1 welcome ! dongchul son center for high energy physics kyungpook national university daegu, korea...

32
1 Welcome ! Welcome ! Dongchul Son Dongchul Son Center for High Energy Physics Center for High Energy Physics Kyungpook National University Kyungpook National University Daegu, Korea Daegu, Korea September 29- October 1, 2008 September 29- October 1, 2008 The 2 nd Asia ILC R&D Seminar (September 29-30, 2008) ATF2 Project Meeting (Oct. 1, 2008)

Upload: ashley-stokes

Post on 27-Dec-2015

221 views

Category:

Documents


1 download

TRANSCRIPT

1

Welcome !Welcome !

Dongchul SonDongchul Son Center for High Energy PhysicsCenter for High Energy PhysicsKyungpook National UniversityKyungpook National University

Daegu, KoreaDaegu, KoreaSeptember 29- October 1, 2008September 29- October 1, 2008

The 2nd Asia ILC R&D Seminar (September 29-30, 2008) ATF2 Project Meeting (Oct. 1, 2008)

The 2nd Asia ILC R&D Seminar (September 29-30, 2008) ATF2 Project Meeting (Oct. 1, 2008)

2D. Son, Asia ILC R&D Seminar & ATF2 Project Meeting, 29 Sept-1 Oct/2008

School of Physics and Energy Science School of Physics and Energy Science & Center for High Energy Physics& Center for High Energy Physics

School of Physics and Energy ScienceSchool of Physics and Energy Science From 2005 we have Physics Major and Energy Science Major From 2005 we have Physics Major and Energy Science Major

which includes HEP, nanophysics andwhich includes HEP, nanophysics and Nuclear Engineering, Accelerator Physics, Energy Chemistry/Nuclear Engineering, Accelerator Physics, Energy Chemistry/

Material for Hydrogen Energy / Solar EnergyMaterial for Hydrogen Energy / Solar Energy

CHEP was established July 1, 2000CHEP was established July 1, 2000 Major project being supported by MOST through KOSEF Major project being supported by MOST through KOSEF The “High Energy Physics” is a top-downed field for the CenteThe “High Energy Physics” is a top-downed field for the Cente

r of Excellence (COE) Program by MOST/KOSEFr of Excellence (COE) Program by MOST/KOSEF Hosted by Kyungpook National University, DaeguHosted by Kyungpook National University, Daegu

3D. Son, Asia ILC R&D Seminar & ATF2 Project Meeting, 29 Sept-1 Oct/2008

Brief IntroductionBrief IntroductionManpower at KNU

HEP (exp) HEP (Th.)

Acc Phys Nucl (Exp)

Radiation Phys Nucl Eng

Energy Chemist Nano Phy (Exp)

Nano Phy (Th) Physics Ed

ManpowerManpower COE program supports 20~22 faculty members fCOE program supports 20~22 faculty members f

rom rom Kyungpook NU and participating major universiKyungpook NU and participating major universi

ties, i.e., ties, i.e., Seoul NU, Korea Inst. of Advanced StudySeoul NU, Korea Inst. of Advanced Study Korea Adv. Inst. of Sci. and Tech,Korea Adv. Inst. of Sci. and Tech, Ewha Women U, Yonsei U, Korea U, Konkuk U, Ewha Women U, Yonsei U, Korea U, Konkuk U,

SKKU, SKKU, Chonnam NU, Chonbuk NU, Gyeongsang NU, PChonnam NU, Chonbuk NU, Gyeongsang NU, P

usan NUusan NU PostechPostech

Other several HEP projects underwayOther several HEP projects underway Total ~150 people including ~90 Graduate StudeTotal ~150 people including ~90 Graduate Stude

nts (a little decreased)nts (a little decreased) At Kyungpook NU, 30 Ph. D. (15 faculty and 15 At Kyungpook NU, 30 Ph. D. (15 faculty and 15

associates) are in the fields of High Energy Partiassociates) are in the fields of High Energy Particle and Nuclear Physics as well as Accelerator Pcle and Nuclear Physics as well as Accelerator Physicshysics

