10/30/2018 alabama department of transportation … · reference nbr fa number scope of work type...
TRANSCRIPT
Route SR-68 ProjectDescription
BRIDGE REMOVAL BIN 002591, SR-68 OVER TAG RAILROAD 0.5 MILE NORTH OF SR-273 (SUFF=64.4, STATUS=FO)
Type of Work BRIDGE REMOVAL
Project Length in Miles 0.266 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049710 BR 0068 (505) UTILITIES
BRIDGE REMOVAL
2019 $17 $4 $21
TOTAL COST: $17 $4 $21
Route SR-9 ProjectDescription
BR REPL AND APP ON SR-9 OVER TERRAPIN CR #9-10-7.4 BIN #3411
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.200 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062337 BR 0009 (508) UTILITIES
BRIDGES AND APPROACHES
2019 $1,838 $460 $2,298
100003725 BR 0009 (508) CONSTRUCTION
BRIDGES AND APPROACHES
2019 $7,676 $1,919 $9,595
TOTAL COST: $9,515 $2,379 $11,893
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
1 of 94
REGION HIGHWAY PROJECTS - CHEROKEE
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
IMPROVEMENTS ADD LANES WEBSTER STREET FROM AVALON AVE TO SR-184 (SECOND ST) IN MUSCLE SHOALS
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.000 Urban Area SHOALS COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056067 STPOA 8828 (602) UTILITIES
ADDITIONAL ROADWAY LANES
2018 $98 $24 $122
TOTAL COST: $98 $24 $122
Route CR-NA ProjectDescription
ROADWAY WIDENING AND DRAINAGE IMPROVEMENTS ON WEBSTER STREET BETWEEN AVALON AVENUE AND SR-184
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 1.000 Urban Area SHOALS COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056068 ACOA56068 ATRP (014) CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2018 $986 $268 $1,254
TOTAL COST: $986 $268 $1,254
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
2 of 94
REGION HIGHWAY PROJECTS - COLBERT
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
RESURFACING, LEVELING AND DRAINAGE IMPROVEMENTS ON COX BOULEVARD FROM AVALON AVENUE TO SECOND STREET
Type of Work RESURFACING
Project Length in Miles 3.000 Urban Area SHOALS COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056076 STPOA 8822 (601) RIGHT OF WAY
RESURFACING
2019 $495 $124 $619
100056077 STPOA 8822 (601) UTILITIES
RESURFACING
2019 $90 $23 $113
100056078 STPOA 8822 (601) CONSTRUCTION
RESURFACING
2019 $1,838 $459 $2,297
TOTAL COST: $2,423 $606 $3,029
Route NA- ProjectDescription
ADDITIONAL LANES ON AVALON AVENUE FROM SOUTH MONTGOMERY AVE TO COX BLVD
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 0.000 Urban Area SHOALS COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059748 ACOA59748 ATRP (009) CONSTRUCTION
ADDITIONAL ROADWAY LANES
2016 $4,528 $946 $5,475
TOTAL COST: $4,528 $946 $5,475
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
3 of 94
REGION HIGHWAY PROJECTS - COLBERT
STIP PLAN: 2016 - Original
Route SR-133 ProjectDescription
ADDITIONAL LANES SR-133 FROM SR-20 (ALT US-72) TO NORFOLK SOUTHERN RR
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.022 Urban Area SHOALS COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100009150 STPOAF-NHF-RPF 0133 (506)
CONSTRUCTION
ADDITIONAL ROADWAY LANES
2017 $5,790 $1,448 $7,238
TOTAL COST: $5,790 $1,448 $7,238
Route SR-2 ProjectDescription
REPLACE BRIDGES AND APPROACHES, BIN 001708 AND BIN 005442, ON SR-2 (US-72) OVER ASHE BOULEVARD (SUFF=66.2, STATUS=FO)
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.400 Urban Area SHOALS COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100055932 BRF 0002 (529) UTILITIES
BRIDGES AND APPROACHES
2019 $273 $68 $342
100049340 BRF 0002 (529) CONSTRUCTION
BRIDGES AND APPROACHES
2019 $4,246 $1,061 $5,307
TOTAL COST: $4,519 $1,130 $5,649
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
4 of 94
REGION HIGHWAY PROJECTS - COLBERT
STIP PLAN: 2016 - Original
Route CR-1435 ProjectDescription
BRIDGE CULVERT REPLACEMENT AND RESURFACING ON CR-1435 (EVA ROAD) OVER BRIDGE CREEK BIN# 3740
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061112 ACBR61112 ATRP (010) CONSTRUCTION
BRIDGE REPLACEMENT
2018 $2,672 $676 $3,348
TOTAL COST: $2,672 $676 $3,348
Route CR-216 ProjectDescription
BRIDGE REPLACEMENT (BIN # 1436) ON CR-216 (BEECH GROVE ROAD) OVER BAVAR CREEK
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059329 ACBRZ59329 ATRP (010)
CONSTRUCTION
BRIDGE REPLACEMENT
2016 $640 $160 $800
TOTAL COST: $640 $160 $800
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT ON CONVENT ROAD NORTH EAST OVER EIGHTMILE CREEK BIN# 6659
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061111 ACBR61111 ATRP (013) CONSTRUCTION
BRIDGE REPLACEMENT
2019 $1,390 $348 $1,738
TOTAL COST: $1,390 $348 $1,738
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
5 of 94
REGION HIGHWAY PROJECTS - CULLMAN
STIP PLAN: 2016 - Original
Route I -65 ProjectDescription
REHABILITATE I-65 FROM BLOUNT COUNTY LINE TO SOUTH OF NEW CR-222 INTERCHANGE.
Type of Work PREVENTATIVE MAINTENANCE LEVEL 1
Project Length in Miles 13.545 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100055355 IM I065 (463) CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 1
2016 $9,175 $1,019 $10,195
TOTAL COST: $9,175 $1,019 $10,195
Route I -65 ProjectDescription
I-65 AT SR-157 INTERCHANGE RAMPS (EXIT 310), REPLACEMENT OF CONCRETE PAVEMENT FOR ALL RAMPS. ALSO TO INCLUDE A RIGHT TURN LANE ADDITION TO THE NORTHBOUND EXIT RAMP.
Type of Work PAVEMENT REHABILITATION
Project Length in Miles 0.942 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060248 IM I065 (452) CONSTRUCTION
PAVEMENT REHABILITATION
2016 $3,423 $385 $3,808
TOTAL COST: $3,423 $385 $3,808
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
6 of 94
REGION HIGHWAY PROJECTS - CULLMAN
STIP PLAN: 2016 - Original
Route SR-157 ProjectDescription
SR-157, ADDITIONAL LANES AND BRIDGES FROM SR-69 TO EAST OF SR-3 (US-31) NORTH OF CULLMAN. BRIDGES OVER LAKE CATOMA AND CSX RAILROAD
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 4.417 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100038840 NH 0157 (506) UTILITIES
GRADE, DRAIN, BASE AND PAVE
2019 $228 $57 $285
TOTAL COST: $228 $57 $285
Route SR-69 ProjectDescription
ADDITION OF LEFT TURN LANE ON SR-69 AT CR-1545 (GOLD RIDGE ROAD)
Type of Work TURN LANES
Project Length in Miles 0.500 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061436 HSIP 0069 (551) CONSTRUCTION
TURN LANES 2017 $360 $343 $703
TOTAL COST: $360 $343 $703
Route SR-74 ProjectDescription
REPLACE BRIDGE, BIN 001618, ON SR-74 (US-278) OVER BRINDLEY CREEK 0.8 MILE EAST OF SR-69 (SUFF=50.8, STATUS=FO)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 1.174 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049720 BR 0074 (517) CONSTRUCTION
BRIDGE REPLACEMENT
2018 $7,056 $1,764 $8,820
TOTAL COST: $7,056 $1,764 $8,820
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
7 of 94
REGION HIGHWAY PROJECTS - CULLMAN
STIP PLAN: 2016 - Original
Route CR-91 ProjectDescription
BRIDGE REPLACEMENT ON CR-91 (CHAVIES ROAD) OVER TOWN CREEK IN THE CITY OF RAINSVILLE BIN# 19009
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059382 ACBRZ59382 ATRP (010)
CONSTRUCTION
BRIDGE REPLACEMENT
2018 $1,846 $580 $2,426
TOTAL COST: $1,846 $580 $2,426
Route NA- ProjectDescription
RESURFACE DEAN ROAD FROM CR-89 TO CR-153
Type of Work RESURFACING
Project Length in Miles 2.600 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061194 ACOA61194 ATRP (008) CONSTRUCTION
RESURFACING
2016 $392 $98 $490
TOTAL COST: $392 $98 $490
Route NA- ProjectDescription
CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES AT VARIOUS LOCATIONS IN DEKALB AND JACKSON COUNTIES
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060151 STPAA NR13 () CONSTRUCTION
SIDEWALK 2019 $155 $39 $193
TOTAL COST: $155 $39 $193
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
8 of 94
REGION HIGHWAY PROJECTS - DEKALB
STIP PLAN: 2016 - Original
Route SR-117 ProjectDescription
REPL BIN 000543, SR-117 OVER W. FORK LITTLE RIVER (SUFF =52.8, STAT = FO)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.511 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100045893 BRF 0117 (501) RIGHT OF WAY
BRIDGE REPLACEMENT
2016 $189 $47 $236
100048487 BRF 0117 (501) UTILITIES
BRIDGE REPLACEMENT
2017 $897 $224 $1,121
100040786 BRF 0117 (501) CONSTRUCTION
BRIDGE REPLACEMENT
2018 $5,974 $1,493 $7,467
TOTAL COST: $7,060 $1,765 $8,824
Route SR-117 ProjectDescription
REPLACE BRIDGE, BIN 000426, SR-117 OVERPASS AGS RAILROAD IN VALLEY HEAD. (SUFF=54.5, STATUS = FO)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.853 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064443 BR 0117 (502) UTILITIES
