About Course:
You will be imparted knowledge/training about Renewable Energy Technologies and concept of Grid
Connected Rooftop Solar (GCRT), to understand the state and central policy initiatives, grid-interconnection
guidelines, quality standards for grid-connected rooftop SPV systems, metering arrangements,
entrepreneurship skill development, business models and to explore financing opportunities in grid-
connected rooftop solar PV projects, which can be availed by Graduate Engineers with basic knowledge of
Electrical Concepts; Solar Entrepreneurs; Public Sector Undertaking Officials; EPC contractors; MNRE
channel partners; Senior Energy Department Officials of Govt. of India and Officers from State Nodal
Agencies.
Learning Objectives:
I. How to do Load Analysis and Location Analysis
II. How to select the right Module and Inverter Technology
III. System Sizing and Detailed Design of Solar Photovoltaic Power Plants
IV. National and State Policies for Grid Integrated SPV Power Plants
V. Different Metering mechanisms and Key Implementation Requirements, Standards,
Regulations and Procedures for grid integrated solar rooftop development Along with case
study
About NISE:
National Institute of Solar Energy (NISE) is an Autonomous Institute of Ministry of New and Renewable Energy,
Government of India to function as an Apex National Centre for research and technology development and related
activities in the areas of Solar Energy Technologies in the Country. NISE is located on a 200 acre campus at the
Gurugram- Faridabad Road, Gwal-Pahari, Gurugram. The Institute works on development of Solar Energy
Technologies and practices and contributes in advancement of related Science and Engineering. The R & D
activities of NISE are carried out in coordination with other research organizations and industry.
2
VI. Pre commissioning inspection of the Grid Connected Rooftop Solar PV Power Plant
VII. Post commissioning inspection of the Grid Connected Rooftop Solar PV Power Plant
VIII. Maintain Personal Health & Safety at Project Site
Target Audience Graduate Engineers with basic knowledge of Electrical Concepts; Solar Entrepreneurs; Public Sector
Undertaking Officials; EPC contractors; MNRE channel partners; Senior Energy Department Officials of
Govt. of India and Officers from State Nodal Agencies etc.
Rooftop Solar Grid Engineer SGJ/Q0106
Date: 11th to 22th September, 2017 Training Schedule
DAY 1 Time TOPICS Learning outcomes 10:00 -10:30 Welcome inauguration, Registration and Introduction among the participants
10:30 -11:30 Skilling Ecosystem
in India, National
Qualification on
Rooftop Solar Grid
Engineer and
Assessment process.
The evolving skilling ecosystem in India and international best practices,
Introduction to National Qualification on Rooftop Solar Grid Engineer and
Assessment process;
Overview of the course
11:30-11:45 Tea Break
11:45-1:15 Overview of
Renewable Energy
Technologies and
concept of Rooftop
solar , GCRT (Grid
connected rooftop
solar)
Overview of Renewable energy technologies,
Brief on National Solar Mission,
Conceptualization of Rooftop Solar program in India,
Present status for Rooftop program in India
Key challenges for Rooftop solar PV sector in India.
1:15-2:00 LUNCH
2:00-3:00 Types of Rooftop
Solar PV Power
Plants and their
operating principle.
Introduction to different types of rooftop solar PV power plants including their
functional configuration and working principle (Grid tied / Grid connected / Off
Grid or Standalone / Hybrid),
Insights into integration of Rooftop Solar PV Power Plant with DG set,
Factors affecting performance and reliability of a Rooftop Solar PV power plant
3:00-4:00 Solar Resource
assessment
Solar irradiation availability & assessment,
Solar irradiation components and its measurement equipment ,
Importance of Solar Radiation data in technology selection, Perform simple
calculations to derive the power and energy received from solar radiation in a
given area
3:00-3:15 TEA BREAK
4:00-5:30 Visit to Solar
Resource assessment
outdoor facility at
NISE
Demonstration of data acquisition system and its working principle for
irradiation measurements
DAY-2
10:00-11:30 Overview and
selection criteria for
Solar PV Modules
Overview of different technology and types of solar PV modules,
Interpretation of Standard test conditions and module watt peak (Wp) notation,
Typical Specifications, functioning and operating principle of solar PV modules
and associated accessories,
Interpretation of I-V curve and its role in module technology selection,
3
Reading and interpretation of data specification sheet
Factors affecting the performance of solar PV modules,
Electrical and fire safety while module construction and relevant IEC standard
explanation,
Introduction and understanding of relevant IEC standards for modules or
relevant Indian standards,
Selection criteria for solar PV modules
11:30-11:45 TEA BREAK 11:45-1:15 PRACTICAL /
Hands-On learning
for health & safety
toolkit and site visit
for understanding a
solar PV power plant
installation
