Route SR-68 Project Description BRIDGE REMOVAL BIN 002591, SR-68 OVER TAG RAILROAD 0.5 MILE NORTH OF SR-273 (SUFF=64.4, STATUS=FO) Type of Work BRIDGE REMOVAL Project Length in Miles 0.266 Urban Area COST IN THOUSANDS Project Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State- Other TOTAL 100049710 BR 0068 (505) UTILITIES BRIDGE REMOVAL 2019 $17 $4 $21 TOTAL COST: $17 $4 $21 Route SR-9 Project Description BR REPL AND APP ON SR-9 OVER TERRAPIN CR #9-10-7.4 BIN #3411 Type of Work BRIDGES AND APPROACHES Project Length in Miles 0.200 Urban Area COST IN THOUSANDS Project Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State- Other TOTAL 100062337 BR 0009 (508) UTILITIES BRIDGES AND APPROACHES 2019 $1,838 $460 $2,298 100003725 BR 0009 (508) CONSTRUCTION BRIDGES AND APPROACHES 2019 $7,676 $1,919 $9,595 TOTAL COST: $9,515 $2,379 $11,893 11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM STIP YEARS from 10/1/2014-9/30/2019 1 of 94 REGION HIGHWAY PROJECTS - CHEROKEE STIP PLAN: 2016 - Original

Upload: vanduong

Post on 09-Nov-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route SR-68 ProjectDescription

BRIDGE REMOVAL BIN 002591, SR-68 OVER TAG RAILROAD 0.5 MILE NORTH OF SR-273 (SUFF=64.4, STATUS=FO)

Type of Work BRIDGE REMOVAL

Project Length in Miles 0.266 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049710 BR 0068 (505) UTILITIES

BRIDGE REMOVAL

2019 $17 $4 $21

TOTAL COST: $17 $4 $21

Route SR-9 ProjectDescription

BR REPL AND APP ON SR-9 OVER TERRAPIN CR #9-10-7.4 BIN #3411

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.200 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062337 BR 0009 (508) UTILITIES

BRIDGES AND APPROACHES

2019 $1,838 $460 $2,298

100003725 BR 0009 (508) CONSTRUCTION

BRIDGES AND APPROACHES

2019 $7,676 $1,919 $9,595

TOTAL COST: $9,515 $2,379 $11,893

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

1 of 94

REGION HIGHWAY PROJECTS - CHEROKEE

STIP PLAN: 2016 - Original

Page 2: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-NA ProjectDescription

IMPROVEMENTS ADD LANES WEBSTER STREET FROM AVALON AVE TO SR-184 (SECOND ST) IN MUSCLE SHOALS

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.000 Urban Area SHOALS COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056067 STPOA 8828 (602) UTILITIES

ADDITIONAL ROADWAY LANES

2018 $98 $24 $122

TOTAL COST: $98 $24 $122

Route CR-NA ProjectDescription

ROADWAY WIDENING AND DRAINAGE IMPROVEMENTS ON WEBSTER STREET BETWEEN AVALON AVENUE AND SR-184

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 1.000 Urban Area SHOALS COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056068 ACOA56068 ATRP (014) CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2018 $986 $268 $1,254

TOTAL COST: $986 $268 $1,254

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

2 of 94

REGION HIGHWAY PROJECTS - COLBERT

STIP PLAN: 2016 - Original

Page 3: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-NA ProjectDescription

RESURFACING, LEVELING AND DRAINAGE IMPROVEMENTS ON COX BOULEVARD FROM AVALON AVENUE TO SECOND STREET

Type of Work RESURFACING

Project Length in Miles 3.000 Urban Area SHOALS COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056076 STPOA 8822 (601) RIGHT OF WAY

RESURFACING

2019 $495 $124 $619

100056077 STPOA 8822 (601) UTILITIES

RESURFACING

2019 $90 $23 $113

100056078 STPOA 8822 (601) CONSTRUCTION

RESURFACING

2019 $1,838 $459 $2,297

TOTAL COST: $2,423 $606 $3,029

Route NA- ProjectDescription

ADDITIONAL LANES ON AVALON AVENUE FROM SOUTH MONTGOMERY AVE TO COX BLVD

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 0.000 Urban Area SHOALS COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059748 ACOA59748 ATRP (009) CONSTRUCTION

ADDITIONAL ROADWAY LANES

2016 $4,528 $946 $5,475

TOTAL COST: $4,528 $946 $5,475

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

3 of 94

REGION HIGHWAY PROJECTS - COLBERT

STIP PLAN: 2016 - Original

Page 4: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route SR-133 ProjectDescription

ADDITIONAL LANES SR-133 FROM SR-20 (ALT US-72) TO NORFOLK SOUTHERN RR

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.022 Urban Area SHOALS COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100009150 STPOAF-NHF-RPF 0133 (506)

CONSTRUCTION

ADDITIONAL ROADWAY LANES

2017 $5,790 $1,448 $7,238

TOTAL COST: $5,790 $1,448 $7,238

Route SR-2 ProjectDescription

REPLACE BRIDGES AND APPROACHES, BIN 001708 AND BIN 005442, ON SR-2 (US-72) OVER ASHE BOULEVARD (SUFF=66.2, STATUS=FO)

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.400 Urban Area SHOALS COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100055932 BRF 0002 (529) UTILITIES

BRIDGES AND APPROACHES

2019 $273 $68 $342

100049340 BRF 0002 (529) CONSTRUCTION

BRIDGES AND APPROACHES

2019 $4,246 $1,061 $5,307

TOTAL COST: $4,519 $1,130 $5,649

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

4 of 94

REGION HIGHWAY PROJECTS - COLBERT

STIP PLAN: 2016 - Original

Page 5: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-1435 ProjectDescription

BRIDGE CULVERT REPLACEMENT AND RESURFACING ON CR-1435 (EVA ROAD) OVER BRIDGE CREEK BIN# 3740

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061112 ACBR61112 ATRP (010) CONSTRUCTION

BRIDGE REPLACEMENT

2018 $2,672 $676 $3,348

TOTAL COST: $2,672 $676 $3,348

Route CR-216 ProjectDescription

BRIDGE REPLACEMENT (BIN # 1436) ON CR-216 (BEECH GROVE ROAD) OVER BAVAR CREEK

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059329 ACBRZ59329 ATRP (010)

CONSTRUCTION

BRIDGE REPLACEMENT

2016 $640 $160 $800

TOTAL COST: $640 $160 $800

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT ON CONVENT ROAD NORTH EAST OVER EIGHTMILE CREEK BIN# 6659

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061111 ACBR61111 ATRP (013) CONSTRUCTION

BRIDGE REPLACEMENT

2019 $1,390 $348 $1,738

TOTAL COST: $1,390 $348 $1,738

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

5 of 94

REGION HIGHWAY PROJECTS - CULLMAN

STIP PLAN: 2016 - Original

Page 6: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route I -65 ProjectDescription

REHABILITATE I-65 FROM BLOUNT COUNTY LINE TO SOUTH OF NEW CR-222 INTERCHANGE.

