CalEEMod Version: CalEEMod.2013.2.2 Page 1 of 1 Date: 4/12/2016 8:51 AM
Concordia University - Phases 1 & 2 ConstructionOrange County, Winter
1.0 Project Characteristics
1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population
University/College (4Yr) 92.00 Student 5.00 48,580.00 0
Other Asphalt Surfaces 0.50 Acre 0.50 21,780.00 0
Other Non-Asphalt Surfaces 0.50 Acre 0.50 21,780.00 0
Parking Lot 158.00 Space 1.42 63,200.00 0
1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 2.2 Precipitation Freq (Days) 30
Climate Zone 8 Operational Year 2020
Utility Company Southern California Edison
CO2 Intensity (lb/MWhr)
630.89 CH4 Intensity (lb/MWhr)
0.029 N2O Intensity (lb/MWhr)
0.006
1.3 User Entered Comments & Non-Default Data
Project Characteristics -
Land Use - Assumes the construction of 48,580 square feet of new institutional building space, a 1.42-acre (158 space) parking lot expansion, 0.5 acre of paved roadway improvements, and 0.5 acre of asphalt improvements.Construction Phase - Construction dates entered to reflect anticipated construction schedule.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes one rubber tired dozer and one tractor/loader/backhoe due to small development area.
Off-road Equipment -
1 of 53
Off-road Equipment -
Off-road Equipment - Substantial grading during site prep
Off-road Equipment -
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Dorm Road-lot grad
Off-road Equipment -
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment -
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Trips and VMT - Haul trips per Psomas 3/31/16; add'l trips for site clear
Grading - Amount of material imported and exported based on Psomas 3/31/16.Acres disturbed based on site size and duration of work
Architectural Coating - SCAQMD Rule 1113 limits paints to a maximum VOC content of 50 g/L.
Vehicle Trips - Operational emissions are not calculated in this scenario.
Consumer Products - Operational emissions are not calculated in this scenario.
Area Coating - Operational emissions are not calculated in this scenario.
Landscape Equipment - Operational emissions are not calculated in this scenario.
Energy Use - Operational emissions are not calculated in this scenario.
Water And Wastewater - Operational emissions are not calculated in this scenario.
Solid Waste - Operational emissions are not calculated in this scenario.
Construction Off-road Equipment Mitigation - Assumes compliance with SCAQMD Rule 403 for fugitive dust as required.
2 of 53
Table Name Column Name Default Value New Value
tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00
tblAreaCoating ReapplicationRatePercent 10 0
tblConstructionPhase NumDays 20.00 21.00
tblConstructionPhase NumDays 20.00 15.00
tblConstructionPhase NumDays 230.00 157.00
tblConstructionPhase NumDays 230.00 45.00
tblConstructionPhase NumDays 230.00 339.00
tblConstructionPhase NumDays 230.00 196.00
tblConstructionPhase NumDays 20.00 40.00
tblConstructionPhase NumDays 20.00 26.00
tblConstructionPhase NumDays 20.00 78.00
tblConstructionPhase NumDays 20.00 12.00
tblConstructionPhase NumDays 20.00 6.00
tblConstructionPhase NumDays 20.00 24.00
tblConstructionPhase NumDays 20.00 6.00
tblConstructionPhase NumDays 10.00 27.00
tblConstructionPhase NumDays 10.00 27.00
tblConstructionPhase NumDays 10.00 79.00
tblConstructionPhase NumDays 10.00 15.00
tblConstructionPhase NumDays 10.00 12.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
3 of 53
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase PhaseEndDate 9/18/2018 8/31/2018
tblConstructionPhase PhaseEndDate 8/22/2017 7/23/2017
tblConstructionPhase PhaseEndDate 8/22/2018 7/31/2018
tblConstructionPhase PhaseEndDate 12/15/2018 9/15/2018
tblConstructionPhase PhaseEndDate 9/29/2018 8/14/2018
tblConstructionPhase PhaseEndDate 8/21/2018 8/7/2018
tblConstructionPhase PhaseEndDate 9/28/2018 10/13/2018
tblConstructionPhase PhaseEndDate 11/14/2018 5/31/2019
tblConstructionPhase PhaseEndDate 8/31/2017 7/31/2017
tblConstructionPhase PhaseEndDate 8/17/2017 5/31/2017
tblConstructionPhase PhaseEndDate 8/14/2018 12/14/2017
tblConstructionPhase PhaseStartDate 9/1/2018 8/15/2018
tblConstructionPhase PhaseStartDate 7/1/2017 6/1/2017
tblConstructionPhase PhaseStartDate 7/24/2017 7/1/2017
tblConstructionPhase PhaseStartDate 10/31/2018 8/1/2018
4 of 53
tblConstructionPhase PhaseStartDate 9/16/2018 8/1/2018
tblConstructionPhase PhaseStartDate 8/15/2018 8/1/2018
tblConstructionPhase PhaseStartDate 9/1/2018 9/16/2018
tblConstructionPhase PhaseStartDate 10/14/2018 5/1/2019
tblConstructionPhase PhaseStartDate 6/1/2017 5/1/2017
tblConstructionPhase PhaseStartDate 8/1/2017 5/15/2017
tblConstructionPhase PhaseStartDate 8/1/2018 12/1/2017
tblEnergyUse LightingElect 0.88 0.00
tblEnergyUse LightingElect 5.23 0.00
tblEnergyUse NT24E 2.72 0.00
tblEnergyUse NT24NG 5.21 0.00
tblEnergyUse T24E 6.10 0.00
tblEnergyUse T24NG 10.65 0.00
tblGrading AcresOfGrading 20.00 40.00
tblGrading AcresOfGrading 11.38 13.00
tblGrading AcresOfGrading 0.00 8.00
tblGrading AcresOfGrading 0.00 13.00
tblGrading AcresOfGrading 39.50 12.00
tblGrading AcresOfGrading 0.00 8.00
tblGrading AcresOfGrading 0.00 2.00
tblGrading MaterialExported 0.00 100.00
tblGrading MaterialExported 0.00 186.00
tblGrading MaterialExported 0.00 5,732.00
tblGrading MaterialImported 0.00 100.00
tblGrading MaterialImported 0.00 3,287.00
tblGrading MaterialImported 0.00 3,850.00
tblGrading MaterialImported 0.00 6.00
tblGrading MaterialImported 0.00 6,368.00
tblGrading MaterialImported 0.00 1,122.00
tblLandUse LandUseSquareFeet 16,909.37 48,580.00
5 of 53
tblLandUse LotAcreage 0.39 5.00
tblOffRoadEquipment OffRoadEquipmentType Graders
tblOffRoadEquipment OffRoadEquipmentType Excavators
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 1.00
6 of 53
tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 1.00
tblOffRoadEquipment UsageHours 8.00 7.00
tblOffRoadEquipment UsageHours 8.00 7.00
tblProjectCharacteristics OperationalYear 2014 2020
tblSolidWaste SolidWasteGenerationRate 16.79 0.00
tblTripsAndVMT HaulingTripNumber 19.00 24.00
tblTripsAndVMT HaulingTripNumber 796.00 800.00
tblTripsAndVMT HaulingTripNumber 678.00 858.00
tblTripsAndVMT HaulingTripNumber 0.00 30.00
tblTripsAndVMT HaulingTripNumber 411.00 412.00
tblTripsAndVMT HaulingTripNumber 0.00 6.00
tblTripsAndVMT HaulingTripNumber 381.00 482.00
tblVehicleTrips ST_TR 1.30 0.00
tblVehicleTrips WD_TR 2.38 0.00
tblWater IndoorWaterUseRate 196,981.20 0.00
Exhaust PM10
PM10 Total
tblWater OutdoorWaterUseRate 308,098.80 0.00
2.0 Emissions Summary
2.1 Overall Construction (Maximum Daily Emission)
NBio- CO2 Total CO2
Unmitigated Construction
ROG NOx CO SO2 Fugitive PM10
CH4 N2O CO2e
Year lb/day lb/day
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2
2017 8.4974 83.7347 63.5826 0.0993 19.5703 4.2358 22.8886 10.1680 3.9312 13.2208 0.0000 9,740.5699
9,740.5699 1.8590 0.0000 9,779.6096
2018 56.7051 81.1417 65.9300 0.0926 14.3800 4.4081 18.6764 6.9908 4.0555 11.0166 0.0000 9,175.4718
9,175.4718 2.5874 0.0000 9,229.8080
2019 22.0961 20.1725 17.2174 0.0344 7.1316 0.8228 7.9074 3.5256 0.7830 4.2393 0.0000 3,327.1201
3,327.1201 0.3947 0.0000 3,335.4095
Total 87.2986 185.0488 146.7300 0.2264 4.8412 0.0000 22,344.8271
41.0819 9.4667 49.4723 20.6844 8.7697 28.4767 0.0000 22,243.1618
22,243.1618
7 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO Total CO2 CH4 N2O CO2e
Year lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
2017 8.4974 83.7347 63.5826 0.0993 7.9149 4.2358 11.2332 4.0417 3.9312 7.0945 0.0000 9,740.5699
9,740.5699 1.8590 0.0000 9,779.6096
2018 56.7051 81.1417 65.9300 0.0926 6.0624 4.4081 10.3587 2.8475 4.0555 6.8733 0.0000 9,175.4718
9,175.4718 2.5874 0.0000 9,229.8080
2019 22.0961 20.1725 17.2174 0.0344 3.1304 0.8228 3.9062 1.4703 0.7830 2.1840 0.0000 3,327.1201
3,327.1201 0.3947 0.0000 3,335.4095
Total 87.2986 185.0488 146.7300 0.2264 17.1076 9.4667 25.4981 8.3594 8.7697 16.1518 0.0000 22,243.1618
22,243.1618
4.8412 0.0000 22,344.8271
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent Reduction
0.00 0.00 0.00 0.00 58.36 0.00 48.46 59.59 0.00 43.28 0.00 0.00 0.00 0.00 0.00 0.00
3.0 Construction Detail
Construction Phase
Phase Number
Phase Name Phase Type Start Date End Date Num Days Week
Num Days Phase Description
1 Astronomy Center Site Preparation
Site Preparation 5/1/2017 5/31/2017 6 27
2 Baseball Lot Expansion Site Preparation
Site Preparation 5/1/2017 7/31/2017 6 79
3 MWT Site Preparation Site Preparation 5/15/2017 5/31/2017 6 15
4 MWT Grading Grading 6/1/2017 6/30/2017 6 26
5 Astronomy Center Construction Building Construction 6/1/2017 7/23/2017 6 45
6 MWT Construction Building Construction 7/1/2017 7/31/2018 6 339
7 CU Center Site Preparation Site Preparation 12/1/2017 12/14/2017 6 12
8 CU Center Construction Building Construction 12/15/2017 7/31/2018 6 196
9 Dorm Road-District lot const Grading 8/1/2018 10/30/2018 6 78
10 Baseball Lot Expansion Grading Grading 8/1/2018 9/15/2018 6 40
8 of 53
11 MWT Paving Paving 8/1/2018 8/14/2018 6 12
12 CU Center Paving Paving 8/1/2018 8/7/2018 6 6
13 CU Center Architectural Coating Architectural Coating 8/8/2018 8/31/2018 6 21
14 MWT Architectural Coating Architectural Coating 8/15/2018 8/31/2018 6 15
15 Baseball Lot Expansion Paving Paving 9/16/2018 10/13/2018 6 24
16 Field Locker Rooms Site Preparation
Site Preparation 5/1/2019 5/31/2019 6 27
6
17 Field Locker Rooms Construction Building Construction 6/1/2019 11/30/2019 6
12/31/2019 6
157
18 Field Locker Rooms Paving Paving 12/1/2019 12/7/2019 6
20
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 141,054; Non-Residential Outdoor: 47,018 (Architectural Coating –
19 Field Locker Rooms Architectural Coatings
Architectural Coating 12/8/2019
OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor
Astronomy Center Site Preparation Rubber Tired Dozers 1 8.00 255 0.40
Astronomy Center Site Preparation Tractors/Loaders/Backhoes 1 8.00 97 0.37
Baseball Lot Expansion Site Preparation
Rubber Tired Dozers 1 8.00 255 0.40
Baseball Lot Expansion Site Preparation
Tractors/Loaders/Backhoes 1 8.00 97 0.37
MWT Site Preparation Rubber Tired Dozers 1 8.00 255 0.40
MWT Site Preparation Tractors/Loaders/Backhoes 1 8.00 97 0.37
MWT Grading Excavators 1 8.00 162 0.38
MWT Grading Graders 1 7.00 174 0.41
MWT Grading Rubber Tired Dozers 1 7.00 255 0.40
MWT Grading Tractors/Loaders/Backhoes 1 8.00 97 0.37
Astronomy Center Construction Cranes 1 7.00 226 0.29
Astronomy Center Construction Forklifts 1 8.00 89 0.20
Astronomy Center Construction Generator Sets 1 8.00 84 0.74
9 of 53
Astronomy Center Construction Tractors/Loaders/Backhoes 1 7.00 97 0.37
Astronomy Center Construction Welders 1 8.00 46 0.45
MWT Construction Cranes 1 7.00 226 0.29
MWT Construction Forklifts 1 8.00 89 0.20
MWT Construction Generator Sets 1 8.00 84 0.74
MWT Construction Tractors/Loaders/Backhoes 1 7.00 97 0.37
MWT Construction Welders 1 8.00 46 0.45
CU Center Site Preparation Rubber Tired Dozers 1 8.00 255 0.40
CU Center Site Preparation Tractors/Loaders/Backhoes 1 8.00 97 0.37
CU Center Construction Cranes 1 7.00 226 0.29
CU Center Construction Forklifts 1 8.00 89 0.20
CU Center Construction Generator Sets 1 8.00 84 0.74
CU Center Construction Tractors/Loaders/Backhoes 1 7.00 97 0.37
CU Center Construction Welders 1 8.00 46 0.45
Dorm Road-District lot const Excavators 1 8.00 162 0.38
Dorm Road-District lot const Graders 1 8.00 174 0.41
Dorm Road-District lot const Pavers 0 8.00 125 0.42
Dorm Road-District lot const Paving Equipment 0 8.00 130 0.36
Dorm Road-District lot const Rollers 0 8.00 80 0.38
Dorm Road-District lot const Rubber Tired Dozers 1 8.00 255 0.40
Dorm Road-District lot const Tractors/Loaders/Backhoes 3 8.00 97 0.37
Baseball Lot Expansion Grading Excavators 1 8.00 162 0.38
Baseball Lot Expansion Grading Graders 1 8.00 174 0.41
Baseball Lot Expansion Grading Rubber Tired Dozers 1 8.00 255 0.40
Baseball Lot Expansion Grading Tractors/Loaders/Backhoes 3 8.00 97 0.37
MWT Paving Pavers 1 8.00 125 0.42
MWT Paving Paving Equipment 1 8.00 130 0.36
MWT Paving Rollers 1 8.00 80 0.38
CU Center Paving Pavers 1 8.00 125 0.42
CU Center Paving Paving Equipment 1 8.00 130 0.36
10 of 53
CU Center Paving Rollers 1 8.00 80 0.38
CU Center Architectural Coating Air Compressors 1 6.00 78 0.48
MWT Architectural Coating Air Compressors 1 6.00 78 0.48
Baseball Lot Expansion Paving Pavers 2 8.00 125 0.42
Baseball Lot Expansion Paving Paving Equipment 2 8.00 130 0.36
Baseball Lot Expansion Paving Rollers 2 8.00 80 0.38
Field Locker Rooms Site Preparation Rubber Tired Dozers 1 8.00 255 0.40
Field Locker Rooms Site Preparation Tractors/Loaders/Backhoes 1 8.00 97 0.37
Field Locker Rooms Construction Cranes 1 7.00 226 0.29
Field Locker Rooms Construction Forklifts 1 8.00 89 0.20
Field Locker Rooms Construction Generator Sets 1 8.00 84 0.74
Field Locker Rooms Construction Tractors/Loaders/Backhoes 1 7.00 97 0.37
Field Locker Rooms Construction Welders 1 8.00 46 0.45
Field Locker Rooms Paving Pavers 1 8.00 125 0.42
Field Locker Rooms Paving Paving Equipment 1 8.00 130 0.36
Field Locker Rooms Paving Rollers 1 8.00 80 0.38
Field Locker Rooms Architectural Coatings
Air Compressors 1 6.00 78 0.48
Baseball Lot Expansion Site Preparation
Graders 1 8.00 174 0.41
Baseball Lot Expansion Site Preparation
Excavators 1 8.00 162 0.38
Trips and VMT
Phase Name Offroad Equipment Count
Worker Trip Number
Vendor Trip Number
Hauling Trip Number
Worker Trip Length
Vendor Trip Length
Hauling Trip Length
Worker Vehicle Class
Vendor Vehicle Class
Hauling Vehicle Class
Astronomy Center Site Preparation
2 5.00 0.00 24.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Baseball Lot Expansion Site
4 10.00 0.00 858.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
MWT Site Preparation 2 5.00 0.00 30.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
MWT Grading 4 10.00 0.00 412.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Astronomy Center Construction
5 65.00 25.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
MWT Construction 5 65.00 25.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
CU Center Site Preparation
2 5.00 0.00 6.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
11 of 53
CU Center Construction
5 65.00 25.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Dorm Road-District lot const
6 15.00 0.00 482.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Baseball Lot Expansion Grading
6 15.00 0.00 25.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
MWT Paving 3 8.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
CU Center Paving 3 8.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
CU Center Architectural Coating
1 13.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
MWT Architectural Coating
1 13.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Baseball Lot Expansion Paving
6 15.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Field Locker Rooms Site Preparation
2 5.00 0.00 800.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Field Locker Rooms Construction
5 65.00 25.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Field Locker Rooms Paving
3 8.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
LD_Mix HDT_Mix HHDT
3.1 Mitigation Measures Construction
Field Locker Rooms Architectural Coatings
1 13.00 0.00 0.00 14.70
NOx CO SO2 Fugitive PM10
6.90 20.00
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2
Water Exposed Area
3.2 Astronomy Center Site Preparation - 2017Unmitigated Construction On-Site
ROG NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Exhaust PM10
PM10 Total
Fugitive Dust 6.3363 0.0000 6.3363 3.3442 0.0000 3.3442 0.0000 0.0000
Off-Road 1.5071 16.2365 12.3344 0.0120 0.8418 0.8418 0.7744 0.7744 1,228.2737
1,228.2737 0.3763 1,236.1768
Total 1.5071 16.2365 12.3344 0.0120 0.3763 1,236.17686.3363 0.8418 7.1781 3.3442 0.7744 4.1186 1,228.2737
1,228.2737
12 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0163 0.2323 0.1960 6.5000e-004
0.0155 3.3800e-003
0.0189 4.2400e-003
3.1100e-003
7.3500e-003
64.6550 64.6550 4.7000e-004
64.6647
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0166 0.0224 0.2351 6.4000e-004
0.0559 3.8000e-004
0.0563 0.0148 3.5000e-004
0.0152 51.6485 51.6485 2.4800e-003
51.7005
Total 0.0329 0.2547 0.4312 1.2900e-003
2.9500e-003
116.36520.0714 3.7600e-003
0.0751 0.0191 3.4600e-003
0.0225
SO2 Fugitive PM10
Exhaust PM10
116.3035 116.3035
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.4712 0.0000 2.4712 1.3042 0.0000 1.3042 0.0000 0.0000
Off-Road 1.5071 16.2365 12.3344 0.0120 0.8418 0.8418 0.7744 0.7744 0.0000 1,228.2737
1,228.2737 0.3763 1,236.1768
Total 1.5071 16.2365 12.3344 0.0120 0.3763 1,236.17682.4712 0.8418 3.3129 1.3042 0.7744 2.0787 0.0000 1,228.2737
1,228.2737
13 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0163 0.2323 0.1960 6.5000e-004
0.0155 3.3800e-003
0.0189 4.2400e-003
3.1100e-003
7.3500e-003
64.6550 64.6550 4.7000e-004
64.6647
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0166 0.0224 0.2351 6.4000e-004
0.0559 3.8000e-004
0.0563 0.0148 3.5000e-004
0.0152 51.6485 51.6485 2.4800e-003
51.7005
Total 0.0329 0.2547 0.4312 1.2900e-003
2.9500e-003
116.36520.0714 3.7600e-003
0.0751 0.0191 3.4600e-003
0.0225
SO2 Fugitive PM10
Exhaust PM10
116.3035 116.3035
PM2.5 Total
Bio- CO2 NBio- CO2
3.3 Baseball Lot Expansion Site Preparation - 2017Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 6.1832 0.0000 6.1832 3.3276 0.0000 3.3276 0.0000 0.0000
Off-Road 2.8219 29.8947 20.5935 0.0235 1.5810 1.5810 1.4545 1.4545 2,407.1368
2,407.1368 0.7375 2,422.6252
Total 2.8219 29.8947 20.5935 0.0235 0.7375 2,422.62526.1832 1.5810 7.7641 3.3276 1.4545 4.7821 2,407.1368
2,407.1368
14 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.1993 2.8386 2.3953 7.9700e-003
0.1892 0.0413 0.2305 0.0518 0.0380 0.0898 789.9771 789.9771 5.6900e-003
790.0966
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0332 0.0448 0.4703 1.2800e-003
0.1118 7.6000e-004
0.1125 0.0296 7.1000e-004
0.0304 103.2970 103.2970 4.9500e-003
103.4010
Total 0.2325 2.8834 2.8656 9.2500e-003
0.0106 893.49760.3010 0.0421 0.3431 0.0815 0.0387 0.1201
SO2 Fugitive PM10
Exhaust PM10
893.2741 893.2741
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.4114 0.0000 2.4114 1.2978 0.0000 1.2978 0.0000 0.0000
Off-Road 2.8219 29.8947 20.5935 0.0235 1.5810 1.5810 1.4545 1.4545 0.0000 2,407.1368
2,407.1368 0.7375 2,422.6252
Total 2.8219 29.8947 20.5935 0.0235 0.7375 2,422.62522.4114 1.5810 3.9924 1.2978 1.4545 2.7523 0.0000 2,407.1368
2,407.1368
15 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.1993 2.8386 2.3953 7.9700e-003
0.1892 0.0413 0.2305 0.0518 0.0380 0.0898 789.9771 789.9771 5.6900e-003
790.0966
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0332 0.0448 0.4703 1.2800e-003
0.1118 7.6000e-004
0.1125 0.0296 7.1000e-004
0.0304 103.2970 103.2970 4.9500e-003
103.4010
Total 0.2325 2.8834 2.8656 9.2500e-003
0.0106 893.49760.3010 0.0421 0.3431 0.0815 0.0387 0.1201
SO2 Fugitive PM10
Exhaust PM10
893.2741 893.2741
PM2.5 Total
Bio- CO2 NBio- CO2
3.4 MWT Site Preparation - 2017Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 6.5877 0.0000 6.5877 3.3713 0.0000 3.3713 0.0000 0.0000
Off-Road 1.5071 16.2365 12.3344 0.0120 0.8418 0.8418 0.7744 0.7744 1,228.2737
1,228.2737 0.3763 1,236.1768
Total 1.5071 16.2365 12.3344 0.0120 0.3763 1,236.17686.5877 0.8418 7.4295 3.3713 0.7744 4.1457 1,228.2737
1,228.2737
16 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0367 0.5227 0.4411 1.4700e-003
0.0349 7.6000e-003
0.0425 9.5400e-003
6.9900e-003
0.0165 145.4736 145.4736 1.0500e-003
145.4956
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0166 0.0224 0.2351 6.4000e-004
0.0559 3.8000e-004
0.0563 0.0148 3.5000e-004
0.0152 51.6485 51.6485 2.4800e-003
51.7005
Total 0.0533 0.5451 0.6762 2.1100e-003
3.5300e-003
197.19620.0907 7.9800e-003
0.0987 0.0244 7.3400e-003
0.0317
SO2 Fugitive PM10
Exhaust PM10
197.1222 197.1222
PM2.5 Total
Bio- CO2 NBio- CO2Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.5692 0.0000 2.5692 1.3148 0.0000 1.3148 0.0000 0.0000
Off-Road 1.5071 16.2365 12.3344 0.0120 0.8418 0.8418 0.7744 0.7744 0.0000 1,228.2737
1,228.2737 0.3763 1,236.1768
Total 1.5071 16.2365 12.3344 0.0120 0.3763 1,236.17682.5692 0.8418 3.4110 1.3148 0.7744 2.0892 0.0000 1,228.2737
1,228.2737
17 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0367 0.5227 0.4411 1.4700e-003
0.0349 7.6000e-003
0.0425 9.5400e-003
6.9900e-003
0.0165 145.4736 145.4736 1.0500e-003
145.4956
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0166 0.0224 0.2351 6.4000e-004
0.0559 3.8000e-004
0.0563 0.0148 3.5000e-004
0.0152 51.6485 51.6485 2.4800e-003
51.7005
Total 0.0533 0.5451 0.6762 2.1100e-003
3.5300e-003
197.19620.0907 7.9800e-003
0.0987 0.0244 7.3400e-003
0.0317
SO2 Fugitive PM10
Exhaust PM10
197.1222 197.1222
PM2.5 Total
Bio- CO2 NBio- CO2
3.5 MWT Grading - 2017Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 5.8139 0.0000 5.8139 2.9559 0.0000 2.9559 0.0000 0.0000
Off-Road 2.5541 27.0405 18.7462 0.0216 1.4367 1.4367 1.3217 1.3217 2,213.6855
2,213.6855 0.6783 2,227.9292
Total 2.5541 27.0405 18.7462 0.0216 0.6783 2,227.92925.8139 1.4367 7.2505 2.9559 1.3217 4.2776 2,213.6855
2,213.6855
18 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.2908 4.1417 3.4949 0.0116 0.2761 0.0602 0.3363 0.0756 0.0554 0.1310 1,152.5988
1,152.5988 8.3000e-003
1,152.7732
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0332 0.0448 0.4703 1.2800e-003
0.1118 7.6000e-004
0.1125 0.0296 7.1000e-004
0.0304 103.2970 103.2970 4.9500e-003
103.4010
Total 0.3240 4.1864 3.9651 0.0129 0.0133 1,256.17420.3879 0.0610 0.4489 0.1052 0.0561 0.1614
SO2 Fugitive PM10
Exhaust PM10
1,255.8958
1,255.8958
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-SiteROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.2674 0.0000 2.2674 1.1528 0.0000 1.1528 0.0000 0.0000
Off-Road 2.5541 27.0405 18.7462 0.0216 1.4367 1.4367 1.3217 1.3217 0.0000 2,213.6855
2,213.6855 0.6783 2,227.9292
Total 2.5541 27.0405 18.7462 0.0216 0.6783 2,227.92922.2674 1.4367 3.7041 1.1528 1.3217 2.4745 0.0000 2,213.6855
2,213.6855
19 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.2908 4.1417 3.4949 0.0116 0.2761 0.0602 0.3363 0.0756 0.0554 0.1310 1,152.5988
1,152.5988 8.3000e-003
1,152.7732
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0332 0.0448 0.4703 1.2800e-003
0.1118 7.6000e-004
0.1125 0.0296 7.1000e-004
0.0304 103.2970 103.2970 4.9500e-003
103.4010
Total 0.3240 4.1864 3.9651 0.0129 0.0133 1,256.17420.3879 0.0610 0.4489 0.1052 0.0561 0.1614
SO2 Fugitive PM10
Exhaust PM10
1,255.8958
1,255.8958
PM2.5 Total
Bio- CO2 NBio- CO2
3.6 Astronomy Center Construction - 2017Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 2.1261 17.4261 11.4417 0.0183 1.0793 1.0793 1.0272 1.0272 1,770.3321
1,770.3321 0.3833 1,778.3813
Total 2.1261 17.4261 11.4417 0.0183 0.3833 1,778.38131.0793 1.0793 1.0272 1.0272 1,770.3321
1,770.3321
20 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.2229 2.0127 2.9136 5.3600e-003
0.1563 0.0309 0.1872 0.0445 0.0284 0.0729 528.8148 528.8148 3.8500e-003
528.8956
Worker 0.2158 0.2909 3.0569 8.3500e-003
0.7266 4.9600e-003
0.7315 0.1927 4.5800e-003
0.1973 671.4307 671.4307 0.0322 672.1066
Total 0.4387 2.3036 5.9704 0.0137 0.0360 1,201.00210.8828 0.0359 0.9187 0.2372 0.0330 0.2702
SO2 Fugitive PM10
Exhaust PM10
1,200.2455
1,200.2455
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 2.1261 17.4261 11.4417 0.0183 1.0793 1.0793 1.0272 1.0272 0.0000 1,770.3321
1,770.3321 0.3833 1,778.3813
Total 2.1261 17.4261 11.4417 0.0183 0.3833 1,778.38131.0793 1.0793 1.0272 1.0272 0.0000 1,770.3321
1,770.3321
21 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.2229 2.0127 2.9136 5.3600e-003
0.1563 0.0309 0.1872 0.0445 0.0284 0.0729 528.8148 528.8148 3.8500e-003
528.8956
Worker 0.2158 0.2909 3.0569 8.3500e-003
0.7266 4.9600e-003
0.7315 0.1927 4.5800e-003
0.1973 671.4307 671.4307 0.0322 672.1066
Total 0.4387 2.3036 5.9704 0.0137 0.0360 1,201.00210.8828 0.0359 0.9187 0.2372 0.0330 0.2702
SO2 Fugitive PM10
Exhaust PM10
1,200.2455
1,200.2455
PM2.5 Total
Bio- CO2 NBio- CO2
3.7 MWT Construction - 2017Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 2.1261 17.4261 11.4417 0.0183 1.0793 1.0793 1.0272 1.0272 1,770.3321
1,770.3321 0.3833 1,778.3813
Total 2.1261 17.4261 11.4417 0.0183 0.3833 1,778.38131.0793 1.0793 1.0272 1.0272 1,770.3321
1,770.3321
22 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.2229 2.0127 2.9136 5.3600e-003
0.1563 0.0309 0.1872 0.0445 0.0284 0.0729 528.8148 528.8148 3.8500e-003
528.8956
Worker 0.2158 0.2909 3.0569 8.3500e-003
0.7266 4.9600e-003
0.7315 0.1927 4.5800e-003
0.1973 671.4307 671.4307 0.0322 672.1066
Total 0.4387 2.3036 5.9704 0.0137 0.0360 1,201.00210.8828 0.0359 0.9187 0.2372 0.0330 0.2702
SO2 Fugitive PM10
Exhaust PM10
1,200.2455
1,200.2455
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 2.1261 17.4261 11.4417 0.0183 1.0793 1.0793 1.0272 1.0272 0.0000 1,770.3321
1,770.3321 0.3833 1,778.3813
Total 2.1261 17.4261 11.4417 0.0183 0.3833 1,778.38131.0793 1.0793 1.0272 1.0272 0.0000 1,770.3321
1,770.3321
23 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.2229 2.0127 2.9136 5.3600e-003
0.1563 0.0309 0.1872 0.0445 0.0284 0.0729 528.8148 528.8148 3.8500e-003
528.8956
Worker 0.2158 0.2909 3.0569 8.3500e-003
0.7266 4.9600e-003
0.7315 0.1927 4.5800e-003
0.1973 671.4307 671.4307 0.0322 672.1066
Total 0.4387 2.3036 5.9704 0.0137 0.0360 1,201.00210.8828 0.0359 0.9187 0.2372 0.0330 0.2702
SO2 Fugitive PM10
Exhaust PM10
1,200.2455
1,200.2455
PM2.5 Total
Bio- CO2 NBio- CO2
3.7 MWT Construction - 2018Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.8467 15.5098 11.0209 0.0183 0.9170 0.9170 0.8736 0.8736 1,755.0059
1,755.0059 0.3726 1,762.8294
Total 1.8467 15.5098 11.0209 0.0183 0.3726 1,762.82940.9170 0.9170 0.8736 0.8736 1,755.0059
1,755.0059
24 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.2079 1.8467 2.7878 5.3500e-003
0.1563 0.0291 0.1854 0.0445 0.0268 0.0713 519.8265 519.8265 3.8300e-003
519.9069
Worker 0.1967 0.2655 2.7908 8.3500e-003
0.7266 4.9000e-003
0.7315 0.1927 4.5400e-003
0.1972 646.2466 646.2466 0.0300 646.8774
Total 0.4046 2.1121 5.5786 0.0137 0.0339 1,166.78420.8828 0.0340 0.9168 0.2372 0.0313 0.2685
SO2 Fugitive PM10
Exhaust PM10
1,166.0731
1,166.0731
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.8467 15.5098 11.0209 0.0183 0.9170 0.9170 0.8736 0.8736 0.0000 1,755.0059
1,755.0059 0.3726 1,762.8294
Total 1.8467 15.5098 11.0209 0.0183 0.3726 1,762.82940.9170 0.9170 0.8736 0.8736
SO2 Fugitive PM10
Exhaust PM10
0.0000 1,755.0059
1,755.0059
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.2079 1.8467 2.7878 5.3500e-003
0.1563 0.0291 0.1854 0.0445 0.0268 0.0713 519.8265 519.8265 3.8300e-003
519.9069
Worker 0.1967 0.2655 2.7908 8.3500e-003
0.7266 4.9000e-003
0.7315 0.1927 4.5400e-003
0.1972 646.2466 646.2466 0.0300 646.8774
Total 0.4046 2.1121 5.5786 0.0137 0.0339 1,166.78420.8828 0.0340 0.9168 0.2372 0.0313 0.2685 1,166.0731
1,166.0731
25 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.8 CU Center Site Preparation - 2017Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 6.1988 0.0000 6.1988 3.3293 0.0000 3.3293 0.0000 0.0000
Off-Road 1.5071 16.2365 12.3344 0.0120 0.8418 0.8418 0.7744 0.7744 1,228.2737
1,228.2737 0.3763 1,236.1768
Total 1.5071 16.2365 12.3344 0.0120 0.3763 1,236.17686.1988 0.8418 7.0406 3.3293 0.7744 4.1037
SO2 Fugitive PM10
Exhaust PM10
1,228.2737
1,228.2737
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 9.1800e-003
0.1307 0.1103 3.7000e-004
8.7100e-003
1.9000e-003
0.0106 2.3900e-003
1.7500e-003
4.1300e-003
36.3684 36.3684 2.6000e-004
36.3739
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0166 0.0224 0.2351 6.4000e-004
0.0559 3.8000e-004
0.0563 0.0148 3.5000e-004
0.0152 51.6485 51.6485 2.4800e-003
51.7005
Total 0.0258 0.1531 0.3454 1.0100e-003
2.7400e-003
88.07440.0646 2.2800e-003
0.0669 0.0172 2.1000e-003
0.0193 88.0169 88.0169
26 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.4176 0.0000 2.4176 1.2984 0.0000 1.2984 0.0000 0.0000
Off-Road 1.5071 16.2365 12.3344 0.0120 0.8418 0.8418 0.7744 0.7744 0.0000 1,228.2737
1,228.2737 0.3763 1,236.1768
Total 1.5071 16.2365 12.3344 0.0120 0.3763 1,236.17682.4176 0.8418 3.2593 1.2984 0.7744 2.0729
SO2 Fugitive PM10
Exhaust PM10
0.0000 1,228.2737
1,228.2737
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 9.1800e-003
0.1307 0.1103 3.7000e-004
8.7100e-003
1.9000e-003
0.0106 2.3900e-003
1.7500e-003
4.1300e-003
36.3684 36.3684 2.6000e-004
36.3739
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0166 0.0224 0.2351 6.4000e-004
0.0559 3.8000e-004
0.0563 0.0148 3.5000e-004
0.0152 51.6485 51.6485 2.4800e-003
51.7005
Total 0.0258 0.1531 0.3454 1.0100e-003
2.7400e-003
88.07440.0646 2.2800e-003
0.0669 0.0172 2.1000e-003
0.0193
SO2 Fugitive PM10
Exhaust PM10
88.0169 88.0169
PM2.5 Total
Bio- CO2 NBio- CO2
3.9 CU Center Construction - 2017Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 2.1261 17.4261 11.4417 0.0183 1.0793 1.0793 1.0272 1.0272 1,770.3321
1,770.3321 0.3833 1,778.3813
Total 2.1261 17.4261 11.4417 0.0183 0.3833 1,778.38131.0793 1.0793 1.0272 1.0272 1,770.3321
1,770.3321
27 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.2229 2.0127 2.9136 5.3600e-003
0.1563 0.0309 0.1872 0.0445 0.0284 0.0729 528.8148 528.8148 3.8500e-003
528.8956
Worker 0.2158 0.2909 3.0569 8.3500e-003
0.7266 4.9600e-003
0.7315 0.1927 4.5800e-003
0.1973 671.4307 671.4307 0.0322 672.1066
Total 0.4387 2.3036 5.9704 0.0137 0.0360 1,201.00210.8828 0.0359 0.9187 0.2372 0.0330 0.2702
SO2 Fugitive PM10
Exhaust PM10
1,200.2455
1,200.2455
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 2.1261 17.4261 11.4417 0.0183 1.0793 1.0793 1.0272 1.0272 0.0000 1,770.3321
1,770.3321 0.3833 1,778.3813
Total 2.1261 17.4261 11.4417 0.0183 0.3833 1,778.38131.0793 1.0793 1.0272 1.0272 0.0000 1,770.3321
1,770.3321
28 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.2229 2.0127 2.9136 5.3600e-003
0.1563 0.0309 0.1872 0.0445 0.0284 0.0729 528.8148 528.8148 3.8500e-003
528.8956
Worker 0.2158 0.2909 3.0569 8.3500e-003
0.7266 4.9600e-003
0.7315 0.1927 4.5800e-003
0.1973 671.4307 671.4307 0.0322 672.1066
Total 0.4387 2.3036 5.9704 0.0137 0.0360 1,201.00210.8828 0.0359 0.9187 0.2372 0.0330 0.2702
SO2 Fugitive PM10
Exhaust PM10
1,200.2455
1,200.2455
PM2.5 Total
Bio- CO2 NBio- CO2
3.9 CU Center Construction - 2018Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.8467 15.5098 11.0209 0.0183 0.9170 0.9170 0.8736 0.8736 1,755.0059
1,755.0059 0.3726 1,762.8294
Total 1.8467 15.5098 11.0209 0.0183 0.3726 1,762.82940.9170 0.9170 0.8736 0.8736 1,755.0059
1,755.0059
29 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.2079 1.8467 2.7878 5.3500e-003
0.1563 0.0291 0.1854 0.0445 0.0268 0.0713 519.8265 519.8265 3.8300e-003
519.9069
Worker 0.1967 0.2655 2.7908 8.3500e-003
0.7266 4.9000e-003
0.7315 0.1927 4.5400e-003
0.1972 646.2466 646.2466 0.0300 646.8774
Total 0.4046 2.1121 5.5786 0.0137 0.0339 1,166.78420.8828 0.0340 0.9168 0.2372 0.0313 0.2685
SO2 Fugitive PM10
Exhaust PM10
1,166.0731
1,166.0731
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.8467 15.5098 11.0209 0.0183 0.9170 0.9170 0.8736 0.8736 0.0000 1,755.0059
1,755.0059 0.3726 1,762.8294
Total 1.8467 15.5098 11.0209 0.0183 0.3726 1,762.82940.9170 0.9170 0.8736 0.8736 0.0000 1,755.0059
1,755.0059
30 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.2079 1.8467 2.7878 5.3500e-003
0.1563 0.0291 0.1854 0.0445 0.0268 0.0713 519.8265 519.8265 3.8300e-003
519.9069
Worker 0.1967 0.2655 2.7908 8.3500e-003
0.7266 4.9000e-003
0.7315 0.1927 4.5400e-003
0.1972 646.2466 646.2466 0.0300 646.8774
Total 0.4046 2.1121 5.5786 0.0137 0.0339 1,166.78420.8828 0.0340 0.9168 0.2372 0.0313 0.2685
SO2 Fugitive PM10
Exhaust PM10
1,166.0731
1,166.0731
PM2.5 Total
Bio- CO2 NBio- CO2
3.10 Dorm Road-District lot const - 2018Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 6.5523 0.0000 6.5523 3.3675 0.0000 3.3675 0.0000 0.0000
Off-Road 3.0028 31.0702 23.9988 0.0297 1.7201 1.7201 1.5825 1.5825 2,993.1005
2,993.1005 0.9318 3,012.6681
Total 3.0028 31.0702 23.9988 0.0297 0.9318 3,012.66816.5523 1.7201 8.2724 3.3675 1.5825 4.9500 2,993.1005
2,993.1005
31 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.1095 1.4991 1.3286 4.5300e-003
0.1077 0.0235 0.1312 0.0295 0.0216 0.0511 441.9576 441.9576 3.2800e-003
442.0265
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0454 0.0613 0.6440 1.9300e-003
0.1677 1.1300e-003
0.1688 0.0445 1.0500e-003
0.0455 149.1338 149.1338 6.9300e-003
149.2794
Total 0.1549 1.5603 1.9726 6.4600e-003
0.0102 591.30590.2753 0.0246 0.3000 0.0740 0.0226 0.0966
SO2 Fugitive PM10
Exhaust PM10
591.0914 591.0914
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.5554 0.0000 2.5554 1.3133 0.0000 1.3133 0.0000 0.0000
Off-Road 3.0028 31.0702 23.9988 0.0297 1.7201 1.7201 1.5825 1.5825 0.0000 2,993.1005
2,993.1005 0.9318 3,012.6681
Total 3.0028 31.0702 23.9988 0.0297 0.9318 3,012.66812.5554 1.7201 4.2755 1.3133 1.5825 2.8958 0.0000 2,993.1005
2,993.1005
32 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.1095 1.4991 1.3286 4.5300e-003
0.1077 0.0235 0.1312 0.0295 0.0216 0.0511 441.9576 441.9576 3.2800e-003
442.0265
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0454 0.0613 0.6440 1.9300e-003
0.1677 1.1300e-003
0.1688 0.0445 1.0500e-003
0.0455 149.1338 149.1338 6.9300e-003
149.2794
Total 0.1549 1.5603 1.9726 6.4600e-003
0.0102 591.30590.2753 0.0246 0.3000 0.0740 0.0226 0.0966
SO2 Fugitive PM10
Exhaust PM10
591.0914 591.0914
PM2.5 Total
Bio- CO2 NBio- CO2
3.11 Baseball Lot Expansion Grading - 2018Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 7.0832 0.0000 7.0832 3.4248 0.0000 3.4248 0.0000 0.0000
Off-Road 3.0028 31.0702 23.9988 0.0297 1.7201 1.7201 1.5825 1.5825 2,993.1005
2,993.1005 0.9318 3,012.6681
Total 3.0028 31.0702 23.9988 0.0297 0.9318 3,012.66817.0832 1.7201 8.8032 3.4248 1.5825 5.0073 2,993.1005
2,993.1005
33 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0111 0.1516 0.1344 4.6000e-004
0.0109 2.3700e-003
0.0133 2.9800e-003
2.1800e-003
5.1700e-003
44.7001 44.7001 3.3000e-004
44.7070
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0454 0.0613 0.6440 1.9300e-003
0.1677 1.1300e-003
0.1688 0.0445 1.0500e-003
0.0455 149.1338 149.1338 6.9300e-003
149.2794
Total 0.0565 0.2129 0.7784 2.3900e-003
7.2600e-003
193.98640.1786 3.5000e-003
0.1821 0.0475 3.2300e-003
0.0507
SO2 Fugitive PM10
Exhaust PM10
193.8339 193.8339
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.7624 0.0000 2.7624 1.3357 0.0000 1.3357 0.0000 0.0000
Off-Road 3.0028 31.0702 23.9988 0.0297 1.7201 1.7201 1.5825 1.5825 0.0000 2,993.1005
2,993.1005 0.9318 3,012.6681
Total 3.0028 31.0702 23.9988 0.0297 0.9318 3,012.66812.7624 1.7201 4.4825 1.3357 1.5825 2.9182 0.0000 2,993.1005
2,993.1005
34 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0111 0.1516 0.1344 4.6000e-004
0.0109 2.3700e-003
0.0133 2.9800e-003
2.1800e-003
5.1700e-003
44.7001 44.7001 3.3000e-004
44.7070
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0454 0.0613 0.6440 1.9300e-003
0.1677 1.1300e-003
0.1688 0.0445 1.0500e-003
0.0455 149.1338 149.1338 6.9300e-003
149.2794
Total 0.0565 0.2129 0.7784 2.3900e-003
7.2600e-003
193.98640.1786 3.5000e-003
0.1821 0.0475 3.2300e-003
0.0507
SO2 Fugitive PM10
Exhaust PM10
193.8339 193.8339
PM2.5 Total
Bio- CO2 NBio- CO2
3.12 MWT Paving - 2018Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.8057 8.5814 7.2472 0.0112 0.4693 0.4693 0.4318 0.4318 1,122.6347
1,122.6347 0.3495 1,129.9741
Paving 0.4192 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 1.2249 8.5814 7.2472 0.0112 0.3495 1,129.97410.4693 0.4693 0.4318 0.4318 1,122.6347
1,122.6347
35 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0242 0.0327 0.3435 1.0300e-003
0.0894 6.0000e-004
0.0900 0.0237 5.6000e-004
0.0243 79.5381 79.5381 3.7000e-003
79.6157
Total 0.0242 0.0327 0.3435 1.0300e-003
3.7000e-003
79.61570.0894 6.0000e-004
0.0900 0.0237 5.6000e-004
0.0243
SO2 Fugitive PM10
Exhaust PM10
79.5381 79.5381
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.8057 8.5814 7.2472 0.0112 0.4693 0.4693 0.4318 0.4318 0.0000 1,122.6347
1,122.6347 0.3495 1,129.9741
Paving 0.4192 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 1.2249 8.5814 7.2472 0.0112 0.3495 1,129.97410.4693 0.4693 0.4318 0.4318 0.0000 1,122.6347
1,122.6347
36 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0242 0.0327 0.3435 1.0300e-003
0.0894 6.0000e-004
0.0900 0.0237 5.6000e-004
0.0243 79.5381 79.5381 3.7000e-003
79.6157
Total 0.0242 0.0327 0.3435 1.0300e-003
3.7000e-003
79.61570.0894 6.0000e-004
0.0900 0.0237 5.6000e-004
0.0243
SO2 Fugitive PM10
Exhaust PM10
79.5381 79.5381
PM2.5 Total
Bio- CO2 NBio- CO2
3.13 CU Center Paving - 2018Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.8057 8.5814 7.2472 0.0112 0.4693 0.4693 0.4318 0.4318 1,122.6347
1,122.6347 0.3495 1,129.9741
Paving 0.8384 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 1.6441 8.5814 7.2472 0.0112 0.3495 1,129.97410.4693 0.4693 0.4318 0.4318 1,122.6347
1,122.6347
37 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0242 0.0327 0.3435 1.0300e-003
0.0894 6.0000e-004
0.0900 0.0237 5.6000e-004
0.0243 79.5381 79.5381 3.7000e-003
79.6157
Total 0.0242 0.0327 0.3435 1.0300e-003
3.7000e-003
79.61570.0894 6.0000e-004
0.0900 0.0237 5.6000e-004
0.0243
SO2 Fugitive PM10
Exhaust PM10
79.5381 79.5381
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.8057 8.5814 7.2472 0.0112 0.4693 0.4693 0.4318 0.4318 0.0000 1,122.6347
1,122.6347 0.3495 1,129.9741
Paving 0.8384 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 1.6441 8.5814 7.2472 0.0112 0.3495 1,129.97410.4693 0.4693 0.4318 0.4318 0.0000 1,122.6347
1,122.6347
38 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0242 0.0327 0.3435 1.0300e-003
0.0894 6.0000e-004
0.0900 0.0237 5.6000e-004
0.0243 79.5381 79.5381 3.7000e-003
79.6157
Total 0.0242 0.0327 0.3435 1.0300e-003
3.7000e-003
79.61570.0894 6.0000e-004
0.0900 0.0237 5.6000e-004
0.0243
SO2 Fugitive PM10
Exhaust PM10
79.5381 79.5381
PM2.5 Total
Bio- CO2 NBio- CO2
3.14 CU Center Architectural Coating - 2018Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 20.7551 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.2986 2.0058 1.8542 2.9700e-003
0.1506 0.1506 0.1506 0.1506 281.4485 281.4485 0.0267 282.0102
Total 21.0537 2.0058 1.8542 2.9700e-003
0.0267 282.01020.1506 0.1506 0.1506 0.1506 281.4485 281.4485
39 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0393 0.0531 0.5582 1.6700e-003
0.1453 9.8000e-004
0.1463 0.0385 9.1000e-004
0.0395 129.2493 129.2493 6.0100e-003
129.3755
Total 0.0393 0.0531 0.5582 1.6700e-003
6.0100e-003
129.37550.1453 9.8000e-004
0.1463 0.0385 9.1000e-004
0.0395
SO2 Fugitive PM10
Exhaust PM10
129.2493 129.2493
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 20.7551 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.2986 2.0058 1.8542 2.9700e-003
0.1506 0.1506 0.1506 0.1506 0.0000 281.4485 281.4485 0.0267 282.0102
Total 21.0537 2.0058 1.8542 2.9700e-003
0.0267 282.01020.1506 0.1506 0.1506 0.1506 0.0000 281.4485 281.4485
40 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0393 0.0531 0.5582 1.6700e-003
0.1453 9.8000e-004
0.1463 0.0385 9.1000e-004
0.0395 129.2493 129.2493 6.0100e-003
129.3755
Total 0.0393 0.0531 0.5582 1.6700e-003
6.0100e-003
129.37550.1453 9.8000e-004
0.1463 0.0385 9.1000e-004
0.0395
SO2 Fugitive PM10
Exhaust PM10
129.2493 129.2493
PM2.5 Total
Bio- CO2 NBio- CO2
3.15 MWT Architectural Coating - 2018Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 29.0571 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.2986 2.0058 1.8542 2.9700e-003
0.1506 0.1506 0.1506 0.1506 281.4485 281.4485 0.0267 282.0102
Total 29.3558 2.0058 1.8542 2.9700e-003
0.0267 282.01020.1506 0.1506 0.1506 0.1506 281.4485 281.4485
41 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0393 0.0531 0.5582 1.6700e-003
0.1453 9.8000e-004
0.1463 0.0385 9.1000e-004
0.0395 129.2493 129.2493 6.0100e-003
129.3755
Total 0.0393 0.0531 0.5582 1.6700e-003
6.0100e-003
129.37550.1453 9.8000e-004
0.1463 0.0385 9.1000e-004
0.0395
SO2 Fugitive PM10
Exhaust PM10
129.2493 129.2493
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 29.0571 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.2986 2.0058 1.8542 2.9700e-003
0.1506 0.1506 0.1506 0.1506 0.0000 281.4485 281.4485 0.0267 282.0102
Total 29.3558 2.0058 1.8542 2.9700e-003
0.0267 282.01020.1506 0.1506 0.1506 0.1506 0.0000 281.4485 281.4485
42 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0393 0.0531 0.5582 1.6700e-003
0.1453 9.8000e-004
0.1463 0.0385 9.1000e-004
0.0395 129.2493 129.2493 6.0100e-003
129.3755
Total 0.0393 0.0531 0.5582 1.6700e-003
6.0100e-003
129.37550.1453 9.8000e-004
0.1463 0.0385 9.1000e-004
0.0395
SO2 Fugitive PM10
Exhaust PM10
129.2493 129.2493
PM2.5 Total
Bio- CO2 NBio- CO2
3.16 Baseball Lot Expansion Paving - 2018Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.6114 17.1628 14.4944 0.0223 0.9386 0.9386 0.8635 0.8635 2,245.2695
2,245.2695 0.6990 2,259.9481
Paving 0.2096 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 1.8210 17.1628 14.4944 0.0223 0.6990 2,259.94810.9386 0.9386 0.8635 0.8635 2,245.2695
2,245.2695
43 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0454 0.0613 0.6440 1.9300e-003
0.1677 1.1300e-003
0.1688 0.0445 1.0500e-003
0.0455 149.1338 149.1338 6.9300e-003
149.2794
Total 0.0454 0.0613 0.6440 1.9300e-003
6.9300e-003
149.27940.1677 1.1300e-003
0.1688 0.0445 1.0500e-003
0.0455
SO2 Fugitive PM10
Exhaust PM10
149.1338 149.1338
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.6114 17.1628 14.4944 0.0223 0.9386 0.9386 0.8635 0.8635 0.0000 2,245.2695
2,245.2695 0.6990 2,259.9481
Paving 0.2096 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 1.8210 17.1628 14.4944 0.0223 0.6990 2,259.94810.9386 0.9386 0.8635 0.8635 0.0000 2,245.2695
2,245.2695
44 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0454 0.0613 0.6440 1.9300e-003
0.1677 1.1300e-003
0.1688 0.0445 1.0500e-003
0.0455 149.1338 149.1338 6.9300e-003
149.2794
Total 0.0454 0.0613 0.6440 1.9300e-003
6.9300e-003
149.27940.1677 1.1300e-003
0.1688 0.0445 1.0500e-003
0.0455
SO2 Fugitive PM10
Exhaust PM10
149.1338 149.1338
PM2.5 Total
Bio- CO2 NBio- CO2
3.17 Field Locker Rooms Site Preparation - 2019Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 6.5594 0.0000 6.5594 3.3694 0.0000 3.3694 0.0000 0.0000
Off-Road 1.2620 13.3891 10.8354 0.0120 0.6648 0.6648 0.6116 0.6116 1,189.7272
1,189.7272 0.3764 1,197.6319
Total 1.2620 13.3891 10.8354 0.0120 0.3764 1,197.63196.5594 0.6648 7.2242 3.3694 0.6116 3.9810 1,189.7272
1,189.7272
45 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.5070 6.7645 6.1822 0.0218 0.5163 0.1106 0.6269 0.1414 0.1017 0.2431 2,089.2347
2,089.2347 0.0161 2,089.5730
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0141 0.0189 0.1999 6.4000e-004
0.0559 3.8000e-004
0.0563 0.0148 3.5000e-004
0.0152 48.1583 48.1583 2.2100e-003
48.2046
Total 0.5212 6.7834 6.3821 0.0224 0.0183 2,137.77760.5722 0.1110 0.6832 0.1562 0.1021 0.2583
SO2 Fugitive PM10
Exhaust PM10
2,137.3930
2,137.3930
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.5582 0.0000 2.5582 1.3141 0.0000 1.3141 0.0000 0.0000
Off-Road 1.2620 13.3891 10.8354 0.0120 0.6648 0.6648 0.6116 0.6116 0.0000 1,189.7272
1,189.7272 0.3764 1,197.6319
Total 1.2620 13.3891 10.8354 0.0120 0.3764 1,197.63192.5582 0.6648 3.2230 1.3141 0.6116 1.9257 0.0000 1,189.7272
1,189.7272
46 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.5070 6.7645 6.1822 0.0218 0.5163 0.1106 0.6269 0.1414 0.1017 0.2431 2,089.2347
2,089.2347 0.0161 2,089.5730
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0141 0.0189 0.1999 6.4000e-004
0.0559 3.8000e-004
0.0563 0.0148 3.5000e-004
0.0152 48.1583 48.1583 2.2100e-003
48.2046
Total 0.5212 6.7834 6.3821 0.0224 0.0183 2,137.77760.5722 0.1110 0.6832 0.1562 0.1021 0.2583
SO2 Fugitive PM10
Exhaust PM10
2,137.3930
2,137.3930
PM2.5 Total
Bio- CO2 NBio- CO2
3.18 Field Locker Rooms Construction - 2019Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.6243 14.0180 10.7023 0.0183 0.7907 0.7907 0.7535 0.7535 1,739.9227
1,739.9227 0.3619 1,747.5222
Total 1.6243 14.0180 10.7023 0.0183 0.3619 1,747.52220.7907 0.7907 0.7535 0.7535 1,739.9227
1,739.9227
47 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1939 1.7120 2.6640 5.3600e-003
0.1563 0.0271 0.1834 0.0445 0.0250 0.0695 512.6046 512.6046 3.8600e-003
512.6856
Worker 0.1839 0.2460 2.5985 8.3800e-003
0.7266 4.9500e-003
0.7315 0.1927 4.5900e-003
0.1973 626.0577 626.0577 0.0287 626.6598
Total 0.3778 1.9580 5.2625 0.0137 0.0325 1,139.34540.8828 0.0321 0.9149 0.2372 0.0296 0.2668
SO2 Fugitive PM10
Exhaust PM10
1,138.6623
1,138.6623
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.6243 14.0180 10.7023 0.0183 0.7907 0.7907 0.7535 0.7535 0.0000 1,739.9227
1,739.9227 0.3619 1,747.5222
Total 1.6243 14.0180 10.7023 0.0183 0.3619 1,747.52220.7907 0.7907 0.7535 0.7535 0.0000 1,739.9227
1,739.9227
48 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1939 1.7120 2.6640 5.3600e-003
0.1563 0.0271 0.1834 0.0445 0.0250 0.0695 512.6046 512.6046 3.8600e-003
512.6856
Worker 0.1839 0.2460 2.5985 8.3800e-003
0.7266 4.9500e-003
0.7315 0.1927 4.5900e-003
0.1973 626.0577 626.0577 0.0287 626.6598
Total 0.3778 1.9580 5.2625 0.0137 0.0325 1,139.34540.8828 0.0321 0.9149 0.2372 0.0296 0.2668
SO2 Fugitive PM10
Exhaust PM10
1,138.6623
1,138.6623
PM2.5 Total
Bio- CO2 NBio- CO2
3.19 Field Locker Rooms Paving - 2019Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.7129 7.4677 7.1826 0.0112 0.4047 0.4047 0.3723 0.3723 1,104.4866
1,104.4866 0.3495 1,111.8250
Paving 0.8384 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 1.5513 7.4677 7.1826 0.0112 0.3495 1,111.82500.4047 0.4047 0.3723 0.3723 1,104.4866
1,104.4866
49 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0226 0.0303 0.3198 1.0300e-003
0.0894 6.1000e-004
0.0900 0.0237 5.6000e-004
0.0243 77.0533 77.0533 3.5300e-003
77.1274
Total 0.0226 0.0303 0.3198 1.0300e-003
3.5300e-003
77.12740.0894 6.1000e-004
0.0900 0.0237 5.6000e-004
0.0243
SO2 Fugitive PM10
Exhaust PM10
77.0533 77.0533
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.7129 7.4677 7.1826 0.0112 0.4047 0.4047 0.3723 0.3723 0.0000 1,104.4866
1,104.4866 0.3495 1,111.8250
Paving 0.8384 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 1.5513 7.4677 7.1826 0.0112 0.3495 1,111.82500.4047 0.4047 0.3723 0.3723 0.0000 1,104.4866
1,104.4866
50 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0226 0.0303 0.3198 1.0300e-003
0.0894 6.1000e-004
0.0900 0.0237 5.6000e-004
0.0243 77.0533 77.0533 3.5300e-003
77.1274
Total 0.0226 0.0303 0.3198 1.0300e-003
3.5300e-003
77.12740.0894 6.1000e-004
0.0900 0.0237 5.6000e-004
0.0243
SO2 Fugitive PM10
Exhaust PM10
77.0533 77.0533
PM2.5 Total
Bio- CO2 NBio- CO2
3.20 Field Locker Rooms Architectural Coatings - 2019Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 21.7928 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.2664 1.8354 1.8413 2.9700e-003
0.1288 0.1288 0.1288 0.1288 281.4481 281.4481 0.0238 281.9473
Total 22.0593 1.8354 1.8413 2.9700e-003
0.0238 281.94730.1288 0.1288 0.1288 0.1288 281.4481 281.4481
51 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0368 0.0492 0.5197 1.6800e-003
0.1453 9.9000e-004
0.1463 0.0385 9.2000e-004
0.0395 125.2116 125.2116 5.7300e-003
125.3320
Total 0.0368 0.0492 0.5197 1.6800e-003
5.7300e-003
125.33200.1453 9.9000e-004
0.1463 0.0385 9.2000e-004
0.0395
SO2 Fugitive PM10
Exhaust PM10
125.2116 125.2116
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 21.7928 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.2664 1.8354 1.8413 2.9700e-003
0.1288 0.1288 0.1288 0.1288 0.0000 281.4481 281.4481 0.0238 281.9473
Total 22.0593 1.8354 1.8413 2.9700e-003
0.0238 281.94730.1288 0.1288 0.1288 0.1288 0.0000 281.4481 281.4481
52 of 53
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0368 0.0492 0.5197 1.6800e-003
0.1453 9.9000e-004
0.1463 0.0385 9.2000e-004
0.0395 125.2116 125.2116 5.7300e-003
125.3320
Total 0.0368 0.0492 0.5197 1.6800e-003
0.1453 9.9000e-004
0.1463 0.0385 9.2000e-004
0.0395 125.2116 125.2116 5.7300e-003
125.3320
53 of 53
CalEEMod Version: CalEEMod.2013.2.2 Page 1 of 1 Date: 4/12/2016 9:43 AM
Concordia University - Phases 1 & 2 ConstructionOrange County, Summer
1.0 Project Characteristics
1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population
University/College (4Yr) 92.00 Student 5.00 48,580.00 0
Other Asphalt Surfaces 0.50 Acre 0.50 21,780.00 0
Other Non-Asphalt Surfaces 0.50 Acre 0.50 21,780.00 0
Parking Lot 158.00 Space 1.42 63,200.00 0
1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 2.2 Precipitation Freq (Days) 30
Climate Zone 8 Operational Year 2020
Utility Company Southern California Edison
CO2 Intensity (lb/MWhr)
630.89 CH4 Intensity (lb/MWhr)
0.029 N2O Intensity (lb/MWhr)
0.006
1.3 User Entered Comments & Non-Default Data
Project Characteristics -
Land Use - Assumes the construction of 48,580 square feet of new institutional building space, a 1.42-acre (158 space) parking lot expansion, 0.5 acre of paved roadway improvements, and 0.5 acre of asphalt improvements.Construction Phase - Construction dates entered to reflect anticipated construction schedule.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes one rubber tired dozer and one tractor/loader/backhoe due to small development area.
Off-road Equipment -
Off-road Equipment -
1 of 54
Off-road Equipment - Substantial grading during site prep
Off-road Equipment -
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Dorm Road-lot grad
Off-road Equipment -
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment -
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Trips and VMT - Haul trips per Psomas 3/31/16; add'l trips for site clear
Grading - Amount of material imported and exported based on Psomas 3/31/16.Acres disturbed based on site size and duration of work
Architectural Coating - SCAQMD Rule 1113 limits paints to a maximum VOC content of 50 g/L.
Vehicle Trips - Operational emissions are not calculated in this scenario.
Consumer Products - Operational emissions are not calculated in this scenario.
Area Coating - Operational emissions are not calculated in this scenario.
Landscape Equipment - Operational emissions are not calculated in this scenario.
Energy Use - Operational emissions are not calculated in this scenario.
Water And Wastewater - Operational emissions are not calculated in this scenario.
Solid Waste - Operational emissions are not calculated in this scenario.
Construction Off-road Equipment Mitigation - Assumes compliance with SCAQMD Rule 403 for fugitive dust as required.