Demonstrate safe and proper use of required tools and equipment for Solar PV
Installations,
Demonstrate the working of safety kit used for Rooftop Solar PV Installations,
Demonstrate the use and administration of first aid kit;
Visit to a rooftop for understanding a solar PV power plant installation
1:15-2:00 LUNCH
2:00-3:30 Lab visit IEC standards testing process including STC testing, I-V curve tracer,
resistance test,
NOCT, ambient temp test and others,
Demonstration of different types of Solar PV technologies and their specific
characteristics
3:30-3:45 TEA BREAK 3:45-5:30
Practical/Hands-on
learning
Observing the variation in energy generation by changing different parameters
like tilt, radiation, shadow, tracking and diode
DAY-3 10:00-11:30 Overview and
selection criteria for
Solar Inverters
Typical Specifications, functioning and operating principle of inverters and
charge controllers,
Different types of inverters and protection devices including their relevant
regulations for connecting to the grid,
(transformer less inverter)
Reading and interpretation of data specification sheet,
Factors affecting the performance of inverters and charge controllers,
Electrical and fire safety for inverters and relevant IEC standard explanation,
Introduction and understanding of relevant IEC standards for inverters or
relevant Indian standards
Selection criteria for inverters and charge controllers
11:30-11:45 TEA BREAK 11:45-1:15 Grid Connectivity,
Decoding the
variation of
parameters while
integration of the
solar PV with the
grid.
Understanding the Anti islanding phenomenon and its importance while grid
integration,
Interpretation and understating of relevant IEC standard for anti-islanding,
Understand the effect on power factor, harmonics, frequency voltage and other
factors while grid integration and their control measures for optimum
performance of Rooftop Solar PV power plant
1:15-2:00 LUNCH 2:00-5:30 Practical learning -
Inverter lab visit
Working of Different types of inverter and understanding their relevant IEC
standard testing process for quality and performance,
Demonstration of Anti islanding, change in harmonics, power factor, Phase
imbalance etc.
DAY 4 10:00-11:30 Overview and
selection criteria for
Battery and balance
Typical Specifications, functioning and operating principle for different types
of battery, cables, junction Boxes and other accessories;
Reading and interpretation of different components data specification sheets,
4
of system including
structure
Factors affecting the performance of batteries and other balance of system;
Relevant IEC standards explanation,
Introduction and understanding of relevant IEC standards or relevant Indian
standards for batteries and balance of system,
Selection criteria for batteries and balance of system
11:30-11:45 TEA BREAK 11:45-1:15 Overview of
Earthing and
lightning protection
Overview about earthing and lightning protection,
Different types of earthing and lightning protection,
Importance of earthing and lightning protection and its safety aspects related to
Rooftop Solar PV power plant,
Verify and assess the safety of earthing and lightning protection of the rooftop
solar PV power plant
1:15-2:00 LUNCH 2:00-3:00 Practical learning Visit to battery lab for understanding the testing process for quality and
performance
3:00-3:15 TEA BREAK 3:15- 5:30 1) Visit to 25KW
and 500 KW SPV
plant for components
identifications
2) Practical on earth-
pit testing using
toolkit
3) I-V curve tracer,
resistance
measurement,
thermal imaging etc.
Visit to 25KW and 500 KW SPV plant –
Identification and listing of components,
Earth pit testing,
I-V curve verification,
Module Temperature measurement,
Resistance measurement (Leakage current), thermal imaging
DAY-5 10:00 11:30 Metering
arrangements and
their relevant
regulations
Types of meters, bidirectional and unidirectional such as import and export,
Types of metering arrangement including Net Metering and Gross Metering
concepts and layout,
Identify the key regulatory parameters for interconnection and metering
arrangement including power quality of the grid at the project site,
National technical regulations and technical standards such as CEA’s
’Technical standards for connectivity of the Distributed Generation Resources’
Regulations 2013, CEA’s ‘Installation and Operations of meters’
Regulations 2007 and CEA’s ‘Measures of Safety and Electricity Supply
Regulation,2010
Verify the capacity of the rooftop solar PV power plant as per the relevant
policy/ regulation,
Verification of the operation of the installed Solar metering system including
import and export of energy.
11:30-11:45 TEA BREAK
11:45 - 1:15 Case study Case study of Solar PV plant and their functioning including performance,
challenges and solutions for net metering and gross metering arrangements
respectively
1:15: 2:00 LUNCH
2:00-3:30 Overview of
Protection Devices,
Junction boxes,
MCB, Surge
protection and other
isolation devices
Different types protection devices including their relevant regulations for
connecting to the grid.