Type of Work PREVENTATIVE MAINTENANCE LEVEL 1

Project Length in Miles 13.545 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100055355 IM I065 (463) CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 1

2016 $9,175 $1,019 $10,195

TOTAL COST: $9,175 $1,019 $10,195

Route I -65 ProjectDescription

I-65 AT SR-157 INTERCHANGE RAMPS (EXIT 310), REPLACEMENT OF CONCRETE PAVEMENT FOR ALL RAMPS. ALSO TO INCLUDE A RIGHT TURN LANE ADDITION TO THE NORTHBOUND EXIT RAMP.

Type of Work PAVEMENT REHABILITATION

Project Length in Miles 0.942 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060248 IM I065 (452) CONSTRUCTION

PAVEMENT REHABILITATION

2016 $3,423 $385 $3,808

TOTAL COST: $3,423 $385 $3,808

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

6 of 94

REGION HIGHWAY PROJECTS - CULLMAN

STIP PLAN: 2016 - Original

Page 7: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route SR-157 ProjectDescription

SR-157, ADDITIONAL LANES AND BRIDGES FROM SR-69 TO EAST OF SR-3 (US-31) NORTH OF CULLMAN. BRIDGES OVER LAKE CATOMA AND CSX RAILROAD

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 4.417 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100038840 NH 0157 (506) UTILITIES

GRADE, DRAIN, BASE AND PAVE

2019 $228 $57 $285

TOTAL COST: $228 $57 $285

Route SR-69 ProjectDescription

ADDITION OF LEFT TURN LANE ON SR-69 AT CR-1545 (GOLD RIDGE ROAD)

Type of Work TURN LANES

Project Length in Miles 0.500 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061436 HSIP 0069 (551) CONSTRUCTION

TURN LANES 2017 $360 $343 $703

TOTAL COST: $360 $343 $703

Route SR-74 ProjectDescription

REPLACE BRIDGE, BIN 001618, ON SR-74 (US-278) OVER BRINDLEY CREEK 0.8 MILE EAST OF SR-69 (SUFF=50.8, STATUS=FO)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 1.174 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049720 BR 0074 (517) CONSTRUCTION

BRIDGE REPLACEMENT

2018 $7,056 $1,764 $8,820

TOTAL COST: $7,056 $1,764 $8,820

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

7 of 94

REGION HIGHWAY PROJECTS - CULLMAN

STIP PLAN: 2016 - Original

Page 8: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-91 ProjectDescription

BRIDGE REPLACEMENT ON CR-91 (CHAVIES ROAD) OVER TOWN CREEK IN THE CITY OF RAINSVILLE BIN# 19009

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059382 ACBRZ59382 ATRP (010)

CONSTRUCTION

BRIDGE REPLACEMENT

2018 $1,846 $580 $2,426

TOTAL COST: $1,846 $580 $2,426

Route NA- ProjectDescription

RESURFACE DEAN ROAD FROM CR-89 TO CR-153

Type of Work RESURFACING

Project Length in Miles 2.600 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061194 ACOA61194 ATRP (008) CONSTRUCTION

RESURFACING

2016 $392 $98 $490

TOTAL COST: $392 $98 $490

Route NA- ProjectDescription

CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES AT VARIOUS LOCATIONS IN DEKALB AND JACKSON COUNTIES

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060151 STPAA NR13 () CONSTRUCTION

SIDEWALK 2019 $155 $39 $193

TOTAL COST: $155 $39 $193

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

8 of 94

REGION HIGHWAY PROJECTS - DEKALB

STIP PLAN: 2016 - Original

Page 9: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route SR-117 ProjectDescription

REPL BIN 000543, SR-117 OVER W. FORK LITTLE RIVER (SUFF =52.8, STAT = FO)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.511 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100045893 BRF 0117 (501) RIGHT OF WAY

BRIDGE REPLACEMENT

2016 $189 $47 $236

100048487 BRF 0117 (501) UTILITIES

BRIDGE REPLACEMENT

2017 $897 $224 $1,121

100040786 BRF 0117 (501) CONSTRUCTION

BRIDGE REPLACEMENT

2018 $5,974 $1,493 $7,467

TOTAL COST: $7,060 $1,765 $8,824

Route SR-117 ProjectDescription

REPLACE BRIDGE, BIN 000426, SR-117 OVERPASS AGS RAILROAD IN VALLEY HEAD. (SUFF=54.5, STATUS = FO)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.853 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064443 BR 0117 (502) UTILITIES

BRIDGE REPLACEMENT

2016 $170 $42 $212

100047072 BR 0117 (502) CONSTRUCTION

BRIDGE REPLACEMENT

2017 $5,738 $1,435 $7,173

TOTAL COST: $5,907 $1,478 $7,385

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

9 of 94

REGION HIGHWAY PROJECTS - DEKALB

STIP PLAN: 2016 - Original

Page 10: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route SR-7 ProjectDescription

REPL BR, BIN 000481, SR-7 (US-11) OVER DRY CREEK (SUFF=66.9, STAT=SD)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.042 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060273 BR 0007 (529) UTILITIES

BRIDGE REPLACEMENT

2019 $419 $105 $524

100041641 BR 0007 (529) CONSTRUCTION

BRIDGE REPLACEMENT

2019 $1,807 $452 $2,259

TOTAL COST: $2,226 $556 $2,782

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

10 of 94

REGION HIGHWAY PROJECTS - DEKALB

STIP PLAN: 2016 - Original

Page 11: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-2 ProjectDescription