2 of 54
Table Name Column Name Default Value New Value
tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00
tblAreaCoating ReapplicationRatePercent 10 0
tblConstructionPhase NumDays 20.00 21.00
tblConstructionPhase NumDays 20.00 15.00
tblConstructionPhase NumDays 230.00 157.00
tblConstructionPhase NumDays 230.00 45.00
tblConstructionPhase NumDays 230.00 339.00
tblConstructionPhase NumDays 230.00 196.00
tblConstructionPhase NumDays 20.00 40.00
tblConstructionPhase NumDays 20.00 26.00
tblConstructionPhase NumDays 20.00 78.00
tblConstructionPhase NumDays 20.00 12.00
tblConstructionPhase NumDays 20.00 6.00
tblConstructionPhase NumDays 20.00 24.00
tblConstructionPhase NumDays 20.00 6.00
tblConstructionPhase NumDays 10.00 27.00
tblConstructionPhase NumDays 10.00 27.00
tblConstructionPhase NumDays 10.00 79.00
tblConstructionPhase NumDays 10.00 15.00
tblConstructionPhase NumDays 10.00 12.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
3 of 54
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase PhaseEndDate 9/18/2018 8/31/2018
tblConstructionPhase PhaseEndDate 8/22/2017 7/23/2017
tblConstructionPhase PhaseEndDate 8/22/2018 7/31/2018
tblConstructionPhase PhaseEndDate 12/15/2018 9/15/2018
tblConstructionPhase PhaseEndDate 9/29/2018 8/14/2018
tblConstructionPhase PhaseEndDate 8/21/2018 8/7/2018
tblConstructionPhase PhaseEndDate 9/28/2018 10/13/2018
tblConstructionPhase PhaseEndDate 11/14/2018 5/31/2019
tblConstructionPhase PhaseEndDate 8/31/2017 7/31/2017
tblConstructionPhase PhaseEndDate 8/17/2017 5/31/2017
tblConstructionPhase PhaseEndDate 8/14/2018 12/14/2017
tblConstructionPhase PhaseStartDate 9/1/2018 8/15/2018
tblConstructionPhase PhaseStartDate 7/1/2017 6/1/2017
tblConstructionPhase PhaseStartDate 7/24/2017 7/1/2017
tblConstructionPhase PhaseStartDate 10/31/2018 8/1/2018
4 of 54
tblConstructionPhase PhaseStartDate 9/16/2018 8/1/2018
tblConstructionPhase PhaseStartDate 8/15/2018 8/1/2018
tblConstructionPhase PhaseStartDate 9/1/2018 9/16/2018
tblConstructionPhase PhaseStartDate 10/14/2018 5/1/2019
tblConstructionPhase PhaseStartDate 6/1/2017 5/1/2017
tblConstructionPhase PhaseStartDate 8/1/2017 5/15/2017
tblConstructionPhase PhaseStartDate 8/1/2018 12/1/2017
tblEnergyUse LightingElect 0.88 0.00
tblEnergyUse LightingElect 5.23 0.00
tblEnergyUse NT24E 2.72 0.00
tblEnergyUse NT24NG 5.21 0.00
tblEnergyUse T24E 6.10 0.00
tblEnergyUse T24NG 10.65 0.00
tblGrading AcresOfGrading 20.00 40.00
tblGrading AcresOfGrading 11.38 13.00
tblGrading AcresOfGrading 0.00 8.00
tblGrading AcresOfGrading 0.00 13.00
tblGrading AcresOfGrading 39.50 12.00
tblGrading AcresOfGrading 0.00 8.00
tblGrading AcresOfGrading 0.00 2.00
tblGrading MaterialExported 0.00 100.00
tblGrading MaterialExported 0.00 186.00
tblGrading MaterialExported 0.00 5,732.00
tblGrading MaterialImported 0.00 100.00
tblGrading MaterialImported 0.00 3,287.00
tblGrading MaterialImported 0.00 3,850.00
tblGrading MaterialImported 0.00 6.00
tblGrading MaterialImported 0.00 6,368.00
tblGrading MaterialImported 0.00 1,122.00
tblLandUse LandUseSquareFeet 16,909.37 48,580.00
5 of 54
tblLandUse LotAcreage 0.39 5.00
tblOffRoadEquipment OffRoadEquipmentType Graders
tblOffRoadEquipment OffRoadEquipmentType Excavators
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 1.00
6 of 54
tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 1.00
tblOffRoadEquipment UsageHours 8.00 7.00
tblOffRoadEquipment UsageHours 8.00 7.00
tblProjectCharacteristics OperationalYear 2014 2020
tblSolidWaste SolidWasteGenerationRate 16.79 0.00
tblTripsAndVMT HaulingTripNumber 19.00 24.00
tblTripsAndVMT HaulingTripNumber 796.00 800.00
tblTripsAndVMT HaulingTripNumber 678.00 858.00
tblTripsAndVMT HaulingTripNumber 0.00 30.00
tblTripsAndVMT HaulingTripNumber 411.00 412.00
tblTripsAndVMT HaulingTripNumber 0.00 6.00
tblTripsAndVMT HaulingTripNumber 381.00 482.00
tblVehicleTrips ST_TR 1.30 0.00
tblVehicleTrips WD_TR 2.38 0.00
tblWater IndoorWaterUseRate 196,981.20 0.00
Exhaust PM10
PM10 Total
tblWater OutdoorWaterUseRate 308,098.80 0.00
2.0 Emissions Summary
2.1 Overall Construction (Maximum Daily Emission)
NBio- CO2 Total CO2
Unmitigated Construction
ROG NOx CO SO2 Fugitive PM10
CH4 N2O CO2e
Year lb/day lb/day
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2
2017 8.4326 83.4241 62.5421 0.1000 19.5703 4.2353 22.8885 10.1680 3.9307 13.2207 0.0000 9,798.8187
9,798.8187 1.8587 0.0000 9,837.8519
2018 56.6904 81.0701 65.8621 0.0930 14.3800 4.4081 18.6763 6.9908 4.0554 11.0166 0.0000 9,202.2309
9,202.2309 2.5874 0.0000 9,256.5660
2019 22.0944 19.9480 16.3449 0.0345 7.1316 0.8225 7.9071 3.5256 0.7828 4.2391 0.0000 3,334.8103
3,334.8103 0.3945 0.0000 3,343.0949
Total 87.2173 184.4422 144.7490 0.2275 4.8406 0.0000 22,437.5128
41.0819 9.4658 49.4719 20.6844 8.7689 28.4764 0.0000 22,335.8599
22,335.8599
7 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO Total CO2 CH4 N2O CO2e
Year lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
2017 8.4326 83.4241 62.5421 0.1000 7.9149 4.2353 11.2331 4.0417 3.9307 7.0944 0.0000 9,798.8187
9,798.8187 1.8587 0.0000 9,837.8519
2018 56.6904 81.0701 65.8621 0.0930 6.0624 4.4081 10.3586 2.8475 4.0554 6.8733 0.0000 9,202.2309
9,202.2309 2.5874 0.0000 9,256.5660
2019 22.0944 19.9480 16.3449 0.0345 3.1304 0.8225 3.9059 1.4703 0.7828 2.1838 0.0000 3,334.8103
3,334.8103 0.3945 0.0000 3,343.0949
Total 87.2173 184.4422 144.7490 0.2275 17.1076 9.4658 25.4977 8.3594 8.7689 16.1514 0.0000 22,335.8599
22,335.8599
4.8406 0.0000 22,437.5128
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent Reduction
0.00 0.00 0.00 0.00 58.36 0.00 48.46 59.59 0.00 43.28 0.00 0.00 0.00 0.00 0.00 0.00
3.0 Construction Detail
Construction Phase
Phase Number
Phase Name Phase Type Start Date End Date Num Days Week
Num Days Phase Description
1 Astronomy Center Site Preparation
Site Preparation 5/1/2017 5/31/2017 6 27
2 Baseball Lot Expansion Site Preparation
Site Preparation 5/1/2017 7/31/2017 6 79
3 MWT Site Preparation Site Preparation 5/15/2017 5/31/2017 6 15
4 MWT Grading Grading 6/1/2017 6/30/2017 6 26
5 Astronomy Center Construction Building Construction 6/1/2017 7/23/2017 6 45
6 MWT Construction Building Construction 7/1/2017 7/31/2018 6 339
7 CU Center Site Preparation Site Preparation 12/1/2017 12/14/2017 6 12
8 CU Center Construction Building Construction 12/15/2017 7/31/2018 6 196
9 Dorm Road-District lot const Grading 8/1/2018 10/30/2018 6 78
8 of 54
10 Baseball Lot Expansion Grading Grading 8/1/2018 9/15/2018 6 40
11 MWT Paving Paving 8/1/2018 8/14/2018 6 12
12 CU Center Paving Paving 8/1/2018 8/7/2018 6 6
13 CU Center Architectural Coating Architectural Coating 8/8/2018 8/31/2018 6 21
14 MWT Architectural Coating Architectural Coating 8/15/2018 8/31/2018 6 15
15 Baseball Lot Expansion Paving Paving 9/16/2018 10/13/2018 6 24
16 Field Locker Rooms Site Preparation
Site Preparation 5/1/2019 5/31/2019 6 27
6
17 Field Locker Rooms Construction Building Construction 6/1/2019 11/30/2019 6
12/31/2019 6
157
18 Field Locker Rooms Paving Paving 12/1/2019 12/7/2019 6
20
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 141,054; Non-Residential Outdoor: 47,018 (Architectural Coating –
19 Field Locker Rooms Architectural Coatings
Architectural Coating 12/8/2019
OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor
Astronomy Center Site Preparation Rubber Tired Dozers 1 8.00 255 0.40
Astronomy Center Site Preparation Tractors/Loaders/Backhoes 1 8.00 97 0.37
Baseball Lot Expansion Site Preparation
Rubber Tired Dozers 1 8.00 255 0.40
Baseball Lot Expansion Site Preparation
Tractors/Loaders/Backhoes 1 8.00 97 0.37
MWT Site Preparation Rubber Tired Dozers 1 8.00 255 0.40
MWT Site Preparation Tractors/Loaders/Backhoes 1 8.00 97 0.37
MWT Grading Excavators 1 8.00 162 0.38
MWT Grading Graders 1 7.00 174 0.41
MWT Grading Rubber Tired Dozers 1 7.00 255 0.40
MWT Grading Tractors/Loaders/Backhoes 1 8.00 97 0.37
Astronomy Center Construction Cranes 1 7.00 226 0.29
Astronomy Center Construction Forklifts 1 8.00 89 0.20
9 of 54
Astronomy Center Construction Generator Sets 1 8.00 84 0.74
Astronomy Center Construction Tractors/Loaders/Backhoes 1 7.00 97 0.37
Astronomy Center Construction Welders 1 8.00 46 0.45
MWT Construction Cranes 1 7.00 226 0.29
MWT Construction Forklifts 1 8.00 89 0.20
MWT Construction Generator Sets 1 8.00 84 0.74
MWT Construction Tractors/Loaders/Backhoes 1 7.00 97 0.37
MWT Construction Welders 1 8.00 46 0.45
CU Center Site Preparation Rubber Tired Dozers 1 8.00 255 0.40
CU Center Site Preparation Tractors/Loaders/Backhoes 1 8.00 97 0.37
CU Center Construction Cranes 1 7.00 226 0.29
CU Center Construction Forklifts 1 8.00 89 0.20
CU Center Construction Generator Sets 1 8.00 84 0.74
CU Center Construction Tractors/Loaders/Backhoes 1 7.00 97 0.37
CU Center Construction Welders 1 8.00 46 0.45
Dorm Road-District lot const Excavators 1 8.00 162 0.38
Dorm Road-District lot const Graders 1 8.00 174 0.41
Dorm Road-District lot const Pavers 0 8.00 125 0.42
Dorm Road-District lot const Paving Equipment 0 8.00 130 0.36
Dorm Road-District lot const Rollers 0 8.00 80 0.38
Dorm Road-District lot const Rubber Tired Dozers 1 8.00 255 0.40
Dorm Road-District lot const Tractors/Loaders/Backhoes 3 8.00 97 0.37
Baseball Lot Expansion Grading Excavators 1 8.00 162 0.38
Baseball Lot Expansion Grading Graders 1 8.00 174 0.41
Baseball Lot Expansion Grading Rubber Tired Dozers 1 8.00 255 0.40
Baseball Lot Expansion Grading Tractors/Loaders/Backhoes 3 8.00 97 0.37
MWT Paving Pavers 1 8.00 125 0.42
MWT Paving Paving Equipment 1 8.00 130 0.36
MWT Paving Rollers 1 8.00 80 0.38
CU Center Paving Pavers 1 8.00 125 0.42
10 of 54
CU Center Paving Paving Equipment 1 8.00 130 0.36
CU Center Paving Rollers 1 8.00 80 0.38
CU Center Architectural Coating Air Compressors 1 6.00 78 0.48
MWT Architectural Coating Air Compressors 1 6.00 78 0.48
Baseball Lot Expansion Paving Pavers 2 8.00 125 0.42
Baseball Lot Expansion Paving Paving Equipment 2 8.00 130 0.36
Baseball Lot Expansion Paving Rollers 2 8.00 80 0.38
Field Locker Rooms Site Preparation Rubber Tired Dozers 1 8.00 255 0.40
Field Locker Rooms Site Preparation Tractors/Loaders/Backhoes 1 8.00 97 0.37
Field Locker Rooms Construction Cranes 1 7.00 226 0.29
Field Locker Rooms Construction Forklifts 1 8.00 89 0.20
Field Locker Rooms Construction Generator Sets 1 8.00 84 0.74
Field Locker Rooms Construction Tractors/Loaders/Backhoes 1 7.00 97 0.37
Field Locker Rooms Construction Welders 1 8.00 46 0.45
Field Locker Rooms Paving Pavers 1 8.00 125 0.42
Field Locker Rooms Paving Paving Equipment 1 8.00 130 0.36
Field Locker Rooms Paving Rollers 1 8.00 80 0.38
Field Locker Rooms Architectural Coatings
Air Compressors 1 6.00 78 0.48
Baseball Lot Expansion Site Preparation
Graders 1 8.00 174 0.41
Baseball Lot Expansion Site Preparation
Excavators 1 8.00 162 0.38
11 of 54
Trips and VMT
Phase Name Offroad Equipment Count
Worker Trip Number
Vendor Trip Number
Hauling Trip Number
Worker Trip Length
Vendor Trip Length
Hauling Trip Length
Worker Vehicle Class
Vendor Vehicle Class
Hauling Vehicle Class
Astronomy Center Site Preparation
2 5.00 0.00 24.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Baseball Lot Expansion Site
4 10.00 0.00 858.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
MWT Site Preparation 2 5.00 0.00 30.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
MWT Grading 4 10.00 0.00 412.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Astronomy Center Construction
5 65.00 25.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
MWT Construction 5 65.00 25.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
CU Center Site Preparation
2 5.00 0.00 6.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
CU Center Construction
5 65.00 25.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Dorm Road-District lot const
6 15.00 0.00 482.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Baseball Lot Expansion Grading
6 15.00 0.00 25.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
MWT Paving 3 8.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
CU Center Paving 3 8.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
CU Center Architectural Coating
1 13.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
MWT Architectural Coating
1 13.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Baseball Lot Expansion Paving
6 15.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Field Locker Rooms Site Preparation
2 5.00 0.00 800.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Field Locker Rooms Construction
5 65.00 25.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Field Locker Rooms Paving
3 8.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
LD_Mix HDT_Mix HHDTField Locker Rooms Architectural Coatings
1 13.00 0.00 0.00 14.70 6.90 20.00
12 of 54
3.1 Mitigation Measures Construction
NOx CO SO2 Fugitive PM10
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2
Water Exposed Area
3.2 Astronomy Center Site Preparation - 2017Unmitigated Construction On-Site
ROG NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Exhaust PM10
PM10 Total
Fugitive Dust 6.3363 0.0000 6.3363 3.3442 0.0000 3.3442 0.0000 0.0000
Off-Road 1.5071 16.2365 12.3344 0.0120 0.8418 0.8418 0.7744 0.7744 1,228.2737
1,228.2737 0.3763 1,236.1768
Total 1.5071 16.2365 12.3344 0.0120 0.3763 1,236.17686.3363 0.8418 7.1781 3.3442 0.7744 4.1186
SO2 Fugitive PM10
Exhaust PM10
1,228.2737
1,228.2737
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0153 0.2246 0.1698 6.5000e-004
0.0155 3.3700e-003
0.0189 4.2400e-003
3.1000e-003
7.3400e-003
64.8096 64.8096 4.6000e-004
64.8192
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0158 0.0204 0.2504 6.8000e-004
0.0559 3.8000e-004
0.0563 0.0148 3.5000e-004
0.0152 54.5365 54.5365 2.4800e-003
54.5884
Total 0.0311 0.2450 0.4201 1.3300e-003
2.9400e-003
119.40770.0714 3.7500e-003
0.0751 0.0191 3.4500e-003
0.0225 119.3460 119.3460
13 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.4712 0.0000 2.4712 1.3042 0.0000 1.3042 0.0000 0.0000
Off-Road 1.5071 16.2365 12.3344 0.0120 0.8418 0.8418 0.7744 0.7744 0.0000 1,228.2737
1,228.2737 0.3763 1,236.1768
Total 1.5071 16.2365 12.3344 0.0120 0.3763 1,236.17682.4712 0.8418 3.3129 1.3042 0.7744 2.0787
SO2 Fugitive PM10
Exhaust PM10
0.0000 1,228.2737
1,228.2737
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0153 0.2246 0.1698 6.5000e-004
0.0155 3.3700e-003
0.0189 4.2400e-003
3.1000e-003
7.3400e-003
64.8096 64.8096 4.6000e-004
64.8192
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0158 0.0204 0.2504 6.8000e-004
0.0559 3.8000e-004
0.0563 0.0148 3.5000e-004
0.0152 54.5365 54.5365 2.4800e-003
54.5884
Total 0.0311 0.2450 0.4201 1.3300e-003
2.9400e-003
119.40770.0714 3.7500e-003
0.0751 0.0191 3.4500e-003
0.0225 119.3460 119.3460
14 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.3 Baseball Lot Expansion Site Preparation - 2017Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 6.1832 0.0000 6.1832 3.3276 0.0000 3.3276 0.0000 0.0000
Off-Road 2.8219 29.8947 20.5935 0.0235 1.5810 1.5810 1.4545 1.4545 2,407.1368
2,407.1368 0.7375 2,422.6252
Total 2.8219 29.8947 20.5935 0.0235 0.7375 2,422.62526.1832 1.5810 7.7641 3.3276 1.4545 4.7821
SO2 Fugitive PM10
Exhaust PM10
2,407.1368
2,407.1368
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.1872 2.7448 2.0742 7.9800e-003
0.1892 0.0412 0.2304 0.0518 0.0379 0.0897 791.8663 791.8663 5.6100e-003
791.9842
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0316 0.0407 0.5007 1.3600e-003
0.1118 7.6000e-004
0.1125 0.0296 7.1000e-004
0.0304 109.0729 109.0729 4.9500e-003
109.1769
Total 0.2188 2.7855 2.5749 9.3400e-003
0.0106 901.16100.3010 0.0420 0.3430 0.0815 0.0386 0.1201 900.9392 900.9392
15 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.4114 0.0000 2.4114 1.2978 0.0000 1.2978 0.0000 0.0000
Off-Road 2.8219 29.8947 20.5935 0.0235 1.5810 1.5810 1.4545 1.4545 0.0000 2,407.1368
2,407.1368 0.7375 2,422.6252
Total 2.8219 29.8947 20.5935 0.0235 0.7375 2,422.62522.4114 1.5810 3.9924 1.2978 1.4545 2.7523
SO2 Fugitive PM10
Exhaust PM10
0.0000 2,407.1368
2,407.1368
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.1872 2.7448 2.0742 7.9800e-003
0.1892 0.0412 0.2304 0.0518 0.0379 0.0897 791.8663 791.8663 5.6100e-003
791.9842
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0316 0.0407 0.5007 1.3600e-003
0.1118 7.6000e-004
0.1125 0.0296 7.1000e-004
0.0304 109.0729 109.0729 4.9500e-003
109.1769
Total 0.2188 2.7855 2.5749 9.3400e-003
0.0106 901.16100.3010 0.0420 0.3430 0.0815 0.0386 0.1201 900.9392 900.9392
16 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.4 MWT Site Preparation - 2017Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 6.5877 0.0000 6.5877 3.3713 0.0000 3.3713 0.0000 0.0000
Off-Road 1.5071 16.2365 12.3344 0.0120 0.8418 0.8418 0.7744 0.7744 1,228.2737
1,228.2737 0.3763 1,236.1768
Total 1.5071 16.2365 12.3344 0.0120 0.3763 1,236.17686.5877 0.8418 7.4295 3.3713 0.7744 4.1457
SO2 Fugitive PM10
Exhaust PM10
1,228.2737
1,228.2737
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0345 0.5055 0.3820 1.4700e-003
0.0349 7.5900e-003
0.0424 9.5400e-003
6.9800e-003
0.0165 145.8215 145.8215 1.0300e-003
145.8432
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0158 0.0204 0.2504 6.8000e-004
0.0559 3.8000e-004
0.0563 0.0148 3.5000e-004
0.0152 54.5365 54.5365 2.4800e-003
54.5884
Total 0.0503 0.5258 0.6323 2.1500e-003
3.5100e-003
200.43170.0907 7.9700e-003
0.0987 0.0244 7.3300e-003
0.0317 200.3580 200.3580
17 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.5692 0.0000 2.5692 1.3148 0.0000 1.3148 0.0000 0.0000
Off-Road 1.5071 16.2365 12.3344 0.0120 0.8418 0.8418 0.7744 0.7744 0.0000 1,228.2737
1,228.2737 0.3763 1,236.1768
Total 1.5071 16.2365 12.3344 0.0120 0.3763 1,236.17682.5692 0.8418 3.4110 1.3148 0.7744 2.0892
SO2 Fugitive PM10
Exhaust PM10
0.0000 1,228.2737
1,228.2737
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0345 0.5055 0.3820 1.4700e-003
0.0349 7.5900e-003
0.0424 9.5400e-003
6.9800e-003
0.0165 145.8215 145.8215 1.0300e-003
145.8432
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0158 0.0204 0.2504 6.8000e-004
0.0559 3.8000e-004
0.0563 0.0148 3.5000e-004
0.0152 54.5365 54.5365 2.4800e-003
54.5884
Total 0.0503 0.5258 0.6323 2.1500e-003
3.5100e-003
200.43170.0907 7.9700e-003
0.0987 0.0244 7.3300e-003
0.0317 200.3580 200.3580
18 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.5 MWT Grading - 2017Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 5.8139 0.0000 5.8139 2.9559 0.0000 2.9559 0.0000 0.0000
Off-Road 2.5541 27.0405 18.7462 0.0216 1.4367 1.4367 1.3217 1.3217 2,213.6855
2,213.6855 0.6783 2,227.9292
Total 2.5541 27.0405 18.7462 0.0216 0.6783 2,227.92925.8139 1.4367 7.2505 2.9559 1.3217 4.2776
SO2 Fugitive PM10
Exhaust PM10
2,213.6855
2,213.6855
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.2731 4.0047 3.0262 0.0116 0.2761 0.0601 0.3362 0.0756 0.0553 0.1309 1,155.3552
1,155.3552 8.1900e-003
1,155.5272
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0316 0.0407 0.5007 1.3600e-003
0.1118 7.6000e-004
0.1125 0.0296 7.1000e-004
0.0304 109.0729 109.0729 4.9500e-003
109.1769
Total 0.3047 4.0454 3.5270 0.0130 0.0131 1,264.70410.3879 0.0609 0.4487 0.1052 0.0560 0.1612 1,264.4281
1,264.4281
19 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.2674 0.0000 2.2674 1.1528 0.0000 1.1528 0.0000 0.0000
Off-Road 2.5541 27.0405 18.7462 0.0216 1.4367 1.4367 1.3217 1.3217 0.0000 2,213.6855
2,213.6855 0.6783 2,227.9292
Total 2.5541 27.0405 18.7462 0.0216 0.6783 2,227.92922.2674 1.4367 3.7041 1.1528 1.3217 2.4745
SO2 Fugitive PM10
Exhaust PM10
0.0000 2,213.6855
2,213.6855
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.2731 4.0047 3.0262 0.0116 0.2761 0.0601 0.3362 0.0756 0.0553 0.1309 1,155.3552
1,155.3552 8.1900e-003
1,155.5272
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0316 0.0407 0.5007 1.3600e-003
0.1118 7.6000e-004
0.1125 0.0296 7.1000e-004
0.0304 109.0729 109.0729 4.9500e-003
109.1769
Total 0.3047 4.0454 3.5270 0.0130 0.0131 1,264.70410.3879 0.0609 0.4487 0.1052 0.0560 0.1612
SO2 Fugitive PM10
Exhaust PM10
1,264.4281
1,264.4281
PM2.5 Total
Bio- CO2 NBio- CO2
3.6 Astronomy Center Construction - 2017Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 2.1261 17.4261 11.4417 0.0183 1.0793 1.0793 1.0272 1.0272 1,770.3321
1,770.3321 0.3833 1,778.3813
Total 2.1261 17.4261 11.4417 0.0183 0.3833 1,778.38131.0793 1.0793 1.0272 1.0272 1,770.3321
1,770.3321
20 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.2017 1.9675 2.4039 5.4000e-003
0.1563 0.0306 0.1869 0.0445 0.0281 0.0726 533.3230 533.3230 3.7300e-003
533.4013
Worker 0.2053 0.2646 3.2548 8.8200e-003
0.7266 4.9600e-003
0.7315 0.1927 4.5800e-003
0.1973 708.9739 708.9739 0.0322 709.6498
Total 0.4070 2.2320 5.6588 0.0142 0.0359 1,243.05110.8828 0.0356 0.9184 0.2372 0.0327 0.2699
SO2 Fugitive PM10
Exhaust PM10
1,242.2970
1,242.2970
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 2.1261 17.4261 11.4417 0.0183 1.0793 1.0793 1.0272 1.0272 0.0000 1,770.3321
1,770.3321 0.3833 1,778.3813
Total 2.1261 17.4261 11.4417 0.0183 0.3833 1,778.38131.0793 1.0793 1.0272 1.0272 0.0000 1,770.3321
1,770.3321
21 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.2017 1.9675 2.4039 5.4000e-003
0.1563 0.0306 0.1869 0.0445 0.0281 0.0726 533.3230 533.3230 3.7300e-003
533.4013
Worker 0.2053 0.2646 3.2548 8.8200e-003
0.7266 4.9600e-003
0.7315 0.1927 4.5800e-003
0.1973 708.9739 708.9739 0.0322 709.6498
Total 0.4070 2.2320 5.6588 0.0142 0.0359 1,243.05110.8828 0.0356 0.9184 0.2372 0.0327 0.2699
SO2 Fugitive PM10
Exhaust PM10
1,242.2970
1,242.2970
PM2.5 Total
Bio- CO2 NBio- CO2
3.7 MWT Construction - 2017Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 2.1261 17.4261 11.4417 0.0183 1.0793 1.0793 1.0272 1.0272 1,770.3321
1,770.3321 0.3833 1,778.3813
Total 2.1261 17.4261 11.4417 0.0183 0.3833 1,778.38131.0793 1.0793 1.0272 1.0272 1,770.3321
1,770.3321
22 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.2017 1.9675 2.4039 5.4000e-003
0.1563 0.0306 0.1869 0.0445 0.0281 0.0726 533.3230 533.3230 3.7300e-003
533.4013
Worker 0.2053 0.2646 3.2548 8.8200e-003
0.7266 4.9600e-003
0.7315 0.1927 4.5800e-003
0.1973 708.9739 708.9739 0.0322 709.6498
Total 0.4070 2.2320 5.6588 0.0142 0.0359 1,243.05110.8828 0.0356 0.9184 0.2372 0.0327 0.2699
SO2 Fugitive PM10
Exhaust PM10
1,242.2970
1,242.2970
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 2.1261 17.4261 11.4417 0.0183 1.0793 1.0793 1.0272 1.0272 0.0000 1,770.3321
1,770.3321 0.3833 1,778.3813
Total 2.1261 17.4261 11.4417 0.0183 0.3833 1,778.38131.0793 1.0793 1.0272 1.0272 0.0000 1,770.3321
1,770.3321
23 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.2017 1.9675 2.4039 5.4000e-003
0.1563 0.0306 0.1869 0.0445 0.0281 0.0726 533.3230 533.3230 3.7300e-003
533.4013
Worker 0.2053 0.2646 3.2548 8.8200e-003
0.7266 4.9600e-003
0.7315 0.1927 4.5800e-003
0.1973 708.9739 708.9739 0.0322 709.6498
Total 0.4070 2.2320 5.6588 0.0142 0.0359 1,243.05110.8828 0.0356 0.9184 0.2372 0.0327 0.2699
SO2 Fugitive PM10
Exhaust PM10
1,242.2970
1,242.2970
PM2.5 Total
Bio- CO2 NBio- CO2
3.7 MWT Construction - 2018Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.8467 15.5098 11.0209 0.0183 0.9170 0.9170 0.8736 0.8736 1,755.0059
1,755.0059 0.3726 1,762.8294
Total 1.8467 15.5098 11.0209 0.0183 0.3726 1,762.82940.9170 0.9170 0.8736 0.8736 1,755.0059
1,755.0059
24 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1889 1.8061 2.2820 5.3900e-003
0.1563 0.0288 0.1851 0.0445 0.0265 0.0710 524.2685 524.2685 3.7100e-003
524.3463
Worker 0.1874 0.2414 2.9808 8.8200e-003
0.7266 4.9000e-003
0.7315 0.1927 4.5400e-003
0.1972 682.4128 682.4128 0.0300 683.0435
Total 0.3763 2.0475 5.2629 0.0142 0.0337 1,207.38990.8828 0.0337 0.9165 0.2372 0.0311 0.2682
SO2 Fugitive PM10
Exhaust PM10
1,206.6813
1,206.6813
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.8467 15.5098 11.0209 0.0183 0.9170 0.9170 0.8736 0.8736 0.0000 1,755.0059
1,755.0059 0.3726 1,762.8294
Total 1.8467 15.5098 11.0209 0.0183 0.3726 1,762.82940.9170 0.9170 0.8736 0.8736 0.0000 1,755.0059
1,755.0059
25 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1889 1.8061 2.2820 5.3900e-003
0.1563 0.0288 0.1851 0.0445 0.0265 0.0710 524.2685 524.2685 3.7100e-003
524.3463
Worker 0.1874 0.2414 2.9808 8.8200e-003
0.7266 4.9000e-003
0.7315 0.1927 4.5400e-003
0.1972 682.4128 682.4128 0.0300 683.0435
Total 0.3763 2.0475 5.2629 0.0142 0.0337 1,207.38990.8828 0.0337 0.9165 0.2372 0.0311 0.2682
SO2 Fugitive PM10
Exhaust PM10
1,206.6813
1,206.6813
PM2.5 Total
Bio- CO2 NBio- CO2
3.8 CU Center Site Preparation - 2017Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 6.1988 0.0000 6.1988 3.3293 0.0000 3.3293 0.0000 0.0000
Off-Road 1.5071 16.2365 12.3344 0.0120 0.8418 0.8418 0.7744 0.7744 1,228.2737
1,228.2737 0.3763 1,236.1768
Total 1.5071 16.2365 12.3344 0.0120 0.3763 1,236.17686.1988 0.8418 7.0406 3.3293 0.7744 4.1037 1,228.2737
1,228.2737
26 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 8.6200e-003
0.1264 0.0955 3.7000e-004
8.7100e-003
1.9000e-003
0.0106 2.3900e-003
1.7400e-003
4.1300e-003
36.4554 36.4554 2.6000e-004
36.4608
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0158 0.0204 0.2504 6.8000e-004
0.0559 3.8000e-004
0.0563 0.0148 3.5000e-004
0.0152 54.5365 54.5365 2.4800e-003
54.5884
Total 0.0244 0.1467 0.3459 1.0500e-003
2.7400e-003
91.04930.0646 2.2800e-003
0.0669 0.0172 2.0900e-003
0.0193
SO2 Fugitive PM10
Exhaust PM10
90.9918 90.9918
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.4176 0.0000 2.4176 1.2984 0.0000 1.2984 0.0000 0.0000
Off-Road 1.5071 16.2365 12.3344 0.0120 0.8418 0.8418 0.7744 0.7744 0.0000 1,228.2737
1,228.2737 0.3763 1,236.1768
Total 1.5071 16.2365 12.3344 0.0120 0.3763 1,236.17682.4176 0.8418 3.2593 1.2984 0.7744 2.0729 0.0000 1,228.2737
1,228.2737
27 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 8.6200e-003
0.1264 0.0955 3.7000e-004
8.7100e-003
1.9000e-003
0.0106 2.3900e-003
1.7400e-003
4.1300e-003
36.4554 36.4554 2.6000e-004
36.4608
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0158 0.0204 0.2504 6.8000e-004
0.0559 3.8000e-004
0.0563 0.0148 3.5000e-004
0.0152 54.5365 54.5365 2.4800e-003
54.5884
Total 0.0244 0.1467 0.3459 1.0500e-003
2.7400e-003
91.04930.0646 2.2800e-003
0.0669 0.0172 2.0900e-003
0.0193
SO2 Fugitive PM10
Exhaust PM10
90.9918 90.9918
PM2.5 Total
Bio- CO2 NBio- CO2
3.9 CU Center Construction - 2017Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 2.1261 17.4261 11.4417 0.0183 1.0793 1.0793 1.0272 1.0272 1,770.3321
1,770.3321 0.3833 1,778.3813
Total 2.1261 17.4261 11.4417 0.0183 0.3833 1,778.38131.0793 1.0793 1.0272 1.0272 1,770.3321
1,770.3321
28 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.2017 1.9675 2.4039 5.4000e-003
0.1563 0.0306 0.1869 0.0445 0.0281 0.0726 533.3230 533.3230 3.7300e-003
533.4013
Worker 0.2053 0.2646 3.2548 8.8200e-003
0.7266 4.9600e-003
0.7315 0.1927 4.5800e-003
0.1973 708.9739 708.9739 0.0322 709.6498
Total 0.4070 2.2320 5.6588 0.0142 0.0359 1,243.05110.8828 0.0356 0.9184 0.2372 0.0327 0.2699
SO2 Fugitive PM10
Exhaust PM10
1,242.2970
1,242.2970
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 2.1261 17.4261 11.4417 0.0183 1.0793 1.0793 1.0272 1.0272 0.0000 1,770.3321
1,770.3321 0.3833 1,778.3813
Total 2.1261 17.4261 11.4417 0.0183 0.3833 1,778.38131.0793 1.0793 1.0272 1.0272 0.0000 1,770.3321
1,770.3321
29 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.2017 1.9675 2.4039 5.4000e-003
0.1563 0.0306 0.1869 0.0445 0.0281 0.0726 533.3230 533.3230 3.7300e-003
533.4013
Worker 0.2053 0.2646 3.2548 8.8200e-003
0.7266 4.9600e-003
0.7315 0.1927 4.5800e-003
0.1973 708.9739 708.9739 0.0322 709.6498
Total 0.4070 2.2320 5.6588 0.0142 0.0359 1,243.05110.8828 0.0356 0.9184 0.2372 0.0327 0.2699
SO2 Fugitive PM10
Exhaust PM10
1,242.2970
1,242.2970
PM2.5 Total
Bio- CO2 NBio- CO2
3.9 CU Center Construction - 2018Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.8467 15.5098 11.0209 0.0183 0.9170 0.9170 0.8736 0.8736 1,755.0059
1,755.0059 0.3726 1,762.8294
Total 1.8467 15.5098 11.0209 0.0183 0.3726 1,762.82940.9170 0.9170 0.8736 0.8736 1,755.0059
1,755.0059
30 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1889 1.8061 2.2820 5.3900e-003
0.1563 0.0288 0.1851 0.0445 0.0265 0.0710 524.2685 524.2685 3.7100e-003
524.3463
Worker 0.1874 0.2414 2.9808 8.8200e-003
0.7266 4.9000e-003
0.7315 0.1927 4.5400e-003
0.1972 682.4128 682.4128 0.0300 683.0435
Total 0.3763 2.0475 5.2629 0.0142 0.0337 1,207.38990.8828 0.0337 0.9165 0.2372 0.0311 0.2682
SO2 Fugitive PM10
Exhaust PM10
1,206.6813
1,206.6813
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.8467 15.5098 11.0209 0.0183 0.9170 0.9170 0.8736 0.8736 0.0000 1,755.0059
1,755.0059 0.3726 1,762.8294
Total 1.8467 15.5098 11.0209 0.0183 0.3726 1,762.82940.9170 0.9170 0.8736 0.8736 0.0000 1,755.0059
1,755.0059
31 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1889 1.8061 2.2820 5.3900e-003
0.1563 0.0288 0.1851 0.0445 0.0265 0.0710 524.2685 524.2685 3.7100e-003
524.3463
Worker 0.1874 0.2414 2.9808 8.8200e-003
0.7266 4.9000e-003
0.7315 0.1927 4.5400e-003
0.1972 682.4128 682.4128 0.0300 683.0435
Total 0.3763 2.0475 5.2629 0.0142 0.0337 1,207.38990.8828 0.0337 0.9165 0.2372 0.0311 0.2682
SO2 Fugitive PM10
Exhaust PM10
1,206.6813
1,206.6813
PM2.5 Total
Bio- CO2 NBio- CO2
3.10 Dorm Road-District lot const - 2018Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 6.5523 0.0000 6.5523 3.3675 0.0000 3.3675 0.0000 0.0000
Off-Road 3.0028 31.0702 23.9988 0.0297 1.7201 1.7201 1.5825 1.5825 2,993.1005
2,993.1005 0.9318 3,012.6681
Total 3.0028 31.0702 23.9988 0.0297 0.9318 3,012.66816.5523 1.7201 8.2724 3.3675 1.5825 4.9500 2,993.1005
2,993.1005
32 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.1033 1.4496 1.1448 4.5400e-003
0.1077 0.0234 0.1311 0.0295 0.0215 0.0510 443.0152 443.0152 3.2400e-003
443.0831
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0433 0.0557 0.6879 2.0300e-003
0.1677 1.1300e-003
0.1688 0.0445 1.0500e-003
0.0455 157.4799 157.4799 6.9300e-003
157.6254
Total 0.1466 1.5053 1.8327 6.5700e-003
0.0102 600.70860.2753 0.0246 0.2999 0.0740 0.0226 0.0965
SO2 Fugitive PM10
Exhaust PM10
600.4951 600.4951
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.5554 0.0000 2.5554 1.3133 0.0000 1.3133 0.0000 0.0000
Off-Road 3.0028 31.0702 23.9988 0.0297 1.7201 1.7201 1.5825 1.5825 0.0000 2,993.1005
2,993.1005 0.9318 3,012.6681
Total 3.0028 31.0702 23.9988 0.0297 0.9318 3,012.66812.5554 1.7201 4.2755 1.3133 1.5825 2.8958 0.0000 2,993.1005
2,993.1005
33 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.1033 1.4496 1.1448 4.5400e-003
0.1077 0.0234 0.1311 0.0295 0.0215 0.0510 443.0152 443.0152 3.2400e-003
443.0831
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0433 0.0557 0.6879 2.0300e-003
0.1677 1.1300e-003
0.1688 0.0445 1.0500e-003
0.0455 157.4799 157.4799 6.9300e-003
157.6254
Total 0.1466 1.5053 1.8327 6.5700e-003
0.0102 600.70860.2753 0.0246 0.2999 0.0740 0.0226 0.0965
SO2 Fugitive PM10
Exhaust PM10
600.4951 600.4951
PM2.5 Total
Bio- CO2 NBio- CO2
3.11 Baseball Lot Expansion Grading - 2018Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 7.0832 0.0000 7.0832 3.4248 0.0000 3.4248 0.0000 0.0000
Off-Road 3.0028 31.0702 23.9988 0.0297 1.7201 1.7201 1.5825 1.5825 2,993.1005
2,993.1005 0.9318 3,012.6681
Total 3.0028 31.0702 23.9988 0.0297 0.9318 3,012.66817.0832 1.7201 8.8032 3.4248 1.5825 5.0073 2,993.1005
2,993.1005
34 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0105 0.1466 0.1158 4.6000e-004
0.0109 2.3700e-003
0.0133 2.9800e-003
2.1800e-003
5.1600e-003
44.8070 44.8070 3.3000e-004
44.8139
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0433 0.0557 0.6879 2.0300e-003
0.1677 1.1300e-003
0.1688 0.0445 1.0500e-003
0.0455 157.4799 157.4799 6.9300e-003
157.6254
Total 0.0537 0.2023 0.8037 2.4900e-003
7.2600e-003
202.43930.1786 3.5000e-003
0.1821 0.0475 3.2300e-003
0.0507
SO2 Fugitive PM10
Exhaust PM10
202.2869 202.2869
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.7624 0.0000 2.7624 1.3357 0.0000 1.3357 0.0000 0.0000
Off-Road 3.0028 31.0702 23.9988 0.0297 1.7201 1.7201 1.5825 1.5825 0.0000 2,993.1005
2,993.1005 0.9318 3,012.6681
Total 3.0028 31.0702 23.9988 0.0297 0.9318 3,012.66812.7624 1.7201 4.4825 1.3357 1.5825 2.9182 0.0000 2,993.1005
2,993.1005
35 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0105 0.1466 0.1158 4.6000e-004
0.0109 2.3700e-003
0.0133 2.9800e-003
2.1800e-003
5.1600e-003
44.8070 44.8070 3.3000e-004
44.8139
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0433 0.0557 0.6879 2.0300e-003
0.1677 1.1300e-003
0.1688 0.0445 1.0500e-003
0.0455 157.4799 157.4799 6.9300e-003
157.6254
Total 0.0537 0.2023 0.8037 2.4900e-003
7.2600e-003
202.43930.1786 3.5000e-003
0.1821 0.0475 3.2300e-003
0.0507
SO2 Fugitive PM10
Exhaust PM10
202.2869 202.2869
PM2.5 Total
Bio- CO2 NBio- CO2
3.12 MWT Paving - 2018Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.8057 8.5814 7.2472 0.0112 0.4693 0.4693 0.4318 0.4318 1,122.6347
1,122.6347 0.3495 1,129.9741
Paving 0.4192 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 1.2249 8.5814 7.2472 0.0112 0.3495 1,129.97410.4693 0.4693 0.4318 0.4318 1,122.6347
1,122.6347
36 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0231 0.0297 0.3669 1.0900e-003
0.0894 6.0000e-004
0.0900 0.0237 5.6000e-004
0.0243 83.9893 83.9893 3.7000e-003
84.0669
Total 0.0231 0.0297 0.3669 1.0900e-003
3.7000e-003
84.06690.0894 6.0000e-004
0.0900 0.0237 5.6000e-004
0.0243
SO2 Fugitive PM10
Exhaust PM10
83.9893 83.9893
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.8057 8.5814 7.2472 0.0112 0.4693 0.4693 0.4318 0.4318 0.0000 1,122.6347
1,122.6347 0.3495 1,129.9741
Paving 0.4192 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 1.2249 8.5814 7.2472 0.0112 0.3495 1,129.97410.4693 0.4693 0.4318 0.4318 0.0000 1,122.6347
1,122.6347
37 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0231 0.0297 0.3669 1.0900e-003
0.0894 6.0000e-004
0.0900 0.0237 5.6000e-004
0.0243 83.9893 83.9893 3.7000e-003
84.0669
Total 0.0231 0.0297 0.3669 1.0900e-003
3.7000e-003
84.06690.0894 6.0000e-004
0.0900 0.0237 5.6000e-004
0.0243
SO2 Fugitive PM10
Exhaust PM10
83.9893 83.9893
PM2.5 Total
Bio- CO2 NBio- CO2
3.13 CU Center Paving - 2018Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.8057 8.5814 7.2472 0.0112 0.4693 0.4693 0.4318 0.4318 1,122.6347
1,122.6347 0.3495 1,129.9741
Paving 0.8384 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 1.6441 8.5814 7.2472 0.0112 0.3495 1,129.97410.4693 0.4693 0.4318 0.4318 1,122.6347
1,122.6347
38 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0231 0.0297 0.3669 1.0900e-003
0.0894 6.0000e-004
0.0900 0.0237 5.6000e-004
0.0243 83.9893 83.9893 3.7000e-003
84.0669
Total 0.0231 0.0297 0.3669 1.0900e-003
3.7000e-003
84.06690.0894 6.0000e-004
0.0900 0.0237 5.6000e-004
0.0243
SO2 Fugitive PM10
Exhaust PM10
83.9893 83.9893
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.8057 8.5814 7.2472 0.0112 0.4693 0.4693 0.4318 0.4318 0.0000 1,122.6347
1,122.6347 0.3495 1,129.9741
Paving 0.8384 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 1.6441 8.5814 7.2472 0.0112 0.3495 1,129.97410.4693 0.4693 0.4318 0.4318 0.0000 1,122.6347
1,122.6347
39 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0231 0.0297 0.3669 1.0900e-003
0.0894 6.0000e-004
0.0900 0.0237 5.6000e-004
0.0243 83.9893 83.9893 3.7000e-003
84.0669
Total 0.0231 0.0297 0.3669 1.0900e-003
3.7000e-003
84.06690.0894 6.0000e-004
0.0900 0.0237 5.6000e-004
0.0243
SO2 Fugitive PM10
Exhaust PM10
83.9893 83.9893
PM2.5 Total
Bio- CO2 NBio- CO2
3.14 CU Center Architectural Coating - 2018Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 20.7551 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.2986 2.0058 1.8542 2.9700e-003
0.1506 0.1506 0.1506 0.1506 281.4485 281.4485 0.0267 282.0102
Total 21.0537 2.0058 1.8542 2.9700e-003
0.0267 282.01020.1506 0.1506 0.1506 0.1506 281.4485 281.4485
40 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0375 0.0483 0.5962 1.7600e-003
0.1453 9.8000e-004
0.1463 0.0385 9.1000e-004
0.0395 136.4826 136.4826 6.0100e-003
136.6087
Total 0.0375 0.0483 0.5962 1.7600e-003
6.0100e-003
136.60870.1453 9.8000e-004
0.1463 0.0385 9.1000e-004
0.0395
SO2 Fugitive PM10
Exhaust PM10
136.4826 136.4826
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 20.7551 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.2986 2.0058 1.8542 2.9700e-003
0.1506 0.1506 0.1506 0.1506 0.0000 281.4485 281.4485 0.0267 282.0102
Total 21.0537 2.0058 1.8542 2.9700e-003
0.0267 282.01020.1506 0.1506 0.1506 0.1506 0.0000 281.4485 281.4485
41 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0375 0.0483 0.5962 1.7600e-003
0.1453 9.8000e-004
0.1463 0.0385 9.1000e-004
0.0395 136.4826 136.4826 6.0100e-003
136.6087
Total 0.0375 0.0483 0.5962 1.7600e-003
6.0100e-003
136.60870.1453 9.8000e-004
0.1463 0.0385 9.1000e-004
0.0395
SO2 Fugitive PM10
Exhaust PM10
136.4826 136.4826
PM2.5 Total
Bio- CO2 NBio- CO2
3.15 MWT Architectural Coating - 2018Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 29.0571 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.2986 2.0058 1.8542 2.9700e-003
0.1506 0.1506 0.1506 0.1506 281.4485 281.4485 0.0267 282.0102
Total 29.3558 2.0058 1.8542 2.9700e-003
0.0267 282.01020.1506 0.1506 0.1506 0.1506 281.4485 281.4485
42 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0375 0.0483 0.5962 1.7600e-003
0.1453 9.8000e-004
0.1463 0.0385 9.1000e-004
0.0395 136.4826 136.4826 6.0100e-003
136.6087
Total 0.0375 0.0483 0.5962 1.7600e-003
6.0100e-003
136.60870.1453 9.8000e-004
0.1463 0.0385 9.1000e-004
0.0395
SO2 Fugitive PM10
Exhaust PM10
136.4826 136.4826
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 29.0571 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.2986 2.0058 1.8542 2.9700e-003
0.1506 0.1506 0.1506 0.1506 0.0000 281.4485 281.4485 0.0267 282.0102
Total 29.3558 2.0058 1.8542 2.9700e-003
0.0267 282.01020.1506 0.1506 0.1506 0.1506 0.0000 281.4485 281.4485
43 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0375 0.0483 0.5962 1.7600e-003
0.1453 9.8000e-004
0.1463 0.0385 9.1000e-004
0.0395 136.4826 136.4826 6.0100e-003
136.6087
Total 0.0375 0.0483 0.5962 1.7600e-003
6.0100e-003
136.60870.1453 9.8000e-004
0.1463 0.0385 9.1000e-004
0.0395
SO2 Fugitive PM10
Exhaust PM10
136.4826 136.4826
PM2.5 Total
Bio- CO2 NBio- CO2
3.16 Baseball Lot Expansion Paving - 2018Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.6114 17.1628 14.4944 0.0223 0.9386 0.9386 0.8635 0.8635 2,245.2695
2,245.2695 0.6990 2,259.9481
Paving 0.2096 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 1.8210 17.1628 14.4944 0.0223 0.6990 2,259.94810.9386 0.9386 0.8635 0.8635 2,245.2695
2,245.2695
44 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0433 0.0557 0.6879 2.0300e-003
0.1677 1.1300e-003
0.1688 0.0445 1.0500e-003
0.0455 157.4799 157.4799 6.9300e-003
157.6254
Total 0.0433 0.0557 0.6879 2.0300e-003
6.9300e-003
157.62540.1677 1.1300e-003
0.1688 0.0445 1.0500e-003
0.0455
SO2 Fugitive PM10
Exhaust PM10
157.4799 157.4799
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.6114 17.1628 14.4944 0.0223 0.9386 0.9386 0.8635 0.8635 0.0000 2,245.2695
2,245.2695 0.6990 2,259.9481
Paving 0.2096 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 1.8210 17.1628 14.4944 0.0223 0.6990 2,259.94810.9386 0.9386 0.8635 0.8635 0.0000 2,245.2695
2,245.2695
45 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0433 0.0557 0.6879 2.0300e-003
0.1677 1.1300e-003
0.1688 0.0445 1.0500e-003
0.0455 157.4799 157.4799 6.9300e-003
157.6254
Total 0.0433 0.0557 0.6879 2.0300e-003
6.9300e-003
157.62540.1677 1.1300e-003
0.1688 0.0445 1.0500e-003
0.0455
SO2 Fugitive PM10
Exhaust PM10
157.4799 157.4799
PM2.5 Total
Bio- CO2 NBio- CO2
3.17 Field Locker Rooms Site Preparation - 2019Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 6.5594 0.0000 6.5594 3.3694 0.0000 3.3694 0.0000 0.0000
Off-Road 1.2620 13.3891 10.8354 0.0120 0.6648 0.6648 0.6116 0.6116 1,189.7272
1,189.7272 0.3764 1,197.6319
Total 1.2620 13.3891 10.8354 0.0120 0.3764 1,197.63196.5594 0.6648 7.2242 3.3694 0.6116 3.9810 1,189.7272
1,189.7272
46 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.4816 6.5417 5.2954 0.0218 0.5163 0.1104 0.6267 0.1414 0.1015 0.2429 2,094.2238
2,094.2238 0.0159 2,094.5573
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0135 0.0172 0.2141 6.8000e-004
0.0559 3.8000e-004
0.0563 0.0148 3.5000e-004
0.0152 50.8594 50.8594 2.2100e-003
50.9057
Total 0.4951 6.5589 5.5095 0.0225 0.0181 2,145.46300.5722 0.1107 0.6830 0.1562 0.1019 0.2581
SO2 Fugitive PM10
Exhaust PM10
2,145.0832
2,145.0832
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.5582 0.0000 2.5582 1.3141 0.0000 1.3141 0.0000 0.0000
Off-Road 1.2620 13.3891 10.8354 0.0120 0.6648 0.6648 0.6116 0.6116 0.0000 1,189.7272
1,189.7272 0.3764 1,197.6319
Total 1.2620 13.3891 10.8354 0.0120 0.3764 1,197.63192.5582 0.6648 3.2230 1.3141 0.6116 1.9257 0.0000 1,189.7272
1,189.7272
47 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.4816 6.5417 5.2954 0.0218 0.5163 0.1104 0.6267 0.1414 0.1015 0.2429 2,094.2238
2,094.2238 0.0159 2,094.5573
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0135 0.0172 0.2141 6.8000e-004
0.0559 3.8000e-004
0.0563 0.0148 3.5000e-004
0.0152 50.8594 50.8594 2.2100e-003
50.9057
Total 0.4951 6.5589 5.5095 0.0225 0.0181 2,145.46300.5722 0.1107 0.6830 0.1562 0.1019 0.2581
SO2 Fugitive PM10
Exhaust PM10
2,145.0832
2,145.0832
PM2.5 Total
Bio- CO2 NBio- CO2
3.18 Field Locker Rooms Construction - 2019Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.6243 14.0180 10.7023 0.0183 0.7907 0.7907 0.7535 0.7535 1,739.9227
1,739.9227 0.3619 1,747.5222
Total 1.6243 14.0180 10.7023 0.0183 0.3619 1,747.52220.7907 0.7907 0.7535 0.7535 1,739.9227
1,739.9227
48 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1771 1.6751 2.1611 5.4000e-003
0.1563 0.0269 0.1832 0.0445 0.0247 0.0692 516.9802 516.9802 3.7300e-003
517.0586
Worker 0.1754 0.2237 2.7828 8.8600e-003
0.7266 4.9500e-003
0.7315 0.1927 4.5900e-003
0.1973 661.1721 661.1721 0.0287 661.7742
Total 0.3525 1.8989 4.9439 0.0143 0.0324 1,178.83270.8828 0.0318 0.9147 0.2372 0.0293 0.2665
SO2 Fugitive PM10
Exhaust PM10
1,178.1523
1,178.1523
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.6243 14.0180 10.7023 0.0183 0.7907 0.7907 0.7535 0.7535 0.0000 1,739.9227
1,739.9227 0.3619 1,747.5222
Total 1.6243 14.0180 10.7023 0.0183 0.3619 1,747.52220.7907 0.7907 0.7535 0.7535 0.0000 1,739.9227
1,739.9227
49 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1771 1.6751 2.1611 5.4000e-003
0.1563 0.0269 0.1832 0.0445 0.0247 0.0692 516.9802 516.9802 3.7300e-003
517.0586
Worker 0.1754 0.2237 2.7828 8.8600e-003
0.7266 4.9500e-003
0.7315 0.1927 4.5900e-003
0.1973 661.1721 661.1721 0.0287 661.7742
Total 0.3525 1.8989 4.9439 0.0143 0.0324 1,178.83270.8828 0.0318 0.9147 0.2372 0.0293 0.2665
SO2 Fugitive PM10
Exhaust PM10
1,178.1523
1,178.1523
PM2.5 Total
Bio- CO2 NBio- CO2
3.19 Field Locker Rooms Paving - 2019Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.7129 7.4677 7.1826 0.0112 0.4047 0.4047 0.3723 0.3723 1,104.4866
1,104.4866 0.3495 1,111.8250
Paving 0.8384 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 1.5513 7.4677 7.1826 0.0112 0.3495 1,111.82500.4047 0.4047 0.3723 0.3723 1,104.4866
1,104.4866
50 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0216 0.0275 0.3425 1.0900e-003
0.0894 6.1000e-004
0.0900 0.0237 5.6000e-004
0.0243 81.3750 81.3750 3.5300e-003
81.4491
Total 0.0216 0.0275 0.3425 1.0900e-003
3.5300e-003
81.44910.0894 6.1000e-004
0.0900 0.0237 5.6000e-004
0.0243
SO2 Fugitive PM10
Exhaust PM10
81.3750 81.3750
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.7129 7.4677 7.1826 0.0112 0.4047 0.4047 0.3723 0.3723 0.0000 1,104.4866
1,104.4866 0.3495 1,111.8250
Paving 0.8384 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 1.5513 7.4677 7.1826 0.0112 0.3495 1,111.82500.4047 0.4047 0.3723 0.3723 0.0000 1,104.4866
1,104.4866
51 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0216 0.0275 0.3425 1.0900e-003
0.0894 6.1000e-004
0.0900 0.0237 5.6000e-004
0.0243 81.3750 81.3750 3.5300e-003
81.4491
Total 0.0216 0.0275 0.3425 1.0900e-003
3.5300e-003
81.44910.0894 6.1000e-004
0.0900 0.0237 5.6000e-004
0.0243
SO2 Fugitive PM10
Exhaust PM10
81.3750 81.3750
PM2.5 Total
Bio- CO2 NBio- CO2
3.20 Field Locker Rooms Architectural Coatings - 2019Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 21.7928 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.2664 1.8354 1.8413 2.9700e-003
0.1288 0.1288 0.1288 0.1288 281.4481 281.4481 0.0238 281.9473
Total 22.0593 1.8354 1.8413 2.9700e-003
0.0238 281.94730.1288 0.1288 0.1288 0.1288 281.4481 281.4481
52 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0351 0.0448 0.5566 1.7700e-003
0.1453 9.9000e-004
0.1463 0.0385 9.2000e-004
0.0395 132.2344 132.2344 5.7300e-003
132.3548
Total 0.0351 0.0448 0.5566 1.7700e-003
5.7300e-003
132.35480.1453 9.9000e-004
0.1463 0.0385 9.2000e-004
0.0395
SO2 Fugitive PM10
Exhaust PM10
132.2344 132.2344
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 21.7928 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.2664 1.8354 1.8413 2.9700e-003
0.1288 0.1288 0.1288 0.1288 0.0000 281.4481 281.4481 0.0238 281.9473
Total 22.0593 1.8354 1.8413 2.9700e-003
0.0238 281.94730.1288 0.1288 0.1288 0.1288 0.0000 281.4481 281.4481
53 of 54
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0351 0.0448 0.5566 1.7700e-003
0.1453 9.9000e-004
0.1463 0.0385 9.2000e-004
0.0395 132.2344 132.2344 5.7300e-003
132.3548
Total 0.0351 0.0448 0.5566 1.7700e-003
0.1453 9.9000e-004
0.1463 0.0385 9.2000e-004
0.0395 132.2344 132.2344 5.7300e-003
132.3548
54 of 54
Orange County, Winter
Concordia University - Phases 1 & 2 Operation - 2020
1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population
University/College (4Yr) 1,600.00 Student 72.80 547,551.00 1024
1.2 Other Project Characteristics
Urbanization
Climate Zone
Urban
8
Wind Speed (m/s) Precipitation Freq (Days)2.2 30
1.3 User Entered Comments & Non-Default Data
1.0 Project Characteristics
Utility Company Southern California Edison
2020Operational Year
CO2 Intensity (lb/MWhr)
630.89 0.029CH4 Intensity (lb/MWhr)
0.006N2O Intensity (lb/MWhr)
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:24 PMPage 1 of 20
Project Characteristics -
Land Use - Campus area is 72.8 acres. Assumes an interim student population of 1,600 students, 291,551 square feet of institutional building space, approx. 256,000 square feet of residence hall space, and 1,024 campus residents.
Construction Phase - No construction emissions for this analysis.
Off-road Equipment - No construction emissions under existing conditions.
Off-road Equipment - No construction emissions for this analysis.
Trips and VMT - No construction emissions for this analysis.
Vehicle Trips - Trip generation rates revised to be consistent with project Traffic Impact Analysis. Saturday trip rate is assumed to be 0.55% of weekday rate. Sunday trip rate is asumed to be 0.25% of weekday rate.
Woodstoves -
Area Coating - SCAQMD Rule 1113 limits paints to a maximum VOC content of 50 g/L.
Solid Waste - Default solid waste generation rate changed to 500 tons per year per historic solid waste disposal for the campus (including residence halls).
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:24 PMPage 2 of 20
2.0 Emissions Summary
Table Name Column Name Default Value New Value
tblAreaCoating Area_EF_Nonresidential_Exterior 250 50
tblAreaCoating Area_EF_Nonresidential_Interior 250 50
tblAreaCoating Area_EF_Residential_Exterior 100 50
tblAreaMitigation UseLowVOCPaintNonresidentialExteriorValue
50 250
tblConstructionPhase NumDays 1,110.00 848.00
tblLandUse LandUseSquareFeet 294,075.95 547,551.00
tblLandUse LotAcreage 6.75 72.80
tblLandUse Population 0.00 1,024.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00
tblProjectCharacteristics OperationalYear 2014 2020
tblSolidWaste SolidWasteGenerationRate 292.00 500.00
tblTripsAndVMT VendorTripNumber 90.00 0.00
tblTripsAndVMT WorkerTripNumber 230.00 0.00
tblVehicleTrips ST_TR 1.30 1.95
tblVehicleTrips SU_TR 0.00 0.89
tblVehicleTrips WD_TR 2.38 3.55
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:24 PMPage 3 of 20
2.1 Overall Construction (Maximum Daily Emission)
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
2016 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2017 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2018 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2019 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:24 PMPage 4 of 20
2.1 Overall Construction (Maximum Daily Emission)
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
2016 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2017 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2018 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2019 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent Reduction
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:24 PMPage 5 of 20
2.2 Overall Operational
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Area 11.5523 1.5200e-003
0.1644 1.0000e-005
5.9000e-004
5.9000e-004
5.9000e-004
5.9000e-004
0.3502 0.3502 9.4000e-004
0.3699
Energy 0.2566 2.3326 1.9594 0.0140 0.1773 0.1773 0.1773 0.1773 2,799.0842
2,799.0842
0.0537 0.0513 2,816.1190
Mobile 15.0895 32.5127 153.0827 0.4845 36.0572 0.5082 36.5654 9.6215 0.4691 10.0906 36,966.5120
36,966.5120
1.3709 36,995.3003
Total 26.8983 34.8468 155.2065 0.4985 36.0572 0.6861 36.7433 9.6215 0.6470 10.2685 39,765.9464
39,765.9464
1.4255 0.0513 39,811.7892
Unmitigated Operational
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Area 11.5523 1.5200e-003
0.1644 1.0000e-005
5.9000e-004
5.9000e-004
5.9000e-004
5.9000e-004
0.3502 0.3502 9.4000e-004
0.3699
Energy 0.2566 2.3326 1.9594 0.0140 0.1773 0.1773 0.1773 0.1773 2,799.0842
2,799.0842
0.0537 0.0513 2,816.1190
Mobile 15.0895 32.5127 153.0827 0.4845 36.0572 0.5082 36.5654 9.6215 0.4691 10.0906 36,966.5120
36,966.5120
1.3709 36,995.3003
Total 26.8983 34.8468 155.2065 0.4985 36.0572 0.6861 36.7433 9.6215 0.6470 10.2685 39,765.9464
39,765.9464
1.4255 0.0513 39,811.7892
Mitigated Operational
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:24 PMPage 6 of 20
3.0 Construction Detail
3.1 Mitigation Measures Construction
Construction Phase
Phase Number
Phase Name Phase Type Start Date End Date Num Days Week
Num Days Phase Description
1 Building Construction Building Construction 1/1/2016 4/2/2019 5 848
OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor
Building Construction Cranes 0 7.00 226 0.29
Trips and VMT
Phase Name Offroad Equipment Count
Worker Trip Number
Vendor Trip Number
Hauling Trip Number
Worker Trip Length
Vendor Trip Length
Hauling Trip Length
Worker Vehicle Class
Vendor Vehicle Class
Hauling Vehicle Class
Building Construction 8 0.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent Reduction
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 0; Non-Residential Outdoor: 0 (Architectural Coating – sqft)
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:24 PMPage 7 of 20
3.2 Building Construction - 2016
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:24 PMPage 8 of 20
3.2 Building Construction - 2016
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:24 PMPage 9 of 20
3.2 Building Construction - 2017
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:24 PMPage 10 of 20
3.2 Building Construction - 2017
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:24 PMPage 11 of 20
3.2 Building Construction - 2018
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:24 PMPage 12 of 20
3.2 Building Construction - 2018
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:24 PMPage 13 of 20
3.2 Building Construction - 2019
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:24 PMPage 14 of 20
4.0 Operational Detail - Mobile
3.2 Building Construction - 2019
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:24 PMPage 15 of 20
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Mitigated 15.0895 32.5127 153.0827 0.4845 36.0572 0.5082 36.5654 9.6215 0.4691 10.0906 36,966.5120
36,966.5120
1.3709 36,995.3003
Unmitigated 15.0895 32.5127 153.0827 0.4845 36.0572 0.5082 36.5654 9.6215 0.4691 10.0906 36,966.5120
36,966.5120
1.3709 36,995.3003
4.1 Mitigation Measures Mobile
4.2 Trip Summary Information
4.3 Trip Type Information
Average Daily Trip Rate Unmitigated Mitigated
Land Use Weekday Saturday Sunday Annual VMT Annual VMT
University/College (4Yr) 5,680.00 3,120.00 1424.00 14,137,153 14,137,153
Total 5,680.00 3,120.00 1,424.00 14,137,153 14,137,153
Miles Trip % Trip Purpose %
Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by
University/College (4Yr) 16.60 8.40 6.90 6.40 88.60 5.00 91 9 0
5.0 Energy Detail4.4 Fleet Mix
LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH
0.508857 0.056420 0.193204 0.150829 0.041936 0.005921 0.015893 0.015805 0.001454 0.002159 0.004747 0.000498 0.002277
Historical Energy Use: N
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:24 PMPage 16 of 20
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
NaturalGas Mitigated
0.2566 2.3326 1.9594 0.0140 0.1773 0.1773 0.1773 0.1773 2,799.0842
2,799.0842
0.0537 0.0513 2,816.1190
NaturalGas Unmitigated
0.2566 2.3326 1.9594 0.0140 0.1773 0.1773 0.1773 0.1773 2,799.0842
2,799.0842
0.0537 0.0513 2,816.1190
5.2 Energy by Land Use - NaturalGas
NaturalGas Use
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr lb/day lb/day
University/College (4Yr)
23792.2 0.2566 2.3326 1.9594 0.0140 0.1773 0.1773 0.1773 0.1773 2,799.0842
2,799.0842
0.0537 0.0513 2,816.1190
Total 0.2566 2.3326 1.9594 0.0140 0.1773 0.1773 0.1773 0.1773 2,799.0842
2,799.0842
0.0537 0.0513 2,816.1190
Unmitigated
5.1 Mitigation Measures Energy
Historical Energy Use: N
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:24 PMPage 17 of 20
6.1 Mitigation Measures Area
6.0 Area Detail
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Mitigated 11.5523 1.5200e-003
0.1644 1.0000e-005
5.9000e-004
5.9000e-004
5.9000e-004
5.9000e-004
0.3502 0.3502 9.4000e-004
0.3699
Unmitigated 11.5523 1.5200e-003
0.1644 1.0000e-005
5.9000e-004
5.9000e-004
5.9000e-004
5.9000e-004
0.3502 0.3502 9.4000e-004
0.3699
5.2 Energy by Land Use - NaturalGas
NaturalGas Use
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr lb/day lb/day
University/College (4Yr)
23.7922 0.2566 2.3326 1.9594 0.0140 0.1773 0.1773 0.1773 0.1773 2,799.0842
2,799.0842
0.0537 0.0513 2,816.1190
Total 0.2566 2.3326 1.9594 0.0140 0.1773 0.1773 0.1773 0.1773 2,799.0842
2,799.0842
0.0537 0.0513 2,816.1190
Mitigated
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:24 PMPage 18 of 20
7.0 Water Detail
6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory lb/day lb/day
Architectural Coating
0.6953 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Consumer Products
10.8415 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Landscaping 0.0155 1.5200e-003
0.1644 1.0000e-005
5.9000e-004
5.9000e-004
5.9000e-004
5.9000e-004
0.3502 0.3502 9.4000e-004
0.3699
Total 11.5523 1.5200e-003
0.1644 1.0000e-005
5.9000e-004
5.9000e-004
5.9000e-004
5.9000e-004
0.3502 0.3502 9.4000e-004
0.3699
Unmitigated
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory lb/day lb/day
Architectural Coating
0.6953 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Consumer Products
10.8415 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Landscaping 0.0155 1.5200e-003
0.1644 1.0000e-005
5.9000e-004
5.9000e-004
5.9000e-004
5.9000e-004
0.3502 0.3502 9.4000e-004
0.3699
Total 11.5523 1.5200e-003
0.1644 1.0000e-005
5.9000e-004
5.9000e-004
5.9000e-004
5.9000e-004
0.3502 0.3502 9.4000e-004
0.3699
Mitigated
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:24 PMPage 19 of 20
8.1 Mitigation Measures Waste
7.1 Mitigation Measures Water
8.0 Waste Detail
10.0 Vegetation
9.0 Operational Offroad
Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:24 PMPage 20 of 20
Orange County, Summer
Concordia University - Phases 1 & 2 Operation - 2020
1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population
University/College (4Yr) 1,600.00 Student 72.80 547,551.00 1024
1.2 Other Project Characteristics
Urbanization
Climate Zone
Urban
8
Wind Speed (m/s) Precipitation Freq (Days)2.2 30
1.3 User Entered Comments & Non-Default Data
1.0 Project Characteristics
Utility Company Southern California Edison
2020Operational Year
CO2 Intensity (lb/MWhr)
630.89 0.029CH4 Intensity (lb/MWhr)
0.006N2O Intensity (lb/MWhr)
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:26 PMPage 1 of 20
Project Characteristics -
Land Use - Campus area is 72.8 acres. Assumes an interim student population of 1,600 students, 291,551 square feet of institutional building space, approx. 256,000 square feet of residence hall space, and 1,024 campus residents.
Construction Phase - No construction emissions for this analysis.
Off-road Equipment - No construction emissions under existing conditions.
Off-road Equipment - No construction emissions for this analysis.
Trips and VMT - No construction emissions for this analysis.
Vehicle Trips - Trip generation rates revised to be consistent with project Traffic Impact Analysis. Saturday trip rate is assumed to be 0.55% of weekday rate. Sunday trip rate is asumed to be 0.25% of weekday rate.
Woodstoves -
Area Coating - SCAQMD Rule 1113 limits paints to a maximum VOC content of 50 g/L.
Solid Waste - Default solid waste generation rate changed to 500 tons per year per historic solid waste disposal for the campus (including residence halls).
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:26 PMPage 2 of 20
2.0 Emissions Summary
Table Name Column Name Default Value New Value
tblAreaCoating Area_EF_Nonresidential_Exterior 250 50
tblAreaCoating Area_EF_Nonresidential_Interior 250 50
tblAreaCoating Area_EF_Residential_Exterior 100 50
tblAreaMitigation UseLowVOCPaintNonresidentialExteriorValue
50 250
tblConstructionPhase NumDays 1,110.00 848.00
tblLandUse LandUseSquareFeet 294,075.95 547,551.00
tblLandUse LotAcreage 6.75 72.80
tblLandUse Population 0.00 1,024.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00
tblProjectCharacteristics OperationalYear 2014 2020
tblSolidWaste SolidWasteGenerationRate 292.00 500.00
tblTripsAndVMT VendorTripNumber 90.00 0.00
tblTripsAndVMT WorkerTripNumber 230.00 0.00
tblVehicleTrips ST_TR 1.30 1.95
tblVehicleTrips SU_TR 0.00 0.89
tblVehicleTrips WD_TR 2.38 3.55
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:26 PMPage 3 of 20
2.1 Overall Construction (Maximum Daily Emission)
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
2016 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2017 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2018 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2019 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:26 PMPage 4 of 20
2.1 Overall Construction (Maximum Daily Emission)
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
2016 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2017 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2018 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2019 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent Reduction
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:26 PMPage 5 of 20
2.2 Overall Operational
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Area 11.5523 1.5200e-003
0.1644 1.0000e-005
5.9000e-004
5.9000e-004
5.9000e-004
5.9000e-004
0.3502 0.3502 9.4000e-004
0.3699
Energy 0.2566 2.3326 1.9594 0.0140 0.1773 0.1773 0.1773 0.1773 2,799.0842
2,799.0842
0.0537 0.0513 2,816.1190
Mobile 14.3108 30.8145 153.7119 0.5074 36.0572 0.5066 36.5638 9.6215 0.4676 10.0891 38,632.6854
38,632.6854
1.3699 38,661.4533
Total 26.1197 33.1486 155.8356 0.5214 36.0572 0.6844 36.7417 9.6215 0.6455 10.2670 41,432.1198
41,432.1198
1.4245 0.0513 41,477.9422
Unmitigated Operational
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Area 11.5523 1.5200e-003
0.1644 1.0000e-005
5.9000e-004
5.9000e-004
5.9000e-004
5.9000e-004
0.3502 0.3502 9.4000e-004
0.3699
Energy 0.2566 2.3326 1.9594 0.0140 0.1773 0.1773 0.1773 0.1773 2,799.0842
2,799.0842
0.0537 0.0513 2,816.1190
Mobile 14.3108 30.8145 153.7119 0.5074 36.0572 0.5066 36.5638 9.6215 0.4676 10.0891 38,632.6854
38,632.6854
1.3699 38,661.4533
Total 26.1197 33.1486 155.8356 0.5214 36.0572 0.6844 36.7417 9.6215 0.6455 10.2670 41,432.1198
41,432.1198
1.4245 0.0513 41,477.9422
Mitigated Operational
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:26 PMPage 6 of 20
3.0 Construction Detail
3.1 Mitigation Measures Construction
Construction Phase
Phase Number
Phase Name Phase Type Start Date End Date Num Days Week
Num Days Phase Description
1 Building Construction Building Construction 1/1/2016 4/2/2019 5 848
OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor
Building Construction Cranes 0 7.00 226 0.29
Trips and VMT
Phase Name Offroad Equipment Count
Worker Trip Number
Vendor Trip Number
Hauling Trip Number
Worker Trip Length
Vendor Trip Length
Hauling Trip Length
Worker Vehicle Class
Vendor Vehicle Class
Hauling Vehicle Class
Building Construction 8 0.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent Reduction
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 0; Non-Residential Outdoor: 0 (Architectural Coating – sqft)
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:26 PMPage 7 of 20
3.2 Building Construction - 2016
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:26 PMPage 8 of 20
3.2 Building Construction - 2016
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:26 PMPage 9 of 20
3.2 Building Construction - 2017
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:26 PMPage 10 of 20
3.2 Building Construction - 2017
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:26 PMPage 11 of 20
3.2 Building Construction - 2018
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:26 PMPage 12 of 20
3.2 Building Construction - 2018
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:26 PMPage 13 of 20
3.2 Building Construction - 2019
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:26 PMPage 14 of 20
4.0 Operational Detail - Mobile
3.2 Building Construction - 2019
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:26 PMPage 15 of 20
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Mitigated 14.3108 30.8145 153.7119 0.5074 36.0572 0.5066 36.5638 9.6215 0.4676 10.0891 38,632.6854
38,632.6854
1.3699 38,661.4533
Unmitigated 14.3108 30.8145 153.7119 0.5074 36.0572 0.5066 36.5638 9.6215 0.4676 10.0891 38,632.6854
38,632.6854
1.3699 38,661.4533
4.1 Mitigation Measures Mobile
4.2 Trip Summary Information
4.3 Trip Type Information
Average Daily Trip Rate Unmitigated Mitigated
Land Use Weekday Saturday Sunday Annual VMT Annual VMT
University/College (4Yr) 5,680.00 3,120.00 1424.00 14,137,153 14,137,153
Total 5,680.00 3,120.00 1,424.00 14,137,153 14,137,153
Miles Trip % Trip Purpose %
Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by
University/College (4Yr) 16.60 8.40 6.90 6.40 88.60 5.00 91 9 0
5.0 Energy Detail4.4 Fleet Mix
LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH
0.508857 0.056420 0.193204 0.150829 0.041936 0.005921 0.015893 0.015805 0.001454 0.002159 0.004747 0.000498 0.002277
Historical Energy Use: N
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:26 PMPage 16 of 20
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
NaturalGas Mitigated
0.2566 2.3326 1.9594 0.0140 0.1773 0.1773 0.1773 0.1773 2,799.0842
2,799.0842
0.0537 0.0513 2,816.1190
NaturalGas Unmitigated
0.2566 2.3326 1.9594 0.0140 0.1773 0.1773 0.1773 0.1773 2,799.0842
2,799.0842
0.0537 0.0513 2,816.1190
5.2 Energy by Land Use - NaturalGas
NaturalGas Use
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr lb/day lb/day
University/College (4Yr)
23792.2 0.2566 2.3326 1.9594 0.0140 0.1773 0.1773 0.1773 0.1773 2,799.0842
2,799.0842
0.0537 0.0513 2,816.1190
Total 0.2566 2.3326 1.9594 0.0140 0.1773 0.1773 0.1773 0.1773 2,799.0842
2,799.0842
0.0537 0.0513 2,816.1190
Unmitigated
5.1 Mitigation Measures Energy
Historical Energy Use: N
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:26 PMPage 17 of 20
6.1 Mitigation Measures Area
6.0 Area Detail
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Mitigated 11.5523 1.5200e-003
0.1644 1.0000e-005
5.9000e-004
5.9000e-004
5.9000e-004
5.9000e-004
0.3502 0.3502 9.4000e-004
0.3699
Unmitigated 11.5523 1.5200e-003
0.1644 1.0000e-005
5.9000e-004
5.9000e-004
5.9000e-004
5.9000e-004
0.3502 0.3502 9.4000e-004
0.3699
5.2 Energy by Land Use - NaturalGas
NaturalGas Use
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr lb/day lb/day
University/College (4Yr)
23.7922 0.2566 2.3326 1.9594 0.0140 0.1773 0.1773 0.1773 0.1773 2,799.0842
2,799.0842
0.0537 0.0513 2,816.1190
Total 0.2566 2.3326 1.9594 0.0140 0.1773 0.1773 0.1773 0.1773 2,799.0842
2,799.0842
0.0537 0.0513 2,816.1190
Mitigated
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:26 PMPage 18 of 20
7.0 Water Detail
6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory lb/day lb/day
Architectural Coating
0.6953 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Consumer Products
10.8415 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Landscaping 0.0155 1.5200e-003
0.1644 1.0000e-005
5.9000e-004
5.9000e-004
5.9000e-004
5.9000e-004
0.3502 0.3502 9.4000e-004
0.3699
Total 11.5523 1.5200e-003
0.1644 1.0000e-005
5.9000e-004
5.9000e-004
5.9000e-004
5.9000e-004
0.3502 0.3502 9.4000e-004
0.3699
Unmitigated
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory lb/day lb/day
Architectural Coating
0.6953 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Consumer Products
10.8415 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Landscaping 0.0155 1.5200e-003
0.1644 1.0000e-005
5.9000e-004
5.9000e-004
5.9000e-004
5.9000e-004
0.3502 0.3502 9.4000e-004
0.3699
Total 11.5523 1.5200e-003
0.1644 1.0000e-005
5.9000e-004
5.9000e-004
5.9000e-004
5.9000e-004
0.3502 0.3502 9.4000e-004
0.3699
Mitigated
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:26 PMPage 19 of 20
8.1 Mitigation Measures Waste
7.1 Mitigation Measures Water
8.0 Waste Detail
10.0 Vegetation
9.0 Operational Offroad
Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 4:26 PMPage 20 of 20
CalEEMod Version: CalEEMod.2013.2.2 Page 1 of 1 Date: 4/17/2016 3:00 PM
Concordia University - Phases 3 & 4 ConstructionOrange County, Winter
1.0 Project Characteristics
1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population
University/College (4Yr) 200.00 Student 5.00 100,300.00 0
Other Non-Asphalt Surfaces 0.50 Acre 0.50 21,780.00 0
Parking Lot 137.00 Space 1.23 54,800.00 0
Unenclosed Parking Structure 0.50 Acre 0.50 21,780.00 0
1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 2.2 Precipitation Freq (Days) 30
Climate Zone 8 Operational Year 2035
Utility Company Southern California Edison
CO2 Intensity (lb/MWhr)
630.89 CH4 Intensity (lb/MWhr)
0.029 N2O Intensity (lb/MWhr)
0.006
1.3 User Entered Comments & Non-Default Data
Project Characteristics -
Land Use - Assumes the construction of 100,300 square feet of new institutional building space, 1.23-acre (137 space) of new parking lot sapce, 0.5 acre of concrete improvements and 0 5 acre of concrete parking structure for tennis courtsConstruction Phase - Construction dates entered to reflect anticipated construction schedule.
