1 Video Conference Summary Currently 19 FNAL v/c room endpoints. Upgrades/relocations for 4 v/c rooms in queue. 2 new v/c rooms in queue. ECS scheduler cutover Jan 31, 2004. Plan for video streaming evaluation.

Upload: barbra-walsh

Post on 23-Dec-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 Video Conference Summary Currently 19 FNAL v/c room endpoints. Upgrades/relocations for 4 v/c rooms in queue. 2 new v/c rooms in queue. ECS scheduler

1

Video ConferenceSummary Currently 19 FNAL v/c room endpoints. Upgrades/relocations for 4 v/c rooms in

queue. 2 new v/c rooms in queue. ECS scheduler cutover Jan 31, 2004. Plan for video streaming evaluation.

Page 2: 1 Video Conference Summary Currently 19 FNAL v/c room endpoints. Upgrades/relocations for 4 v/c rooms in queue. 2 new v/c rooms in queue. ECS scheduler

2

Video ConferenceStatistics (ISDN)

ISDN Meetings FY2003

0.00

200.00

400.00

600.00

800.00

1000.00

1200.00

Oct-02 Nov-02 Dec-02 Jan-03 Feb-03 Mar-03 Apr-03 May-03 Jun-03 Jul-03 Aug-03 Sep-03 Oct-03

# m

tgs

/ # h

rs

Page 3: 1 Video Conference Summary Currently 19 FNAL v/c room endpoints. Upgrades/relocations for 4 v/c rooms in queue. 2 new v/c rooms in queue. ECS scheduler

3

Video ConferenceStatistics (IP/H.323) Out of ~175 standing FNAL conference

room meetings 30 are (or should be) point-to-point H.323.

Meetings currently using ESnet Ad-Hoc: D0 Muon ID, D0-BID, D0/Dutch CDF DB CD/Sam BTeV RTeS, Dark Camera ?

Page 4: 1 Video Conference Summary Currently 19 FNAL v/c room endpoints. Upgrades/relocations for 4 v/c rooms in queue. 2 new v/c rooms in queue. ECS scheduler

4

Video ConferenceStatistics (VRVS) November 2003

VRVS Call Record Detail stats just released. Estimate 51 mtgs for total of 213 hours.

Page 5: 1 Video Conference Summary Currently 19 FNAL v/c room endpoints. Upgrades/relocations for 4 v/c rooms in queue. 2 new v/c rooms in queue. ECS scheduler

5

Video ConferenceInstallations and Upgrades New systems installed within the last FY

were: SiDet, WH8X (replacing WH12NW), PPD/D0, CDF/B02, PPD/EPP roll-about (latter two IP only).

Upgrades for PPD/CMS Project Office v/c room completed in April. Video and audio upgrades to CDF/B02 Theater conference room completed in August.

Installation of new gear in DAB3 conference room scheduled for January.

Page 6: 1 Video Conference Summary Currently 19 FNAL v/c room endpoints. Upgrades/relocations for 4 v/c rooms in queue. 2 new v/c rooms in queue. ECS scheduler

6

Video ConferenceProjects in Queue Upgrade audio in WH2NW (Directorate). Appoint WH2NE with video conf’g

(Directorate). Appoint X-Gallery Huddle Conf. Room with

video conf’g (Accelerator Division). Ongoing upgrades or equipment

installations in existing rooms (FCC1, WH8X, etc).

Page 7: 1 Video Conference Summary Currently 19 FNAL v/c room endpoints. Upgrades/relocations for 4 v/c rooms in queue. 2 new v/c rooms in queue. ECS scheduler

7

Video ConferenceScheduling ESnet DCS to ECS scheduler cutover Jan. 31.

As DCS power user have joined ESnet et al in beta testing of ECS scheduler. Considerable consulting effort to on and off-site users regarding scheduler changes and ISDN to IP migration.

ECS will not yet have schedulable IP multipoint capability, but we’ll use the email features for notifying users of Ad-hoc bridge numbers.

Lost official back-up Fermilab scheduling support in December.

Page 8: 1 Video Conference Summary Currently 19 FNAL v/c room endpoints. Upgrades/relocations for 4 v/c rooms in queue. 2 new v/c rooms in queue. ECS scheduler

8

Video ConferenceInvestigations CMS Virtual Control Room Project,

participants include Data Comm and PPD/CMS. At present we’re determining best v/c equipment for the testbed.

Video Streaming for on-site video meetings. $0 requisition submitted for a 30 day trial of the video furnace streaming device. We plan on testing with CD, D0, CDF, BTeV, et al. Equipment needed estimated to be just under $25K.

Page 9: 1 Video Conference Summary Currently 19 FNAL v/c room endpoints. Upgrades/relocations for 4 v/c rooms in queue. 2 new v/c rooms in queue. ECS scheduler

9

Video Conference Equipment We’re currently using ESnet’s gatekeeper

for H.323/IP video. As the number of on-site desktop IP video

conference users increase we see a need for a H.323 gatekeeper at Fermilab.

Hardware and software for g/k ~$21K and operational support is significant.