BRIDGE REPLACEMENT ON CR-2 (JACKSON TRAIL ROAD) OVER LOCUST FORK IN ETOWAH COUNTY BIN #6003

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059783 ACBRZ59783 ATRP (005)

CONSTRUCTION

BRIDGE REPLACEMENT

2016 $1,401 $350 $1,751

TOTAL COST: $1,401 $350 $1,751

Route CR-224 ProjectDescription

BRIDGE AND APPROACHES ON (CR-224) COX GAP ROAD OVER SHORT CREEK BIN # 4718

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061382 ACBRZ61382 ATRP (014)

CONSTRUCTION

BRIDGE REPLACEMENT

2016 $468 $117 $585

TOTAL COST: $468 $117 $585

Route CR-251 ProjectDescription

BRIDGE AND APPROACHES ON (CR-251) SON JOHNSON ROAD OVER SHORT CREEK BIN # 9465

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061375 ACBRZ61375 ATRP (011)

CONSTRUCTION

BRIDGE REPLACEMENT

2018 $836 $209 $1,045

TOTAL COST: $836 $209 $1,045

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

11 of 94

REGION HIGHWAY PROJECTS - ETOWAH

STIP PLAN: 2016 - Original

Page 12: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-290 ProjectDescription

WIDENING, RESURFACING AND TRAFFIC STRIPE ON LAY SPRINGS ROAD AND MOON ROAD FROM GADSDEN CITY LIMITS TO TABOR ROAD (CR-291)

Type of Work RESURFACING

Project Length in Miles 6.700 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056668 STPOA 2814 (252) CONSTRUCTION

RESURFACING

2019 $952 $238 $1,190

TOTAL COST: $952 $238 $1,190

Route CR-568 ProjectDescription

BRIDGE AND APPROACHES ON (CR-568) YATES ROAD OVER BLACK CREEK BIN # 8921

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061376 ACBRZ61376 ATRP (012)

CONSTRUCTION

BRIDGE REPLACEMENT

2019 $748 $187 $935

TOTAL COST: $748 $187 $935

Route CR-71 ProjectDescription

BRIDGE AND APPROACHES ON CR-71 (CENTRE ROAD) OVER DRY CREEK BIN # 2479

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061380 ACBR61380 ATRP (014) CONSTRUCTION

BRIDGE REPLACEMENT

2018 $1,105 $283 $1,389

TOTAL COST: $1,105 $283 $1,389

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

12 of 94

REGION HIGHWAY PROJECTS - ETOWAH

STIP PLAN: 2016 - Original

Page 13: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-NA ProjectDescription

RESURFACING AND TRAFFIC STRIPE ON NORTH COLLEGE STREET FROM RAILROAD AVENUE TO RABBITTOWN ROAD

Type of Work RESURFACING

Project Length in Miles 2.385 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064387 STPOA 2818 (250) PRELIMINARY ENGINEERING

RESURFACING

2018 $10 $2 $12

100064395 STPOA 2818 (250) CONSTRUCTION

RESURFACING

2019 $438 $110 $548

TOTAL COST: $448 $112 $560

Route CR-NA ProjectDescription

RECONSTRUCTION OF SOUTH 11TH STREET FROM BLACK CREEK PARKWAY TO THE BRIDGE AT BLACK CREEK

Type of Work PAVEMENT REHABILITATION

Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064626 STPOA 2815 (252) PRELIMINARY ENGINEERING

PAVEMENT REHABILITATION

2017 $66 $17 $83

100064625 STPOA 2815 (252) CONSTRUCTION

PAVEMENT REHABILITATION

2019 $374 $94 $468

TOTAL COST: $440 $110 $550

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

13 of 94

REGION HIGHWAY PROJECTS - ETOWAH

STIP PLAN: 2016 - Original

Page 14: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT ON HICKORY STREET OVER BLACK CREEK IN THE CITY OF GADSDEN BIN# 003666

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064636 STPOA 2815 (253) PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2017 $245 $61 $306

TOTAL COST: $245 $61 $306

Route CR-NA ProjectDescription

RESURFACING AND TRAFFIC STRIPE ON CHESTNUT STREET FROM 5TH STREET TO BLACK CREEK IN THE CITY OF GADSDEN

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064639 STPOA 2815 () PRELIMINARY ENGINEERING

RESURFACING

2019 $52 $13 $65

TOTAL COST: $52 $13 $65

Route CR-NA ProjectDescription

RESURFACING AND TRAFFIC STRIPE ON WALNUT STREET FROM SR-25 (US-411/ALBERT RAINS BLVD) TO 12TH STREET IN THE CITY OF GADSDEN

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064641 STPOA 2815 () PRELIMINARY ENGINEERING

RESURFACING

2019 $42 $11 $53

TOTAL COST: $42 $11 $53

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

14 of 94

REGION HIGHWAY PROJECTS - ETOWAH

STIP PLAN: 2016 - Original

Page 15: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT ON FORREST AVENUE OVER BLACK CREEK IN THE CITY OF GADSDEN BIN# 000741

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064645 STPOA 2815 () PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2019 $187 $47 $234

TOTAL COST: $187 $47 $234

Route CR-NA ProjectDescription

WIDEN AND RESURFACE SOUTH 11TH STREET FROM CR-203 (BLACK CREEK PARKWAY) TO NEAR PIEDMONT AVENUE

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 0.560 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100048747 STPOA 8121 (601) CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2019 $1,830 $458 $2,288

TOTAL COST: $1,830 $458 $2,288

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT AND APPROACHES ON COATS BEND CIRCLE OVER UNNAMED TRIBUTARY TO COOSA RIVER BIN 000561

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061377 ACBRZ61377 ATRP (016)

CONSTRUCTION

BRIDGE REPLACEMENT

2017 $262 $66 $328

TOTAL COST: $262 $66 $328

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

15 of 94

REGION HIGHWAY PROJECTS - ETOWAH

STIP PLAN: 2016 - Original

Page 16: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-NA ProjectDescription