BRIDGE REPLACEMENT
2016 $170 $42 $212
100047072 BR 0117 (502) CONSTRUCTION
BRIDGE REPLACEMENT
2017 $5,738 $1,435 $7,173
TOTAL COST: $5,907 $1,478 $7,385
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
9 of 94
REGION HIGHWAY PROJECTS - DEKALB
STIP PLAN: 2016 - Original
Route SR-7 ProjectDescription
REPL BR, BIN 000481, SR-7 (US-11) OVER DRY CREEK (SUFF=66.9, STAT=SD)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.042 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060273 BR 0007 (529) UTILITIES
BRIDGE REPLACEMENT
2019 $419 $105 $524
100041641 BR 0007 (529) CONSTRUCTION
BRIDGE REPLACEMENT
2019 $1,807 $452 $2,259
TOTAL COST: $2,226 $556 $2,782
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
10 of 94
REGION HIGHWAY PROJECTS - DEKALB
STIP PLAN: 2016 - Original
Route CR-2 ProjectDescription
BRIDGE REPLACEMENT ON CR-2 (JACKSON TRAIL ROAD) OVER LOCUST FORK IN ETOWAH COUNTY BIN #6003
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059783 ACBRZ59783 ATRP (005)
CONSTRUCTION
BRIDGE REPLACEMENT
2016 $1,401 $350 $1,751
TOTAL COST: $1,401 $350 $1,751
Route CR-224 ProjectDescription
BRIDGE AND APPROACHES ON (CR-224) COX GAP ROAD OVER SHORT CREEK BIN # 4718
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061382 ACBRZ61382 ATRP (014)
CONSTRUCTION
BRIDGE REPLACEMENT
2016 $468 $117 $585
TOTAL COST: $468 $117 $585
Route CR-251 ProjectDescription
BRIDGE AND APPROACHES ON (CR-251) SON JOHNSON ROAD OVER SHORT CREEK BIN # 9465
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061375 ACBRZ61375 ATRP (011)
CONSTRUCTION
BRIDGE REPLACEMENT
2018 $836 $209 $1,045
TOTAL COST: $836 $209 $1,045
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
11 of 94
REGION HIGHWAY PROJECTS - ETOWAH
STIP PLAN: 2016 - Original
Route CR-290 ProjectDescription
WIDENING, RESURFACING AND TRAFFIC STRIPE ON LAY SPRINGS ROAD AND MOON ROAD FROM GADSDEN CITY LIMITS TO TABOR ROAD (CR-291)
Type of Work RESURFACING
Project Length in Miles 6.700 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056668 STPOA 2814 (252) CONSTRUCTION
RESURFACING
2019 $952 $238 $1,190
TOTAL COST: $952 $238 $1,190
Route CR-568 ProjectDescription
BRIDGE AND APPROACHES ON (CR-568) YATES ROAD OVER BLACK CREEK BIN # 8921
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061376 ACBRZ61376 ATRP (012)
CONSTRUCTION
BRIDGE REPLACEMENT
2019 $748 $187 $935
TOTAL COST: $748 $187 $935
Route CR-71 ProjectDescription
BRIDGE AND APPROACHES ON CR-71 (CENTRE ROAD) OVER DRY CREEK BIN # 2479
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061380 ACBR61380 ATRP (014) CONSTRUCTION
BRIDGE REPLACEMENT
2018 $1,105 $283 $1,389
TOTAL COST: $1,105 $283 $1,389
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
12 of 94
REGION HIGHWAY PROJECTS - ETOWAH
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
RESURFACING AND TRAFFIC STRIPE ON NORTH COLLEGE STREET FROM RAILROAD AVENUE TO RABBITTOWN ROAD
Type of Work RESURFACING
Project Length in Miles 2.385 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064387 STPOA 2818 (250) PRELIMINARY ENGINEERING
RESURFACING
2018 $10 $2 $12
100064395 STPOA 2818 (250) CONSTRUCTION
RESURFACING
2019 $438 $110 $548
TOTAL COST: $448 $112 $560
Route CR-NA ProjectDescription
RECONSTRUCTION OF SOUTH 11TH STREET FROM BLACK CREEK PARKWAY TO THE BRIDGE AT BLACK CREEK
Type of Work PAVEMENT REHABILITATION
Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064626 STPOA 2815 (252) PRELIMINARY ENGINEERING
PAVEMENT REHABILITATION
2017 $66 $17 $83
100064625 STPOA 2815 (252) CONSTRUCTION
PAVEMENT REHABILITATION
2019 $374 $94 $468
TOTAL COST: $440 $110 $550
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
13 of 94
REGION HIGHWAY PROJECTS - ETOWAH
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT ON HICKORY STREET OVER BLACK CREEK IN THE CITY OF GADSDEN BIN# 003666
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064636 STPOA 2815 (253) PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2017 $245 $61 $306
TOTAL COST: $245 $61 $306
Route CR-NA ProjectDescription
RESURFACING AND TRAFFIC STRIPE ON CHESTNUT STREET FROM 5TH STREET TO BLACK CREEK IN THE CITY OF GADSDEN
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064639 STPOA 2815 () PRELIMINARY ENGINEERING
RESURFACING
2019 $52 $13 $65
TOTAL COST: $52 $13 $65
Route CR-NA ProjectDescription
RESURFACING AND TRAFFIC STRIPE ON WALNUT STREET FROM SR-25 (US-411/ALBERT RAINS BLVD) TO 12TH STREET IN THE CITY OF GADSDEN
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064641 STPOA 2815 () PRELIMINARY ENGINEERING
RESURFACING
2019 $42 $11 $53
TOTAL COST: $42 $11 $53
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
14 of 94
REGION HIGHWAY PROJECTS - ETOWAH
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT ON FORREST AVENUE OVER BLACK CREEK IN THE CITY OF GADSDEN BIN# 000741
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064645 STPOA 2815 () PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2019 $187 $47 $234
TOTAL COST: $187 $47 $234
Route CR-NA ProjectDescription
WIDEN AND RESURFACE SOUTH 11TH STREET FROM CR-203 (BLACK CREEK PARKWAY) TO NEAR PIEDMONT AVENUE
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 0.560 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100048747 STPOA 8121 (601) CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2019 $1,830 $458 $2,288
TOTAL COST: $1,830 $458 $2,288
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT AND APPROACHES ON COATS BEND CIRCLE OVER UNNAMED TRIBUTARY TO COOSA RIVER BIN 000561
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061377 ACBRZ61377 ATRP (016)
CONSTRUCTION
BRIDGE REPLACEMENT
2017 $262 $66 $328
TOTAL COST: $262 $66 $328
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
15 of 94
REGION HIGHWAY PROJECTS - ETOWAH
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
BRIDGE AND APPROACHES ON MURPHEE VALLEY ROAD OVER LOCUST FORK OF WARRIOR RIVER BIN # 1229
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061378 ACBRZ61378 ATRP (013)
CONSTRUCTION
BRIDGE REPLACEMENT
2018 $1,817 $454 $2,271
TOTAL COST: $1,817 $454 $2,271
Route CR-NA ProjectDescription
RESURFACING OF 3RD STREET FROM JUST NORTH OF SR-25 (US-411) TO TUSCALOOSA AVNUE AND GOODYEAR AVENUE FROM JUST NORTH OF SR-1 (US-431) TO JUST WEST OF SR-74 (US-278)
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061200 ACOA61200 ATRP (003) CONSTRUCTION
RESURFACING
2016 $522 $131 $653
TOTAL COST: $522 $131 $653
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
16 of 94
REGION HIGHWAY PROJECTS - ETOWAH
STIP PLAN: 2016 - Original
Route I -759 ProjectDescription
RESURFACING I-759 FROM THE I-59 INTERCHANGE TO THE EAST END OF THE COOSA RIVER BRIDGE, TO INCLUDE SLOPE CORRECTION, ACCEL LANE EXTENSION, DECEL LANE INSTALLATION, GUARDRAIL REPLACEMENT AND GUIDERAIL INSTALLATION
Type of Work PAVEMENT MINOR REHABILITATION
Project Length in Miles 4.935 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056197 IMF-HSIPF I759 (301) CONSTRUCTION
PAVEMENT MINOR REHABILITATION
2017 $6,624 $736 $7,360
TOTAL COST: $6,624 $736 $7,360
Route NA- ProjectDescription
RESURFACE BURKE AVENUE FROM LEE STREET TO SR-77 IN THE CITY OF ATTALLA
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061199 ACOA61199 ATRP (013) CONSTRUCTION
RESURFACING
2016 $201 $50 $251
TOTAL COST: $201 $50 $251
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
17 of 94
REGION HIGHWAY PROJECTS - ETOWAH
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
RESURFACE 4TH STREET FROM 6TH AVE TO SR-7 (US-11) IN THE CITY OF ATTALLA
Type of Work RESURFACING
Project Length in Miles 1.110 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061198 ACOA61198 ATRP (008) CONSTRUCTION
RESURFACING
2016 $615 $154 $768
TOTAL COST: $615 $154 $768
Route NA- ProjectDescription
CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES AT VARIOUS LOCATIONS IN ETOWAH COUNTY
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061454 STPAA NR13 () CONSTRUCTION
SIDEWALK 2019 $35 $9 $44
TOTAL COST: $35 $9 $44
Route NA- ProjectDescription
RESURFACING VANDELL BOULEVARD FROM HICKORY STREET TO FORREST AVENUE IN THE CITY OF GADSDEN
Type of Work RESURFACING
Project Length in Miles 0.779 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063363 STPOA 2815 (250) CONSTRUCTION
RESURFACING
2016 $268 $84 $352
TOTAL COST: $268 $84 $352
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
18 of 94
REGION HIGHWAY PROJECTS - ETOWAH
STIP PLAN: 2016 - Original
Route SR-1 ProjectDescription
REPLACE BRIDGE SR-1 (US-431) BIN # 5430 STR#1-28-11.9A AND BIN # 8648 STR#1-28-11.9B OVER BLACK CREEK.