Off-road Equipment -
Off-road Equipment -
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Equipment based on grading quantities
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
1 of 87
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes one trencher.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment -
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes one trencher.
Off-road Equipment -
Off-road Equipment -
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes one excavator.
Off-road Equipment -
Off-road Equipment -
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Equipment based on grading quantities
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment -
Off-road Equipment -
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes one trencher.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Trips and VMT - Haul trips per Psomas
Demolition -
Grading - Amount of material imported and exported based on Conceptual Grading Plan.
Architectural Coating - SCAQMD Rule 1113 limits paints to a maximum VOC content of 50 g/L.
2 of 87
Vehicle Trips - Operational emissions are not calculated in this scenario.
Consumer Products - Operational emissions are not calculated in this scenario.
Area Coating - Operational emissions are not calculated in this scenario.
Landscape Equipment - Operational emissions are not calculated in this scenario.
Energy Use - Operational emissions are not calculated in this scenario.
Water And Wastewater - Operational emissions are not calculated in this scenario.
Solid Waste - Operational emissions are not calculated in this scenario.
Construction Off-road Equipment Mitigation - Assumes compliance with SCAQMD Rule 403 for fugitive dust as required.
Table Name Column Name Default Value New Value
tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00
tblAreaCoating ReapplicationRatePercent 10 0
tblConstructionPhase NumDays 20.00 53.00
tblConstructionPhase NumDays 20.00 26.00
tblConstructionPhase NumDays 20.00 26.00
tblConstructionPhase NumDays 230.00 366.00
tblConstructionPhase NumDays 230.00 469.00
tblConstructionPhase NumDays 230.00 79.00
tblConstructionPhase NumDays 230.00 92.00
tblConstructionPhase NumDays 230.00 469.00
tblConstructionPhase NumDays 20.00 15.00
tblConstructionPhase NumDays 20.00 26.00
tblConstructionPhase NumDays 20.00 8.00
tblConstructionPhase NumDays 20.00 27.00
3 of 87
tblConstructionPhase NumDays 20.00 25.00
tblConstructionPhase NumDays 20.00 12.00
tblConstructionPhase NumDays 20.00 53.00
tblConstructionPhase NumDays 20.00 6.00
tblConstructionPhase NumDays 20.00 13.00
tblConstructionPhase NumDays 20.00 6.00
tblConstructionPhase NumDays 20.00 6.00
tblConstructionPhase NumDays 10.00 27.00
tblConstructionPhase NumDays 10.00 12.00
tblConstructionPhase NumDays 10.00 26.00
tblConstructionPhase NumDays 10.00 6.00
tblConstructionPhase NumDays 10.00 18.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
4 of 87
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase PhaseEndDate 11/7/2026 10/31/2026
tblConstructionPhase PhaseEndDate 12/1/2026 9/30/2026
tblConstructionPhase PhaseEndDate 7/7/2027 6/30/2027
tblConstructionPhase PhaseEndDate 12/16/2026 9/15/2026
tblConstructionPhase PhaseEndDate 3/31/2025 2/28/2025
tblConstructionPhase PhaseEndDate 11/29/2025 11/30/2025
tblConstructionPhase PhaseEndDate 9/22/2026 9/7/2026
tblConstructionPhase PhaseEndDate 10/15/2026 9/30/2026
tblConstructionPhase PhaseEndDate 10/7/2026 6/7/2027
tblConstructionPhase PhaseEndDate 9/14/2026 10/14/2025
tblConstructionPhase PhaseEndDate 6/30/2027 4/30/2026
tblConstructionPhase PhaseEndDate 5/7/2026 4/7/2026
tblConstructionPhase PhaseEndDate 12/13/2025 11/30/2025
tblConstructionPhase PhaseEndDate 6/13/2026 5/31/2026
tblConstructionPhase PhaseEndDate 6/16/2026 5/31/2026
tblConstructionPhase PhaseStartDate 9/8/2026 9/1/2026
tblConstructionPhase PhaseStartDate 11/1/2026 9/1/2026
5 of 87
tblConstructionPhase PhaseStartDate 6/8/2027 6/1/2027
tblConstructionPhase PhaseStartDate 9/1/2026 6/1/2026
tblConstructionPhase PhaseStartDate 10/1/2023 9/1/2023
tblConstructionPhase PhaseStartDate 9/16/2026 9/1/2026
tblConstructionPhase PhaseStartDate 10/1/2026 9/16/2026
tblConstructionPhase PhaseStartDate 10/1/2026 6/1/2027
tblConstructionPhase PhaseStartDate 9/1/2026 10/1/2025
tblConstructionPhase PhaseStartDate 6/1/2027 4/1/2026
tblConstructionPhase PhaseStartDate 5/1/2026 4/1/2026
tblConstructionPhase PhaseStartDate 12/1/2025 11/16/2025
tblConstructionPhase PhaseStartDate 5/15/2026 5/1/2026
tblConstructionPhase PhaseStartDate 6/1/2026 5/15/2026
tblEnergyUse NT24E 2.72 0.00
tblEnergyUse T24E 6.10 0.00
tblGrading AcresOfGrading 13.50 2.00
tblGrading AcresOfGrading 6.50 2.00
tblGrading AcresOfGrading 6.00 1.00
tblGrading AcresOfGrading 26.50 2.00
tblGrading AcresOfGrading 0.00 2.00
tblGrading AcresOfGrading 0.00 2.00
tblGrading AcresOfGrading 0.00 1.50
tblGrading AcresOfGrading 0.00 1.00
tblGrading AcresOfGrading 0.00 2.00
tblGrading MaterialExported 0.00 1,963.00
tblGrading MaterialExported 0.00 23,080.00
tblGrading MaterialExported 0.00 1,963.00
tblGrading MaterialImported 0.00 3,088.00
tblGrading MaterialImported 0.00 580.00
tblGrading MaterialImported 0.00 3,088.00
tblLandUse LandUseSquareFeet 36,759.49 100,300.00
6 of 87
tblLandUse LotAcreage 0.84 5.00
tblOffRoadEquipment HorsePower 80.00 162.00
tblOffRoadEquipment HorsePower 80.00 162.00
tblOffRoadEquipment HorsePower 80.00 162.00
tblOffRoadEquipment LoadFactor 0.50 0.38
tblOffRoadEquipment LoadFactor 0.50 0.38
tblOffRoadEquipment LoadFactor 0.50 0.38
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 2.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 2.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 2.00
7 of 87
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 2.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 2.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 1.00
tblProjectCharacteristics OperationalYear 2014 2035
tblSolidWaste SolidWasteGenerationRate 36.50 0.00
tblTripsAndVMT HaulingTripNumber 631.00 864.00
tblTripsAndVMT HaulingTripNumber 2,958.00 2,522.00
tblTripsAndVMT HaulingTripNumber 0.00 956.00
tblTripsAndVMT HaulingTripNumber 631.00 1,820.00
tblVehicleTrips ST_TR 1.30 0.00
tblVehicleTrips WD_TR 2.38 0.00
tblWater IndoorWaterUseRate 428,220.00 0.00
tblWater OutdoorWaterUseRate 669,780.00 0.00
8 of 87
Exhaust PM10
PM10 Total
2.0 Emissions Summary
2.1 Overall Construction (Maximum Daily Emission)
NBio- CO2 Total CO2
Unmitigated Construction
ROG NOx CO SO2 Fugitive PM10
CH4 N2O CO2e
Year lb/day lb/day
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2
2023 3.6263 31.3124 38.7883 0.0694 6.8391 1.4948 7.8793 3.5246 1.3900 4.4816 0.0000 6,299.9309
6,299.9309 1.3809 0.0000 6,328.9293
2024 1.8507 14.8067 21.6609 0.0446 1.1341 0.6468 1.7809 0.3048 0.6077 0.9125 0.0000 3,923.0314
3,923.0314 0.6356 0.0000 3,936.3781
2025 33.9274 50.1492 70.4170 0.1666 9.5822 2.0952 11.6774 4.3167 1.9386 6.2552 0.0000 15,443.0171
15,443.0171
2.1321 0.0000 15,487.7919
2026 43.5186 55.1011 85.0304 0.1783 15.3032 2.2411 17.2027 7.4610 2.1056 9.2305 0.0000 15,629.2324
15,629.2324
2.5218 0.0000 15,682.1903
2027 27.1446 13.7587 21.1544 0.0446 1.1342 0.5604 1.6946 0.3049 0.5265 0.8314 0.0000 3,900.8171
3,900.8171 0.6298 0.0000 3,914.0432
Total 110.0676 165.1280 237.0509 0.5035 7.3002 0.0000 45,349.3327
33.9927 7.0383 40.2348 15.9119 6.5684 21.7112
SO2 Fugitive PM10
Exhaust PM10
0.0000 45,196.0289
45,196.0289
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO Total CO2 CH4 N2O CO2e
Year lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
2023 3.6263 31.3124 38.7883 0.0694 3.1346 1.4948 4.1748 1.5017 1.3900 2.4587 0.0000 6,299.9309
6,299.9309 1.3809 0.0000 6,328.9293
2024 1.8507 14.8067 21.6609 0.0446 1.1341 0.6468 1.7809 0.3048 0.6077 0.9125 0.0000 3,923.0314
3,923.0314 0.6356 0.0000 3,936.3781
2025 33.9274 50.1492 70.4170 0.1666 5.6447 2.0952 7.7399 2.2012 1.9386 4.1398 0.0000 15,443.0171
15,443.0171
2.1321 0.0000 15,487.7919
2026 43.5186 55.1011 85.0304 0.1783 7.8111 2.2411 9.7106 3.4069 2.1056 5.1763 0.0000 15,629.2324
15,629.2324
2.5218 0.0000 15,682.1903
2027 27.1446 13.7587 21.1544 0.0446 1.1342 0.5604 1.6946 0.3049 0.5265 0.8314 0.0000 3,900.8171
3,900.8171 0.6298 0.0000 3,914.0432
Total 110.0676 165.1280 237.0509 0.5035 18.8587 7.0383 25.1008 7.7194 6.5684 13.5187 0.0000 45,196.0289
45,196.0289
7.3002 0.0000 45,349.3327
9 of 87
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent Reduction
0.00 0.00 0.00 0.00 44.52 0.00 37.61 51.49 0.00 37.73 0.00 0.00 0.00 0.00 0.00 0.00
3.0 Construction Detail
Construction Phase
Phase Number
Phase Name Phase Type Start Date End Date Num Days Week
Num Days Phase Description
1 SN & CC Site Preparation Site Preparation 5/1/2023 5/31/2023 6 27
2 SN & CC Demolition Demolition 6/1/2023 6/30/2023 6 26
3 SN & CC Grading Grading 7/1/2023 8/31/2023 6 53
4 SN & CC Underground Utilities Trenching 9/1/2023 9/30/2023 6 26
5 SN & CC Construction Building Construction 9/1/2023 2/28/2025 6 469
6 SN & CC Paving Paving 3/1/2025 3/7/2025 6 6
7 SN & CC Architectural Coating Architectural Coating 3/8/2025 3/31/2025 6 20
8 Residence Hall Site Preparation Site Preparation 4/1/2025 4/21/2025 6 18
9 Tennis Courts Demolition Demolition 4/22/2025 4/30/2025 6 8
10 Residence Hall Grading Grading 5/1/2025 5/31/2025 6 27
11 Residence Hall Underground Utilities
Trenching 6/1/2025 6/30/2025 6 25
12 Residence Hall Construction Building Construction 7/1/2025 8/31/2026 6 366
13 AAA Building Site Preparation Site Preparation 10/1/2025 10/14/2025 6 12
14 AAA Building Demolition Demolition 10/15/2025 10/31/2025 6 15
15 AAA Building Grading Grading 11/1/2025 11/30/2025 6 25
16 AAA Building Underground Utilities
Trenching 11/16/2025 11/30/2025 6 12
17 AAA Building Construction Building Construction 12/1/2025 5/31/2027 6 469
18 Tennis Court Deck Site Preparation
Site Preparation 4/1/2026 4/30/2026 6 26
19 Pool & RE Building Site Preparation
Site Preparation 4/1/2026 4/7/2026 6 6
20 Pool & RE Building Demolition Demolition 4/8/2026 4/30/2026 6 20
21 Pool & RE Building Grading Grading 5/1/2026 5/14/2026 6 12
22 Tennis Court Deck Underground Utilities
Trenching 5/1/2026 5/31/2026 6 26
10 of 87
23 Pool & RE Building Underground Utilities
Trenching 5/15/2026 5/31/2026 6 14
24 Tennis Court Deck Construction Building Construction 6/1/2026 8/31/2026 6 79
25 Pool & RE Building Construction Building Construction 6/1/2026 9/15/2026 6 92
26 Residence Hall Paving Paving 9/1/2026 9/7/2026 6 6
27 Residence Hall Architecturaql Coating
Architectural Coating 9/1/2026 10/31/2026 6 53
28 Tennis Court Deck Architectural Coating
Architectural Coating 9/1/2026 9/30/2026 6 26
6
29 Pool & RE Building Paving Paving 9/16/2026 9/30/2026 6
6/30/2027 6
13
30 AAA Building Paving Paving 6/1/2027 6/7/2027 6
26
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 218,256; Non-Residential Outdoor: 72,752 (Architectural Coating –
31 AAA Building Architectural Coating
Architectural Coating 6/1/2027
OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor
SN & CC Site Preparation Rubber Tired Dozers 1 8.00 255 0.40
SN & CC Site Preparation Tractors/Loaders/Backhoes 1 8.00 97 0.37
SN & CC Demolition Concrete/Industrial Saws 1 8.00 81 0.73
SN & CC Demolition Excavators 1 8.00 162 0.38
SN & CC Demolition Rubber Tired Dozers 1 8.00 255 0.40
SN & CC Demolition Tractors/Loaders/Backhoes 1 8.00 97 0.37
SN & CC Grading Excavators 2 8.00 162 0.38
SN & CC Grading Graders 1 8.00 174 0.41
SN & CC Grading Rubber Tired Dozers 1 8.00 255 0.40
SN & CC Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37
SN & CC Underground Utilities Excavators 1 8.00 162 0.38
SN & CC Underground Utilities Graders 1 8.00 174 0.41
SN & CC Underground Utilities Rubber Tired Dozers 1 8.00 255 0.40
11 of 87
SN & CC Underground Utilities Tractors/Loaders/Backhoes 1 8.00 97 0.37
SN & CC Construction Cranes 1 7.00 226 0.29
SN & CC Construction Forklifts 3 8.00 89 0.20
SN & CC Construction Generator Sets 1 8.00 84 0.74
SN & CC Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37
SN & CC Construction Welders 1 8.00 46 0.45
SN & CC Paving Pavers 1 8.00 125 0.42
SN & CC Paving Paving Equipment 1 8.00 130 0.36
SN & CC Paving Rollers 1 8.00 80 0.38
SN & CC Architectural Coating Air Compressors 1 6.00 78 0.48
Residence Hall Site Preparation Rubber Tired Dozers 1 8.00 255 0.40
Residence Hall Site Preparation Tractors/Loaders/Backhoes 1 8.00 97 0.37
Tennis Courts Demolition Concrete/Industrial Saws 1 8.00 81 0.73
Tennis Courts Demolition Excavators 1 8.00 162 0.38
Tennis Courts Demolition Rubber Tired Dozers 1 8.00 255 0.40
Residence Hall Grading Excavators 1 8.00 162 0.38
Residence Hall Grading Graders 1 8.00 174 0.41
Residence Hall Grading Rubber Tired Dozers 1 8.00 255 0.40
Residence Hall Grading Tractors/Loaders/Backhoes 1 8.00 97 0.37
Residence Hall Underground Utilities Excavators 1 8.00 162 0.38
Residence Hall Construction Cranes 1 7.00 226 0.29
Residence Hall Construction Forklifts 3 8.00 89 0.20
Residence Hall Construction Generator Sets 1 8.00 84 0.74
Residence Hall Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37
Residence Hall Construction Welders 1 8.00 46 0.45
AAA Building Site Preparation Rubber Tired Dozers 1 8.00 255 0.40
AAA Building Site Preparation Tractors/Loaders/Backhoes 1 8.00 97 0.37
AAA Building Demolition Concrete/Industrial Saws 1 8.00 81 0.73
AAA Building Demolition Excavators 1 8.00 162 0.38
AAA Building Demolition Rubber Tired Dozers 1 8.00 255 0.40
12 of 87
AAA Building Grading Excavators 2 8.00 162 0.38
AAA Building Grading Graders 1 8.00 174 0.41
AAA Building Grading Rubber Tired Dozers 2 8.00 255 0.40
AAA Building Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37
AAA Building Underground Utilities Trenchers 1 8.00 162 0.38
AAA Building Construction Cranes 1 7.00 226 0.29
AAA Building Construction Forklifts 3 8.00 89 0.20
AAA Building Construction Generator Sets 1 8.00 84 0.74
AAA Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37
AAA Building Construction Welders 1 8.00 46 0.45
Tennis Court Deck Site Preparation Rubber Tired Dozers 1 8.00 255 0.40
Tennis Court Deck Site Preparation Tractors/Loaders/Backhoes 1 8.00 97 0.37
Pool & RE Building Site Preparation Rubber Tired Dozers 1 8.00 255 0.40
Pool & RE Building Site Preparation Tractors/Loaders/Backhoes 1 8.00 97 0.37
Pool & RE Building Demolition Concrete/Industrial Saws 1 8.00 81 0.73
Pool & RE Building Demolition Excavators 1 8.00 162 0.38
Pool & RE Building Demolition Rubber Tired Dozers 1 8.00 255 0.40
Pool & RE Building Grading Excavators 1 8.00 162 0.38
Pool & RE Building Grading Graders 1 8.00 174 0.41
Pool & RE Building Grading Rubber Tired Dozers 1 8.00 255 0.40
Pool & RE Building Grading Tractors/Loaders/Backhoes 1 8.00 97 0.37
Tennis Court Deck Underground Utilities
Trenchers 1 8.00 162 0.38
Pool & RE Building Underground Utilities
Trenchers 1 1.00 162 0.38
Tennis Court Deck Construction Cranes 1 7.00 226 0.29
Tennis Court Deck Construction Forklifts 3 8.00 89 0.20
Tennis Court Deck Construction Generator Sets 1 8.00 84 0.74
Tennis Court Deck Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37
Tennis Court Deck Construction Welders 1 8.00 46 0.45
Pool & RE Building Construction Cranes 1 7.00 226 0.29
Pool & RE Building Construction Forklifts 3 8.00 89 0.20
13 of 87
Pool & RE Building Construction Generator Sets 1 8.00 84 0.74
Pool & RE Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37
Pool & RE Building Construction Welders 1 8.00 46 0.45
Residence Hall Paving Pavers 1 8.00 125 0.42
Residence Hall Paving Paving Equipment 1 8.00 130 0.36
Residence Hall Paving Rollers 1 8.00 80 0.38
Residence Hall Architecturaql Coating Air Compressors 1 6.00 78 0.48
Tennis Court Deck Architectural Coating
Air Compressors 1 6.00 78 0.48
Pool & RE Building Paving Pavers 1 8.00 125 0.42
Pool & RE Building Paving Paving Equipment 1 8.00 130 0.36
Pool & RE Building Paving Rollers 1 8.00 80 0.38
AAA Building Paving Pavers 1 8.00 125 0.42
AAA Building Paving Paving Equipment 1 8.00 130 0.36
AAA Building Paving Rollers 1 8.00 80 0.38
AAA Building Architectural Coating Air Compressors 1 6.00 78 0.48
Trips and VMT
Phase Name Offroad Equipment Count
Worker Trip Number
Vendor Trip Number
Hauling Trip Number
Worker Trip Length
Vendor Trip Length
Hauling Trip Length
Worker Vehicle Class
Vendor Vehicle Class
Hauling Vehicle Class
SN & CC Site Preparation
2 5.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
SN & CC Demolition 4 10.00 0.00 199.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
SN & CC Grading 6 15.00 0.00 1,820.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
SN & CC Underground Utilities
4 10.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
SN & CC Construction 9 83.00 33.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
SN & CC Paving 3 8.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
SN & CC Architectural Coating
1 17.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Residence Hall Site Preparation
2 5.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Tennis Courts Demolition
3 8.00 0.00 2.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Residence Hall Grading
4 10.00 0.00 864.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Residence Hall Underground Utilities
1 3.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
14 of 87
Residence Hall Construction
9 83.00 33.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
AAA Building Site Preparation
2 5.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
AAA Building Demolition
3 8.00 0.00 125.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
AAA Building Grading 7 18.00 0.00 2,522.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
AAA Building Underground Utilities
1 3.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
AAA Building Construction
9 83.00 33.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Tennis Court Deck Site Preparation
2 5.00 0.00 956.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Pool & RE Building Site Preparation
2 5.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Pool & RE Building Demolition
3 8.00 0.00 2.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Pool & RE Building Grading
4 10.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Tennis Court Deck Underground Utilities
1 3.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Pool & RE Building Underground Utilities
1 3.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Tennis Court Deck Construction
9 83.00 33.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Pool & RE Building Construction
9 83.00 33.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Residence Hall Paving 3 8.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Residence Hall Architecturaql Coating
1 17.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Tennis Court Deck Architectural Coating
1 17.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Pool & RE Building Paving
3 8.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
AAA Building Paving 3 8.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
LD_Mix HDT_Mix HHDTAAA Building Architectural Coating
1 17.00 0.00 0.00 14.70 6.90 20.00
15 of 87
3.1 Mitigation Measures Construction
NOx CO SO2 Fugitive PM10
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2
Water Exposed Area
3.2 SN & CC Site Preparation - 2023Unmitigated Construction On-Site
ROG NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Exhaust PM10
PM10 Total
Fugitive Dust 6.1006 0.0000 6.1006 3.3187 0.0000 3.3187 0.0000 0.0000
Off-Road 0.9548 9.4662 8.8626 0.0120 0.4383 0.4383 0.4032 0.4032 1,164.1257
1,164.1257 0.3765 1,172.0322
Total 0.9548 9.4662 8.8626 0.0120 0.3765 1,172.03226.1006 0.4383 6.5390 3.3187 0.4032 3.7220
SO2 Fugitive PM10
Exhaust PM10
1,164.1257
1,164.1257
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0116 0.0148 0.1585 6.5000e-004
0.0559 3.9000e-004
0.0563 0.0148 3.6000e-004
0.0152 44.0547 44.0547 1.8700e-003
44.0939
Total 0.0116 0.0148 0.1585 6.5000e-004
1.8700e-003
44.09390.0559 3.9000e-004
0.0563 0.0148 3.6000e-004
0.0152 44.0547 44.0547
16 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.3793 0.0000 2.3793 1.2943 0.0000 1.2943 0.0000 0.0000
Off-Road 0.9548 9.4662 8.8626 0.0120 0.4383 0.4383 0.4032 0.4032 0.0000 1,164.1257
1,164.1257 0.3765 1,172.0322
Total 0.9548 9.4662 8.8626 0.0120 0.3765 1,172.03222.3793 0.4383 2.8176 1.2943 0.4032 1.6975
SO2 Fugitive PM10
Exhaust PM10
0.0000 1,164.1257
1,164.1257
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0116 0.0148 0.1585 6.5000e-004
0.0559 3.9000e-004
0.0563 0.0148 3.6000e-004
0.0152 44.0547 44.0547 1.8700e-003
44.0939
Total 0.0116 0.0148 0.1585 6.5000e-004
1.8700e-003
44.09390.0559 3.9000e-004
0.0563 0.0148 3.6000e-004
0.0152 44.0547 44.0547
17 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.3 SN & CC Demolition - 2023Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 1.6567 0.0000 1.6567 0.2509 0.0000 0.2509 0.0000 0.0000
Off-Road 1.4819 13.6383 15.8602 0.0236 0.6443 0.6443 0.6030 0.6030 2,269.5579
2,269.5579 0.5715 2,281.5603
Total 1.4819 13.6383 15.8602 0.0236 0.5715 2,281.56031.6567 0.6443 2.3010 0.2509 0.6030 0.8539
SO2 Fugitive PM10
Exhaust PM10
2,269.5579
2,269.5579
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.1096 0.8889 1.4475 5.5600e-003
0.1334 0.0276 0.1610 0.0365 0.0254 0.0619 522.7189 522.7189 3.7400e-003
522.7975
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0231 0.0296 0.3170 1.2900e-003
0.1118 7.8000e-004
0.1126 0.0296 7.3000e-004
0.0304 88.1093 88.1093 3.7400e-003
88.1878
Total 0.1328 0.9185 1.7645 6.8500e-003
7.4800e-003
610.98530.2452 0.0284 0.2735 0.0662 0.0261 0.0923 610.8282 610.8282
18 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 0.6461 0.0000 0.6461 0.0978 0.0000 0.0978 0.0000 0.0000
Off-Road 1.4819 13.6383 15.8602 0.0236 0.6443 0.6443 0.6030 0.6030 0.0000 2,269.5579
2,269.5579 0.5715 2,281.5603
Total 1.4819 13.6383 15.8602 0.0236 0.5715 2,281.56030.6461 0.6443 1.2904 0.0978 0.6030 0.7009
SO2 Fugitive PM10
Exhaust PM10
0.0000 2,269.5579
2,269.5579
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.1096 0.8889 1.4475 5.5600e-003
0.1334 0.0276 0.1610 0.0365 0.0254 0.0619 522.7189 522.7189 3.7400e-003
522.7975
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0231 0.0296 0.3170 1.2900e-003
0.1118 7.8000e-004
0.1126 0.0296 7.3000e-004
0.0304 88.1093 88.1093 3.7400e-003
88.1878
Total 0.1328 0.9185 1.7645 6.8500e-003
7.4800e-003
610.98530.2452 0.0284 0.2735 0.0662 0.0261 0.0923 610.8282 610.8282
19 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.4 SN & CC Grading - 2023Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 6.0729 0.0000 6.0729 3.3162 0.0000 3.3162 0.0000 0.0000
Off-Road 1.9835 18.6415 22.1154 0.0319 0.9153 0.9153 0.8421 0.8421 3,093.2479
3,093.2479 1.0004 3,114.2567
Total 1.9835 18.6415 22.1154 0.0319 1.0004 3,114.25676.0729 0.9153 6.9882 3.3162 0.8421 4.1583
SO2 Fugitive PM10
Exhaust PM10
3,093.2479
3,093.2479
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.4919 3.9879 6.4941 0.0249 0.5985 0.1237 0.7222 0.1639 0.1138 0.2777 2,345.2221
2,345.2221 0.0168 2,345.5747
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0347 0.0445 0.4755 1.9400e-003
0.1677 1.1800e-003
0.1688 0.0445 1.0900e-003
0.0456 132.1640 132.1640 5.6100e-003
132.2818
Total 0.5266 4.0323 6.9696 0.0269 0.0224 2,477.85650.7662 0.1249 0.8911 0.2084 0.1149 0.3233 2,477.3861
2,477.3861
20 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.3684 0.0000 2.3684 1.2933 0.0000 1.2933 0.0000 0.0000
Off-Road 1.9835 18.6415 22.1154 0.0319 0.9153 0.9153 0.8421 0.8421 0.0000 3,093.2479
3,093.2479 1.0004 3,114.2567
Total 1.9835 18.6415 22.1154 0.0319 1.0004 3,114.25672.3684 0.9153 3.2838 1.2933 0.8421 2.1354
SO2 Fugitive PM10
Exhaust PM10
0.0000 3,093.2479
3,093.2479
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.4919 3.9879 6.4941 0.0249 0.5985 0.1237 0.7222 0.1639 0.1138 0.2777 2,345.2221
2,345.2221 0.0168 2,345.5747
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0347 0.0445 0.4755 1.9400e-003
0.1677 1.1800e-003
0.1688 0.0445 1.0900e-003
0.0456 132.1640 132.1640 5.6100e-003
132.2818
Total 0.5266 4.0323 6.9696 0.0269 0.0224 2,477.85650.7662 0.1249 0.8911 0.2084 0.1149 0.3233 2,477.3861
2,477.3861
21 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.5 SN & CC Underground Utilities - 2023Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.6387 15.5180 16.5438 0.0235 0.7618 0.7618 0.7009 0.7009 2,278.9049
2,278.9049 0.7370 2,294.3828
Total 1.6387 15.5180 16.5438 0.0235 0.7370 2,294.38280.7618 0.7618 0.7009 0.7009
SO2 Fugitive PM10
Exhaust PM10
2,278.9049
2,278.9049
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0231 0.0296 0.3170 1.2900e-003
0.1118 7.8000e-004
0.1126 0.0296 7.3000e-004
0.0304 88.1093 88.1093 3.7400e-003
88.1878
Total 0.0231 0.0296 0.3170 1.2900e-003
3.7400e-003
88.18780.1118 7.8000e-004
0.1126 0.0296 7.3000e-004
0.0304 88.1093 88.1093
22 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.6387 15.5180 16.5438 0.0235 0.7618 0.7618 0.7009 0.7009 0.0000 2,278.9049
2,278.9049 0.7370 2,294.3828
Total 1.6387 15.5180 16.5438 0.0235 0.7370 2,294.38280.7618 0.7618 0.7009 0.7009
SO2 Fugitive PM10
Exhaust PM10
0.0000 2,278.9049
2,278.9049
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0231 0.0296 0.3170 1.2900e-003
0.1118 7.8000e-004
0.1126 0.0296 7.3000e-004
0.0304 88.1093 88.1093 3.7400e-003
88.1878
Total 0.0231 0.0296 0.3170 1.2900e-003
3.7400e-003
88.18780.1118 7.8000e-004
0.1126 0.0296 7.3000e-004
0.0304 88.1093 88.1093
23 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.6 SN & CC Construction - 2023Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.5661 14.3126 16.2093 0.0268 0.6967 0.6967 0.6557 0.6557 2,544.6262
2,544.6262 0.6044 2,557.3191
Total 1.5661 14.3126 16.2093 0.0268 0.6044 2,557.31910.6967 0.6967 0.6557 0.6557
SO2 Fugitive PM10
Exhaust PM10
2,544.6262
2,544.6262
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.2064 1.2061 3.0871 7.0200e-003
0.2063 0.0290 0.2354 0.0588 0.0267 0.0855 656.9831 656.9831 4.6400e-003
657.0806
Worker 0.1920 0.2460 2.6311 0.0107 0.9277 6.5000e-003
0.9343 0.2460 6.0300e-003
0.2521 731.3074 731.3074 0.0310 731.9590
Total 0.3984 1.4521 5.7182 0.0177 0.0357 1,389.03961.1341 0.0355 1.1696 0.3048 0.0327 0.3375 1,388.2905
1,388.2905
24 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.5661 14.3126 16.2093 0.0268 0.6967 0.6967 0.6557 0.6557 0.0000 2,544.6262
2,544.6262 0.6044 2,557.3191
Total 1.5661 14.3126 16.2093 0.0268 0.6044 2,557.31910.6967 0.6967 0.6557 0.6557
SO2 Fugitive PM10
Exhaust PM10
0.0000 2,544.6262
2,544.6262
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.2064 1.2061 3.0871 7.0200e-003
0.2063 0.0290 0.2354 0.0588 0.0267 0.0855 656.9831 656.9831 4.6400e-003
657.0806
Worker 0.1920 0.2460 2.6311 0.0107 0.9277 6.5000e-003
0.9343 0.2460 6.0300e-003
0.2521 731.3074 731.3074 0.0310 731.9590
Total 0.3984 1.4521 5.7182 0.0177 0.0357 1,389.03961.1341 0.0355 1.1696 0.3048 0.0327 0.3375 1,388.2905
1,388.2905
25 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.6 SN & CC Construction - 2024Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.4653 13.3774 16.1332 0.0268 0.6106 0.6106 0.5744 0.5744 2,545.1154
2,545.1154 0.6009 2,557.7349
Total 1.4653 13.3774 16.1332 0.0268 0.6009 2,557.73490.6106 0.6106 0.5744 0.5744
SO2 Fugitive PM10
Exhaust PM10
2,545.1154
2,545.1154
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.2023 1.1958 3.0365 7.0200e-003
0.2064 0.0297 0.2360 0.0588 0.0273 0.0861 656.8471 656.8471 4.6600e-003
656.9450
Worker 0.1831 0.2335 2.4911 0.0107 0.9277 6.5500e-003
0.9343 0.2460 6.0700e-003
0.2521 721.0689 721.0689 0.0300 721.6982
Total 0.3854 1.4293 5.5277 0.0177 0.0346 1,378.64321.1341 0.0362 1.1703 0.3048 0.0334 0.3382 1,377.9160
1,377.9160
26 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.4653 13.3774 16.1332 0.0268 0.6106 0.6106 0.5744 0.5744 0.0000 2,545.1154
2,545.1154 0.6009 2,557.7349
Total 1.4653 13.3774 16.1332 0.0268 0.6009 2,557.73490.6106 0.6106 0.5744 0.5744
SO2 Fugitive PM10
Exhaust PM10
0.0000 2,545.1154
2,545.1154
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.2023 1.1958 3.0365 7.0200e-003
0.2064 0.0297 0.2360 0.0588 0.0273 0.0861 656.8471 656.8471 4.6600e-003
656.9450
Worker 0.1831 0.2335 2.4911 0.0107 0.9277 6.5500e-003
0.9343 0.2460 6.0700e-003
0.2521 721.0689 721.0689 0.0300 721.6982
Total 0.3854 1.4293 5.5277 0.0177 0.0346 1,378.64321.1341 0.0362 1.1703 0.3048 0.0334 0.3382 1,377.9160
1,377.9160
27 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.6 SN & CC Construction - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.8905
2,545.8905 0.5975 2,558.4386
Total 1.3615 12.4097 16.0518 0.0269 0.5975 2,558.43860.5250 0.5250 0.4939 0.4939
SO2 Fugitive PM10
Exhaust PM10
2,545.8905
2,545.8905
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1971 1.1869 2.9650 7.0200e-003
0.2064 0.0298 0.2362 0.0588 0.0274 0.0862 656.9055 656.9055 4.6800e-003
657.0038
Worker 0.1758 0.2234 2.3884 0.0107 0.9277 6.6100e-003
0.9344 0.2460 6.1300e-003
0.2522 712.2364 712.2364 0.0291 712.8479
Total 0.3730 1.4102 5.3534 0.0177 0.0338 1,369.85161.1341 0.0364 1.1706 0.3048 0.0336 0.3384 1,369.1419
1,369.1419
28 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 0.0000 2,545.8905
2,545.8905 0.5975 2,558.4386
Total 1.3615 12.4097 16.0518 0.0269 0.5975 2,558.43860.5250 0.5250 0.4939 0.4939
SO2 Fugitive PM10
Exhaust PM10
0.0000 2,545.8905
2,545.8905
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1971 1.1869 2.9650 7.0200e-003
0.2064 0.0298 0.2362 0.0588 0.0274 0.0862 656.9055 656.9055 4.6800e-003
657.0038
Worker 0.1758 0.2234 2.3884 0.0107 0.9277 6.6100e-003
0.9344 0.2460 6.1300e-003
0.2522 712.2364 712.2364 0.0291 712.8479
Total 0.3730 1.4102 5.3534 0.0177 0.0338 1,369.85161.1341 0.0364 1.1706 0.3048 0.0336 0.3384 1,369.1419
1,369.1419
29 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.7 SN & CC Paving - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.4487 4.2108 7.1390 0.0112 0.2055 0.2055 0.1890 0.1890 1,079.8983
1,079.8983 0.3493 1,087.2328
Paving 0.5371 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.9858 4.2108 7.1390 0.0112 0.3493 1,087.23280.2055 0.2055 0.1890 0.1890
SO2 Fugitive PM10
Exhaust PM10
1,079.8983
1,079.8983
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0170 0.0215 0.2302 1.0300e-003
0.0894 6.4000e-004
0.0901 0.0237 5.9000e-004
0.0243 68.6493 68.6493 2.8100e-003
68.7082
Total 0.0170 0.0215 0.2302 1.0300e-003
2.8100e-003
68.70820.0894 6.4000e-004
0.0901 0.0237 5.9000e-004
0.0243 68.6493 68.6493
30 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.4487 4.2108 7.1390 0.0112 0.2055 0.2055 0.1890 0.1890 0.0000 1,079.8983
1,079.8983 0.3493 1,087.2328
Paving 0.5371 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.9858 4.2108 7.1390 0.0112 0.3493 1,087.23280.2055 0.2055 0.1890 0.1890
SO2 Fugitive PM10
Exhaust PM10
0.0000 1,079.8983
1,079.8983
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0170 0.0215 0.2302 1.0300e-003
0.0894 6.4000e-004
0.0901 0.0237 5.9000e-004
0.0243 68.6493 68.6493 2.8100e-003
68.7082
Total 0.0170 0.0215 0.2302 1.0300e-003
2.8100e-003
68.70820.0894 6.4000e-004
0.0901 0.0237 5.9000e-004
0.0243 68.6493 68.6493
31 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.8 SN & CC Architectural Coating - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 33.7206 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.1709 1.1455 1.8091 2.9700e-003
0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.7705
Total 33.8914 1.1455 1.8091 2.9700e-003
0.0154 281.77050.0515 0.0515 0.0515 0.0515
SO2 Fugitive PM10
Exhaust PM10
281.4481 281.4481
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0360 0.0458 0.4892 2.1900e-003
0.1900 1.3500e-003
0.1914 0.0504 1.2600e-003
0.0517 145.8797 145.8797 5.9600e-003
146.0050
Total 0.0360 0.0458 0.4892 2.1900e-003
5.9600e-003
146.00500.1900 1.3500e-003
0.1914 0.0504 1.2600e-003
0.0517 145.8797 145.8797
32 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 33.7206 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.1709 1.1455 1.8091 2.9700e-003
0.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481 0.0154 281.7705
Total 33.8914 1.1455 1.8091 2.9700e-003
0.0154 281.77050.0515 0.0515 0.0515 0.0515
SO2 Fugitive PM10
Exhaust PM10
0.0000 281.4481 281.4481
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0360 0.0458 0.4892 2.1900e-003
0.1900 1.3500e-003
0.1914 0.0504 1.2600e-003
0.0517 145.8797 145.8797 5.9600e-003
146.0050
Total 0.0360 0.0458 0.4892 2.1900e-003
5.9600e-003
146.00500.1900 1.3500e-003
0.1914 0.0504 1.2600e-003
0.0517 145.8797 145.8797
33 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.9 Residence Hall Site Preparation - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 6.1399 0.0000 6.1399 3.3230 0.0000 3.3230 0.0000 0.0000
Off-Road 0.7921 7.3969 7.5527 0.0120 0.3251 0.3251 0.2991 0.2991 1,163.9281
1,163.9281 0.3764 1,171.8333
Total 0.7921 7.3969 7.5527 0.0120 0.3764 1,171.83336.1399 0.3251 6.4650 3.3230 0.2991 3.6220
SO2 Fugitive PM10
Exhaust PM10
1,163.9281
1,163.9281
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0106 0.0135 0.1439 6.5000e-004
0.0559 4.0000e-004
0.0563 0.0148 3.7000e-004
0.0152 42.9058 42.9058 1.7500e-003
42.9426
Total 0.0106 0.0135 0.1439 6.5000e-004
1.7500e-003
42.94260.0559 4.0000e-004
0.0563 0.0148 3.7000e-004
0.0152 42.9058 42.9058
34 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.3946 0.0000 2.3946 1.2960 0.0000 1.2960 0.0000 0.0000
Off-Road 0.7921 7.3969 7.5527 0.0120 0.3251 0.3251 0.2991 0.2991 0.0000 1,163.9281
1,163.9281 0.3764 1,171.8333
Total 0.7921 7.3969 7.5527 0.0120 0.3764 1,171.83332.3946 0.3251 2.7196 1.2960 0.2991 1.5950
SO2 Fugitive PM10
Exhaust PM10
0.0000 1,163.9281
1,163.9281
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0106 0.0135 0.1439 6.5000e-004
0.0559 4.0000e-004
0.0563 0.0148 3.7000e-004
0.0152 42.9058 42.9058 1.7500e-003
42.9426
Total 0.0106 0.0135 0.1439 6.5000e-004
1.7500e-003
42.94260.0559 4.0000e-004
0.0563 0.0148 3.7000e-004
0.0152 42.9058 42.9058
35 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.10 Tennis Courts Demolition - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 0.0535 0.0000 0.0535 8.1000e-003
0.0000 8.1000e-003
0.0000 0.0000
Off-Road 1.1264 9.5836 12.3098 0.0205 0.4252 0.4252 0.3986 0.3986 1,967.5426
1,967.5426 0.4707 1,977.4281
Total 1.1264 9.5836 12.3098 0.0205 0.4707 1,977.42810.0535 0.4252 0.4787 8.1000e-003
0.3986 0.4067
SO2 Fugitive PM10
Exhaust PM10
1,967.5426
1,967.5426
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 3.5100e-003
0.0288 0.0464 1.8000e-004
4.3600e-003
9.2000e-004
5.2800e-003
1.1900e-003
8.5000e-004
2.0400e-003
17.0599 17.0599 1.2000e-004
17.0625
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0170 0.0215 0.2302 1.0300e-003
0.0894 6.4000e-004
0.0901 0.0237 5.9000e-004
0.0243 68.6493 68.6493 2.8100e-003
68.7082
Total 0.0205 0.0504 0.2766 1.2100e-003
2.9300e-003
85.77070.0938 1.5600e-003
0.0953 0.0249 1.4400e-003
0.0264 85.7092 85.7092
36 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 0.0209 0.0000 0.0209 3.1600e-003
0.0000 3.1600e-003
0.0000 0.0000
Off-Road 1.1264 9.5836 12.3098 0.0205 0.4252 0.4252 0.3986 0.3986 0.0000 1,967.5426
1,967.5426 0.4707 1,977.4281
Total 1.1264 9.5836 12.3098 0.0205 0.4707 1,977.42810.0209 0.4252 0.4461 3.1600e-003
0.3986 0.4018
SO2 Fugitive PM10
Exhaust PM10
0.0000 1,967.5426
1,967.5426
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 3.5100e-003
0.0288 0.0464 1.8000e-004
4.3600e-003
9.2000e-004
5.2800e-003
1.1900e-003
8.5000e-004
2.0400e-003
17.0599 17.0599 1.2000e-004
17.0625
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0170 0.0215 0.2302 1.0300e-003
0.0894 6.4000e-004
0.0901 0.0237 5.9000e-004
0.0243 68.6493 68.6493 2.8100e-003
68.7082
Total 0.0205 0.0504 0.2766 1.2100e-003
2.9300e-003
85.77070.0938 1.5600e-003
0.0953 0.0249 1.4400e-003
0.0264 85.7092 85.7092
37 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.11 Residence Hall Grading - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 6.1218 0.0000 6.1218 3.3219 0.0000 3.3219 0.0000 0.0000
Off-Road 1.3771 12.1397 15.1947 0.0235 0.5779 0.5779 0.5316 0.5316 2,279.0027
2,279.0027 0.7371 2,294.4812
Total 1.3771 12.1397 15.1947 0.0235 0.7371 2,294.48126.1218 0.5779 6.6997 3.3219 0.5316 3.8535
SO2 Fugitive PM10
Exhaust PM10
2,279.0027
2,279.0027
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.4493 3.6892 5.9399 0.0232 0.5578 0.1184 0.6762 0.1528 0.1089 0.2617 2,183.6679
2,183.6679 0.0158 2,183.9994
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0212 0.0269 0.2878 1.2900e-003
0.1118 8.0000e-004
0.1126 0.0296 7.4000e-004
0.0304 85.8116 85.8116 3.5100e-003
85.8853
Total 0.4704 3.7162 6.2276 0.0245 0.0193 2,269.88470.6696 0.1192 0.7888 0.1824 0.1097 0.2921 2,269.4795
2,269.4795
38 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.3875 0.0000 2.3875 1.2956 0.0000 1.2956 0.0000 0.0000
Off-Road 1.3771 12.1397 15.1947 0.0235 0.5779 0.5779 0.5316 0.5316 0.0000 2,279.0027
2,279.0027 0.7371 2,294.4812
Total 1.3771 12.1397 15.1947 0.0235 0.7371 2,294.48122.3875 0.5779 2.9654 1.2956 0.5316 1.8272
SO2 Fugitive PM10
Exhaust PM10
0.0000 2,279.0027
2,279.0027
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.4493 3.6892 5.9399 0.0232 0.5578 0.1184 0.6762 0.1528 0.1089 0.2617 2,183.6679
2,183.6679 0.0158 2,183.9994
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0212 0.0269 0.2878 1.2900e-003
0.1118 8.0000e-004
0.1126 0.0296 7.4000e-004
0.0304 85.8116 85.8116 3.5100e-003
85.8853
Total 0.4704 3.7162 6.2276 0.0245 0.0193 2,269.88470.6696 0.1192 0.7888 0.1824 0.1097 0.2921 2,269.4795
2,269.4795
39 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.12 Residence Hall Underground Utilities - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.1713 1.2526 3.3419 5.3000e-003
0.0614 0.0614 0.0565 0.0565 513.0047 513.0047 0.1659 516.4889
Total 0.1713 1.2526 3.3419 5.3000e-003
0.1659 516.48890.0614 0.0614 0.0565 0.0565
SO2 Fugitive PM10
Exhaust PM10
513.0047 513.0047
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 6.3500e-003
8.0700e-003
0.0863 3.9000e-004
0.0335 2.4000e-004
0.0338 8.8900e-003
2.2000e-004
9.1100e-003
25.7435 25.7435 1.0500e-003
25.7656
Total 6.3500e-003
8.0700e-003
0.0863 3.9000e-004
1.0500e-003
25.76560.0335 2.4000e-004
0.0338 8.8900e-003
2.2000e-004
9.1100e-003
25.7435 25.7435
40 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.1713 1.2526 3.3419 5.3000e-003
0.0614 0.0614 0.0565 0.0565 0.0000 513.0047 513.0047 0.1659 516.4889
Total 0.1713 1.2526 3.3419 5.3000e-003
0.1659 516.48890.0614 0.0614 0.0565 0.0565
SO2 Fugitive PM10
Exhaust PM10
0.0000 513.0047 513.0047
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 6.3500e-003
8.0700e-003
0.0863 3.9000e-004
0.0335 2.4000e-004
0.0338 8.8900e-003
2.2000e-004
9.1100e-003
25.7435 25.7435 1.0500e-003
25.7656
Total 6.3500e-003
8.0700e-003
0.0863 3.9000e-004
1.0500e-003
25.76560.0335 2.4000e-004
0.0338 8.8900e-003
2.2000e-004
9.1100e-003
25.7435 25.7435
41 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.13 Residence Hall Construction - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.8905
2,545.8905 0.5975 2,558.4386
Total 1.3615 12.4097 16.0518 0.0269 0.5975 2,558.43860.5250 0.5250 0.4939 0.4939
SO2 Fugitive PM10
Exhaust PM10
2,545.8905
2,545.8905
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1971 1.1869 2.9650 7.0200e-003
0.2064 0.0298 0.2362 0.0588 0.0274 0.0862 656.9055 656.9055 4.6800e-003
657.0038
Worker 0.1758 0.2234 2.3884 0.0107 0.9277 6.6100e-003
0.9344 0.2460 6.1300e-003
0.2522 712.2364 712.2364 0.0291 712.8479
Total 0.3730 1.4102 5.3534 0.0177 0.0338 1,369.85161.1341 0.0364 1.1706 0.3048 0.0336 0.3384 1,369.1419
1,369.1419
42 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 0.0000 2,545.8905
2,545.8905 0.5975 2,558.4386
Total 1.3615 12.4097 16.0518 0.0269 0.5975 2,558.43860.5250 0.5250 0.4939 0.4939
SO2 Fugitive PM10
Exhaust PM10
0.0000 2,545.8905
2,545.8905
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1971 1.1869 2.9650 7.0200e-003
0.2064 0.0298 0.2362 0.0588 0.0274 0.0862 656.9055 656.9055 4.6800e-003
657.0038
Worker 0.1758 0.2234 2.3884 0.0107 0.9277 6.6100e-003
0.9344 0.2460 6.1300e-003
0.2522 712.2364 712.2364 0.0291 712.8479
Total 0.3730 1.4102 5.3534 0.0177 0.0338 1,369.85161.1341 0.0364 1.1706 0.3048 0.0336 0.3384 1,369.1419
1,369.1419
43 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.13 Residence Hall Construction - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.8905
2,545.8905 0.5975 2,558.4386
Total 1.3615 12.4097 16.0518 0.0269 0.5975 2,558.43860.5250 0.5250 0.4939 0.4939
SO2 Fugitive PM10
Exhaust PM10
2,545.8905
2,545.8905
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1904 1.1510 2.9062 7.0200e-003
0.2064 0.0286 0.2350 0.0588 0.0263 0.0851 656.8410 656.8410 4.5400e-003
656.9364
Worker 0.1691 0.2146 2.2996 0.0107 0.9277 6.6800e-003
0.9344 0.2460 6.2000e-003
0.2522 704.5765 704.5765 0.0284 705.1726
Total 0.3595 1.3656 5.2058 0.0177 0.0329 1,362.10901.1342 0.0353 1.1694 0.3048 0.0325 0.3373 1,361.4176
1,361.4176
44 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 0.0000 2,545.8905
2,545.8905 0.5975 2,558.4386
Total 1.3615 12.4097 16.0518 0.0269 0.5975 2,558.43860.5250 0.5250 0.4939 0.4939
SO2 Fugitive PM10
Exhaust PM10
0.0000 2,545.8905
2,545.8905
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1904 1.1510 2.9062 7.0200e-003
0.2064 0.0286 0.2350 0.0588 0.0263 0.0851 656.8410 656.8410 4.5400e-003
656.9364
Worker 0.1691 0.2146 2.2996 0.0107 0.9277 6.6800e-003
0.9344 0.2460 6.2000e-003
0.2522 704.5765 704.5765 0.0284 705.1726
Total 0.3595 1.3656 5.2058 0.0177 0.0329 1,362.10901.1342 0.0353 1.1694 0.3048 0.0325 0.3373 1,361.4176
1,361.4176
45 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.14 AAA Building Site Preparation - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 6.1988 0.0000 6.1988 3.3293 0.0000 3.3293 0.0000 0.0000
Off-Road 0.7921 7.3969 7.5527 0.0120 0.3251 0.3251 0.2991 0.2991 1,163.9281
1,163.9281 0.3764 1,171.8333
Total 0.7921 7.3969 7.5527 0.0120 0.3764 1,171.83336.1988 0.3251 6.5239 3.3293 0.2991 3.6284
SO2 Fugitive PM10
Exhaust PM10
1,163.9281
1,163.9281
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0106 0.0135 0.1439 6.5000e-004
0.0559 4.0000e-004
0.0563 0.0148 3.7000e-004
0.0152 42.9058 42.9058 1.7500e-003
42.9426
Total 0.0106 0.0135 0.1439 6.5000e-004
1.7500e-003
42.94260.0559 4.0000e-004
0.0563 0.0148 3.7000e-004
0.0152 42.9058 42.9058
46 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.4176 0.0000 2.4176 1.2984 0.0000 1.2984 0.0000 0.0000
Off-Road 0.7921 7.3969 7.5527 0.0120 0.3251 0.3251 0.2991 0.2991 0.0000 1,163.9281
1,163.9281 0.3764 1,171.8333
Total 0.7921 7.3969 7.5527 0.0120 0.3764 1,171.83332.4176 0.3251 2.7426 1.2984 0.2991 1.5975
SO2 Fugitive PM10
Exhaust PM10
0.0000 1,163.9281
1,163.9281
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0106 0.0135 0.1439 6.5000e-004
0.0559 4.0000e-004
0.0563 0.0148 3.7000e-004
0.0152 42.9058 42.9058 1.7500e-003
42.9426
Total 0.0106 0.0135 0.1439 6.5000e-004
1.7500e-003
42.94260.0559 4.0000e-004
0.0563 0.0148 3.7000e-004
0.0152 42.9058 42.9058
47 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.15 AAA Building Demolition - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 1.8028 0.0000 1.8028 0.2730 0.0000 0.2730 0.0000 0.0000
Off-Road 1.1264 9.5836 12.3098 0.0205 0.4252 0.4252 0.3986 0.3986 1,967.5426
1,967.5426 0.4707 1,977.4281
Total 1.1264 9.5836 12.3098 0.0205 0.4707 1,977.42811.8028 0.4252 2.2280 0.2730 0.3986 0.6716
SO2 Fugitive PM10
Exhaust PM10
1,967.5426
1,967.5426
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.1170 0.9607 1.5468 6.0500e-003
0.1453 0.0308 0.1761 0.0398 0.0284 0.0682 568.6635 568.6635 4.1100e-003
568.7499
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0170 0.0215 0.2302 1.0300e-003
0.0894 6.4000e-004
0.0901 0.0237 5.9000e-004
0.0243 68.6493 68.6493 2.8100e-003
68.7082
Total 0.1339 0.9823 1.7770 7.0800e-003
6.9200e-003
637.45810.2347 0.0315 0.2662 0.0635 0.0290 0.0925 637.3128 637.3128
48 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 0.7031 0.0000 0.7031 0.1065 0.0000 0.1065 0.0000 0.0000
Off-Road 1.1264 9.5836 12.3098 0.0205 0.4252 0.4252 0.3986 0.3986 0.0000 1,967.5426
1,967.5426 0.4707 1,977.4281
Total 1.1264 9.5836 12.3098 0.0205 0.4707 1,977.42810.7031 0.4252 1.1283 0.1065 0.3986 0.5051
SO2 Fugitive PM10
Exhaust PM10
0.0000 1,967.5426
1,967.5426
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.1170 0.9607 1.5468 6.0500e-003
0.1453 0.0308 0.1761 0.0398 0.0284 0.0682 568.6635 568.6635 4.1100e-003
568.7499
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0170 0.0215 0.2302 1.0300e-003
0.0894 6.4000e-004
0.0901 0.0237 5.9000e-004
0.0243 68.6493 68.6493 2.8100e-003
68.7082
Total 0.1339 0.9823 1.7770 7.0800e-003
6.9200e-003
637.45810.2347 0.0315 0.2662 0.0635 0.0290 0.0925 637.3128 637.3128
49 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.16 AAA Building Grading - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 6.4548 0.0000 6.4548 3.4680 0.0000 3.4680 0.0000 0.0000
Off-Road 2.3405 20.7891 26.0894 0.0409 0.9643 0.9643 0.8872 0.8872 3,955.9355
3,955.9355 1.2794 3,982.8035
Total 2.3405 20.7891 26.0894 0.0409 1.2794 3,982.80356.4548 0.9643 7.4192 3.4680 0.8872 4.3552
SO2 Fugitive PM10
Exhaust PM10
3,955.9355
3,955.9355
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 1.4163 11.6303 18.7254 0.0732 1.7585 0.3732 2.1317 0.4816 0.3434 0.8250 6,884.0131
6,884.0131 0.0498 6,885.0582
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0381 0.0484 0.5180 2.3200e-003
0.2012 1.4300e-003
0.2026 0.0534 1.3300e-003
0.0547 154.4609 154.4609 6.3200e-003
154.5935
Total 1.4544 11.6788 19.2434 0.0755 0.0561 7,039.65171.9597 0.3747 2.3343 0.5349 0.3447 0.8797 7,038.4740
7,038.4740
50 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.5174 0.0000 2.5174 1.3525 0.0000 1.3525 0.0000 0.0000
Off-Road 2.3405 20.7891 26.0894 0.0409 0.9643 0.9643 0.8872 0.8872 0.0000 3,955.9355
3,955.9355 1.2794 3,982.8035
Total 2.3405 20.7891 26.0894 0.0409 1.2794 3,982.80352.5174 0.9643 3.4817 1.3525 0.8872 2.2397
SO2 Fugitive PM10
Exhaust PM10
0.0000 3,955.9355
3,955.9355
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 1.4163 11.6303 18.7254 0.0732 1.7585 0.3732 2.1317 0.4816 0.3434 0.8250 6,884.0131
6,884.0131 0.0498 6,885.0582
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0381 0.0484 0.5180 2.3200e-003
0.2012 1.4300e-003
0.2026 0.0534 1.3300e-003
0.0547 154.4609 154.4609 6.3200e-003
154.5935
Total 1.4544 11.6788 19.2434 0.0755 0.0561 7,039.65171.9597 0.3747 2.3343 0.5349 0.3447 0.8797 7,038.4740
7,038.4740
51 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.17 AAA Building Underground Utilities - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.3888 3.8533 3.5928 5.2400e-003
0.1945 0.1945 0.1790 0.1790 507.8318 507.8318 0.1642 511.2809
Total 0.3888 3.8533 3.5928 5.2400e-003
0.1642 511.28090.1945 0.1945 0.1790 0.1790
SO2 Fugitive PM10
Exhaust PM10
507.8318 507.8318
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 6.3500e-003
8.0700e-003
0.0863 3.9000e-004
0.0335 2.4000e-004
0.0338 8.8900e-003
2.2000e-004
9.1100e-003
25.7435 25.7435 1.0500e-003
25.7656
Total 6.3500e-003
8.0700e-003
0.0863 3.9000e-004
1.0500e-003
25.76560.0335 2.4000e-004
0.0338 8.8900e-003
2.2000e-004
9.1100e-003
25.7435 25.7435
52 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.3888 3.8533 3.5928 5.2400e-003
0.1945 0.1945 0.1790 0.1790 0.0000 507.8318 507.8318 0.1642 511.2809
Total 0.3888 3.8533 3.5928 5.2400e-003
0.1642 511.28090.1945 0.1945 0.1790 0.1790
SO2 Fugitive PM10
Exhaust PM10
0.0000 507.8318 507.8318
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 6.3500e-003
8.0700e-003
0.0863 3.9000e-004
0.0335 2.4000e-004
0.0338 8.8900e-003
2.2000e-004
9.1100e-003
25.7435 25.7435 1.0500e-003
25.7656
Total 6.3500e-003
8.0700e-003
0.0863 3.9000e-004
1.0500e-003
25.76560.0335 2.4000e-004
0.0338 8.8900e-003
2.2000e-004
9.1100e-003
25.7435 25.7435
53 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.18 AAA Building Construction - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.8905
2,545.8905 0.5975 2,558.4386
Total 1.3615 12.4097 16.0518 0.0269 0.5975 2,558.43860.5250 0.5250 0.4939 0.4939
SO2 Fugitive PM10
Exhaust PM10
2,545.8905
2,545.8905
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1971 1.1869 2.9650 7.0200e-003
0.2064 0.0298 0.2362 0.0588 0.0274 0.0862 656.9055 656.9055 4.6800e-003
657.0038
Worker 0.1758 0.2234 2.3884 0.0107 0.9277 6.6100e-003
0.9344 0.2460 6.1300e-003
0.2522 712.2364 712.2364 0.0291 712.8479
Total 0.3730 1.4102 5.3534 0.0177 0.0338 1,369.85161.1341 0.0364 1.1706 0.3048 0.0336 0.3384 1,369.1419
1,369.1419
54 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 0.0000 2,545.8905
2,545.8905 0.5975 2,558.4386
Total 1.3615 12.4097 16.0518 0.0269 0.5975 2,558.43860.5250 0.5250 0.4939 0.4939
SO2 Fugitive PM10
Exhaust PM10
0.0000 2,545.8905
2,545.8905
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1971 1.1869 2.9650 7.0200e-003
0.2064 0.0298 0.2362 0.0588 0.0274 0.0862 656.9055 656.9055 4.6800e-003
657.0038
Worker 0.1758 0.2234 2.3884 0.0107 0.9277 6.6100e-003
0.9344 0.2460 6.1300e-003
0.2522 712.2364 712.2364 0.0291 712.8479
Total 0.3730 1.4102 5.3534 0.0177 0.0338 1,369.85161.1341 0.0364 1.1706 0.3048 0.0336 0.3384 1,369.1419
1,369.1419
55 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.18 AAA Building Construction - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.8905
2,545.8905 0.5975 2,558.4386
Total 1.3615 12.4097 16.0518 0.0269 0.5975 2,558.43860.5250 0.5250 0.4939 0.4939
SO2 Fugitive PM10
Exhaust PM10
2,545.8905
2,545.8905
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1904 1.1510 2.9062 7.0200e-003
0.2064 0.0286 0.2350 0.0588 0.0263 0.0851 656.8410 656.8410 4.5400e-003
656.9364
Worker 0.1691 0.2146 2.2996 0.0107 0.9277 6.6800e-003
0.9344 0.2460 6.2000e-003
0.2522 704.5765 704.5765 0.0284 705.1726
Total 0.3595 1.3656 5.2058 0.0177 0.0329 1,362.10901.1342 0.0353 1.1694 0.3048 0.0325 0.3373 1,361.4176
1,361.4176
56 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 0.0000 2,545.8905
2,545.8905 0.5975 2,558.4386
Total 1.3615 12.4097 16.0518 0.0269 0.5975 2,558.43860.5250 0.5250 0.4939 0.4939
SO2 Fugitive PM10
Exhaust PM10
0.0000 2,545.8905
2,545.8905
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1904 1.1510 2.9062 7.0200e-003
0.2064 0.0286 0.2350 0.0588 0.0263 0.0851 656.8410 656.8410 4.5400e-003
656.9364
Worker 0.1691 0.2146 2.2996 0.0107 0.9277 6.6800e-003
0.9344 0.2460 6.2000e-003
0.2522 704.5765 704.5765 0.0284 705.1726
Total 0.3595 1.3656 5.2058 0.0177 0.0329 1,362.10901.1342 0.0353 1.1694 0.3048 0.0325 0.3373 1,361.4176
1,361.4176
57 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.18 AAA Building Construction - 2027Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.8905
2,545.8905 0.5975 2,558.4386
Total 1.3615 12.4097 16.0518 0.0269 0.5975 2,558.43860.5250 0.5250 0.4939 0.4939
SO2 Fugitive PM10
Exhaust PM10
2,545.8905
2,545.8905
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1885 1.1421 2.8804 7.0200e-003
0.2065 0.0287 0.2351 0.0588 0.0264 0.0852 656.9737 656.9737 4.5500e-003
657.0693
Worker 0.1629 0.2069 2.2222 0.0107 0.9277 6.7400e-003
0.9345 0.2460 6.2600e-003
0.2523 697.9528 697.9528 0.0277 698.5353
Total 0.3514 1.3490 5.1026 0.0177 0.0323 1,355.60461.1342 0.0354 1.1696 0.3049 0.0326 0.3375 1,354.9265
1,354.9265
58 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 0.0000 2,545.8905
2,545.8905 0.5975 2,558.4386
Total 1.3615 12.4097 16.0518 0.0269 0.5975 2,558.43860.5250 0.5250 0.4939 0.4939
SO2 Fugitive PM10
Exhaust PM10
0.0000 2,545.8905
2,545.8905
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1885 1.1421 2.8804 7.0200e-003
0.2065 0.0287 0.2351 0.0588 0.0264 0.0852 656.9737 656.9737 4.5500e-003
657.0693
Worker 0.1629 0.2069 2.2222 0.0107 0.9277 6.7400e-003
0.9345 0.2460 6.2600e-003
0.2523 697.9528 697.9528 0.0277 698.5353
Total 0.3514 1.3490 5.1026 0.0177 0.0323 1,355.60461.1342 0.0354 1.1696 0.3049 0.0326 0.3375 1,354.9265
1,354.9265
59 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.19 Tennis Court Deck Site Preparation - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 6.0833 0.0000 6.0833 3.3168 0.0000 3.3168 0.0000 0.0000
Off-Road 0.7921 7.3969 7.5527 0.0120 0.3251 0.3251 0.2991 0.2991 1,163.9281
1,163.9281 0.3764 1,171.8333
Total 0.7921 7.3969 7.5527 0.0120 0.3764 1,171.83336.0833 0.3251 6.4083 3.3168 0.2991 3.6159
SO2 Fugitive PM10
Exhaust PM10
1,163.9281
1,163.9281
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.4912 4.0473 6.6765 0.0267 0.6410 0.1280 0.7690 0.1755 0.1178 0.2933 2,508.0169
2,508.0169 0.0172 2,508.3786
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0102 0.0129 0.1385 6.5000e-004
0.0559 4.0000e-004
0.0563 0.0148 3.7000e-004
0.0152 42.4444 42.4444 1.7100e-003
42.4803
Total 0.5014 4.0602 6.8150 0.0273 0.0189 2,550.85890.6969 0.1284 0.8253 0.1904 0.1181 0.3085 2,550.4613
2,550.4613
60 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.3725 0.0000 2.3725 1.2936 0.0000 1.2936 0.0000 0.0000
Off-Road 0.7921 7.3969 7.5527 0.0120 0.3251 0.3251 0.2991 0.2991 0.0000 1,163.9281
1,163.9281 0.3764 1,171.8333
Total 0.7921 7.3969 7.5527 0.0120 0.3764 1,171.83332.3725 0.3251 2.6975 1.2936 0.2991 1.5926
SO2 Fugitive PM10
Exhaust PM10
0.0000 1,163.9281
1,163.9281
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.4912 4.0473 6.6765 0.0267 0.6410 0.1280 0.7690 0.1755 0.1178 0.2933 2,508.0169
2,508.0169 0.0172 2,508.3786
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0102 0.0129 0.1385 6.5000e-004
0.0559 4.0000e-004
0.0563 0.0148 3.7000e-004
0.0152 42.4444 42.4444 1.7100e-003
42.4803
Total 0.5014 4.0602 6.8150 0.0273 0.0189 2,550.85890.6969 0.1284 0.8253 0.1904 0.1181 0.3085 2,550.4613
2,550.4613
61 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.20 Pool & RE Building Site Preparation - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 6.1988 0.0000 6.1988 3.3293 0.0000 3.3293 0.0000 0.0000
Off-Road 0.7921 7.3969 7.5527 0.0120 0.3251 0.3251 0.2991 0.2991 1,163.9281
1,163.9281 0.3764 1,171.8333
Total 0.7921 7.3969 7.5527 0.0120 0.3764 1,171.83336.1988 0.3251 6.5239 3.3293 0.2991 3.6284
SO2 Fugitive PM10
Exhaust PM10
1,163.9281
1,163.9281
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0102 0.0129 0.1385 6.5000e-004
0.0559 4.0000e-004
0.0563 0.0148 3.7000e-004
0.0152 42.4444 42.4444 1.7100e-003
42.4803
Total 0.0102 0.0129 0.1385 6.5000e-004
1.7100e-003
42.48030.0559 4.0000e-004
0.0563 0.0148 3.7000e-004
0.0152 42.4444 42.4444
62 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.4176 0.0000 2.4176 1.2984 0.0000 1.2984 0.0000 0.0000
Off-Road 0.7921 7.3969 7.5527 0.0120 0.3251 0.3251 0.2991 0.2991 0.0000 1,163.9281
1,163.9281 0.3764 1,171.8333
Total 0.7921 7.3969 7.5527 0.0120 0.3764 1,171.83332.4176 0.3251 2.7426 1.2984 0.2991 1.5975
SO2 Fugitive PM10
Exhaust PM10
0.0000 1,163.9281
1,163.9281
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0102 0.0129 0.1385 6.5000e-004
0.0559 4.0000e-004
0.0563 0.0148 3.7000e-004
0.0152 42.4444 42.4444 1.7100e-003
42.4803
Total 0.0102 0.0129 0.1385 6.5000e-004
1.7100e-003
42.48030.0559 4.0000e-004
0.0563 0.0148 3.7000e-004
0.0152 42.4444 42.4444
63 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.21 Pool & RE Building Demolition - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 0.0214 0.0000 0.0214 3.2400e-003
0.0000 3.2400e-003
0.0000 0.0000
Off-Road 1.1264 9.5836 12.3098 0.0205 0.4252 0.4252 0.3986 0.3986 1,967.5426
1,967.5426 0.4707 1,977.4281
Total 1.1264 9.5836 12.3098 0.0205 0.4707 1,977.42810.0214 0.4252 0.4466 3.2400e-003
0.3986 0.4018
SO2 Fugitive PM10
Exhaust PM10
1,967.5426
1,967.5426
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 1.3400e-003
0.0110 0.0182 7.0000e-005
1.7400e-003
3.5000e-004
2.0900e-003
4.8000e-004
3.2000e-004
8.0000e-004
6.8210 6.8210 5.0000e-005
6.8220
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0163 0.0207 0.2216 1.0300e-003
0.0894 6.4000e-004