Disconnect and isolation devices,
Understanding of relevant IEC standards or Indian standards for protection
devices.
Working principle and operation of the disconnect protections/isolation devices.
3:30-3:45 Tea break
3:45- 5:30 Visit to 500 KW to
identify the
protection devices.
Visit to 500 KW to identify and list the protection devices including
understanding of working principle
Net metering understanding-Visit
5
Net metering
understanding visit
DAY 6 10:00-11:30 Sizing of SPV power
plant manually
And with the help of
PV syst and PV sol
Understand the principles of sizing for different types of Rooftop Solar PV
power plants;
Understanding the integration of existing home UPS system with Solar PV
11:30-11:45 TEA BREAK
11:45-1:15 Understanding of
Single Line Diagram
Read and Interpret Single Line Diagram for different types of Rooftop Solar PV
Power plants,
Ensuring that the single line diagram of a rooftop solar PV power plant is as per
the regulatory specifications.
1:15-2:00 LUNCH
2:00-4:00 Visit to 500 kWp
and 25 kWp for
Practical / Hands-On
learning
Preparation of single line diagram and its interpretation through hands-on
experience
4:00-4:15 TEA BREAK
4:15-5:30 Group discussion
after site visit
Discussion with the group on the SLD prepared
DAY-7 10:00-11:30 Site survey for Solar
rooftop power plant
-Location analysis
-Load analysis
Assess the load to be run on Solar Power Plant,
Prepare a load profile,
Understand the location of installations and optimize the route plan,
Assess the site level pre-requisites for solar panel installation,
Document the site survey variables ad prepare a layout diagram.
11:30-11:45 TEA BREAK
11:45-1:15 Overview of Pre-
commissioning
inspection
parameters
Identify and verify the documents required for connecting the rooftop solar PV
power plant to the grid,
Identify the key regulatory parameters for interconnection and metering
arrangement including power quality of the grid at the project site,
Understanding the importance and completion of the checklist for the
following-
Test, record and verify the power quality of rooftop PV power plant at time of
interconnection including harmonics, current, voltage etc.
Test and verify the power factor.
Verify that the inverters, panels, protection devices, etc. Are conforming to IEC
standards or relevant Indian standards.
1:15-2:00 LUNCH
2:00-3:00 Interconnection
requirement and
documents required
as per regulations,
(CEA and CERC
regulations)
Interpretation and understanding of National technical regulations and technical
standards such as CEA’s ’Technical standards for connectivity of the
Distributed Generation Resources’ Regulations 2013, CEA’s ‘Installation and
Operations of meters’
Regulations 2007 and CEA’s ‘Measures of Safety and Electricity Supply
Regulation,2010;
Understanding of any regulations issued by CERC or SERCs.
3:00-3:15 TEA BREAK
3:15-5:30 Practical / Hands-On
learning
Site visit to verify pre-commissioning parameters and completing the checklist
DAY -8
10:00-5:30 Practical / hands-on
learning
And discussion
Practical and hands-on learning on inspection and testing of 1kw solar PV
power plant connecting to grid and test string voltage, and other relevant
parameters for commissioning of plant
6
DAY 9 10:00-11:30 Post commissioning
parameters
inspection
procedures for
Power quality,
Fluctuation,
harmonics, Power
factor, phase
imbalance, etc.
Effect of harmonic current injection, flicker and DC injection into AC grid on
quality of power,
Inverter response to abnormal conditions like over voltage and under voltage
trip function, over and under frequency trip functions and unintentional
islanding function,
Know-how of Tools & Tackles required for inspection and commissioning of
the plant, Do's and don'ts of DC wiring and installation of other electrical
components,
Testing and commissioning activities and its interpretation - visual inspection,
continuity of wiring, earthing, polarity check, insulation, voltage drop etc.
Typical faults, their causes and resolution for all system components,
Connection of the Solar Power Plant to the distribution box/ LT Panel and
switchover along with precautions based on different types of plants Current
Indian regulation on harmonics, flicker, frequency range and voltage range
Verify the operation of the installed Solar metering system including import
and export of energy.
11:30-11:45 TEA BREAK
11:45-01:15 Post commissioning
checklist.
Discussion on Post commissioning checklist.
1:15-2:00 lunch
2:00-5:30 Practical / Hands-On
learning for
Challenges and its
mitigation measures
while integrating
solar PV power plant
with the grid.
Post commissioning
checklist.
Verify the operation of the disconnect protections/isolation devices.
Test, record and verify the power quality of rooftop PV power plant at time of
interconnection including harmonics, current, voltage etc.
Test and verify the power factor
Test and verify the Rooftop Solar PV power plant for any phase imbalance
DAY 10 10:00-11:30 Govt scheme ,
ARUN application
and SPIN available
vendors, etc.