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.781 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100038045 BR 0001 (565) CONSTRUCTION
BRIDGE REPLACEMENT
2016 $8,853 $2,213 $11,066
100064484 BR 0001 (565) UTILITIES
BRIDGE REPLACEMENT
2016 $544 $136 $680
TOTAL COST: $9,397 $2,349 $11,746
Route SR-205 ProjectDescription
BRIDGE REPLACEMENT ON SR-205 OVER L AND N RAILROAD (BIN #000438) (SUFF = 47.4)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 1.140 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064720 BR 0205 (507) PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2016 $121 $30 $152
100064725 BR 0205 (507) RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $83 $21 $104
100064724 BR 0205 (507) UTILITIES
BRIDGE REPLACEMENT
2019 $62 $16 $78
TOTAL COST: $267 $67 $334
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
19 of 94
REGION HIGHWAY PROJECTS - ETOWAH
STIP PLAN: 2016 - Original
Route SR-77 ProjectDescription
REPLACE BRIDGE, BIN 002035, SR-77 (NORTH BOUND) OVER COOSA RIVER. (SUFF=56.8, STATUS=FO)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.600 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059992 DE A181 () PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2019 $800 $0 $800
TOTAL COST: $800 $0 $800
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
20 of 94
REGION HIGHWAY PROJECTS - ETOWAH
STIP PLAN: 2016 - Original
Route CR-11 ProjectDescription
RESURFACE AND TRAFFIC STRIPE ON CR-11 FROM BEAR CREEK BRIDGE TO CR-15
Type of Work RESURFACING
Project Length in Miles 6.280 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062435 ACNU62435 ATRP (004) CONSTRUCTION
RESURFACING
2016 $413 $119 $533
TOTAL COST: $413 $119 $533
Route CR-11 ProjectDescription
RESURFACE AND TRAFFIC STRIPE ON CR-11 AND 4TH STREET FROM HAPPY HOLLOW ROAD TO BRIDGE BIN # 19621
Type of Work RESURFACING
Project Length in Miles 6.500 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062454 ACNU62454 ATRP (009) CONSTRUCTION
RESURFACING
2016 $587 $147 $733
TOTAL COST: $587 $147 $733
Route CR-22 ProjectDescription
FULL DEPTH RECLAMATION AND SURFACE TREATMENT ON CR-22 FROM SR-187 TO MCAFEE ROAD
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063401 ACNU63401 ATRP (006) CONSTRUCTION
RESURFACING
2016 $82 $20 $102
TOTAL COST: $82 $20 $102
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
21 of 94
REGION HIGHWAY PROJECTS - FRANKLIN
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
PLANING AND RESURFACING 4TH STREET (GOLDEN ROAD) FROM SR-19 TO THE MS. STATE LINE AND BRIDGE REPLACEMENT WITH BRIDGE CULVERT AT UNNAMED TRIBUTARY TO BEAR CREEK
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059643 ACBR59643 ATRP (004) CONSTRUCTION
BRIDGE REPLACEMENT
2016 $785 $196 $982
TOTAL COST: $785 $196 $982
Route SR-243 ProjectDescription
BRIDGE REPLACEMENT (BIN 008912) ON SR-243 OVER CEDAR CREEK (SUFF = 6.0, STAT = 1)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.055 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063654 BR 0243 (504) PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2019 $208 $52 $260
100049146 BR 0243 (504) RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $285 $71 $357
TOTAL COST: $493 $123 $617
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
22 of 94
REGION HIGHWAY PROJECTS - FRANKLIN
STIP PLAN: 2016 - Original
Route SR-247 ProjectDescription
REPLACE BRIDGE, BIN 008467, SR-247 OVER CEDAR CREEK. (SUFF=46.8, STATUS=SD)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.500 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049911 BR 0247 (501) RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $57 $14 $71
TOTAL COST: $57 $14 $71
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
23 of 94
REGION HIGHWAY PROJECTS - FRANKLIN
STIP PLAN: 2016 - Original
Route CR-213 ProjectDescription
BRIDGE REPLACEMENT ON CR-213 OVER MUD CREEK IN JACKSON COUNTY (BIN 439 SUFF 22.7)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100058647 ACBRZ58647 ATRP (010)
CONSTRUCTION
BRIDGE REPLACEMENT
2016 $1,249 $312 $1,561
TOTAL COST: $1,249 $312 $1,561
Route CR-288 ProjectDescription
BRIDGE CULVERT REPLACEMENT CR-288 (RIDGEDALE ROAD) OVER DRY CREEK AND RESURFACING OF RIDGEDALE ROAD BIN# 3303
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 2.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059397 ACBR59397 ATRP (007) CONSTRUCTION
BRIDGE REPLACEMENT
2016 $1,126 $281 $1,407
TOTAL COST: $1,126 $281 $1,407
Route CR-NA ProjectDescription
RESURFACING OF CLEMONS ROAD FROM SR-35 TO 0.2 MILES SOUTH OF SUMMER DRIVE
Type of Work RESURFACING
Project Length in Miles 3.810 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061202 ACOA61202 ATRP (006) CONSTRUCTION
RESURFACING
2018 $1,205 $301 $1,506
TOTAL COST: $1,205 $301 $1,506
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
24 of 94
REGION HIGHWAY PROJECTS - JACKSON
STIP PLAN: 2016 - Original
Route CR-10 ProjectDescription
CR-10 BRIDGE REPLACMENT OVER CYPRESS CREEK AND CYPRESS CREEK RELIEF BIN #744 AND #1422
Type of Work BRIDGE
Project Length in Miles 0.200 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062120 ACBRZ62120 ATRP (010)
CONSTRUCTION
BRIDGE 2016 $1,511 $378 $1,889
TOTAL COST: $1,511 $378 $1,889
Route CR-16 ProjectDescription
CR-16 BRIDGE REPLACEMENT OVER CYPRESS CREEK IN LAUDERDALE COUNTY BIN #001434
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.200 Urban Area SHOALS COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059049 STPOA 3914 (251) RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $40 $10 $50
100059050 STPOA 3914 (251) UTILITIES
BRIDGE REPLACEMENT
2020 $39 $10 $49
TOTAL COST: $79 $20 $99
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
25 of 94
REGION HIGHWAY PROJECTS - LAUDERDALE
STIP PLAN: 2016 - Original
Route CR-344 ProjectDescription
BRIDGE REPLACEMENT ON CR-344 OVER COWPEN CREEK BIN #1324
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062144 ACBR62144 ATRP (005) CONSTRUCTION
BRIDGE REPLACEMENT
2018 $380 $95 $475
TOTAL COST: $380 $95 $475
Route CR-489 ProjectDescription
BRIDGE REPLACEMENT ON CR-489 OVER SECOND CREEK BIN #1602
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062135 ACBRZ62135 ATRP (002)
CONSTRUCTION
BRIDGE REPLACEMENT
2016 $454 $114 $568
TOTAL COST: $454 $114 $568
Route CR-49 ProjectDescription
BRIDGE REPLACEMENT ON CR-49 OVER THE WEST FORK OF ANDERSON CREEK BIN #1587
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062132 ACBRZ62132 ATRP (006)
CONSTRUCTION
BRIDGE REPLACEMENT
2016 $383 $96 $479
TOTAL COST: $383 $96 $479
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
26 of 94
REGION HIGHWAY PROJECTS - LAUDERDALE
STIP PLAN: 2016 - Original
Route CR-52 ProjectDescription
BRIDGE REPLACEMENT ON CR-52 OVER DEERLICK BRANCH BIN #1595
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062133 ACBRZ62133 ATRP (007)
CONSTRUCTION
BRIDGE REPLACEMENT
2016 $395 $99 $494
TOTAL COST: $395 $99 $494
Route CR-61 ProjectDescription
BRIDGE REPLACEMENT ON CR-61 OVER BUTLER CREEK BIN #1467
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062145 ACBRZ62145 ATRP (005)
CONSTRUCTION
BRIDGE REPLACEMENT
2017 $1,045 $261 $1,306
TOTAL COST: $1,045 $261 $1,306
Route CR-76 ProjectDescription
BRIDGE REPLACEMENT ON CR-76 OVER SECOND CREEK BIN # 7097
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062146 ACBRZ62146 ATRP (013)
CONSTRUCTION
BRIDGE REPLACEMENT
2019 $1,403 $351 $1,754
TOTAL COST: $1,403 $351 $1,754
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
27 of 94
REGION HIGHWAY PROJECTS - LAUDERDALE
STIP PLAN: 2016 - Original
Route CR-87 ProjectDescription
BRIDGE REPLACEMENT ON CR-87 OVER BLUFF CREEK BIN# 1202 AND CR-25 OVER WEST FORK CREEK BIN# 2749
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area SHOALS COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063660 ACBRZ63660 ATRP () UTILITIES
BRIDGE REPLACEMENT
2018 $29 $7 $36
TOTAL COST: $29 $7 $36
Route CR-92 ProjectDescription
BRIDGE REPLACEMENT ON CR-92 OVER FIRST CREEK BIN #5942
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062143 ACBRZ62143 ATRP (004)
CONSTRUCTION
BRIDGE REPLACEMENT
2018 $599 $150 $749
TOTAL COST: $599 $150 $749
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
28 of 94
REGION HIGHWAY PROJECTS - LAUDERDALE
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
JOHN COFFEE MEMORIAL BRIDGE RAIL PAINTING. NATCHEZ TRACE PARKWAY
Type of Work BRIDGE PAINTING
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065123 PFH 3916 () CONSTRUCTION
BRIDGE PAINTING
2019 $5,152 $0 $5,152
TOTAL COST: $5,152 $0 $5,152
Route CR-NA ProjectDescription
RESURFACING AND RECONSTRUCTION OF COLLEGE STREET FROM WEST MOBILE STREET TO DR. HICKS BOULEVARD IN THE CITY OF FLORENCE
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 0.000 Urban Area SHOALS COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059695 ACOA59695 ATRP (013) CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2017 $674 $169 $843
TOTAL COST: $674 $169 $843
Route CR-NA ProjectDescription
ROUND-ABOUT AT THE INTERSECTION OF ROYAL AVENUE AND HUNTSVILLE ROAD IN THE CITY OF FLORENCE
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area SHOALS COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061359 ACOA61359 ATRP (014) CONSTRUCTION
INTERSECTION IMPROVEMENTS
2018 $1,349 $337 $1,687
TOTAL COST: $1,349 $337 $1,687
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
29 of 94
REGION HIGHWAY PROJECTS - LAUDERDALE
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT ON MARS HILL ROAD OVER COX CREEK BIN # 5004
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area SHOALS COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061360 ACBRZ61360 ATRP (016)
CONSTRUCTION
BRIDGE REPLACEMENT
2016 $473 $118 $591