4D. Son, Asia ILC R&D Seminar & ATF2 Project Meeting, 29 Sept-1 Oct/2008

Research Projects IResearch Projects I

On-going experimental works and related theoretical worksOn-going experimental works and related theoretical works High Luminosity electron-positron exp at KEK: BelleHigh Luminosity electron-positron exp at KEK: Belle

Discovery of X (3872) particle, etc., Computing over NetworkDiscovery of X (3872) particle, etc., Computing over Network At KNU: Profs. Hwanbae Park, Hongjoo Kim, Dr. S Ryu and studentsAt KNU: Profs. Hwanbae Park, Hongjoo Kim, Dr. S Ryu and students

Proton-Antiproton scattering exp at Fermliab, US : CDFProton-Antiproton scattering exp at Fermliab, US : CDF At KNU: Profs. Donghee Kim, J S Suh, Drs. D J Kong, J Kim and studentsAt KNU: Profs. Donghee Kim, J S Suh, Drs. D J Kong, J Kim and students

Neutrino Osc Exp at KEK & Super-K in K2K, Super-K, T2K Neutrino Osc Exp at KEK & Super-K in K2K, Super-K, T2K No KNU teamNo KNU team

ep : CLAS at JLab, (ZEUS at DESY, now closed)ep : CLAS at JLab, (ZEUS at DESY, now closed) At KNU: Profs. Wooyoung Kim, two research associates (CLAS), At KNU: Profs. Wooyoung Kim, two research associates (CLAS),

D. Son (ZEUS) D. Son (ZEUS) Theoretical works: Higgs, SUSY, Superstrings, B PhysicsTheoretical works: Higgs, SUSY, Superstrings, B Physics

At KNU: Profs. S Jo, C Ahn, H Choi, Seung Woo HamAt KNU: Profs. S Jo, C Ahn, H Choi, Seung Woo Ham

cf) Previous Exps.: AMY at KEK, BNL E818, L3 at CERN, AMS01cf) Previous Exps.: AMY at KEK, BNL E818, L3 at CERN, AMS01

5D. Son, Asia ILC R&D Seminar & ATF2 Project Meeting, 29 Sept-1 Oct/2008

Research Projects IIResearch Projects II

Preparing experimentsPreparing experiments p-p collisions at 14 TeV with Compact Muon Solenoid (CMS) p-p collisions at 14 TeV with Compact Muon Solenoid (CMS)

DAQ, Data Center, AnalysisDAQ, Data Center, Analysis At KNU: Profs. D Son, D Kim, GN Kim, HK Park, JS Suh, Drs. S Ro, J At KNU: Profs. D Son, D Kim, GN Kim, HK Park, JS Suh, Drs. S Ro, J

Chung, DJ Kong, J Kim, MW Lee, KS Kim, SW HamChung, DJ Kong, J Kim, MW Lee, KS Kim, SW Ham

Outer-space HEP exp (AMS) at the International Space Station (ISS)Outer-space HEP exp (AMS) at the International Space Station (ISS) Superconducting Magnet (Control, Power), TRD, SRDSuperconducting Magnet (Control, Power), TRD, SRD At KNU: Profs. D Son, GN Kim, Drs. MW Lee, KS Kim & studentsAt KNU: Profs. D Son, GN Kim, Drs. MW Lee, KS Kim & students

Reactor Neutrino Exp and other neutrino/Dark matter/double beta decReactor Neutrino Exp and other neutrino/Dark matter/double beta decay experiments: ay experiments: At KNU: Profs. D Kim, W Kim, HK Park, HJ Kim, and research associatAt KNU: Profs. D Kim, W Kim, HK Park, HJ Kim, and research associat

es, studentses, students

6D. Son, Asia ILC R&D Seminar & ATF2 Project Meeting, 29 Sept-1 Oct/2008

Research Projects IIIResearch Projects III

Preparing experiments (Continued…)Preparing experiments (Continued…) International Linear Collider (ILC) AcceleratorsInternational Linear Collider (ILC) Accelerators

Bunch compressor, Damping Ring. Superconducting Cavity / Klystron, Bunch compressor, Damping Ring. Superconducting Cavity / Klystron, BPM, etc. BPM, etc.