0.0901 0.0237 6.0000e-004
0.0243 67.9110 67.9110 2.7400e-003
67.9684
Total 0.0176 0.0317 0.2398 1.1000e-003
2.7900e-003
74.79040.0912 9.9000e-004
0.0922 0.0242 9.2000e-004
0.0251 74.7320 74.7320
64 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 8.3500e-003
0.0000 8.3500e-003
1.2600e-003
0.0000 1.2600e-003
0.0000 0.0000
Off-Road 1.1264 9.5836 12.3098 0.0205 0.4252 0.4252 0.3986 0.3986 0.0000 1,967.5426
1,967.5426 0.4707 1,977.4281
Total 1.1264 9.5836 12.3098 0.0205 0.4707 1,977.42818.3500e-003
0.4252 0.4336 1.2600e-003
0.3986 0.3999
SO2 Fugitive PM10
Exhaust PM10
0.0000 1,967.5426
1,967.5426
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 1.3400e-003
0.0110 0.0182 7.0000e-005
1.7400e-003
3.5000e-004
2.0900e-003
4.8000e-004
3.2000e-004
8.0000e-004
6.8210 6.8210 5.0000e-005
6.8220
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0163 0.0207 0.2216 1.0300e-003
0.0894 6.4000e-004
0.0901 0.0237 6.0000e-004
0.0243 67.9110 67.9110 2.7400e-003
67.9684
Total 0.0176 0.0317 0.2398 1.1000e-003
2.7900e-003
74.79040.0912 9.9000e-004
0.0922 0.0242 9.2000e-004
0.0251 74.7320 74.7320
65 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.22 Pool & RE Building Grading - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 6.1105 0.0000 6.1105 3.3198 0.0000 3.3198 0.0000 0.0000
Off-Road 1.3771 12.1397 15.1947 0.0235 0.5779 0.5779 0.5316 0.5316 2,279.0027
2,279.0027 0.7371 2,294.4812
Total 1.3771 12.1397 15.1947 0.0235 0.7371 2,294.48126.1105 0.5779 6.6883 3.3198 0.5316 3.8514
SO2 Fugitive PM10
Exhaust PM10
2,279.0027
2,279.0027
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0204 0.0259 0.2771 1.2900e-003
0.1118 8.1000e-004
0.1126 0.0296 7.5000e-004
0.0304 84.8887 84.8887 3.4200e-003
84.9606
Total 0.0204 0.0259 0.2771 1.2900e-003
3.4200e-003
84.96060.1118 8.1000e-004
0.1126 0.0296 7.5000e-004
0.0304 84.8887 84.8887
66 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.3831 0.0000 2.3831 1.2947 0.0000 1.2947 0.0000 0.0000
Off-Road 1.3771 12.1397 15.1947 0.0235 0.5779 0.5779 0.5316 0.5316 0.0000 2,279.0027
2,279.0027 0.7371 2,294.4812
Total 1.3771 12.1397 15.1947 0.0235 0.7371 2,294.48122.3831 0.5779 2.9609 1.2947 0.5316 1.8263
SO2 Fugitive PM10
Exhaust PM10
0.0000 2,279.0027
2,279.0027
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0204 0.0259 0.2771 1.2900e-003
0.1118 8.1000e-004
0.1126 0.0296 7.5000e-004
0.0304 84.8887 84.8887 3.4200e-003
84.9606
Total 0.0204 0.0259 0.2771 1.2900e-003
3.4200e-003
84.96060.1118 8.1000e-004
0.1126 0.0296 7.5000e-004
0.0304 84.8887 84.8887
67 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.23 Tennis Court Deck Underground Utilities - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.3888 3.8533 3.5928 5.2400e-003
0.1945 0.1945 0.1790 0.1790 507.8318 507.8318 0.1642 511.2809
Total 0.3888 3.8533 3.5928 5.2400e-003
0.1642 511.28090.1945 0.1945 0.1790 0.1790
SO2 Fugitive PM10
Exhaust PM10
507.8318 507.8318
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 6.1100e-003
7.7600e-003
0.0831 3.9000e-004
0.0335 2.4000e-004
0.0338 8.8900e-003
2.2000e-004
9.1200e-003
25.4666 25.4666 1.0300e-003
25.4882
Total 6.1100e-003
7.7600e-003
0.0831 3.9000e-004
1.0300e-003
25.48820.0335 2.4000e-004
0.0338 8.8900e-003
2.2000e-004
9.1200e-003
25.4666 25.4666
68 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.3888 3.8533 3.5928 5.2400e-003
0.1945 0.1945 0.1790 0.1790 0.0000 507.8318 507.8318 0.1642 511.2809
Total 0.3888 3.8533 3.5928 5.2400e-003
0.1642 511.28090.1945 0.1945 0.1790 0.1790
SO2 Fugitive PM10
Exhaust PM10
0.0000 507.8318 507.8318
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 6.1100e-003
7.7600e-003
0.0831 3.9000e-004
0.0335 2.4000e-004
0.0338 8.8900e-003
2.2000e-004
9.1200e-003
25.4666 25.4666 1.0300e-003
25.4882
Total 6.1100e-003
7.7600e-003
0.0831 3.9000e-004
1.0300e-003
25.48820.0335 2.4000e-004
0.0338 8.8900e-003
2.2000e-004
9.1200e-003
25.4666 25.4666
69 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.24 Pool & RE Building Underground Utilities - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.0486 0.4817 0.4491 6.6000e-004
0.0243 0.0243 0.0224 0.0224 63.4790 63.4790 0.0205 63.9101
Total 0.0486 0.4817 0.4491 6.6000e-004
0.0205 63.91010.0243 0.0243 0.0224 0.0224
SO2 Fugitive PM10
Exhaust PM10
63.4790 63.4790
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 6.1100e-003
7.7600e-003
0.0831 3.9000e-004
0.0335 2.4000e-004
0.0338 8.8900e-003
2.2000e-004
9.1200e-003
25.4666 25.4666 1.0300e-003
25.4882
Total 6.1100e-003
7.7600e-003
0.0831 3.9000e-004
1.0300e-003
25.48820.0335 2.4000e-004
0.0338 8.8900e-003
2.2000e-004
9.1200e-003
25.4666 25.4666
70 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.0486 0.4817 0.4491 6.6000e-004
0.0243 0.0243 0.0224 0.0224 0.0000 63.4790 63.4790 0.0205 63.9101
Total 0.0486 0.4817 0.4491 6.6000e-004
0.0205 63.91010.0243 0.0243 0.0224 0.0224
SO2 Fugitive PM10
Exhaust PM10
0.0000 63.4790 63.4790
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 6.1100e-003
7.7600e-003
0.0831 3.9000e-004
0.0335 2.4000e-004
0.0338 8.8900e-003
2.2000e-004
9.1200e-003
25.4666 25.4666 1.0300e-003
25.4882
Total 6.1100e-003
7.7600e-003
0.0831 3.9000e-004
1.0300e-003
25.48820.0335 2.4000e-004
0.0338 8.8900e-003
2.2000e-004
9.1200e-003
25.4666 25.4666
71 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.25 Tennis Court Deck Construction - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.8905
2,545.8905 0.5975 2,558.4386
Total 1.3615 12.4097 16.0518 0.0269 0.5975 2,558.43860.5250 0.5250 0.4939 0.4939
SO2 Fugitive PM10
Exhaust PM10
2,545.8905
2,545.8905
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1904 1.1510 2.9062 7.0200e-003
0.2064 0.0286 0.2350 0.0588 0.0263 0.0851 656.8410 656.8410 4.5400e-003
656.9364
Worker 0.1691 0.2146 2.2996 0.0107 0.9277 6.6800e-003
0.9344 0.2460 6.2000e-003
0.2522 704.5765 704.5765 0.0284 705.1726
Total 0.3595 1.3656 5.2058 0.0177 0.0329 1,362.10901.1342 0.0353 1.1694 0.3048 0.0325 0.3373 1,361.4176
1,361.4176
72 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 0.0000 2,545.8905
2,545.8905 0.5975 2,558.4386
Total 1.3615 12.4097 16.0518 0.0269 0.5975 2,558.43860.5250 0.5250 0.4939 0.4939
SO2 Fugitive PM10
Exhaust PM10
0.0000 2,545.8905
2,545.8905
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1904 1.1510 2.9062 7.0200e-003
0.2064 0.0286 0.2350 0.0588 0.0263 0.0851 656.8410 656.8410 4.5400e-003
656.9364
Worker 0.1691 0.2146 2.2996 0.0107 0.9277 6.6800e-003
0.9344 0.2460 6.2000e-003
0.2522 704.5765 704.5765 0.0284 705.1726
Total 0.3595 1.3656 5.2058 0.0177 0.0329 1,362.10901.1342 0.0353 1.1694 0.3048 0.0325 0.3373 1,361.4176
1,361.4176
73 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.26 Pool & RE Building Construction - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.8905
2,545.8905 0.5975 2,558.4386
Total 1.3615 12.4097 16.0518 0.0269 0.5975 2,558.43860.5250 0.5250 0.4939 0.4939
SO2 Fugitive PM10
Exhaust PM10
2,545.8905
2,545.8905
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1904 1.1510 2.9062 7.0200e-003
0.2064 0.0286 0.2350 0.0588 0.0263 0.0851 656.8410 656.8410 4.5400e-003
656.9364
Worker 0.1691 0.2146 2.2996 0.0107 0.9277 6.6800e-003
0.9344 0.2460 6.2000e-003
0.2522 704.5765 704.5765 0.0284 705.1726
Total 0.3595 1.3656 5.2058 0.0177 0.0329 1,362.10901.1342 0.0353 1.1694 0.3048 0.0325 0.3373 1,361.4176
1,361.4176
74 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 0.0000 2,545.8905
2,545.8905 0.5975 2,558.4386
Total 1.3615 12.4097 16.0518 0.0269 0.5975 2,558.43860.5250 0.5250 0.4939 0.4939
SO2 Fugitive PM10
Exhaust PM10
0.0000 2,545.8905
2,545.8905
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1904 1.1510 2.9062 7.0200e-003
0.2064 0.0286 0.2350 0.0588 0.0263 0.0851 656.8410 656.8410 4.5400e-003
656.9364
Worker 0.1691 0.2146 2.2996 0.0107 0.9277 6.6800e-003
0.9344 0.2460 6.2000e-003
0.2522 704.5765 704.5765 0.0284 705.1726
Total 0.3595 1.3656 5.2058 0.0177 0.0329 1,362.10901.1342 0.0353 1.1694 0.3048 0.0325 0.3373 1,361.4176
1,361.4176
75 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.27 Residence Hall Paving - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.4487 4.2108 7.1390 0.0112 0.2055 0.2055 0.1890 0.1890 1,079.8983
1,079.8983 0.3493 1,087.2328
Paving 0.5371 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.9858 4.2108 7.1390 0.0112 0.3493 1,087.23280.2055 0.2055 0.1890 0.1890
SO2 Fugitive PM10
Exhaust PM10
1,079.8983
1,079.8983
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0163 0.0207 0.2216 1.0300e-003
0.0894 6.4000e-004
0.0901 0.0237 6.0000e-004
0.0243 67.9110 67.9110 2.7400e-003
67.9684
Total 0.0163 0.0207 0.2216 1.0300e-003
2.7400e-003
67.96840.0894 6.4000e-004
0.0901 0.0237 6.0000e-004
0.0243 67.9110 67.9110
76 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.4487 4.2108 7.1390 0.0112 0.2055 0.2055 0.1890 0.1890 0.0000 1,079.8983
1,079.8983 0.3493 1,087.2328
Paving 0.5371 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.9858 4.2108 7.1390 0.0112 0.3493 1,087.23280.2055 0.2055 0.1890 0.1890
SO2 Fugitive PM10
Exhaust PM10
0.0000 1,079.8983
1,079.8983
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0163 0.0207 0.2216 1.0300e-003
0.0894 6.4000e-004
0.0901 0.0237 6.0000e-004
0.0243 67.9110 67.9110 2.7400e-003
67.9684
Total 0.0163 0.0207 0.2216 1.0300e-003
2.7400e-003
67.96840.0894 6.4000e-004
0.0901 0.0237 6.0000e-004
0.0243 67.9110 67.9110
77 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.28 Residence Hall Architecturaql Coating - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 12.7247 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.1709 1.1455 1.8091 2.9700e-003
0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.7705
Total 12.8956 1.1455 1.8091 2.9700e-003
0.0154 281.77050.0515 0.0515 0.0515 0.0515
SO2 Fugitive PM10
Exhaust PM10
281.4481 281.4481
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0346 0.0440 0.4710 2.1900e-003
0.1900 1.3700e-003
0.1914 0.0504 1.2700e-003
0.0517 144.3109 144.3109 5.8100e-003
144.4330
Total 0.0346 0.0440 0.4710 2.1900e-003
5.8100e-003
144.43300.1900 1.3700e-003
0.1914 0.0504 1.2700e-003
0.0517 144.3109 144.3109
78 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-SiteROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 12.7247 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.1709 1.1455 1.8091 2.9700e-003
0.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481 0.0154 281.7705
Total 12.8956 1.1455 1.8091 2.9700e-003
0.0154 281.77050.0515 0.0515 0.0515 0.0515
SO2 Fugitive PM10
Exhaust PM10
0.0000 281.4481 281.4481
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0346 0.0440 0.4710 2.1900e-003
0.1900 1.3700e-003
0.1914 0.0504 1.2700e-003
0.0517 144.3109 144.3109 5.8100e-003
144.4330
Total 0.0346 0.0440 0.4710 2.1900e-003
5.8100e-003
144.43300.1900 1.3700e-003
0.1914 0.0504 1.2700e-003
0.0517 144.3109 144.3109
79 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.29 Tennis Court Deck Architectural Coating - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 25.9389 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.1709 1.1455 1.8091 2.9700e-003
0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.7705
Total 26.1098 1.1455 1.8091 2.9700e-003
0.0154 281.77050.0515 0.0515 0.0515 0.0515
SO2 Fugitive PM10
Exhaust PM10
281.4481 281.4481
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0346 0.0440 0.4710 2.1900e-003
0.1900 1.3700e-003
0.1914 0.0504 1.2700e-003
0.0517 144.3109 144.3109 5.8100e-003
144.4330
Total 0.0346 0.0440 0.4710 2.1900e-003
5.8100e-003
144.43300.1900 1.3700e-003
0.1914 0.0504 1.2700e-003
0.0517 144.3109 144.3109
80 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 25.9389 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.1709 1.1455 1.8091 2.9700e-003
0.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481 0.0154 281.7705
Total 26.1098 1.1455 1.8091 2.9700e-003
0.0154 281.77050.0515 0.0515 0.0515 0.0515
SO2 Fugitive PM10
Exhaust PM10
0.0000 281.4481 281.4481
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0346 0.0440 0.4710 2.1900e-003
0.1900 1.3700e-003
0.1914 0.0504 1.2700e-003
0.0517 144.3109 144.3109 5.8100e-003
144.4330
Total 0.0346 0.0440 0.4710 2.1900e-003
5.8100e-003
144.43300.1900 1.3700e-003
0.1914 0.0504 1.2700e-003
0.0517 144.3109 144.3109
81 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.30 Pool & RE Building Paving - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.4487 4.2108 7.1390 0.0112 0.2055 0.2055 0.1890 0.1890 1,079.8983
1,079.8983 0.3493 1,087.2328
Paving 0.2479 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.6966 4.2108 7.1390 0.0112 0.3493 1,087.23280.2055 0.2055 0.1890 0.1890
SO2 Fugitive PM10
Exhaust PM10
1,079.8983
1,079.8983
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0163 0.0207 0.2216 1.0300e-003
0.0894 6.4000e-004
0.0901 0.0237 6.0000e-004
0.0243 67.9110 67.9110 2.7400e-003
67.9684
Total 0.0163 0.0207 0.2216 1.0300e-003
2.7400e-003
67.96840.0894 6.4000e-004
0.0901 0.0237 6.0000e-004
0.0243 67.9110 67.9110
82 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.4487 4.2108 7.1390 0.0112 0.2055 0.2055 0.1890 0.1890 0.0000 1,079.8983
1,079.8983 0.3493 1,087.2328
Paving 0.2479 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.6966 4.2108 7.1390 0.0112 0.3493 1,087.23280.2055 0.2055 0.1890 0.1890
SO2 Fugitive PM10
Exhaust PM10
0.0000 1,079.8983
1,079.8983
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0163 0.0207 0.2216 1.0300e-003
0.0894 6.4000e-004
0.0901 0.0237 6.0000e-004
0.0243 67.9110 67.9110 2.7400e-003
67.9684
Total 0.0163 0.0207 0.2216 1.0300e-003
2.7400e-003
67.96840.0894 6.4000e-004
0.0901 0.0237 6.0000e-004
0.0243 67.9110 67.9110
83 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.31 AAA Building Paving - 2027Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.4487 4.2108 7.1390 0.0112 0.2055 0.2055 0.1890 0.1890 1,079.8983
1,079.8983 0.3493 1,087.2328
Paving 0.5371 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.9858 4.2108 7.1390 0.0112 0.3493 1,087.23280.2055 0.2055 0.1890 0.1890
SO2 Fugitive PM10
Exhaust PM10
1,079.8983
1,079.8983
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0157 0.0199 0.2142 1.0300e-003
0.0894 6.5000e-004
0.0901 0.0237 6.0000e-004
0.0243 67.2726 67.2726 2.6700e-003
67.3287
Total 0.0157 0.0199 0.2142 1.0300e-003
2.6700e-003
67.32870.0894 6.5000e-004
0.0901 0.0237 6.0000e-004
0.0243 67.2726 67.2726
84 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.4487 4.2108 7.1390 0.0112 0.2055 0.2055 0.1890 0.1890 0.0000 1,079.8983
1,079.8983 0.3493 1,087.2328
Paving 0.5371 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.9858 4.2108 7.1390 0.0112 0.3493 1,087.23280.2055 0.2055 0.1890 0.1890
SO2 Fugitive PM10
Exhaust PM10
0.0000 1,079.8983
1,079.8983
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0157 0.0199 0.2142 1.0300e-003
0.0894 6.5000e-004
0.0901 0.0237 6.0000e-004
0.0243 67.2726 67.2726 2.6700e-003
67.3287
Total 0.0157 0.0199 0.2142 1.0300e-003
2.6700e-003
67.32870.0894 6.5000e-004
0.0901 0.0237 6.0000e-004
0.0243 67.2726 67.2726
85 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.32 AAA Building Architectural Coating - 2027Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 25.9389 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.1709 1.1455 1.8091 2.9700e-003
0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.7705
Total 26.1098 1.1455 1.8091 2.9700e-003
0.0154 281.77050.0515 0.0515 0.0515 0.0515
SO2 Fugitive PM10
Exhaust PM10
281.4481 281.4481
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0334 0.0424 0.4552 2.1900e-003
0.1900 1.3800e-003
0.1914 0.0504 1.2800e-003
0.0517 142.9542 142.9542 5.6800e-003
143.0735
Total 0.0334 0.0424 0.4552 2.1900e-003
5.6800e-003
143.07350.1900 1.3800e-003
0.1914 0.0504 1.2800e-003
0.0517 142.9542 142.9542
86 of 87
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 25.9389 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.1709 1.1455 1.8091 2.9700e-003
0.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481 0.0154 281.7705
Total 26.1098 1.1455 1.8091 2.9700e-003
0.0154 281.77050.0515 0.0515 0.0515 0.0515
SO2 Fugitive PM10
Exhaust PM10
0.0000 281.4481 281.4481
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0334 0.0424 0.4552 2.1900e-003
0.1900 1.3800e-003
0.1914 0.0504 1.2800e-003
0.0517 142.9542 142.9542 5.6800e-003
143.0735
Total 0.0334 0.0424 0.4552 2.1900e-003
0.1900 1.3800e-003
0.1914 0.0504 1.2800e-003
0.0517 142.9542 142.9542 5.6800e-003
143.0735
87 of 87
CalEEMod Version: CalEEMod.2013.2.2 Page 1 of 1 Date: 4/17/2016 4:42 PM
Concordia University - Phases 3 & 4 ConstructionOrange County, Summer
1.0 Project Characteristics
1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population
University/College (4Yr) 200.00 Student 5.00 100,300.00 0
Other Non-Asphalt Surfaces 0.50 Acre 0.50 21,780.00 0
Parking Lot 137.00 Space 1.23 54,800.00 0
Unenclosed Parking Structure 0.50 Acre 0.50 21,780.00 0
1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 2.2 Precipitation Freq (Days) 30
Climate Zone 8 Operational Year 2035
Utility Company Southern California Edison
CO2 Intensity (lb/MWhr)
630.89 CH4 Intensity (lb/MWhr)
0.029 N2O Intensity (lb/MWhr)
0.006
1.3 User Entered Comments & Non-Default Data
Project Characteristics -
Land Use - Assumes the construction of 100,300 square feet of new institutional building space, 1.23-acre (137 space) of new parking lot space 0.5 acre of Construction Phase - Construction dates entered to reflect anticipated construction schedule.
Off-road Equipment -
Off-road Equipment -
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Equipment based on grading quantities
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
1 of 86
Off-road Equipment - Assumes one trencher.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment -
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes one trencher.
Off-road Equipment -
Off-road Equipment -
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes one excavator.
Off-road Equipment -
Off-road Equipment -
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Equipment based on grading quantities
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment -
Off-road Equipment -
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes one trencher.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Trips and VMT - Haul trips per Psomas
Demolition -
Grading - Amount of material imported and exported based on Conceptual Grading Plan.
Architectural Coating - SCAQMD Rule 1113 limits paints to a maximum VOC content of 50 g/L.
Vehicle Trips - Operational emissions are not calculated in this scenario.
2 of 86
Consumer Products - Operational emissions are not calculated in this scenario.
Area Coating - Operational emissions are not calculated in this scenario.
Landscape Equipment - Operational emissions are not calculated in this scenario.
Energy Use - Operational emissions are not calculated in this scenario.
Water And Wastewater - Operational emissions are not calculated in this scenario.
Solid Waste - Operational emissions are not calculated in this scenario.
Construction Off-road Equipment Mitigation - Assumes compliance with SCAQMD Rule 403 for fugitive dust as required.
Table Name Column Name Default Value New Value
tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00
tblAreaCoating ReapplicationRatePercent 10 0
tblConstructionPhase NumDays 20.00 53.00
tblConstructionPhase NumDays 20.00 26.00
tblConstructionPhase NumDays 20.00 26.00
tblConstructionPhase NumDays 230.00 366.00
tblConstructionPhase NumDays 230.00 469.00
tblConstructionPhase NumDays 230.00 79.00
tblConstructionPhase NumDays 230.00 92.00
tblConstructionPhase NumDays 230.00 469.00
tblConstructionPhase NumDays 20.00 15.00
tblConstructionPhase NumDays 20.00 26.00
tblConstructionPhase NumDays 20.00 8.00
tblConstructionPhase NumDays 20.00 27.00
tblConstructionPhase NumDays 20.00 25.00
3 of 86
tblConstructionPhase NumDays 20.00 12.00
tblConstructionPhase NumDays 20.00 53.00
tblConstructionPhase NumDays 20.00 6.00
tblConstructionPhase NumDays 20.00 13.00
tblConstructionPhase NumDays 20.00 6.00
tblConstructionPhase NumDays 20.00 6.00
tblConstructionPhase NumDays 10.00 27.00
tblConstructionPhase NumDays 10.00 12.00
tblConstructionPhase NumDays 10.00 26.00
tblConstructionPhase NumDays 10.00 6.00
tblConstructionPhase NumDays 10.00 18.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
4 of 86
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase PhaseEndDate 11/7/2026 10/31/2026
tblConstructionPhase PhaseEndDate 12/1/2026 9/30/2026
tblConstructionPhase PhaseEndDate 7/7/2027 6/30/2027
tblConstructionPhase PhaseEndDate 12/16/2026 9/15/2026
tblConstructionPhase PhaseEndDate 3/31/2025 2/28/2025
tblConstructionPhase PhaseEndDate 11/29/2025 11/30/2025
tblConstructionPhase PhaseEndDate 9/22/2026 9/7/2026
tblConstructionPhase PhaseEndDate 10/15/2026 9/30/2026
tblConstructionPhase PhaseEndDate 10/7/2026 6/7/2027
tblConstructionPhase PhaseEndDate 9/14/2026 10/14/2025
tblConstructionPhase PhaseEndDate 6/30/2027 4/30/2026
tblConstructionPhase PhaseEndDate 5/7/2026 4/7/2026
tblConstructionPhase PhaseEndDate 12/13/2025 11/30/2025
tblConstructionPhase PhaseEndDate 6/13/2026 5/31/2026
tblConstructionPhase PhaseEndDate 6/16/2026 5/31/2026
tblConstructionPhase PhaseStartDate 9/8/2026 9/1/2026
tblConstructionPhase PhaseStartDate 11/1/2026 9/1/2026
tblConstructionPhase PhaseStartDate 6/8/2027 6/1/2027
5 of 86
tblConstructionPhase PhaseStartDate 9/1/2026 6/1/2026
tblConstructionPhase PhaseStartDate 10/1/2023 9/1/2023
tblConstructionPhase PhaseStartDate 9/16/2026 9/1/2026
tblConstructionPhase PhaseStartDate 10/1/2026 9/16/2026
tblConstructionPhase PhaseStartDate 10/1/2026 6/1/2027
tblConstructionPhase PhaseStartDate 9/1/2026 10/1/2025
tblConstructionPhase PhaseStartDate 6/1/2027 4/1/2026
tblConstructionPhase PhaseStartDate 5/1/2026 4/1/2026
tblConstructionPhase PhaseStartDate 12/1/2025 11/16/2025
tblConstructionPhase PhaseStartDate 5/15/2026 5/1/2026
tblConstructionPhase PhaseStartDate 6/1/2026 5/15/2026
tblEnergyUse NT24E 2.72 0.00
tblEnergyUse T24E 6.10 0.00
tblGrading AcresOfGrading 13.50 2.00
tblGrading AcresOfGrading 6.50 2.00
tblGrading AcresOfGrading 6.00 1.00
tblGrading AcresOfGrading 26.50 2.00
tblGrading AcresOfGrading 0.00 2.00
tblGrading AcresOfGrading 0.00 2.00
tblGrading AcresOfGrading 0.00 1.50
tblGrading AcresOfGrading 0.00 1.00
tblGrading AcresOfGrading 0.00 2.00
tblGrading MaterialExported 0.00 1,963.00
tblGrading MaterialExported 0.00 23,080.00
tblGrading MaterialExported 0.00 1,963.00
tblGrading MaterialImported 0.00 3,088.00
tblGrading MaterialImported 0.00 580.00
tblGrading MaterialImported 0.00 3,088.00
tblLandUse LandUseSquareFeet 36,759.49 100,300.00
tblLandUse LotAcreage 0.84 5.00
6 of 86
tblOffRoadEquipment HorsePower 80.00 162.00
tblOffRoadEquipment HorsePower 80.00 162.00
tblOffRoadEquipment HorsePower 80.00 162.00
tblOffRoadEquipment LoadFactor 0.50 0.38
tblOffRoadEquipment LoadFactor 0.50 0.38
tblOffRoadEquipment LoadFactor 0.50 0.38
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 2.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 2.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 2.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
7 of 86
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 2.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 2.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 1.00
tblProjectCharacteristics OperationalYear 2014 2035
tblSolidWaste SolidWasteGenerationRate 36.50 0.00
tblTripsAndVMT HaulingTripNumber 631.00 864.00
tblTripsAndVMT HaulingTripNumber 2,958.00 2,522.00
tblTripsAndVMT HaulingTripNumber 0.00 956.00
tblTripsAndVMT HaulingTripNumber 631.00 1,820.00
tblVehicleTrips ST_TR 1.30 0.00
tblVehicleTrips WD_TR 2.38 0.00
tblWater IndoorWaterUseRate 428,220.00 0.00
tblWater OutdoorWaterUseRate 669,780.00 0.00
8 of 86
Exhaust PM10
PM10 Total
2.0 Emissions Summary
2.1 Overall Construction (Maximum Daily Emission)
NBio- CO2 Total CO2
Unmitigated Construction
ROG NOx CO SO2 Fugitive PM10
CH4 N2O CO2e
Year lb/day lb/day
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2
2023 3.5997 31.2672 38.3927 0.0701 6.8391 1.4946 7.8790 3.5246 1.3897 4.4813 0.0000 6,351.7085
6,351.7085 1.3807 0.0000 6,380.7030
2024 1.8260 14.7658 21.2444 0.0452 1.1341 0.6465 1.7806 0.3048 0.6075 0.9123 0.0000 3,969.3511
3,969.3511 0.6354 0.0000 3,982.6939
2025 33.9258 49.7395 67.2667 0.1676 9.5822 2.0942 11.6764 4.3167 1.9377 6.2543 0.0000 15,515.6494
15,515.6494
2.1311 0.0000 15,560.4022
2026 43.4695 54.9515 83.4427 0.1810 15.3032 2.2402 17.2019 7.4610 2.1048 9.2298 0.0000 15,811.1016
15,811.1016
2.5211 0.0000 15,864.0442
2027 27.1423 13.7224 20.7592 0.0452 1.1342 0.5602 1.6944 0.3049 0.5263 0.8312 0.0000 3,945.9456
3,945.9456 0.6296 0.0000 3,959.1678
Total 109.9632 164.4464 231.1058 0.5091 7.2979 0.0000 45,747.0112
33.9927 7.0357 40.2323 15.9119 6.5660 21.7090 0.0000 45,593.7561
45,593.7561
9 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO Total CO2 CH4 N2O CO2e
Year lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
2023 3.5997 31.2672 38.3927 0.0701 3.1346 1.4946 4.1746 1.5017 1.3897 2.4584 0.0000 6,351.7085
6,351.7085 1.3807 0.0000 6,380.7030
2024 1.8260 14.7658 21.2444 0.0452 1.1341 0.6465 1.7806 0.3048 0.6075 0.9123 0.0000 3,969.3511
3,969.3511 0.6354 0.0000 3,982.6939
2025 33.9258 49.7395 67.2667 0.1676 5.6447 2.0942 7.7390 2.2012 1.9377 4.1389 0.0000 15,515.6494
15,515.6494
2.1311 0.0000 15,560.4022
2026 43.4695 54.9515 83.4427 0.1810 7.8111 2.2402 9.7098 3.4069 2.1048 5.1757 0.0000 15,811.1016
15,811.1016
2.5211 0.0000 15,864.0442
2027 27.1423 13.7224 20.7592 0.0452 1.1342 0.5602 1.6944 0.3049 0.5263 0.8312 0.0000 3,945.9456
3,945.9456 0.6296 0.0000 3,959.1678
Total 109.9632 164.4464 231.1058 0.5091 18.8587 7.0357 25.0984 7.7194 6.5660 13.5165 0.0000 45,593.7561
45,593.7561
7.2979 0.0000 45,747.0112
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent Reduction
0.00 0.00 0.00 0.00 44.52 0.00 37.62 51.49 0.00 37.74 0.00 0.00 0.00 0.00 0.00 0.00
3.0 Construction Detail
Construction Phase
Phase Number
Phase Name Phase Type Start Date End Date Num Days Week
Num Days Phase Description
1 SN & CC Site Preparation Site Preparation 5/1/2023 5/31/2023 6 27
2 SN & CC Demolition Demolition 6/1/2023 6/30/2023 6 26
3 SN & CC Grading Grading 7/1/2023 8/31/2023 6 53
4 SN & CC Underground Utilities Trenching 9/1/2023 9/30/2023 6 26
5 SN & CC Construction Building Construction 9/1/2023 2/28/2025 6 469
6 SN & CC Paving Paving 3/1/2025 3/7/2025 6 6
7 SN & CC Architectural Coating Architectural Coating 3/8/2025 3/31/2025 6 20
10 of 86
8 Residence Hall Site Preparation Site Preparation 4/1/2025 4/21/2025 6 18
9 Tennis Courts Demolition Demolition 4/22/2025 4/30/2025 6 8
10 Residence Hall Grading Grading 5/1/2025 5/31/2025 6 27
11 Residence Hall Underground Utilities
Trenching 6/1/2025 6/30/2025 6 25
12 Residence Hall Construction Building Construction 7/1/2025 8/31/2026 6 366
13 AAA Building Site Preparation Site Preparation 10/1/2025 10/14/2025 6 12
14 AAA Building Demolition Demolition 10/15/2025 10/31/2025 6 15
15 AAA Building Grading Grading 11/1/2025 11/30/2025 6 25
16 AAA Building Underground Utilities
Trenching 11/16/2025 11/30/2025 6 12
17 AAA Building Construction Building Construction 12/1/2025 5/31/2027 6 469
18 Tennis Court Deck Site Preparation
Site Preparation 4/1/2026 4/30/2026 6 26
19 Pool & RE Building Site Preparation
Site Preparation 4/1/2026 4/7/2026 6 6
20 Pool & RE Building Demolition Demolition 4/8/2026 4/30/2026 6 20
21 Pool & RE Building Grading Grading 5/1/2026 5/14/2026 6 12
22 Tennis Court Deck Underground Utilities
Trenching 5/1/2026 5/31/2026 6 26
23 Pool & RE Building Underground Utilities
Trenching 5/15/2026 5/31/2026 6 14
24 Tennis Court Deck Construction Building Construction 6/1/2026 8/31/2026 6 79
25 Pool & RE Building Construction Building Construction 6/1/2026 9/15/2026 6 92
26 Residence Hall Paving Paving 9/1/2026 9/7/2026 6 6
27 Residence Hall Architecturaql Coating
Architectural Coating 9/1/2026 10/31/2026 6 53
28 Tennis Court Deck Architectural Coating
Architectural Coating 9/1/2026 9/30/2026 6 26
6
29 Pool & RE Building Paving Paving 9/16/2026 9/30/2026 6
6/30/2027 6
13
30 AAA Building Paving Paving 6/1/2027 6/7/2027 6
26
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 218,256; Non-Residential Outdoor: 72,752 (Architectural Coating –
31 AAA Building Architectural Coating
Architectural Coating 6/1/2027
11 of 86
OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor
SN & CC Site Preparation Rubber Tired Dozers 1 8.00 255 0.40
SN & CC Site Preparation Tractors/Loaders/Backhoes 1 8.00 97 0.37
SN & CC Demolition Concrete/Industrial Saws 1 8.00 81 0.73
SN & CC Demolition Excavators 1 8.00 162 0.38
SN & CC Demolition Rubber Tired Dozers 1 8.00 255 0.40
SN & CC Demolition Tractors/Loaders/Backhoes 1 8.00 97 0.37
SN & CC Grading Excavators 2 8.00 162 0.38
SN & CC Grading Graders 1 8.00 174 0.41
SN & CC Grading Rubber Tired Dozers 1 8.00 255 0.40
SN & CC Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37
SN & CC Underground Utilities Excavators 1 8.00 162 0.38
SN & CC Underground Utilities Graders 1 8.00 174 0.41
SN & CC Underground Utilities Rubber Tired Dozers 1 8.00 255 0.40
SN & CC Underground Utilities Tractors/Loaders/Backhoes 1 8.00 97 0.37
SN & CC Construction Cranes 1 7.00 226 0.29
SN & CC Construction Forklifts 3 8.00 89 0.20
SN & CC Construction Generator Sets 1 8.00 84 0.74
SN & CC Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37
SN & CC Construction Welders 1 8.00 46 0.45
SN & CC Paving Pavers 1 8.00 125 0.42
SN & CC Paving Paving Equipment 1 8.00 130 0.36
SN & CC Paving Rollers 1 8.00 80 0.38
SN & CC Architectural Coating Air Compressors 1 6.00 78 0.48
Residence Hall Site Preparation Rubber Tired Dozers 1 8.00 255 0.40
Residence Hall Site Preparation Tractors/Loaders/Backhoes 1 8.00 97 0.37
Tennis Courts Demolition Concrete/Industrial Saws 1 8.00 81 0.73
Tennis Courts Demolition Excavators 1 8.00 162 0.38
Tennis Courts Demolition Rubber Tired Dozers 1 8.00 255 0.40
12 of 86
Residence Hall Grading Excavators 1 8.00 162 0.38
Residence Hall Grading Graders 1 8.00 174 0.41
Residence Hall Grading Rubber Tired Dozers 1 8.00 255 0.40
Residence Hall Grading Tractors/Loaders/Backhoes 1 8.00 97 0.37
Residence Hall Underground Utilities Excavators 1 8.00 162 0.38
Residence Hall Construction Cranes 1 7.00 226 0.29
Residence Hall Construction Forklifts 3 8.00 89 0.20
Residence Hall Construction Generator Sets 1 8.00 84 0.74
Residence Hall Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37
Residence Hall Construction Welders 1 8.00 46 0.45
AAA Building Site Preparation Rubber Tired Dozers 1 8.00 255 0.40
AAA Building Site Preparation Tractors/Loaders/Backhoes 1 8.00 97 0.37
AAA Building Demolition Concrete/Industrial Saws 1 8.00 81 0.73
AAA Building Demolition Excavators 1 8.00 162 0.38
AAA Building Demolition Rubber Tired Dozers 1 8.00 255 0.40
AAA Building Grading Excavators 2 8.00 162 0.38
AAA Building Grading Graders 1 8.00 174 0.41
AAA Building Grading Rubber Tired Dozers 2 8.00 255 0.40
AAA Building Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37
AAA Building Underground Utilities Trenchers 1 8.00 162 0.38
AAA Building Construction Cranes 1 7.00 226 0.29
AAA Building Construction Forklifts 3 8.00 89 0.20
AAA Building Construction Generator Sets 1 8.00 84 0.74
AAA Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37
AAA Building Construction Welders 1 8.00 46 0.45
Tennis Court Deck Site Preparation Rubber Tired Dozers 1 8.00 255 0.40
Tennis Court Deck Site Preparation Tractors/Loaders/Backhoes 1 8.00 97 0.37
Pool & RE Building Site Preparation Rubber Tired Dozers 1 8.00 255 0.40
Pool & RE Building Site Preparation Tractors/Loaders/Backhoes 1 8.00 97 0.37
Pool & RE Building Demolition Concrete/Industrial Saws 1 8.00 81 0.73
13 of 86
Pool & RE Building Demolition Excavators 1 8.00 162 0.38
Pool & RE Building Demolition Rubber Tired Dozers 1 8.00 255 0.40
Pool & RE Building Grading Excavators 1 8.00 162 0.38
Pool & RE Building Grading Graders 1 8.00 174 0.41
Pool & RE Building Grading Rubber Tired Dozers 1 8.00 255 0.40
Pool & RE Building Grading Tractors/Loaders/Backhoes 1 8.00 97 0.37
Tennis Court Deck Underground Utilities
Trenchers 1 8.00 162 0.38
Pool & RE Building Underground Utilities
Trenchers 1 1.00 162 0.38
Tennis Court Deck Construction Cranes 1 7.00 226 0.29
Tennis Court Deck Construction Forklifts 3 8.00 89 0.20
Tennis Court Deck Construction Generator Sets 1 8.00 84 0.74
Tennis Court Deck Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37
Tennis Court Deck Construction Welders 1 8.00 46 0.45
Pool & RE Building Construction Cranes 1 7.00 226 0.29
Pool & RE Building Construction Forklifts 3 8.00 89 0.20
Pool & RE Building Construction Generator Sets 1 8.00 84 0.74
Pool & RE Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37
Pool & RE Building Construction Welders 1 8.00 46 0.45
Residence Hall Paving Pavers 1 8.00 125 0.42
Residence Hall Paving Paving Equipment 1 8.00 130 0.36
Residence Hall Paving Rollers 1 8.00 80 0.38
Residence Hall Architecturaql Coating Air Compressors 1 6.00 78 0.48
Tennis Court Deck Architectural Coating
Air Compressors 1 6.00 78 0.48
Pool & RE Building Paving Pavers 1 8.00 125 0.42
Pool & RE Building Paving Paving Equipment 1 8.00 130 0.36
Pool & RE Building Paving Rollers 1 8.00 80 0.38
AAA Building Paving Pavers 1 8.00 125 0.42
AAA Building Paving Paving Equipment 1 8.00 130 0.36
AAA Building Paving Rollers 1 8.00 80 0.38
AAA Building Architectural Coating Air Compressors 1 6.00 78 0.48
14 of 86
Trips and VMT
Phase Name Offroad Equipment Count
Worker Trip Number
Vendor Trip Number
Hauling Trip Number
Worker Trip Length
Vendor Trip Length
Hauling Trip Length
Worker Vehicle Class
Vendor Vehicle Class
Hauling Vehicle Class
SN & CC Site Preparation
2 5.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
SN & CC Demolition 4 10.00 0.00 199.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
SN & CC Grading 6 15.00 0.00 1,820.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
SN & CC Underground Utilities
4 10.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
SN & CC Construction 9 83.00 33.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
SN & CC Paving 3 8.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
SN & CC Architectural Coating
1 17.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Residence Hall Site Preparation
2 5.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Tennis Courts Demolition
3 8.00 0.00 2.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Residence Hall Grading
4 10.00 0.00 864.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Residence Hall Underground Utilities
1 3.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Residence Hall Construction
9 83.00 33.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
AAA Building Site Preparation
2 5.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
AAA Building Demolition
3 8.00 0.00 125.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
AAA Building Grading 7 18.00 0.00 2,522.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
AAA Building Underground Utilities
1 3.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
AAA Building Construction
9 83.00 33.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Tennis Court Deck Site Preparation
2 5.00 0.00 956.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Pool & RE Building Site Preparation
2 5.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Pool & RE Building Demolition
3 8.00 0.00 2.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Pool & RE Building Grading
4 10.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Tennis Court Deck Underground Utilities
1 3.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Pool & RE Building Underground Utilities
1 3.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Tennis Court Deck Construction
9 83.00 33.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Pool & RE Building Construction
9 83.00 33.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Residence Hall Paving 3 8.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Residence Hall Architecturaql Coating
1 17.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
15 of 86
Tennis Court Deck Architectural Coating
1 17.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Pool & RE Building Paving
3 8.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
AAA Building Paving 3 8.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
LD_Mix HDT_Mix HHDT
3.1 Mitigation Measures Construction
AAA Building Architectural Coating
1 17.00 0.00 0.00 14.70
NOx CO SO2 Fugitive PM10
6.90 20.00
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2
Water Exposed Area
3.2 SN & CC Site Preparation - 2023Unmitigated Construction On-Site
ROG NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Exhaust PM10
PM10 Total
Fugitive Dust 6.1006 0.0000 6.1006 3.3187 0.0000 3.3187 0.0000 0.0000
Off-Road 0.9548 9.4662 8.8626 0.0120 0.4383 0.4383 0.4032 0.4032 1,164.1257
1,164.1257 0.3765 1,172.0322
Total 0.9548 9.4662 8.8626 0.0120 0.3765 1,172.03226.1006 0.4383 6.5390 3.3187 0.4032 3.7220
SO2 Fugitive PM10
Exhaust PM10
1,164.1257
1,164.1257
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0110 0.0135 0.1708 6.8000e-004
0.0559 3.9000e-004
0.0563 0.0148 3.6000e-004
0.0152 46.5341 46.5341 1.8700e-003
46.5734
Total 0.0110 0.0135 0.1708 6.8000e-004
1.8700e-003
46.57340.0559 3.9000e-004
0.0563 0.0148 3.6000e-004
0.0152 46.5341 46.5341
16 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.3793 0.0000 2.3793 1.2943 0.0000 1.2943 0.0000 0.0000
Off-Road 0.9548 9.4662 8.8626 0.0120 0.4383 0.4383 0.4032 0.4032 0.0000 1,164.1257
1,164.1257 0.3765 1,172.0322
Total 0.9548 9.4662 8.8626 0.0120 0.3765 1,172.03222.3793 0.4383 2.8176 1.2943 0.4032 1.6975
SO2 Fugitive PM10
Exhaust PM10
0.0000 1,164.1257
1,164.1257
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0110 0.0135 0.1708 6.8000e-004
0.0559 3.9000e-004
0.0563 0.0148 3.6000e-004
0.0152 46.5341 46.5341 1.8700e-003
46.5734
Total 0.0110 0.0135 0.1708 6.8000e-004
1.8700e-003
46.57340.0559 3.9000e-004
0.0563 0.0148 3.6000e-004
0.0152 46.5341 46.5341
17 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.3 SN & CC Demolition - 2023Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 1.6567 0.0000 1.6567 0.2509 0.0000 0.2509 0.0000 0.0000
Off-Road 1.4819 13.6383 15.8602 0.0236 0.6443 0.6443 0.6030 0.6030 2,269.5579
2,269.5579 0.5715 2,281.5603
Total 1.4819 13.6383 15.8602 0.0236 0.5715 2,281.56031.6567 0.6443 2.3010 0.2509 0.6030 0.8539
SO2 Fugitive PM10
Exhaust PM10
2,269.5579
2,269.5579
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.1048 0.8609 1.2264 5.5700e-003
0.1334 0.0275 0.1609 0.0365 0.0253 0.0618 523.9782 523.9782 3.6800e-003
524.0554
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0221 0.0270 0.3416 1.3600e-003
0.1118 7.8000e-004
0.1126 0.0296 7.3000e-004
0.0304 93.0683 93.0683 3.7400e-003
93.1468
Total 0.1269 0.8879 1.5680 6.9300e-003
7.4200e-003
617.20210.2452 0.0283 0.2735 0.0662 0.0260 0.0922 617.0464 617.0464
18 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 0.6461 0.0000 0.6461 0.0978 0.0000 0.0978 0.0000 0.0000
Off-Road 1.4819 13.6383 15.8602 0.0236 0.6443 0.6443 0.6030 0.6030 0.0000 2,269.5579
2,269.5579 0.5715 2,281.5603
Total 1.4819 13.6383 15.8602 0.0236 0.5715 2,281.56030.6461 0.6443 1.2904 0.0978 0.6030 0.7009
SO2 Fugitive PM10
Exhaust PM10
0.0000 2,269.5579
2,269.5579
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.1048 0.8609 1.2264 5.5700e-003
0.1334 0.0275 0.1609 0.0365 0.0253 0.0618 523.9782 523.9782 3.6800e-003
524.0554
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0221 0.0270 0.3416 1.3600e-003
0.1118 7.8000e-004
0.1126 0.0296 7.3000e-004
0.0304 93.0683 93.0683 3.7400e-003
93.1468
Total 0.1269 0.8879 1.5680 6.9300e-003
7.4200e-003
617.20210.2452 0.0283 0.2735 0.0662 0.0260 0.0922 617.0464 617.0464
19 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.4 SN & CC Grading - 2023Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 6.0729 0.0000 6.0729 3.3162 0.0000 3.3162 0.0000 0.0000
Off-Road 1.9835 18.6415 22.1154 0.0319 0.9153 0.9153 0.8421 0.8421 3,093.2479
3,093.2479 1.0004 3,114.2567
Total 1.9835 18.6415 22.1154 0.0319 1.0004 3,114.25676.0729 0.9153 6.9882 3.3162 0.8421 4.1583
SO2 Fugitive PM10
Exhaust PM10
3,093.2479
3,093.2479
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.4702 3.8624 5.5024 0.0250 0.5985 0.1234 0.7220 0.1639 0.1136 0.2775 2,350.8719
2,350.8719 0.0165 2,351.2183
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0331 0.0405 0.5123 2.0500e-003
0.1677 1.1800e-003
0.1688 0.0445 1.0900e-003
0.0456 139.6024 139.6024 5.6100e-003
139.7202
Total 0.5033 3.9029 6.0147 0.0270 0.0221 2,490.93850.7662 0.1246 0.8908 0.2084 0.1146 0.3230 2,490.4743
2,490.4743
20 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.3684 0.0000 2.3684 1.2933 0.0000 1.2933 0.0000 0.0000
Off-Road 1.9835 18.6415 22.1154 0.0319 0.9153 0.9153 0.8421 0.8421 0.0000 3,093.2479
3,093.2479 1.0004 3,114.2567
Total 1.9835 18.6415 22.1154 0.0319 1.0004 3,114.25672.3684 0.9153 3.2838 1.2933 0.8421 2.1354
SO2 Fugitive PM10
Exhaust PM10
0.0000 3,093.2479
3,093.2479
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.4702 3.8624 5.5024 0.0250 0.5985 0.1234 0.7220 0.1639 0.1136 0.2775 2,350.8719
2,350.8719 0.0165 2,351.2183
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0331 0.0405 0.5123 2.0500e-003
0.1677 1.1800e-003
0.1688 0.0445 1.0900e-003
0.0456 139.6024 139.6024 5.6100e-003
139.7202
Total 0.5033 3.9029 6.0147 0.0270 0.0221 2,490.93850.7662 0.1246 0.8908 0.2084 0.1146 0.3230 2,490.4743
2,490.4743
21 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.5 SN & CC Underground Utilities - 2023Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.6387 15.5180 16.5438 0.0235 0.7618 0.7618 0.7009 0.7009 2,278.9049
2,278.9049 0.7370 2,294.3828
Total 1.6387 15.5180 16.5438 0.0235 0.7370 2,294.38280.7618 0.7618 0.7009 0.7009
SO2 Fugitive PM10
Exhaust PM10
2,278.9049
2,278.9049
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0221 0.0270 0.3416 1.3600e-003
0.1118 7.8000e-004
0.1126 0.0296 7.3000e-004
0.0304 93.0683 93.0683 3.7400e-003
93.1468
Total 0.0221 0.0270 0.3416 1.3600e-003
3.7400e-003
93.14680.1118 7.8000e-004
0.1126 0.0296 7.3000e-004
0.0304
SO2 Fugitive PM10
Exhaust PM10
93.0683 93.0683
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.6387 15.5180 16.5438 0.0235 0.7618 0.7618 0.7009 0.7009 0.0000 2,278.9049
2,278.9049 0.7370 2,294.3828
Total 1.6387 15.5180 16.5438 0.0235 0.7370 2,294.38280.7618 0.7618 0.7009 0.7009 0.0000 2,278.9049
2,278.9049
22 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0221 0.0270 0.3416 1.3600e-003
0.1118 7.8000e-004
0.1126 0.0296 7.3000e-004
0.0304 93.0683 93.0683 3.7400e-003
93.1468
Total 0.0221 0.0270 0.3416 1.3600e-003
3.7400e-003
93.14680.1118 7.8000e-004
0.1126 0.0296 7.3000e-004
0.0304
SO2 Fugitive PM10
Exhaust PM10
93.0683 93.0683
PM2.5 Total
Bio- CO2 NBio- CO2
3.6 SN & CC Construction - 2023Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.5661 14.3126 16.2093 0.0268 0.6967 0.6967 0.6557 0.6557 2,544.6262
2,544.6262 0.6044 2,557.3191
Total 1.5661 14.3126 16.2093 0.0268 0.6044 2,557.31910.6967 0.6967 0.6557 0.6557 2,544.6262
2,544.6262
23 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1896 1.1855 2.4632 7.0700e-003
0.2063 0.0288 0.2351 0.0588 0.0265 0.0853 662.6425 662.6425 4.4600e-003
662.7361
Worker 0.1832 0.2240 2.8349 0.0113 0.9277 6.5000e-003
0.9343 0.2460 6.0300e-003
0.2521 772.4666 772.4666 0.0310 773.1182
Total 0.3728 1.4095 5.2981 0.0184 0.0355 1,435.85441.1341 0.0353 1.1694 0.3048 0.0325 0.3373
SO2 Fugitive PM10
Exhaust PM10
1,435.1091
1,435.1091
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.5661 14.3126 16.2093 0.0268 0.6967 0.6967 0.6557 0.6557 0.0000 2,544.6262
2,544.6262 0.6044 2,557.3191
Total 1.5661 14.3126 16.2093 0.0268 0.6044 2,557.31910.6967 0.6967 0.6557 0.6557 0.0000 2,544.6262
2,544.6262
24 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1896 1.1855 2.4632 7.0700e-003
0.2063 0.0288 0.2351 0.0588 0.0265 0.0853 662.6425 662.6425 4.4600e-003
662.7361
Worker 0.1832 0.2240 2.8349 0.0113 0.9277 6.5000e-003
0.9343 0.2460 6.0300e-003
0.2521 772.4666 772.4666 0.0310 773.1182
Total 0.3728 1.4095 5.2981 0.0184 0.0355 1,435.85441.1341 0.0353 1.1694 0.3048 0.0325 0.3373
SO2 Fugitive PM10
Exhaust PM10
1,435.1091
1,435.1091
PM2.5 Total
Bio- CO2 NBio- CO2
3.6 SN & CC Construction - 2024Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.4653 13.3774 16.1332 0.0268 0.6106 0.6106 0.5744 0.5744 2,545.1154
2,545.1154 0.6009 2,557.7349
Total 1.4653 13.3774 16.1332 0.0268 0.6009 2,557.73490.6106 0.6106 0.5744 0.5744 2,545.1154
2,545.1154
25 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1861 1.1757 2.4239 7.0700e-003
0.2064 0.0294 0.2358 0.0588 0.0271 0.0859 662.5070 662.5070 4.4800e-003
662.6011
Worker 0.1746 0.2127 2.6873 0.0113 0.9277 6.5500e-003
0.9343 0.2460 6.0700e-003
0.2521 761.7286 761.7286 0.0300 762.3579
Total 0.3607 1.3884 5.1112 0.0184 0.0345 1,424.95901.1341 0.0360 1.1701 0.3048 0.0331 0.3380
SO2 Fugitive PM10
Exhaust PM10
1,424.2356
1,424.2356
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.4653 13.3774 16.1332 0.0268 0.6106 0.6106 0.5744 0.5744 0.0000 2,545.1154
2,545.1154 0.6009 2,557.7349
Total 1.4653 13.3774 16.1332 0.0268 0.6009 2,557.73490.6106 0.6106 0.5744 0.5744 0.0000 2,545.1154
2,545.1154
26 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1861 1.1757 2.4239 7.0700e-003
0.2064 0.0294 0.2358 0.0588 0.0271 0.0859 662.5070 662.5070 4.4800e-003
662.6011
Worker 0.1746 0.2127 2.6873 0.0113 0.9277 6.5500e-003
0.9343 0.2460 6.0700e-003
0.2521 761.7286 761.7286 0.0300 762.3579
Total 0.3607 1.3884 5.1112 0.0184 0.0345 1,424.95901.1341 0.0360 1.1701 0.3048 0.0331 0.3380
SO2 Fugitive PM10
Exhaust PM10
1,424.2356
1,424.2356
PM2.5 Total
Bio- CO2 NBio- CO2
3.6 SN & CC Construction - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.8905
2,545.8905 0.5975 2,558.4386
Total 1.3615 12.4097 16.0518 0.0269 0.5975 2,558.43860.5250 0.5250 0.4939 0.4939 2,545.8905
2,545.8905
27 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1819 1.1671 2.3712 7.0700e-003
0.2064 0.0296 0.2360 0.0588 0.0272 0.0860 662.5659 662.5659 4.5000e-003
662.6604
Worker 0.1677 0.2035 2.5796 0.0113 0.9277 6.6100e-003
0.9344 0.2460 6.1300e-003
0.2522 752.4384 752.4384 0.0291 753.0499
Total 0.3495 1.3707 4.9507 0.0184 0.0336 1,415.71031.1341 0.0362 1.1703 0.3048 0.0333 0.3382
SO2 Fugitive PM10
Exhaust PM10
1,415.0043
1,415.0043
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 0.0000 2,545.8905
2,545.8905 0.5975 2,558.4386
Total 1.3615 12.4097 16.0518 0.0269 0.5975 2,558.43860.5250 0.5250 0.4939 0.4939 0.0000 2,545.8905
2,545.8905
28 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1819 1.1671 2.3712 7.0700e-003
0.2064 0.0296 0.2360 0.0588 0.0272 0.0860 662.5659 662.5659 4.5000e-003
662.6604
Worker 0.1677 0.2035 2.5796 0.0113 0.9277 6.6100e-003
0.9344 0.2460 6.1300e-003
0.2522 752.4384 752.4384 0.0291 753.0499
Total 0.3495 1.3707 4.9507 0.0184 0.0336 1,415.71031.1341 0.0362 1.1703 0.3048 0.0333 0.3382
SO2 Fugitive PM10
Exhaust PM10
1,415.0043
1,415.0043
PM2.5 Total
Bio- CO2 NBio- CO2
3.7 SN & CC Paving - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.4487 4.2108 7.1390 0.0112 0.2055 0.2055 0.1890 0.1890 1,079.8983
1,079.8983 0.3493 1,087.2328
Paving 0.5371 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.9858 4.2108 7.1390 0.0112 0.3493 1,087.23280.2055 0.2055 0.1890 0.1890 1,079.8983
1,079.8983
29 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0162 0.0196 0.2486 1.0900e-003
0.0894 6.4000e-004
0.0901 0.0237 5.9000e-004
0.0243 72.5242 72.5242 2.8100e-003
72.5831
Total 0.0162 0.0196 0.2486 1.0900e-003
2.8100e-003
72.58310.0894 6.4000e-004
0.0901 0.0237 5.9000e-004
0.0243
SO2 Fugitive PM10
Exhaust PM10
72.5242 72.5242
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.4487 4.2108 7.1390 0.0112 0.2055 0.2055 0.1890 0.1890 0.0000 1,079.8983
1,079.8983 0.3493 1,087.2328
Paving 0.5371 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.9858 4.2108 7.1390 0.0112 0.3493 1,087.23280.2055 0.2055 0.1890 0.1890 0.0000 1,079.8983
1,079.8983
30 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-SiteROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0162 0.0196 0.2486 1.0900e-003
0.0894 6.4000e-004
0.0901 0.0237 5.9000e-004
0.0243 72.5242 72.5242 2.8100e-003
72.5831
Total 0.0162 0.0196 0.2486 1.0900e-003
2.8100e-003
72.58310.0894 6.4000e-004
0.0901 0.0237 5.9000e-004
0.0243
SO2 Fugitive PM10
Exhaust PM10
72.5242 72.5242
PM2.5 Total
Bio- CO2 NBio- CO2
3.8 SN & CC Architectural Coating - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 33.7206 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.1709 1.1455 1.8091 2.9700e-003
0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.7705
Total 33.8914 1.1455 1.8091 2.9700e-003
0.0154 281.77050.0515 0.0515 0.0515 0.0515 281.4481 281.4481
31 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0343 0.0417 0.5284 2.3200e-003
0.1900 1.3500e-003
0.1914 0.0504 1.2600e-003
0.0517 154.1139 154.1139 5.9600e-003
154.2391
Total 0.0343 0.0417 0.5284 2.3200e-003
5.9600e-003
154.23910.1900 1.3500e-003
0.1914 0.0504 1.2600e-003
0.0517
SO2 Fugitive PM10
Exhaust PM10
154.1139 154.1139
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 33.7206 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.1709 1.1455 1.8091 2.9700e-003
0.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481 0.0154 281.7705
Total 33.8914 1.1455 1.8091 2.9700e-003
0.0154 281.77050.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481
32 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0343 0.0417 0.5284 2.3200e-003
0.1900 1.3500e-003
0.1914 0.0504 1.2600e-003
0.0517 154.1139 154.1139 5.9600e-003
154.2391
Total 0.0343 0.0417 0.5284 2.3200e-003
5.9600e-003
154.23910.1900 1.3500e-003
0.1914 0.0504 1.2600e-003
0.0517
SO2 Fugitive PM10
Exhaust PM10
154.1139 154.1139
PM2.5 Total
Bio- CO2 NBio- CO2
3.9 Residence Hall Site Preparation - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 6.1399 0.0000 6.1399 3.3230 0.0000 3.3230 0.0000 0.0000
Off-Road 0.7921 7.3969 7.5527 0.0120 0.3251 0.3251 0.2991 0.2991 1,163.9281
1,163.9281 0.3764 1,171.8333
Total 0.7921 7.3969 7.5527 0.0120 0.3764 1,171.83336.1399 0.3251 6.4650 3.3230 0.2991 3.6220 1,163.9281
1,163.9281
33 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0101 0.0123 0.1554 6.8000e-004
0.0559 4.0000e-004
0.0563 0.0148 3.7000e-004
0.0152 45.3276 45.3276 1.7500e-003
45.3645
Total 0.0101 0.0123 0.1554 6.8000e-004
1.7500e-003
45.36450.0559 4.0000e-004
0.0563 0.0148 3.7000e-004
0.0152
SO2 Fugitive PM10
Exhaust PM10
45.3276 45.3276
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.3946 0.0000 2.3946 1.2960 0.0000 1.2960 0.0000 0.0000
Off-Road 0.7921 7.3969 7.5527 0.0120 0.3251 0.3251 0.2991 0.2991 0.0000 1,163.9281
1,163.9281 0.3764 1,171.8333
Total 0.7921 7.3969 7.5527 0.0120 0.3764 1,171.83332.3946 0.3251 2.7196 1.2960 0.2991 1.5950 0.0000 1,163.9281
1,163.9281
34 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0101 0.0123 0.1554 6.8000e-004
0.0559 4.0000e-004
0.0563 0.0148 3.7000e-004
0.0152 45.3276 45.3276 1.7500e-003
45.3645
Total 0.0101 0.0123 0.1554 6.8000e-004
1.7500e-003
45.36450.0559 4.0000e-004
0.0563 0.0148 3.7000e-004
0.0152
SO2 Fugitive PM10
Exhaust PM10
45.3276 45.3276
PM2.5 Total
Bio- CO2 NBio- CO2
3.10 Tennis Courts Demolition - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 0.0535 0.0000 0.0535 8.1000e-003
0.0000 8.1000e-003
0.0000 0.0000
Off-Road 1.1264 9.5836 12.3098 0.0205 0.4252 0.4252 0.3986 0.3986 1,967.5426
1,967.5426 0.4707 1,977.4281
Total 1.1264 9.5836 12.3098 0.0205 0.4707 1,977.42810.0535 0.4252 0.4787 8.1000e-003
0.3986 0.4067 1,967.5426
1,967.5426
35 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 3.3700e-003
0.0279 0.0395 1.8000e-004
4.3600e-003
9.2000e-004
5.2800e-003
1.1900e-003
8.5000e-004
2.0400e-003
17.1010 17.1010 1.2000e-004
17.1036
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0162 0.0196 0.2486 1.0900e-003
0.0894 6.4000e-004
0.0901 0.0237 5.9000e-004
0.0243 72.5242 72.5242 2.8100e-003
72.5831
Total 0.0195 0.0475 0.2881 1.2700e-003
2.9300e-003
89.68670.0938 1.5600e-003
0.0953 0.0249 1.4400e-003
0.0264
SO2 Fugitive PM10
Exhaust PM10
89.6252 89.6252
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 0.0209 0.0000 0.0209 3.1600e-003
0.0000 3.1600e-003
0.0000 0.0000
Off-Road 1.1264 9.5836 12.3098 0.0205 0.4252 0.4252 0.3986 0.3986 0.0000 1,967.5426
1,967.5426 0.4707 1,977.4281
Total 1.1264 9.5836 12.3098 0.0205 0.4707 1,977.42810.0209 0.4252 0.4461 3.1600e-003
0.3986 0.4018 0.0000 1,967.5426
1,967.5426
36 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 3.3700e-003
0.0279 0.0395 1.8000e-004
4.3600e-003
9.2000e-004
5.2800e-003
1.1900e-003
8.5000e-004
2.0400e-003
17.1010 17.1010 1.2000e-004
17.1036
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0162 0.0196 0.2486 1.0900e-003
0.0894 6.4000e-004
0.0901 0.0237 5.9000e-004
0.0243 72.5242 72.5242 2.8100e-003
72.5831
Total 0.0195 0.0475 0.2881 1.2700e-003
2.9300e-003
89.68670.0938 1.5600e-003
0.0953 0.0249 1.4400e-003
0.0264
SO2 Fugitive PM10
Exhaust PM10
89.6252 89.6252
PM2.5 Total
Bio- CO2 NBio- CO2
3.11 Residence Hall Grading - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 6.1218 0.0000 6.1218 3.3219 0.0000 3.3219 0.0000 0.0000
Off-Road 1.3771 12.1397 15.1947 0.0235 0.5779 0.5779 0.5316 0.5316 2,279.0027
2,279.0027 0.7371 2,294.4812
Total 1.3771 12.1397 15.1947 0.0235 0.7371 2,294.48126.1218 0.5779 6.6997 3.3219 0.5316 3.8535 2,279.0027
2,279.0027
37 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.4310 3.5734 5.0530 0.0233 0.5578 0.1182 0.6760 0.1528 0.1087 0.2615 2,188.9330
2,188.9330 0.0155 2,189.2588
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0202 0.0245 0.3108 1.3600e-003
0.1118 8.0000e-004
0.1126 0.0296 7.4000e-004
0.0304 90.6552 90.6552 3.5100e-003
90.7289
Total 0.4512 3.5979 5.3638 0.0246 0.0190 2,279.98770.6696 0.1190 0.7885 0.1824 0.1094 0.2918
SO2 Fugitive PM10
Exhaust PM10
2,279.5882
2,279.5882
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.3875 0.0000 2.3875 1.2956 0.0000 1.2956 0.0000 0.0000
Off-Road 1.3771 12.1397 15.1947 0.0235 0.5779 0.5779 0.5316 0.5316 0.0000 2,279.0027
2,279.0027 0.7371 2,294.4812
Total 1.3771 12.1397 15.1947 0.0235 0.7371 2,294.48122.3875 0.5779 2.9654 1.2956 0.5316 1.8272 0.0000 2,279.0027
2,279.0027
38 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.4310 3.5734 5.0530 0.0233 0.5578 0.1182 0.6760 0.1528 0.1087 0.2615 2,188.9330
2,188.9330 0.0155 2,189.2588
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0202 0.0245 0.3108 1.3600e-003
0.1118 8.0000e-004
0.1126 0.0296 7.4000e-004
0.0304 90.6552 90.6552 3.5100e-003
90.7289
Total 0.4512 3.5979 5.3638 0.0246 0.0190 2,279.98770.6696 0.1190 0.7885 0.1824 0.1094 0.2918
SO2 Fugitive PM10
Exhaust PM10
2,279.5882
2,279.5882
PM2.5 Total
Bio- CO2 NBio- CO2
3.12 Residence Hall Underground Utilities - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.1713 1.2526 3.3419 5.3000e-003
0.0614 0.0614 0.0565 0.0565 513.0047 513.0047 0.1659 516.4889
Total 0.1713 1.2526 3.3419 5.3000e-003
0.1659 516.48890.0614 0.0614 0.0565 0.0565 513.0047 513.0047
39 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 6.0600e-003
7.3600e-003
0.0932 4.1000e-004
0.0335 2.4000e-004
0.0338 8.8900e-003
2.2000e-004
9.1100e-003
27.1966 27.1966 1.0500e-003
27.2187
Total 6.0600e-003
7.3600e-003
0.0932 4.1000e-004
1.0500e-003
27.21870.0335 2.4000e-004
0.0338 8.8900e-003
2.2000e-004
9.1100e-003
SO2 Fugitive PM10
Exhaust PM10
27.1966 27.1966
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.1713 1.2526 3.3419 5.3000e-003
0.0614 0.0614 0.0565 0.0565 0.0000 513.0047 513.0047 0.1659 516.4889
Total 0.1713 1.2526 3.3419 5.3000e-003
0.1659 516.48890.0614 0.0614 0.0565 0.0565 0.0000 513.0047 513.0047
40 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 6.0600e-003