TOTAL COST: $473 $118 $591
Route CR-NA ProjectDescription
MALL ROAD AND HOUGH ROAD/MADISON AVENUE REHABILITATION AND INTERSECTION IMPROVEMENTS CITY OF FLORENCE
Type of Work PAVEMENT REHABILITATION
Project Length in Miles 0.000 Urban Area SHOALS COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061522 STPOA UR14 (601) CONSTRUCTION
PAVEMENT REHABILITATION
2018 $2,144 $536 $2,679
TOTAL COST: $2,144 $536 $2,679
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
30 of 94
REGION HIGHWAY PROJECTS - LAUDERDALE
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
WIDENING RICKWOOD ROAD FROM RAILROAD TO CHISHOLM ROAD
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 0.000 Urban Area SHOALS COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063588 STPOA 3915 () RIGHT OF WAY
ADDITIONAL ROADWAY LANES
2019 $60 $15 $75
100063589 STPOA 3915 () UTILITIES
ADDITIONAL ROADWAY LANES
2019 $320 $80 $400
100063590 STPOA 3915 () CONSTRUCTION
ADDITIONAL ROADWAY LANES
2020 $1,280 $320 $1,600
TOTAL COST: $1,660 $415 $2,075
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
31 of 94
REGION HIGHWAY PROJECTS - LAUDERDALE
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
WIDENING RICKWOOD ROAD FROM RAILROAD TO CHISHOLM ROAD
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 0.000 Urban Area SHOALS COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063587 STPOA 3915 (250) PRELIMINARY ENGINEERING
ADDITIONAL ROADWAY LANES
2016 $360 $90 $450
TOTAL COST: $360 $90 $450
Route NA- ProjectDescription
RESURFACING AND RECONSTRUCTION OF WOOD AVENUE FROM EAST TUSCALOOSA STREET TO GILBERT COURT IN THE CITY OF FLORENCE
Type of Work PAVEMENT REHABILITATION
Project Length in Miles 0.900 Urban Area SHOALS COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059651 ACOA59651 ATRP (007) CONSTRUCTION
PAVEMENT REHABILITATION
2016 $977 $244 $1,221
TOTAL COST: $977 $244 $1,221
Route NA- ProjectDescription
BRIDGE REHABILITATION ON JACKSON ROAD IN THE CITY OF FLORENCE BIN # 11874
Type of Work BRIDGE REHABILITATION
Project Length in Miles 0.000 Urban Area SHOALS COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061358 ACBR61358 ATRP (014) CONSTRUCTION
BRIDGE REHABILITATION
2016 $149 $37 $186
TOTAL COST: $149 $37 $186
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
32 of 94
REGION HIGHWAY PROJECTS - LAUDERDALE
STIP PLAN: 2016 - Original
Route SR-2 ProjectDescription
REPLACE BRIDGE AND APPROACH, BIN 001386, ON SR-2 (US-72) OVER SECOND CREEK (SUFF=68.8, STATUS=F0)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.250 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049332 BR 0002 (528) CONSTRUCTION
BRIDGE REPLACEMENT
2016 $6,838 $1,709 $8,547
TOTAL COST: $6,838 $1,709 $8,547
Route SR-2 ProjectDescription
BRIDGE REPLACEMENT (BIN 001709) ON SR-2 (US-72) OVER SR-20
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.370 Urban Area SHOALS COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100038052 BR 0002 (579) RIGHT OF WAY
BRIDGES AND APPROACHES
2019 $2,279 $570 $2,848
TOTAL COST: $2,279 $570 $2,848
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
33 of 94
REGION HIGHWAY PROJECTS - LAUDERDALE
STIP PLAN: 2016 - Original
Route CR-165 ProjectDescription
BRIDGE REPLACEMENT ON CR-165 OVER UNNAMED STREAM (BIN 5658)(R.A.M.P.) AND BRIDGE REPLACEMENT ON CR-377 OVER MALLARD CREEK (BIN 2596)(R.A.M.P.)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060568 ACBRZ60568 ATRP (011)
CONSTRUCTION
BRIDGE REPLACEMENT
2018 $504 $126 $631
TOTAL COST: $504 $126 $631
Route CR-187 ProjectDescription
BRIDGE REPLACEMENT ON CR-187 OVER WEST FLINT CREEK BIN #9738 (R.A.M.P)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060553 ACBRZ60553 ATRP (012)
CONSTRUCTION
BRIDGE REPLACEMENT
2019 $1,317 $329 $1,646
TOTAL COST: $1,317 $329 $1,646
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
34 of 94
REGION HIGHWAY PROJECTS - LAWRENCE
STIP PLAN: 2016 - Original
Route CR-270 ProjectDescription
BRIDGE REPLACEMENT ON JEFFERSON STREET (CR-270) OVER BIG NANCE CREEK (BIN # 349) AND RELIEF BRIDGE (BIN # 348) IN THE CITY OF COURTLAND (R.A.M.P.)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060555 ACBRZ60555 ATRP (011)
CONSTRUCTION
BRIDGE REPLACEMENT
2019 $910 $227 $1,137
TOTAL COST: $910 $227 $1,137
Route CR-270 ProjectDescription
BRIDGE REPLACEMENT ON JEFFERSON STREET (CR-270) OVER NORFOLK SOUTHERN RAILROAD IN THE CITY OF COURTLAND (BIN 397)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060567 ACBRZ60567 ATRP (014)
CONSTRUCTION
BRIDGE REPLACEMENT
2019 $432 $108 $540
TOTAL COST: $432 $108 $540
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
35 of 94
REGION HIGHWAY PROJECTS - LAWRENCE
STIP PLAN: 2016 - Original
Route CR-70 ProjectDescription
RESURFACE AND TRAFFIC STRIPE CR-70 FROM LAWRENCE - WINSTON COUNTY LINE TO SR-33 (SITE 1) AND CR-71 FROM LAWRENCE- WINSTON COUNTY LINE TO CR-70 (SITE 2) FEDERAL LANDS PROJECT # AL-FLAP-LRNC-FH41(1)
Type of Work RESURFACING
Project Length in Miles 6.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063055 FLAP FLAP (002) CONSTRUCTION
RESURFACING
2014 $334 $177 $511
TOTAL COST: $334 $177 $511
Route SR-101 ProjectDescription
REPLACE BRIDGE, BIN 001493, SR-101 OVER BIG NANCE CREEK. (SUFF=36.0, STATUS=SD)
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 1.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049905 BR 0101 (570) PRELIMINARY ENGINEERING
BRIDGES AND APPROACHES
2018 $282 $71 $353
100049906 BR 0101 (570) RIGHT OF WAY
BRIDGES AND APPROACHES
2019 $57 $14 $71
TOTAL COST: $339 $85 $424
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
36 of 94
REGION HIGHWAY PROJECTS - LAWRENCE
STIP PLAN: 2016 - Original
Route CR-304 ProjectDescription
BRIDGE REPLACEMENTS ON CR-304 (RAGSDALE CREEK ROAD) OVER RAGSDALE CREEK, TWO BRIDGES BIN # 5989 AND 2753
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059659 ACBR59659 ATRP (005) CONSTRUCTION
BRIDGE REPLACEMENT
2016 $690 $179 $869
TOTAL COST: $690 $179 $869
Route CR-45 ProjectDescription
BRIDGE REPLACEMENT CR-45 (LUCAS FERRY ROAD) OVER MUD CREEK BIN# 7415
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059663 ACBRZ59663 ATRP (005)
CONSTRUCTION
BRIDGE REPLACEMENT
2016 $338 $86 $424
TOTAL COST: $338 $86 $424
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
37 of 94
REGION HIGHWAY PROJECTS - LIMESTONE
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
RESURFACE AND TRAFFIC STRIPE ON 5TH AVENUE FROM MARKET STREET TO JEFFERSON STREET
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063302 ACOA63302 ATRP (017) CONSTRUCTION
RESURFACING
2018 $410 $103 $513
TOTAL COST: $410 $103 $513
Route CR-NA ProjectDescription
RESURFACE AND TRAFFIC STRIPE ON WASHINGTON STREET FROM SR-2 (US-72) TO HOFFMAN STREET
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063306 ACOA63306 ATRP (017) CONSTRUCTION
RESURFACING
2017 $1,057 $264 $1,322
TOTAL COST: $1,057 $264 $1,322
Route CR-NA ProjectDescription
ADD TURN LANES ON EAST LIMESTONE ROAD FROM MCLEMORE CIRCLE TO EAST LIMESTONE SCHOOL
Type of Work TURN LANES
Project Length in Miles 0.000 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061945 ACAA61945 ATRP (013) CONSTRUCTION
TURN LANES 2018 $792 $259 $1,051
TOTAL COST: $792 $259 $1,051
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
38 of 94
REGION HIGHWAY PROJECTS - LIMESTONE
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT ON THACH ROAD OVER AN UNAMED CREEK (BIN # 4132)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061859 ACBRZ61859 ATRP (013)
CONSTRUCTION
BRIDGE REPLACEMENT
2019 $282 $70 $352
TOTAL COST: $282 $70 $352
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT ON QUINN ROAD OVER ROUND ISLAND CREEK (BIN 4488)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061946 ACBRZ61946 ATRP (011)
CONSTRUCTION
BRIDGE REPLACEMENT
2016 $475 $119 $594
TOTAL COST: $475 $119 $594
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT ON QUINN ROAD OVER BEAUCHAMP CREEK (BIN # 7825)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061858 ACBRZ61858 ATRP (011)
CONSTRUCTION
BRIDGE REPLACEMENT
2017 $601 $150 $751
TOTAL COST: $601 $150 $751
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
39 of 94
REGION HIGHWAY PROJECTS - LIMESTONE
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT ON LIBERTY WAY OVER LITTLE LIMESTONE CREEK (BIN 9162)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061861 ACBRZ61861 ATRP () CONSTRUCTION
BRIDGE REPLACEMENT
2019 $960 $240 $1,200
TOTAL COST: $960 $240 $1,200
Route CR-NA ProjectDescription
BRIDGE REPLACEMENTS ON FORREST STREET OVER SWAN CREEK AND RELIEF STRUCTURE (BINS 8813 AND 8814) AND RESURFACE AND TRAFFIC STRIPE ON FORREST STREET FROM SR-3(US-31) TO LINDSAY LANE
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063307 ACBR63307 ATRP (015) CONSTRUCTION
BRIDGE REPLACEMENT
2018 $2,937 $1,456 $4,394
TOTAL COST: $2,937 $1,456 $4,394
Route CR-NA ProjectDescription
RESURFACE, TRAFFIC STRIPE AND CULVERT EXTENSION ON NICK DAVIS ROAD FROM LINDSAY LANE TO MOORESVILLE ROAD
Type of Work RESURFACING
Project Length in Miles 2.969 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063309 ACOA63309 ATRP (015) CONSTRUCTION
RESURFACING
2017 $493 $123 $617
TOTAL COST: $493 $123 $617
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
40 of 94
REGION HIGHWAY PROJECTS - LIMESTONE
STIP PLAN: 2016 - Original
Route I -565 ProjectDescription
MEDIAN CROSSOVER PROTECTION ON I-565 FROM SPRING BRANCH (MP 0.10) TO CR-1036 (MADISON BOULEVARD OVERPASS) (MP 13.30) LIMESTONE AND MADISON COUNTIES
Type of Work SAFETY IMPROVEMENTS
Project Length in Miles 13.200 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100058241 HSIP-STPSA I565 (311) CONSTRUCTION
SAFETY IMPROVEMENTS
2016 $773 $86 $860
TOTAL COST: $773 $86 $860