BRIDGE AND APPROACHES ON MURPHEE VALLEY ROAD OVER LOCUST FORK OF WARRIOR RIVER BIN # 1229

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061378 ACBRZ61378 ATRP (013)

CONSTRUCTION

BRIDGE REPLACEMENT

2018 $1,817 $454 $2,271

TOTAL COST: $1,817 $454 $2,271

Route CR-NA ProjectDescription

RESURFACING OF 3RD STREET FROM JUST NORTH OF SR-25 (US-411) TO TUSCALOOSA AVNUE AND GOODYEAR AVENUE FROM JUST NORTH OF SR-1 (US-431) TO JUST WEST OF SR-74 (US-278)

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061200 ACOA61200 ATRP (003) CONSTRUCTION

RESURFACING

2016 $522 $131 $653

TOTAL COST: $522 $131 $653

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

16 of 94

REGION HIGHWAY PROJECTS - ETOWAH

STIP PLAN: 2016 - Original

Page 17: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route I -759 ProjectDescription

RESURFACING I-759 FROM THE I-59 INTERCHANGE TO THE EAST END OF THE COOSA RIVER BRIDGE, TO INCLUDE SLOPE CORRECTION, ACCEL LANE EXTENSION, DECEL LANE INSTALLATION, GUARDRAIL REPLACEMENT AND GUIDERAIL INSTALLATION

Type of Work PAVEMENT MINOR REHABILITATION

Project Length in Miles 4.935 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056197 IMF-HSIPF I759 (301) CONSTRUCTION

PAVEMENT MINOR REHABILITATION

2017 $6,624 $736 $7,360

TOTAL COST: $6,624 $736 $7,360

Route NA- ProjectDescription

RESURFACE BURKE AVENUE FROM LEE STREET TO SR-77 IN THE CITY OF ATTALLA

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061199 ACOA61199 ATRP (013) CONSTRUCTION

RESURFACING

2016 $201 $50 $251

TOTAL COST: $201 $50 $251

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

17 of 94

REGION HIGHWAY PROJECTS - ETOWAH

STIP PLAN: 2016 - Original

Page 18: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route NA- ProjectDescription

RESURFACE 4TH STREET FROM 6TH AVE TO SR-7 (US-11) IN THE CITY OF ATTALLA

Type of Work RESURFACING

Project Length in Miles 1.110 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061198 ACOA61198 ATRP (008) CONSTRUCTION

RESURFACING

2016 $615 $154 $768

TOTAL COST: $615 $154 $768

Route NA- ProjectDescription

CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES AT VARIOUS LOCATIONS IN ETOWAH COUNTY

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061454 STPAA NR13 () CONSTRUCTION

SIDEWALK 2019 $35 $9 $44

TOTAL COST: $35 $9 $44

Route NA- ProjectDescription

RESURFACING VANDELL BOULEVARD FROM HICKORY STREET TO FORREST AVENUE IN THE CITY OF GADSDEN

Type of Work RESURFACING

Project Length in Miles 0.779 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063363 STPOA 2815 (250) CONSTRUCTION

RESURFACING

2016 $268 $84 $352

TOTAL COST: $268 $84 $352

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

18 of 94

REGION HIGHWAY PROJECTS - ETOWAH

STIP PLAN: 2016 - Original

Page 19: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route SR-1 ProjectDescription

REPLACE BRIDGE SR-1 (US-431) BIN # 5430 STR#1-28-11.9A AND BIN # 8648 STR#1-28-11.9B OVER BLACK CREEK.

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.781 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100038045 BR 0001 (565) CONSTRUCTION

BRIDGE REPLACEMENT

2016 $8,853 $2,213 $11,066

100064484 BR 0001 (565) UTILITIES

BRIDGE REPLACEMENT

2016 $544 $136 $680

TOTAL COST: $9,397 $2,349 $11,746

Route SR-205 ProjectDescription

BRIDGE REPLACEMENT ON SR-205 OVER L AND N RAILROAD (BIN #000438) (SUFF = 47.4)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 1.140 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064720 BR 0205 (507) PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2016 $121 $30 $152

100064725 BR 0205 (507) RIGHT OF WAY

BRIDGE REPLACEMENT

2019 $83 $21 $104

100064724 BR 0205 (507) UTILITIES

BRIDGE REPLACEMENT

2019 $62 $16 $78

TOTAL COST: $267 $67 $334

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

19 of 94

REGION HIGHWAY PROJECTS - ETOWAH

STIP PLAN: 2016 - Original

Page 20: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route SR-77 ProjectDescription

REPLACE BRIDGE, BIN 002035, SR-77 (NORTH BOUND) OVER COOSA RIVER. (SUFF=56.8, STATUS=FO)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.600 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059992 DE A181 () PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2019 $800 $0 $800

TOTAL COST: $800 $0 $800

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

20 of 94

REGION HIGHWAY PROJECTS - ETOWAH

STIP PLAN: 2016 - Original

Page 21: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-11 ProjectDescription

RESURFACE AND TRAFFIC STRIPE ON CR-11 FROM BEAR CREEK BRIDGE TO CR-15

Type of Work RESURFACING

Project Length in Miles 6.280 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062435 ACNU62435 ATRP (004) CONSTRUCTION

RESURFACING

2016 $413 $119 $533

TOTAL COST: $413 $119 $533

Route CR-11 ProjectDescription

RESURFACE AND TRAFFIC STRIPE ON CR-11 AND 4TH STREET FROM HAPPY HOLLOW ROAD TO BRIDGE BIN # 19621

Type of Work RESURFACING

Project Length in Miles 6.500 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062454 ACNU62454 ATRP (009) CONSTRUCTION

RESURFACING

2016 $587 $147 $733

TOTAL COST: $587 $147 $733

Route CR-22 ProjectDescription

FULL DEPTH RECLAMATION AND SURFACE TREATMENT ON CR-22 FROM SR-187 TO MCAFEE ROAD

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063401 ACNU63401 ATRP (006) CONSTRUCTION

RESURFACING

2016 $82 $20 $102

TOTAL COST: $82 $20 $102

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

21 of 94

REGION HIGHWAY PROJECTS - FRANKLIN

STIP PLAN: 2016 - Original

Page 22: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route NA- ProjectDescription

