS

UAS

UAS

UAS

Page 3: 1 UAS INTEGRATION & FREQUENCY SPECTRUM Mike Lissone EUROCONTROL UAS FOCAL POINT 2nd EU UAS PANEL WORKSHOP 2011 September 13 - 14, 2011

EUROCONTROL Operating principles

• UAS are transformational - must be integrated safely and seamlessly into non-segregated airspace

• UAS operations - equivalent level of safety or better to manned aircraft

• UAS should not increase the risk to other airspace users and should not deny them access to airspace and impact capacity

Page 4: 1 UAS INTEGRATION & FREQUENCY SPECTRUM Mike Lissone EUROCONTROL UAS FOCAL POINT 2nd EU UAS PANEL WORKSHOP 2011 September 13 - 14, 2011

ATM IMPACT ASSESSMENTATM IMPACT ASSESSMENT

Page 5: 1 UAS INTEGRATION & FREQUENCY SPECTRUM Mike Lissone EUROCONTROL UAS FOCAL POINT 2nd EU UAS PANEL WORKSHOP 2011 September 13 - 14, 2011

UAS ATM INTEGRATION ACTIVITY DELIVERABLESUAS ATM INTEGRATION ACTIVITY DELIVERABLES

EUROCONTROL/JAA taskforce

UAS Real Time Simulation

UAS Consolidated Market Assessment

Sense and Avoid/Collision ATM requirements

C3 Channel Saturation Study

UAS preliminary Safety Case

Human Factors Case

UAS Security Risk Assessment

Global Hawk Guidelines

OAT UAS specification

Page 6: 1 UAS INTEGRATION & FREQUENCY SPECTRUM Mike Lissone EUROCONTROL UAS FOCAL POINT 2nd EU UAS PANEL WORKSHOP 2011 September 13 - 14, 2011

PRESENT SITUATIONPRESENT SITUATION

Light UASLight UAS (VLOS & BLOS)This is happening now!

What is the issueWhat is the issue;

RISK FOR FRAGMENTATION

Safety implications

Stopping Industry

Urgent need to finalise!!!

Foundation for further regulatory work Foundation for further regulatory work

on Large UASon Large UAS

Page 7: 1 UAS INTEGRATION & FREQUENCY SPECTRUM Mike Lissone EUROCONTROL UAS FOCAL POINT 2nd EU UAS PANEL WORKSHOP 2011 September 13 - 14, 2011

PRESENT SITUATIONPRESENT SITUATION

Large UAS (>150kg)Several independent initiatives ongoing!

What is the issue;

Ensure timely development regulation

ICAO & EUROCAE RISK FOR FRAGMENTATION

Cross border

Safety implications

Stopping Industry

Urgent need to have a consolidated EUROPEAN approach

Page 8: 1 UAS INTEGRATION & FREQUENCY SPECTRUM Mike Lissone EUROCONTROL UAS FOCAL POINT 2nd EU UAS PANEL WORKSHOP 2011 September 13 - 14, 2011

AIRPORTSAIRPORTS

No integrated UAS operations so far

Three phased regulatory approach envisaged;

Segregation

Enabling present technology

Integration based on new technology

Need to develop ATM airport procedures

Page 9: 1 UAS INTEGRATION & FREQUENCY SPECTRUM Mike Lissone EUROCONTROL UAS FOCAL POINT 2nd EU UAS PANEL WORKSHOP 2011 September 13 - 14, 2011

PROPOSED WAY FORWARD (1)PROPOSED WAY FORWARD (1)

Conduct gap analysisExisting regulationNational initiatives

Develop Regulatory roadmapEUROCONTROL & EASA

Set up Stakeholder consultation ANSPNAAsMILIndustryPublic perspective

Page 10: 1 UAS INTEGRATION & FREQUENCY SPECTRUM Mike Lissone EUROCONTROL UAS FOCAL POINT 2nd EU UAS PANEL WORKSHOP 2011 September 13 - 14, 2011

PROPOSED WAY FORWARD (2)PROPOSED WAY FORWARD (2)

Consider effective support to:

ICAO UASSGOther relevant panels when required

EUROCAE WG 73

JARUS

States

Page 11: 1 UAS INTEGRATION & FREQUENCY SPECTRUM Mike Lissone EUROCONTROL UAS FOCAL POINT 2nd EU UAS PANEL WORKSHOP 2011 September 13 - 14, 2011

Summary

Our

ATM-UAS

Vision

UAS are an integral element of the SES

ATM integration capitalising on first steps

HARMONISATION is essential

Effective support

FILE and FLY remains the goal

UAS technology beneficial to manned aviation

Written contributions will be taken into account!

Page 12: 1 UAS INTEGRATION & FREQUENCY SPECTRUM Mike Lissone EUROCONTROL UAS FOCAL POINT 2nd EU UAS PANEL WORKSHOP 2011 September 13 - 14, 2011

Questions ?

Thank-you !