7.3600e-003
0.0932 4.1000e-004
0.0335 2.4000e-004
0.0338 8.8900e-003
2.2000e-004
9.1100e-003
27.1966 27.1966 1.0500e-003
27.2187
Total 6.0600e-003
7.3600e-003
0.0932 4.1000e-004
1.0500e-003
27.21870.0335 2.4000e-004
0.0338 8.8900e-003
2.2000e-004
9.1100e-003
SO2 Fugitive PM10
Exhaust PM10
27.1966 27.1966
PM2.5 Total
Bio- CO2 NBio- CO2
3.13 Residence Hall Construction - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.8905
2,545.8905 0.5975 2,558.4386
Total 1.3615 12.4097 16.0518 0.0269 0.5975 2,558.43860.5250 0.5250 0.4939 0.4939 2,545.8905
2,545.8905
41 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1819 1.1671 2.3712 7.0700e-003
0.2064 0.0296 0.2360 0.0588 0.0272 0.0860 662.5659 662.5659 4.5000e-003
662.6604
Worker 0.1677 0.2035 2.5796 0.0113 0.9277 6.6100e-003
0.9344 0.2460 6.1300e-003
0.2522 752.4384 752.4384 0.0291 753.0499
Total 0.3495 1.3707 4.9507 0.0184 0.0336 1,415.71031.1341 0.0362 1.1703 0.3048 0.0333 0.3382
SO2 Fugitive PM10
Exhaust PM10
1,415.0043
1,415.0043
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 0.0000 2,545.8905
2,545.8905 0.5975 2,558.4386
Total 1.3615 12.4097 16.0518 0.0269 0.5975 2,558.43860.5250 0.5250 0.4939 0.4939 0.0000 2,545.8905
2,545.8905
42 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1819 1.1671 2.3712 7.0700e-003
0.2064 0.0296 0.2360 0.0588 0.0272 0.0860 662.5659 662.5659 4.5000e-003
662.6604
Worker 0.1677 0.2035 2.5796 0.0113 0.9277 6.6100e-003
0.9344 0.2460 6.1300e-003
0.2522 752.4384 752.4384 0.0291 753.0499
Total 0.3495 1.3707 4.9507 0.0184 0.0336 1,415.71031.1341 0.0362 1.1703 0.3048 0.0333 0.3382
SO2 Fugitive PM10
Exhaust PM10
1,415.0043
1,415.0043
PM2.5 Total
Bio- CO2 NBio- CO2
3.13 Residence Hall Construction - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.8905
2,545.8905 0.5975 2,558.4386
Total 1.3615 12.4097 16.0518 0.0269 0.5975 2,558.43860.5250 0.5250 0.4939 0.4939 2,545.8905
2,545.8905
43 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1757 1.1326 2.3224 7.0700e-003
0.2064 0.0284 0.2348 0.0588 0.0261 0.0849 662.5019 662.5019 4.3600e-003
662.5935
Worker 0.1612 0.1956 2.4865 0.0113 0.9277 6.6800e-003
0.9344 0.2460 6.2000e-003
0.2522 744.3830 744.3830 0.0284 744.9790
Total 0.3369 1.3282 4.8089 0.0184 0.0327 1,407.57251.1342 0.0350 1.1692 0.3048 0.0323 0.3371
SO2 Fugitive PM10
Exhaust PM10
1,406.8849
1,406.8849
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 0.0000 2,545.8905
2,545.8905 0.5975 2,558.4386
Total 1.3615 12.4097 16.0518 0.0269 0.5975 2,558.43860.5250 0.5250 0.4939 0.4939
SO2 Fugitive PM10
Exhaust PM10
0.0000 2,545.8905
2,545.8905
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1757 1.1326 2.3224 7.0700e-003
0.2064 0.0284 0.2348 0.0588 0.0261 0.0849 662.5019 662.5019 4.3600e-003
662.5935
Worker 0.1612 0.1956 2.4865 0.0113 0.9277 6.6800e-003
0.9344 0.2460 6.2000e-003
0.2522 744.3830 744.3830 0.0284 744.9790
Total 0.3369 1.3282 4.8089 0.0184 0.0327 1,407.57251.1342 0.0350 1.1692 0.3048 0.0323 0.3371 1,406.8849
1,406.8849
44 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.14 AAA Building Site Preparation - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 6.1988 0.0000 6.1988 3.3293 0.0000 3.3293 0.0000 0.0000
Off-Road 0.7921 7.3969 7.5527 0.0120 0.3251 0.3251 0.2991 0.2991 1,163.9281
1,163.9281 0.3764 1,171.8333
Total 0.7921 7.3969 7.5527 0.0120 0.3764 1,171.83336.1988 0.3251 6.5239 3.3293 0.2991 3.6284
SO2 Fugitive PM10
Exhaust PM10
1,163.9281
1,163.9281
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0101 0.0123 0.1554 6.8000e-004
0.0559 4.0000e-004
0.0563 0.0148 3.7000e-004
0.0152 45.3276 45.3276 1.7500e-003
45.3645
Total 0.0101 0.0123 0.1554 6.8000e-004
1.7500e-003
45.36450.0559 4.0000e-004
0.0563 0.0148 3.7000e-004
0.0152 45.3276 45.3276
45 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.4176 0.0000 2.4176 1.2984 0.0000 1.2984 0.0000 0.0000
Off-Road 0.7921 7.3969 7.5527 0.0120 0.3251 0.3251 0.2991 0.2991 0.0000 1,163.9281
1,163.9281 0.3764 1,171.8333
Total 0.7921 7.3969 7.5527 0.0120 0.3764 1,171.83332.4176 0.3251 2.7426 1.2984 0.2991 1.5975
SO2 Fugitive PM10
Exhaust PM10
0.0000 1,163.9281
1,163.9281
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0101 0.0123 0.1554 6.8000e-004
0.0559 4.0000e-004
0.0563 0.0148 3.7000e-004
0.0152 45.3276 45.3276 1.7500e-003
45.3645
Total 0.0101 0.0123 0.1554 6.8000e-004
1.7500e-003
45.36450.0559 4.0000e-004
0.0563 0.0148 3.7000e-004
0.0152 45.3276 45.3276
46 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.15 AAA Building Demolition - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 1.8028 0.0000 1.8028 0.2730 0.0000 0.2730 0.0000 0.0000
Off-Road 1.1264 9.5836 12.3098 0.0205 0.4252 0.4252 0.3986 0.3986 1,967.5426
1,967.5426 0.4707 1,977.4281
Total 1.1264 9.5836 12.3098 0.0205 0.4707 1,977.42811.8028 0.4252 2.2280 0.2730 0.3986 0.6716
SO2 Fugitive PM10
Exhaust PM10
1,967.5426
1,967.5426
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.1123 0.9306 1.3159 6.0600e-003
0.1453 0.0308 0.1760 0.0398 0.0283 0.0681 570.0346 570.0346 4.0400e-003
570.1195
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0162 0.0196 0.2486 1.0900e-003
0.0894 6.4000e-004
0.0901 0.0237 5.9000e-004
0.0243 72.5242 72.5242 2.8100e-003
72.5831
Total 0.1284 0.9502 1.5645 7.1500e-003
6.8500e-003
642.70260.2347 0.0314 0.2661 0.0635 0.0289 0.0924 642.5588 642.5588
47 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 0.7031 0.0000 0.7031 0.1065 0.0000 0.1065 0.0000 0.0000
Off-Road 1.1264 9.5836 12.3098 0.0205 0.4252 0.4252 0.3986 0.3986 0.0000 1,967.5426
1,967.5426 0.4707 1,977.4281
Total 1.1264 9.5836 12.3098 0.0205 0.4707 1,977.42810.7031 0.4252 1.1283 0.1065 0.3986 0.5051
SO2 Fugitive PM10
Exhaust PM10
0.0000 1,967.5426
1,967.5426
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.1123 0.9306 1.3159 6.0600e-003
0.1453 0.0308 0.1760 0.0398 0.0283 0.0681 570.0346 570.0346 4.0400e-003
570.1195
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0162 0.0196 0.2486 1.0900e-003
0.0894 6.4000e-004
0.0901 0.0237 5.9000e-004
0.0243 72.5242 72.5242 2.8100e-003
72.5831
Total 0.1284 0.9502 1.5645 7.1500e-003
6.8500e-003
642.70260.2347 0.0314 0.2661 0.0635 0.0289 0.0924 642.5588 642.5588
48 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.16 AAA Building Grading - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 6.4548 0.0000 6.4548 3.4680 0.0000 3.4680 0.0000 0.0000
Off-Road 2.3405 20.7891 26.0894 0.0409 0.9643 0.9643 0.8872 0.8872 3,955.9355
3,955.9355 1.2794 3,982.8035
Total 2.3405 20.7891 26.0894 0.0409 1.2794 3,982.80356.4548 0.9643 7.4192 3.4680 0.8872 4.3552
SO2 Fugitive PM10
Exhaust PM10
3,955.9355
3,955.9355
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 1.3589 11.2652 15.9294 0.0734 1.7585 0.3725 2.1310 0.4816 0.3427 0.8243 6,900.6113
6,900.6113 0.0489 6,901.6383
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0364 0.0441 0.5594 2.4500e-003
0.2012 1.4300e-003
0.2026 0.0534 1.3300e-003
0.0547 163.1794 163.1794 6.3200e-003
163.3120
Total 1.3952 11.3094 16.4889 0.0758 0.0552 7,064.95031.9597 0.3739 2.3336 0.5349 0.3440 0.8790 7,063.7907
7,063.7907
49 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.5174 0.0000 2.5174 1.3525 0.0000 1.3525 0.0000 0.0000
Off-Road 2.3405 20.7891 26.0894 0.0409 0.9643 0.9643 0.8872 0.8872 0.0000 3,955.9355
3,955.9355 1.2794 3,982.8035
Total 2.3405 20.7891 26.0894 0.0409 1.2794 3,982.80352.5174 0.9643 3.4817 1.3525 0.8872 2.2397
SO2 Fugitive PM10
Exhaust PM10
0.0000 3,955.9355
3,955.9355
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 1.3589 11.2652 15.9294 0.0734 1.7585 0.3725 2.1310 0.4816 0.3427 0.8243 6,900.6113
6,900.6113 0.0489 6,901.6383
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0364 0.0441 0.5594 2.4500e-003
0.2012 1.4300e-003
0.2026 0.0534 1.3300e-003
0.0547 163.1794 163.1794 6.3200e-003
163.3120
Total 1.3952 11.3094 16.4889 0.0758 0.0552 7,064.95031.9597 0.3739 2.3336 0.5349 0.3440 0.8790 7,063.7907
7,063.7907
50 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.17 AAA Building Underground Utilities - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.3888 3.8533 3.5928 5.2400e-003
0.1945 0.1945 0.1790 0.1790 507.8318 507.8318 0.1642 511.2809
Total 0.3888 3.8533 3.5928 5.2400e-003
0.1642 511.28090.1945 0.1945 0.1790 0.1790
SO2 Fugitive PM10
Exhaust PM10
507.8318 507.8318
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 6.0600e-003
7.3600e-003
0.0932 4.1000e-004
0.0335 2.4000e-004
0.0338 8.8900e-003
2.2000e-004
9.1100e-003
27.1966 27.1966 1.0500e-003
27.2187
Total 6.0600e-003
7.3600e-003
0.0932 4.1000e-004
1.0500e-003
27.21870.0335 2.4000e-004
0.0338 8.8900e-003
2.2000e-004
9.1100e-003
SO2 Fugitive PM10
Exhaust PM10
27.1966 27.1966
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.3888 3.8533 3.5928 5.2400e-003
0.1945 0.1945 0.1790 0.1790 0.0000 507.8318 507.8318 0.1642 511.2809
Total 0.3888 3.8533 3.5928 5.2400e-003
0.1642 511.28090.1945 0.1945 0.1790 0.1790 0.0000 507.8318 507.8318
51 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 6.0600e-003
7.3600e-003
0.0932 4.1000e-004
0.0335 2.4000e-004
0.0338 8.8900e-003
2.2000e-004
9.1100e-003
27.1966 27.1966 1.0500e-003
27.2187
Total 6.0600e-003
7.3600e-003
0.0932 4.1000e-004
1.0500e-003
27.21870.0335 2.4000e-004
0.0338 8.8900e-003
2.2000e-004
9.1100e-003
SO2 Fugitive PM10
Exhaust PM10
27.1966 27.1966
PM2.5 Total
Bio- CO2 NBio- CO2
3.18 AAA Building Construction - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.8905
2,545.8905 0.5975 2,558.4386
Total 1.3615 12.4097 16.0518 0.0269 0.5975 2,558.43860.5250 0.5250 0.4939 0.4939 2,545.8905
2,545.8905
52 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1819 1.1671 2.3712 7.0700e-003
0.2064 0.0296 0.2360 0.0588 0.0272 0.0860 662.5659 662.5659 4.5000e-003
662.6604
Worker 0.1677 0.2035 2.5796 0.0113 0.9277 6.6100e-003
0.9344 0.2460 6.1300e-003
0.2522 752.4384 752.4384 0.0291 753.0499
Total 0.3495 1.3707 4.9507 0.0184 0.0336 1,415.71031.1341 0.0362 1.1703 0.3048 0.0333 0.3382
SO2 Fugitive PM10
Exhaust PM10
1,415.0043
1,415.0043
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 0.0000 2,545.8905
2,545.8905 0.5975 2,558.4386
Total 1.3615 12.4097 16.0518 0.0269 0.5975 2,558.43860.5250 0.5250 0.4939 0.4939 0.0000 2,545.8905
2,545.8905
53 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1819 1.1671 2.3712 7.0700e-003
0.2064 0.0296 0.2360 0.0588 0.0272 0.0860 662.5659 662.5659 4.5000e-003
662.6604
Worker 0.1677 0.2035 2.5796 0.0113 0.9277 6.6100e-003
0.9344 0.2460 6.1300e-003
0.2522 752.4384 752.4384 0.0291 753.0499
Total 0.3495 1.3707 4.9507 0.0184 0.0336 1,415.71031.1341 0.0362 1.1703 0.3048 0.0333 0.3382
SO2 Fugitive PM10
Exhaust PM10
1,415.0043
1,415.0043
PM2.5 Total
Bio- CO2 NBio- CO2
3.18 AAA Building Construction - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.8905
2,545.8905 0.5975 2,558.4386
Total 1.3615 12.4097 16.0518 0.0269 0.5975 2,558.43860.5250 0.5250 0.4939 0.4939 2,545.8905
2,545.8905
54 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1757 1.1326 2.3224 7.0700e-003
0.2064 0.0284 0.2348 0.0588 0.0261 0.0849 662.5019 662.5019 4.3600e-003
662.5935
Worker 0.1612 0.1956 2.4865 0.0113 0.9277 6.6800e-003
0.9344 0.2460 6.2000e-003
0.2522 744.3830 744.3830 0.0284 744.9790
Total 0.3369 1.3282 4.8089 0.0184 0.0327 1,407.57251.1342 0.0350 1.1692 0.3048 0.0323 0.3371
SO2 Fugitive PM10
Exhaust PM10
1,406.8849
1,406.8849
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 0.0000 2,545.8905
2,545.8905 0.5975 2,558.4386
Total 1.3615 12.4097 16.0518 0.0269 0.5975 2,558.43860.5250 0.5250 0.4939 0.4939 0.0000 2,545.8905
2,545.8905
55 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1757 1.1326 2.3224 7.0700e-003
0.2064 0.0284 0.2348 0.0588 0.0261 0.0849 662.5019 662.5019 4.3600e-003
662.5935
Worker 0.1612 0.1956 2.4865 0.0113 0.9277 6.6800e-003
0.9344 0.2460 6.2000e-003
0.2522 744.3830 744.3830 0.0284 744.9790
Total 0.3369 1.3282 4.8089 0.0184 0.0327 1,407.57251.1342 0.0350 1.1692 0.3048 0.0323 0.3371
SO2 Fugitive PM10
Exhaust PM10
1,406.8849
1,406.8849
PM2.5 Total
Bio- CO2 NBio- CO2
3.18 AAA Building Construction - 2027Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.8905
2,545.8905 0.5975 2,558.4386
Total 1.3615 12.4097 16.0518 0.0269 0.5975 2,558.43860.5250 0.5250 0.4939 0.4939 2,545.8905
2,545.8905
56 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1741 1.1241 2.3021 7.0700e-003
0.2065 0.0284 0.2349 0.0588 0.0262 0.0850 662.6350 662.6350 4.3700e-003
662.7268
Worker 0.1553 0.1887 2.4054 0.0113 0.9277 6.7400e-003
0.9345 0.2460 6.2600e-003
0.2523 737.4200 737.4200 0.0277 738.0025
Total 0.3294 1.3127 4.7075 0.0184 0.0321 1,400.72931.1342 0.0352 1.1694 0.3049 0.0324 0.3373
SO2 Fugitive PM10
Exhaust PM10
1,400.0550
1,400.0550
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 0.0000 2,545.8905
2,545.8905 0.5975 2,558.4386
Total 1.3615 12.4097 16.0518 0.0269 0.5975 2,558.43860.5250 0.5250 0.4939 0.4939 0.0000 2,545.8905
2,545.8905
57 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1741 1.1241 2.3021 7.0700e-003
0.2065 0.0284 0.2349 0.0588 0.0262 0.0850 662.6350 662.6350 4.3700e-003
662.7268
Worker 0.1553 0.1887 2.4054 0.0113 0.9277 6.7400e-003
0.9345 0.2460 6.2600e-003
0.2523 737.4200 737.4200 0.0277 738.0025
Total 0.3294 1.3127 4.7075 0.0184 0.0321 1,400.72931.1342 0.0352 1.1694 0.3049 0.0324 0.3373
SO2 Fugitive PM10
Exhaust PM10
1,400.0550
1,400.0550
PM2.5 Total
Bio- CO2 NBio- CO2
3.19 Tennis Court Deck Site Preparation - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 6.0833 0.0000 6.0833 3.3168 0.0000 3.3168 0.0000 0.0000
Off-Road 0.7921 7.3969 7.5527 0.0120 0.3251 0.3251 0.2991 0.2991 1,163.9281
1,163.9281 0.3764 1,171.8333
Total 0.7921 7.3969 7.5527 0.0120 0.3764 1,171.83336.0833 0.3251 6.4083 3.3168 0.2991 3.6159 1,163.9281
1,163.9281
58 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.4712 3.9212 5.6709 0.0267 0.6410 0.1277 0.7687 0.1755 0.1175 0.2931 2,514.0669
2,514.0669 0.0169 2,514.4219
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 9.7100e-003
0.0118 0.1498 6.8000e-004
0.0559 4.0000e-004
0.0563 0.0148 3.7000e-004
0.0152 44.8424 44.8424 1.7100e-003
44.8783
Total 0.4809 3.9330 5.8207 0.0274 0.0186 2,559.30020.6969 0.1281 0.8250 0.1904 0.1179 0.3083
SO2 Fugitive PM10
Exhaust PM10
2,558.9092
2,558.9092
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.3725 0.0000 2.3725 1.2936 0.0000 1.2936 0.0000 0.0000
Off-Road 0.7921 7.3969 7.5527 0.0120 0.3251 0.3251 0.2991 0.2991 0.0000 1,163.9281
1,163.9281 0.3764 1,171.8333
Total 0.7921 7.3969 7.5527 0.0120 0.3764 1,171.83332.3725 0.3251 2.6975 1.2936 0.2991 1.5926 0.0000 1,163.9281
1,163.9281
59 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.4712 3.9212 5.6709 0.0267 0.6410 0.1277 0.7687 0.1755 0.1175 0.2931 2,514.0669
2,514.0669 0.0169 2,514.4219
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 9.7100e-003
0.0118 0.1498 6.8000e-004
0.0559 4.0000e-004
0.0563 0.0148 3.7000e-004
0.0152 44.8424 44.8424 1.7100e-003
44.8783
Total 0.4809 3.9330 5.8207 0.0274 0.0186 2,559.30020.6969 0.1281 0.8250 0.1904 0.1179 0.3083
SO2 Fugitive PM10
Exhaust PM10
2,558.9092
2,558.9092
PM2.5 Total
Bio- CO2 NBio- CO2
3.20 Pool & RE Building Site Preparation - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 6.1988 0.0000 6.1988 3.3293 0.0000 3.3293 0.0000 0.0000
Off-Road 0.7921 7.3969 7.5527 0.0120 0.3251 0.3251 0.2991 0.2991 1,163.9281
1,163.9281 0.3764 1,171.8333
Total 0.7921 7.3969 7.5527 0.0120 0.3764 1,171.83336.1988 0.3251 6.5239 3.3293 0.2991 3.6284 1,163.9281
1,163.9281
60 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 9.7100e-003
0.0118 0.1498 6.8000e-004
0.0559 4.0000e-004
0.0563 0.0148 3.7000e-004
0.0152 44.8424 44.8424 1.7100e-003
44.8783
Total 9.7100e-003
0.0118 0.1498 6.8000e-004
1.7100e-003
44.87830.0559 4.0000e-004
0.0563 0.0148 3.7000e-004
0.0152
SO2 Fugitive PM10
Exhaust PM10
44.8424 44.8424
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.4176 0.0000 2.4176 1.2984 0.0000 1.2984 0.0000 0.0000
Off-Road 0.7921 7.3969 7.5527 0.0120 0.3251 0.3251 0.2991 0.2991 0.0000 1,163.9281
1,163.9281 0.3764 1,171.8333
Total 0.7921 7.3969 7.5527 0.0120 0.3764 1,171.83332.4176 0.3251 2.7426 1.2984 0.2991 1.5975 0.0000 1,163.9281
1,163.9281
61 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 9.7100e-003
0.0118 0.1498 6.8000e-004
0.0559 4.0000e-004
0.0563 0.0148 3.7000e-004
0.0152 44.8424 44.8424 1.7100e-003
44.8783
Total 9.7100e-003
0.0118 0.1498 6.8000e-004
1.7100e-003
44.87830.0559 4.0000e-004
0.0563 0.0148 3.7000e-004
0.0152
SO2 Fugitive PM10
Exhaust PM10
44.8424 44.8424
PM2.5 Total
Bio- CO2 NBio- CO2
3.21 Pool & RE Building Demolition - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 0.0214 0.0000 0.0214 3.2400e-003
0.0000 3.2400e-003
0.0000 0.0000
Off-Road 1.1264 9.5836 12.3098 0.0205 0.4252 0.4252 0.3986 0.3986 1,967.5426
1,967.5426 0.4707 1,977.4281
Total 1.1264 9.5836 12.3098 0.0205 0.4707 1,977.42810.0214 0.4252 0.4466 3.2400e-003
0.3986 0.4018 1,967.5426
1,967.5426
62 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 1.2800e-003
0.0107 0.0154 7.0000e-005
1.7400e-003
3.5000e-004
2.0900e-003
4.8000e-004
3.2000e-004
8.0000e-004
6.8374 6.8374 5.0000e-005
6.8384
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0155 0.0189 0.2397 1.0900e-003
0.0894 6.4000e-004
0.0901 0.0237 6.0000e-004
0.0243 71.7478 71.7478 2.7400e-003
71.8052
Total 0.0168 0.0295 0.2551 1.1600e-003
2.7900e-003
78.64360.0912 9.9000e-004
0.0922 0.0242 9.2000e-004
0.0251
SO2 Fugitive PM10
Exhaust PM10
78.5852 78.5852
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 8.3500e-003
0.0000 8.3500e-003
1.2600e-003
0.0000 1.2600e-003
0.0000 0.0000
Off-Road 1.1264 9.5836 12.3098 0.0205 0.4252 0.4252 0.3986 0.3986 0.0000 1,967.5426
1,967.5426 0.4707 1,977.4281
Total 1.1264 9.5836 12.3098 0.0205 0.4707 1,977.42818.3500e-003
0.4252 0.4336 1.2600e-003
0.3986 0.3999 0.0000 1,967.5426
1,967.5426
63 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 1.2800e-003
0.0107 0.0154 7.0000e-005
1.7400e-003
3.5000e-004
2.0900e-003
4.8000e-004
3.2000e-004
8.0000e-004
6.8374 6.8374 5.0000e-005
6.8384
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0155 0.0189 0.2397 1.0900e-003
0.0894 6.4000e-004
0.0901 0.0237 6.0000e-004
0.0243 71.7478 71.7478 2.7400e-003
71.8052
Total 0.0168 0.0295 0.2551 1.1600e-003
2.7900e-003
78.64360.0912 9.9000e-004
0.0922 0.0242 9.2000e-004
0.0251
SO2 Fugitive PM10
Exhaust PM10
78.5852 78.5852
PM2.5 Total
Bio- CO2 NBio- CO2
3.22 Pool & RE Building Grading - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 6.1105 0.0000 6.1105 3.3198 0.0000 3.3198 0.0000 0.0000
Off-Road 1.3771 12.1397 15.1947 0.0235 0.5779 0.5779 0.5316 0.5316 2,279.0027
2,279.0027 0.7371 2,294.4812
Total 1.3771 12.1397 15.1947 0.0235 0.7371 2,294.48126.1105 0.5779 6.6883 3.3198 0.5316 3.8514 2,279.0027
2,279.0027
64 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0194 0.0236 0.2996 1.3600e-003
0.1118 8.1000e-004
0.1126 0.0296 7.5000e-004
0.0304 89.6847 89.6847 3.4200e-003
89.7565
Total 0.0194 0.0236 0.2996 1.3600e-003
3.4200e-003
89.75650.1118 8.1000e-004
0.1126 0.0296 7.5000e-004
0.0304
SO2 Fugitive PM10
Exhaust PM10
89.6847 89.6847
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.3831 0.0000 2.3831 1.2947 0.0000 1.2947 0.0000 0.0000
Off-Road 1.3771 12.1397 15.1947 0.0235 0.5779 0.5779 0.5316 0.5316 0.0000 2,279.0027
2,279.0027 0.7371 2,294.4812
Total 1.3771 12.1397 15.1947 0.0235 0.7371 2,294.48122.3831 0.5779 2.9609 1.2947 0.5316 1.8263 0.0000 2,279.0027
2,279.0027
65 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0194 0.0236 0.2996 1.3600e-003
0.1118 8.1000e-004
0.1126 0.0296 7.5000e-004
0.0304 89.6847 89.6847 3.4200e-003
89.7565
Total 0.0194 0.0236 0.2996 1.3600e-003
3.4200e-003
89.75650.1118 8.1000e-004
0.1126 0.0296 7.5000e-004
0.0304
SO2 Fugitive PM10
Exhaust PM10
89.6847 89.6847
PM2.5 Total
Bio- CO2 NBio- CO2
3.23 Tennis Court Deck Underground Utilities - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.3888 3.8533 3.5928 5.2400e-003
0.1945 0.1945 0.1790 0.1790 507.8318 507.8318 0.1642 511.2809
Total 0.3888 3.8533 3.5928 5.2400e-003
0.1642 511.28090.1945 0.1945 0.1790 0.1790 507.8318 507.8318
66 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 5.8300e-003
7.0700e-003
0.0899 4.1000e-004
0.0335 2.4000e-004
0.0338 8.8900e-003
2.2000e-004
9.1200e-003
26.9054 26.9054 1.0300e-003
26.9270
Total 5.8300e-003
7.0700e-003
0.0899 4.1000e-004
1.0300e-003
26.92700.0335 2.4000e-004
0.0338 8.8900e-003
2.2000e-004
9.1200e-003
SO2 Fugitive PM10
Exhaust PM10
26.9054 26.9054
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.3888 3.8533 3.5928 5.2400e-003
0.1945 0.1945 0.1790 0.1790 0.0000 507.8318 507.8318 0.1642 511.2809
Total 0.3888 3.8533 3.5928 5.2400e-003
0.1642 511.28090.1945 0.1945 0.1790 0.1790 0.0000 507.8318 507.8318
67 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 5.8300e-003
7.0700e-003
0.0899 4.1000e-004
0.0335 2.4000e-004
0.0338 8.8900e-003
2.2000e-004
9.1200e-003
26.9054 26.9054 1.0300e-003
26.9270
Total 5.8300e-003
7.0700e-003
0.0899 4.1000e-004
1.0300e-003
26.92700.0335 2.4000e-004
0.0338 8.8900e-003
2.2000e-004
9.1200e-003
SO2 Fugitive PM10
Exhaust PM10
26.9054 26.9054
PM2.5 Total
Bio- CO2 NBio- CO2
3.24 Pool & RE Building Underground Utilities - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.0486 0.4817 0.4491 6.6000e-004
0.0243 0.0243 0.0224 0.0224 63.4790 63.4790 0.0205 63.9101
Total 0.0486 0.4817 0.4491 6.6000e-004
0.0205 63.91010.0243 0.0243 0.0224 0.0224 63.4790 63.4790
68 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 5.8300e-003
7.0700e-003
0.0899 4.1000e-004
0.0335 2.4000e-004
0.0338 8.8900e-003
2.2000e-004
9.1200e-003
26.9054 26.9054 1.0300e-003
26.9270
Total 5.8300e-003
7.0700e-003
0.0899 4.1000e-004
1.0300e-003
26.92700.0335 2.4000e-004
0.0338 8.8900e-003
2.2000e-004
9.1200e-003
SO2 Fugitive PM10
Exhaust PM10
26.9054 26.9054
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.0486 0.4817 0.4491 6.6000e-004
0.0243 0.0243 0.0224 0.0224 0.0000 63.4790 63.4790 0.0205 63.9101
Total 0.0486 0.4817 0.4491 6.6000e-004
0.0205 63.91010.0243 0.0243 0.0224 0.0224 0.0000 63.4790 63.4790
69 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 5.8300e-003
7.0700e-003
0.0899 4.1000e-004
0.0335 2.4000e-004
0.0338 8.8900e-003
2.2000e-004
9.1200e-003
26.9054 26.9054 1.0300e-003
26.9270
Total 5.8300e-003
7.0700e-003
0.0899 4.1000e-004
1.0300e-003
26.92700.0335 2.4000e-004
0.0338 8.8900e-003
2.2000e-004
9.1200e-003
SO2 Fugitive PM10
Exhaust PM10
26.9054 26.9054
PM2.5 Total
Bio- CO2 NBio- CO2
3.25 Tennis Court Deck Construction - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.8905
2,545.8905 0.5975 2,558.4386
Total 1.3615 12.4097 16.0518 0.0269 0.5975 2,558.43860.5250 0.5250 0.4939 0.4939 2,545.8905
2,545.8905
70 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1757 1.1326 2.3224 7.0700e-003
0.2064 0.0284 0.2348 0.0588 0.0261 0.0849 662.5019 662.5019 4.3600e-003
662.5935
Worker 0.1612 0.1956 2.4865 0.0113 0.9277 6.6800e-003
0.9344 0.2460 6.2000e-003
0.2522 744.3830 744.3830 0.0284 744.9790
Total 0.3369 1.3282 4.8089 0.0184 0.0327 1,407.57251.1342 0.0350 1.1692 0.3048 0.0323 0.3371
SO2 Fugitive PM10
Exhaust PM10
1,406.8849
1,406.8849
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 0.0000 2,545.8905
2,545.8905 0.5975 2,558.4386
Total 1.3615 12.4097 16.0518 0.0269 0.5975 2,558.43860.5250 0.5250 0.4939 0.4939 0.0000 2,545.8905
2,545.8905
71 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1757 1.1326 2.3224 7.0700e-003
0.2064 0.0284 0.2348 0.0588 0.0261 0.0849 662.5019 662.5019 4.3600e-003
662.5935
Worker 0.1612 0.1956 2.4865 0.0113 0.9277 6.6800e-003
0.9344 0.2460 6.2000e-003
0.2522 744.3830 744.3830 0.0284 744.9790
Total 0.3369 1.3282 4.8089 0.0184 0.0327 1,407.57251.1342 0.0350 1.1692 0.3048 0.0323 0.3371
SO2 Fugitive PM10
Exhaust PM10
1,406.8849
1,406.8849
PM2.5 Total
Bio- CO2 NBio- CO2
3.26 Pool & RE Building Construction - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 2,545.8905
2,545.8905 0.5975 2,558.4386
Total 1.3615 12.4097 16.0518 0.0269 0.5975 2,558.43860.5250 0.5250 0.4939 0.4939 2,545.8905
2,545.8905
72 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1757 1.1326 2.3224 7.0700e-003
0.2064 0.0284 0.2348 0.0588 0.0261 0.0849 662.5019 662.5019 4.3600e-003
662.5935
Worker 0.1612 0.1956 2.4865 0.0113 0.9277 6.6800e-003
0.9344 0.2460 6.2000e-003
0.2522 744.3830 744.3830 0.0284 744.9790
Total 0.3369 1.3282 4.8089 0.0184 0.0327 1,407.57251.1342 0.0350 1.1692 0.3048 0.0323 0.3371
SO2 Fugitive PM10
Exhaust PM10
1,406.8849
1,406.8849
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3615 12.4097 16.0518 0.0269 0.5250 0.5250 0.4939 0.4939 0.0000 2,545.8905
2,545.8905 0.5975 2,558.4386
Total 1.3615 12.4097 16.0518 0.0269 0.5975 2,558.43860.5250 0.5250 0.4939 0.4939 0.0000 2,545.8905
2,545.8905
73 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.1757 1.1326 2.3224 7.0700e-003
0.2064 0.0284 0.2348 0.0588 0.0261 0.0849 662.5019 662.5019 4.3600e-003
662.5935
Worker 0.1612 0.1956 2.4865 0.0113 0.9277 6.6800e-003
0.9344 0.2460 6.2000e-003
0.2522 744.3830 744.3830 0.0284 744.9790
Total 0.3369 1.3282 4.8089 0.0184 0.0327 1,407.57251.1342 0.0350 1.1692 0.3048 0.0323 0.3371
SO2 Fugitive PM10
Exhaust PM10
1,406.8849
1,406.8849
PM2.5 Total
Bio- CO2 NBio- CO2
3.27 Residence Hall Paving - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.4487 4.2108 7.1390 0.0112 0.2055 0.2055 0.1890 0.1890 1,079.8983
1,079.8983 0.3493 1,087.2328
Paving 0.5371 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.9858 4.2108 7.1390 0.0112 0.3493 1,087.23280.2055 0.2055 0.1890 0.1890 1,079.8983
1,079.8983
74 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0155 0.0189 0.2397 1.0900e-003
0.0894 6.4000e-004
0.0901 0.0237 6.0000e-004
0.0243 71.7478 71.7478 2.7400e-003
71.8052
Total 0.0155 0.0189 0.2397 1.0900e-003
2.7400e-003
71.80520.0894 6.4000e-004
0.0901 0.0237 6.0000e-004
0.0243
SO2 Fugitive PM10
Exhaust PM10
71.7478 71.7478
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.4487 4.2108 7.1390 0.0112 0.2055 0.2055 0.1890 0.1890 0.0000 1,079.8983
1,079.8983 0.3493 1,087.2328
Paving 0.5371 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.9858 4.2108 7.1390 0.0112 0.3493 1,087.23280.2055 0.2055 0.1890 0.1890 0.0000 1,079.8983
1,079.8983
75 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0155 0.0189 0.2397 1.0900e-003
0.0894 6.4000e-004
0.0901 0.0237 6.0000e-004
0.0243 71.7478 71.7478 2.7400e-003
71.8052
Total 0.0155 0.0189 0.2397 1.0900e-003
2.7400e-003
71.80520.0894 6.4000e-004
0.0901 0.0237 6.0000e-004
0.0243
SO2 Fugitive PM10
Exhaust PM10
71.7478 71.7478
PM2.5 Total
Bio- CO2 NBio- CO2
3.28 Residence Hall Architecturaql Coating - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 12.7247 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.1709 1.1455 1.8091 2.9700e-003
0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.7705
Total 12.8956 1.1455 1.8091 2.9700e-003
0.0154 281.77050.0515 0.0515 0.0515 0.0515 281.4481 281.4481
76 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0330 0.0401 0.5093 2.3200e-003
0.1900 1.3700e-003
0.1914 0.0504 1.2700e-003
0.0517 152.4640 152.4640 5.8100e-003
152.5861
Total 0.0330 0.0401 0.5093 2.3200e-003
5.8100e-003
152.58610.1900 1.3700e-003
0.1914 0.0504 1.2700e-003
0.0517
SO2 Fugitive PM10
Exhaust PM10
152.4640 152.4640
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 12.7247 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.1709 1.1455 1.8091 2.9700e-003
0.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481 0.0154 281.7705
Total 12.8956 1.1455 1.8091 2.9700e-003
0.0154 281.77050.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481
77 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0330 0.0401 0.5093 2.3200e-003
0.1900 1.3700e-003
0.1914 0.0504 1.2700e-003
0.0517 152.4640 152.4640 5.8100e-003
152.5861
Total 0.0330 0.0401 0.5093 2.3200e-003
5.8100e-003
152.58610.1900 1.3700e-003
0.1914 0.0504 1.2700e-003
0.0517
SO2 Fugitive PM10
Exhaust PM10
152.4640 152.4640
PM2.5 Total
Bio- CO2 NBio- CO2
3.29 Tennis Court Deck Architectural Coating - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 25.9389 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.1709 1.1455 1.8091 2.9700e-003
0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.7705
Total 26.1098 1.1455 1.8091 2.9700e-003
0.0154 281.77050.0515 0.0515 0.0515 0.0515 281.4481 281.4481
78 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0330 0.0401 0.5093 2.3200e-003
0.1900 1.3700e-003
0.1914 0.0504 1.2700e-003
0.0517 152.4640 152.4640 5.8100e-003
152.5861
Total 0.0330 0.0401 0.5093 2.3200e-003
5.8100e-003
152.58610.1900 1.3700e-003
0.1914 0.0504 1.2700e-003
0.0517
SO2 Fugitive PM10
Exhaust PM10
152.4640 152.4640
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 25.9389 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.1709 1.1455 1.8091 2.9700e-003
0.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481 0.0154 281.7705
Total 26.1098 1.1455 1.8091 2.9700e-003
0.0154 281.77050.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481
79 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0330 0.0401 0.5093 2.3200e-003
0.1900 1.3700e-003
0.1914 0.0504 1.2700e-003
0.0517 152.4640 152.4640 5.8100e-003
152.5861
Total 0.0330 0.0401 0.5093 2.3200e-003
5.8100e-003
152.58610.1900 1.3700e-003
0.1914 0.0504 1.2700e-003
0.0517
SO2 Fugitive PM10
Exhaust PM10
152.4640 152.4640
PM2.5 Total
Bio- CO2 NBio- CO2
3.30 Pool & RE Building Paving - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.4487 4.2108 7.1390 0.0112 0.2055 0.2055 0.1890 0.1890 1,079.8983
1,079.8983 0.3493 1,087.2328
Paving 0.2479 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.6966 4.2108 7.1390 0.0112 0.3493 1,087.23280.2055 0.2055 0.1890 0.1890 1,079.8983
1,079.8983
80 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0155 0.0189 0.2397 1.0900e-003
0.0894 6.4000e-004
0.0901 0.0237 6.0000e-004
0.0243 71.7478 71.7478 2.7400e-003
71.8052
Total 0.0155 0.0189 0.2397 1.0900e-003
2.7400e-003
71.80520.0894 6.4000e-004
0.0901 0.0237 6.0000e-004
0.0243
SO2 Fugitive PM10
Exhaust PM10
71.7478 71.7478
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.4487 4.2108 7.1390 0.0112 0.2055 0.2055 0.1890 0.1890 0.0000 1,079.8983
1,079.8983 0.3493 1,087.2328
Paving 0.2479 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.6966 4.2108 7.1390 0.0112 0.3493 1,087.23280.2055 0.2055 0.1890 0.1890 0.0000 1,079.8983
1,079.8983
81 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0155 0.0189 0.2397 1.0900e-003
0.0894 6.4000e-004
0.0901 0.0237 6.0000e-004
0.0243 71.7478 71.7478 2.7400e-003
71.8052
Total 0.0155 0.0189 0.2397 1.0900e-003
2.7400e-003
71.80520.0894 6.4000e-004
0.0901 0.0237 6.0000e-004
0.0243
SO2 Fugitive PM10
Exhaust PM10
71.7478 71.7478
PM2.5 Total
Bio- CO2 NBio- CO2
3.31 AAA Building Paving - 2027Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.4487 4.2108 7.1390 0.0112 0.2055 0.2055 0.1890 0.1890 1,079.8983
1,079.8983 0.3493 1,087.2328
Paving 0.5371 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.9858 4.2108 7.1390 0.0112 0.3493 1,087.23280.2055 0.2055 0.1890 0.1890 1,079.8983
1,079.8983
82 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0150 0.0182 0.2319 1.0900e-003
0.0894 6.5000e-004
0.0901 0.0237 6.0000e-004
0.0243 71.0766 71.0766 2.6700e-003
71.1328
Total 0.0150 0.0182 0.2319 1.0900e-003
2.6700e-003
71.13280.0894 6.5000e-004
0.0901 0.0237 6.0000e-004
0.0243
SO2 Fugitive PM10
Exhaust PM10
71.0766 71.0766
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.4487 4.2108 7.1390 0.0112 0.2055 0.2055 0.1890 0.1890 0.0000 1,079.8983
1,079.8983 0.3493 1,087.2328
Paving 0.5371 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.9858 4.2108 7.1390 0.0112 0.3493 1,087.23280.2055 0.2055 0.1890 0.1890 0.0000 1,079.8983
1,079.8983
83 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0150 0.0182 0.2319 1.0900e-003
0.0894 6.5000e-004
0.0901 0.0237 6.0000e-004
0.0243 71.0766 71.0766 2.6700e-003
71.1328
Total 0.0150 0.0182 0.2319 1.0900e-003
2.6700e-003
71.13280.0894 6.5000e-004
0.0901 0.0237 6.0000e-004
0.0243
SO2 Fugitive PM10
Exhaust PM10
71.0766 71.0766
PM2.5 Total
Bio- CO2 NBio- CO2
3.32 AAA Building Architectural Coating - 2027Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 25.9389 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.1709 1.1455 1.8091 2.9700e-003
0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.7705
Total 26.1098 1.1455 1.8091 2.9700e-003
0.0154 281.77050.0515 0.0515 0.0515 0.0515 281.4481 281.4481
84 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0318 0.0386 0.4927 2.3200e-003
0.1900 1.3800e-003
0.1914 0.0504 1.2800e-003
0.0517 151.0378 151.0378 5.6800e-003
151.1571
Total 0.0318 0.0386 0.4927 2.3200e-003
5.6800e-003
151.15710.1900 1.3800e-003
0.1914 0.0504 1.2800e-003
0.0517
SO2 Fugitive PM10
Exhaust PM10
151.0378 151.0378
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 25.9389 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.1709 1.1455 1.8091 2.9700e-003
0.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481 0.0154 281.7705
Total 26.1098 1.1455 1.8091 2.9700e-003
0.0154 281.77050.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481
85 of 86
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0318 0.0386 0.4927 2.3200e-003
0.1900 1.3800e-003
0.1914 0.0504 1.2800e-003
0.0517 151.0378 151.0378 5.6800e-003
151.1571
Total 0.0318 0.0386 0.4927 2.3200e-003
0.1900 1.3800e-003
0.1914 0.0504 1.2800e-003
0.0517 151.0378 151.0378 5.6800e-003
151.1571
86 of 86
Orange County, Winter
Concordia University - Campus Build-Out - 2035
1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population
University/College (4Yr) 1,800.00 Student 72.80 667,000.00 1320
1.2 Other Project Characteristics
Urbanization
Climate Zone
Urban
8
Wind Speed (m/s) Precipitation Freq (Days)2.2 30
1.3 User Entered Comments & Non-Default Data
1.0 Project Characteristics
Utility Company Southern California Edison
2035Operational Year
CO2 Intensity (lb/MWhr)
630.89 0.029CH4 Intensity (lb/MWhr)
0.006N2O Intensity (lb/MWhr)
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:59 PMPage 1 of 21
Project Characteristics -
Land Use - Campus area is 72.8 acres. Assumes a maximum student population of 1,800 students, 321,200 square feet of institutional building space, approx. 346,000 square feet of residence hall space, and 1,320 campus residents.
Construction Phase - No construction emissions analysis for build-out conditions.
Off-road Equipment - No construction emissions under existing conditions.
Off-road Equipment - No construction emissions analysis for build-out conditions.
Trips and VMT - No construction emissions analysis for build-out conditions.
Vehicle Trips - Trip generation rates revised to be consistent with project Traffic Impact Analysis. Saturday trip rate is assumed to be 0.55% of weekday rate. Sunday trip rate is asumed to be 0.25% of weekday rate.
Woodstoves -
Area Coating - SCAQMD Rule 1113 limits paints to a maximum VOC content of 50 g/L.
Solid Waste - Default solid waste generation rate changed to 562 tons per year per historic solid waste disposal for the campus (including residence halls).
Table Name Column Name Default Value New Value
tblAreaCoating Area_EF_Nonresidential_Exterior 250 50
tblAreaMitigation UseLowVOCPaintNonresidentialExteriorValue
50 250
tblLandUse LandUseSquareFeet 330,835.44 667,000.00
tblLandUse LotAcreage 7.59 72.80
tblLandUse Population 0.00 1,320.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00
tblProjectCharacteristics OperationalYear 2014 2035
tblSolidWaste SolidWasteGenerationRate 328.50 562.00
tblTripsAndVMT VendorTripNumber 109.00 0.00
tblTripsAndVMT WorkerTripNumber 280.00 0.00
tblVehicleTrips ST_TR 1.30 1.91
tblVehicleTrips SU_TR 0.00 0.87
tblVehicleTrips WD_TR 2.38 3.47
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:59 PMPage 2 of 21
2.0 Emissions Summary
2.1 Overall Construction (Maximum Daily Emission)
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
2016 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2017 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2018 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2019 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2020 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:59 PMPage 3 of 21
2.1 Overall Construction (Maximum Daily Emission)
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
2016 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2017 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2018 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2019 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2020 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent Reduction
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:59 PMPage 4 of 21
2.2 Overall Operational
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Area 16.6113 1.6400e-003
0.1827 1.0000e-005
6.5000e-004
6.5000e-004
6.5000e-004
6.5000e-004
0.3939 0.3939 1.0100e-003
0.4153
Energy 0.3126 2.8414 2.3868 0.0171 0.2160 0.2160 0.2160 0.2160 3,409.7083
3,409.7083
0.0654 0.0625 3,430.4592
Mobile 11.2484 21.9443 113.4784 0.5468 39.7167 0.6062 40.3228 10.6055 0.5599 11.1654 38,225.2219
38,225.2219
1.0657 38,247.6012
Total 28.1722 24.7874 116.0479 0.5639 39.7167 0.8228 40.5394 10.6055 0.7765 11.3820 41,635.3241
41,635.3241
1.1320 0.0625 41,678.4757
Unmitigated Operational
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Area 16.6113 1.6400e-003
0.1827 1.0000e-005
6.5000e-004
6.5000e-004
6.5000e-004
6.5000e-004
0.3939 0.3939 1.0100e-003
0.4153
Energy 0.3126 2.8414 2.3868 0.0171 0.2160 0.2160 0.2160 0.2160 3,409.7083
3,409.7083
0.0654 0.0625 3,430.4592
Mobile 11.2484 21.9443 113.4784 0.5468 39.7167 0.6062 40.3228 10.6055 0.5599 11.1654 38,225.2219
38,225.2219
1.0657 38,247.6012
Total 28.1722 24.7874 116.0479 0.5639 39.7167 0.8228 40.5394 10.6055 0.7765 11.3820 41,635.3241
41,635.3241
1.1320 0.0625 41,678.4757
Mitigated Operational
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:59 PMPage 5 of 21
3.0 Construction Detail
3.1 Mitigation Measures Construction
Construction Phase
Phase Number
Phase Name Phase Type Start Date End Date Num Days Week
Num Days Phase Description
1 Building Construction Building Construction 1/1/2016 4/2/2020 5 1110
OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor
Building Construction Cranes 0 7.00 226 0.29
Trips and VMT
Phase Name Offroad Equipment Count
Worker Trip Number
Vendor Trip Number
Hauling Trip Number
Worker Trip Length
Vendor Trip Length
Hauling Trip Length
Worker Vehicle Class
Vendor Vehicle Class
Hauling Vehicle Class
Building Construction 0 0.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent Reduction
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 0; Non-Residential Outdoor: 0 (Architectural Coating – sqft)
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:59 PMPage 6 of 21
3.2 Building Construction - 2016
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:59 PMPage 7 of 21
3.2 Building Construction - 2016
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:59 PMPage 8 of 21
3.2 Building Construction - 2017
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:59 PMPage 9 of 21
3.2 Building Construction - 2017
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:59 PMPage 10 of 21
3.2 Building Construction - 2018
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:59 PMPage 11 of 21
3.2 Building Construction - 2018
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:59 PMPage 12 of 21
3.2 Building Construction - 2019
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:59 PMPage 13 of 21
3.2 Building Construction - 2019
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:59 PMPage 14 of 21
3.2 Building Construction - 2020
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:59 PMPage 15 of 21
4.0 Operational Detail - Mobile
3.2 Building Construction - 2020
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:59 PMPage 16 of 21
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Mitigated 11.2484 21.9443 113.4784 0.5468 39.7167 0.6062 40.3228 10.6055 0.5599 11.1654 38,225.2219
38,225.2219
1.0657 38,247.6012
Unmitigated 11.2484 21.9443 113.4784 0.5468 39.7167 0.6062 40.3228 10.6055 0.5599 11.1654 38,225.2219
38,225.2219
1.0657 38,247.6012
4.1 Mitigation Measures Mobile
4.2 Trip Summary Information
4.3 Trip Type Information
Average Daily Trip Rate Unmitigated Mitigated
Land Use Weekday Saturday Sunday Annual VMT Annual VMT
University/College (4Yr) 6,246.00 3,438.00 1566.00 15,548,981 15,548,981
Total 6,246.00 3,438.00 1,566.00 15,548,981 15,548,981
Miles Trip % Trip Purpose %
Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by
University/College (4Yr) 16.60 8.40 6.90 6.40 88.60 5.00 91 9 0
5.0 Energy Detail4.4 Fleet Mix
LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH
0.477544 0.059603 0.204041 0.158997 0.043661 0.006299 0.017331 0.021321 0.001547 0.002362 0.003004 0.000478 0.003811
Historical Energy Use: N
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:59 PMPage 17 of 21
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
NaturalGas Mitigated
0.3126 2.8414 2.3868 0.0171 0.2160 0.2160 0.2160 0.2160 3,409.7083
3,409.7083
0.0654 0.0625 3,430.4592
NaturalGas Unmitigated
0.3126 2.8414 2.3868 0.0171 0.2160 0.2160 0.2160 0.2160 3,409.7083
3,409.7083
0.0654 0.0625 3,430.4592
5.2 Energy by Land Use - NaturalGas
NaturalGas Use
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr lb/day lb/day
University/College (4Yr)
28982.5 0.3126 2.8414 2.3868 0.0171 0.2160 0.2160 0.2160 0.2160 3,409.7083
3,409.7083
0.0654 0.0625 3,430.4592
Total 0.3126 2.8414 2.3868 0.0171 0.2160 0.2160 0.2160 0.2160 3,409.7083
3,409.7083
0.0654 0.0625 3,430.4592
Unmitigated
5.1 Mitigation Measures Energy
Historical Energy Use: N
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:59 PMPage 18 of 21
6.1 Mitigation Measures Area
6.0 Area Detail
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Mitigated 16.6113 1.6400e-003
0.1827 1.0000e-005
6.5000e-004
6.5000e-004
6.5000e-004
6.5000e-004
0.3939 0.3939 1.0100e-003
0.4153
Unmitigated 16.6113 1.6400e-003
0.1827 1.0000e-005
6.5000e-004
6.5000e-004
6.5000e-004
6.5000e-004
0.3939 0.3939 1.0100e-003
0.4153
5.2 Energy by Land Use - NaturalGas
NaturalGas Use
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr lb/day lb/day
University/College (4Yr)
28.9825 0.3126 2.8414 2.3868 0.0171 0.2160 0.2160 0.2160 0.2160 3,409.7083
3,409.7083
0.0654 0.0625 3,430.4592
Total 0.3126 2.8414 2.3868 0.0171 0.2160 0.2160 0.2160 0.2160 3,409.7083
3,409.7083
0.0654 0.0625 3,430.4592
Mitigated
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:59 PMPage 19 of 21
7.0 Water Detail
6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory lb/day lb/day
Consumer Products
13.2066 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Landscaping 0.0167 1.6400e-003
0.1827 1.0000e-005
6.5000e-004
6.5000e-004
6.5000e-004
6.5000e-004
0.3939 0.3939 1.0100e-003
0.4153
Architectural Coating
3.3880 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 16.6113 1.6400e-003
0.1827 1.0000e-005
6.5000e-004
6.5000e-004
6.5000e-004
6.5000e-004
0.3939 0.3939 1.0100e-003
0.4153
Unmitigated
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory lb/day lb/day
Consumer Products
13.2066 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Landscaping 0.0167 1.6400e-003
0.1827 1.0000e-005
6.5000e-004
6.5000e-004
6.5000e-004
6.5000e-004
0.3939 0.3939 1.0100e-003
0.4153
Architectural Coating
3.3880 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 16.6113 1.6400e-003
0.1827 1.0000e-005
6.5000e-004
6.5000e-004
6.5000e-004
6.5000e-004
0.3939 0.3939 1.0100e-003
0.4153
Mitigated
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:59 PMPage 20 of 21
8.1 Mitigation Measures Waste
7.1 Mitigation Measures Water
8.0 Waste Detail
10.0 Vegetation
9.0 Operational Offroad
Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:59 PMPage 21 of 21
Orange County, Summer
Concordia University - Campus Build-Out - 2035
1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population
University/College (4Yr) 1,800.00 Student 72.80 667,000.00 1320
1.2 Other Project Characteristics
Urbanization
Climate Zone
Urban
8
Wind Speed (m/s) Precipitation Freq (Days)2.2 30
1.3 User Entered Comments & Non-Default Data
1.0 Project Characteristics
Utility Company Southern California Edison
2035Operational Year
CO2 Intensity (lb/MWhr)
630.89 0.029CH4 Intensity (lb/MWhr)
0.006N2O Intensity (lb/MWhr)
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:58 PMPage 1 of 21
Project Characteristics -
Land Use - Campus area is 72.8 acres. Assumes a maximum student population of 1,800 students, 321,200 square feet of institutional building space, approx. 346,000 square feet of residence hall space, and 1,320 campus residents.
Construction Phase - No construction emissions analysis for build-out conditions.
Off-road Equipment - No construction emissions under existing conditions.
Off-road Equipment - No construction emissions analysis for build-out conditions.
Trips and VMT - No construction emissions analysis for build-out conditions.
Vehicle Trips - Trip generation rates revised to be consistent with project Traffic Impact Analysis. Saturday trip rate is assumed to be 0.55% of weekday rate. Sunday trip rate is asumed to be 0.25% of weekday rate.
Woodstoves -
Area Coating - SCAQMD Rule 1113 limits paints to a maximum VOC content of 50 g/L.
Solid Waste - Default solid waste generation rate changed to 562 tons per year per historic solid waste disposal for the campus (including residence halls).
Table Name Column Name Default Value New Value
tblAreaCoating Area_EF_Nonresidential_Exterior 250 50
tblAreaMitigation UseLowVOCPaintNonresidentialExteriorValue
50 250
tblLandUse LandUseSquareFeet 330,835.44 667,000.00
tblLandUse LotAcreage 7.59 72.80
tblLandUse Population 0.00 1,320.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00
tblProjectCharacteristics OperationalYear 2014 2035
tblSolidWaste SolidWasteGenerationRate 328.50 562.00
tblTripsAndVMT VendorTripNumber 109.00 0.00
tblTripsAndVMT WorkerTripNumber 280.00 0.00
tblVehicleTrips ST_TR 1.30 1.91
tblVehicleTrips SU_TR 0.00 0.87
tblVehicleTrips WD_TR 2.38 3.47
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:58 PMPage 2 of 21
2.0 Emissions Summary
2.1 Overall Construction (Maximum Daily Emission)
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
2016 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2017 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2018 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2019 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2020 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:58 PMPage 3 of 21
2.1 Overall Construction (Maximum Daily Emission)
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
2016 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2017 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2018 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2019 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2020 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent Reduction
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:58 PMPage 4 of 21
2.2 Overall Operational
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Area 16.6113 1.6400e-003
0.1827 1.0000e-005
6.5000e-004
6.5000e-004
6.5000e-004
6.5000e-004
0.3939 0.3939 1.0100e-003
0.4153
Energy 0.3126 2.8414 2.3868 0.0171 0.2160 0.2160 0.2160 0.2160 3,409.7083
3,409.7083
0.0654 0.0625 3,430.4592
Mobile 10.6766 20.9047 113.3945 0.5720 39.7167 0.6044 40.3211 10.6055 0.5583 11.1638 39,866.8283
39,866.8283
1.0642 39,889.1760
Total 27.6004 23.7477 115.9640 0.5891 39.7167 0.8210 40.5377 10.6055 0.7749 11.3804 43,276.9305
43,276.9305
1.1305 0.0625 43,320.0505
Unmitigated Operational
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Area 16.6113 1.6400e-003
0.1827 1.0000e-005
6.5000e-004
6.5000e-004
6.5000e-004
6.5000e-004
0.3939 0.3939 1.0100e-003
0.4153
Energy 0.3126 2.8414 2.3868 0.0171 0.2160 0.2160 0.2160 0.2160 3,409.7083
3,409.7083
0.0654 0.0625 3,430.4592
Mobile 10.6766 20.9047 113.3945 0.5720 39.7167 0.6044 40.3211 10.6055 0.5583 11.1638 39,866.8283
39,866.8283
1.0642 39,889.1760
Total 27.6004 23.7477 115.9640 0.5891 39.7167 0.8210 40.5377 10.6055 0.7749 11.3804 43,276.9305
43,276.9305
1.1305 0.0625 43,320.0505
Mitigated Operational
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:58 PMPage 5 of 21
3.0 Construction Detail
3.1 Mitigation Measures Construction
Construction Phase
Phase Number
Phase Name Phase Type Start Date End Date Num Days Week
Num Days Phase Description
1 Building Construction Building Construction 1/1/2016 4/2/2020 5 1110
OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor
Building Construction Cranes 0 7.00 226 0.29
Trips and VMT
Phase Name Offroad Equipment Count
Worker Trip Number
Vendor Trip Number
Hauling Trip Number
Worker Trip Length
Vendor Trip Length
Hauling Trip Length
Worker Vehicle Class
Vendor Vehicle Class
Hauling Vehicle Class
Building Construction 0 0.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent Reduction
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 0; Non-Residential Outdoor: 0 (Architectural Coating – sqft)
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:58 PMPage 6 of 21
3.2 Building Construction - 2016
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:58 PMPage 7 of 21
3.2 Building Construction - 2016
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:58 PMPage 8 of 21
3.2 Building Construction - 2017
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:58 PMPage 9 of 21
3.2 Building Construction - 2017
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:58 PMPage 10 of 21
3.2 Building Construction - 2018
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:58 PMPage 11 of 21
3.2 Building Construction - 2018
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:58 PMPage 12 of 21
3.2 Building Construction - 2019
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:58 PMPage 13 of 21
3.2 Building Construction - 2019
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:58 PMPage 14 of 21
3.2 Building Construction - 2020
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:58 PMPage 15 of 21
4.0 Operational Detail - Mobile
3.2 Building Construction - 2020
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:58 PMPage 16 of 21
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Mitigated 10.6766 20.9047 113.3945 0.5720 39.7167 0.6044 40.3211 10.6055 0.5583 11.1638 39,866.8283
39,866.8283
1.0642 39,889.1760
Unmitigated 10.6766 20.9047 113.3945 0.5720 39.7167 0.6044 40.3211 10.6055 0.5583 11.1638 39,866.8283
39,866.8283
1.0642 39,889.1760
4.1 Mitigation Measures Mobile
4.2 Trip Summary Information
4.3 Trip Type Information
Average Daily Trip Rate Unmitigated Mitigated
Land Use Weekday Saturday Sunday Annual VMT Annual VMT
University/College (4Yr) 6,246.00 3,438.00 1566.00 15,548,981 15,548,981
Total 6,246.00 3,438.00 1,566.00 15,548,981 15,548,981
Miles Trip % Trip Purpose %
Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by
University/College (4Yr) 16.60 8.40 6.90 6.40 88.60 5.00 91 9 0
5.0 Energy Detail4.4 Fleet Mix
LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH
0.477544 0.059603 0.204041 0.158997 0.043661 0.006299 0.017331 0.021321 0.001547 0.002362 0.003004 0.000478 0.003811
Historical Energy Use: N
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:58 PMPage 17 of 21
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
NaturalGas Mitigated
0.3126 2.8414 2.3868 0.0171 0.2160 0.2160 0.2160 0.2160 3,409.7083
3,409.7083
0.0654 0.0625 3,430.4592
NaturalGas Unmitigated
0.3126 2.8414 2.3868 0.0171 0.2160 0.2160 0.2160 0.2160 3,409.7083
3,409.7083
0.0654 0.0625 3,430.4592
5.2 Energy by Land Use - NaturalGas
NaturalGas Use
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr lb/day lb/day
University/College (4Yr)
28982.5 0.3126 2.8414 2.3868 0.0171 0.2160 0.2160 0.2160 0.2160 3,409.7083
3,409.7083
0.0654 0.0625 3,430.4592
Total 0.3126 2.8414 2.3868 0.0171 0.2160 0.2160 0.2160 0.2160 3,409.7083
3,409.7083
0.0654 0.0625 3,430.4592
Unmitigated
5.1 Mitigation Measures Energy
Historical Energy Use: N
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:58 PMPage 18 of 21
6.1 Mitigation Measures Area
6.0 Area Detail
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Mitigated 16.6113 1.6400e-003
0.1827 1.0000e-005
6.5000e-004
6.5000e-004
6.5000e-004
6.5000e-004
0.3939 0.3939 1.0100e-003
0.4153
Unmitigated 16.6113 1.6400e-003
0.1827 1.0000e-005
6.5000e-004
6.5000e-004
6.5000e-004
6.5000e-004
0.3939 0.3939 1.0100e-003
0.4153
5.2 Energy by Land Use - NaturalGas
NaturalGas Use
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr lb/day lb/day
University/College (4Yr)
28.9825 0.3126 2.8414 2.3868 0.0171 0.2160 0.2160 0.2160 0.2160 3,409.7083
3,409.7083
0.0654 0.0625 3,430.4592
Total 0.3126 2.8414 2.3868 0.0171 0.2160 0.2160 0.2160 0.2160 3,409.7083
3,409.7083
0.0654 0.0625 3,430.4592
Mitigated
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:58 PMPage 19 of 21
7.0 Water Detail
6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory lb/day lb/day
Consumer Products
13.2066 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Landscaping 0.0167 1.6400e-003
0.1827 1.0000e-005
6.5000e-004
6.5000e-004
6.5000e-004
6.5000e-004
0.3939 0.3939 1.0100e-003
0.4153
Architectural Coating
3.3880 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 16.6113 1.6400e-003
0.1827 1.0000e-005
6.5000e-004
6.5000e-004
6.5000e-004
6.5000e-004
0.3939 0.3939 1.0100e-003
0.4153
Unmitigated
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory lb/day lb/day
Consumer Products
13.2066 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Landscaping 0.0167 1.6400e-003
0.1827 1.0000e-005
6.5000e-004
6.5000e-004
6.5000e-004
6.5000e-004
0.3939 0.3939 1.0100e-003
0.4153
Architectural Coating
3.3880 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 16.6113 1.6400e-003
0.1827 1.0000e-005
6.5000e-004
6.5000e-004
6.5000e-004
6.5000e-004
0.3939 0.3939 1.0100e-003
0.4153
Mitigated
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:58 PMPage 20 of 21
8.1 Mitigation Measures Waste
7.1 Mitigation Measures Water
8.0 Waste Detail
10.0 Vegetation
9.0 Operational Offroad
Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type
CalEEMod Version: CalEEMod.2013.2.2 Date: 12/30/2015 3:58 PMPage 21 of 21
CalEEMod Version: CalEEMod.2013.2.2 Page 1 of 1 Date: 4/10/2016 10:36 AM
Concordia University - Existing Uses - 2015Orange County, Annual
1.0 Project Characteristics
1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population
University/College (4Yr) 1,508.00 Student 72.80 499,571.00 1024
1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 2.2 Precipitation Freq (Days) 30
Climate Zone 8 Operational Year 2015
Utility Company Southern California Edison
CO2 Intensity (lb/MWhr)
570 CH4 Intensity (lb/MWhr)
0.029 N2O Intensity (lb/MWhr)
0.006
1.3 User Entered Comments & Non-Default Data
Project Characteristics - SCE carbon intensity for 2016
1 of 10
Land Use - Campus area is 72.8 acres. Assumes an existing student population of 1,508 students, 243,571 square feet of existing institutional building space, approx. 256,000 square feet of residence hall space, and 1,024 campus residents.
Construction Phase - No construction emissions under existing conditions.
Off-road Equipment - No construction emissions under existing conditions.
Off-road Equipment - No construction emissions under existing conditions.
Trips and VMT - No construction emissions under existing conditions.
Vehicle Trips - Trip generation rates revised to be consistent with project Traffic Impact Analysis. Saturday trip rate is assumed to be 0.55% of weekday rate. Sunday trip rate is asumed to be 0.25% of weekday rate.
Woodstoves -
Area Coating - SCAQMD Rule 1113 limits paints to a maximum VOC content of 50 g/L.
Solid Waste - Default solid waste generation rate changed to 472 tons per year per historic solid waste disposal for the campus (including residence halls).