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
41 of 94
REGION HIGHWAY PROJECTS - LIMESTONE
STIP PLAN: 2016 - Original
Route I -65 ProjectDescription
RESURFACING ON I-65 FROM NEAR I-565 (MP 338.85) TO NEAR SR-2 (US-72) (351.25)
Type of Work PREVENTATIVE MAINTENANCE LEVEL 2
Project Length in Miles 24.812 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063557 IMF I065 (467) PRELIMINARY ENGINEERING
PREVENTATIVE MAINTENANCE LEVEL 2
2016 $210 $23 $233
100063558 RPF-IMF I065 (467) CONSTRUCTION
PAVEMENT MINOR REHABILITATION
2017 $17,978 $1,998 $19,975
TOTAL COST: $18,187 $2,021 $20,208
Route I -65 ProjectDescription
MEDIAN CROSSOVER PROTECTION ON I-65 FROM NORFOLK SOUTHERN RR OVERPASS (MP 341.40) TO 0.1 MILE SOUTH SR-3 (US-31) (MP 354.1) AND FROM 1.3 MILES NORTH SR-53 UNDERPASS (MP 366.20) TO TENNESSEE STATE LINE (MP 366.30) LIMESTONE COUNTY
Type of Work SAFETY IMPROVEMENTS
Project Length in Miles 24.900 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100058237 HSIP-STPSA I065 (443) CONSTRUCTION
SAFETY IMPROVEMENTS
2016 $1,022 $114 $1,136
TOTAL COST: $1,022 $114 $1,136
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
42 of 94
REGION HIGHWAY PROJECTS - LIMESTONE
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
RESURFACE AND TRAFFIC STRIPE ON HINE STREET FROM SR-2 (US-72) TO ELM STREET
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063305 ACOA63305 ATRP (018) CONSTRUCTION
RESURFACING
2016 $390 $97 $487
TOTAL COST: $390 $97 $487
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
43 of 94
REGION HIGHWAY PROJECTS - LIMESTONE
STIP PLAN: 2016 - Original
Route CR-11 ProjectDescription
ADDITIONAL LANES, CR-11 (MARTIN ROAD) FROM CR-12 (OLD JIM WILLIAMS ROAD) TO CR-7 (ZIERDT ROAD)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.500 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060160 ACAA60160 ATRP (012) CONSTRUCTION
ADDITIONAL ROADWAY LANES
2018 $9,080 $2,270 $11,350
TOTAL COST: $9,080 $2,270 $11,350
Route CR-19 ProjectDescription
ADDITIONAL LANES ON CR-19 (JEFF ROAD) FROM 0.8 MILES SOUTH OF CR-28 (CAPSHAW ROAD) TO NORTH OF DOUGLASS ROAD
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 2.800 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061458 ACAA61458 ATRP (015) CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2020 $9,045 $4,455 $13,500
TOTAL COST: $9,045 $4,455 $13,500
Route CR-242 ProjectDescription
CR-242 (OLD HIGHWAY 431) FOUR (4) BRIDGE REPLACEMENTS. BIN NUMBERS 313, 558, 559, AND 314
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062252 STPHV 4514 () CONSTRUCTION
BRIDGE REPLACEMENT
2019 $6,792 $1,698 $8,490
TOTAL COST: $6,792 $1,698 $8,490
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
44 of 94
REGION HIGHWAY PROJECTS - MADISON
STIP PLAN: 2016 - Original
Route CR-7 ProjectDescription
CR-7 (ZIERDT ROAD) SOUTHBOUND LANES AND GREENWAY FROM SOUTH OF CR-11 (MARTIN ROAD) TO THE INTERSECTION OF MADISON BOULEVARD, INCLUDES INTERSECTION IMPROVEMENTS AT MARTIN ROAD AND MADISON BOULEVARD
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 2.600 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062037 STPHV-ACAA62037 ATRP (016)
CONSTRUCTION
GRADE, DRAIN, BASE AND PAVE
2018 $16,420 $4,105 $20,525
TOTAL COST: $16,420 $4,105 $20,525
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
45 of 94
REGION HIGHWAY PROJECTS - MADISON
STIP PLAN: 2016 - Original
Route CR-93 ProjectDescription
ADDITIONAL LANES ON CR-93 (WINCHESTER ROAD) FROM CR-983 (DOMINION CIRCLE) TO CR-406 (NAUGHER ROAD)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 2.300 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061222 ACAA61222 ATRP (010) CONSTRUCTION
ADDITIONAL ROADWAY LANES
2019 $10,385 $5,115 $15,500
TOTAL COST: $10,385 $5,115 $15,500
Route CR-93 ProjectDescription
ADDITIONAL LANES ON CR-93 (WINCHESTER ROAD) FROM FLINT RIVER TO .10 MILE PAST BELL FACTORY ROAD
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 0.530 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059776 ACAA59776 ATRP (012) CONSTRUCTION
ADDITIONAL ROADWAY LANES
2016 $2,542 $635 $3,177
TOTAL COST: $2,542 $635 $3,177
Route CR-93 ProjectDescription
ADDITIONAL LANES ON CR-93 (WINCHESTER ROAD) FROM CR-406 (NAUGHER ROAD) TO CR-389 (RIVERTON ROAD)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.000 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061457 ACAA61457 ATRP (012) CONSTRUCTION
ADDITIONAL ROADWAY LANES
2019 $7,366 $2,581 $9,947
TOTAL COST: $7,366 $2,581 $9,947
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
46 of 94
REGION HIGHWAY PROJECTS - MADISON
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
WIDENING AND REALIGNMENT OF CHURCH ST. (PHASE I) FROM MONROE ST. TO E. OF PRATT AVE. AND REALIGNMENT OF PRATT AVE. INCLUDING BRIDGE REPLACEMENTS OVER PINHOOK CREEK (BINS# 003521 AND 008439) IN THE CITY OF HUNTSVILLE
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.100 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049499 STPHV 4500 (217) CONSTRUCTION
ADDITIONAL ROADWAY LANES
2018 $10,988 $3,305 $14,293
TOTAL COST: $10,988 $3,305 $14,293
Route CR-NA ProjectDescription
HUNTSVILLE NORTHERN BYPASS FROM 1.2 MILES EAST OF CR-86 (PULASKI PIKE) TO 1500 FT EAST OF SR-1 (US-231/431) INTERSECTION
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 12.600 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061849 ST-045-000-015 () RIGHT OF WAY
GRADE, DRAIN, BASE, PAVE AND BRG
2016 $0 $0 $0
100061850 NHF-STPAAF 4514 (252)
UTILITIES
GRADE, DRAIN, BASE, PAVE AND BRG
2019 $3,056 $764 $3,820
100061851 NHF-STPAAF 4514 (252)
CONSTRUCTION
GRADE, DRAIN, BASE, PAVE AND BRG
2019 $18,951 $4,738 $23,688
TOTAL COST: $22,007 $5,502 $27,508
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
47 of 94
REGION HIGHWAY PROJECTS - MADISON
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
KELLNER ROAD EXTENSION TO ZIERDT ROAD
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 2.200 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062261 STPHV 4514 (253) PRELIMINARY ENGINEERING
GRADE, DRAIN, BASE AND PAVE
2017 $440 $110 $550
TOTAL COST: $440 $110 $550
Route CR-NA ProjectDescription
KELLNER ROAD EXTENSION FROM WALL TRIANA HWY TO SOUTH OF BUSINESS PARK BLVD
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 2.200 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061239 ACAA61239 ATRP (010) CONSTRUCTION
GRADE, DRAIN, BASE AND PAVE
2019 $8,040 $3,960 $12,000
TOTAL COST: $8,040 $3,960 $12,000
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
48 of 94
REGION HIGHWAY PROJECTS - MADISON
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
CLEARING AND GRUBBING AND STRUCTURE REMOVAL FOR THE RELOCATION OF CHURCH STREET AND PRATT AVENUE IN HUNTSVILLE
Type of Work CLEARING AND GRUBBING
Project Length in Miles 1.100 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100033484 STPHV 4500 (200) CONSTRUCTION
CLEARING AND GRUBBING
2016 $355 $89 $444
TOTAL COST: $355 $89 $444
Route NA- ProjectDescription
IMPROVE PEDESTRIAN FACILITIESATFIVE POINTS ; PROJECT LOCATED NEAR HOLMES AV, PRATT AV, AND ANDREW JACKSON AV. IN HUNTSVILLE
Type of Work STREETSCAPE
Project Length in Miles 0.000 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100045139 STPAA AL61 (900) CONSTRUCTION
STREETSCAPE
2019 $474 $119 $593
TOTAL COST: $474 $119 $593
Route NA- ProjectDescription
CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES AT VARIOUS LOCATIONS IN MADISON COUNTY
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060145 STPAA NR13 (945) CONSTRUCTION
SIDEWALK 2019 $390 $98 $488
TOTAL COST: $390 $98 $488
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
49 of 94
REGION HIGHWAY PROJECTS - MADISON
STIP PLAN: 2016 - Original
Route SR-1 ProjectDescription
SR-1 (MEMORIAL PARKWAY) FROM 0.31 MI S OF CR-75 (MASTIN LAKE RD) TO CR-65 (WINCHESTER RD) INCLUDING AN OVERPASS AT CR-75 AND ACCESS IMPROVEMENTS TO CR-65
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 1.887 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100041419 ST-045-001-015 () RIGHT OF WAY
GRADE, DRAIN, BASE, PAVE AND BRG
2017 $0 $4,848 $4,848
100041420 NHF 8510 (009) UTILITIES
GRADE, DRAIN, BASE, PAVE AND BRG
2019 $683 $171 $853
100004926 NHF 8510 (009) CONSTRUCTION
GRADE, DRAIN, BASE, PAVE AND BRG
2019 $23,880 $5,970 $29,850
TOTAL COST: $24,563 $10,989
$35,551
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
50 of 94
REGION HIGHWAY PROJECTS - MADISON
STIP PLAN: 2016 - Original
Route SR-2 ProjectDescription
ADDITIONAL LANES SR-2 (US-72) FROM BALCH ROAD TO HUGHES ROAD IN THE CITY LIMITS OF MADISON
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.552 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061224 ACAA61224 ATRP (012) CONSTRUCTION
ADDITIONAL ROADWAY LANES
2019 $4,400 $2,167 $6,567
TOTAL COST: $4,400 $2,167 $6,567
Route SR-2 ProjectDescription
ADDITIONAL LANES SR-2 (US-72) FROM COUNTY LINE ROAD TO PROVIDENCE MAIN ROAD IN THE CITY OF HUNTSVILLE
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 16.320 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061845 NHF 0002 (566) RIGHT OF WAY
ADDITIONAL ROADWAY LANES
2019 $6,121 $1,530 $7,651
100061846 NHF 0002 (566) UTILITIES
ADDITIONAL ROADWAY LANES
2019 $2,409 $602 $3,012
100061847 NH 0002 () CONSTRUCTION
ADDITIONAL ROADWAY LANES
2019 $24,000 $6,000 $30,000
TOTAL COST: $32,530 $8,132 $40,662
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
51 of 94
REGION HIGHWAY PROJECTS - MADISON
STIP PLAN: 2016 - Original
Route SR-255 ProjectDescription
INTERCHANGE AT BLAKE BOTTOM ROAD AND SR-255 (RESEARCH PARK BLVD)
Type of Work INTERCHANGE
Project Length in Miles 0.000 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059775 ACAA59775 ATRP (009) CONSTRUCTION
INTERCHANGE