At KNU: Profs. Eun-San Kim, Hyeong Suk Kim, Drs. S Shin, I HwangAt KNU: Profs. Eun-San Kim, Hyeong Suk Kim, Drs. S Shin, I Hwang

ILC Detectors: Silicon Tracker, Scintillators for Calorimeter, etc.ILC Detectors: Silicon Tracker, Scintillators for Calorimeter, etc. At KNU: Profs. H Park, HJ Kim, H. Kim, D Kim, JS Suh, etc.At KNU: Profs. H Park, HJ Kim, H. Kim, D Kim, JS Suh, etc.

Data Grid Computing, High Speed Bandwidth Networking etc.Data Grid Computing, High Speed Bandwidth Networking etc. At KNU: Prof. HK Park, JS Suh, D Son, Dr. JH Chung, S Ro and At KNU: Prof. HK Park, JS Suh, D Son, Dr. JH Chung, S Ro and

Mr. D HanMr. D Han

7D. Son, Asia ILC R&D Seminar & ATF2 Project Meeting, 29 Sept-1 Oct/2008

A Vision of Future Korean HEP Facilities A Vision of Future Korean HEP Facilities

Underground Reactor Exp - YounggwangUnderground Reactor Exp - Younggwang

Proton Accelerator at GyeongjuUnder constructionProton Accelerator at GyeongjuUnder construction

Dark Matter Research LabYangyangDark Matter Research LabYangyang

Underground Neutrino Exp ? - T2KK candidate

Underground Neutrino Exp ? - T2KK candidate

8

R&D Efforts for ILC in KoreaR&D Efforts for ILC in Korea

9D. Son, Asia ILC R&D Seminar & ATF2 Project Meeting, 29 Sept-1 Oct/2008

Some history for ILCSome history for ILC A Planning Team formed at CHEP (March 2004) Korean ILC Workshops (4 times + 3 mini-workshops) PAL ILC Task Force (Jan 2005) formed Strategic Plannings for ILC (three times) ILC-Asia MoU (Aug 2005)

CHEP, PAL, KEK, IHEP, TIFR, CAT, IUAC ILC-Common Fund MoU (Oct. 2006) Held Several international conferences and workshops Research Projects;

Int. Coop. Project (P.I.-H. Park) for Physics and Detectors SRC Projects (Accelerator & Detectors)

Several Committee Activities: ICFA, ILCSC, ITRP, Parameter, LCWS–WG Coordinators

1. LCWS 2002 (Jeju)

2. 8th ACFA LCWS (Daegu 2005)

3. Committees: ITRP(Pohang 2004) and ILCSC, ICFA, FALC-RG during ICFA Seminar (Daegu 2005)

4. ILCSC, ICFA, FALC-RG during LP07 (Daegu )

5. Ecloud’07 (Daegu)

6. And this workshop

10D. Son, Asia ILC R&D Seminar & ATF2 Project Meeting, 29 Sept-1 Oct/2008

Through for 4 ILC Workshops in Korea Through for 4 ILC Workshops in Korea and 3 Strategy Reports (2005-2008)and 3 Strategy Reports (2005-2008)

We have identified some major R&D areas for ILC Detector areas;

Silicon Tracker Silicon/Tungsten Calorimeter Plastic Scintillator/Tungsten Calorimeter

Accelerator areas; Bunch Compression System Damping Ring BPMs RF systems Modulators and RF waveguide for ILC SCRF

11D. Son, Asia ILC R&D Seminar & ATF2 Project Meeting, 29 Sept-1 Oct/2008

On-going R&D’s for DetectorsOn-going R&D’s for Detectors

Studies for Silicon Vertex Detector Design Studies for Silicon Central/Forward Tracker Design

KNU, YU, SKKU, HU

Calorimetry Si-Scintillator

EWU, YU, SKKU Extruded type of Plastic Scintillator

KNU

KNU: Kyungpook Nat’l U. EWU: Ewha Women’s U. YU: Yonsei U. SKKU: Sungkyunkwan U., HU: Hanyang U.