Table Name Column Name Default Value New Value
tblAreaCoating Area_EF_Nonresidential_Exterior 250 50
tblAreaMitigation UseLowVOCPaintNonresidentialExteriorValue
50 250
tblConstructionPhase NumDays 1,110.00 66.00
tblConstructionPhase PhaseEndDate 4/1/2016 4/2/2016
tblLandUse LandUseSquareFeet 277,166.58 499,571.00
tblLandUse LotAcreage 6.36 72.80
tblLandUse Population 0.00 1,024.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00
tblProjectCharacteristics CO2IntensityFactor 630.89 570
tblProjectCharacteristics OperationalYear 2014 2015
tblSolidWaste SolidWasteGenerationRate 275.21 472.00
tblTripsAndVMT VendorTripNumber 82.00 0.00
tblTripsAndVMT WorkerTripNumber 210.00 0.00
tblVehicleTrips ST_TR 1.30 1.73
0.00 0.79
tblVehicleTrips WD_TR 2.38 3.14
tblVehicleTrips SU_TR
2 of 10
SO2 Fugitive PM10
Exhaust PM10
2.0 Emissions Summary
PM2.5 Total
Bio- CO2 NBio- CO2
2.2 Overall OperationalUnmitigated Operational
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Area 2.2703 1.9000e-004
0.0199 0.0000 7.0000e-005
7.0000e-005
7.0000e-005
7.0000e-005
0.0000 0.0374 0.0374 1.1000e-004
0.0000 0.0397
Energy 0.0427 0.3884 0.3263 2.3300e-003
0.0295 0.0295 0.0295 0.0295 0.0000 2,237.5508
2,237.5508 0.1004 0.0269 2,247.9846
Mobile 2.4351 6.1221 27.5462 0.0610 4.4522 0.0796 4.5318 1.1895 0.0732 1.2626 0.0000 4,960.3050
4,960.3050 0.2123 0.0000 4,964.7632
Waste 0.0000 0.0000 0.0000 0.0000 95.8117 0.0000 95.8117 5.6623 0.0000 214.7203
Water 0.0000 0.0000 0.0000 0.0000 1.0243 25.3762 26.4005 0.1065 2.7500e-003
29.4900
Total 4.7481 6.5107 27.8924 0.0634 6.0816 0.0296 7,456.9977
4.4522 0.1092 4.5614 1.1895 0.1028 1.2922 96.8361 7,223.2694
7,320.1055
3 of 10
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Operational
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Area 2.2703 1.9000e-004
0.0199 0.0000 7.0000e-005
7.0000e-005
7.0000e-005
7.0000e-005
0.0000 0.0374 0.0374 1.1000e-004
0.0000 0.0397
Energy 0.0427 0.3884 0.3263 2.3300e-003
0.0295 0.0295 0.0295 0.0295 0.0000 2,237.5508
2,237.5508 0.1004 0.0269 2,247.9846
Mobile 2.4351 6.1221 27.5462 0.0610 4.4522 0.0796 4.5318 1.1895 0.0732 1.2626 0.0000 4,960.3050
4,960.3050 0.2123 0.0000 4,964.7632
Waste 0.0000 0.0000 0.0000 0.0000 95.8117 0.0000 95.8117 5.6623 0.0000 214.7203
Water 0.0000 0.0000 0.0000 0.0000 1.0243 25.3762 26.4005 0.1065 2.7500e-003
29.4883
Total 4.7481 6.5107 27.8924 0.0634 4.4522 0.1092 4.5614 1.1895 0.1028 1.2922 96.8361 7,223.2694
7,320.1055 6.0816 0.0296 7,456.9961
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent Reduction
0.00 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00
CO SO2 Fugitive PM10
0.00 0.00 0.00
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2
4.0 Operational Detail - Mobile
4.1 Mitigation Measures Mobile
ROG NOx NBio- CO2
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust PM10
PM10 Total
Mitigated 2.4351 6.1221 27.5462 0.0610 4.4522 0.0796 4.5318 1.1895 0.0732 1.2626 0.0000 4,960.3050
4,960.3050 0.2123 0.0000 4,964.7632
Unmitigated 2.4351 6.1221 27.5462 0.0610 4.4522 0.0796 4.5318 1.1895 0.0732 1.2626 0.0000 4,960.3050
4,960.3050 0.2123 0.0000 4,964.7632
4 of 10
4.2 Trip Summary Information
Average Daily Trip Rate Unmitigated MitigatedLand Use Weekday Saturday Sunday Annual VMT Annual VMT
University/College (4Yr) 4,735.12 2,608.84 1191.32 11,790,585 11,790,585Total 4,735.12 2,608.84 1,191.32 11,790,585 11,790,585
4.3 Trip Type Information
Miles Trip % Trip Purpose %
Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W
H-S or C-C H-O or C-NW Primary Diverted Pass-by
University/College (4Yr) 16.60 8.40 6.90 6.40 88.60 5.00 91 9 0
LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY
0.004703 0.000510 0.002224
5.0 Energy Detail
SBUS MH
0.511437 0.057382 0.191336 0.153047
NOx CO SO2 Fugitive PM10
0.001416 0.0021360.041226 0.005877 0.014979 0.013726
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2
4.4 Fleet MixHistorical Energy Use: N
5.1 Mitigation Measures Energy
ROG NBio- CO2
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust PM10
PM10 Total
Electricity Mitigated
0.0000 0.0000 0.0000 0.0000 0.0000 1,814.7389
1,814.7389 0.0923 0.0191 1,822.5996
Electricity Unmitigated
0.0000 0.0000 0.0000 0.0000 0.0000 1,814.7389
1,814.7389 0.0923 0.0191 1,822.5996
NaturalGas Mitigated
0.0427 0.3884 0.3263 2.3300e-003
0.0295 0.0295 0.0295 0.0295 0.0000 422.8119 422.8119 8.1000e-003
7.7500e-003
425.3851
NaturalGas Unmitigated
0.0427 0.3884 0.3263 2.3300e-003
422.8119 422.8119 8.1000e-003
7.7500e-003
425.38510.0295 0.0295 0.0295 0.00000.0295
5 of 10
ROG NOx CO SO2 Fugitive PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2
5.2 Energy by Land Use - NaturalGasUnmitigated
NaturalGas Use
NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr tons/yr MT/yr
Exhaust PM10
University/College (4Yr)
7.9232e+006
0.0427 0.3884 0.3263 7.7500e-003
2.3300e-003
0.0295 0.0295 0.0295
0.0295
0.0295 0.0000 422.8119 422.8119 8.1000e-003
422.8119
425.3851
Total 0.0427 0.3884 0.3263 2.3300e-003
422.8119 8.1000e-003
7.7500e-003
Mitigated
0.0295 0.0295 0.0295 0.0000
NaturalGas Use
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr tons/yr MT/yr
University/College (4Yr)
7.9232e+006
0.0427 0.3884 0.3263 2.3300e-003
0.0295 0.0295 0.0295 0.0295 0.0000 422.8119 422.8119 8.1000e-003
0.0000
7.7500e-003
Total 0.0427 0.3884 0.3263 2.3300e-003
422.8119 422.8119 8.1000e-003
7.7500e-003
5.3 Energy by Land Use - Electricity
0.0295 0.0295 0.0295 0.0295
Unmitigated
Electricity Use
Total CO2 CH4 N2O CO2e
Land Use kWh/yr ton
MT/yr
University/College (4Yr)
7.01897e+006
1,814.7389 0.0923 0.0191 1,822.5996
Total 1,814.7389 0.0923 0.0191 1,822.5996
425.3851
425.3851
425.3851
6 of 10
0.0191
Mitigated
Electricity Use
Total CO2 CH4 N2O CO2e
1,822.5996
Land Use kWh/yr ton
MT/yr
University/College (4Yr)
7.01897e+006
1,814.7389 0.0923
CO SO2 Fugitive PM10
1,822.5996
Total 1,814.7389 0.0923 0.0191
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2
6.0 Area Detail
6.1 Mitigation Measures Area
ROG NOx NBio- CO2
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust PM10
PM10 Total
Mitigated 2.2703 1.9000e-004
0.0199 0.0000 7.0000e-005
7.0000e-005
7.0000e-005
7.0000e-005
0.0000 0.0374 0.0374 1.1000e-004
0.0000 0.0397
Unmitigated 2.2703 1.9000e-004
0.0199 0.0000 1.1000e-004
0.0000 0.03977.0000e-005
7.0000e-005
7.0000e-005
7.0000e-005
0.0000 0.0374 0.0374
7 of 10
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
6.2 Area by SubCategoryUnmitigated
ROG NOx CO Total CO2 CH4 N2O CO2e
SubCategory tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Architectural Coating
0.4631 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Consumer Products
1.8052 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Landscaping 1.9700e-003
1.9000e-004
0.0199 0.0000 7.0000e-005
7.0000e-005
7.0000e-005
7.0000e-005
0.0000 0.0374 0.0374 1.1000e-004
0.0000 0.0397
Total 2.2703 1.9000e-004
0.0199 0.0000 1.1000e-004
0.0000 0.03977.0000e-005
7.0000e-005
7.0000e-005
7.0000e-005
SO2 Fugitive PM10
Exhaust PM10
0.0000 0.0374 0.0374
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated
ROG NOx CO Total CO2 CH4 N2O CO2e
SubCategory tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Consumer Products
1.8052 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Landscaping 1.9700e-003
1.9000e-004
0.0199 0.0000 7.0000e-005
7.0000e-005
7.0000e-005
7.0000e-005
0.0000 0.0374 0.0374 1.1000e-004
0.0000 0.0397
Architectural Coating
0.4631 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 2.2703 1.9000e-004
0.0199 0.0000 7.0000e-005
7.0000e-005
7.0000e-005
7.0000e-005
0.0000 0.0374 0.0374 1.1000e-004
0.0000 0.0397
8 of 10
7.0 Water Detail
7.1 Mitigation Measures Water
Total CO2 CH4 N2O CO2e
Category ton
MT/yr
Mitigated 26.4005 0.1065 2.7500e-003
29.4883
Unmitigated 26.4005 0.1065 2.7500e-003
29.4900
7.2 Water by Land UseUnmitigated
Indoor/Outdoor Use
Total CO2 CH4 N2O CO2e
Land Use Mgal ton
MT/yr
University/College (4Yr)
3.22878 / 5.05014
26.4005 0.1065 2.7500e-003
29.4900
Total 26.4005 0.1065 2.7500e-003
29.4900
Mitigated
Indoor/Outdoor Use
Total CO2 CH4 N2O CO2e
Land Use Mgal ton
MT/yr
University/College (4Yr)
3.22878 / 5.05014
26.4005 0.1065 2.7500e-003
29.4883
Total 26.4005 0.1065 2.7500e-003
29.4883
9 of 10
8.0 Waste Detail
8.1 Mitigation Measures Waste
Category/Year
Total CO2 CH4 N2O CO2e
ton
MT/yr
Mitigated 95.8117 5.6623 0.0000 214.7203
Unmitigated 95.8117 5.6623 0.0000 214.7203
8.2 Waste by Land UseUnmitigated
Waste Disposed
Total CO2 CH4 N2O CO2e
Land Use tons ton
MT/yr
University/College (4Yr)
472 95.8117 5.6623 0.0000 214.7203
Total 95.8117 5.6623 0.0000 214.7203
0.0000
Mitigated
Waste Disposed
Total CO2 CH4 N2O CO2e
214.7203
Land Use tons ton
MT/yr
University/College (4Yr)
472 95.8117 5.6623 214.7203
Total 95.8117 5.6623 0.0000
10 of 10
Off-road Equipment - Assumes one rubber tired dozer and one tractor/loader/backhoe due to small development area.
Off-road Equipment -
Off-road Equipment -
1.3 User Entered Comments & Non-Default Data
Project Characteristics -
Land Use - Assumes the construction of 48,580 square feet of new institutional building space, a 1.42-acre (158 space) parking lot expansion, 0.5 acre of paved roadway improvements and 0 5 acre of asphalt improvementsConstruction Phase - Construction dates entered to reflect anticipated construction schedule.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
CO2 Intensity (lb/MWhr)
630.89 CH4 Intensity (lb/MWhr)
0.029 N2O Intensity (lb/MWhr)
0.006
30
Climate Zone 8 Operational Year 2020
Utility Company Southern California Edison
1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 2.2 Precipitation Freq (Days)
Parking Lot 158.00 Space 1.42 63,200.00 0
Other Non-Asphalt Surfaces 0.50 Acre 0.50 21,780.00 0
Other Asphalt Surfaces 0.50 Acre 0.50 21,780.00 0
Population
University/College (4Yr) 92.00 Student 5.00 48,580.00 0
1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area
CalEEMod Version: CalEEMod.2013.2.2 Page 1 of 1 Date: 4/12/2016 8:56 AM
Concordia University - Phases 1 & 2 ConstructionOrange County, Annual
1.0 Project Characteristics
1 of 40
Landscape Equipment - Operational emissions are not calculated in this scenario.
Energy Use - Operational emissions are not calculated in this scenario.
Water And Wastewater - Operational emissions are not calculated in this scenario.
Solid Waste - Operational emissions are not calculated in this scenario.
Construction Off-road Equipment Mitigation - Assumes compliance with SCAQMD Rule 403 for fugitive dust as required.
Trips and VMT - Haul trips per Psomas 3/31/16; add'l trips for site clear
Grading - Amount of material imported and exported based on Psomas 3/31/16.Acres disturbed based on site size and duration of work
Architectural Coating - SCAQMD Rule 1113 limits paints to a maximum VOC content of 50 g/L.
Vehicle Trips - Operational emissions are not calculated in this scenario.
Consumer Products - Operational emissions are not calculated in this scenario.
Area Coating - Operational emissions are not calculated in this scenario.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment -
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Dorm Road-lot grad
Off-road Equipment -
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Substantial grading during site prep
Off-road Equipment -
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
2 of 40
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDays 10.00 12.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDays 10.00 79.00
tblConstructionPhase NumDays 10.00 15.00
tblConstructionPhase NumDays 10.00 27.00
tblConstructionPhase NumDays 10.00 27.00
tblConstructionPhase NumDays 20.00 24.00
tblConstructionPhase NumDays 20.00 6.00
tblConstructionPhase NumDays 20.00 12.00
tblConstructionPhase NumDays 20.00 6.00
tblConstructionPhase NumDays 20.00 26.00
tblConstructionPhase NumDays 20.00 78.00
tblConstructionPhase NumDays 230.00 196.00
tblConstructionPhase NumDays 20.00 40.00
tblConstructionPhase NumDays 230.00 45.00
tblConstructionPhase NumDays 230.00 339.00
tblConstructionPhase NumDays 20.00 15.00
tblConstructionPhase NumDays 230.00 157.00
tblAreaCoating ReapplicationRatePercent 10 0
tblConstructionPhase NumDays 20.00 21.00
tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00
Table Name Column Name Default Value New Value
3 of 40
tblConstructionPhase PhaseStartDate 10/31/2018 8/1/2018
tblConstructionPhase PhaseStartDate 7/1/2017 6/1/2017
tblConstructionPhase PhaseStartDate 7/24/2017 7/1/2017
tblConstructionPhase PhaseEndDate 8/14/2018 12/14/2017
tblConstructionPhase PhaseStartDate 9/1/2018 8/15/2018
tblConstructionPhase PhaseEndDate 8/31/2017 7/31/2017
tblConstructionPhase PhaseEndDate 8/17/2017 5/31/2017
tblConstructionPhase PhaseEndDate 9/28/2018 10/13/2018
tblConstructionPhase PhaseEndDate 11/14/2018 5/31/2019
tblConstructionPhase PhaseEndDate 9/29/2018 8/14/2018
tblConstructionPhase PhaseEndDate 8/21/2018 8/7/2018
tblConstructionPhase PhaseEndDate 8/22/2018 7/31/2018
tblConstructionPhase PhaseEndDate 12/15/2018 9/15/2018
tblConstructionPhase PhaseEndDate 9/18/2018 8/31/2018
tblConstructionPhase PhaseEndDate 8/22/2017 7/23/2017
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
4 of 40
tblLandUse LandUseSquareFeet 16,909.37 48,580.00
tblGrading MaterialImported 0.00 6,368.00
tblGrading MaterialImported 0.00 1,122.00
tblGrading MaterialImported 0.00 3,850.00
tblGrading MaterialImported 0.00 6.00
tblGrading MaterialImported 0.00 100.00
tblGrading MaterialImported 0.00 3,287.00
tblGrading MaterialExported 0.00 186.00
tblGrading MaterialExported 0.00 5,732.00
tblGrading AcresOfGrading 0.00 2.00
tblGrading MaterialExported 0.00 100.00
tblGrading AcresOfGrading 39.50 12.00
tblGrading AcresOfGrading 0.00 8.00
tblGrading AcresOfGrading 0.00 8.00
tblGrading AcresOfGrading 0.00 13.00
tblGrading AcresOfGrading 20.00 40.00
tblGrading AcresOfGrading 11.38 13.00
tblEnergyUse T24E 6.10 0.00
tblEnergyUse T24NG 10.65 0.00
tblEnergyUse NT24E 2.72 0.00
tblEnergyUse NT24NG 5.21 0.00
tblEnergyUse LightingElect 0.88 0.00
tblEnergyUse LightingElect 5.23 0.00
tblConstructionPhase PhaseStartDate 8/1/2017 5/15/2017
tblConstructionPhase PhaseStartDate 8/1/2018 12/1/2017
tblConstructionPhase PhaseStartDate 10/14/2018 5/1/2019
tblConstructionPhase PhaseStartDate 6/1/2017 5/1/2017
tblConstructionPhase PhaseStartDate 8/15/2018 8/1/2018
tblConstructionPhase PhaseStartDate 9/1/2018 9/16/2018
tblConstructionPhase PhaseStartDate 9/16/2018 8/1/2018
5 of 40
tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentType Graders
tblOffRoadEquipment OffRoadEquipmentType Excavators
tblLandUse LotAcreage 0.39 5.00
6 of 40
tblWater OutdoorWaterUseRate 308,098.80 0.00
tblVehicleTrips WD_TR 2.38 0.00
tblWater IndoorWaterUseRate 196,981.20 0.00
tblTripsAndVMT HaulingTripNumber 381.00 482.00
tblVehicleTrips ST_TR 1.30 0.00
tblTripsAndVMT HaulingTripNumber 411.00 412.00
tblTripsAndVMT HaulingTripNumber 0.00 6.00
tblTripsAndVMT HaulingTripNumber 678.00 858.00
tblTripsAndVMT HaulingTripNumber 0.00 30.00
tblTripsAndVMT HaulingTripNumber 19.00 24.00
tblTripsAndVMT HaulingTripNumber 796.00 800.00
tblProjectCharacteristics OperationalYear 2014 2020
tblSolidWaste SolidWasteGenerationRate 16.79 0.00
tblOffRoadEquipment UsageHours 8.00 7.00
tblOffRoadEquipment UsageHours 8.00 7.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 1.00
7 of 40
0.00 0.00 0.00 0.00 0.00 0.0044.35 0.00 30.70 51.03 0.00 26.44
NBio-CO2 Total CO2 CH4 N20 CO2e
Percent Reduction
0.00 0.00 0.00 0.00
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2ROG NOx CO SO2 Fugitive PM10
0.0000 1,450.2845
1,450.2845 0.2480 0.0000 1,455.49330.7483 0.5982 1.3465 0.2960 0.5619 0.8578Total 1.9462 11.2949 9.7736 0.0171
0.0000 253.5670 253.5670 0.0341 0.0000 254.28400.1119 0.0776 0.1895 0.0386 0.0735 0.11212019 0.4053 1.5726 1.5241 3.0800e-003
0.0000 711.7564 711.7564 0.1286 0.0000 714.45610.3322 0.2938 0.6260 0.1256 0.2760 0.40162018 1.0669 5.4358 4.8112 8.3900e-003
0.0000 484.9611 484.9611 0.0853 0.0000 486.75310.3042 0.2268 0.5310 0.1318 0.2124 0.34422017 0.4740 4.2865 3.4383 5.5800e-003
Total CO2 CH4 N2O CO2e
Year tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Mitigated Construction
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 1,450.2856
1,450.2856
PM2.5 Total
Bio- CO2 NBio- CO2
0.2480 0.0000 1,455.49441.3447 0.5982 1.9429 0.6044 0.5619 1.1663Total 1.9462 11.2949 9.7736 0.0171
0.0000 253.5672 253.5672 0.0341 0.0000 254.28420.1659 0.0776 0.2435 0.0663 0.0735 0.13982019 0.4053 1.5726 1.5241 3.0800e-003
0.0000 711.7570 711.7570 0.1286 0.0000 714.45670.5745 0.2938 0.8683 0.2475 0.2760 0.52352018 1.0669 5.4358 4.8112 8.3900e-003
0.0000 484.9615 484.9615 0.0853 0.0000 486.75350.6043 0.2268 0.8311 0.2905 0.2124 0.50292017 0.4740 4.2865 3.4383 5.5800e-003
CH4 N2O CO2e
Year tons/yr MT/yr
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2
Unmitigated Construction
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
2.0 Emissions Summary
2.1 Overall Construction
NBio- CO2 Total CO2
8 of 40
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 141,054; Non-Residential Outdoor: 47,018 (Architectural Coating – sqft)
15718 Field Locker Rooms Paving Paving 12/1/2019 12/7/2019 6 617 Field Locker Rooms Building Construction 6/1/2019 11/30/2019 6
2416 Field Locker Rooms Site Site Preparation 5/1/2019 5/31/2019 6 2715 Baseball Lot Expansion Paving Paving 9/16/2018 10/13/2018 6
2114 MWT Architectural Coating Architectural Coating 8/15/2018 8/31/2018 6 1513 CU Center Architectural Coating Architectural Coating 8/8/2018 8/31/2018 6
1212 CU Center Paving Paving 8/1/2018 8/7/2018 6 611 MWT Paving Paving 8/1/2018 8/14/2018 6
7810 Baseball Lot Expansion Grading Grading 8/1/2018 9/15/2018 6 409 Dorm Road-District lot const Grading 8/1/2018 10/30/2018 6
128 CU Center Construction Building Construction 12/15/2017 7/31/2018 6 1967 CU Center Site Preparation Site Preparation 12/1/2017 12/14/2017 6
456 MWT Construction Building Construction 7/1/2017 7/31/2018 6 3395 Astronomy Center Construction Building Construction 6/1/2017 7/23/2017 6
154 MWT Grading Grading 6/1/2017 6/30/2017 6 263 MWT Site Preparation Site Preparation 5/15/2017 5/31/2017 6
272 Baseball Lot Expansion Site Site Preparation 5/1/2017 7/31/2017 6 79
End Date Num Days Num Days Phase Description1 Astronomy Center Site Site Preparation 5/1/2017 5/31/2017 6
3.0 Construction Detail
Construction Phase
Phase Phase Name Phase Type Start Date
9 of 40
Dorm Road-District lot const Rubber Tired Dozers 1 8.00 255 0.40
Dorm Road-District lot const Rollers 0 8.00 80 0.38
Dorm Road-District lot const Paving Equipment 0 8.00 130 0.36
Dorm Road-District lot const Pavers 0 8.00 125 0.42Dorm Road-District lot const Graders 1 8.00 174 0.41
Dorm Road-District lot const Excavators 1 8.00 162 0.38CU Center Construction Welders 1 8.00 46 0.45CU Center Construction Tractors/Loaders/Backhoes 1 7.00 97 0.37CU Center Construction Generator Sets 1 8.00 84 0.74CU Center Construction Forklifts 1 8.00 89 0.20CU Center Construction Cranes 1 7.00 226 0.29
CU Center Site Preparation Tractors/Loaders/Backhoes 1 8.00 97 0.37CU Center Site Preparation Rubber Tired Dozers 1 8.00 255 0.40
MWT Construction Welders 1 8.00 46 0.45MWT Construction Tractors/Loaders/Backhoes 1 7.00 97 0.37
MWT Construction Generator Sets 1 8.00 84 0.74
MWT Construction Forklifts 1 8.00 89 0.20
MWT Construction Cranes 1 7.00 226 0.29
Astronomy Center Construction Welders 1 8.00 46 0.45
Astronomy Center Construction Tractors/Loaders/Backhoes 1 7.00 97 0.37
Astronomy Center Construction Generator Sets 1 8.00 84 0.74
Astronomy Center Construction Forklifts 1 8.00 89 0.20
Astronomy Center Construction Cranes 1 7.00 226 0.29
MWT Grading Tractors/Loaders/Backhoes 1 8.00 97 0.37
MWT Grading Rubber Tired Dozers 1 7.00 255 0.40
MWT Grading Graders 1 7.00 174 0.41
MWT Grading Excavators 1 8.00 162 0.38
MWT Site Preparation Tractors/Loaders/Backhoes 1 8.00 97 0.37
MWT Site Preparation Rubber Tired Dozers 1 8.00 255 0.40
Baseball Lot Expansion Site Preparation
Tractors/Loaders/Backhoes 1 8.00 97 0.37
Baseball Lot Expansion Site Preparation
Rubber Tired Dozers 1 8.00 255 0.40
Astronomy Center Site Preparation Tractors/Loaders/Backhoes 1 8.00 97 0.37
Load Factor
Astronomy Center Site Preparation Rubber Tired Dozers 1 8.00 255 0.40
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power
10 of 40
Baseball Lot Expansion Site Preparation
Excavators 1 8.00 162 0.38
Baseball Lot Expansion Site Preparation
Graders 1 8.00 174 0.41
Field Locker Rooms Architectural Coatings
Air Compressors 1 6.00 78 0.48
Field Locker Rooms Paving Rollers 1 8.00 80 0.38
Field Locker Rooms Paving Paving Equipment 1 8.00 130 0.36
Field Locker Rooms Paving Pavers 1 8.00 125 0.42
Field Locker Rooms Construction Welders 1 8.00 46 0.45
Field Locker Rooms Construction Tractors/Loaders/Backhoes 1 7.00 97 0.37
Field Locker Rooms Construction Generator Sets 1 8.00 84 0.74
Field Locker Rooms Construction Forklifts 1 8.00 89 0.20
Field Locker Rooms Construction Cranes 1 7.00 226 0.29
Field Locker Rooms Site Preparation Tractors/Loaders/Backhoes 1 8.00 97 0.37
Field Locker Rooms Site Preparation Rubber Tired Dozers 1 8.00 255 0.40
Baseball Lot Expansion Paving Rollers 2 8.00 80 0.38
Baseball Lot Expansion Paving Paving Equipment 2 8.00 130 0.36
Baseball Lot Expansion Paving Pavers 2 8.00 125 0.42
MWT Architectural Coating Air Compressors 1 6.00 78 0.48
CU Center Architectural Coating Air Compressors 1 6.00 78 0.48
CU Center Paving Rollers 1 8.00 80 0.38
CU Center Paving Paving Equipment 1 8.00 130 0.36
CU Center Paving Pavers 1 8.00 125 0.42
MWT Paving Rollers 1 8.00 80 0.38
MWT Paving Paving Equipment 1 8.00 130 0.36
MWT Paving Pavers 1 8.00 125 0.42
Baseball Lot Expansion Grading Tractors/Loaders/Backhoes 3 8.00 97 0.37
Baseball Lot Expansion Grading Rubber Tired Dozers 1 8.00 255 0.40
Baseball Lot Expansion Grading Graders 1 8.00 174 0.41
Baseball Lot Expansion Grading Excavators 1 8.00 162 0.38
Dorm Road-District lot const Tractors/Loaders/Backhoes 3 8.00 97 0.37
11 of 40
6.90 20.00 LD_Mix HDT_Mix HHDTField Locker Rooms Architectural Coatings
1 13.00 0.00 0.00 14.70
14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
6.90 20.00 LD_Mix HDT_Mix HHDT
Field Locker Rooms Paving
3 8.00 0.00 0.00
Field Locker Rooms Construction
5 65.00 25.00 0.00 14.70
14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
6.90 20.00 LD_Mix HDT_Mix HHDT
Field Locker Rooms Site Preparation
2 5.00 0.00 800.00
Baseball Lot Expansion Paving
6 15.00 0.00 0.00 14.70
14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
6.90 20.00 LD_Mix HDT_Mix HHDT
MWT Architectural Coating
1 13.00 0.00 0.00
CU Center Architectural Coating
1 13.00 0.00 0.00 14.70
14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
6.90 20.00 LD_Mix HDT_Mix HHDT
CU Center Paving 3 8.00 0.00 0.00
MWT Paving 3 8.00 0.00 0.00 14.70
14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
6.90 20.00 LD_Mix HDT_Mix HHDT
Baseball Lot Expansion Grading
6 15.00 0.00 25.00
Dorm Road-District lot const
6 15.00 0.00 482.00 14.70
14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
6.90 20.00 LD_Mix HDT_Mix HHDT
CU Center Construction
5 65.00 25.00 0.00
CU Center Site Preparation
2 5.00 0.00 6.00 14.70
14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
6.90 20.00 LD_Mix HDT_Mix HHDT
MWT Construction 5 65.00 25.00 0.00
Astronomy Center Construction
5 65.00 25.00 0.00 14.70
14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
6.90 20.00 LD_Mix HDT_Mix HHDT
MWT Grading 4 10.00 0.00 412.00
MWT Site Preparation 2 5.00 0.00 30.00 14.70
14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
6.90 20.00 LD_Mix HDT_Mix HHDT
Baseball Lot Expansion Site
4 10.00 0.00 858.00
Astronomy Center Site Preparation
2 5.00 0.00 24.00 14.70
Worker Trip Length
Vendor Trip Length
Hauling Trip Length
Worker Vehicle Class
Vendor Vehicle Class
Hauling Vehicle Class
Trips and VMT
Phase Name Offroad Equipment Count
Worker Trip Number
Vendor Trip Number
Hauling Trip Number
12 of 40
0.0000 1.4350 1.4350 4.0000e-005
0.0000 1.43589.5000e-004
6.0000e-005
1.0000e-003
2.6000e-004
4.0000e-005
3.0000e-004
Total 4.3000e-004
3.5000e-003
5.8000e-003
2.0000e-005
0.0000 0.6421 0.6421 3.0000e-005
0.0000 0.64277.4000e-004
1.0000e-005
7.5000e-004
2.0000e-004
0.0000 2.0000e-004
Worker 2.1000e-004
3.1000e-004
3.2400e-003
1.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Vendor 0.0000 0.0000 0.0000 0.0000
0.0000 0.7929 0.7929 1.0000e-005
0.0000 0.79312.1000e-004
5.0000e-005
2.5000e-004
6.0000e-005
4.0000e-005
1.0000e-004
Hauling 2.2000e-004
3.1900e-003
2.5600e-003
1.0000e-005
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 15.0427 15.0427
PM2.5 Total
Bio- CO2 NBio- CO2
4.6100e-003
0.0000 15.13950.0855 0.0114 0.0969 0.0452 0.0105 0.0556Total 0.0204 0.2192 0.1665 1.6000e-004
0.0000 15.0427 15.0427 4.6100e-003
0.0000 15.13950.0114 0.0114 0.0105 0.0105Off-Road 0.0204 0.2192 0.1665 1.6000e-004
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0855 0.0000 0.0855 0.0452 0.0000 0.0452Fugitive Dust
CO2e
Category tons/yr MT/yr
Exhaust PM10
PM10 Total
Water Exposed Area
3.2 Astronomy Center Site Preparation - 2017Unmitigated Construction On-Site
ROG NBio- CO2 Total CO2 CH4 N2ONOx CO SO2 Fugitive PM10
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2
3.1 Mitigation Measures Construction
13 of 40
0.0000 86.2569 86.2569 0.0264 0.0000 86.81190.2442 0.0625 0.3067 0.1314 0.0575 0.1889Total 0.1115 1.1808 0.8134 9.3000e-004
0.0000 86.2569 86.2569 0.0264 0.0000 86.81190.0625 0.0625 0.0575 0.0575Off-Road 0.1115 1.1808 0.8134 9.3000e-004
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.2442 0.0000 0.2442 0.1314 0.0000 0.1314Fugitive Dust
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 1.4350 1.4350
PM2.5 T t l
Bio- CO2 NBio- CO2
3.3 Baseball Lot Expansion Site Preparation - 2017
4.0000e-005
0.0000 1.43589.5000e-004
6.0000e-005
1.0000e-003
2.6000e-004
4.0000e-005
3.0000e-004
Total 4.3000e-004
3.5000e-003
5.8000e-003
2.0000e-005
0.0000 0.6421 0.6421 3.0000e-005
0.0000 0.64277.4000e-004
1.0000e-005
7.5000e-004
2.0000e-004
0.0000 2.0000e-004
Worker 2.1000e-004
3.1000e-004
3.2400e-003
1.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Vendor 0.0000 0.0000 0.0000 0.0000
0.0000 0.7929 0.7929 1.0000e-005
0.0000 0.79312.1000e-004
5.0000e-005
2.5000e-004
6.0000e-005
4.0000e-005
1.0000e-004
Hauling 2.2000e-004
3.1900e-003
2.5600e-003
1.0000e-005
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 15.0426 15.0426
PM2.5 T t l
Bio- CO2 NBio- CO2
4.6100e-003
0.0000 15.13940.0334 0.0114 0.0447 0.0176 0.0105 0.0281Total 0.0204 0.2192 0.1665 1.6000e-004
0.0000 15.0426 15.0426 4.6100e-003
0.0000 15.13940.0114 0.0114 0.0105 0.0105Off-Road 0.0204 0.2192 0.1665 1.6000e-004
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0334 0.0000 0.0334 0.0176 0.0000 0.0176Fugitive Dust
Total CO2 CH4 N2O CO2eCategory tons/yr MT/yr
PM10 Fugitive Exhaust
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive Exhaust PM2.5 Bio- CO2 NBio- CO2
14 of 40
0.0000 32.1045 32.1045 3.8000e-004
0.0000 32.11240.0117 1.6600e-003
0.0134 3.1700e-003
1.5300e-003
4.7000e-003
Total 8.9400e-003
0.1159 0.1107 3.7000e-004
0.0000 3.7573 3.7573 1.8000e-004
0.0000 3.76114.3400e-003
3.0000e-005
4.3700e-003
1.1500e-003
3.0000e-005
1.1800e-003
Worker 1.2300e-003
1.8200e-003
0.0190 5.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Vendor 0.0000 0.0000 0.0000 0.0000
0.0000 28.3471 28.3471 2.0000e-004
0.0000 28.35147.3600e-003
1.6300e-003
8.9900e-003
2.0200e-003
1.5000e-003
3.5200e-003
Hauling 7.7100e-003
0.1141 0.0917 3.2000e-004
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 86.2568 86.2568
PM2.5 T t l
Bio- CO2 NBio- CO2
0.0264 0.0000 86.81180.0953 0.0625 0.1577 0.0513 0.0575 0.1087Total 0.1115 1.1808 0.8134 9.3000e-004
0.0000 86.2568 86.2568 0.0264 0.0000 86.81180.0625 0.0625 0.0575 0.0575Off-Road 0.1115 1.1808 0.8134 9.3000e-004
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0953 0.0000 0.0953 0.0513 0.0000 0.0513Fugitive Dust
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 32.1045 32.1045
PM2.5 T t l
Bio- CO2 NBio- CO2
3.8000e-004
0.0000 32.11240.0117 1.6600e-003
0.0134 3.1700e-003
1.5300e-003
4.7000e-003
Total 8.9400e-003
0.1159 0.1107 3.7000e-004
0.0000 3.7573 3.7573 1.8000e-004
0.0000 3.76114.3400e-003
3.0000e-005
4.3700e-003
1.1500e-003
3.0000e-005
1.1800e-003
Worker 1.2300e-003
1.8200e-003
0.0190 5.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Vendor 0.0000 0.0000 0.0000 0.0000
0.0000 28.3471 28.3471 2.0000e-004
0.0000 28.35147.3600e-003
1.6300e-003
8.9900e-003
2.0200e-003
1.5000e-003
3.5200e-003
Hauling 7.7100e-003
0.1141 0.0917 3.2000e-004
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM2.5 T t l
Bio- CO2 NBio- CO2
15 of 40
0.0000 8.3570 8.3570 2.5600e-003
0.0000 8.41080.0193 6.3100e-003
0.0256 9.8600e-003
5.8100e-003
0.0157Total 0.0113 0.1218 0.0925 9.0000e-005
0.0000 8.3570 8.3570 2.5600e-003
0.0000 8.41086.3100e-003
6.3100e-003
5.8100e-003
5.8100e-003
Off-Road 0.0113 0.1218 0.0925 9.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0193 0.0000 0.0193 9.8600e-003
0.0000 9.8600e-003
Fugitive Dust
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 1.3479 1.3479
PM2.5 T t l
Bio- CO2 NBio- CO2
3.0000e-005
0.0000 1.34846.7000e-004
6.0000e-005
7.2000e-004
1.8000e-004
5.0000e-005
2.3000e-004
Total 3.9000e-004
4.1600e-003
5.0100e-003
1.0000e-005
0.0000 0.3567 0.3567 2.0000e-005
0.0000 0.35714.1000e-004
0.0000 4.1000e-004
1.1000e-004
0.0000 1.1000e-004
Worker 1.2000e-004
1.7000e-004
1.8000e-003
0.0000
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Vendor 0.0000 0.0000 0.0000 0.0000
0.0000 0.9912 0.9912 1.0000e-005
0.0000 0.99132.6000e-004
6.0000e-005
3.1000e-004
7.0000e-005
5.0000e-005
1.2000e-004
Hauling 2.7000e-004
3.9900e-003
3.2100e-003
1.0000e-005
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 8.3570 8.3570
PM2.5 T t l
Bio- CO2 NBio- CO2
2.5600e-003
0.0000 8.41080.0494 6.3100e-003
0.0557 0.0253 5.8100e-003
0.0311Total 0.0113 0.1218 0.0925 9.0000e-005
0.0000 8.3570 8.3570 2.5600e-003
0.0000 8.41086.3100e-003
6.3100e-003
5.8100e-003
5.8100e-003
Off-Road 0.0113 0.1218 0.0925 9.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0494 0.0000 0.0494 0.0253 0.0000 0.0253Fugitive Dust
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM2.5 T t l
Bio- CO2 NBio- CO2
3.4 MWT Site Preparation - 2017
16 of 40
0.0000 14.8485 14.8485 1.6000e-004
0.0000 14.85184.9600e-003
7.9000e-004
5.7600e-003
1.3500e-003
7.3000e-004
2.0800e-003
Total 4.1000e-003
0.0554 0.0503 1.7000e-004
0.0000 1.2366 1.2366 6.0000e-005
0.0000 1.23781.4300e-003
1.0000e-005
1.4400e-003
3.8000e-004
1.0000e-005
3.9000e-004
Worker 4.0000e-004
6.0000e-004
6.2400e-003
2.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Vendor 0.0000 0.0000 0.0000 0.0000
0.0000 13.6119 13.6119 1.0000e-004
0.0000 13.61403.5300e-003
7.8000e-004
4.3200e-003
9.7000e-004
7.2000e-004
1.6900e-003
Hauling 3.7000e-003
0.0548 0.0440 1.5000e-004
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 26.1069 26.1069
PM2.5 T t l
Bio- CO2 NBio- CO2
8.0000e-003
0.0000 26.27490.0756 0.0187 0.0943 0.0384 0.0172 0.0556Total 0.0332 0.3515 0.2437 2.8000e-004
0.0000 26.1069 26.1069 8.0000e-003
0.0000 26.27490.0187 0.0187 0.0172 0.0172Off-Road 0.0332 0.3515 0.2437 2.8000e-004
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0756 0.0000 0.0756 0.0384 0.0000 0.0384Fugitive Dust
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 1.3479 1.3479
PM2.5 T t l
Bio- CO2 NBio- CO2
3.5 MWT Grading - 2017
3.0000e-005
0.0000 1.34846.7000e-004
6.0000e-005
7.2000e-004
1.8000e-004
5.0000e-005
2.3000e-004
Total 3.9000e-004
4.1600e-003
5.0100e-003
1.0000e-005
0.0000 0.3567 0.3567 2.0000e-005
0.0000 0.35714.1000e-004
0.0000 4.1000e-004
1.1000e-004
0.0000 1.1000e-004
Worker 1.2000e-004
1.7000e-004
1.8000e-003
0.0000
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Vendor 0.0000 0.0000 0.0000 0.0000
0.0000 0.9912 0.9912 1.0000e-005
0.0000 0.99132.6000e-004
6.0000e-005
3.1000e-004
7.0000e-005
5.0000e-005
1.2000e-004
Hauling 2.7000e-004
3.9900e-003
3.2100e-003
1.0000e-005
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM2.5 T t l
Bio- CO2 NBio- CO2
17 of 40
0.0000 36.1354 36.1354 7.8200e-003
0.0000 36.29970.0243 0.0243 0.0231 0.0231Total 0.0478 0.3921 0.2574 4.1000e-004
0.0000 36.1354 36.1354 7.8200e-003
0.0000 36.29970.0243 0.0243 0.0231 0.0231Off-Road 0.0478 0.3921 0.2574 4.1000e-004
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 14.8485 14.8485
PM2.5 T t l
Bio- CO2 NBio- CO2
3.6 Astronomy Center Construction - 2017
1.6000e-004
0.0000 14.85184.9600e-003
7.9000e-004
5.7600e-003
1.3500e-003
7.3000e-004
2.0800e-003
Total 4.1000e-003
0.0554 0.0503 1.7000e-004
0.0000 1.2366 1.2366 6.0000e-005
0.0000 1.23781.4300e-003
1.0000e-005
1.4400e-003
3.8000e-004
1.0000e-005
3.9000e-004
Worker 4.0000e-004
6.0000e-004
6.2400e-003
2.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Vendor 0.0000 0.0000 0.0000 0.0000
0.0000 13.6119 13.6119 1.0000e-004
0.0000 13.61403.5300e-003
7.8000e-004
4.3200e-003
9.7000e-004
7.2000e-004
1.6900e-003
Hauling 3.7000e-003
0.0548 0.0440 1.5000e-004
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 26.1069 26.1069
PM2.5 T t l
Bio- CO2 NBio- CO2
8.0000e-003
0.0000 26.27480.0295 0.0187 0.0482 0.0150 0.0172 0.0322Total 0.0332 0.3515 0.2437 2.8000e-004
0.0000 26.1069 26.1069 8.0000e-003
0.0000 26.27480.0187 0.0187 0.0172 0.0172Off-Road 0.0332 0.3515 0.2437 2.8000e-004
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0295 0.0000 0.0295 0.0150 0.0000 0.0150Fugitive Dust
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM2.5 T t l
Bio- CO2 NBio- CO2
18 of 40
0.0000 126.0724 126.0724 0.0273 0.0000 126.64570.0847 0.0847 0.0806 0.0806Total 0.1669 1.3680 0.8982 1.4400e-003
0.0000 126.0724 126.0724 0.0273 0.0000 126.64570.0847 0.0847 0.0806 0.0806Off-Road 0.1669 1.3680 0.8982 1.4400e-003
Category tons/yr MT/yr
Unmitigated Construction On-Site
0.0000 24.7590 24.7590
3.7 MWT Construction - 2017
7.4000e-004
0.0000 24.77440.0195 8.0000e-004
0.0203 5.2500e-003
7.4000e-004
5.9900e-003
Total 9.3800e-003
0.0529 0.1330 3.1000e-004
0.0000 13.9116 13.9116 6.6000e-004
0.0000 13.92540.0161 1.1000e-004
0.0162 4.2600e-003
1.0000e-004
4.3700e-003
Worker 4.5400e-003
6.7200e-003
0.0703 1.9000e-004
0.0000 10.8474 10.8474 8.0000e-005
0.0000 10.84903.4600e-003
6.9000e-004
4.1500e-003
9.9000e-004
6.4000e-004
1.6200e-003
Vendor 4.8400e-003
0.0462 0.0628 1.2000e-004
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Hauling 0.0000 0.0000 0.0000 0.0000
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 36.1354 36.1354
PM2.5 T t l
Bio- CO2 NBio- CO2
7.8200e-003
0.0000 36.29970.0243 0.0243 0.0231 0.0231Total 0.0478 0.3921 0.2574 4.1000e-004
0.0000 36.1354 36.1354 7.8200e-003
0.0000 36.29970.0243 0.0243 0.0231 0.0231Off-Road 0.0478 0.3921 0.2574 4.1000e-004
Category tons/yr MT/yr
Mitigated Construction On-Site
0.0000 24.7590 24.7590 7.4000e-004
0.0000 24.77440.0195 8.0000e-004
0.0203 5.2500e-003
7.4000e-004
5.9900e-003
Total 9.3800e-003
0.0529 0.1330 3.1000e-004
0.0000 13.9116 13.9116 6.6000e-004
0.0000 13.92540.0161 1.1000e-004
0.0162 4.2600e-003
1.0000e-004
4.3700e-003
Worker 4.5400e-003
6.7200e-003
0.0703 1.9000e-004
0.0000 10.8474 10.8474 8.0000e-005
0.0000 10.84903.4600e-003
6.9000e-004
4.1500e-003
9.9000e-004
6.4000e-004
1.6200e-003
Vendor 4.8400e-003
0.0462 0.0628 1.2000e-004
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Hauling 0.0000 0.0000 0.0000 0.0000
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM2.5 T t l
Bio- CO2 NBio- CO2
19 of 40
0.0000 144.8824 144.8824 0.0308 0.0000 145.52830.0834 0.0834 0.0795 0.0795Total 0.1681 1.4114 1.0029 1.6700e-003
0.0000 144.8824 144.8824 0.0308 0.0000 145.52830.0834 0.0834 0.0795 0.0795Off-Road 0.1681 1.4114 1.0029 1.6700e-003
Category tons/yr MT/yr
Unmitigated Construction On-Site
0.0000 86.3813 86.3813
3.7 MWT Construction - 2018
2.5600e-003
0.0000 86.43510.0681 2.8000e-003
0.0709 0.0183 2.5800e-003
0.0209Total 0.0327 0.1845 0.4641 1.0900e-003
0.0000 48.5361 48.5361 2.2900e-003
0.0000 48.58420.0560 3.9000e-004
0.0564 0.0149 3.6000e-004
0.0152Worker 0.0158 0.0235 0.2451 6.7000e-004
0.0000 37.8452 37.8452 2.7000e-004
0.0000 37.85090.0121 2.4100e-003
0.0145 3.4500e-003
2.2200e-003
5.6700e-003
Vendor 0.0169 0.1611 0.2191 4.2000e-004
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Hauling 0.0000 0.0000 0.0000 0.0000Category tons/yr MT/yr
Mitigated Construction Off-Site
0.0000 126.0723 126.0723 0.0273 0.0000 126.64550.0847 0.0847 0.0806 0.0806Total 0.1669 1.3680 0.8982 1.4400e-003
0.0000 126.0723 126.0723 0.0273 0.0000 126.64550.0847 0.0847 0.0806 0.0806Off-Road 0.1669 1.3680 0.8982 1.4400e-003
Category tons/yr MT/yr
Mitigated Construction On-Site
0.0000 86.3813 86.3813 2.5600e-003
0.0000 86.43510.0681 2.8000e-003
0.0709 0.0183 2.5800e-003
0.0209Total 0.0327 0.1845 0.4641 1.0900e-003
0.0000 48.5361 48.5361 2.2900e-003
0.0000 48.58420.0560 3.9000e-004
0.0564 0.0149 3.6000e-004
0.0152Worker 0.0158 0.0235 0.2451 6.7000e-004
0.0000 37.8452 37.8452 2.7000e-004
0.0000 37.85090.0121 2.4100e-003
0.0145 3.4500e-003
2.2200e-003
5.6700e-003
Vendor 0.0169 0.1611 0.2191 4.2000e-004
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Hauling 0.0000 0.0000 0.0000 0.0000
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM2.5 T t l
Bio- CO2 NBio- CO2
20 of 40
0.0000 6.6856 6.6856 2.0500e-003
0.0000 6.72860.0372 5.0500e-003
0.0422 0.0200 4.6500e-003
0.0246Total 9.0400e-003
0.0974 0.0740 7.0000e-005
0.0000 6.6856 6.6856 2.0500e-003
0.0000 6.72865.0500e-003
5.0500e-003
4.6500e-003
4.6500e-003
Off-Road 9.0400e-003
0.0974 0.0740 7.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0372 0.0000 0.0372 0.0200 0.0000 0.0200Fugitive DustCategory tons/yr MT/yr
Unmitigated Construction On-Site
0.0000 97.2814 97.2814
3.8 CU Center Site Preparation - 2017
2.7900e-003
0.0000 97.34000.0789 3.0800e-003
0.0820 0.0212 2.8300e-003
0.0241Total 0.0350 0.1962 0.5020 1.2600e-003
0.0000 54.1550 54.1550 2.4800e-003
0.0000 54.20710.0649 4.5000e-004
0.0654 0.0172 4.1000e-004
0.0177Worker 0.0167 0.0248 0.2596 7.7000e-004
0.0000 43.1263 43.1263 3.1000e-004
0.0000 43.13290.0140 2.6300e-003
0.0166 4.0000e-003
2.4200e-003
6.4200e-003
Vendor 0.0183 0.1713 0.2425 4.9000e-004
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Hauling 0.0000 0.0000 0.0000 0.0000
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 144.8823 144.8823
PM2.5 T t l
Bio- CO2 NBio- CO2
0.0308 0.0000 145.52810.0834 0.0834 0.0795 0.0795Total 0.1681 1.4114 1.0029 1.6700e-003
0.0000 144.8823 144.8823 0.0308 0.0000 145.52810.0834 0.0834 0.0795 0.0795Off-Road 0.1681 1.4114 1.0029 1.6700e-003
Category tons/yr MT/yr
Mitigated Construction On-Site
0.0000 97.2814 97.2814 2.7900e-003
0.0000 97.34000.0789 3.0800e-003
0.0820 0.0212 2.8300e-003
0.0241Total 0.0350 0.1962 0.5020 1.2600e-003
0.0000 54.1550 54.1550 2.4800e-003
0.0000 54.20710.0649 4.5000e-004
0.0654 0.0172 4.1000e-004
0.0177Worker 0.0167 0.0248 0.2596 7.7000e-004
0.0000 43.1263 43.1263 3.1000e-004
0.0000 43.13290.0140 2.6300e-003
0.0166 4.0000e-003
2.4200e-003
6.4200e-003
Vendor 0.0183 0.1713 0.2425 4.9000e-004
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Hauling 0.0000 0.0000 0.0000 0.0000
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM2.5 T t l
Bio- CO2 NBio- CO2
21 of 40
0.0000 0.4836 0.4836 1.0000e-005
0.0000 0.48393.8000e-004
1.0000e-005
3.9000e-004
1.0000e-004
1.0000e-005
1.1000e-004
Total 1.4000e-004
9.4000e-004
2.0800e-003
0.0000
0.0000 0.2854 0.2854 1.0000e-005
0.0000 0.28573.3000e-004
0.0000 3.3000e-004
9.0000e-005
0.0000 9.0000e-005
Worker 9.0000e-005
1.4000e-004
1.4400e-003
0.0000
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Vendor 0.0000 0.0000 0.0000 0.0000
0.0000 0.1982 0.1982 0.0000 0.0000 0.19835.0000e-005
1.0000e-005
6.0000e-005
1.0000e-005
1.0000e-005
2.0000e-005
Hauling 5.0000e-005
8.0000e-004
6.4000e-004
0.0000
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 6.6856 6.6856
PM2.5 T t l
Bio- CO2 NBio- CO2
2.0500e-003
0.0000 6.72860.0145 5.0500e-003
0.0196 7.7900e-003
4.6500e-003
0.0124Total 9.0400e-003
0.0974 0.0740 7.0000e-005
0.0000 6.6856 6.6856 2.0500e-003
0.0000 6.72865.0500e-003
5.0500e-003
4.6500e-003
4.6500e-003
Off-Road 9.0400e-003
0.0974 0.0740 7.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0145 0.0000 0.0145 7.7900e-003
0.0000 7.7900e-003
Fugitive Dust
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 0.4836 0.4836
PM2.5 T t l
Bio- CO2 NBio- CO2
1.0000e-005
0.0000 0.48393.8000e-004
1.0000e-005
3.9000e-004
1.0000e-004
1.0000e-005
1.1000e-004
Total 1.4000e-004
9.4000e-004
2.0800e-003
0.0000
0.0000 0.2854 0.2854 1.0000e-005
0.0000 0.28573.3000e-004
0.0000 3.3000e-004
9.0000e-005
0.0000 9.0000e-005
Worker 9.0000e-005
1.4000e-004
1.4400e-003
0.0000
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Vendor 0.0000 0.0000 0.0000 0.0000
0.0000 0.1982 0.1982 0.0000 0.0000 0.19835.0000e-005
1.0000e-005
6.0000e-005
1.0000e-005
1.0000e-005
2.0000e-005
Hauling 5.0000e-005
8.0000e-004
6.4000e-004
0.0000
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM2.5 T t l
Bio- CO2 NBio- CO2
22 of 40
0.0000 7.7028 7.7028 2.2000e-004
0.0000 7.70766.0700e-003
2.5000e-004
6.3200e-003
1.6400e-003
2.3000e-004
1.8700e-003
Total 2.9100e-003
0.0165 0.0414 1.0000e-004
0.0000 4.3281 4.3281 2.0000e-004
0.0000 4.33244.9900e-003
3.0000e-005
5.0300e-003
1.3300e-003
3.0000e-005
1.3600e-003
Worker 1.4100e-003
2.0900e-003
0.0219 6.0000e-005
0.0000 3.3747 3.3747 2.0000e-005
0.0000 3.37521.0800e-003
2.2000e-004
1.2900e-003
3.1000e-004
2.0000e-004
5.1000e-004
Vendor 1.5000e-003
0.0144 0.0195 4.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Hauling 0.0000 0.0000 0.0000 0.0000
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 11.2421 11.2421
PM2.5 T t l
Bio- CO2 NBio- CO2
2.4300e-003
0.0000 11.29327.5500e-003
7.5500e-003
7.1900e-003
7.1900e-003
Total 0.0149 0.1220 0.0801 1.3000e-004
0.0000 11.2421 11.2421 2.4300e-003
0.0000 11.29327.5500e-003
7.5500e-003
7.1900e-003
7.1900e-003
Off-Road 0.0149 0.1220 0.0801 1.3000e-004
Category tons/yr MT/yr
Mitigated Construction On-Site
0.0000 7.7028 7.7028 2.2000e-004
0.0000 7.70766.0700e-003
2.5000e-004
6.3200e-003
1.6400e-003
2.3000e-004
1.8700e-003
Total 2.9100e-003
0.0165 0.0414 1.0000e-004
0.0000 4.3281 4.3281 2.0000e-004
0.0000 4.33244.9900e-003
3.0000e-005
5.0300e-003
1.3300e-003
3.0000e-005
1.3600e-003
Worker 1.4100e-003
2.0900e-003
0.0219 6.0000e-005
0.0000 3.3747 3.3747 2.0000e-005
0.0000 3.37521.0800e-003
2.2000e-004
1.2900e-003
3.1000e-004
2.0000e-004
5.1000e-004
Vendor 1.5000e-003
0.0144 0.0195 4.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Hauling 0.0000 0.0000 0.0000 0.0000
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 11.2421 11.2421
PM2.5 T t l
Bio- CO2 NBio- CO2
2.4300e-003
0.0000 11.29327.5500e-003
7.5500e-003
7.1900e-003
7.1900e-003
Total 0.0149 0.1220 0.0801 1.3000e-004
0.0000 11.2421 11.2421 2.4300e-003
0.0000 11.29327.5500e-003
7.5500e-003
7.1900e-003
7.1900e-003
Off-Road 0.0149 0.1220 0.0801 1.3000e-004
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM2.5 T t l
Bio- CO2 NBio- CO2
3.9 CU Center Construction - 2017
23 of 40
0.0000 97.2814 97.2814 2.7900e-003
0.0000 97.34000.0789 3.0800e-003
0.0820 0.0212 2.8300e-003
0.0241Total 0.0350 0.1962 0.5020 1.2600e-003
0.0000 54.1550 54.1550 2.4800e-003
0.0000 54.20710.0649 4.5000e-004
0.0654 0.0172 4.1000e-004
0.0177Worker 0.0167 0.0248 0.2596 7.7000e-004
0.0000 43.1263 43.1263 3.1000e-004
0.0000 43.13290.0140 2.6300e-003
0.0166 4.0000e-003
2.4200e-003
6.4200e-003
Vendor 0.0183 0.1713 0.2425 4.9000e-004
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Hauling 0.0000 0.0000 0.0000 0.0000
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 144.8823 144.8823
PM2.5 T t l
Bio- CO2 NBio- CO2
0.0308 0.0000 145.52810.0834 0.0834 0.0795 0.0795Total 0.1681 1.4114 1.0029 1.6700e-003
0.0000 144.8823 144.8823 0.0308 0.0000 145.52810.0834 0.0834 0.0795 0.0795Off-Road 0.1681 1.4114 1.0029 1.6700e-003
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 97.2814 97.2814
PM2.5 T t l
Bio- CO2 NBio- CO2
2.7900e-003
0.0000 97.34000.0789 3.0800e-003
0.0820 0.0212 2.8300e-003
0.0241Total 0.0350 0.1962 0.5020 1.2600e-003
0.0000 54.1550 54.1550 2.4800e-003
0.0000 54.20710.0649 4.5000e-004
0.0654 0.0172 4.1000e-004
0.0177Worker 0.0167 0.0248 0.2596 7.7000e-004
0.0000 43.1263 43.1263 3.1000e-004
0.0000 43.13290.0140 2.6300e-003
0.0166 4.0000e-003
2.4200e-003
6.4200e-003
Vendor 0.0183 0.1713 0.2425 4.9000e-004
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Hauling 0.0000 0.0000 0.0000 0.0000
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 144.8824 144.8824
PM2.5 T t l
Bio- CO2 NBio- CO2
0.0308 0.0000 145.52830.0834 0.0834 0.0795 0.0795Total 0.1681 1.4114 1.0029 1.6700e-003
0.0000 144.8824 144.8824 0.0308 0.0000 145.52830.0834 0.0834 0.0795 0.0795Off-Road 0.1681 1.4114 1.0029 1.6700e-003
Category tons/yr MT/yr
Unmitigated Construction On-Site
3.9 CU Center Construction - 2018
24 of 40
0.0000 105.8964 105.8964 0.0330 0.0000 106.58870.0997 0.0671 0.1667 0.0512 0.0617 0.1129Total 0.1171 1.2117 0.9360 1.1600e-003
0.0000 105.8964 105.8964 0.0330 0.0000 106.58870.0671 0.0671 0.0617 0.0617Off-Road 0.1171 1.2117 0.9360 1.1600e-003
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0997 0.0000 0.0997 0.0512 0.0000 0.0512Fugitive Dust
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 21.0142 21.0142
PM2.5 T t l
Bio- CO2 NBio- CO2
3.7000e-004
0.0000 21.02180.0106 9.5000e-004
0.0115 2.8400e-003
8.8000e-004
3.7200e-003
Total 5.8400e-003
0.0619 0.0758 2.6000e-004
0.0000 5.3560 5.3560 2.5000e-004
0.0000 5.36116.4200e-003
4.0000e-005
6.4700e-003
1.7100e-003
4.0000e-005
1.7500e-003
Worker 1.6500e-003
2.4500e-003
0.0257 8.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Vendor 0.0000 0.0000 0.0000 0.0000
0.0000 15.6583 15.6583 1.2000e-004
0.0000 15.66074.1300e-003
9.1000e-004
5.0500e-003
1.1300e-003
8.4000e-004
1.9700e-003
Hauling 4.1900e-003
0.0595 0.0502 1.8000e-004
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 105.8965 105.8965
PM2.5 T t l
Bio- CO2 NBio- CO2
0.0330 0.0000 106.58880.2555 0.0671 0.3226 0.1313 0.0617 0.1931Total 0.1171 1.2117 0.9360 1.1600e-003
0.0000 105.8965 105.8965 0.0330 0.0000 106.58880.0671 0.0671 0.0617 0.0617Off-Road 0.1171 1.2117 0.9360 1.1600e-003
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.2555 0.0000 0.2555 0.1313 0.0000 0.1313Fugitive DustCategory tons/yr MT/yr
Unmitigated Construction On-Site
3.10 Dorm Road-District lot const - 2018
25 of 40
0.0000 3.5588 3.5588 1.4000e-004
0.0000 3.56163.5000e-003
7.0000e-005
3.5800e-003
9.3000e-004
6.0000e-005
1.0000e-003
Total 1.0700e-003
4.3400e-003
0.0158 5.0000e-005
0.0000 2.7467 2.7467 1.3000e-004
0.0000 2.74933.2900e-003
2.0000e-005
3.3200e-003
8.7000e-004
2.0000e-005
9.0000e-004
Worker 8.5000e-004
1.2600e-003
0.0132 4.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Vendor 0.0000 0.0000 0.0000 0.0000
0.0000 0.8122 0.8122 1.0000e-005
0.0000 0.81232.1000e-004
5.0000e-005
2.6000e-004
6.0000e-005
4.0000e-005
1.0000e-004
Hauling 2.2000e-004
3.0800e-003
2.6000e-003
1.0000e-005
Total CO2 CH4 N2O CO2eCategory tons/yr MT/yr
PM10 Fugitive Exhaust
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive Exhaust
0.0000 54.3059 54.3059
PM2.5 Bio- CO2 NBio- CO2
0.0169 0.0000 54.66090.1417 0.0344 0.1761 0.0685 0.0317 0.1002Total 0.0601 0.6214 0.4800 5.9000e-004
0.0000 54.3059 54.3059 0.0169 0.0000 54.66090.0344 0.0344 0.0317 0.0317Off-Road 0.0601 0.6214 0.4800 5.9000e-004
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.1417 0.0000 0.1417 0.0685 0.0000 0.0685Fugitive Dust
Total CO2 CH4 N2O CO2eCategory tons/yr MT/yr
PM10 Fugitive Exhaust Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive Exhaust
0.0000 21.0142 21.0142
PM2.5 Bio- CO2 NBio- CO2
3.11 Baseball Lot Expansion Grading - 2018
3.7000e-004
0.0000 21.02180.0106 9.5000e-004
0.0115 2.8400e-003
8.8000e-004
3.7200e-003
Total 5.8400e-003
0.0619 0.0758 2.6000e-004
0.0000 5.3560 5.3560 2.5000e-004
0.0000 5.36116.4200e-003
4.0000e-005
6.4700e-003
1.7100e-003
4.0000e-005
1.7500e-003
Worker 1.6500e-003
2.4500e-003
0.0257 8.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Vendor 0.0000 0.0000 0.0000 0.0000
0.0000 15.6583 15.6583 1.2000e-004
0.0000 15.66074.1300e-003
9.1000e-004
5.0500e-003
1.1300e-003
8.4000e-004
1.9700e-003
Hauling 4.1900e-003
0.0595 0.0502 1.8000e-004
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM2.5 T t l
Bio- CO2 NBio- CO2
26 of 40
0.0000 6.1106 6.1106 1.9000e-003
0.0000 6.15062.8200e-003
2.8200e-003
2.5900e-003
2.5900e-003
Total 7.3500e-003
0.0515 0.0435 7.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000Paving 2.5200e-003
0.0000 6.1106 6.1106 1.9000e-003
0.0000 6.15062.8200e-003
2.8200e-003
2.5900e-003
2.5900e-003
Off-Road 4.8300e-003
0.0515 0.0435 7.0000e-005
Total CO2 CH4 N2O CO2eCategory tons/yr MT/yr
PM10 Fugitive Exhaust ROG NOx CO SO2 Fugitive Exhaust
0.0000 3.5588 3.5588
PM2.5 Bio- CO2 NBio- CO2
3.12 MWT Paving - 2018
1.4000e-004
0.0000 3.56163.5000e-003
7.0000e-005
3.5800e-003
9.3000e-004
6.0000e-005
1.0000e-003
Total 1.0700e-003
4.3400e-003
0.0158 5.0000e-005
0.0000 2.7467 2.7467 1.3000e-004
0.0000 2.74933.2900e-003
2.0000e-005
3.3200e-003
8.7000e-004
2.0000e-005
9.0000e-004
Worker 8.5000e-004
1.2600e-003
0.0132 4.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Vendor 0.0000 0.0000 0.0000 0.0000
0.0000 0.8122 0.8122 1.0000e-005
0.0000 0.81232.1000e-004
5.0000e-005
2.6000e-004
6.0000e-005
4.0000e-005
1.0000e-004
Hauling 2.2000e-004
3.0800e-003
2.6000e-003
1.0000e-005
Total CO2 CH4 N2O CO2eCategory tons/yr MT/yr
PM10 Fugitive Exhaust Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive Exhaust
0.0000 54.3058 54.3058
PM2.5 Bio- CO2 NBio- CO2
0.0169 0.0000 54.66090.0553 0.0344 0.0897 0.0267 0.0317 0.0584Total 0.0601 0.6214 0.4800 5.9000e-004
0.0000 54.3058 54.3058 0.0169 0.0000 54.66090.0344 0.0344 0.0317 0.0317Off-Road 0.0601 0.6214 0.4800 5.9000e-004
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0553 0.0000 0.0553 0.0267 0.0000 0.0267Fugitive Dust
Total CO2 CH4 N2O CO2eCategory tons/yr MT/yr
PM10 Fugitive Exhaust
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive Exhaust PM2.5 Bio- CO2 NBio- CO2
27 of 40
0.0000 0.4395 0.4395 2.0000e-005
0.0000 0.43995.3000e-004
0.0000 5.3000e-004
1.4000e-004
0.0000 1.4000e-004
Total 1.4000e-004
2.0000e-004
2.1100e-003
1.0000e-005
0.0000 0.4395 0.4395 2.0000e-005
0.0000 0.43995.3000e-004
0.0000 5.3000e-004
1.4000e-004
0.0000 1.4000e-004
Worker 1.4000e-004
2.0000e-004
2.1100e-003
1.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Vendor 0.0000 0.0000 0.0000 0.0000
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Hauling 0.0000 0.0000 0.0000 0.0000
Total CO2 CH4 N2O CO2eCategory tons/yr MT/yr
PM10 Fugitive Exhaust
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive Exhaust
0.0000 6.1106 6.1106
PM2.5 Bio- CO2 NBio- CO2
1.9000e-003
0.0000 6.15062.8200e-003
2.8200e-003
2.5900e-003
2.5900e-003
Total 7.3500e-003
0.0515 0.0435 7.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000Paving 2.5200e-003
0.0000 6.1106 6.1106 1.9000e-003
0.0000 6.15062.8200e-003
2.8200e-003
2.5900e-003
2.5900e-003
Off-Road 4.8300e-003
0.0515 0.0435 7.0000e-005
Total CO2 CH4 N2O CO2eCategory tons/yr MT/yr
PM10 Fugitive Exhaust
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive Exhaust
0.0000 0.4395 0.4395
PM2.5 Bio- CO2 NBio- CO2
2.0000e-005
0.0000 0.43995.3000e-004
0.0000 5.3000e-004
1.4000e-004
0.0000 1.4000e-004
Total 1.4000e-004
2.0000e-004
2.1100e-003
1.0000e-005
0.0000 0.4395 0.4395 2.0000e-005
0.0000 0.43995.3000e-004
0.0000 5.3000e-004
1.4000e-004
0.0000 1.4000e-004
Worker 1.4000e-004
2.0000e-004
2.1100e-003
1.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Vendor 0.0000 0.0000 0.0000 0.0000
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Hauling 0.0000 0.0000 0.0000 0.0000
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
28 of 40
0.0000 3.0553 3.0553 9.5000e-004
0.0000 3.07531.4100e-003
1.4100e-003
1.3000e-003
1.3000e-003
Total 4.9400e-003
0.0257 0.0217 3.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000Paving 2.5200e-003
0.0000 3.0553 3.0553 9.5000e-004
0.0000 3.07531.4100e-003
1.4100e-003
1.3000e-003
1.3000e-003
Off-Road 2.4200e-003
0.0257 0.0217 3.0000e-005
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 0.2197 0.2197
PM2.5 T t l
Bio- CO2 NBio- CO2
1.0000e-005
0.0000 0.21992.6000e-004
0.0000 2.7000e-004
7.0000e-005
0.0000 7.0000e-005
Total 7.0000e-005
1.0000e-004
1.0500e-003
0.0000
0.0000 0.2197 0.2197 1.0000e-005
0.0000 0.21992.6000e-004
0.0000 2.7000e-004
7.0000e-005
0.0000 7.0000e-005
Worker 7.0000e-005
1.0000e-004
1.0500e-003
0.0000
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Vendor 0.0000 0.0000 0.0000 0.0000
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Hauling 0.0000 0.0000 0.0000 0.0000
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 3.0553 3.0553
PM2.5 T t l
Bio- CO2 NBio- CO2
9.5000e-004
0.0000 3.07531.4100e-003
1.4100e-003
1.3000e-003
1.3000e-003
Total 4.9400e-003
0.0257 0.0217 3.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000Paving 2.5200e-003
0.0000 3.0553 3.0553 9.5000e-004
0.0000 3.07531.4100e-003
1.4100e-003
1.3000e-003
1.3000e-003
Off-Road 2.4200e-003
0.0257 0.0217 3.0000e-005
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM2.5 T t l
Bio- CO2 NBio- CO2
3.13 CU Center Paving - 2018
29 of 40
0.0000 1.2497 1.2497 6.0000e-005
0.0000 1.25091.5000e-003
1.0000e-005
1.5100e-003
4.0000e-004
1.0000e-005
4.1000e-004
Total 3.9000e-004
5.7000e-004
5.9900e-003
2.0000e-005
0.0000 1.2497 1.2497 6.0000e-005
0.0000 1.25091.5000e-003
1.0000e-005
1.5100e-003
4.0000e-004
1.0000e-005
4.1000e-004
Worker 3.9000e-004
5.7000e-004
5.9900e-003
2.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Vendor 0.0000 0.0000 0.0000 0.0000
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Hauling 0.0000 0.0000 0.0000 0.0000
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 2.6809 2.6809
PM2.5 T t l
Bio- CO2 NBio- CO2
2.5000e-004
0.0000 2.68631.5800e-003
1.5800e-003
1.5800e-003
1.5800e-003
Total 0.2211 0.0211 0.0195 3.0000e-005
0.0000 2.6809 2.6809 2.5000e-004
0.0000 2.68631.5800e-003
1.5800e-003
1.5800e-003
1.5800e-003
Off-Road 3.1400e-003
0.0211 0.0195 3.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000Archit. Coating 0.2179
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 0.2197 0.2197
PM2.5 T t l
Bio- CO2 NBio- CO2
3.14 CU Center Architectural Coating - 2018
1.0000e-005
0.0000 0.21992.6000e-004
0.0000 2.7000e-004
7.0000e-005
0.0000 7.0000e-005
Total 7.0000e-005
1.0000e-004
1.0500e-003
0.0000
0.0000 0.2197 0.2197 1.0000e-005
0.0000 0.21992.6000e-004
0.0000 2.7000e-004
7.0000e-005
0.0000 7.0000e-005
Worker 7.0000e-005
1.0000e-004
1.0500e-003
0.0000
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Vendor 0.0000 0.0000 0.0000 0.0000
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Hauling 0.0000 0.0000 0.0000 0.0000
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM2.5 T t l
Bio- CO2 NBio- CO2
30 of 40
0.0000 1.9149 1.9149 1.8000e-004
0.0000 1.91881.1300e-003
1.1300e-003
1.1300e-003
1.1300e-003
Total 0.2202 0.0150 0.0139 2.0000e-005
0.0000 1.9149 1.9149 1.8000e-004
0.0000 1.91881.1300e-003
1.1300e-003
1.1300e-003
1.1300e-003
Off-Road 2.2400e-003
0.0150 0.0139 2.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000Archit. Coating 0.2179
Total CO2 CH4 N2O CO2eCategory tons/yr MT/yr
PM10 Fugitive Exhaust ROG NOx CO SO2 Fugitive Exhaust
0.0000 1.2497 1.2497
PM2.5 Bio- CO2 NBio- CO2
3.15 MWT Architectural Coating - 2018
6.0000e-005
0.0000 1.25091.5000e-003
1.0000e-005
1.5100e-003
4.0000e-004
1.0000e-005
4.1000e-004
Total 3.9000e-004
5.7000e-004
5.9900e-003
2.0000e-005
0.0000 1.2497 1.2497 6.0000e-005
0.0000 1.25091.5000e-003
1.0000e-005
1.5100e-003
4.0000e-004
1.0000e-005
4.1000e-004
Worker 3.9000e-004
5.7000e-004
5.9900e-003
2.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Vendor 0.0000 0.0000 0.0000 0.0000
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Hauling 0.0000 0.0000 0.0000 0.0000
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 2.6809 2.6809
PM2.5 T t l
Bio- CO2 NBio- CO2
2.5000e-004
0.0000 2.68631.5800e-003
1.5800e-003
1.5800e-003
1.5800e-003
Total 0.2211 0.0211 0.0195 3.0000e-005
0.0000 2.6809 2.6809 2.5000e-004
0.0000 2.68631.5800e-003
1.5800e-003
1.5800e-003
1.5800e-003
Off-Road 3.1400e-003
0.0211 0.0195 3.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000Archit. Coating 0.2179
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM2.5 T t l
Bio- CO2 NBio- CO2
31 of 40
0.0000 0.8927 0.8927 4.0000e-005
0.0000 0.89351.0700e-003
1.0000e-005
1.0800e-003
2.8000e-004
1.0000e-005
2.9000e-004
Total 2.8000e-004
4.1000e-004
4.2800e-003
1.0000e-005
0.0000 0.8927 0.8927 4.0000e-005
0.0000 0.89351.0700e-003
1.0000e-005
1.0800e-003
2.8000e-004
1.0000e-005
2.9000e-004
Worker 2.8000e-004
4.1000e-004
4.2800e-003
1.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Vendor 0.0000 0.0000 0.0000 0.0000
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Hauling 0.0000 0.0000 0.0000 0.0000
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 1.9149 1.9149
PM2.5 T t l
Bio- CO2 NBio- CO2
1.8000e-004
0.0000 1.91881.1300e-003
1.1300e-003
1.1300e-003
1.1300e-003
Total 0.2202 0.0150 0.0139 2.0000e-005
0.0000 1.9149 1.9149 1.8000e-004
0.0000 1.91881.1300e-003
1.1300e-003
1.1300e-003
1.1300e-003
Off-Road 2.2400e-003
0.0150 0.0139 2.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000Archit. Coating 0.2179
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 0.8927 0.8927
PM2.5 T t l
Bio- CO2 NBio- CO2
4.0000e-005
0.0000 0.89351.0700e-003
1.0000e-005
1.0800e-003
2.8000e-004
1.0000e-005
2.9000e-004
Total 2.8000e-004
4.1000e-004
4.2800e-003
1.0000e-005
0.0000 0.8927 0.8927 4.0000e-005
0.0000 0.89351.0700e-003
1.0000e-005
1.0800e-003
2.8000e-004
1.0000e-005
2.9000e-004
Worker 2.8000e-004
4.1000e-004
4.2800e-003
1.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Vendor 0.0000 0.0000 0.0000 0.0000
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Hauling 0.0000 0.0000 0.0000 0.0000
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM2.5 T t l
Bio- CO2 NBio- CO2
32 of 40
0.0000 24.4425 24.4425 7.6100e-003
0.0000 24.60230.0113 0.0113 0.0104 0.0104Total 0.0219 0.2060 0.1739 2.7000e-004
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000Paving 2.5200e-003
0.0000 24.4425 24.4425 7.6100e-003
0.0000 24.60230.0113 0.0113 0.0104 0.0104Off-Road 0.0193 0.2060 0.1739 2.7000e-004
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 1.6480 1.6480
PM2.5 T t l
Bio- CO2 NBio- CO2
8.0000e-005
0.0000 1.64961.9800e-003
1.0000e-005
1.9900e-003
5.2000e-004
1.0000e-005
5.4000e-004
Total 5.1000e-004
7.5000e-004
7.9000e-003
2.0000e-005
0.0000 1.6480 1.6480 8.0000e-005
0.0000 1.64961.9800e-003
1.0000e-005
1.9900e-003
5.2000e-004
1.0000e-005
5.4000e-004
Worker 5.1000e-004
7.5000e-004
7.9000e-003
2.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Vendor 0.0000 0.0000 0.0000 0.0000
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Hauling 0.0000 0.0000 0.0000 0.0000
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 24.4425 24.4425
PM2.5 T t l
Bio- CO2 NBio- CO2
7.6100e-003
0.0000 24.60230.0113 0.0113 0.0104 0.0104Total 0.0219 0.2060 0.1739 2.7000e-004
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000Paving 2.5200e-003
0.0000 24.4425 24.4425 7.6100e-003
0.0000 24.60230.0113 0.0113 0.0104 0.0104Off-Road 0.0193 0.2060 0.1739 2.7000e-004
Total CO2 CH4 N2O CO2eCategory tons/yr MT/yr
PM10 Fugitive Exhaust ROG NOx CO SO2 Fugitive Exhaust PM2.5 Bio- CO2 NBio- CO2
3.16 Baseball Lot Expansion Paving - 2018
33 of 40
0.0000 14.5706 14.5706 4.6100e-003
0.0000 14.66740.0886 8.9700e-003
0.0975 0.0455 8.2600e-003
0.0538Total 0.0170 0.1808 0.1463 1.6000e-004
0.0000 14.5706 14.5706 4.6100e-003
0.0000 14.66748.9700e-003
8.9700e-003
8.2600e-003
8.2600e-003
Off-Road 0.0170 0.1808 0.1463 1.6000e-004
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0886 0.0000 0.0886 0.0455 0.0000 0.0455Fugitive Dust
Total CO2 CH4 N2O CO2eCategory tons/yr MT/yr
PM10 Fugitive Exhaust ROG NOx CO SO2 Fugitive Exhaust
0.0000 1.6480 1.6480
PM2.5 Bio- CO2 NBio- CO2
3.17 Field Locker Rooms Site Preparation - 2019
8.0000e-005
0.0000 1.64961.9800e-003
1.0000e-005
1.9900e-003
5.2000e-004
1.0000e-005
5.4000e-004
Total 5.1000e-004
7.5000e-004
7.9000e-003
2.0000e-005
0.0000 1.6480 1.6480 8.0000e-005
0.0000 1.64961.9800e-003
1.0000e-005
1.9900e-003
5.2000e-004
1.0000e-005
5.4000e-004
Worker 5.1000e-004
7.5000e-004
7.9000e-003
2.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Vendor 0.0000 0.0000 0.0000 0.0000
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Hauling 0.0000 0.0000 0.0000 0.0000
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM2.5 T t l
Bio- CO2 NBio- CO2
34 of 40
0.0000 26.2210 26.2210 2.3000e-004
0.0000 26.22577.6000e-003
1.5000e-003
9.1000e-003
2.0800e-003
1.3700e-003
3.4500e-003
Total 6.9100e-003
0.0932 0.0834 3.0000e-004
0.0000 0.5987 0.5987 3.0000e-005
0.0000 0.59937.4000e-004
1.0000e-005
7.5000e-004
2.0000e-004
0.0000 2.0000e-004
Worker 1.8000e-004
2.6000e-004
2.7600e-003
1.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Vendor 0.0000 0.0000 0.0000 0.0000
0.0000 25.6223 25.6223 2.0000e-004
0.0000 25.62646.8600e-003
1.4900e-003
8.3500e-003
1.8800e-003
1.3700e-003
3.2500e-003
Hauling 6.7300e-003
0.0929 0.0807 2.9000e-004
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 14.5706 14.5706
PM2.5 T t l
Bio- CO2 NBio- CO2
4.6100e-003
0.0000 14.66740.0345 8.9700e-003
0.0435 0.0177 8.2600e-003
0.0260Total 0.0170 0.1808 0.1463 1.6000e-004
0.0000 14.5706 14.5706 4.6100e-003
0.0000 14.66748.9700e-003
8.9700e-003
8.2600e-003
8.2600e-003
Off-Road 0.0170 0.1808 0.1463 1.6000e-004
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0345 0.0000 0.0345 0.0177 0.0000 0.0177Fugitive Dust
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 26.2210 26.2210
PM2.5 T t l
Bio- CO2 NBio- CO2
2.3000e-004
0.0000 26.22577.6000e-003
1.5000e-003
9.1000e-003
2.0800e-003
1.3700e-003
3.4500e-003
Total 6.9100e-003
0.0932 0.0834 3.0000e-004
0.0000 0.5987 0.5987 3.0000e-005
0.0000 0.59937.4000e-004
1.0000e-005
7.5000e-004
2.0000e-004
0.0000 2.0000e-004
Worker 1.8000e-004
2.6000e-004
2.7600e-003
1.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Vendor 0.0000 0.0000 0.0000 0.0000
0.0000 25.6223 25.6223 2.0000e-004
0.0000 25.62646.8600e-003
1.4900e-003
8.3500e-003
1.8800e-003
1.3700e-003
3.2500e-003
Hauling 6.7300e-003
0.0929 0.0807 2.9000e-004
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM2.5 T t l
Bio- CO2 NBio- CO2
35 of 40
0.0000 123.9067 123.9067 0.0258 0.0000 124.44790.0621 0.0621 0.0592 0.0592Total 0.1275 1.1004 0.8401 1.4400e-003
0.0000 123.9067 123.9067 0.0258 0.0000 124.44790.0621 0.0621 0.0592 0.0592Off-Road 0.1275 1.1004 0.8401 1.4400e-003
Category tons/yr MT/yr
Mitigated Construction On-Site
0.0000 81.9436 81.9436 2.3100e-003
0.0000 81.99220.0681 2.5100e-003
0.0706 0.0183 2.3100e-003
0.0206Total 0.0282 0.1569 0.4080 1.0900e-003
0.0000 45.2583 45.2583 2.0400e-003
0.0000 45.30120.0560 3.9000e-004
0.0564 0.0149 3.6000e-004
0.0152Worker 0.0135 0.0198 0.2086 6.7000e-004
0.0000 36.6854 36.6854 2.7000e-004
0.0000 36.69100.0121 2.1200e-003
0.0142 3.4500e-003
1.9500e-003
5.4000e-003
Vendor 0.0147 0.1370 0.1994 4.2000e-004
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Hauling 0.0000 0.0000 0.0000 0.0000
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 123.9069 123.9069
PM2.5 T t l
Bio- CO2 NBio- CO2
0.0258 0.0000 124.44810.0621 0.0621 0.0592 0.0592Total 0.1275 1.1004 0.8401 1.4400e-003
0.0000 123.9069 123.9069 0.0258 0.0000 124.44810.0621 0.0621 0.0592 0.0592Off-Road 0.1275 1.1004 0.8401 1.4400e-003
Total CO2 CH4 N2O CO2eCategory tons/yr MT/yr
PM10 Fugitive Exhaust ROG NOx CO SO2 Fugitive Exhaust PM2.5 Bio- CO2 NBio- CO2
3.18 Field Locker Rooms Construction - 2019
36 of 40
0.0000 0.2129 0.2129 1.0000e-005
0.0000 0.21312.6000e-004
0.0000 2.7000e-004
7.0000e-005
0.0000 7.0000e-005
Total 6.0000e-005
9.0000e-005
9.8000e-004
0.0000
0.0000 0.2129 0.2129 1.0000e-005
0.0000 0.21312.6000e-004
0.0000 2.7000e-004
7.0000e-005
0.0000 7.0000e-005
Worker 6.0000e-005
9.0000e-005
9.8000e-004
0.0000
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Vendor 0.0000 0.0000 0.0000 0.0000
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Hauling 0.0000 0.0000 0.0000 0.0000
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 3.0059 3.0059
PM2.5 T t l
Bio- CO2 NBio- CO2
9.5000e-004
0.0000 3.02591.2100e-003
1.2100e-003
1.1200e-003
1.1200e-003
Total 4.6600e-003
0.0224 0.0216 3.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000Paving 2.5200e-003
0.0000 3.0059 3.0059 9.5000e-004
0.0000 3.02591.2100e-003
1.2100e-003
1.1200e-003
1.1200e-003
Off-Road 2.1400e-003
0.0224 0.0216 3.0000e-005
Category tons/yr MT/yr
Unmitigated Construction On-Site
0.0000 81.9436 81.9436
3.19 Field Locker Rooms Paving - 2019
2.3100e-003
0.0000 81.99220.0681 2.5100e-003
0.0706 0.0183 2.3100e-003
0.0206Total 0.0282 0.1569 0.4080 1.0900e-003
0.0000 45.2583 45.2583 2.0400e-003
0.0000 45.30120.0560 3.9000e-004
0.0564 0.0149 3.6000e-004
0.0152Worker 0.0135 0.0198 0.2086 6.7000e-004
0.0000 36.6854 36.6854 2.7000e-004
0.0000 36.69100.0121 2.1200e-003
0.0142 3.4500e-003
1.9500e-003
5.4000e-003
Vendor 0.0147 0.1370 0.1994 4.2000e-004
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Hauling 0.0000 0.0000 0.0000 0.0000
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM2.5 T t l
Bio- CO2 NBio- CO2
37 of 40
0.0000 0.2129 0.2129 1.0000e-005
0.0000 0.21312.6000e-004
0.0000 2.7000e-004
7.0000e-005
0.0000 7.0000e-005
Total 6.0000e-005
9.0000e-005
9.8000e-004
0.0000
0.0000 0.2129 0.2129 1.0000e-005
0.0000 0.21312.6000e-004
0.0000 2.7000e-004
7.0000e-005
0.0000 7.0000e-005
Worker 6.0000e-005
9.0000e-005
9.8000e-004
0.0000
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Vendor 0.0000 0.0000 0.0000 0.0000
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Hauling 0.0000 0.0000 0.0000 0.0000
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 3.0059 3.0059
PM2.5 T t l
Bio- CO2 NBio- CO2
9.5000e-004
0.0000 3.02591.2100e-003
1.2100e-003
1.1200e-003
1.1200e-003
Total 4.6600e-003
0.0224 0.0216 3.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000Paving 2.5200e-003
0.0000 3.0059 3.0059 9.5000e-004
0.0000 3.02591.2100e-003
1.2100e-003
1.1200e-003
1.1200e-003
Off-Road 2.1400e-003
0.0224 0.0216 3.0000e-005
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM2.5 T t l
Bio- CO2 NBio- CO2
38 of 40
0.0000 2.5533 2.5533 2.2000e-004
0.0000 2.55781.2900e-003
1.2900e-003
1.2900e-003
1.2900e-003
Total 0.2206 0.0184 0.0184 3.0000e-005
0.0000 2.5533 2.5533 2.2000e-004
0.0000 2.55781.2900e-003
1.2900e-003
1.2900e-003
1.2900e-003
Off-Road 2.6600e-003
0.0184 0.0184 3.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000Archit. Coating 0.2179
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 1.1531 1.1531
PM2.5 T t l
Bio- CO2 NBio- CO2
5.0000e-005
0.0000 1.15421.4300e-003
1.0000e-005
1.4400e-003
3.8000e-004
1.0000e-005
3.9000e-004
Total 3.4000e-004
5.1000e-004
5.3200e-003
2.0000e-005
0.0000 1.1531 1.1531 5.0000e-005
0.0000 1.15421.4300e-003
1.0000e-005
1.4400e-003
3.8000e-004
1.0000e-005
3.9000e-004
Worker 3.4000e-004
5.1000e-004
5.3200e-003
2.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Vendor 0.0000 0.0000 0.0000 0.0000
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Hauling 0.0000 0.0000 0.0000 0.0000
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
0.0000 2.5533 2.5533
PM2.5 T t l
Bio- CO2 NBio- CO2
2.2000e-004
0.0000 2.55781.2900e-003
1.2900e-003
1.2900e-003
1.2900e-003
Total 0.2206 0.0184 0.0184 3.0000e-005
0.0000 2.5533 2.5533 2.2000e-004
0.0000 2.55781.2900e-003
1.2900e-003
1.2900e-003
1.2900e-003
Off-Road 2.6600e-003
0.0184 0.0184 3.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000Archit. Coating 0.2179
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM2.5 T t l
Bio- CO2 NBio- CO2
3.20 Field Locker Rooms Architectural Coatings - 2019
39 of 40
0.0000 1.1531 1.1531 5.0000e-005
0.0000 1.15421.4300e-003
1.0000e-005
1.4400e-003
3.8000e-004
1.0000e-005
3.9000e-004
Total 3.4000e-004
5.1000e-004
5.3200e-003
2.0000e-005
0.0000 1.1531 1.1531 5.0000e-005
0.0000 1.15421.4300e-003
1.0000e-005
1.4400e-003
3.8000e-004
1.0000e-005
3.9000e-004
Worker 3.4000e-004
5.1000e-004
5.3200e-003
2.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Vendor 0.0000 0.0000 0.0000 0.0000
0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000 0.0000Hauling 0.0000 0.0000 0.0000 0.0000
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 T t l
Fugitive PM2 5
Exhaust PM2 5
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM2.5 T t l
Bio- CO2 NBio- CO2
40 of 40
CalEEMod Version: CalEEMod.2013.2.2 Page 1 of 1 Date: 4/17/2016 4:41 PM
Concordia University - Phases 3 & 4 ConstructionOrange County, Annual
1.0 Project Characteristics
1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population
University/College (4Yr) 200.00 Student 5.00 100,300.00 0
Other Non-Asphalt Surfaces 0.50 Acre 0.50 21,780.00 0
Parking Lot 137.00 Space 1.23 54,800.00 0
Unenclosed Parking Structure 0.50 Acre 0.50 21,780.00 0
1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 2.2 Precipitation Freq (Days) 30
Climate Zone 8 Operational Year 2035
Utility Company Southern California Edison
CO2 Intensity (lb/MWhr)
630.89 CH4 Intensity (lb/MWhr)
0.029 N2O Intensity (lb/MWhr)
0.006
1.3 User Entered Comments & Non-Default Data
Project Characteristics -
Land Use - Assumes the construction of 100,300 square feet of new institutional building space, 1.23-acre (137 space) of new parking lot sapce, 0.5 acre of concrete improvements, and 0.5 acre of concrete parking structure for tennis courts.Construction Phase - Construction dates entered to reflect anticipated construction schedule.