All Govt different schemes and policies of Government for Grid connected
Rooftop Power Plant
ARUN Application: for understanding the basics about solar rooftop and the
methods of installation.
SPIN Portal
11:1145 TEA BREAK
11:45-1:15 Financial
calculations
1:15-2:00 LUNCH
2:00-3:00 Best practice for
Rooftop Solar PV
Installations and
Business models for
Rooftop Solar PV
deployment
Best practice for Rooftop Solar PV Installations;
Understanding and identifying different business models for rooftop solar PV
deployment
3:00-3:15 TEA BREAK
3:15-5:30 Assessment by Skill
Council for Green
Jobs
Assessment will be done by Skill Council For Green Jobs
7
Course Fees: Training Fee per participant
Rs 30,000 in favor of “NISE SKILL DEVELOPMENT, Payable at
Gurugram Haryana- 122003
Total Rs 30,000
Fees Includes Access all the lectures, assessment, certification, Tea and lunch
will be provided
Accommodation Accommodation will be provided as per availability. Does not
include in course Fees.
Accommodation charges Rs 600/Person/Night.
TA/DA TA /DA would not be provided by NISE.
How to Apply? Participants may kindly make the Payment of Rs. 30,000 through RTGS/NEFT/Cheque/Demand Draft (DD) only, in favor of:
Account Holder Name: NISE SKILL DEVELOPMENT Account Type: Savings Bank Bank Name: State Bank of India, Qutub Plaza, Shoppg Cent, DLF Qutub Enclave, Phase-1 Haryana, Account No. 35245666110 IFSC Code: SBIN0006604
Submit your registration forms (Attached at “Annexure A”) through email ([email protected] ) or
through courier/speed post at the following address at least Four days before the start of training.
Deputy Director General (Skill Development)
National Institute of Solar Energy (NISE)
Gurgaon Faridabad Road, Gwal-pahari, Gurgaon-122003, Haryana
Note: The participants must clearly indicate send their bank transfer details (by e-mail) in advance to
the Program Director, then only, the participants could be allowed to attend the training programs.
Number of Seats:
No. of Seats Selection criteria
30 First come First serve basis
Certification and Assessment:This course will be conducted based on Qualification Pack (QP) i.e.
SGJ/0106 which is approved/certified by National Skill Development Corporation (NSDC). This course
QP has been developed based on Industry Requirement in the field of Solar Rooftop Grid tied system.
After completion of this course assessment and certification will be done by Skill Council for Green Jobs.
8
Annexure-A
Registration Form
Rooftop Solar Grid Engineer SGJ/Q0106
Date: 11th to 22th September, 2017 Kindly provide the following details during registration- Participant Details
Name of Delegate/Participant :
Designation :
Address of Delegate/Participant :
(District/State/Pincode) :
Email-ID :
Contact Number :
Organization Details Name of the organization :
Address of the Organization :
Contact number :
Email Id :
GSTN number of the Organization : (If Invoice /Receipt required in the name of organization)
Accommodation Required (On Payment Basis) : Yes/No Amount Transferred : Rs.30,000 NEFT / RTGS Number/Cheque/DD number with Date of Payment : Bank Name & Location :
Signature of the applicant with date Registration forms can be sent through email ([email protected]) or through courier/speed post at the following address at least two days before the start of training -
Deputy Director General (Skill Development) National Institute of Solar Energy (NISE)
Gurgaon Faridabad Road, Gwalpahari, Gurgaon-122003, Haryana For any queries please contact between 11:00 am to 5:00 pm during weekdays: Ms. Swati Agariya: Jr. Research Scientist (Lead Coordinator), [email protected],
Ph: 8882937250. For Accommodation please contact - Mr. Deepak Mathur (0124-2853048)
Photograph
9
How to reach NISE:
NISE is located in a 200 acres campus on Gurgaon-Faridabad Highway. It is approx. 10 KM
from Guru Dronacharya Metro station or Sikanderpur Metro station. Radio Taxies, Ola cabs and
Autos are available from these Metro stations to NISE and vice versa. When you are coming
from Gurgaon to NISE, NISE is located on the left side of the Highway. If you are coming from
Delhi by Car on Mehrauli – Gurgaon Road, after crossing Arjan Garh Metro station and crossing
the haryana Border take a left turn towards Faridabad at Le Meridien Hotel or at Metro Pillar No.
P- 14. From this point NISE is located approx. 10 km away. If you are planning to come from
Faridabad side, NISE is located just 4 km after crossing toll gate on Faridabad-Gurgaon
Highway. You would find NISE on the right side of the Highway.
---XXX---
10