1 us army corps of engineers ® headquarters. 2 us army corps of engineers ® headquarters the...

23
1 US Army Corps of Engineers® Headquarters

Upload: nehemiah-chidsey

Post on 30-Mar-2015

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 1 US Army Corps of Engineers ® Headquarters. 2 US Army Corps of Engineers ® Headquarters The Framework for the Armys Response to the Perfect Storm 26

1

US Army Corpsof Engineers®

Headquarters

Page 2: 1 US Army Corps of Engineers ® Headquarters. 2 US Army Corps of Engineers ® Headquarters The Framework for the Armys Response to the Perfect Storm 26

2

US Army Corpsof Engineers®

Headquarters

The Framework for

the Army’s Response to the Perfect Storm

26 June 2005

SAVE International Conference, San Diego, CA

By Jeffery T. Hooghouse . AIA . AVS

Deputy Chief Architect of the Corps

The Value Methodology:

Page 3: 1 US Army Corps of Engineers ® Headquarters. 2 US Army Corps of Engineers ® Headquarters The Framework for the Armys Response to the Perfect Storm 26

3

US Army Corpsof Engineers®

Headquarters

• History of Initiative

• Pilot Project Sets the Stage

• The Perfect Storm

• USACE Response

• S&C Workshop

• Follow-on Studies

• Summary

Overview of Presentation

Page 4: 1 US Army Corps of Engineers ® Headquarters. 2 US Army Corps of Engineers ® Headquarters The Framework for the Armys Response to the Perfect Storm 26

4

US Army Corpsof Engineers®

Headquarters

Difference?

Value Engineering

-vs-

Value Methodology

Page 5: 1 US Army Corps of Engineers ® Headquarters. 2 US Army Corps of Engineers ® Headquarters The Framework for the Armys Response to the Perfect Storm 26

5

US Army Corpsof Engineers®

Headquarters

• 1996- Whole Barracks Renewal Program

• 1998- Barracks Mid-program Review

• 1999/2000- Program Review

• 2001- HQUSACE VE Studies

• Ft Meade Pilot Project

• GAO Audit on Privatization

History of Initiative

Page 6: 1 US Army Corps of Engineers ® Headquarters. 2 US Army Corps of Engineers ® Headquarters The Framework for the Armys Response to the Perfect Storm 26

6

US Army Corpsof Engineers®

Headquarters

• 1996- Whole Barracks Renewal Program

• 1998- Barracks Mid-program Review

• 1999/2000- Program Review

• 2001- HQUSACE VE Studies

• Ft Meade Pilot Project

• GAO Audit on Privatization

History of Initiative

Page 7: 1 US Army Corps of Engineers ® Headquarters. 2 US Army Corps of Engineers ® Headquarters The Framework for the Armys Response to the Perfect Storm 26

7

US Army Corpsof Engineers®

Headquarters

FY00/01 Ft MeadeType V, $105/SF, 88% complete

FY 00/01 Ft ArmyType II, $140/SF, 22% complete

• Cut Construction time by 55% (NTP dates approx. same, pictures taken in NOV 02)• Occupancy appropriate

Materials & Methods• Cost Decreased while Quality Increased

CO

ST

TIME

QUALITY

Ft Meade Pilot Project

Page 8: 1 US Army Corps of Engineers ® Headquarters. 2 US Army Corps of Engineers ® Headquarters The Framework for the Armys Response to the Perfect Storm 26

8

US Army Corpsof Engineers®

Headquarters

IGPBS

Army Modular Forces

BRAC 05

MIL

ITA

RY

WO

RK

LO

AD

OVER TIME

Multiple ‘Peaking’ Programsw/Critical Facilities Needs

Critical Questions…How much, when?

TempTemp BldgsBldgs

NOW Installations

GWOT Spt

The Perfect Storm

Page 9: 1 US Army Corps of Engineers ® Headquarters. 2 US Army Corps of Engineers ® Headquarters The Framework for the Armys Response to the Perfect Storm 26

9

US Army Corpsof Engineers®

Headquarters

28

The Perfect Storm

Page 10: 1 US Army Corps of Engineers ® Headquarters. 2 US Army Corps of Engineers ® Headquarters The Framework for the Armys Response to the Perfect Storm 26

10

US Army Corpsof Engineers®

Headquarters

The”TRUE” Perfect Storm….