Off-road Equipment -
Off-road Equipment -
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Equipment based on grading quantities
1 of 85
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes one trencher.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment -
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes one trencher.
Off-road Equipment -
Off-road Equipment -
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes one excavator.
Off-road Equipment -
Off-road Equipment -
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Equipment based on grading quantities
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment -
Off-road Equipment -
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Off-road Equipment - Assumes one trencher.
Off-road Equipment - Assumes only one of each default equipment type due to small building area.
Trips and VMT - Haul trips per Psomas
Demolition -
Grading - Amount of material imported and exported based on Conceptual Grading Plan.
2 of 85
Architectural Coating - SCAQMD Rule 1113 limits paints to a maximum VOC content of 50 g/L.
Vehicle Trips - Operational emissions are not calculated in this scenario.
Consumer Products - Operational emissions are not calculated in this scenario.
Area Coating - Operational emissions are not calculated in this scenario.
Landscape Equipment - Operational emissions are not calculated in this scenario.
Energy Use - Operational emissions are not calculated in this scenario.
Water And Wastewater - Operational emissions are not calculated in this scenario.
Solid Waste - Operational emissions are not calculated in this scenario.
Construction Off-road Equipment Mitigation - Assumes compliance with SCAQMD Rule 403 for fugitive dust as required.
Table Name Column Name Default Value New Value
tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Exterior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00
tblArchitecturalCoating EF_Nonresidential_Interior 250.00 50.00
tblAreaCoating ReapplicationRatePercent 10 0
tblConstructionPhase NumDays 20.00 53.00
tblConstructionPhase NumDays 20.00 26.00
tblConstructionPhase NumDays 20.00 26.00
tblConstructionPhase NumDays 230.00 366.00
tblConstructionPhase NumDays 230.00 469.00
tblConstructionPhase NumDays 230.00 79.00
tblConstructionPhase NumDays 230.00 92.00
tblConstructionPhase NumDays 230.00 469.00
tblConstructionPhase NumDays 20.00 15.00
tblConstructionPhase NumDays 20.00 26.00
tblConstructionPhase NumDays 20.00 8.00
3 of 85
tblConstructionPhase NumDays 20.00 27.00
tblConstructionPhase NumDays 20.00 25.00
tblConstructionPhase NumDays 20.00 12.00
tblConstructionPhase NumDays 20.00 53.00
tblConstructionPhase NumDays 20.00 6.00
tblConstructionPhase NumDays 20.00 13.00
tblConstructionPhase NumDays 20.00 6.00
tblConstructionPhase NumDays 20.00 6.00
tblConstructionPhase NumDays 10.00 27.00
tblConstructionPhase NumDays 10.00 12.00
tblConstructionPhase NumDays 10.00 26.00
tblConstructionPhase NumDays 10.00 6.00
tblConstructionPhase NumDays 10.00 18.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
4 of 85
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase NumDaysWeek 5.00 6.00
tblConstructionPhase PhaseEndDate 11/7/2026 10/31/2026
tblConstructionPhase PhaseEndDate 12/1/2026 9/30/2026
tblConstructionPhase PhaseEndDate 7/7/2027 6/30/2027
tblConstructionPhase PhaseEndDate 12/16/2026 9/15/2026
tblConstructionPhase PhaseEndDate 3/31/2025 2/28/2025
tblConstructionPhase PhaseEndDate 11/29/2025 11/30/2025
tblConstructionPhase PhaseEndDate 9/22/2026 9/7/2026
tblConstructionPhase PhaseEndDate 10/15/2026 9/30/2026
tblConstructionPhase PhaseEndDate 10/7/2026 6/7/2027
tblConstructionPhase PhaseEndDate 9/14/2026 10/14/2025
tblConstructionPhase PhaseEndDate 6/30/2027 4/30/2026
tblConstructionPhase PhaseEndDate 5/7/2026 4/7/2026
tblConstructionPhase PhaseEndDate 12/13/2025 11/30/2025
tblConstructionPhase PhaseEndDate 6/13/2026 5/31/2026
tblConstructionPhase PhaseEndDate 6/16/2026 5/31/2026
tblConstructionPhase PhaseStartDate 9/8/2026 9/1/2026
5 of 85
tblConstructionPhase PhaseStartDate 11/1/2026 9/1/2026
tblConstructionPhase PhaseStartDate 6/8/2027 6/1/2027
tblConstructionPhase PhaseStartDate 9/1/2026 6/1/2026
tblConstructionPhase PhaseStartDate 10/1/2023 9/1/2023
tblConstructionPhase PhaseStartDate 9/16/2026 9/1/2026
tblConstructionPhase PhaseStartDate 10/1/2026 9/16/2026
tblConstructionPhase PhaseStartDate 10/1/2026 6/1/2027
tblConstructionPhase PhaseStartDate 9/1/2026 10/1/2025
tblConstructionPhase PhaseStartDate 6/1/2027 4/1/2026
tblConstructionPhase PhaseStartDate 5/1/2026 4/1/2026
tblConstructionPhase PhaseStartDate 12/1/2025 11/16/2025
tblConstructionPhase PhaseStartDate 5/15/2026 5/1/2026
tblConstructionPhase PhaseStartDate 6/1/2026 5/15/2026
tblEnergyUse NT24E 2.72 0.00
tblEnergyUse T24E 6.10 0.00
tblGrading AcresOfGrading 13.50 2.00
tblGrading AcresOfGrading 6.50 2.00
tblGrading AcresOfGrading 6.00 1.00
tblGrading AcresOfGrading 26.50 2.00
tblGrading AcresOfGrading 0.00 2.00
tblGrading AcresOfGrading 0.00 2.00
tblGrading AcresOfGrading 0.00 1.50
tblGrading AcresOfGrading 0.00 1.00
tblGrading AcresOfGrading 0.00 2.00
tblGrading MaterialExported 0.00 1,963.00
tblGrading MaterialExported 0.00 23,080.00
tblGrading MaterialExported 0.00 1,963.00
tblGrading MaterialImported 0.00 3,088.00
tblGrading MaterialImported 0.00 580.00
tblGrading MaterialImported 0.00 3,088.00
6 of 85
tblLandUse LandUseSquareFeet 36,759.49 100,300.00
tblLandUse LotAcreage 0.84 5.00
tblOffRoadEquipment HorsePower 80.00 162.00
tblOffRoadEquipment HorsePower 80.00 162.00
tblOffRoadEquipment HorsePower 80.00 162.00
tblOffRoadEquipment LoadFactor 0.50 0.38
tblOffRoadEquipment LoadFactor 0.50 0.38
tblOffRoadEquipment LoadFactor 0.50 0.38
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 2.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 2.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00
7 of 85
tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 2.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 2.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 2.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 1.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 1.00
tblProjectCharacteristics OperationalYear 2014 2035
tblSolidWaste SolidWasteGenerationRate 36.50 0.00
tblTripsAndVMT HaulingTripNumber 631.00 864.00
tblTripsAndVMT HaulingTripNumber 2,958.00 2,522.00
tblTripsAndVMT HaulingTripNumber 0.00 956.00
tblTripsAndVMT HaulingTripNumber 631.00 1,820.00
tblVehicleTrips ST_TR 1.30 0.00
tblVehicleTrips WD_TR 2.38 0.00
tblWater IndoorWaterUseRate 428,220.00 0.00
tblWater OutdoorWaterUseRate 669,780.00 0.00
8 of 85
Exhaust PM10
PM10 Total
2.0 Emissions Summary
2.1 Overall Construction
NBio- CO2 Total CO2
Unmitigated Construction
ROG NOx CO SO2 Fugitive PM10
CH4 N2O CO2e
Year tons/yr MT/yr
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2
2023 0.2229 1.9437 2.4693 4.7800e-003
0.3481 0.0902 0.4383 0.1584 0.0839 0.2423 0.0000 396.9851 396.9851 0.0750 0.0000 398.5595
2024 0.2876 2.3294 3.3850 7.0300e-003
0.1750 0.1015 0.2765 0.0471 0.0954 0.1425 0.0000 560.7784 560.7784 0.0905 0.0000 562.6791
2025 0.6473 2.5502 3.7398 8.0700e-003
0.4397 0.1055 0.5452 0.1861 0.0985 0.2846 0.0000 658.8434 658.8434 0.1060 0.0000 661.0700
2026 1.3238 5.2583 7.9579 0.0168 0.5397 0.2152 0.7548 0.1821 0.2020 0.3841 0.0000 1,341.4958
1,341.4958 0.2178 0.0000 1,346.0686
2027 0.4522 0.9174 1.4097 2.9900e-003
0.0746 0.0374 0.1120 0.0201 0.0352 0.0553 0.0000 237.2206 237.2206 0.0381 0.0000 238.0197
Total 2.9338 12.9990 18.9617 0.0397 0.5273 0.0000 3,206.39691.5770 0.5498 2.1268 0.5938 0.5149 1.1087 0.0000 3,195.3233
3,195.3233
9 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO Total CO2 CH4 N2O CO2e
Year tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
2023 0.2229 1.9436 2.4693 4.7800e-003
0.1865 0.0902 0.2767 0.0755 0.0839 0.1594 0.0000 396.9848 396.9848 0.0750 0.0000 398.5592
2024 0.2876 2.3294 3.3850 7.0300e-003
0.1750 0.1015 0.2765 0.0471 0.0954 0.1425 0.0000 560.7780 560.7780 0.0905 0.0000 562.6786
2025 0.6473 2.5502 3.7398 8.0700e-003
0.2753 0.1055 0.3808 0.1006 0.0985 0.1991 0.0000 658.8429 658.8429 0.1060 0.0000 661.0696
2026 1.3238 5.2583 7.9579 0.0168 0.4576 0.2152 0.6728 0.1376 0.2020 0.3395 0.0000 1,341.4948
1,341.4948 0.2178 0.0000 1,346.0675
2027 0.4522 0.9174 1.4097 2.9900e-003
0.0746 0.0374 0.1120 0.0201 0.0352 0.0553 0.0000 237.2204 237.2204 0.0381 0.0000 238.0195
Total 2.9338 12.9990 18.9617 0.0397 1.1689 0.5498 1.7187 0.3808 0.5149 0.8957 0.0000 3,195.3209
3,195.3209 0.5273 0.0000 3,206.3944
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent Reduction
0.00 0.00 0.00 0.00 25.87 0.00 19.19 35.87 0.00 19.21 0.00 0.00 0.00 0.00 0.00 0.00
3.0 Construction Detail
Construction Phase
Phase Number
Phase Name Phase Type Start Date End Date Num Days Week
Num Days Phase Description
1 SN & CC Site Preparation Site Preparation 5/1/2023 5/31/2023 6 27
2 SN & CC Demolition Demolition 6/1/2023 6/30/2023 6 26
3 SN & CC Grading Grading 7/1/2023 8/31/2023 6 53
4 SN & CC Underground Utilities Trenching 9/1/2023 9/30/2023 6 26
5 SN & CC Construction Building Construction 9/1/2023 2/28/2025 6 469
6 SN & CC Paving Paving 3/1/2025 3/7/2025 6 6
7 SN & CC Architectural Coating Architectural Coating 3/8/2025 3/31/2025 6 20
8 Residence Hall Site Preparation Site Preparation 4/1/2025 4/21/2025 6 18
10 of 85
9 Tennis Courts Demolition Demolition 4/22/2025 4/30/2025 6 8
10 Residence Hall Grading Grading 5/1/2025 5/31/2025 6 27
11 Residence Hall Underground Utilities
Trenching 6/1/2025 6/30/2025 6 25
12 Residence Hall Construction Building Construction 7/1/2025 8/31/2026 6 366
13 AAA Building Site Preparation Site Preparation 10/1/2025 10/14/2025 6 12
14 AAA Building Demolition Demolition 10/15/2025 10/31/2025 6 15
15 AAA Building Grading Grading 11/1/2025 11/30/2025 6 25
16 AAA Building Underground Utilities
Trenching 11/16/2025 11/30/2025 6 12
17 AAA Building Construction Building Construction 12/1/2025 5/31/2027 6 469
18 Tennis Court Deck Site Preparation
Site Preparation 4/1/2026 4/30/2026 6 26
19 Pool & RE Building Site Preparation
Site Preparation 4/1/2026 4/7/2026 6 6
20 Pool & RE Building Demolition Demolition 4/8/2026 4/30/2026 6 20
21 Pool & RE Building Grading Grading 5/1/2026 5/14/2026 6 12
22 Tennis Court Deck Underground Utilities
Trenching 5/1/2026 5/31/2026 6 26
23 Pool & RE Building Underground Utilities
Trenching 5/15/2026 5/31/2026 6 14
24 Tennis Court Deck Construction Building Construction 6/1/2026 8/31/2026 6 79
25 Pool & RE Building Construction Building Construction 6/1/2026 9/15/2026 6 92
26 Residence Hall Paving Paving 9/1/2026 9/7/2026 6 6
27 Residence Hall Architecturaql Coating
Architectural Coating 9/1/2026 10/31/2026 6 53
28 Tennis Court Deck Architectural Coating
Architectural Coating 9/1/2026 9/30/2026 6 26
6
29 Pool & RE Building Paving Paving 9/16/2026 9/30/2026 6
6/30/2027 6
13
30 AAA Building Paving Paving 6/1/2027 6/7/2027 6
26
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 218,256; Non-Residential Outdoor: 72,752 (Architectural Coating –
31 AAA Building Architectural Coating
Architectural Coating 6/1/2027
11 of 85
OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor
SN & CC Site Preparation Rubber Tired Dozers 1 8.00 255 0.40
SN & CC Site Preparation Tractors/Loaders/Backhoes 1 8.00 97 0.37
SN & CC Demolition Concrete/Industrial Saws 1 8.00 81 0.73
SN & CC Demolition Excavators 1 8.00 162 0.38
SN & CC Demolition Rubber Tired Dozers 1 8.00 255 0.40
SN & CC Demolition Tractors/Loaders/Backhoes 1 8.00 97 0.37
SN & CC Grading Excavators 2 8.00 162 0.38
SN & CC Grading Graders 1 8.00 174 0.41
SN & CC Grading Rubber Tired Dozers 1 8.00 255 0.40
SN & CC Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37
SN & CC Underground Utilities Excavators 1 8.00 162 0.38
SN & CC Underground Utilities Graders 1 8.00 174 0.41
SN & CC Underground Utilities Rubber Tired Dozers 1 8.00 255 0.40
SN & CC Underground Utilities Tractors/Loaders/Backhoes 1 8.00 97 0.37
SN & CC Construction Cranes 1 7.00 226 0.29
SN & CC Construction Forklifts 3 8.00 89 0.20
SN & CC Construction Generator Sets 1 8.00 84 0.74
SN & CC Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37
SN & CC Construction Welders 1 8.00 46 0.45
SN & CC Paving Pavers 1 8.00 125 0.42
SN & CC Paving Paving Equipment 1 8.00 130 0.36
SN & CC Paving Rollers 1 8.00 80 0.38
SN & CC Architectural Coating Air Compressors 1 6.00 78 0.48
Residence Hall Site Preparation Rubber Tired Dozers 1 8.00 255 0.40
Residence Hall Site Preparation Tractors/Loaders/Backhoes 1 8.00 97 0.37
Tennis Courts Demolition Concrete/Industrial Saws 1 8.00 81 0.73
Tennis Courts Demolition Excavators 1 8.00 162 0.38
Tennis Courts Demolition Rubber Tired Dozers 1 8.00 255 0.40
12 of 85
Residence Hall Grading Excavators 1 8.00 162 0.38
Residence Hall Grading Graders 1 8.00 174 0.41
Residence Hall Grading Rubber Tired Dozers 1 8.00 255 0.40
Residence Hall Grading Tractors/Loaders/Backhoes 1 8.00 97 0.37
Residence Hall Underground Utilities Excavators 1 8.00 162 0.38
Residence Hall Construction Cranes 1 7.00 226 0.29
Residence Hall Construction Forklifts 3 8.00 89 0.20
Residence Hall Construction Generator Sets 1 8.00 84 0.74
Residence Hall Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37
Residence Hall Construction Welders 1 8.00 46 0.45
AAA Building Site Preparation Rubber Tired Dozers 1 8.00 255 0.40
AAA Building Site Preparation Tractors/Loaders/Backhoes 1 8.00 97 0.37
AAA Building Demolition Concrete/Industrial Saws 1 8.00 81 0.73
AAA Building Demolition Excavators 1 8.00 162 0.38
AAA Building Demolition Rubber Tired Dozers 1 8.00 255 0.40
AAA Building Grading Excavators 2 8.00 162 0.38
AAA Building Grading Graders 1 8.00 174 0.41
AAA Building Grading Rubber Tired Dozers 2 8.00 255 0.40
AAA Building Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37
AAA Building Underground Utilities Trenchers 1 8.00 162 0.38
AAA Building Construction Cranes 1 7.00 226 0.29
AAA Building Construction Forklifts 3 8.00 89 0.20
AAA Building Construction Generator Sets 1 8.00 84 0.74
AAA Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37
AAA Building Construction Welders 1 8.00 46 0.45
Tennis Court Deck Site Preparation Rubber Tired Dozers 1 8.00 255 0.40
Tennis Court Deck Site Preparation Tractors/Loaders/Backhoes 1 8.00 97 0.37
Pool & RE Building Site Preparation Rubber Tired Dozers 1 8.00 255 0.40
Pool & RE Building Site Preparation Tractors/Loaders/Backhoes 1 8.00 97 0.37
Pool & RE Building Demolition Concrete/Industrial Saws 1 8.00 81 0.73
13 of 85
Pool & RE Building Demolition Excavators 1 8.00 162 0.38
Pool & RE Building Demolition Rubber Tired Dozers 1 8.00 255 0.40
Pool & RE Building Grading Excavators 1 8.00 162 0.38
Pool & RE Building Grading Graders 1 8.00 174 0.41
Pool & RE Building Grading Rubber Tired Dozers 1 8.00 255 0.40
Pool & RE Building Grading Tractors/Loaders/Backhoes 1 8.00 97 0.37
Tennis Court Deck Underground Utilities
Trenchers 1 8.00 162 0.38
Pool & RE Building Underground Utilities
Trenchers 1 1.00 162 0.38
Tennis Court Deck Construction Cranes 1 7.00 226 0.29
Tennis Court Deck Construction Forklifts 3 8.00 89 0.20
Tennis Court Deck Construction Generator Sets 1 8.00 84 0.74
Tennis Court Deck Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37
Tennis Court Deck Construction Welders 1 8.00 46 0.45
Pool & RE Building Construction Cranes 1 7.00 226 0.29
Pool & RE Building Construction Forklifts 3 8.00 89 0.20
Pool & RE Building Construction Generator Sets 1 8.00 84 0.74
Pool & RE Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37
Pool & RE Building Construction Welders 1 8.00 46 0.45
Residence Hall Paving Pavers 1 8.00 125 0.42
Residence Hall Paving Paving Equipment 1 8.00 130 0.36
Residence Hall Paving Rollers 1 8.00 80 0.38
Residence Hall Architecturaql Coating Air Compressors 1 6.00 78 0.48
Tennis Court Deck Architectural Coating
Air Compressors 1 6.00 78 0.48
Pool & RE Building Paving Pavers 1 8.00 125 0.42
Pool & RE Building Paving Paving Equipment 1 8.00 130 0.36
Pool & RE Building Paving Rollers 1 8.00 80 0.38
AAA Building Paving Pavers 1 8.00 125 0.42
AAA Building Paving Paving Equipment 1 8.00 130 0.36
AAA Building Paving Rollers 1 8.00 80 0.38
AAA Building Architectural Coating Air Compressors 1 6.00 78 0.48
14 of 85
Trips and VMT
Phase Name Offroad Equipment Count
Worker Trip Number
Vendor Trip Number
Hauling Trip Number
Worker Trip Length
Vendor Trip Length
Hauling Trip Length
Worker Vehicle Class
Vendor Vehicle Class
Hauling Vehicle Class
SN & CC Site Preparation
2 5.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
SN & CC Demolition 4 10.00 0.00 199.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
SN & CC Grading 6 15.00 0.00 1,820.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
SN & CC Underground Utilities
4 10.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
SN & CC Construction 9 83.00 33.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
SN & CC Paving 3 8.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
SN & CC Architectural Coating
1 17.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Residence Hall Site Preparation
2 5.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Tennis Courts Demolition
3 8.00 0.00 2.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Residence Hall Grading
4 10.00 0.00 864.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Residence Hall Underground Utilities
1 3.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Residence Hall Construction
9 83.00 33.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
AAA Building Site Preparation
2 5.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
AAA Building Demolition
3 8.00 0.00 125.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
AAA Building Grading 7 18.00 0.00 2,522.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
AAA Building Underground Utilities
1 3.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
AAA Building Construction
9 83.00 33.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Tennis Court Deck Site Preparation
2 5.00 0.00 956.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Pool & RE Building Site Preparation
2 5.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Pool & RE Building Demolition
3 8.00 0.00 2.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Pool & RE Building Grading
4 10.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Tennis Court Deck Underground Utilities
1 3.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Pool & RE Building Underground Utilities
1 3.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Tennis Court Deck Construction
9 83.00 33.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Pool & RE Building Construction
9 83.00 33.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Residence Hall Paving 3 8.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Residence Hall Architecturaql Coating
1 17.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
15 of 85
Tennis Court Deck Architectural Coating
1 17.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
Pool & RE Building Paving
3 8.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
AAA Building Paving 3 8.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT
LD_Mix HDT_Mix HHDT
3.1 Mitigation Measures Construction
AAA Building Architectural Coating
1 17.00 0.00 0.00 14.70
NOx CO SO2 Fugitive PM10
6.90 20.00
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2
Water Exposed Area
3.2 SN & CC Site Preparation - 2023Unmitigated Construction On-Site
ROG NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust PM10
PM10 Total
Fugitive Dust 0.0824 0.0000 0.0824 0.0448 0.0000 0.0448 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.0129 0.1278 0.1197 1.6000e-004
5.9200e-003
5.9200e-003
5.4400e-003
5.4400e-003
0.0000 14.2570 14.2570 4.6100e-003
0.0000 14.3539
Total 0.0129 0.1278 0.1197 1.6000e-004
4.6100e-003
0.0000 14.35390.0824 5.9200e-003
0.0883 0.0448 5.4400e-003
0.0502
SO2 Fugitive PM10
Exhaust PM10
0.0000 14.2570 14.2570
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 1.5000e-004
2.1000e-004
2.1900e-003
1.0000e-005
7.4000e-004
1.0000e-005
7.5000e-004
2.0000e-004
0.0000 2.0000e-004
0.0000 0.5477 0.5477 2.0000e-005
0.0000 0.5482
Total 1.5000e-004
2.1000e-004
2.1900e-003
1.0000e-005
2.0000e-005
0.0000 0.54827.4000e-004
1.0000e-005
7.5000e-004
2.0000e-004
0.0000 2.0000e-004
0.0000 0.5477 0.5477
16 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 0.0321 0.0000 0.0321 0.0175 0.0000 0.0175 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.0129 0.1278 0.1197 1.6000e-004
5.9200e-003
5.9200e-003
5.4400e-003
5.4400e-003
0.0000 14.2570 14.2570 4.6100e-003
0.0000 14.3539
Total 0.0129 0.1278 0.1197 1.6000e-004
4.6100e-003
0.0000 14.35390.0321 5.9200e-003
0.0380 0.0175 5.4400e-003
0.0229
SO2 Fugitive PM10
Exhaust PM10
0.0000 14.2570 14.2570
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 1.5000e-004
2.1000e-004
2.1900e-003
1.0000e-005
7.4000e-004
1.0000e-005
7.5000e-004
2.0000e-004
0.0000 2.0000e-004
0.0000 0.5477 0.5477 2.0000e-005
0.0000 0.5482
Total 1.5000e-004
2.1000e-004
2.1900e-003
1.0000e-005
2.0000e-005
0.0000 0.54827.4000e-004
1.0000e-005
7.5000e-004
2.0000e-004
0.0000 2.0000e-004
0.0000 0.5477 0.5477
17 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.3 SN & CC Demolition - 2023Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 0.0215 0.0000 0.0215 3.2600e-003
0.0000 3.2600e-003
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.0193 0.1773 0.2062 3.1000e-004
8.3800e-003
8.3800e-003
7.8400e-003
7.8400e-003
0.0000 26.7658 26.7658 6.7400e-003
0.0000 26.9074
Total 0.0193 0.1773 0.2062 3.1000e-004
6.7400e-003
0.0000 26.90740.0215 8.3800e-003
0.0299 3.2600e-003
7.8400e-003
0.0111
SO2 Fugitive PM10
Exhaust PM10
0.0000 26.7658 26.7658
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 1.4000e-003
0.0118 0.0181 7.0000e-005
1.7100e-003
3.6000e-004
2.0700e-003
4.7000e-004
3.3000e-004
8.0000e-004
0.0000 6.1733 6.1733 4.0000e-005
0.0000 6.1742
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 2.8000e-004
4.0000e-004
4.2200e-003
2.0000e-005
1.4300e-003
1.0000e-005
1.4400e-003
3.8000e-004
1.0000e-005
3.9000e-004
0.0000 1.0549 1.0549 4.0000e-005
0.0000 1.0558
Total 1.6800e-003
0.0122 0.0223 9.0000e-005
8.0000e-005
0.0000 7.23003.1400e-003
3.7000e-004
3.5100e-003
8.5000e-004
3.4000e-004
1.1900e-003
0.0000 7.2281 7.2281
18 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 8.4000e-003
0.0000 8.4000e-003
1.2700e-003
0.0000 1.2700e-003
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.0193 0.1773 0.2062 3.1000e-004
8.3800e-003
8.3800e-003
7.8400e-003
7.8400e-003
0.0000 26.7658 26.7658 6.7400e-003
0.0000 26.9073
Total 0.0193 0.1773 0.2062 3.1000e-004
6.7400e-003
0.0000 26.90738.4000e-003
8.3800e-003
0.0168 1.2700e-003
7.8400e-003
9.1100e-003
SO2 Fugitive PM10
Exhaust PM10
0.0000 26.7658 26.7658
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 1.4000e-003
0.0118 0.0181 7.0000e-005
1.7100e-003
3.6000e-004
2.0700e-003
4.7000e-004
3.3000e-004
8.0000e-004
0.0000 6.1733 6.1733 4.0000e-005
0.0000 6.1742
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 2.8000e-004
4.0000e-004
4.2200e-003
2.0000e-005
1.4300e-003
1.0000e-005
1.4400e-003
3.8000e-004
1.0000e-005
3.9000e-004
0.0000 1.0549 1.0549 4.0000e-005
0.0000 1.0558
Total 1.6800e-003
0.0122 0.0223 9.0000e-005
8.0000e-005
0.0000 7.23003.1400e-003
3.7000e-004
3.5100e-003
8.5000e-004
3.4000e-004
1.1900e-003
0.0000 7.2281 7.2281
19 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.4 SN & CC Grading - 2023Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 0.1609 0.0000 0.1609 0.0879 0.0000 0.0879 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.0526 0.4940 0.5861 8.5000e-004
0.0243 0.0243 0.0223 0.0223 0.0000 74.3629 74.3629 0.0241 0.0000 74.8680
Total 0.0526 0.4940 0.5861 8.5000e-004
0.0241 0.0000 74.86800.1609 0.0243 0.1852 0.0879 0.0223 0.1102
SO2 Fugitive PM10
Exhaust PM10
0.0000 74.3629 74.3629
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0128 0.1075 0.1657 6.6000e-004
0.0156 3.2700e-003
0.0189 4.2800e-003
3.0100e-003
7.2900e-003
0.0000 56.4588 56.4588 4.0000e-004
0.0000 56.4672
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 8.6000e-004
1.2100e-003
0.0129 5.0000e-005
4.3600e-003
3.0000e-005
4.3900e-003
1.1600e-003
3.0000e-005
1.1900e-003
0.0000 3.2255 3.2255 1.3000e-004
0.0000 3.2283
Total 0.0137 0.1087 0.1786 7.1000e-004
5.3000e-004
0.0000 59.69560.0200 3.3000e-003
0.0233 5.4400e-003
3.0400e-003
8.4800e-003
0.0000 59.6843 59.6843
20 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 0.0628 0.0000 0.0628 0.0343 0.0000 0.0343 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.0526 0.4940 0.5861 8.5000e-004
0.0243 0.0243 0.0223 0.0223 0.0000 74.3628 74.3628 0.0241 0.0000 74.8679
Total 0.0526 0.4940 0.5861 8.5000e-004
0.0241 0.0000 74.86790.0628 0.0243 0.0870 0.0343 0.0223 0.0566
SO2 Fugitive PM10
Exhaust PM10
0.0000 74.3628 74.3628
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0128 0.1075 0.1657 6.6000e-004
0.0156 3.2700e-003
0.0189 4.2800e-003
3.0100e-003
7.2900e-003
0.0000 56.4588 56.4588 4.0000e-004
0.0000 56.4672
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 8.6000e-004
1.2100e-003
0.0129 5.0000e-005
4.3600e-003
3.0000e-005
4.3900e-003
1.1600e-003
3.0000e-005
1.1900e-003
0.0000 3.2255 3.2255 1.3000e-004
0.0000 3.2283
Total 0.0137 0.1087 0.1786 7.1000e-004
5.3000e-004
0.0000 59.69560.0200 3.3000e-003
0.0233 5.4400e-003
3.0400e-003
8.4800e-003
SO2 Fugitive PM10
Exhaust PM10
0.0000 59.6843 59.6843
PM2.5 Total
Bio- CO2 NBio- CO2
3.5 SN & CC Underground Utilities - 2023Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.0213 0.2017 0.2151 3.1000e-004
9.9000e-003
9.9000e-003
9.1100e-003
9.1100e-003
0.0000 26.8760 26.8760 8.6900e-003
0.0000 27.0586
Total 0.0213 0.2017 0.2151 3.1000e-004
8.6900e-003
0.0000 27.05869.9000e-003
9.9000e-003
9.1100e-003
9.1100e-003
0.0000 26.8760 26.8760
21 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 2.8000e-004
4.0000e-004
4.2200e-003
2.0000e-005
1.4300e-003
1.0000e-005
1.4400e-003
3.8000e-004
1.0000e-005
3.9000e-004
0.0000 1.0549 1.0549 4.0000e-005
0.0000 1.0558
Total 2.8000e-004
4.0000e-004
4.2200e-003
2.0000e-005
4.0000e-005
0.0000 1.05581.4300e-003
1.0000e-005
1.4400e-003
3.8000e-004
1.0000e-005
3.9000e-004
SO2 Fugitive PM10
Exhaust PM10
0.0000 1.0549 1.0549
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.0213 0.2017 0.2151 3.1000e-004
9.9000e-003
9.9000e-003
9.1100e-003
9.1100e-003
0.0000 26.8760 26.8760 8.6900e-003
0.0000 27.0586
Total 0.0213 0.2017 0.2151 3.1000e-004
8.6900e-003
0.0000 27.05869.9000e-003
9.9000e-003
9.1100e-003
9.1100e-003
0.0000 26.8760 26.8760
22 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 2.8000e-004
4.0000e-004
4.2200e-003
2.0000e-005
1.4300e-003
1.0000e-005
1.4400e-003
3.8000e-004
1.0000e-005
3.9000e-004
0.0000 1.0549 1.0549 4.0000e-005
0.0000 1.0558
Total 2.8000e-004
4.0000e-004
4.2200e-003
2.0000e-005
4.0000e-005
0.0000 1.05581.4300e-003
1.0000e-005
1.4400e-003
3.8000e-004
1.0000e-005
3.9000e-004
SO2 Fugitive PM10
Exhaust PM10
0.0000 1.0549 1.0549
PM2.5 Total
Bio- CO2 NBio- CO2
3.6 SN & CC Construction - 2023Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.0814 0.7443 0.8429 1.4000e-003
0.0362 0.0362 0.0341 0.0341 0.0000 120.0392 120.0392 0.0285 0.0000 120.6380
Total 0.0814 0.7443 0.8429 1.4000e-003
0.0285 0.0000 120.63800.0362 0.0362 0.0341 0.0341 0.0000 120.0392 120.0392
23 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0104 0.0639 0.1521 3.7000e-004
0.0106 1.5000e-003
0.0121 3.0200e-003
1.3800e-003
4.4000e-003
0.0000 31.1471 31.1471 2.1000e-004
0.0000 31.1516
Worker 9.3100e-003
0.0132 0.1401 5.7000e-004
0.0474 3.4000e-004
0.0477 0.0126 3.1000e-004
0.0129 0.0000 35.0219 35.0219 1.4600e-003
0.0000 35.0526
Total 0.0197 0.0771 0.2922 9.4000e-004
1.6700e-003
0.0000 66.20420.0580 1.8400e-003
0.0598 0.0156 1.6900e-003
0.0173
SO2 Fugitive PM10
Exhaust PM10
0.0000 66.1690 66.1690
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.0814 0.7443 0.8429 1.4000e-003
0.0362 0.0362 0.0341 0.0341 0.0000 120.0391 120.0391 0.0285 0.0000 120.6378
Total 0.0814 0.7443 0.8429 1.4000e-003
0.0285 0.0000 120.63780.0362 0.0362 0.0341 0.0341 0.0000 120.0391 120.0391
24 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0104 0.0639 0.1521 3.7000e-004
0.0106 1.5000e-003
0.0121 3.0200e-003
1.3800e-003
4.4000e-003
0.0000 31.1471 31.1471 2.1000e-004
0.0000 31.1516
Worker 9.3100e-003
0.0132 0.1401 5.7000e-004
0.0474 3.4000e-004
0.0477 0.0126 3.1000e-004
0.0129 0.0000 35.0219 35.0219 1.4600e-003
0.0000 35.0526
Total 0.0197 0.0771 0.2922 9.4000e-004
1.6700e-003
0.0000 66.20420.0580 1.8400e-003
0.0598 0.0156 1.6900e-003
0.0173
SO2 Fugitive PM10
Exhaust PM10
0.0000 66.1690 66.1690
PM2.5 Total
Bio- CO2 NBio- CO2
3.6 SN & CC Construction - 2024Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.2301 2.1003 2.5329 4.2100e-003
0.0959 0.0959 0.0902 0.0902 0.0000 362.4957 362.4957 0.0856 0.0000 364.2931
Total 0.2301 2.1003 2.5329 4.2100e-003
0.0856 0.0000 364.29310.0959 0.0959 0.0902 0.0902 0.0000 362.4957 362.4957
25 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0307 0.1914 0.4514 1.1100e-003
0.0319 4.6400e-003
0.0366 9.1100e-003
4.2600e-003
0.0134 0.0000 94.0210 94.0210 6.5000e-004
0.0000 94.0346
Worker 0.0268 0.0377 0.4007 1.7100e-003
0.1431 1.0300e-003
0.1441 0.0380 9.5000e-004
0.0389 0.0000 104.2617 104.2617 4.2700e-003
0.0000 104.3514
Total 0.0575 0.2291 0.8521 2.8200e-003
4.9200e-003
0.0000 198.38600.1750 5.6700e-003
0.1806 0.0471 5.2100e-003
0.0523
SO2 Fugitive PM10
Exhaust PM10
0.0000 198.2827 198.2827
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.2301 2.1003 2.5329 4.2100e-003
0.0959 0.0959 0.0902 0.0902 0.0000 362.4953 362.4953 0.0856 0.0000 364.2926
Total 0.2301 2.1003 2.5329 4.2100e-003
0.0856 0.0000 364.29260.0959 0.0959 0.0902 0.0902 0.0000 362.4953 362.4953
26 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0307 0.1914 0.4514 1.1100e-003
0.0319 4.6400e-003
0.0366 9.1100e-003
4.2600e-003
0.0134 0.0000 94.0210 94.0210 6.5000e-004
0.0000 94.0346
Worker 0.0268 0.0377 0.4007 1.7100e-003
0.1431 1.0300e-003
0.1441 0.0380 9.5000e-004
0.0389 0.0000 104.2617 104.2617 4.2700e-003
0.0000 104.3514
Total 0.0575 0.2291 0.8521 2.8200e-003
4.9200e-003
0.0000 198.38600.1750 5.6700e-003
0.1806 0.0471 5.2100e-003
0.0523
SO2 Fugitive PM10
Exhaust PM10
0.0000 198.2827 198.2827
PM2.5 Total
Bio- CO2 NBio- CO2
3.6 SN & CC Construction - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.0347 0.3165 0.4093 6.8000e-004
0.0134 0.0134 0.0126 0.0126 0.0000 58.8946 58.8946 0.0138 0.0000 59.1849
Total 0.0347 0.3165 0.4093 6.8000e-004
0.0138 0.0000 59.18490.0134 0.0134 0.0126 0.0126 0.0000 58.8946 58.8946
27 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 4.8600e-003
0.0309 0.0716 1.8000e-004
5.1800e-003
7.6000e-004
5.9400e-003
1.4800e-003
7.0000e-004
2.1800e-003
0.0000 15.2723 15.2723 1.1000e-004
0.0000 15.2745
Worker 4.1800e-003
5.8600e-003
0.0624 2.8000e-004
0.0232 1.7000e-004
0.0234 6.1700e-003
1.6000e-004
6.3300e-003
0.0000 16.7271 16.7271 6.7000e-004
0.0000 16.7412
Total 9.0400e-003
0.0367 0.1340 4.6000e-004
7.8000e-004
0.0000 32.01570.0284 9.3000e-004
0.0293 7.6500e-003
8.6000e-004
8.5100e-003
SO2 Fugitive PM10
Exhaust PM10
0.0000 31.9993 31.9993
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.0347 0.3165 0.4093 6.8000e-004
0.0134 0.0134 0.0126 0.0126 0.0000 58.8946 58.8946 0.0138 0.0000 59.1848
Total 0.0347 0.3165 0.4093 6.8000e-004
0.0138 0.0000 59.18480.0134 0.0134 0.0126 0.0126 0.0000 58.8946 58.8946
28 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 4.8600e-003
0.0309 0.0716 1.8000e-004
5.1800e-003
7.6000e-004
5.9400e-003
1.4800e-003
7.0000e-004
2.1800e-003
0.0000 15.2723 15.2723 1.1000e-004
0.0000 15.2745
Worker 4.1800e-003
5.8600e-003
0.0624 2.8000e-004
0.0232 1.7000e-004
0.0234 6.1700e-003
1.6000e-004
6.3300e-003
0.0000 16.7271 16.7271 6.7000e-004
0.0000 16.7412
Total 9.0400e-003
0.0367 0.1340 4.6000e-004
7.8000e-004
0.0000 32.01570.0284 9.3000e-004
0.0293 7.6500e-003
8.6000e-004
8.5100e-003
SO2 Fugitive PM10
Exhaust PM10
0.0000 31.9993 31.9993
PM2.5 Total
Bio- CO2 NBio- CO2
3.7 SN & CC Paving - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3500e-003
0.0126 0.0214 3.0000e-005
6.2000e-004
6.2000e-004
5.7000e-004
5.7000e-004
0.0000 2.9390 2.9390 9.5000e-004
0.0000 2.9590
Paving 1.6100e-003
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 2.9600e-003
0.0126 0.0214 3.0000e-005
9.5000e-004
0.0000 2.95906.2000e-004
6.2000e-004
5.7000e-004
5.7000e-004
0.0000 2.9390 2.9390
29 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 5.0000e-005
7.0000e-005
7.1000e-004
0.0000 2.6000e-004
0.0000 2.7000e-004
7.0000e-005
0.0000 7.0000e-005
0.0000 0.1897 0.1897 1.0000e-005
0.0000 0.1898
Total 5.0000e-005
7.0000e-005
7.1000e-004
0.0000 1.0000e-005
0.0000 0.18982.6000e-004
0.0000 2.7000e-004
7.0000e-005
0.0000 7.0000e-005
SO2 Fugitive PM10
Exhaust PM10
0.0000 0.1897 0.1897
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3500e-003
0.0126 0.0214 3.0000e-005
6.2000e-004
6.2000e-004
5.7000e-004
5.7000e-004
0.0000 2.9390 2.9390 9.5000e-004
0.0000 2.9590
Paving 1.6100e-003
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 2.9600e-003
0.0126 0.0214 3.0000e-005
9.5000e-004
0.0000 2.95906.2000e-004
6.2000e-004
5.7000e-004
5.7000e-004
0.0000 2.9390 2.9390
30 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 5.0000e-005
7.0000e-005
7.1000e-004
0.0000 2.6000e-004
0.0000 2.7000e-004
7.0000e-005
0.0000 7.0000e-005
0.0000 0.1897 0.1897 1.0000e-005
0.0000 0.1898
Total 5.0000e-005
7.0000e-005
7.1000e-004
0.0000 1.0000e-005
0.0000 0.18982.6000e-004
0.0000 2.7000e-004
7.0000e-005
0.0000 7.0000e-005
SO2 Fugitive PM10
Exhaust PM10
0.0000 0.1897 0.1897
PM2.5 Total
Bio- CO2 NBio- CO2
3.8 SN & CC Architectural Coating - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 0.3372 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 1.7100e-003
0.0115 0.0181 3.0000e-005
5.2000e-004
5.2000e-004
5.2000e-004
5.2000e-004
0.0000 2.5533 2.5533 1.4000e-004
0.0000 2.5562
Total 0.3389 0.0115 0.0181 3.0000e-005
1.4000e-004
0.0000 2.55625.2000e-004
5.2000e-004
5.2000e-004
5.2000e-004
0.0000 2.5533 2.5533
31 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 3.4000e-004
4.7000e-004
5.0100e-003
2.0000e-005
1.8700e-003
1.0000e-005
1.8800e-003
5.0000e-004
1.0000e-005
5.1000e-004
0.0000 1.3435 1.3435 5.0000e-005
0.0000 1.3447
Total 3.4000e-004
4.7000e-004
5.0100e-003
2.0000e-005
5.0000e-005
0.0000 1.34471.8700e-003
1.0000e-005
1.8800e-003
5.0000e-004
1.0000e-005
5.1000e-004
SO2 Fugitive PM10
Exhaust PM10
0.0000 1.3435 1.3435
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 0.3372 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 1.7100e-003
0.0115 0.0181 3.0000e-005
5.2000e-004
5.2000e-004
5.2000e-004
5.2000e-004
0.0000 2.5533 2.5533 1.4000e-004
0.0000 2.5562
Total 0.3389 0.0115 0.0181 3.0000e-005
1.4000e-004
0.0000 2.55625.2000e-004
5.2000e-004
5.2000e-004
5.2000e-004
0.0000 2.5533 2.5533
32 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 3.4000e-004
4.7000e-004
5.0100e-003
2.0000e-005
1.8700e-003
1.0000e-005
1.8800e-003
5.0000e-004
1.0000e-005
5.1000e-004
0.0000 1.3435 1.3435 5.0000e-005
0.0000 1.3447
Total 3.4000e-004
4.7000e-004
5.0100e-003
2.0000e-005
5.0000e-005
0.0000 1.34471.8700e-003
1.0000e-005
1.8800e-003
5.0000e-004
1.0000e-005
5.1000e-004
SO2 Fugitive PM10
Exhaust PM10
0.0000 1.3435 1.3435
PM2.5 Total
Bio- CO2 NBio- CO2
3.9 Residence Hall Site Preparation - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 0.0553 0.0000 0.0553 0.0299 0.0000 0.0299 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 7.1300e-003
0.0666 0.0680 1.1000e-004
2.9300e-003
2.9300e-003
2.6900e-003
2.6900e-003
0.0000 9.5031 9.5031 3.0700e-003
0.0000 9.5676
Total 7.1300e-003
0.0666 0.0680 1.1000e-004
3.0700e-003
0.0000 9.56760.0553 2.9300e-003
0.0582 0.0299 2.6900e-003
0.0326 0.0000 9.5031 9.5031
33 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 9.0000e-005
1.2000e-004
1.3300e-003
1.0000e-005
4.9000e-004
0.0000 5.0000e-004
1.3000e-004
0.0000 1.3000e-004
0.0000 0.3556 0.3556 1.0000e-005
0.0000 0.3559
Total 9.0000e-005
1.2000e-004
1.3300e-003
1.0000e-005
1.0000e-005
0.0000 0.35594.9000e-004
0.0000 5.0000e-004
1.3000e-004
0.0000 1.3000e-004
SO2 Fugitive PM10
Exhaust PM10
0.0000 0.3556 0.3556
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 0.0216 0.0000 0.0216 0.0117 0.0000 0.0117 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 7.1300e-003
0.0666 0.0680 1.1000e-004
2.9300e-003
2.9300e-003
2.6900e-003
2.6900e-003
0.0000 9.5031 9.5031 3.0700e-003
0.0000 9.5676
Total 7.1300e-003
0.0666 0.0680 1.1000e-004
3.0700e-003
0.0000 9.56760.0216 2.9300e-003
0.0245 0.0117 2.6900e-003
0.0144 0.0000 9.5031 9.5031
34 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 9.0000e-005
1.2000e-004
1.3300e-003
1.0000e-005
4.9000e-004
0.0000 5.0000e-004
1.3000e-004
0.0000 1.3000e-004
0.0000 0.3556 0.3556 1.0000e-005
0.0000 0.3559
Total 9.0000e-005
1.2000e-004
1.3300e-003
1.0000e-005
1.0000e-005
0.0000 0.35594.9000e-004
0.0000 5.0000e-004
1.3000e-004
0.0000 1.3000e-004
SO2 Fugitive PM10
Exhaust PM10
0.0000 0.3556 0.3556
PM2.5 Total
Bio- CO2 NBio- CO2
3.10 Tennis Courts Demolition - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.1000e-004
0.0000 2.1000e-004
3.0000e-005
0.0000 3.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 4.5100e-003
0.0383 0.0492 8.0000e-005
1.7000e-003
1.7000e-003
1.5900e-003
1.5900e-003
0.0000 7.1397 7.1397 1.7100e-003
0.0000 7.1756
Total 4.5100e-003
0.0383 0.0492 8.0000e-005
1.7100e-003
0.0000 7.17562.1000e-004
1.7000e-003
1.9100e-003
3.0000e-005
1.5900e-003
1.6200e-003
0.0000 7.1397 7.1397
35 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 1.0000e-005
1.2000e-004
1.8000e-004
0.0000 2.0000e-005
0.0000 2.0000e-005
0.0000 0.0000 1.0000e-005
0.0000 0.0620 0.0620 0.0000 0.0000 0.0620
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 6.0000e-005
9.0000e-005
9.4000e-004
0.0000 3.5000e-004
0.0000 3.5000e-004
9.0000e-005
0.0000 1.0000e-004
0.0000 0.2529 0.2529 1.0000e-005
0.0000 0.2531
Total 7.0000e-005
2.1000e-004
1.1200e-003
0.0000 1.0000e-005
0.0000 0.31513.7000e-004
0.0000 3.7000e-004
9.0000e-005
0.0000 1.1000e-004
SO2 Fugitive PM10
Exhaust PM10
0.0000 0.3149 0.3149
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 8.0000e-005
0.0000 8.0000e-005
1.0000e-005
0.0000 1.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 4.5100e-003
0.0383 0.0492 8.0000e-005
1.7000e-003
1.7000e-003
1.5900e-003
1.5900e-003
0.0000 7.1397 7.1397 1.7100e-003
0.0000 7.1756
Total 4.5100e-003
0.0383 0.0492 8.0000e-005
1.7100e-003
0.0000 7.17568.0000e-005
1.7000e-003
1.7800e-003
1.0000e-005
1.5900e-003
1.6000e-003
0.0000 7.1397 7.1397
36 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 1.0000e-005
1.2000e-004
1.8000e-004
0.0000 2.0000e-005
0.0000 2.0000e-005
0.0000 0.0000 1.0000e-005
0.0000 0.0620 0.0620 0.0000 0.0000 0.0620
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 6.0000e-005
9.0000e-005
9.4000e-004
0.0000 3.5000e-004
0.0000 3.5000e-004
9.0000e-005
0.0000 1.0000e-004
0.0000 0.2529 0.2529 1.0000e-005
0.0000 0.2531
Total 7.0000e-005
2.1000e-004
1.1200e-003
0.0000 1.0000e-005
0.0000 0.31513.7000e-004
0.0000 3.7000e-004
9.0000e-005
0.0000 1.1000e-004
SO2 Fugitive PM10
Exhaust PM10
0.0000 0.3149 0.3149
PM2.5 Total
Bio- CO2 NBio- CO2
3.11 Residence Hall Grading - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 0.0826 0.0000 0.0826 0.0449 0.0000 0.0449 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.0186 0.1639 0.2051 3.2000e-004
7.8000e-003
7.8000e-003
7.1800e-003
7.1800e-003
0.0000 27.9109 27.9109 9.0300e-003
0.0000 28.1005
Total 0.0186 0.1639 0.2051 3.2000e-004
9.0300e-003
0.0000 28.10050.0826 7.8000e-003
0.0904 0.0449 7.1800e-003
0.0520 0.0000 27.9109 27.9109
37 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 5.9700e-003
0.0507 0.0772 3.1000e-004
7.4100e-003
1.6000e-003
9.0100e-003
2.0300e-003
1.4700e-003
3.5000e-003
0.0000 26.7808 26.7808 1.9000e-004
0.0000 26.7848
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 2.7000e-004
3.7000e-004
3.9800e-003
2.0000e-005
1.4800e-003
1.0000e-005
1.4900e-003
3.9000e-004
1.0000e-005
4.0000e-004
0.0000 1.0669 1.0669 4.0000e-005
0.0000 1.0678
Total 6.2400e-003
0.0510 0.0812 3.3000e-004
2.3000e-004
0.0000 27.85268.8900e-003
1.6100e-003
0.0105 2.4200e-003
1.4800e-003
3.9000e-003
SO2 Fugitive PM10
Exhaust PM10
0.0000 27.8477 27.8477
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 0.0322 0.0000 0.0322 0.0175 0.0000 0.0175 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.0186 0.1639 0.2051 3.2000e-004
7.8000e-003
7.8000e-003
7.1800e-003
7.1800e-003
0.0000 27.9109 27.9109 9.0300e-003
0.0000 28.1005
Total 0.0186 0.1639 0.2051 3.2000e-004
9.0300e-003
0.0000 28.10050.0322 7.8000e-003
0.0400 0.0175 7.1800e-003
0.0247 0.0000 27.9109 27.9109
38 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 5.9700e-003
0.0507 0.0772 3.1000e-004
7.4100e-003
1.6000e-003
9.0100e-003
2.0300e-003
1.4700e-003
3.5000e-003
0.0000 26.7808 26.7808 1.9000e-004
0.0000 26.7848
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 2.7000e-004
3.7000e-004
3.9800e-003
2.0000e-005
1.4800e-003
1.0000e-005
1.4900e-003
3.9000e-004
1.0000e-005
4.0000e-004
0.0000 1.0669 1.0669 4.0000e-005
0.0000 1.0678
Total 6.2400e-003
0.0510 0.0812 3.3000e-004
2.3000e-004
0.0000 27.85268.8900e-003
1.6100e-003
0.0105 2.4200e-003
1.4800e-003
3.9000e-003
SO2 Fugitive PM10
Exhaust PM10
0.0000 27.8477 27.8477
PM2.5 Total
Bio- CO2 NBio- CO2
3.12 Residence Hall Underground Utilities - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 2.1400e-003
0.0157 0.0418 7.0000e-005
7.7000e-004
7.7000e-004
7.1000e-004
7.1000e-004
0.0000 5.8174 5.8174 1.8800e-003
0.0000 5.8569
Total 2.1400e-003
0.0157 0.0418 7.0000e-005
1.8800e-003
0.0000 5.85697.7000e-004
7.7000e-004
7.1000e-004
7.1000e-004
0.0000 5.8174 5.8174
39 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 7.0000e-005
1.0000e-004
1.1100e-003
0.0000 4.1000e-004
0.0000 4.1000e-004
1.1000e-004
0.0000 1.1000e-004
0.0000 0.2964 0.2964 1.0000e-005
0.0000 0.2966
Total 7.0000e-005
1.0000e-004
1.1100e-003
0.0000 1.0000e-005
0.0000 0.29664.1000e-004
0.0000 4.1000e-004
1.1000e-004
0.0000 1.1000e-004
SO2 Fugitive PM10
Exhaust PM10
0.0000 0.2964 0.2964
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 2.1400e-003
0.0157 0.0418 7.0000e-005
7.7000e-004
7.7000e-004
7.1000e-004
7.1000e-004
0.0000 5.8174 5.8174 1.8800e-003
0.0000 5.8569
Total 2.1400e-003
0.0157 0.0418 7.0000e-005
1.8800e-003
0.0000 5.85697.7000e-004
7.7000e-004
7.1000e-004
7.1000e-004
0.0000 5.8174 5.8174
40 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 7.0000e-005
1.0000e-004
1.1100e-003
0.0000 4.1000e-004
0.0000 4.1000e-004
1.1000e-004
0.0000 1.1000e-004
0.0000 0.2964 0.2964 1.0000e-005
0.0000 0.2966
Total 7.0000e-005
1.0000e-004
1.1100e-003
0.0000 1.0000e-005
0.0000 0.29664.1000e-004
0.0000 4.1000e-004
1.1000e-004
0.0000 1.1000e-004
SO2 Fugitive PM10
Exhaust PM10
0.0000 0.2964 0.2964
PM2.5 Total
Bio- CO2 NBio- CO2
3.13 Residence Hall Construction - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.1076 0.9804 1.2681 2.1200e-003
0.0415 0.0415 0.0390 0.0390 0.0000 182.4579 182.4579 0.0428 0.0000 183.3571
Total 0.1076 0.9804 1.2681 2.1200e-003
0.0428 0.0000 183.35710.0415 0.0415 0.0390 0.0390 0.0000 182.4579 182.4579
41 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0151 0.0956 0.2217 5.6000e-004
0.0161 2.3400e-003
0.0184 4.5800e-003
2.1600e-003
6.7400e-003
0.0000 47.3141 47.3141 3.3000e-004
0.0000 47.3210
Worker 0.0129 0.0181 0.1934 8.6000e-004
0.0720 5.2000e-004
0.0725 0.0191 4.8000e-004
0.0196 0.0000 51.8211 51.8211 2.0900e-003
0.0000 51.8649
Total 0.0280 0.1138 0.4151 1.4200e-003
2.4200e-003
0.0000 99.18590.0880 2.8600e-003
0.0909 0.0237 2.6400e-003
0.0263
SO2 Fugitive PM10
Exhaust PM10
0.0000 99.1352 99.1352
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.1076 0.9804 1.2681 2.1200e-003
0.0415 0.0415 0.0390 0.0390 0.0000 182.4576 182.4576 0.0428 0.0000 183.3569
Total 0.1076 0.9804 1.2681 2.1200e-003
0.0428 0.0000 183.35690.0415 0.0415 0.0390 0.0390 0.0000 182.4576 182.4576
42 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0151 0.0956 0.2217 5.6000e-004
0.0161 2.3400e-003
0.0184 4.5800e-003
2.1600e-003
6.7400e-003
0.0000 47.3141 47.3141 3.3000e-004
0.0000 47.3210
Worker 0.0129 0.0181 0.1934 8.6000e-004
0.0720 5.2000e-004
0.0725 0.0191 4.8000e-004
0.0196 0.0000 51.8211 51.8211 2.0900e-003
0.0000 51.8649
Total 0.0280 0.1138 0.4151 1.4200e-003
2.4200e-003
0.0000 99.18590.0880 2.8600e-003
0.0909 0.0237 2.6400e-003
0.0263
SO2 Fugitive PM10
Exhaust PM10
0.0000 99.1352 99.1352
PM2.5 Total
Bio- CO2 NBio- CO2
3.13 Residence Hall Construction - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.1416 1.2906 1.6694 2.7900e-003
0.0546 0.0546 0.0514 0.0514 0.0000 240.1977 240.1977 0.0564 0.0000 241.3816
Total 0.1416 1.2906 1.6694 2.7900e-003
0.0564 0.0000 241.38160.0546 0.0546 0.0514 0.0514 0.0000 240.1977 240.1977
43 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0192 0.1221 0.2859 7.3000e-004
0.0212 2.9600e-003
0.0241 6.0400e-003
2.7200e-003
8.7600e-003
0.0000 62.2809 62.2809 4.2000e-004
0.0000 62.2897
Worker 0.0164 0.0230 0.2452 1.1300e-003
0.0948 7.0000e-004
0.0955 0.0252 6.4000e-004
0.0258 0.0000 67.4874 67.4874 2.6800e-003
0.0000 67.5436
Total 0.0355 0.1450 0.5311 1.8600e-003
3.1000e-003
0.0000 129.83330.1159 3.6600e-003
0.1196 0.0312 3.3600e-003
0.0346
SO2 Fugitive PM10
Exhaust PM10
0.0000 129.7683 129.7683
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.1416 1.2906 1.6694 2.7900e-003
0.0546 0.0546 0.0514 0.0514 0.0000 240.1974 240.1974 0.0564 0.0000 241.3813
Total 0.1416 1.2906 1.6694 2.7900e-003
0.0564 0.0000 241.38130.0546 0.0546 0.0514 0.0514
SO2 Fugitive PM10
Exhaust PM10
0.0000 240.1974 240.1974
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0192 0.1221 0.2859 7.3000e-004
0.0212 2.9600e-003
0.0241 6.0400e-003
2.7200e-003
8.7600e-003
0.0000 62.2809 62.2809 4.2000e-004
0.0000 62.2897
Worker 0.0164 0.0230 0.2452 1.1300e-003
0.0948 7.0000e-004
0.0955 0.0252 6.4000e-004
0.0258 0.0000 67.4874 67.4874 2.6800e-003
0.0000 67.5436
Total 0.0355 0.1450 0.5311 1.8600e-003
3.1000e-003
0.0000 129.83330.1159 3.6600e-003
0.1196 0.0312 3.3600e-003
0.0346 0.0000 129.7683 129.7683
44 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.14 AAA Building Site Preparation - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 0.0372 0.0000 0.0372 0.0200 0.0000 0.0200 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 4.7500e-003
0.0444 0.0453 7.0000e-005
1.9500e-003
1.9500e-003
1.7900e-003
1.7900e-003
0.0000 6.3354 6.3354 2.0500e-003
0.0000 6.3784
Total 4.7500e-003
0.0444 0.0453 7.0000e-005
2.0500e-003
0.0000 6.37840.0372 1.9500e-003
0.0391 0.0200 1.7900e-003
0.0218
SO2 Fugitive PM10
Exhaust PM10
0.0000 6.3354 6.3354
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 6.0000e-005
8.0000e-005
8.8000e-004
0.0000 3.3000e-004