2017 $7,196 $1,799 $8,995
TOTAL COST: $7,196 $1,799 $8,995
Route SR-53 ProjectDescription
ACCESS MANAGEMENT AND INTERSECTION IMPROVEMENTS ON SR-53 (US-231) FROM HOBBS ISLAND ROAD TO SOUTH OF WEATHERLY ROAD
Type of Work UNCLASSIFIED
Project Length in Miles 12.582 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061839 NH 0053 (571) RIGHT OF WAY
UNCLASSIFIED 2019 $320 $80 $400
100061838 NH 0053 (571) UTILITIES
UNCLASSIFIED 2019 $1,233 $308 $1,541
100061840 RP-NH 0053 () CONSTRUCTION
UNCLASSIFIED 2019 $9,210 $2,303 $11,513
TOTAL COST: $10,764 $2,691 $13,455
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
52 of 94
REGION HIGHWAY PROJECTS - MADISON
STIP PLAN: 2016 - Original
Route CR-106 ProjectDescription
BRIDGE REPLACEMENT ON CR-106 (NEW HOME ROAD) AT CLEAR CREEK BIN #1815
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061315 ACBRZ61315 ATRP (015)
CONSTRUCTION
BRIDGE REPLACEMENT
2018 $806 $201 $1,007
TOTAL COST: $806 $201 $1,007
Route CR-213 ProjectDescription
BRIDGE REPLACEMENT ON CR-213 (GLENDALE ROAD) AT EDDY BRANCH BIN # 4163
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061306 ACBRZ61306 ATRP (008)
CONSTRUCTION
BRIDGE REPLACEMENT
2017 $244 $61 $305
TOTAL COST: $244 $61 $305
Route CR-291 ProjectDescription
BRIDGE REPLACEMENT ON CR-291 (MT. SINAI ROAD) AT SLAB CREEK BIN#8403
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061314 BRZ 4818 (250) CONSTRUCTION
BRIDGE REPLACEMENT
2018 $766 $233 $999
TOTAL COST: $766 $233 $999
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
53 of 94
REGION HIGHWAY PROJECTS - MARSHALL
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
RESURFACING INDUSTRIAL BOULEVARD AND JACKSON STREET IN THE CITY OF ALBERTVILLE
Type of Work RESURFACING
Project Length in Miles 1.450 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059485 ACOA59485 ATRP (006) CONSTRUCTION
RESURFACING
2016 $698 $305 $1,003
TOTAL COST: $698 $305 $1,003
Route NA- ProjectDescription
CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES AT VARIOUS LOCATIONS IN MARSHALL COUNTY
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060147 STPAA NR13 (935) CONSTRUCTION
SIDEWALK 2016 $625 $158 $783
TOTAL COST: $625 $158 $783
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
54 of 94
REGION HIGHWAY PROJECTS - MARSHALL
STIP PLAN: 2016 - Original
Route SR-168 ProjectDescription
REPLACE BRIDGE, BIN 003362, SR-168 OVER SHORT CREEK 3 MILES EAST SR-1 (US-431) (SUFF=48.1, STATUS=FO)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.750 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049732 BR 0168 (501) RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $85 $21 $107
100049733 BR 0168 (501) UTILITIES
BRIDGE REPLACEMENT
2019 $40 $10 $50
100049734 BR 0168 (501) CONSTRUCTION
BRIDGE REPLACEMENT
2019 $2,724 $681 $3,405
TOTAL COST: $2,850 $712 $3,562
Route SR-205 ProjectDescription
REPLACE BIN 000210 ON SR-205 OVER DRUM CREEK (SUFF=52.8, STAT=2)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.038 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060666 RP-BR 0205 (506) RIGHT OF WAY
BRIDGE REPLACEMENT
2016 $323 $81 $403
100040784 RP-BR 0205 (506) CONSTRUCTION
BRIDGE REPLACEMENT
2017 $2,114 $529 $2,643
TOTAL COST: $2,437 $609 $3,046
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
55 of 94
REGION HIGHWAY PROJECTS - MARSHALL
STIP PLAN: 2016 - Original
Route CR-28 ProjectDescription
BRIDGE REPLACEMENT AND APPROACHES ON CR-28 (VAUGHN BRIDGE ROAD) OVER FLINT CREEK BIN # 6691
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area DECATUR COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059675 ACBR59675 ATRP (009) CONSTRUCTION
BRIDGE REPLACEMENT
2016 $2,096 $524 $2,620
TOTAL COST: $2,096 $524 $2,620
Route CR-43 ProjectDescription
ADD LANES ON CR-43 (SPRING AV.) FROM DAY RD TO CEDAR LAKE RD SOUTH OF SR-67 ANDWOF SR-3, PROJECT SPONSOR CITY OF DECATUR
Type of Work UTILITY ADJUSTMENT
Project Length in Miles 3.575 Urban Area DECATUR COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100043404 STPOA 9215 (600) UTILITIES
UTILITY ADJUSTMENT
2016 $2,443 $611 $3,054
100033425 STPOA 9215 (600) CONSTRUCTION
ADDITIONAL ROADWAY LANES
2018 $9,439 $2,360 $11,798
TOTAL COST: $11,882 $2,970 $14,852
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
56 of 94
REGION HIGHWAY PROJECTS - MORGAN
STIP PLAN: 2016 - Original
Route CR-61 ProjectDescription
RESURFACE MOULTON STREET, CR-61 (OLD MOULTON ROAD), AND 12TH AVENUE SOUTH WEST IN THE CITY OF DECATUR
Type of Work RESURFACING
Project Length in Miles 2.390 Urban Area DECATUR COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100058404 ACOA58404 ATRP (016) CONSTRUCTION
RESURFACING
2016 $1,253 $313 $1,566
TOTAL COST: $1,253 $313 $1,566
Route CR-NA ProjectDescription
ADDITIONAL LANES ON WEST MOULTON STREET FROM COCKRELL AVENUE TO EXISTING 4-LANE
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 0.950 Urban Area DECATUR COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059677 ACOA59677 ATRP (013) CONSTRUCTION
ADDITIONAL ROADWAY LANES
2017 $1,771 $520 $2,291
TOTAL COST: $1,771 $520 $2,291
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT AND APPROACHES ON CEDAR CREEK ROAD OVER CEDAR CREEK BIN #18217
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area DECATUR COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061816 ACBRZ61816 ATRP (013)
CONSTRUCTION
BRIDGE REPLACEMENT
2017 $668 $167 $835
TOTAL COST: $668 $167 $835
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
57 of 94
REGION HIGHWAY PROJECTS - MORGAN
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
RESURFACE AUSTINVILLE-FLINT ROAD, CENTRAL AVENUE SW, AND MILL ROAD IN THE CITY OF DECATUR
Type of Work RESURFACING
Project Length in Miles 3.190 Urban Area DECATUR COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100058400 ACOA58400 ATRP (010) CONSTRUCTION
RESURFACING
2016 $956 $239 $1,195
TOTAL COST: $956 $239 $1,195
Route NA- ProjectDescription
RESURFACE SOUTH GREENWAY DRIVE FROM OLD HWY 24 TO GORDON TERRY PARKWAY (SR-24) IN THE TOWN OF TRINITY
Type of Work RESURFACING
Project Length in Miles 0.874 Urban Area DECATUR COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062270 STPOA 5214 (250) CONSTRUCTION
RESURFACING
2016 $266 $67 $333
TOTAL COST: $266 $67 $333
Route NA- ProjectDescription
BRIDGE REPLACEMENT, RESURFACING, AND TRAFFIC STRIPE ON COTACO-FLORETTE ROAD FROM SR-67 TO SR-36 BIN #3884
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 4.095 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061814 ACBR61814 ATRP (013) CONSTRUCTION
BRIDGE REPLACEMENT
2016 $1,713 $428 $2,141
TOTAL COST: $1,713 $428 $2,141
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
58 of 94
REGION HIGHWAY PROJECTS - MORGAN
STIP PLAN: 2016 - Original
Route SR-3 ProjectDescription
REPLACE SOUTHBOUND BRIDGE, BIN 000882, SR-3 (US-31) OVER CEDAR CREEK
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.750 Urban Area DECATUR COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049717 BR 0003 (591) RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $68 $17 $85
100049718 BR 0003 (591) UTILITIES
BRIDGE REPLACEMENT
2019 $40 $10 $50
100049719 BR 0003 (591) CONSTRUCTION
BRIDGE REPLACEMENT
2019 $2,040 $510 $2,550
TOTAL COST: $2,149 $537 $2,686
Route SR-NA ProjectDescription
CURB RAMP INSTALLATIONS AND MODIFICATIONS ON SR-20, SR-36 AND SR-3 (US-31) IN MORGAN COUNTY AND SR-53 IN LIMESTONE COUNTY
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area DECATUR COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061284 STPAA NR13 (952) CONSTRUCTION
SIDEWALK 2018 $157 $39 $196
TOTAL COST: $157 $39 $196
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
59 of 94
REGION HIGHWAY PROJECTS - MORGAN
STIP PLAN: 2016 - Original
Route CR-51 ProjectDescription
LEVEL, RESURFACE, TRAFFIC STRIPE, MARKERS, MARKINGS, AND LEGENDS ON CR-51 FROM SHOALS MPO LIMITS NORTH TO CR-65
Type of Work RESURFACING
Project Length in Miles 0.868 Urban Area SHOALS COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065032 STPOA 1714 (256) CONSTRUCTION
RESURFACING
2016 $130 $33 $162
TOTAL COST: $130 $33 $162
Route CR-NA ProjectDescription
RESURFACING AND TRAFFIC STRIPE CR-20 FR CR-27 TO COLBERT STEAM PLANT RD,CR-47 FR SR-2 TO CR-148,CR-148 FROM CR-47 TO TUSCUMBIA CL,CR-22 FR SR-20 TO MUSCLE SHOALS CL,CR-61(GNAT POND RD) FROM CR-22 TO SR-184,CR-61(GATE 6 RD)FROM JERRY DAVID DR TO CR-40
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area SHOALS COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065033 STPOA 1715 (251) CONSTRUCTION
RESURFACING
2017 $1,151 $288 $1,439
TOTAL COST: $1,151 $288 $1,439
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
60 of 94
REGION HIGHWAY PROJECTS - COLBERT
STIP PLAN: 2016 - Amendment # 1
Route CR-NA ProjectDescription
RESURFACING AIR DEPOT ROAD FROM COLLEGE PARKWAY TO LONESOME BEND ROAD IN THE CITY OF GLENCOE
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064393 STPOA 2815 () PRELIMINARY ENGINEERING
RESURFACING
2019 $31 $8 $39
100064394 STPOA 2815 () CONSTRUCTION
RESURFACING
2019 $303 $76 $379
TOTAL COST: $334 $84 $418
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
61 of 94
REGION HIGHWAY PROJECTS - ETOWAH
STIP PLAN: 2016 - Amendment # 1
Route SR-13 ProjectDescription
US-43 FR SR-64 TO CR-140 (ADDED LANES) SR-64 TO CR-47 4 LN DIVIDED CR-47 TO CR-140 5 LN SECTION
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 4.825 Urban Area SHOALS COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100048218 EBF-NHF 0013 (535) UTILITIES
GRADE, DRAIN, BASE AND PAVE
2016 $792 $510 $1,302
100004264 EBF-NHF 0013 (535) CONSTRUCTION
GRADE, DRAIN, BASE AND PAVE
2016 $8,544 $2,136 $10,680
TOTAL COST: $9,336 $2,646 $11,982
Route SR-13 ProjectDescription