Page 11: 1 US Army Corps of Engineers ® Headquarters. 2 US Army Corps of Engineers ® Headquarters The Framework for the Armys Response to the Perfect Storm 26

11

US Army Corpsof Engineers®

Headquarters

• Operations/Administration

- 500,000 SF or 11½ acres of Office Space

• Apartments

- 540,000 SF for 1,500 Soldiers or 750 Two-Bdrm Apts

• Cafeteria

- 30,000 SF for 800 Soldiers

• Truck Maintenance Shop

- 280,000 SF or 6.4 Acres Shop Space

• Parking Lots

- 182,000 SY or 36 Football Fields

• Mini-Storage

- 65,000 SF or 325 Single Car Garages

Approximate Magnitude

Page 12: 1 US Army Corps of Engineers ® Headquarters. 2 US Army Corps of Engineers ® Headquarters The Framework for the Armys Response to the Perfect Storm 26

12

US Army Corpsof Engineers®

Headquarters

“Asst. Secretary of the Army objective is …

• Leverage Private Industry Standards & Best Practices

• Innovative Design & Construction Practices

• Maintain level of Quality / Value

• Optimize Life-cycle costs

• Execute faster

• 25 Year “Functionality” Life

ASA (I&E) Directive

Page 13: 1 US Army Corps of Engineers ® Headquarters. 2 US Army Corps of Engineers ® Headquarters The Framework for the Armys Response to the Perfect Storm 26

13

US Army Corpsof Engineers®

Headquarters

• Established Program Delivery Team– HQDA & HQUSACE

• Three Focus Groups– Planning & Programming

• VM Focus for Requirements Development

– Acquisition & Execution• 5 Industry Forums / Market Research

• Master Acquisition Strategy

– Standards & Criteria

USACE Response

Page 14: 1 US Army Corps of Engineers ® Headquarters. 2 US Army Corps of Engineers ® Headquarters The Framework for the Armys Response to the Perfect Storm 26

14

US Army Corpsof Engineers®

Headquarters

• Comparison of MILCON to Industry (Functional / Operational / Technical)

• Development of Model RFPs(Performance versus Prescriptive)

• Inputs to other Focus Areas (ie., Evaluation Criteria, etc.)

• Outputs of Scope / Resourcing (Planning and Programming Focus)

• Identification of Roadblocks

• Implementation “Path Forward”

Standards & Criteria Focus

Initial Value Management Study:

Page 15: 1 US Army Corps of Engineers ® Headquarters. 2 US Army Corps of Engineers ® Headquarters The Framework for the Armys Response to the Perfect Storm 26

15

US Army Corpsof Engineers®

Headquarters

Tier I Facilities:• Barracks• Dining Facility• Company Operations Facility• BDE/BN Headquarters• Tactical Vehicle Maintenance

Facility

First Wave Facilities

Page 16: 1 US Army Corps of Engineers ® Headquarters. 2 US Army Corps of Engineers ® Headquarters The Framework for the Armys Response to the Perfect Storm 26

16

US Army Corpsof Engineers®

Headquarters

MILCON Barracks (1+1)$168/SF (OSD Unit Cost)

Private Industry Apartment

• Function: House People• Construction Type: All Types• Occupancy Type: Residential

• Operations: Accommodate Sleeping/Bathing, Relaxation/Cooking, Accommodate Privacy,

Gather People, Facilitate Circulation

• Function: House Soldiers• Construction Type: Type I or II non-combustible• Occupancy Type: Residential • Operations: Accommodate Sleeping/Bathing, Relaxation/Cooking, Accommodate Privacy, Gather People, Facilitate Circulation

IndustryInstallation

With the goal in mind….

