1KAIZEN and GEMBAKAIZEN
are the trademarks of KAIZEN Institute
Leading Textile Equipment Manufacturer
Performance Indicator
Benefit Realized
Quantum of Improvement
Overall inventory Reduced 55%
Order to delivery time Reduced 50%
Manpower productivity Increased 58%
Break-Even Point Reduced 30%
![Page 2: 10 case studies for kaizen implementation](https://reader035.vdocument.in/reader035/viewer/2022070522/58ef09a31a28ab8f4e8b45db/html5/thumbnails/2.jpg)
2KAIZEN and GEMBAKAIZEN
are the trademarks of KAIZEN Institute
Pharmaceutical I
Industry Details Performance Indicator
Benefit Realized
Quantum of Improvement
Tablets Yield Enhanced By 2.1% to reach 99.6%
Lyophilization Capacity Increased Without Investment
80%
Vaccine Packing Line Productivity Increased 30%
![Page 3: 10 case studies for kaizen implementation](https://reader035.vdocument.in/reader035/viewer/2022070522/58ef09a31a28ab8f4e8b45db/html5/thumbnails/3.jpg)
3KAIZEN and GEMBAKAIZEN
are the trademarks of KAIZEN Institute
Pharmaceutical II
Industry Details Performance Indicator
Benefit Realized
Quantum of Improvement
Vial Packing Manpower Productivity Increased 32%
PFS Packing Manpower Productivity Increased 92%
![Page 4: 10 case studies for kaizen implementation](https://reader035.vdocument.in/reader035/viewer/2022070522/58ef09a31a28ab8f4e8b45db/html5/thumbnails/4.jpg)
4KAIZEN and GEMBAKAIZEN
are the trademarks of KAIZEN Institute
Stainless Steel Tube Manufacturer
Performance Indicator
Benefit Realized
Quantum of Improvement
OEE(Overall Equipment Efficiency)
Improved From 46% to 66%
Capacity Increased without Investment 44%
![Page 5: 10 case studies for kaizen implementation](https://reader035.vdocument.in/reader035/viewer/2022070522/58ef09a31a28ab8f4e8b45db/html5/thumbnails/5.jpg)
5KAIZEN and GEMBAKAIZEN
are the trademarks of KAIZEN Institute
Plastic Thermoware Manufacturers
Performance Indicator
Benefit Realized
Quantum of Improvement
Assembly Productivity Went up 250%!!
Floor space in assembly Reduced 60%
![Page 6: 10 case studies for kaizen implementation](https://reader035.vdocument.in/reader035/viewer/2022070522/58ef09a31a28ab8f4e8b45db/html5/thumbnails/6.jpg)
6KAIZEN and GEMBAKAIZEN
are the trademarks of KAIZEN Institute
Garment Industry
Performance Indicator
Benefit Realized
Quantum of Improvement
Manpower Productivity Went up 90%
Space used Reduced by 30%
![Page 7: 10 case studies for kaizen implementation](https://reader035.vdocument.in/reader035/viewer/2022070522/58ef09a31a28ab8f4e8b45db/html5/thumbnails/7.jpg)
7KAIZEN and GEMBAKAIZEN
are the trademarks of KAIZEN Institute
Precision Automotive & Aerospace Components Manufacturer
Performance Indicator
Benefit Realized
Quantum of Improvement
Manpower productivity Went up 25%
Space required Reduced by 17%
Manufacturing Costs Went down 31%
![Page 8: 10 case studies for kaizen implementation](https://reader035.vdocument.in/reader035/viewer/2022070522/58ef09a31a28ab8f4e8b45db/html5/thumbnails/8.jpg)
8KAIZEN and GEMBAKAIZEN
are the trademarks of KAIZEN Institute
Aircraft Electricals EOU
Performance Indicator
Benefit Realized
Quantum of Improvement
Throughput time (& Inventory) Reduced 48%
![Page 9: 10 case studies for kaizen implementation](https://reader035.vdocument.in/reader035/viewer/2022070522/58ef09a31a28ab8f4e8b45db/html5/thumbnails/9.jpg)
9KAIZEN and GEMBAKAIZEN
are the trademarks of KAIZEN Institute
Rubber Products
Performance Indicator
Benefit Realized
Quantum of Improvement
Manpower Productivity Went up 38%
Material Wastage Reduced 37%
Order to Delivery time Went down 67%
Market Share Went up From 34% to 48%
![Page 10: 10 case studies for kaizen implementation](https://reader035.vdocument.in/reader035/viewer/2022070522/58ef09a31a28ab8f4e8b45db/html5/thumbnails/10.jpg)
10KAIZEN and GEMBAKAIZEN
are the trademarks of KAIZEN Institute
Automotive Ancillary
Performance Indicator
Benefit Realized
Quantum of Improvement
Total Inventory Reduced 60%
Manpower Productivity Went Up 100%+
Space used Reduced by 55%
Rejections Went down 80%