ADDITIONAL LANES SR-13 (US-43) FROM CR-140 TO TENNESSEE STATE LINE
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 5.675 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100048219 NHF 0013 (551) UTILITIES
GRADE, DRAIN, BASE AND PAVE
2016 $1,097 $423 $1,521
100004265 NHF 0013 (551) CONSTRUCTION
GRADE, DRAIN, BASE AND PAVE
2016 $10,436 $2,609 $13,045
TOTAL COST: $11,533 $3,032 $14,565
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
62 of 94
REGION HIGHWAY PROJECTS - LAUDERDALE
STIP PLAN: 2016 - Amendment # 1
Route CR-NA ProjectDescription
HUNTSVILLE NORTHERN BYPASS FROM 1500 FEET EAST OF SR-1 (US-231/431) INTERSECTION TO WINCHESTER ROAD
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 18.180 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062235 STPHV 4514 () PRELIMINARY ENGINEERING
GRADE, DRAIN, BASE AND PAVE
2019 $120 $30 $150
100062236 STPHV 4514 () RIGHT OF WAY
GRADE, DRAIN, BASE AND PAVE
2019 $1,520 $380 $1,900
100062237 STPHV 4514 () UTILITIES
GRADE, DRAIN, BASE AND PAVE
2020 $1,506 $376 $1,882
TOTAL COST: $3,146 $786 $3,932
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
63 of 94
REGION HIGHWAY PROJECTS - MADISON
STIP PLAN: 2016 - Amendment # 2
Route CR-162 ProjectDescription
WIDEN CR-162 (STEELE STATION ROAD) FROM SR-77 TO CR-203 (SUTTON BRIDGE ROAD)
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 1.090 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065579 STPOA 8105 (601) UTILITIES
GRADE, DRAIN, BASE AND PAVE
2017 $825 $210 $1,035
TOTAL COST: $825 $210 $1,035
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
64 of 94
REGION HIGHWAY PROJECTS - ETOWAH
STIP PLAN: 2016 - Amendment # 8
Route I -65 ProjectDescription
NEW LIGHTING SYSTEM FOR REST AREA ON I-65 IN CULLMAN COUNTY
Type of Work LIGHTING
Project Length in Miles 3.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100057469 IM I065 (481) PRELIMINARY ENGINEERING
LIGHTING 2017 $227 $25 $253
100057470 IM I065 (481) CONSTRUCTION
LIGHTING 2019 $1,391 $155 $1,545
TOTAL COST: $1,618 $180 $1,798
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
65 of 94
REGION HIGHWAY PROJECTS - CULLMAN
STIP PLAN: 2016 - Amendment # 11
Route CR-NA ProjectDescription
BRIDGE AND APPRO CHURCH STREET BRIDGE OVER BIG SPRING AT BIG SPRING PARK
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.000 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100051833 DEMO A179 () RIGHT OF WAY
BRIDGES AND APPROACHES
2019 $10 $0 $10
TOTAL COST: $10 $0 $10
Route CR-NA ProjectDescription
UTILITY RELOCATION ON RYLAND PIKE FROM SR-2 (US-72) TO EVERETT ROAD
Type of Work SHOULDER WIDENING
Project Length in Miles 0.000 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066077 STPHV 4516 (250) UTILITIES
SHOULDER WIDENING
2019 $2,040 $510 $2,550
TOTAL COST: $2,040 $510 $2,550
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
66 of 94
REGION HIGHWAY PROJECTS - MADISON
STIP PLAN: 2016 - Amendment # 11
Route CR-255 ProjectDescription
WIDEN, RESURFACE AND STRIPE CR-255 FROM SR-176 TO CR-78 - DCP 25-255-16
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 2.025 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066357 FLAP FLAP (009) CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2016 $546 $137 $683
TOTAL COST: $546 $137 $683
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
67 of 94
REGION HIGHWAY PROJECTS - DEKALB
STIP PLAN: 2016 - Amendment # 13
Route CR-NA ProjectDescription
RESURFACING OF EAST 2ND STREET FROM 150' EAST OF SR-117 (KENTUCKY AVENUE) TO PATSY LEE DRIVE
Type of Work RESURFACING
Project Length in Miles 1.070 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066421 ACNU66421 ATRP (017) CONSTRUCTION
RESURFACING
2017 $285 $71 $356
TOTAL COST: $285 $71 $356
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
68 of 94
REGION HIGHWAY PROJECTS - JACKSON
STIP PLAN: 2016 - Amendment # 13
Route CR-NA ProjectDescription
IMPROVEMENTS TO PEPI AVE/MARKATE AVE FR 2ND ST TO RIVER RD W/ NORFOLK SOUTHERN RR XING, AL AVE FR 6TH ST TO AVALON AVE, SHEFFIELD AVE FR 6TH ST TO AVALON AVE, COVENANT DR/JOHN ALDRIDGE DR FR SR-2(US-43) TO 6TH ST, AND ELLEDGE LN FR KING ST TO 6TH ST
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area SHOALS COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065043 STPOA 1715 (252) PRELIMINARY ENGINEERING
RESURFACING
2017 $64 $16 $80
100065044 STPOA 1715 (252) CONSTRUCTION
RESURFACING
2018 $776 $194 $969
TOTAL COST: $840 $210 $1,049
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
69 of 94
REGION HIGHWAY PROJECTS - COLBERT
STIP PLAN: 2016 - Amendment # 14
Route SR-35 ProjectDescription
DEMOLITION AND REMOVAL OF STRUCTURES ON SR-35 IN JACKSON COUNTY, SR-77 IN ETOWAH COUNTY, AND SR-9 IN CHEROKEE COUNTY
Type of Work STRUCTURE REMOVAL
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066464 STPAA 0035 (532) CONSTRUCTION
STRUCTURE REMOVAL
2017 $296 $74 $370
TOTAL COST: $296 $74 $370
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
70 of 94
REGION HIGHWAY PROJECTS - CHEROKEE
STIP PLAN: 2016 - Amendment # 15
Route I -65 ProjectDescription
RESURFACE I-65 FROM SOUTH OF CR-222 (MP 304.1) TO NEAR HURRICANE CREEK (MP 315.500)
Type of Work RESURFACING
Project Length in Miles 19.555 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066222 IM I065 (482) PRELIMINARY ENGINEERING
RESURFACING
2017 $675 $75 $750
100066223 IM I065 (482) CONSTRUCTION
PAVEMENT MINOR REHABILITATION
2019 $14,002 $1,556 $15,558
TOTAL COST: $14,677 $1,631 $16,308
Route SR-74 ProjectDescription
REPLACE BRIDGE, BIN 001618, ON SR-74 (US-278) OVER BRINDLEY CREEK 0.8 MILE EAST OF SR-69 (SUFF=50.8, STATUS=FO)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.250 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066197 BR 0074 (517) RIGHT OF WAY
BRIDGE REPLACEMENT
2017 $35 $9 $43
TOTAL COST: $35 $9 $43
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
71 of 94
REGION HIGHWAY PROJECTS - CULLMAN
STIP PLAN: 2016 - Amendment # 15
Route I -65 ProjectDescription
RESURFACING ON I-65 FROM 0.1 MILE SOUTH OF CSXT OVERPASS (MP 359.000) TO TENNESSEE STATE LINE
Type of Work PREVENTATIVE MAINTENANCE LEVEL 1
Project Length in Miles 14.458 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065905 IM I065 (483) PRELIMINARY ENGINEERING
PREVENTATIVE MAINTENANCE LEVEL 1
2017 $146 $16 $162
100065906 IM I065 (483) CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 1
2018 $4,198 $466 $4,664
TOTAL COST: $4,344 $483 $4,826
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
72 of 94
REGION HIGHWAY PROJECTS - LIMESTONE
STIP PLAN: 2016 - Amendment # 15
Route SR-36 ProjectDescription
BRIDGE REPLACEMENT ON SR-36 BIN # 001775 OVER GUM SPRING CREEK (MP 28.839) AND BIN # 001776 ROAN CREEK (MP 29.229) (SUFF = 54.5, STAT = 2)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.326 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100040782 BR 0036 (503) CONSTRUCTION
BRIDGE REPLACEMENT
2019 $1,938 $485 $2,423
TOTAL COST: $1,938 $485 $2,423
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
73 of 94
REGION HIGHWAY PROJECTS - MORGAN
STIP PLAN: 2016 - Amendment # 17
Route I -65 ProjectDescription
RESURFACE I-65 FROM HURRICANE CREEK (MP 315.665) TO SOUTH OF THE CSX RAILROAD BRIDGE (MP 319.055)
Type of Work PREVENTATIVE MAINTENANCE LEVEL 1
Project Length in Miles 6.786 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066224 IM I065 (490) PRELIMINARY ENGINEERING
PREVENTATIVE MAINTENANCE LEVEL 1
2018 $273 $30 $303
100066225 IM I065 (490) CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 1
2019 $1,636 $182 $1,818
TOTAL COST: $1,909 $212 $2,121
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
74 of 94
REGION HIGHWAY PROJECTS - CULLMAN
STIP PLAN: 2016 - Amendment # 19
Route CR-17 ProjectDescription
2 FT SAFETY WIDENING AND RESURFACING OF CR-17 (BALCH ROAD) FROM SOUTH OF CR-21 (BROWNS FERRY ROAD) TO NORTH OF CR-27 (GOOCH LANE) IN THE CITY OF MADISON
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 2.440 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066571 DE AL81 (940) PRELIMINARY ENGINEERING
WIDENING AND RESURFACING (RDWY)
2018 $150 $0 $150
TOTAL COST: $150 $0 $150
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
75 of 94
REGION HIGHWAY PROJECTS - MADISON
STIP PLAN: 2016 - Amendment # 20
Route SR-2 ProjectDescription
BRIDGE REPLACEMENT (BIN 001709) ON SR-2 (US-72) OVER SR-20
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.370 Urban Area SHOALS COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066652 BR 0002 (579) PRELIMINARY ENGINEERING
BRIDGES AND APPROACHES
2018 $404 $101 $505
TOTAL COST: $404 $101 $505
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
76 of 94
REGION HIGHWAY PROJECTS - LAUDERDALE
STIP PLAN: 2016 - Amendment # 21
Route CR-17 ProjectDescription
2 FT SAFETY WIDENING AND RESURFACING OF CR-17 (BALCH ROAD) FROM SOUTH OF CR-21 (BROWNS FERRY ROAD) TO NORTH OF CR-27 (GOOCH LANE) IN THE CITY OF MADISON
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 2.450 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100046745 DE-STPAA-STPHV AL81 ()
CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2019 $1,486 $195 $1,681
TOTAL COST: $1,486 $195 $1,681
Route CR-93 ProjectDescription
ADDITIONAL LANES ON CR-93 (WINCHESTER ROAD) FROM CR-406 (NAUGHER ROAD) TO CR-389 (RIVERTON ROAD)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.000 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066800 ACNU61457 ATRP (012) UTILITIES
ADDITIONAL ROADWAY LANES
2017 $1,181 $1,599 $2,780
TOTAL COST: $1,181 $1,599 $2,780
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
77 of 94
REGION HIGHWAY PROJECTS - MADISON
STIP PLAN: 2016 - Amendment # 21
Route SR-205 ProjectDescription