Page 17: 1 US Army Corps of Engineers ® Headquarters. 2 US Army Corps of Engineers ® Headquarters The Framework for the Armys Response to the Perfect Storm 26

17

US Army Corpsof Engineers®

Headquarters

Dining Facility$228/SF (OSD Unit Cost) College Cafeteria

• Function: Feed People• Construction Type: All Types• Occupancy Type: Assembly

• Operations: Feed People, Prepare and Serve Food, Accommodate Seating and Dining, Accommodate Studying, Gather People,

Facilitate Circulation

• Function: Feed People• Construction Type: Type I or II non-combustible• Occupancy Type: Assembly • Operations: Feed People, Prepare and Serve Food, Accommodate Seating and Dining, Accommodate Studying, Gather People, Facilitate Circulation

IndustryInstallation

With the goal in mind….

Page 18: 1 US Army Corps of Engineers ® Headquarters. 2 US Army Corps of Engineers ® Headquarters The Framework for the Armys Response to the Perfect Storm 26

18

US Army Corpsof Engineers®

Headquarters

Company Operations Facilities$140/SF (OSD Unit Cost)

Industrial/Admin Warehouse

• Function: Centralize Operations• Construction Type: All Types

• Occupancy Type: Business/Storage • Operations: Manage People, Centralize

Command and Operations, Store and Move Supplies

• Function: Centralize Operations• Construction Type: Type I or II non-combustible• Occupancy Type: Business/Storage • Operations: Manage People, Centralize Command & Operations, Store & Move Supplies

IndustryInstallation

With the goal in mind….

Page 19: 1 US Army Corps of Engineers ® Headquarters. 2 US Army Corps of Engineers ® Headquarters The Framework for the Armys Response to the Perfect Storm 26

19

US Army Corpsof Engineers®

Headquarters

Brigade/Battalion Hq.$155-170/SF (OSD Unit Cost)

• Function: Administer Business• Construction Type: All Types

• Occupancy Type: Business • Operations: Manage People, Centralize

Operations, Manage Business Activities

Office Buildings

• Function: Administer Military Operations• Construction Type: Type I or II non-combustible• Occupancy Type: Business • Operations: Manage People, Centralize Operations, Manage Business Activities

IndustryInstallation

With the goal in mind….

Page 20: 1 US Army Corps of Engineers ® Headquarters. 2 US Army Corps of Engineers ® Headquarters The Framework for the Armys Response to the Perfect Storm 26

20

US Army Corpsof Engineers®

Headquarters

Tactical Equip Maint Facility$159-170/SF (OSD Unit Cost)

Heavy Equip Maint Facility

• Function: Maintain and Repair Vehicles• Construction Type: All Types

• Occupancy Type: Factory (Mod-High Haz) • Operations: Maintain and Repair Vehicles, Organize Equipment and Tools, Store Parts,

Admin, Operations

• Function: Maintain and Repair Vehicles• Construction Type: Type I or II non-combustible• Occupancy Type: Factory (Mod-High Haz)• Operations: Maintain and Repair Vehicles, Organize Equipment and Tools, Store Parts, Admin, Operations, Training, Deployment

IndustryInstallation

With the goal in mind….

Page 21: 1 US Army Corps of Engineers ® Headquarters. 2 US Army Corps of Engineers ® Headquarters The Framework for the Armys Response to the Perfect Storm 26

21

US Army Corpsof Engineers®

Headquarters

Follow-on Studies

• Development of the Program Management Plan for Milcon Transformation• Risk Analysis Workshop• Senior Leader Workshop• RFP Development Workshop

Future VM Workshops…..• Organizational Planning Workshop• Management of Implementation• Future Requirements Definition

Page 22: 1 US Army Corps of Engineers ® Headquarters. 2 US Army Corps of Engineers ® Headquarters The Framework for the Armys Response to the Perfect Storm 26

22

US Army Corpsof Engineers®

Headquarters

The Army needs our help…..

• Quality / Value Improvements

• Leverage Industry Best Practices

• Improve Execution Time

• Life Cycle Cost Improvements

• Areas of Opportunity for Innovation

• Identify Roadblocks & Barriers

Summary

Page 23: 1 US Army Corps of Engineers ® Headquarters. 2 US Army Corps of Engineers ® Headquarters The Framework for the Armys Response to the Perfect Storm 26

23

US Army Corpsof Engineers®

Headquarters