PLANING AND RESURFACING 4TH STREET (GOLDEN ROAD) FROM SR-19 TO THE MS. STATE LINE AND BRIDGE REPLACEMENT WITH BRIDGE CULVERT AT UNNAMED TRIBUTARY TO BEAR CREEK

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059643 ACBR59643 ATRP (004) CONSTRUCTION

BRIDGE REPLACEMENT

2016 $785 $196 $982

TOTAL COST: $785 $196 $982

Route SR-243 ProjectDescription

BRIDGE REPLACEMENT (BIN 008912) ON SR-243 OVER CEDAR CREEK (SUFF = 6.0, STAT = 1)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.055 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063654 BR 0243 (504) PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2019 $208 $52 $260

100049146 BR 0243 (504) RIGHT OF WAY

BRIDGE REPLACEMENT

2019 $285 $71 $357

TOTAL COST: $493 $123 $617

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

22 of 94

REGION HIGHWAY PROJECTS - FRANKLIN

STIP PLAN: 2016 - Original

Page 23: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route SR-247 ProjectDescription

REPLACE BRIDGE, BIN 008467, SR-247 OVER CEDAR CREEK. (SUFF=46.8, STATUS=SD)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.500 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049911 BR 0247 (501) RIGHT OF WAY

BRIDGE REPLACEMENT

2019 $57 $14 $71

TOTAL COST: $57 $14 $71

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

23 of 94

REGION HIGHWAY PROJECTS - FRANKLIN

STIP PLAN: 2016 - Original

Page 24: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-213 ProjectDescription

BRIDGE REPLACEMENT ON CR-213 OVER MUD CREEK IN JACKSON COUNTY (BIN 439 SUFF 22.7)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100058647 ACBRZ58647 ATRP (010)

CONSTRUCTION

BRIDGE REPLACEMENT

2016 $1,249 $312 $1,561

TOTAL COST: $1,249 $312 $1,561

Route CR-288 ProjectDescription

BRIDGE CULVERT REPLACEMENT CR-288 (RIDGEDALE ROAD) OVER DRY CREEK AND RESURFACING OF RIDGEDALE ROAD BIN# 3303

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 2.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059397 ACBR59397 ATRP (007) CONSTRUCTION

BRIDGE REPLACEMENT

2016 $1,126 $281 $1,407

TOTAL COST: $1,126 $281 $1,407

Route CR-NA ProjectDescription

RESURFACING OF CLEMONS ROAD FROM SR-35 TO 0.2 MILES SOUTH OF SUMMER DRIVE

Type of Work RESURFACING

Project Length in Miles 3.810 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061202 ACOA61202 ATRP (006) CONSTRUCTION

RESURFACING

2018 $1,205 $301 $1,506

TOTAL COST: $1,205 $301 $1,506

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

24 of 94

REGION HIGHWAY PROJECTS - JACKSON

STIP PLAN: 2016 - Original

Page 25: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-10 ProjectDescription

CR-10 BRIDGE REPLACMENT OVER CYPRESS CREEK AND CYPRESS CREEK RELIEF BIN #744 AND #1422

Type of Work BRIDGE

Project Length in Miles 0.200 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062120 ACBRZ62120 ATRP (010)

CONSTRUCTION

BRIDGE 2016 $1,511 $378 $1,889

TOTAL COST: $1,511 $378 $1,889

Route CR-16 ProjectDescription

CR-16 BRIDGE REPLACEMENT OVER CYPRESS CREEK IN LAUDERDALE COUNTY BIN #001434

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.200 Urban Area SHOALS COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059049 STPOA 3914 (251) RIGHT OF WAY

BRIDGE REPLACEMENT

2019 $40 $10 $50

100059050 STPOA 3914 (251) UTILITIES

BRIDGE REPLACEMENT

2020 $39 $10 $49

TOTAL COST: $79 $20 $99

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

25 of 94

REGION HIGHWAY PROJECTS - LAUDERDALE

STIP PLAN: 2016 - Original

Page 26: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-344 ProjectDescription

BRIDGE REPLACEMENT ON CR-344 OVER COWPEN CREEK BIN #1324

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062144 ACBR62144 ATRP (005) CONSTRUCTION

BRIDGE REPLACEMENT

2018 $380 $95 $475

TOTAL COST: $380 $95 $475

Route CR-489 ProjectDescription

BRIDGE REPLACEMENT ON CR-489 OVER SECOND CREEK BIN #1602

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062135 ACBRZ62135 ATRP (002)

CONSTRUCTION

BRIDGE REPLACEMENT

2016 $454 $114 $568

TOTAL COST: $454 $114 $568

Route CR-49 ProjectDescription

BRIDGE REPLACEMENT ON CR-49 OVER THE WEST FORK OF ANDERSON CREEK BIN #1587

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062132 ACBRZ62132 ATRP (006)

CONSTRUCTION

BRIDGE REPLACEMENT

2016 $383 $96 $479

TOTAL COST: $383 $96 $479

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

26 of 94

REGION HIGHWAY PROJECTS - LAUDERDALE

STIP PLAN: 2016 - Original

Page 27: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-52 ProjectDescription

BRIDGE REPLACEMENT ON CR-52 OVER DEERLICK BRANCH BIN #1595

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062133 ACBRZ62133 ATRP (007)

CONSTRUCTION

BRIDGE REPLACEMENT

2016 $395 $99 $494

TOTAL COST: $395 $99 $494

Route CR-61 ProjectDescription

BRIDGE REPLACEMENT ON CR-61 OVER BUTLER CREEK BIN #1467

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062145 ACBRZ62145 ATRP (005)

CONSTRUCTION

BRIDGE REPLACEMENT

2017 $1,045 $261 $1,306

TOTAL COST: $1,045 $261 $1,306

Route CR-76 ProjectDescription

BRIDGE REPLACEMENT ON CR-76 OVER SECOND CREEK BIN # 7097

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062146 ACBRZ62146 ATRP (013)

CONSTRUCTION

BRIDGE REPLACEMENT

2019 $1,403 $351 $1,754

TOTAL COST: $1,403 $351 $1,754

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

27 of 94

REGION HIGHWAY PROJECTS - LAUDERDALE

STIP PLAN: 2016 - Original

Page 28: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-87 ProjectDescription