12D. Son, Asia ILC R&D Seminar & ATF2 Project Meeting, 29 Sept-1 Oct/2008

EM CalorimeterEM CalorimeterSilicon SensorsSilicon Sensors

13D. Son, Asia ILC R&D Seminar & ATF2 Project Meeting, 29 Sept-1 Oct/2008

Plastic ScintillatorPlastic Scintillator

14D. Son, Asia ILC R&D Seminar & ATF2 Project Meeting, 29 Sept-1 Oct/2008

Silicon Sensors for TrackersSilicon Sensors for Trackers

15D. Son, Asia ILC R&D Seminar & ATF2 Project Meeting, 29 Sept-1 Oct/2008

Silicon Sensors for TrackersSilicon Sensors for Trackers

16D. Son, Asia ILC R&D Seminar & ATF2 Project Meeting, 29 Sept-1 Oct/2008

Silicon Sensors for TrackersSilicon Sensors for Trackers

17D. Son, Asia ILC R&D Seminar & ATF2 Project Meeting, 29 Sept-1 Oct/2008

Silicon Sensors for TrackersSilicon Sensors for Trackers

18D. Son, Asia ILC R&D Seminar & ATF2 Project Meeting, 29 Sept-1 Oct/2008

R&D for ILC Accelerator TechnologyR&D for ILC Accelerator Technology Pohang Accelerator Laboratory

SCRF for Pohang Light Source (single cell, 9-cell) KEK-ATF2 Q-BPM Design and Fabrication

Prototype/2005, 11 BPMs/2006, 28 MBPs/2007 Kyungpook National University

Pusan National University• Fabrication of Prototype of ILC Cavity BPM for ATF in TM120

Damping ring Lattice design Fast-ion instability and Ecloud instability

Beam dynamics simulation

Upstream RTML in RTML

RTML Alternative ultra-short bunch compressor

HLRF IOT

SRF Cavity Cavity design and processing

BDS

Development of Low-Q IP-BPM and S-band BPM for ATF2 Ring-extraction jitter correlation study

19D. Son, Asia ILC R&D Seminar & ATF2 Project Meeting, 29 Sept-1 Oct/2008

Prototype 3Prototype 3rdrd Harmonic SRF Cavity for PLS Harmonic SRF Cavity for PLS

Prototype 3rd H Cavity Cavity Performance from vertical test @1500MHz

First SRF Cavity developed in Korea !!

20D. Son, Asia ILC R&D Seminar & ATF2 Project Meeting, 29 Sept-1 Oct/2008

Fabrication of 9-cell Cavity - PAL #1 and 2Fabrication of 9-cell Cavity - PAL #1 and 2

21D. Son, Asia ILC R&D Seminar & ATF2 Project Meeting, 29 Sept-1 Oct/2008

Construction of SRF Test Lab at PALConstruction of SRF Test Lab at PAL

Lab. capability Frequency: 1.25-1.55 GHz RF Power: ~100 W Temperature control: 4.5-1.5 K Test cryostat for cavity with 1-3 cells @1.3GHz

Schedule Construction & installation: July 2006 - July 2008 Commissioning with single-cell cavity: February 2008 Normal operation: March 2008 Finish with EP facility: December 2008

22D. Son, Asia ILC R&D Seminar & ATF2 Project Meeting, 29 Sept-1 Oct/2008

Test Cryostat

Systems for SRF Test at PALSystems for SRF Test at PAL

23D. Son, Asia ILC R&D Seminar & ATF2 Project Meeting, 29 Sept-1 Oct/2008

KEK-ATF2 Q-BPM KEK-ATF2 Q-BPM Design and Fabrication at PALDesign and Fabrication at PAL