0.0000 3.3000e-004
9.0000e-005
0.0000 9.0000e-005
0.0000 0.2371 0.2371 1.0000e-005
0.0000 0.2373
Total 6.0000e-005
8.0000e-005
8.8000e-004
0.0000 1.0000e-005
0.0000 0.23733.3000e-004
0.0000 3.3000e-004
9.0000e-005
0.0000 9.0000e-005
0.0000 0.2371 0.2371
45 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 0.0145 0.0000 0.0145 7.7900e-003
0.0000 7.7900e-003
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 4.7500e-003
0.0444 0.0453 7.0000e-005
1.9500e-003
1.9500e-003
1.7900e-003
1.7900e-003
0.0000 6.3354 6.3354 2.0500e-003
0.0000 6.3784
Total 4.7500e-003
0.0444 0.0453 7.0000e-005
2.0500e-003
0.0000 6.37840.0145 1.9500e-003
0.0165 7.7900e-003
1.7900e-003
9.5800e-003
SO2 Fugitive PM10
Exhaust PM10
0.0000 6.3354 6.3354
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 6.0000e-005
8.0000e-005
8.8000e-004
0.0000 3.3000e-004
0.0000 3.3000e-004
9.0000e-005
0.0000 9.0000e-005
0.0000 0.2371 0.2371 1.0000e-005
0.0000 0.2373
Total 6.0000e-005
8.0000e-005
8.8000e-004
0.0000 1.0000e-005
0.0000 0.23733.3000e-004
0.0000 3.3000e-004
9.0000e-005
0.0000 9.0000e-005
0.0000 0.2371 0.2371
46 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.15 AAA Building Demolition - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 0.0135 0.0000 0.0135 2.0500e-003
0.0000 2.0500e-003
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 8.4500e-003
0.0719 0.0923 1.5000e-004
3.1900e-003
3.1900e-003
2.9900e-003
2.9900e-003
0.0000 13.3869 13.3869 3.2000e-003
0.0000 13.4542
Total 8.4500e-003
0.0719 0.0923 1.5000e-004
3.2000e-003
0.0000 13.45420.0135 3.1900e-003
0.0167 2.0500e-003
2.9900e-003
5.0400e-003
SO2 Fugitive PM10
Exhaust PM10
0.0000 13.3869 13.3869
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 8.6000e-004
7.3300e-003
0.0112 5.0000e-005
1.0700e-003
2.3000e-004
1.3000e-003
2.9000e-004
2.1000e-004
5.1000e-004
0.0000 3.8745 3.8745 3.0000e-005
0.0000 3.8751
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 1.2000e-004
1.7000e-004
1.7700e-003
1.0000e-005
6.6000e-004
0.0000 6.6000e-004
1.7000e-004
0.0000 1.8000e-004
0.0000 0.4742 0.4742 2.0000e-005
0.0000 0.4746
Total 9.8000e-004
7.5000e-003
0.0129 6.0000e-005
5.0000e-005
0.0000 4.34971.7300e-003
2.3000e-004
1.9600e-003
4.6000e-004
2.1000e-004
6.9000e-004
0.0000 4.3487 4.3487
47 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 5.2700e-003
0.0000 5.2700e-003
8.0000e-004
0.0000 8.0000e-004
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 8.4500e-003
0.0719 0.0923 1.5000e-004
3.1900e-003
3.1900e-003
2.9900e-003
2.9900e-003
0.0000 13.3869 13.3869 3.2000e-003
0.0000 13.4542
Total 8.4500e-003
0.0719 0.0923 1.5000e-004
3.2000e-003
0.0000 13.45425.2700e-003
3.1900e-003
8.4600e-003
8.0000e-004
2.9900e-003
3.7900e-003
SO2 Fugitive PM10
Exhaust PM10
0.0000 13.3869 13.3869
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 8.6000e-004
7.3300e-003
0.0112 5.0000e-005
1.0700e-003
2.3000e-004
1.3000e-003
2.9000e-004
2.1000e-004
5.1000e-004
0.0000 3.8745 3.8745 3.0000e-005
0.0000 3.8751
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 1.2000e-004
1.7000e-004
1.7700e-003
1.0000e-005
6.6000e-004
0.0000 6.6000e-004
1.7000e-004
0.0000 1.8000e-004
0.0000 0.4742 0.4742 2.0000e-005
0.0000 0.4746
Total 9.8000e-004
7.5000e-003
0.0129 6.0000e-005
5.0000e-005
0.0000 4.34971.7300e-003
2.3000e-004
1.9600e-003
4.6000e-004
2.1000e-004
6.9000e-004
0.0000 4.3487 4.3487
48 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.16 AAA Building Grading - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 0.0807 0.0000 0.0807 0.0434 0.0000 0.0434 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.0293 0.2599 0.3261 5.1000e-004
0.0121 0.0121 0.0111 0.0111 0.0000 44.8596 44.8596 0.0145 0.0000 45.1642
Total 0.0293 0.2599 0.3261 5.1000e-004
0.0145 0.0000 45.16420.0807 0.0121 0.0927 0.0434 0.0111 0.0544
SO2 Fugitive PM10
Exhaust PM10
0.0000 44.8596 44.8596
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0174 0.1479 0.2254 9.2000e-004
0.0216 4.6600e-003
0.0263 5.9400e-003
4.2900e-003
0.0102 0.0000 78.1726 78.1726 5.6000e-004
0.0000 78.1843
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 4.4000e-004
6.2000e-004
6.6300e-003
3.0000e-005
2.4700e-003
2.0000e-005
2.4900e-003
6.6000e-004
2.0000e-005
6.7000e-004
0.0000 1.7782 1.7782 7.0000e-005
0.0000 1.7797
Total 0.0179 0.1485 0.2320 9.5000e-004
6.3000e-004
0.0000 79.96400.0241 4.6800e-003
0.0288 6.6000e-003
4.3100e-003
0.0109 0.0000 79.9508 79.9508
49 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 0.0315 0.0000 0.0315 0.0169 0.0000 0.0169 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.0293 0.2599 0.3261 5.1000e-004
0.0121 0.0121 0.0111 0.0111 0.0000 44.8595 44.8595 0.0145 0.0000 45.1642
Total 0.0293 0.2599 0.3261 5.1000e-004
0.0145 0.0000 45.16420.0315 0.0121 0.0435 0.0169 0.0111 0.0280
SO2 Fugitive PM10
Exhaust PM10
0.0000 44.8595 44.8595
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0174 0.1479 0.2254 9.2000e-004
0.0216 4.6600e-003
0.0263 5.9400e-003
4.2900e-003
0.0102 0.0000 78.1726 78.1726 5.6000e-004
0.0000 78.1843
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 4.4000e-004
6.2000e-004
6.6300e-003
3.0000e-005
2.4700e-003
2.0000e-005
2.4900e-003
6.6000e-004
2.0000e-005
6.7000e-004
0.0000 1.7782 1.7782 7.0000e-005
0.0000 1.7797
Total 0.0179 0.1485 0.2320 9.5000e-004
6.3000e-004
0.0000 79.96400.0241 4.6800e-003
0.0288 6.6000e-003
4.3100e-003
0.0109 0.0000 79.9508 79.9508
50 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.17 AAA Building Underground Utilities - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 2.3300e-003
0.0231 0.0216 3.0000e-005
1.1700e-003
1.1700e-003
1.0700e-003
1.0700e-003
0.0000 2.7642 2.7642 8.9000e-004
0.0000 2.7830
Total 2.3300e-003
0.0231 0.0216 3.0000e-005
8.9000e-004
0.0000 2.78301.1700e-003
1.1700e-003
1.0700e-003
1.0700e-003
SO2 Fugitive PM10
Exhaust PM10
0.0000 2.7642 2.7642
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 4.0000e-005
5.0000e-005
5.3000e-004
0.0000 2.0000e-004
0.0000 2.0000e-004
5.0000e-005
0.0000 5.0000e-005
0.0000 0.1423 0.1423 1.0000e-005
0.0000 0.1424
Total 4.0000e-005
5.0000e-005
5.3000e-004
0.0000 1.0000e-005
0.0000 0.14242.0000e-004
0.0000 2.0000e-004
5.0000e-005
0.0000 5.0000e-005
0.0000 0.1423 0.1423
51 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 2.3300e-003
0.0231 0.0216 3.0000e-005
1.1700e-003
1.1700e-003
1.0700e-003
1.0700e-003
0.0000 2.7642 2.7642 8.9000e-004
0.0000 2.7830
Total 2.3300e-003
0.0231 0.0216 3.0000e-005
8.9000e-004
0.0000 2.78301.1700e-003
1.1700e-003
1.0700e-003
1.0700e-003
SO2 Fugitive PM10
Exhaust PM10
0.0000 2.7642 2.7642
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 4.0000e-005
5.0000e-005
5.3000e-004
0.0000 2.0000e-004
0.0000 2.0000e-004
5.0000e-005
0.0000 5.0000e-005
0.0000 0.1423 0.1423 1.0000e-005
0.0000 0.1424
Total 4.0000e-005
5.0000e-005
5.3000e-004
0.0000 1.0000e-005
0.0000 0.14242.0000e-004
0.0000 2.0000e-004
5.0000e-005
0.0000 5.0000e-005
0.0000 0.1423 0.1423
52 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.18 AAA Building Construction - 2025Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.0184 0.1675 0.2167 3.6000e-004
7.0900e-003
7.0900e-003
6.6700e-003
6.6700e-003
0.0000 31.1795 31.1795 7.3200e-003
0.0000 31.3332
Total 0.0184 0.1675 0.2167 3.6000e-004
7.3200e-003
0.0000 31.33327.0900e-003
7.0900e-003
6.6700e-003
6.6700e-003
SO2 Fugitive PM10
Exhaust PM10
0.0000 31.1795 31.1795
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 2.5700e-003
0.0163 0.0379 1.0000e-004
2.7400e-003
4.0000e-004
3.1500e-003
7.8000e-004
3.7000e-004
1.1500e-003
0.0000 8.0853 8.0853 6.0000e-005
0.0000 8.0865
Worker 2.2100e-003
3.1000e-003
0.0330 1.5000e-004
0.0123 9.0000e-005
0.0124 3.2700e-003
8.0000e-005
3.3500e-003
0.0000 8.8555 8.8555 3.6000e-004
0.0000 8.8630
Total 4.7800e-003
0.0194 0.0709 2.5000e-004
4.2000e-004
0.0000 16.94950.0150 4.9000e-004
0.0155 4.0500e-003
4.5000e-004
4.5000e-003
0.0000 16.9408 16.9408
53 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.0184 0.1675 0.2167 3.6000e-004
7.0900e-003
7.0900e-003
6.6700e-003
6.6700e-003
0.0000 31.1795 31.1795 7.3200e-003
0.0000 31.3331
Total 0.0184 0.1675 0.2167 3.6000e-004
7.3200e-003
0.0000 31.33317.0900e-003
7.0900e-003
6.6700e-003
6.6700e-003
SO2 Fugitive PM10
Exhaust PM10
0.0000 31.1795 31.1795
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 2.5700e-003
0.0163 0.0379 1.0000e-004
2.7400e-003
4.0000e-004
3.1500e-003
7.8000e-004
3.7000e-004
1.1500e-003
0.0000 8.0853 8.0853 6.0000e-005
0.0000 8.0865
Worker 2.2100e-003
3.1000e-003
0.0330 1.5000e-004
0.0123 9.0000e-005
0.0124 3.2700e-003
8.0000e-005
3.3500e-003
0.0000 8.8555 8.8555 3.6000e-004
0.0000 8.8630
Total 4.7800e-003
0.0194 0.0709 2.5000e-004
4.2000e-004
0.0000 16.94950.0150 4.9000e-004
0.0155 4.0500e-003
4.5000e-004
4.5000e-003
0.0000 16.9408 16.9408
54 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.18 AAA Building Construction - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.2131 1.9421 2.5121 4.2000e-003
0.0822 0.0822 0.0773 0.0773 0.0000 361.4513 361.4513 0.0848 0.0000 363.2328
Total 0.2131 1.9421 2.5121 4.2000e-003
0.0848 0.0000 363.23280.0822 0.0822 0.0773 0.0773
SO2 Fugitive PM10
Exhaust PM10
0.0000 361.4513 361.4513
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0288 0.1837 0.4303 1.1000e-003
0.0318 4.4500e-003
0.0363 9.0800e-003
4.1000e-003
0.0132 0.0000 93.7208 93.7208 6.3000e-004
0.0000 93.7340
Worker 0.0247 0.0345 0.3689 1.7000e-003
0.1426 1.0500e-003
0.1436 0.0379 9.7000e-004
0.0388 0.0000 101.5555 101.5555 4.0300e-003
0.0000 101.6402
Total 0.0535 0.2182 0.7992 2.8000e-003
4.6600e-003
0.0000 195.37420.1744 5.5000e-003
0.1799 0.0470 5.0700e-003
0.0520
SO2 Fugitive PM10
Exhaust PM10
0.0000 195.2763 195.2763
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.2131 1.9421 2.5121 4.2000e-003
0.0822 0.0822 0.0773 0.0773 0.0000 361.4509 361.4509 0.0848 0.0000 363.2324
Total 0.2131 1.9421 2.5121 4.2000e-003
0.0848 0.0000 363.23240.0822 0.0822 0.0773 0.0773 0.0000 361.4509 361.4509
55 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0288 0.1837 0.4303 1.1000e-003
0.0318 4.4500e-003
0.0363 9.0800e-003
4.1000e-003
0.0132 0.0000 93.7208 93.7208 6.3000e-004
0.0000 93.7340
Worker 0.0247 0.0345 0.3689 1.7000e-003
0.1426 1.0500e-003
0.1436 0.0379 9.7000e-004
0.0388 0.0000 101.5555 101.5555 4.0300e-003
0.0000 101.6402
Total 0.0535 0.2182 0.7992 2.8000e-003
4.6600e-003
0.0000 195.37420.1744 5.5000e-003
0.1799 0.0470 5.0700e-003
0.0520
SO2 Fugitive PM10
Exhaust PM10
0.0000 195.2763 195.2763
PM2.5 Total
Bio- CO2 NBio- CO2
3.18 AAA Building Construction - 2027Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.0878 0.8004 1.0353 1.7300e-003
0.0339 0.0339 0.0319 0.0319 0.0000 148.9688 148.9688 0.0350 0.0000 149.7030
Total 0.0878 0.8004 1.0353 1.7300e-003
0.0350 0.0000 149.70300.0339 0.0339 0.0319 0.0319 0.0000 148.9688 148.9688
56 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0118 0.0751 0.1757 4.5000e-004
0.0131 1.8400e-003
0.0150 3.7400e-003
1.6900e-003
5.4400e-003
0.0000 38.6339 38.6339 2.6000e-004
0.0000 38.6394
Worker 9.7900e-003
0.0137 0.1470 7.0000e-004
0.0588 4.3000e-004
0.0592 0.0156 4.0000e-004
0.0160 0.0000 41.4622 41.4622 1.6200e-003
0.0000 41.4963
Total 0.0216 0.0889 0.3227 1.1500e-003
1.8800e-003
0.0000 80.13570.0719 2.2700e-003
0.0742 0.0194 2.0900e-003
0.0215
SO2 Fugitive PM10
Exhaust PM10
0.0000 80.0961 80.0961
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.0878 0.8004 1.0353 1.7300e-003
0.0339 0.0339 0.0319 0.0319 0.0000 148.9686 148.9686 0.0350 0.0000 149.7028
Total 0.0878 0.8004 1.0353 1.7300e-003
0.0350 0.0000 149.70280.0339 0.0339 0.0319 0.0319 0.0000 148.9686 148.9686
57 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0118 0.0751 0.1757 4.5000e-004
0.0131 1.8400e-003
0.0150 3.7400e-003
1.6900e-003
5.4400e-003
0.0000 38.6339 38.6339 2.6000e-004
0.0000 38.6394
Worker 9.7900e-003
0.0137 0.1470 7.0000e-004
0.0588 4.3000e-004
0.0592 0.0156 4.0000e-004
0.0160 0.0000 41.4622 41.4622 1.6200e-003
0.0000 41.4963
Total 0.0216 0.0889 0.3227 1.1500e-003
1.8800e-003
0.0000 80.13570.0719 2.2700e-003
0.0742 0.0194 2.0900e-003
0.0215
SO2 Fugitive PM10
Exhaust PM10
0.0000 80.0961 80.0961
PM2.5 Total
Bio- CO2 NBio- CO2
3.19 Tennis Court Deck Site Preparation - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 0.0791 0.0000 0.0791 0.0431 0.0000 0.0431 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.0103 0.0962 0.0982 1.6000e-004
4.2300e-003
4.2300e-003
3.8900e-003
3.8900e-003
0.0000 13.7267 13.7267 4.4400e-003
0.0000 13.8199
Total 0.0103 0.0962 0.0982 1.6000e-004
4.4400e-003
0.0000 13.81990.0791 4.2300e-003
0.0833 0.0431 3.8900e-003
0.0470 0.0000 13.7267 13.7267
58 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 6.2800e-003
0.0535 0.0835 3.5000e-004
8.2000e-003
1.6600e-003
9.8600e-003
2.2500e-003
1.5300e-003
3.7800e-003
0.0000 29.6194 29.6194 2.0000e-004
0.0000 29.6237
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 1.2000e-004
1.7000e-004
1.8500e-003
1.0000e-005
7.1000e-004
1.0000e-005
7.2000e-004
1.9000e-004
0.0000 1.9000e-004
0.0000 0.5082 0.5082 2.0000e-005
0.0000 0.5086
Total 6.4000e-003
0.0537 0.0854 3.6000e-004
2.2000e-004
0.0000 30.13238.9100e-003
1.6700e-003
0.0106 2.4400e-003
1.5300e-003
3.9700e-003
SO2 Fugitive PM10
Exhaust PM10
0.0000 30.1276 30.1276
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 0.0308 0.0000 0.0308 0.0168 0.0000 0.0168 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.0103 0.0962 0.0982 1.6000e-004
4.2300e-003
4.2300e-003
3.8900e-003
3.8900e-003
0.0000 13.7267 13.7267 4.4400e-003
0.0000 13.8199
Total 0.0103 0.0962 0.0982 1.6000e-004
4.4400e-003
0.0000 13.81990.0308 4.2300e-003
0.0351 0.0168 3.8900e-003
0.0207 0.0000 13.7267 13.7267
59 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 6.2800e-003
0.0535 0.0835 3.5000e-004
8.2000e-003
1.6600e-003
9.8600e-003
2.2500e-003
1.5300e-003
3.7800e-003
0.0000 29.6194 29.6194 2.0000e-004
0.0000 29.6237
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 1.2000e-004
1.7000e-004
1.8500e-003
1.0000e-005
7.1000e-004
1.0000e-005
7.2000e-004
1.9000e-004
0.0000 1.9000e-004
0.0000 0.5082 0.5082 2.0000e-005
0.0000 0.5086
Total 6.4000e-003
0.0537 0.0854 3.6000e-004
2.2000e-004
0.0000 30.13238.9100e-003
1.6700e-003
0.0106 2.4400e-003
1.5300e-003
3.9700e-003
SO2 Fugitive PM10
Exhaust PM10
0.0000 30.1276 30.1276
PM2.5 Total
Bio- CO2 NBio- CO2
3.20 Pool & RE Building Site Preparation - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 0.0186 0.0000 0.0186 9.9900e-003
0.0000 9.9900e-003
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 2.3800e-003
0.0222 0.0227 4.0000e-005
9.8000e-004
9.8000e-004
9.0000e-004
9.0000e-004
0.0000 3.1677 3.1677 1.0200e-003
0.0000 3.1892
Total 2.3800e-003
0.0222 0.0227 4.0000e-005
1.0200e-003
0.0000 3.18920.0186 9.8000e-004
0.0196 9.9900e-003
9.0000e-004
0.0109 0.0000 3.1677 3.1677
60 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 3.0000e-005
4.0000e-005
4.3000e-004
0.0000 1.6000e-004
0.0000 1.7000e-004
4.0000e-005
0.0000 4.0000e-005
0.0000 0.1173 0.1173 0.0000 0.0000 0.1174
Total 3.0000e-005
4.0000e-005
4.3000e-004
0.0000 0.0000 0.0000 0.11741.6000e-004
0.0000 1.7000e-004
4.0000e-005
0.0000 4.0000e-005
SO2 Fugitive PM10
Exhaust PM10
0.0000 0.1173 0.1173
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 7.2500e-003
0.0000 7.2500e-003
3.9000e-003
0.0000 3.9000e-003
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 2.3800e-003
0.0222 0.0227 4.0000e-005
9.8000e-004
9.8000e-004
9.0000e-004
9.0000e-004
0.0000 3.1677 3.1677 1.0200e-003
0.0000 3.1892
Total 2.3800e-003
0.0222 0.0227 4.0000e-005
1.0200e-003
0.0000 3.18927.2500e-003
9.8000e-004
8.2300e-003
3.9000e-003
9.0000e-004
4.8000e-003
0.0000 3.1677 3.1677
61 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 3.0000e-005
4.0000e-005
4.3000e-004
0.0000 1.6000e-004
0.0000 1.7000e-004
4.0000e-005
0.0000 4.0000e-005
0.0000 0.1173 0.1173 0.0000 0.0000 0.1174
Total 3.0000e-005
4.0000e-005
4.3000e-004
0.0000 0.0000 0.0000 0.11741.6000e-004
0.0000 1.7000e-004
4.0000e-005
0.0000 4.0000e-005
SO2 Fugitive PM10
Exhaust PM10
0.0000 0.1173 0.1173
PM2.5 Total
Bio- CO2 NBio- CO2
3.21 Pool & RE Building Demolition - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 2.1000e-004
0.0000 2.1000e-004
3.0000e-005
0.0000 3.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.0113 0.0958 0.1231 2.0000e-004
4.2500e-003
4.2500e-003
3.9900e-003
3.9900e-003
0.0000 17.8493 17.8493 4.2700e-003
0.0000 17.9389
Total 0.0113 0.0958 0.1231 2.0000e-004
4.2700e-003
0.0000 17.93892.1000e-004
4.2500e-003
4.4600e-003
3.0000e-005
3.9900e-003
4.0200e-003
0.0000 17.8493 17.8493
62 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 1.0000e-005
1.1000e-004
1.7000e-004
0.0000 2.0000e-005
0.0000 2.0000e-005
0.0000 0.0000 1.0000e-005
0.0000 0.0620 0.0620 0.0000 0.0000 0.0620
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 1.5000e-004
2.1000e-004
2.2700e-003
1.0000e-005
8.8000e-004
1.0000e-005
8.8000e-004
2.3000e-004
1.0000e-005
2.4000e-004
0.0000 0.6255 0.6255 2.0000e-005
0.0000 0.6260
Total 1.6000e-004
3.2000e-004
2.4400e-003
1.0000e-005
2.0000e-005
0.0000 0.68809.0000e-004
1.0000e-005
9.0000e-004
2.3000e-004
1.0000e-005
2.5000e-004
SO2 Fugitive PM10
Exhaust PM10
0.0000 0.6874 0.6874
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 8.0000e-005
0.0000 8.0000e-005
1.0000e-005
0.0000 1.0000e-005
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.0113 0.0958 0.1231 2.0000e-004
4.2500e-003
4.2500e-003
3.9900e-003
3.9900e-003
0.0000 17.8492 17.8492 4.2700e-003
0.0000 17.9389
Total 0.0113 0.0958 0.1231 2.0000e-004
4.2700e-003
0.0000 17.93898.0000e-005
4.2500e-003
4.3300e-003
1.0000e-005
3.9900e-003
4.0000e-003
0.0000 17.8492 17.8492
63 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 1.0000e-005
1.1000e-004
1.7000e-004
0.0000 2.0000e-005
0.0000 2.0000e-005
0.0000 0.0000 1.0000e-005
0.0000 0.0620 0.0620 0.0000 0.0000 0.0620
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 1.5000e-004
2.1000e-004
2.2700e-003
1.0000e-005
8.8000e-004
1.0000e-005
8.8000e-004
2.3000e-004
1.0000e-005
2.4000e-004
0.0000 0.6255 0.6255 2.0000e-005
0.0000 0.6260
Total 1.6000e-004
3.2000e-004
2.4400e-003
1.0000e-005
2.0000e-005
0.0000 0.68809.0000e-004
1.0000e-005
9.0000e-004
2.3000e-004
1.0000e-005
2.5000e-004
SO2 Fugitive PM10
Exhaust PM10
0.0000 0.6874 0.6874
PM2.5 Total
Bio- CO2 NBio- CO2
3.22 Pool & RE Building Grading - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 0.0367 0.0000 0.0367 0.0199 0.0000 0.0199 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 8.2600e-003
0.0728 0.0912 1.4000e-004
3.4700e-003
3.4700e-003
3.1900e-003
3.1900e-003
0.0000 12.4049 12.4049 4.0100e-003
0.0000 12.4891
Total 8.2600e-003
0.0728 0.0912 1.4000e-004
4.0100e-003
0.0000 12.48910.0367 3.4700e-003
0.0401 0.0199 3.1900e-003
0.0231 0.0000 12.4049 12.4049
64 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 1.1000e-004
1.6000e-004
1.7000e-003
1.0000e-005
6.6000e-004
0.0000 6.6000e-004
1.7000e-004
0.0000 1.8000e-004
0.0000 0.4691 0.4691 2.0000e-005
0.0000 0.4695
Total 1.1000e-004
1.6000e-004
1.7000e-003
1.0000e-005
2.0000e-005
0.0000 0.46956.6000e-004
0.0000 6.6000e-004
1.7000e-004
0.0000 1.8000e-004
SO2 Fugitive PM10
Exhaust PM10
0.0000 0.4691 0.4691
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Fugitive Dust 0.0143 0.0000 0.0143 7.7700e-003
0.0000 7.7700e-003
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 8.2600e-003
0.0728 0.0912 1.4000e-004
3.4700e-003
3.4700e-003
3.1900e-003
3.1900e-003
0.0000 12.4048 12.4048 4.0100e-003
0.0000 12.4891
Total 8.2600e-003
0.0728 0.0912 1.4000e-004
4.0100e-003
0.0000 12.48910.0143 3.4700e-003
0.0178 7.7700e-003
3.1900e-003
0.0110 0.0000 12.4048 12.4048
65 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 1.1000e-004
1.6000e-004
1.7000e-003
1.0000e-005
6.6000e-004
0.0000 6.6000e-004
1.7000e-004
0.0000 1.8000e-004
0.0000 0.4691 0.4691 2.0000e-005
0.0000 0.4695
Total 1.1000e-004
1.6000e-004
1.7000e-003
1.0000e-005
2.0000e-005
0.0000 0.46956.6000e-004
0.0000 6.6000e-004
1.7000e-004
0.0000 1.8000e-004
SO2 Fugitive PM10
Exhaust PM10
0.0000 0.4691 0.4691
PM2.5 Total
Bio- CO2 NBio- CO2
3.23 Tennis Court Deck Underground Utilities - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 5.0500e-003
0.0501 0.0467 7.0000e-005
2.5300e-003
2.5300e-003
2.3300e-003
2.3300e-003
0.0000 5.9891 5.9891 1.9400e-003
0.0000 6.0297
Total 5.0500e-003
0.0501 0.0467 7.0000e-005
1.9400e-003
0.0000 6.02972.5300e-003
2.5300e-003
2.3300e-003
2.3300e-003
0.0000 5.9891 5.9891
66 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 7.0000e-005
1.0000e-004
1.1100e-003
1.0000e-005
4.3000e-004
0.0000 4.3000e-004
1.1000e-004
0.0000 1.2000e-004
0.0000 0.3049 0.3049 1.0000e-005
0.0000 0.3052
Total 7.0000e-005
1.0000e-004
1.1100e-003
1.0000e-005
1.0000e-005
0.0000 0.30524.3000e-004
0.0000 4.3000e-004
1.1000e-004
0.0000 1.2000e-004
SO2 Fugitive PM10
Exhaust PM10
0.0000 0.3049 0.3049
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 5.0500e-003
0.0501 0.0467 7.0000e-005
2.5300e-003
2.5300e-003
2.3300e-003
2.3300e-003
0.0000 5.9891 5.9891 1.9400e-003
0.0000 6.0297
Total 5.0500e-003
0.0501 0.0467 7.0000e-005
1.9400e-003
0.0000 6.02972.5300e-003
2.5300e-003
2.3300e-003
2.3300e-003
0.0000 5.9891 5.9891
67 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 7.0000e-005
1.0000e-004
1.1100e-003
1.0000e-005
4.3000e-004
0.0000 4.3000e-004
1.1000e-004
0.0000 1.2000e-004
0.0000 0.3049 0.3049 1.0000e-005
0.0000 0.3052
Total 7.0000e-005
1.0000e-004
1.1100e-003
1.0000e-005
1.0000e-005
0.0000 0.30524.3000e-004
0.0000 4.3000e-004
1.1000e-004
0.0000 1.2000e-004
SO2 Fugitive PM10
Exhaust PM10
0.0000 0.3049 0.3049
PM2.5 Total
Bio- CO2 NBio- CO2
3.24 Pool & RE Building Underground Utilities - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 3.4000e-004
3.3700e-003
3.1400e-003
0.0000 1.7000e-004
1.7000e-004
1.6000e-004
1.6000e-004
0.0000 0.4031 0.4031 1.3000e-004
0.0000 0.4059
Total 3.4000e-004
3.3700e-003
3.1400e-003
0.0000 1.3000e-004
0.0000 0.40591.7000e-004
1.7000e-004
1.6000e-004
1.6000e-004
0.0000 0.4031 0.4031
68 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 4.0000e-005
6.0000e-005
6.0000e-004
0.0000 2.3000e-004
0.0000 2.3000e-004
6.0000e-005
0.0000 6.0000e-005
0.0000 0.1642 0.1642 1.0000e-005
0.0000 0.1643
Total 4.0000e-005
6.0000e-005
6.0000e-004
0.0000 1.0000e-005
0.0000 0.16432.3000e-004
0.0000 2.3000e-004
6.0000e-005
0.0000 6.0000e-005
SO2 Fugitive PM10
Exhaust PM10
0.0000 0.1642 0.1642
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 3.4000e-004
3.3700e-003
3.1400e-003
0.0000 1.7000e-004
1.7000e-004
1.6000e-004
1.6000e-004
0.0000 0.4031 0.4031 1.3000e-004
0.0000 0.4059
Total 3.4000e-004
3.3700e-003
3.1400e-003
0.0000 1.3000e-004
0.0000 0.40591.7000e-004
1.7000e-004
1.6000e-004
1.6000e-004
0.0000 0.4031 0.4031
69 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 4.0000e-005
6.0000e-005
6.0000e-004
0.0000 2.3000e-004
0.0000 2.3000e-004
6.0000e-005
0.0000 6.0000e-005
0.0000 0.1642 0.1642 1.0000e-005
0.0000 0.1643
Total 4.0000e-005
6.0000e-005
6.0000e-004
0.0000 1.0000e-005
0.0000 0.16432.3000e-004
0.0000 2.3000e-004
6.0000e-005
0.0000 6.0000e-005
SO2 Fugitive PM10
Exhaust PM10
0.0000 0.1642 0.1642
PM2.5 Total
Bio- CO2 NBio- CO2
3.25 Tennis Court Deck Construction - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.0538 0.4902 0.6341 1.0600e-003
0.0207 0.0207 0.0195 0.0195 0.0000 91.2289 91.2289 0.0214 0.0000 91.6786
Total 0.0538 0.4902 0.6341 1.0600e-003
0.0214 0.0000 91.67860.0207 0.0207 0.0195 0.0195 0.0000 91.2289 91.2289
70 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 7.2700e-003
0.0464 0.1086 2.8000e-004
8.0300e-003
1.1200e-003
9.1500e-003
2.2900e-003
1.0300e-003
3.3300e-003
0.0000 23.6548 23.6548 1.6000e-004
0.0000 23.6581
Worker 6.2200e-003
8.7200e-003
0.0931 4.3000e-004
0.0360 2.6000e-004
0.0363 9.5600e-003
2.4000e-004
9.8000e-003
0.0000 25.6322 25.6322 1.0200e-003
0.0000 25.6536
Total 0.0135 0.0551 0.2017 7.1000e-004
1.1800e-003
0.0000 49.31170.0440 1.3800e-003
0.0454 0.0119 1.2700e-003
0.0131
SO2 Fugitive PM10
Exhaust PM10
0.0000 49.2870 49.2870
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.0538 0.4902 0.6340 1.0600e-003
0.0207 0.0207 0.0195 0.0195 0.0000 91.2288 91.2288 0.0214 0.0000 91.6785
Total 0.0538 0.4902 0.6340 1.0600e-003
0.0214 0.0000 91.67850.0207 0.0207 0.0195 0.0195 0.0000 91.2288 91.2288
71 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 7.2700e-003
0.0464 0.1086 2.8000e-004
8.0300e-003
1.1200e-003
9.1500e-003
2.2900e-003
1.0300e-003
3.3300e-003
0.0000 23.6548 23.6548 1.6000e-004
0.0000 23.6581
Worker 6.2200e-003
8.7200e-003
0.0931 4.3000e-004
0.0360 2.6000e-004
0.0363 9.5600e-003
2.4000e-004
9.8000e-003
0.0000 25.6322 25.6322 1.0200e-003
0.0000 25.6536
Total 0.0135 0.0551 0.2017 7.1000e-004
1.1800e-003
0.0000 49.31170.0440 1.3800e-003
0.0454 0.0119 1.2700e-003
0.0131
SO2 Fugitive PM10
Exhaust PM10
0.0000 49.2870 49.2870
PM2.5 Total
Bio- CO2 NBio- CO2
3.26 Pool & RE Building Construction - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.0626 0.5709 0.7384 1.2400e-003
0.0242 0.0242 0.0227 0.0227 0.0000 106.2413 106.2413 0.0249 0.0000 106.7649
Total 0.0626 0.5709 0.7384 1.2400e-003
0.0249 0.0000 106.76490.0242 0.0242 0.0227 0.0227 0.0000 106.2413 106.2413
72 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 8.4700e-003
0.0540 0.1265 3.2000e-004
9.3500e-003
1.3100e-003
0.0107 2.6700e-003
1.2000e-003
3.8700e-003
0.0000 27.5473 27.5473 1.9000e-004
0.0000 27.5512
Worker 7.2500e-003
0.0102 0.1084 5.0000e-004
0.0419 3.1000e-004
0.0422 0.0111 2.9000e-004
0.0114 0.0000 29.8502 29.8502 1.1800e-003
0.0000 29.8751
Total 0.0157 0.0641 0.2349 8.2000e-004
1.3700e-003
0.0000 57.42630.0513 1.6200e-003
0.0529 0.0138 1.4900e-003
0.0153
SO2 Fugitive PM10
Exhaust PM10
0.0000 57.3975 57.3975
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 0.0626 0.5708 0.7384 1.2400e-003
0.0242 0.0242 0.0227 0.0227 0.0000 106.2412 106.2412 0.0249 0.0000 106.7648
Total 0.0626 0.5708 0.7384 1.2400e-003
0.0249 0.0000 106.76480.0242 0.0242 0.0227 0.0227
SO2 Fugitive PM10
Exhaust PM10
0.0000 106.2412 106.2412
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 8.4700e-003
0.0540 0.1265 3.2000e-004
9.3500e-003
1.3100e-003
0.0107 2.6700e-003
1.2000e-003
3.8700e-003
0.0000 27.5473 27.5473 1.9000e-004
0.0000 27.5512
Worker 7.2500e-003
0.0102 0.1084 5.0000e-004
0.0419 3.1000e-004
0.0422 0.0111 2.9000e-004
0.0114 0.0000 29.8502 29.8502 1.1800e-003
0.0000 29.8751
Total 0.0157 0.0641 0.2349 8.2000e-004
1.3700e-003
0.0000 57.42630.0513 1.6200e-003
0.0529 0.0138 1.4900e-003
0.0153 0.0000 57.3975 57.3975
73 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.27 Residence Hall Paving - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3500e-003
0.0126 0.0214 3.0000e-005
6.2000e-004
6.2000e-004
5.7000e-004
5.7000e-004
0.0000 2.9390 2.9390 9.5000e-004
0.0000 2.9590
Paving 1.6100e-003
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 2.9600e-003
0.0126 0.0214 3.0000e-005
9.5000e-004
0.0000 2.95906.2000e-004
6.2000e-004
5.7000e-004
5.7000e-004
SO2 Fugitive PM10
Exhaust PM10
0.0000 2.9390 2.9390
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 5.0000e-005
6.0000e-005
6.8000e-004
0.0000 2.6000e-004
0.0000 2.7000e-004
7.0000e-005
0.0000 7.0000e-005
0.0000 0.1876 0.1876 1.0000e-005
0.0000 0.1878
Total 5.0000e-005
6.0000e-005
6.8000e-004
0.0000 1.0000e-005
0.0000 0.18782.6000e-004
0.0000 2.7000e-004
7.0000e-005
0.0000 7.0000e-005
0.0000 0.1876 0.1876
74 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3500e-003
0.0126 0.0214 3.0000e-005
6.2000e-004
6.2000e-004
5.7000e-004
5.7000e-004
0.0000 2.9390 2.9390 9.5000e-004
0.0000 2.9590
Paving 1.6100e-003
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 2.9600e-003
0.0126 0.0214 3.0000e-005
9.5000e-004
0.0000 2.95906.2000e-004
6.2000e-004
5.7000e-004
5.7000e-004
SO2 Fugitive PM10
Exhaust PM10
0.0000 2.9390 2.9390
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 5.0000e-005
6.0000e-005
6.8000e-004
0.0000 2.6000e-004
0.0000 2.7000e-004
7.0000e-005
0.0000 7.0000e-005
0.0000 0.1876 0.1876 1.0000e-005
0.0000 0.1878
Total 5.0000e-005
6.0000e-005
6.8000e-004
0.0000 1.0000e-005
0.0000 0.18782.6000e-004
0.0000 2.7000e-004
7.0000e-005
0.0000 7.0000e-005
0.0000 0.1876 0.1876
75 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.28 Residence Hall Architecturaql Coating - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 0.3372 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 4.5300e-003
0.0304 0.0479 8.0000e-005
1.3600e-003
1.3600e-003
1.3600e-003
1.3600e-003
0.0000 6.7661 6.7661 3.7000e-004
0.0000 6.7739
Total 0.3417 0.0304 0.0479 8.0000e-005
3.7000e-004
0.0000 6.77391.3600e-003
1.3600e-003
1.3600e-003
1.3600e-003
SO2 Fugitive PM10
Exhaust PM10
0.0000 6.7661 6.7661
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 8.6000e-004
1.2000e-003
0.0128 6.0000e-005
4.9500e-003
4.0000e-005
4.9800e-003
1.3100e-003
3.0000e-005
1.3500e-003
0.0000 3.5221 3.5221 1.4000e-004
0.0000 3.5251
Total 8.6000e-004
1.2000e-003
0.0128 6.0000e-005
1.4000e-004
0.0000 3.52514.9500e-003
4.0000e-005
4.9800e-003
1.3100e-003
3.0000e-005
1.3500e-003
0.0000 3.5221 3.5221
76 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 0.3372 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 4.5300e-003
0.0304 0.0479 8.0000e-005
1.3600e-003
1.3600e-003
1.3600e-003
1.3600e-003
0.0000 6.7661 6.7661 3.7000e-004
0.0000 6.7739
Total 0.3417 0.0304 0.0479 8.0000e-005
3.7000e-004
0.0000 6.77391.3600e-003
1.3600e-003
1.3600e-003
1.3600e-003
SO2 Fugitive PM10
Exhaust PM10
0.0000 6.7661 6.7661
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 8.6000e-004
1.2000e-003
0.0128 6.0000e-005
4.9500e-003
4.0000e-005
4.9800e-003
1.3100e-003
3.0000e-005
1.3500e-003
0.0000 3.5221 3.5221 1.4000e-004
0.0000 3.5251
Total 8.6000e-004
1.2000e-003
0.0128 6.0000e-005
1.4000e-004
0.0000 3.52514.9500e-003
4.0000e-005
4.9800e-003
1.3100e-003
3.0000e-005
1.3500e-003
0.0000 3.5221 3.5221
77 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.29 Tennis Court Deck Architectural Coating - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 0.3372 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 2.2200e-003
0.0149 0.0235 4.0000e-005
6.7000e-004
6.7000e-004
6.7000e-004
6.7000e-004
0.0000 3.3192 3.3192 1.8000e-004
0.0000 3.3230
Total 0.3394 0.0149 0.0235 4.0000e-005
1.8000e-004
0.0000 3.32306.7000e-004
6.7000e-004
6.7000e-004
6.7000e-004
SO2 Fugitive PM10
Exhaust PM10
0.0000 3.3192 3.3192
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 4.2000e-004
5.9000e-004
6.2800e-003
3.0000e-005
2.4300e-003
2.0000e-005
2.4400e-003
6.4000e-004
2.0000e-005
6.6000e-004
0.0000 1.7278 1.7278 7.0000e-005
0.0000 1.7293
Total 4.2000e-004
5.9000e-004
6.2800e-003
3.0000e-005
7.0000e-005
0.0000 1.72932.4300e-003
2.0000e-005
2.4400e-003
6.4000e-004
2.0000e-005
6.6000e-004
0.0000 1.7278 1.7278
78 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 0.3372 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 2.2200e-003
0.0149 0.0235 4.0000e-005
6.7000e-004
6.7000e-004
6.7000e-004
6.7000e-004
0.0000 3.3192 3.3192 1.8000e-004
0.0000 3.3230
Total 0.3394 0.0149 0.0235 4.0000e-005
1.8000e-004
0.0000 3.32306.7000e-004
6.7000e-004
6.7000e-004
6.7000e-004
SO2 Fugitive PM10
Exhaust PM10
0.0000 3.3192 3.3192
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 4.2000e-004
5.9000e-004
6.2800e-003
3.0000e-005
2.4300e-003
2.0000e-005
2.4400e-003
6.4000e-004
2.0000e-005
6.6000e-004
0.0000 1.7278 1.7278 7.0000e-005
0.0000 1.7293
Total 4.2000e-004
5.9000e-004
6.2800e-003
3.0000e-005
7.0000e-005
0.0000 1.72932.4300e-003
2.0000e-005
2.4400e-003
6.4000e-004
2.0000e-005
6.6000e-004
0.0000 1.7278 1.7278
79 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.30 Pool & RE Building Paving - 2026Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 2.9200e-003
0.0274 0.0464 7.0000e-005
1.3400e-003
1.3400e-003
1.2300e-003
1.2300e-003
0.0000 6.3678 6.3678 2.0600e-003
0.0000 6.4111
Paving 1.6100e-003
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 4.5300e-003
0.0274 0.0464 7.0000e-005
2.0600e-003
0.0000 6.41111.3400e-003
1.3400e-003
1.2300e-003
1.2300e-003
SO2 Fugitive PM10
Exhaust PM10
0.0000 6.3678 6.3678
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 1.0000e-004
1.4000e-004
1.4800e-003
1.0000e-005
5.7000e-004
0.0000 5.8000e-004
1.5000e-004
0.0000 1.6000e-004
0.0000 0.4066 0.4066 2.0000e-005
0.0000 0.4069
Total 1.0000e-004
1.4000e-004
1.4800e-003
1.0000e-005
2.0000e-005
0.0000 0.40695.7000e-004
0.0000 5.8000e-004
1.5000e-004
0.0000 1.6000e-004
0.0000 0.4066 0.4066
80 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 2.9200e-003
0.0274 0.0464 7.0000e-005
1.3400e-003
1.3400e-003
1.2300e-003
1.2300e-003
0.0000 6.3678 6.3678 2.0600e-003
0.0000 6.4111
Paving 1.6100e-003
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 4.5300e-003
0.0274 0.0464 7.0000e-005
2.0600e-003
0.0000 6.41111.3400e-003
1.3400e-003
1.2300e-003
1.2300e-003
SO2 Fugitive PM10
Exhaust PM10
0.0000 6.3678 6.3678
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 1.0000e-004
1.4000e-004
1.4800e-003
1.0000e-005
5.7000e-004
0.0000 5.8000e-004
1.5000e-004
0.0000 1.6000e-004
0.0000 0.4066 0.4066 2.0000e-005
0.0000 0.4069
Total 1.0000e-004
1.4000e-004
1.4800e-003
1.0000e-005
2.0000e-005
0.0000 0.40695.7000e-004
0.0000 5.8000e-004
1.5000e-004
0.0000 1.6000e-004
0.0000 0.4066 0.4066
81 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.31 AAA Building Paving - 2027Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3500e-003
0.0126 0.0214 3.0000e-005
6.2000e-004
6.2000e-004
5.7000e-004
5.7000e-004
0.0000 2.9390 2.9390 9.5000e-004
0.0000 2.9590
Paving 1.6100e-003
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 2.9600e-003
0.0126 0.0214 3.0000e-005
9.5000e-004
0.0000 2.95906.2000e-004
6.2000e-004
5.7000e-004
5.7000e-004
SO2 Fugitive PM10
Exhaust PM10
0.0000 2.9390 2.9390
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 4.0000e-005
6.0000e-005
6.6000e-004
0.0000 2.6000e-004
0.0000 2.7000e-004
7.0000e-005
0.0000 7.0000e-005
0.0000 0.1859 0.1859 1.0000e-005
0.0000 0.1860
Total 4.0000e-005
6.0000e-005
6.6000e-004
0.0000 1.0000e-005
0.0000 0.18602.6000e-004
0.0000 2.7000e-004
7.0000e-005
0.0000 7.0000e-005
0.0000 0.1859 0.1859
82 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Off-Road 1.3500e-003
0.0126 0.0214 3.0000e-005
6.2000e-004
6.2000e-004
5.7000e-004
5.7000e-004
0.0000 2.9390 2.9390 9.5000e-004
0.0000 2.9590
Paving 1.6100e-003
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 2.9600e-003
0.0126 0.0214 3.0000e-005
9.5000e-004
0.0000 2.95906.2000e-004
6.2000e-004
5.7000e-004
5.7000e-004
SO2 Fugitive PM10
Exhaust PM10
0.0000 2.9390 2.9390
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 4.0000e-005
6.0000e-005
6.6000e-004
0.0000 2.6000e-004
0.0000 2.7000e-004
7.0000e-005
0.0000 7.0000e-005
0.0000 0.1859 0.1859 1.0000e-005
0.0000 0.1860
Total 4.0000e-005
6.0000e-005
6.6000e-004
0.0000 1.0000e-005
0.0000 0.18602.6000e-004
0.0000 2.7000e-004
7.0000e-005
0.0000 7.0000e-005
0.0000 0.1859 0.1859
83 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
3.32 AAA Building Architectural Coating - 2027Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 0.3372 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 2.2200e-003
0.0149 0.0235 4.0000e-005
6.7000e-004
6.7000e-004
6.7000e-004
6.7000e-004
0.0000 3.3192 3.3192 1.8000e-004
0.0000 3.3230
Total 0.3394 0.0149 0.0235 4.0000e-005
1.8000e-004
0.0000 3.32306.7000e-004
6.7000e-004
6.7000e-004
6.7000e-004
SO2 Fugitive PM10
Exhaust PM10
0.0000 3.3192 3.3192
PM2.5 Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 4.0000e-004
5.7000e-004
6.0700e-003
3.0000e-005
2.4300e-003
2.0000e-005
2.4400e-003
6.4000e-004
2.0000e-005
6.6000e-004
0.0000 1.7116 1.7116 7.0000e-005
0.0000 1.7130
Total 4.0000e-004
5.7000e-004
6.0700e-003
3.0000e-005
7.0000e-005
0.0000 1.71302.4300e-003
2.0000e-005
2.4400e-003
6.4000e-004
2.0000e-005
6.6000e-004
0.0000 1.7116 1.7116
84 of 85
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Archit. Coating 0.3372 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 2.2200e-003
0.0149 0.0235 4.0000e-005
6.7000e-004
6.7000e-004
6.7000e-004
6.7000e-004
0.0000 3.3192 3.3192 1.8000e-004
0.0000 3.3230
Total 0.3394 0.0149 0.0235 4.0000e-005
1.8000e-004
0.0000 3.32306.7000e-004
6.7000e-004
6.7000e-004
6.7000e-004
SO2 Fugitive PM10
Exhaust PM10
0.0000 3.3192 3.3192
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 4.0000e-004
5.7000e-004
6.0700e-003
3.0000e-005
2.4300e-003
2.0000e-005
2.4400e-003
6.4000e-004
2.0000e-005
6.6000e-004
0.0000 1.7116 1.7116 7.0000e-005
0.0000 1.7130
Total 4.0000e-004
5.7000e-004
6.0700e-003
3.0000e-005
2.4300e-003
2.0000e-005
2.4400e-003
6.4000e-004
2.0000e-005
6.6000e-004
0.0000 1.7116 1.7116 7.0000e-005
0.0000 1.7130
85 of 85
CalEEMod Version: CalEEMod.2013.2.2 Page 1 of 1 Date: 4/10/2016 10:29 AM
Concordia University - Campus Build-Out - 2035Orange County, Annual
1.0 Project Characteristics
1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population
University/College (4Yr) 1,800.00 Student 72.80 667,000.00 1320
1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 2.2 Precipitation Freq (Days) 30
Climate Zone 8 Operational Year 2035
Utility Company Southern California Edison
CO2 Intensity (lb/MWhr)
372 CH4 Intensity (lb/MWhr)
0.029 N2O Intensity (lb/MWhr)
0.006
1.3 User Entered Comments & Non-Default Data
Project Characteristics - SCE CO2 intensity for 2030
Land Use - Campus area is 72.8 acres. Assumes a maximum student population of 1,800 students, 321,200 square feet of institutional building space, approx. 346,000 square feet of residence hall space, and 1,320 campus residents.
Construction Phase - No construction emissions analysis for build-out conditions.
Off-road Equipment - No construction emissions under existing conditions.
1 of 10
Off-road Equipment - No construction emissions analysis for build-out conditions.
Trips and VMT - No construction emissions analysis for build-out conditions.
Vehicle Trips - Trip generation rates revised to be consistent with project Traffic Impact Analysis. Saturday trip rate is assumed to be 0.55% of weekday rate. Sunday trip rate is asumed to be 0.25% of weekday rate.Woodstoves -
Area Coating - SCAQMD Rule 1113 limits paints to a maximum VOC content of 50 g/L.
Solid Waste - Default solid waste generation rate changed to 562 tons per year per historic solid waste disposal for the campus (including residence halls).
Table Name Column Name Default Value New Value
tblAreaCoating Area_EF_Nonresidential_Exterior 250 50
tblAreaMitigation UseLowVOCPaintNonresidentialExteriorValue
50 250
tblLandUse LandUseSquareFeet 330,835.44 667,000.00
tblLandUse LotAcreage 7.59 72.80
tblLandUse Population 0.00 1,320.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00
tblProjectCharacteristics CO2IntensityFactor 630.89 372
tblProjectCharacteristics OperationalYear 2014 2035
tblSolidWaste SolidWasteGenerationRate 328.50 562.00
tblTripsAndVMT VendorTripNumber 109.00 0.00
tblTripsAndVMT WorkerTripNumber 280.00 0.00
tblVehicleTrips ST_TR 1.30 1.91
0.00 0.87
tblVehicleTrips WD_TR 2.38 3.47
tblVehicleTrips SU_TR
2 of 10
SO2 Fugitive PM10
Exhaust PM10
2.0 Emissions Summary
PM2.5 Total
Bio- CO2 NBio- CO2
2.2 Overall OperationalUnmitigated Operational
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Area 3.0306 2.1000e-004
0.0228 0.0000 8.0000e-005
8.0000e-005
8.0000e-005
8.0000e-005
0.0000 0.0447 0.0447 1.2000e-004
0.0000 0.0471
Energy 0.0570 0.5186 0.4356 3.1100e-003
0.0394 0.0394 0.0394 0.0394 0.0000 2,145.8030
2,145.8030 0.1341 0.0359 2,159.7337
Mobile 1.5988 3.3751 17.1548 0.0834 5.8849 0.0912 5.9760 1.5737 0.0842 1.6579 0.0000 5,286.4878
5,286.4878 0.1455 0.0000 5,289.5439
Waste 0.0000 0.0000 0.0000 0.0000 114.0809 0.0000 114.0809 6.7420 0.0000 255.6627
Water 0.0000 0.0000 0.0000 0.0000 1.2227 19.7681 20.9908 0.1271 3.2800e-003
24.6785
Total 4.6865 3.8939 17.6132 0.0865 7.1489 0.0391 7,729.6658
5.8849 0.1307 6.0155 1.5737 0.1237 1.6974 115.3036 7,452.1036
7,567.4072
3 of 10
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated Operational
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Area 3.0306 2.1000e-004
0.0228 0.0000 8.0000e-005
8.0000e-005
8.0000e-005
8.0000e-005
0.0000 0.0447 0.0447 1.2000e-004
0.0000 0.0471
Energy 0.0570 0.5186 0.4356 3.1100e-003
0.0394 0.0394 0.0394 0.0394 0.0000 2,145.8030
2,145.8030 0.1341 0.0359 2,159.7337
Mobile 1.5988 3.3751 17.1548 0.0834 5.8849 0.0912 5.9760 1.5737 0.0842 1.6579 0.0000 5,286.4878
5,286.4878 0.1455 0.0000 5,289.5439
Waste 0.0000 0.0000 0.0000 0.0000 114.0809 0.0000 114.0809 6.7420 0.0000 255.6627
Water 0.0000 0.0000 0.0000 0.0000 1.2227 19.7681 20.9908 0.1271 3.2800e-003
24.6765
Total 4.6865 3.8939 17.6132 0.0865 5.8849 0.1307 6.0155 1.5737 0.1237 1.6974 115.3036 7,452.1036
7,567.4072 7.1488 0.0391 7,729.6639
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent Reduction
0.00 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00
CO SO2 Fugitive PM10
0.00 0.00 0.00
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2
4.0 Operational Detail - Mobile
4.1 Mitigation Measures Mobile
ROG NOx NBio- CO2
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust PM10
PM10 Total
Mitigated 1.5988 3.3751 17.1548 0.0834 5.8849 0.0912 5.9760 1.5737 0.0842 1.6579 0.0000 5,286.4878
5,286.4878 0.1455 0.0000 5,289.5439
Unmitigated 1.5988 3.3751 17.1548 0.0834 5.8849 0.0912 5.9760 1.5737 0.0842 1.6579 0.0000 5,286.4878
5,286.4878 0.1455 0.0000 5,289.5439
4 of 10
4.2 Trip Summary Information
Average Daily Trip Rate Unmitigated MitigatedLand Use Weekday Saturday Sunday Annual VMT Annual VMT
University/College (4Yr) 6,246.00 3,438.00 1566.00 15,548,981 15,548,981Total 6,246.00 3,438.00 1,566.00 15,548,981 15,548,981
4.3 Trip Type Information
Miles Trip % Trip Purpose %
Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W
H-S or C-C H-O or C-NW Primary Diverted Pass-by
University/College (4Yr) 16.60 8.40 6.90 6.40 88.60 5.00 91 9 0
LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY
0.003004 0.000478 0.003811
5.0 Energy Detail
SBUS MH
0.477544 0.059603 0.204041 0.158997
NOx CO SO2 Fugitive PM10
0.001547 0.0023620.043661 0.006299 0.017331 0.021321
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2
4.4 Fleet MixHistorical Energy Use: N
5.1 Mitigation Measures EnergyROG NBio-
CO2Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust PM10
PM10 Total
Electricity Mitigated
0.0000 0.0000 0.0000 0.0000 0.0000 1,581.2875
1,581.2875 0.1233 0.0255 1,591.7827
Electricity Unmitigated
0.0000 0.0000 0.0000 0.0000 0.0000 1,581.2875
1,581.2875 0.1233 0.0255 1,591.7827
NaturalGas Mitigated
0.0570 0.5186 0.4356 3.1100e-003
0.0394 0.0394 0.0394 0.0394 0.0000 564.5155 564.5155 0.0108 0.0104 567.9510
NaturalGas Unmitigated
0.0570 0.5186 0.4356 3.1100e-003
564.5155 564.5155 0.0108 0.0104 567.95100.0394 0.0394 0.0394 0.00000.0394
5 of 10
ROG NOx CO SO2 Fugitive PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2
5.2 Energy by Land Use - NaturalGasUnmitigated
NaturalGas Use
NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr tons/yr MT/yr
Exhaust PM10
University/College (4Yr)
1.05786e+007
0.0570 0.5186 0.4356 0.0108 0.01043.1100e-003
0.0394 0.0394 0.0394
0.0394
0.0394 0.0000 564.5155 564.5155
0.0000 564.5155
567.9510
Total 0.0570 0.5186 0.4356 3.1100e-003
564.5155 0.0108 0.0104 567.9510
Mitigated
0.0394 0.0394 0.0394
NaturalGas Use
ROG NOx CO SO2 Fugitive PM10
Exhaust PM10
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr tons/yr MT/yr
University/College (4Yr)
1.05786e+007
0.0570 0.5186 564.5155 0.01080.4356 3.1100e-003
0.0394 0.0394
3.1100e-003
0.0394 0.0394 0.0000 564.5155
0.0394 0.0000
0.0104 567.9510
Total 0.0570 0.5186 0.4356 564.5155 564.5155 0.0108 0.0104 567.9510
5.3 Energy by Land Use - Electricity
0.0394 0.0394 0.0394
Unmitigated
Electricity Use
Total CO2 CH4 N2O CO2e
Land Use kWh/yr ton
MT/yr
University/College (4Yr)
9.37135e+006
1,581.2875 0.1233 0.0255 1,591.7827
Total 1,581.2875 0.1233 0.0255 1,591.7827
6 of 10
0.0255
Mitigated
Electricity Use
Total CO2 CH4 N2O CO2e
1,591.7827
Land Use kWh/yr ton
MT/yr
University/College (4Yr)
9.37135e+006
1,581.2875 0.1233
CO SO2 Fugitive PM10
1,591.7827
Total 1,581.2875 0.1233 0.0255
Fugitive PM2.5
Exhaust PM2.5
PM2.5 Total
Bio- CO2
6.0 Area Detail
6.1 Mitigation Measures Area
ROG NOx NBio- CO2
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust PM10
PM10 Total
Mitigated 3.0306 2.1000e-004
0.0228 0.0000 8.0000e-005
8.0000e-005
8.0000e-005
8.0000e-005
0.0000 0.0447 0.0447 1.2000e-004
0.0000 0.0471
Unmitigated 3.0306 2.1000e-004
0.0228 0.0000 1.2000e-004
0.0000 0.04718.0000e-005
8.0000e-005
8.0000e-005
8.0000e-005
SO2 Fugitive PM10
Exhaust PM10
0.0000 0.0447 0.0447
PM2.5 Total
Bio- CO2 NBio- CO2
6.2 Area by SubCategoryUnmitigated
ROG NOx CO Total CO2 CH4 N2O CO2e
SubCategory tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Architectural Coating
0.6183 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Consumer Products
2.4102 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Landscaping 2.0900e-003
2.1000e-004
0.0228 0.0000 8.0000e-005
8.0000e-005
8.0000e-005
8.0000e-005
0.0000 0.0447 0.0447 1.2000e-004
0.0000 0.0471
Total 3.0306 2.1000e-004
0.0228 0.0000 1.2000e-004
0.0000 0.04718.0000e-005
8.0000e-005
8.0000e-005
8.0000e-005
0.0000 0.0447 0.0447
7 of 10
SO2 Fugitive PM10
Exhaust PM10
PM2.5 Total
Bio- CO2 NBio- CO2
Mitigated
ROG NOx CO Total CO2 CH4 N2O CO2e
SubCategory tons/yr MT/yr
PM10 Total
Fugitive PM2.5
Exhaust PM2.5
Consumer Products
2.4102 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Landscaping 2.0900e-003
2.1000e-004
0.0228 0.0000 8.0000e-005
8.0000e-005
8.0000e-005
8.0000e-005
0.0000 0.0447 0.0447 1.2000e-004
0.0000 0.0471
Architectural Coating
0.6183 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 3.0306 2.1000e-004
0.0228 0.0000 8.0000e-005
8.0000e-005
8.0000e-005
8.0000e-005
0.0000 0.0447 0.0447 1.2000e-004
0.0000 0.0471
7.0 Water Detail
7.1 Mitigation Measures WaterTotal CO2 CH4 N2O CO2e
Category ton
MT/yr
Mitigated 20.9908 0.1271 3.2800e-003
24.6765
Unmitigated 20.9908 0.1271 3.2800e-003
24.6785
7.2 Water by Land UseUnmitigated
Indoor/Outdoor Use
Total CO2 CH4 N2O CO2e
Land Use Mgal ton
MT/yr
University/College (4Yr)
3.85398 / 6.02802
20.9908 0.1271 3.2800e-003
24.6785
Total 20.9908 0.1271 3.2800e-003
24.6785
8 of 10
Mitigated
Indoor/Outdoor Use
Total CO2 CH4 N2O CO2e
Land Use Mgal ton
MT/yr
University/College (4Yr)
3.85398 / 6.02802
20.9908 0.1271 3.2800e-003
24.6765
Total 20.9908 0.1271 3.2800e-003
24.6765
8.0 Waste Detail
8.1 Mitigation Measures Waste
Category/Year
Total CO2 CH4 N2O CO2e
ton
MT/yr
Mitigated 114.0809 6.7420 0.0000 255.6627
Unmitigated 114.0809 6.7420 0.0000 255.6627
8.2 Waste by Land UseUnmitigated
Waste Disposed
Total CO2 CH4 N2O CO2e
Land Use tons ton
MT/yr
University/College (4Yr)
562 114.0809 6.7420 0.0000 255.6627
Total 114.0809 6.7420 0.0000 255.6627
9 of 10
Mitigated
Waste Disposed
Total CO2 CH4 N2O CO2e
Land Use tons ton
MT/yr
University/College (4Yr)
562 114.0809 6.7420 0.0000 255.6627
Total 114.0809 6.7420 0.0000 255.6627
10 of 10