BRIDGE REPLACEMENT ON CR-87 OVER BLUFF CREEK BIN# 1202 AND CR-25 OVER WEST FORK CREEK BIN# 2749

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area SHOALS COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063660 ACBRZ63660 ATRP () UTILITIES

BRIDGE REPLACEMENT

2018 $29 $7 $36

TOTAL COST: $29 $7 $36

Route CR-92 ProjectDescription

BRIDGE REPLACEMENT ON CR-92 OVER FIRST CREEK BIN #5942

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062143 ACBRZ62143 ATRP (004)

CONSTRUCTION

BRIDGE REPLACEMENT

2018 $599 $150 $749

TOTAL COST: $599 $150 $749

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

28 of 94

REGION HIGHWAY PROJECTS - LAUDERDALE

STIP PLAN: 2016 - Original

Page 29: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-NA ProjectDescription

JOHN COFFEE MEMORIAL BRIDGE RAIL PAINTING. NATCHEZ TRACE PARKWAY

Type of Work BRIDGE PAINTING

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065123 PFH 3916 () CONSTRUCTION

BRIDGE PAINTING

2019 $5,152 $0 $5,152

TOTAL COST: $5,152 $0 $5,152

Route CR-NA ProjectDescription

RESURFACING AND RECONSTRUCTION OF COLLEGE STREET FROM WEST MOBILE STREET TO DR. HICKS BOULEVARD IN THE CITY OF FLORENCE

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 0.000 Urban Area SHOALS COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059695 ACOA59695 ATRP (013) CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2017 $674 $169 $843

TOTAL COST: $674 $169 $843

Route CR-NA ProjectDescription

ROUND-ABOUT AT THE INTERSECTION OF ROYAL AVENUE AND HUNTSVILLE ROAD IN THE CITY OF FLORENCE

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area SHOALS COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061359 ACOA61359 ATRP (014) CONSTRUCTION

INTERSECTION IMPROVEMENTS

2018 $1,349 $337 $1,687

TOTAL COST: $1,349 $337 $1,687

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

29 of 94

REGION HIGHWAY PROJECTS - LAUDERDALE

STIP PLAN: 2016 - Original

Page 30: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT ON MARS HILL ROAD OVER COX CREEK BIN # 5004

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area SHOALS COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061360 ACBRZ61360 ATRP (016)

CONSTRUCTION

BRIDGE REPLACEMENT

2016 $473 $118 $591

TOTAL COST: $473 $118 $591

Route CR-NA ProjectDescription

MALL ROAD AND HOUGH ROAD/MADISON AVENUE REHABILITATION AND INTERSECTION IMPROVEMENTS CITY OF FLORENCE

Type of Work PAVEMENT REHABILITATION

Project Length in Miles 0.000 Urban Area SHOALS COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061522 STPOA UR14 (601) CONSTRUCTION

PAVEMENT REHABILITATION

2018 $2,144 $536 $2,679

TOTAL COST: $2,144 $536 $2,679

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

30 of 94

REGION HIGHWAY PROJECTS - LAUDERDALE

STIP PLAN: 2016 - Original

Page 31: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-NA ProjectDescription

WIDENING RICKWOOD ROAD FROM RAILROAD TO CHISHOLM ROAD

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 0.000 Urban Area SHOALS COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063588 STPOA 3915 () RIGHT OF WAY

ADDITIONAL ROADWAY LANES

2019 $60 $15 $75

100063589 STPOA 3915 () UTILITIES

ADDITIONAL ROADWAY LANES

2019 $320 $80 $400

100063590 STPOA 3915 () CONSTRUCTION

ADDITIONAL ROADWAY LANES

2020 $1,280 $320 $1,600

TOTAL COST: $1,660 $415 $2,075

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

31 of 94

REGION HIGHWAY PROJECTS - LAUDERDALE

STIP PLAN: 2016 - Original

Page 32: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route NA- ProjectDescription

WIDENING RICKWOOD ROAD FROM RAILROAD TO CHISHOLM ROAD

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 0.000 Urban Area SHOALS COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063587 STPOA 3915 (250) PRELIMINARY ENGINEERING

ADDITIONAL ROADWAY LANES

2016 $360 $90 $450

TOTAL COST: $360 $90 $450

Route NA- ProjectDescription

RESURFACING AND RECONSTRUCTION OF WOOD AVENUE FROM EAST TUSCALOOSA STREET TO GILBERT COURT IN THE CITY OF FLORENCE

Type of Work PAVEMENT REHABILITATION

Project Length in Miles 0.900 Urban Area SHOALS COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059651 ACOA59651 ATRP (007) CONSTRUCTION

PAVEMENT REHABILITATION

2016 $977 $244 $1,221

TOTAL COST: $977 $244 $1,221

Route NA- ProjectDescription

BRIDGE REHABILITATION ON JACKSON ROAD IN THE CITY OF FLORENCE BIN # 11874

Type of Work BRIDGE REHABILITATION

Project Length in Miles 0.000 Urban Area SHOALS COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061358 ACBR61358 ATRP (014) CONSTRUCTION

BRIDGE REHABILITATION

2016 $149 $37 $186

TOTAL COST: $149 $37 $186

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

32 of 94

REGION HIGHWAY PROJECTS - LAUDERDALE

STIP PLAN: 2016 - Original

Page 33: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route SR-2 ProjectDescription

REPLACE BRIDGE AND APPROACH, BIN 001386, ON SR-2 (US-72) OVER SECOND CREEK (SUFF=68.8, STATUS=F0)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.250 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049332 BR 0002 (528) CONSTRUCTION

BRIDGE REPLACEMENT

2016 $6,838 $1,709 $8,547

TOTAL COST: $6,838 $1,709 $8,547

Route SR-2 ProjectDescription

BRIDGE REPLACEMENT (BIN 001709) ON SR-2 (US-72) OVER SR-20

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.370 Urban Area SHOALS COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100038052 BR 0002 (579) RIGHT OF WAY

BRIDGES AND APPROACHES

2019 $2,279 $570 $2,848

TOTAL COST: $2,279 $570 $2,848

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

33 of 94

REGION HIGHWAY PROJECTS - LAUDERDALE

STIP PLAN: 2016 - Original

Page 34: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-165 ProjectDescription