Prototype –Y2005 Cavity Diameter : 53.822 mm Cavity frequency: ~ 6420 MHz Isolation : -50 ~ -53dB Beam Test at KEK(12/2/) Overall Performance: Acceptable

11 BPMswith Long beam tube –Y2006 Cavity Diameter : 53.788 mm Cavity frequency : 6425.476 MHz Isolation : -46.6 dB

28 BPMswith Long beam tube –Y2007 Cavity Diameter : 53.770 mm Cavity frequency : 6426.649 MHz Isolation : -46.3 dB

24D. Son, Asia ILC R&D Seminar & ATF2 Project Meeting, 29 Sept-1 Oct/2008

Development of Low-Q IP-BPMDevelopment of Low-Q IP-BPMKyungpookKyungpook

25D. Son, Asia ILC R&D Seminar & ATF2 Project Meeting, 29 Sept-1 Oct/2008

Installation and TestsInstallation and Tests

26D. Son, Asia ILC R&D Seminar & ATF2 Project Meeting, 29 Sept-1 Oct/2008

S-band BPM in ATF2 S-band BPM in ATF2 KyungpookKyungpook

What for with this BPM(beam position monitor) ? To control beam orbit at final focus beam line in ATF2 To do BBA(beam-based alignment) with 1 mm at final focus

beam line in ATF2 (BPM resolution of a few hundreds nm should be satisfied.)

Requirements for the BPM Dynamic range ; a few mm Diameter of beam tube ; 40 mm Signal decay time ; 35~ 80 ns (where, f= 2878 MHz,

QL = 650~1800, longer decay time will is preferred for the electronics)

27

Beam tube

Cavity Waveguide

117.6

70

60

12

3

Coupling slot

Design of S-band BPM w/ HFSSDesign of S-band BPM w/ HFSS

Waveguide

Cavity

Beam tube Adapter

4014

Dipole mode

Electrical structure & dimension parameters of S-band BPM

Mode selection for the S-band BPM (TM110-mode)

28D. Son, Asia ILC R&D Seminar & ATF2 Project Meeting, 29 Sept-1 Oct/2008

Fabrication of S-band BPMFabrication of S-band BPM

Left_Cap

Right_Cap

Center_Frame

Left_Support

S-band BPM under RF test- 4 BPMs has been shipped to KEK last weekS-band BPM framework

Cold model

29D. Son, Asia ILC R&D Seminar & ATF2 Project Meeting, 29 Sept-1 Oct/2008

Fabrication of S-band BPMFabrication of S-band BPM

Design and fabrication of S-band BPM for the sextupole magnets and quadrupole magnets has been performed in Korea (at Kyungpook)

1 cold model of the S-band BPM has been sent to LAPP for an initial try for the installation, April, 2008.

4 S-band BPMs are sent to KEK to be installed in ATF2 last week. The installation process will be scheduled next month through the ATF2 p

eople.Machine Shop at KNU

30D. Son, Asia ILC R&D Seminar & ATF2 Project Meeting, 29 Sept-1 Oct/2008

Design work of IOT for ILCDesign work of IOT for ILCKyungpook Kyungpook

Planar IOT (Inductive Output Tube) Horizontal Design L-band (1.3GHz) 5MW Tube Calculation of Design Parameters Feasible RF interaction Cavity

H field in the interaction regionL-band HOM IOT Cavity

S-parameters of L-band HOM IOT

Ez field in the interaction regionf(cold)=1.1GHz (MAGIC)

D. Son, Asia ILC R&D Seminar & ATF2 Project Meeting, 29 Sept-1 Oct/2008 31

Cavity Beam Position MonitorCavity Beam Position MonitorPusan National University with KEKPusan National University with KEK

dipole modeelectric field(TM120 mode)

x

yz

x

yz

Cavity radius=156mmTM010 ~0.611GHzTM110 ~1.04GHzTM120 ~2.15GHz

32

Please Enjoy the meeting and Daegu Please Enjoy the meeting and Daegu and and

Thank you!Thank you!