REPLACE BIN 000210 ON SR-205 OVER DRUM CREEK (SUFF=52.8, STAT=2)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.020 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066802 RP-BR 0205 (506) UTILITIES
BRIDGE REPLACEMENT
2017 $1,032 $258 $1,290
TOTAL COST: $1,032 $258 $1,290
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
78 of 94
REGION HIGHWAY PROJECTS - MARSHALL
STIP PLAN: 2016 - Amendment # 21
Route SR-36 ProjectDescription
BRIDGE REPLACEMENT ON SR-36 BIN # 001775 OVER GUM SPRING CREEK (MP 28.839) AND BIN # 001776 ROAN CREEK (MP 29.229) (SUFF = 54.5, STAT = 2)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.652 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066924 BR 0036 (503) RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $273 $68 $341
100066926 BR 0036 (503) UTILITIES
BRIDGE REPLACEMENT
2019 $163 $41 $204
TOTAL COST: $436 $109 $545
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
79 of 94
REGION HIGHWAY PROJECTS - MORGAN
STIP PLAN: 2016 - Amendment # 21
Route CR-63 ProjectDescription
RESURFACING, SHOULDERS, AND TRAFFIC STRIPE ON CR-63 FROM THE MARSHALL COUNTY LINE TO HODGES STREET - JCP 36-47-16
Type of Work RESURFACING
Project Length in Miles 1.665 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067343 STPNU 3616 (251) CONSTRUCTION
RESURFACING
2017 $399 $200 $599
TOTAL COST: $399 $200 $599
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
80 of 94
REGION HIGHWAY PROJECTS - JACKSON
STIP PLAN: 2016 - Amendment # 26
Route CR-NA ProjectDescription
VARIOUS STREET IMPROVEMENTS ON N COMMONS ST W, N COMMONS ST E, KING ST, 6TH ST, E COMMONS ST N, E COMMONS ST S, JOE WHEELER DR, N DICKSON ST, E 5TH ST, HOOK ST
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area SHOALS COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065035 STPOA 1716 (250) PRELIMINARY ENGINEERING
RESURFACING
2018 $64 $16 $80
TOTAL COST: $64 $16 $80
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
81 of 94
REGION HIGHWAY PROJECTS - COLBERT
STIP PLAN: 2016 - Amendment # 30
Route SR-3 ProjectDescription
BRIDGE REPLACEMENT BINS 006153 AND 001391 ON SR-3 (US-31) OVER NORFOLK SOUTHERN RAILROAD
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.010 Urban Area DECATUR COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067287 BR 0003 (618) PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2019 $566 $141 $707
TOTAL COST: $566 $141 $707
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
82 of 94
REGION HIGHWAY PROJECTS - LIMESTONE
STIP PLAN: 2016 - Amendment # 30
Route CR-322 ProjectDescription
BRIDGE ON CR-322 (ARBOR ACRES ROAD) OVER TRIBUTARY TO DRUM CREEK BIN # 4180
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061312 ACBRZ61312 ATRP (011)
CONSTRUCTION
BRIDGE REPLACEMENT
2018 $148 $51 $199
TOTAL COST: $148 $51 $199
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
83 of 94
REGION HIGHWAY PROJECTS - MARSHALL
STIP PLAN: 2016 - Amendment # 30
Route I -65 ProjectDescription
RESURFACING AND TRAFFIC STRIPE ON I-65 FROM SOUTH OF CR-222 (MP 304.100) TO SR-74 (US-278) AT MP 307.500
Type of Work PREVENTATIVE MAINTENANCE LEVEL 2
Project Length in Miles 3.400 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067549 IM I065 (495) CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 2
2019 $4,350 $483 $4,833
TOTAL COST: $4,350 $483 $4,833
Route SR-74 ProjectDescription
REPLACE BRIDGE, BIN 001618, ON SR-74 (US-278) OVER BRINDLEY CREEK 0.8 MILES EAST OF SR-69 (SUFF=50.8, STATUS=FO)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.250 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067821 BR 0074 (517) UTILITIES
BRIDGE REPLACEMENT
2018 $8 $2 $10
TOTAL COST: $8 $2 $10
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
84 of 94
REGION HIGHWAY PROJECTS - CULLMAN
STIP PLAN: 2016 - Amendment # 31
Route SR-2 ProjectDescription
WIDENING SR-2(US-72) FROM JEFFERSON ST TO JUST EAST OF CSX RAILROAD UNDERPASS IN ATHENS GRADE, DRAIN, BASE, PAVE, SIGNAL, AND RETAINING WALLS
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 0.118 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067910 DE-NHF A205 (937) RIGHT OF WAY
ADDITIONAL ROADWAY LANES
2019 $192 $10 $202
100067911 DE-NHF A205 (937) UTILITIES
ADDITIONAL ROADWAY LANES
2019 $121 $30 $152
TOTAL COST: $313 $40 $354
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
85 of 94
REGION HIGHWAY PROJECTS - LIMESTONE
STIP PLAN: 2016 - Amendment # 31
Route CR-NA ProjectDescription
NATCHEZ TRACE PARKWAY OVERLAY PARK ROAD FROM MP 316.55 TO MP 334.55
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067955 FLAP FLAP () CONSTRUCTION
RESURFACING
2019 $4,170 $1,042 $5,212
TOTAL COST: $4,170 $1,042 $5,212
Route SR-2 ProjectDescription
REPLACE BRIDGES AND APPROACHES, BIN 001708 AND BIN 005442, ON SR-2 (US-72) OVER ASHE BOULEVARD (SUFF=66.2, STATUS=FO)
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.200 Urban Area SHOALS COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068037 BRF 0002 (529) RIGHT OF WAY
BRIDGES AND APPROACHES
2018 $68 $17 $85
TOTAL COST: $68 $17 $85
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
86 of 94
REGION HIGHWAY PROJECTS - COLBERT
STIP PLAN: 2016 - Amendment # 33
Route SR-91 ProjectDescription
BRIDGE REPLACEMENT AND APPROACHES ON SR-91 OVER DUCK RIVER, BIN 004129
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.500 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068169 BR 0091 () PRELIMINARY ENGINEERING
BRIDGES AND APPROACHES
2019 $687 $172 $859
TOTAL COST: $687 $172 $859
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
87 of 94
REGION HIGHWAY PROJECTS - CULLMAN
STIP PLAN: 2016 - Amendment # 33
Route I -59 ProjectDescription
RECONSTRUCTION OF THE NORTHBOUND ROADWAY ON I-59 FROM SOUTH OF SR-35 (MP 217.850) TO NORTH OF SR-7 (MP 225.60)
Type of Work PAVEMENT REHABILITATION
Project Length in Miles 7.750 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066507 IM I059 (407) PRELIMINARY ENGINEERING
PAVEMENT REHABILITATION
2018 $900 $100 $1,000
TOTAL COST: $900 $100 $1,000
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
88 of 94
REGION HIGHWAY PROJECTS - DEKALB
STIP PLAN: 2016 - Amendment # 33
Route I -565 ProjectDescription
I-565, INTERCHANGE IMPROVEMENTS AT CR-115 (GREENBRIER ROAD) (PRIORITY #23)
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 0.250 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100051962 IMF I565 (308) CONSTRUCTION
GRADE, DRAIN, BASE AND PAVE
2018 $13,299 $1,478 $14,777
TOTAL COST: $13,299 $1,478 $14,777
Route I -65 ProjectDescription
RESURFACING ON I-65 FROM 0.2 MILE NORTH OF SR-2 (US-72) TO 0.1 MILE SOUTH OF CSXT OVERPASS
Type of Work PREVENTATIVE MAINTENANCE LEVEL 2
Project Length in Miles 15.500 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065907 IM I065 (492) PRELIMINARY ENGINEERING
PREVENTATIVE MAINTENANCE LEVEL 2
2018 $585 $65 $650
100065908 IM I065 () CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 2
2019 $9,817 $1,091 $10,908
TOTAL COST: $10,402 $1,156 $11,558
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
89 of 94
REGION HIGHWAY PROJECTS - LIMESTONE
STIP PLAN: 2016 - Amendment # 33
Route I -59 ProjectDescription
RESURFACING AND TRAFFIC STRIPE ON I-59 FROM .39 MILES SOUTH OF CR-276 (STEPHENS GAP ROAD) TO THE DEKALB COUNTY LINE
Type of Work PREVENTATIVE MAINTENANCE LEVEL 1
Project Length in Miles 3.974 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068314 IM I059 (409) PRELIMINARY ENGINEERING
PREVENTATIVE MAINTENANCE LEVEL 1
2018 $270 $30 $300
TOTAL COST: $270 $30 $300
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
90 of 94
REGION HIGHWAY PROJECTS - ETOWAH
STIP PLAN: 2016 - Amendment # 36
Route I -65 ProjectDescription
WELCOME CENTER REHABILITATION NEAR I-65 NORTH OF ATHENS
Type of Work REST AREA REHABILITATION
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063652 IM I065 (496) PRELIMINARY ENGINEERING
REST AREA REHABILITATION
2018 $492 $55 $546
TOTAL COST: $492 $55 $546
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
91 of 94
REGION HIGHWAY PROJECTS - LIMESTONE
STIP PLAN: 2016 - Amendment # 36
Route SR-35 ProjectDescription
INTERSECTION IMPROVEMENTS AT SR 35 AND AIRPORT ROAD IN FT. PAYNE
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.410 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068764 NH 0035 (535) PRELIMINARY ENGINEERING
INTERSECTION IMPROVEMENTS
2019 $129 $32 $162
100065375 NH 0035 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2019 $606 $152 $758
TOTAL COST: $735 $184 $919
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
92 of 94
REGION HIGHWAY PROJECTS - DEKALB
STIP PLAN: 2016 - Amendment # 38
Route I -59 ProjectDescription
RESURFACING AND TRAFFIC STRIPE ON I-59 FROM .13 MILES SOUTH OF SR-77 (MP 181.056) TO .78 MILES NORTH OF THE ATN RAILROAD OVERPASS (MP 183.800)
Type of Work PREVENTATIVE MAINTENANCE LEVEL 1
Project Length in Miles 2.744 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068312 IM I059 () PRELIMINARY ENGINEERING
PREVENTATIVE MAINTENANCE LEVEL 1
2019 $200 $22 $222
TOTAL COST: $200 $22 $222
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
93 of 94
REGION HIGHWAY PROJECTS - ETOWAH
STIP PLAN: 2016 - Amendment # 38
Route I -565 ProjectDescription
RESURFACING I-565 FROM I-65 (MP 0.00) TO MP 5.63
Type of Work PREVENTATIVE MAINTENANCE LEVEL 2
Project Length in Miles 11.260 Urban Area HUNTSVILLE COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066496 IM I565 (313) PRELIMINARY ENGINEERING
PREVENTATIVE MAINTENANCE LEVEL 2
2019 $318 $35 $354
100066497 IM I565 () CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 2
2020 $5,600 $622 $6,223
TOTAL COST: $5,918 $658 $6,576
11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
94 of 94
REGION HIGHWAY PROJECTS - LIMESTONE
STIP PLAN: 2016 - Amendment # 38