BRIDGE REPLACEMENT ON CR-165 OVER UNNAMED STREAM (BIN 5658)(R.A.M.P.) AND BRIDGE REPLACEMENT ON CR-377 OVER MALLARD CREEK (BIN 2596)(R.A.M.P.)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060568 ACBRZ60568 ATRP (011)

CONSTRUCTION

BRIDGE REPLACEMENT

2018 $504 $126 $631

TOTAL COST: $504 $126 $631

Route CR-187 ProjectDescription

BRIDGE REPLACEMENT ON CR-187 OVER WEST FLINT CREEK BIN #9738 (R.A.M.P)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060553 ACBRZ60553 ATRP (012)

CONSTRUCTION

BRIDGE REPLACEMENT

2019 $1,317 $329 $1,646

TOTAL COST: $1,317 $329 $1,646

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

34 of 94

REGION HIGHWAY PROJECTS - LAWRENCE

STIP PLAN: 2016 - Original

Page 35: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-270 ProjectDescription

BRIDGE REPLACEMENT ON JEFFERSON STREET (CR-270) OVER BIG NANCE CREEK (BIN # 349) AND RELIEF BRIDGE (BIN # 348) IN THE CITY OF COURTLAND (R.A.M.P.)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060555 ACBRZ60555 ATRP (011)

CONSTRUCTION

BRIDGE REPLACEMENT

2019 $910 $227 $1,137

TOTAL COST: $910 $227 $1,137

Route CR-270 ProjectDescription

BRIDGE REPLACEMENT ON JEFFERSON STREET (CR-270) OVER NORFOLK SOUTHERN RAILROAD IN THE CITY OF COURTLAND (BIN 397)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060567 ACBRZ60567 ATRP (014)

CONSTRUCTION

BRIDGE REPLACEMENT

2019 $432 $108 $540

TOTAL COST: $432 $108 $540

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

35 of 94

REGION HIGHWAY PROJECTS - LAWRENCE

STIP PLAN: 2016 - Original

Page 36: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-70 ProjectDescription

RESURFACE AND TRAFFIC STRIPE CR-70 FROM LAWRENCE - WINSTON COUNTY LINE TO SR-33 (SITE 1) AND CR-71 FROM LAWRENCE- WINSTON COUNTY LINE TO CR-70 (SITE 2) FEDERAL LANDS PROJECT # AL-FLAP-LRNC-FH41(1)

Type of Work RESURFACING

Project Length in Miles 6.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063055 FLAP FLAP (002) CONSTRUCTION

RESURFACING

2014 $334 $177 $511

TOTAL COST: $334 $177 $511

Route SR-101 ProjectDescription

REPLACE BRIDGE, BIN 001493, SR-101 OVER BIG NANCE CREEK. (SUFF=36.0, STATUS=SD)

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 1.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049905 BR 0101 (570) PRELIMINARY ENGINEERING

BRIDGES AND APPROACHES

2018 $282 $71 $353

100049906 BR 0101 (570) RIGHT OF WAY

BRIDGES AND APPROACHES

2019 $57 $14 $71

TOTAL COST: $339 $85 $424

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

36 of 94

REGION HIGHWAY PROJECTS - LAWRENCE

STIP PLAN: 2016 - Original

Page 37: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-304 ProjectDescription

BRIDGE REPLACEMENTS ON CR-304 (RAGSDALE CREEK ROAD) OVER RAGSDALE CREEK, TWO BRIDGES BIN # 5989 AND 2753

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059659 ACBR59659 ATRP (005) CONSTRUCTION

BRIDGE REPLACEMENT

2016 $690 $179 $869

TOTAL COST: $690 $179 $869

Route CR-45 ProjectDescription

BRIDGE REPLACEMENT CR-45 (LUCAS FERRY ROAD) OVER MUD CREEK BIN# 7415

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059663 ACBRZ59663 ATRP (005)

CONSTRUCTION

BRIDGE REPLACEMENT

2016 $338 $86 $424

TOTAL COST: $338 $86 $424

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

37 of 94

REGION HIGHWAY PROJECTS - LIMESTONE

STIP PLAN: 2016 - Original

Page 38: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-NA ProjectDescription

RESURFACE AND TRAFFIC STRIPE ON 5TH AVENUE FROM MARKET STREET TO JEFFERSON STREET

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063302 ACOA63302 ATRP (017) CONSTRUCTION

RESURFACING

2018 $410 $103 $513

TOTAL COST: $410 $103 $513

Route CR-NA ProjectDescription

RESURFACE AND TRAFFIC STRIPE ON WASHINGTON STREET FROM SR-2 (US-72) TO HOFFMAN STREET

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063306 ACOA63306 ATRP (017) CONSTRUCTION

RESURFACING

2017 $1,057 $264 $1,322

TOTAL COST: $1,057 $264 $1,322

Route CR-NA ProjectDescription

ADD TURN LANES ON EAST LIMESTONE ROAD FROM MCLEMORE CIRCLE TO EAST LIMESTONE SCHOOL

Type of Work TURN LANES

Project Length in Miles 0.000 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061945 ACAA61945 ATRP (013) CONSTRUCTION

TURN LANES 2018 $792 $259 $1,051

TOTAL COST: $792 $259 $1,051

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

38 of 94

REGION HIGHWAY PROJECTS - LIMESTONE

STIP PLAN: 2016 - Original

Page 39: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT ON THACH ROAD OVER AN UNAMED CREEK (BIN # 4132)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061859 ACBRZ61859 ATRP (013)

CONSTRUCTION

BRIDGE REPLACEMENT

2019 $282 $70 $352

TOTAL COST: $282 $70 $352

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT ON QUINN ROAD OVER ROUND ISLAND CREEK (BIN 4488)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061946 ACBRZ61946 ATRP (011)

CONSTRUCTION

BRIDGE REPLACEMENT

2016 $475 $119 $594

TOTAL COST: $475 $119 $594

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT ON QUINN ROAD OVER BEAUCHAMP CREEK (BIN # 7825)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061858 ACBRZ61858 ATRP (011)

CONSTRUCTION

BRIDGE REPLACEMENT

2017 $601 $150 $751

TOTAL COST: $601 $150 $751

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

39 of 94

REGION HIGHWAY PROJECTS - LIMESTONE

STIP PLAN: 2016 - Original

Page 40: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT ON LIBERTY WAY OVER LITTLE LIMESTONE CREEK (BIN 9162)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061861 ACBRZ61861 ATRP () CONSTRUCTION

BRIDGE REPLACEMENT

2019 $960 $240 $1,200

TOTAL COST: $960 $240 $1,200

Route CR-NA ProjectDescription

BRIDGE REPLACEMENTS ON FORREST STREET OVER SWAN CREEK AND RELIEF STRUCTURE (BINS 8813 AND 8814) AND RESURFACE AND TRAFFIC STRIPE ON FORREST STREET FROM SR-3(US-31) TO LINDSAY LANE

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063307 ACBR63307 ATRP (015) CONSTRUCTION

BRIDGE REPLACEMENT

2018 $2,937 $1,456 $4,394

TOTAL COST: $2,937 $1,456 $4,394

Route CR-NA ProjectDescription

RESURFACE, TRAFFIC STRIPE AND CULVERT EXTENSION ON NICK DAVIS ROAD FROM LINDSAY LANE TO MOORESVILLE ROAD

Type of Work RESURFACING

Project Length in Miles 2.969 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063309 ACOA63309 ATRP (015) CONSTRUCTION

RESURFACING

2017 $493 $123 $617

TOTAL COST: $493 $123 $617

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

40 of 94

REGION HIGHWAY PROJECTS - LIMESTONE

STIP PLAN: 2016 - Original

Page 41: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route I -565 ProjectDescription

MEDIAN CROSSOVER PROTECTION ON I-565 FROM SPRING BRANCH (MP 0.10) TO CR-1036 (MADISON BOULEVARD OVERPASS) (MP 13.30) LIMESTONE AND MADISON COUNTIES

Type of Work SAFETY IMPROVEMENTS

Project Length in Miles 13.200 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100058241 HSIP-STPSA I565 (311) CONSTRUCTION

SAFETY IMPROVEMENTS

2016 $773 $86 $860

TOTAL COST: $773 $86 $860

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

41 of 94

REGION HIGHWAY PROJECTS - LIMESTONE

STIP PLAN: 2016 - Original

Page 42: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route I -65 ProjectDescription

RESURFACING ON I-65 FROM NEAR I-565 (MP 338.85) TO NEAR SR-2 (US-72) (351.25)

Type of Work PREVENTATIVE MAINTENANCE LEVEL 2

Project Length in Miles 24.812 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063557 IMF I065 (467) PRELIMINARY ENGINEERING

PREVENTATIVE MAINTENANCE LEVEL 2

2016 $210 $23 $233

100063558 RPF-IMF I065 (467) CONSTRUCTION

PAVEMENT MINOR REHABILITATION

2017 $17,978 $1,998 $19,975

TOTAL COST: $18,187 $2,021 $20,208

Route I -65 ProjectDescription

MEDIAN CROSSOVER PROTECTION ON I-65 FROM NORFOLK SOUTHERN RR OVERPASS (MP 341.40) TO 0.1 MILE SOUTH SR-3 (US-31) (MP 354.1) AND FROM 1.3 MILES NORTH SR-53 UNDERPASS (MP 366.20) TO TENNESSEE STATE LINE (MP 366.30) LIMESTONE COUNTY

Type of Work SAFETY IMPROVEMENTS

Project Length in Miles 24.900 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100058237 HSIP-STPSA I065 (443) CONSTRUCTION

SAFETY IMPROVEMENTS

2016 $1,022 $114 $1,136

TOTAL COST: $1,022 $114 $1,136

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

42 of 94

REGION HIGHWAY PROJECTS - LIMESTONE

STIP PLAN: 2016 - Original

Page 43: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route NA- ProjectDescription

RESURFACE AND TRAFFIC STRIPE ON HINE STREET FROM SR-2 (US-72) TO ELM STREET

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063305 ACOA63305 ATRP (018) CONSTRUCTION

RESURFACING

2016 $390 $97 $487

TOTAL COST: $390 $97 $487

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

43 of 94

REGION HIGHWAY PROJECTS - LIMESTONE

STIP PLAN: 2016 - Original

Page 44: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-11 ProjectDescription

ADDITIONAL LANES, CR-11 (MARTIN ROAD) FROM CR-12 (OLD JIM WILLIAMS ROAD) TO CR-7 (ZIERDT ROAD)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.500 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060160 ACAA60160 ATRP (012) CONSTRUCTION

ADDITIONAL ROADWAY LANES

2018 $9,080 $2,270 $11,350

TOTAL COST: $9,080 $2,270 $11,350

Route CR-19 ProjectDescription

ADDITIONAL LANES ON CR-19 (JEFF ROAD) FROM 0.8 MILES SOUTH OF CR-28 (CAPSHAW ROAD) TO NORTH OF DOUGLASS ROAD

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 2.800 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061458 ACAA61458 ATRP (015) CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2020 $9,045 $4,455 $13,500

TOTAL COST: $9,045 $4,455 $13,500

Route CR-242 ProjectDescription

CR-242 (OLD HIGHWAY 431) FOUR (4) BRIDGE REPLACEMENTS. BIN NUMBERS 313, 558, 559, AND 314

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062252 STPHV 4514 () CONSTRUCTION

BRIDGE REPLACEMENT

2019 $6,792 $1,698 $8,490

TOTAL COST: $6,792 $1,698 $8,490

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

44 of 94

REGION HIGHWAY PROJECTS - MADISON

STIP PLAN: 2016 - Original

Page 45: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-7 ProjectDescription

CR-7 (ZIERDT ROAD) SOUTHBOUND LANES AND GREENWAY FROM SOUTH OF CR-11 (MARTIN ROAD) TO THE INTERSECTION OF MADISON BOULEVARD, INCLUDES INTERSECTION IMPROVEMENTS AT MARTIN ROAD AND MADISON BOULEVARD

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 2.600 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062037 STPHV-ACAA62037 ATRP (016)

CONSTRUCTION

GRADE, DRAIN, BASE AND PAVE

2018 $16,420 $4,105 $20,525

TOTAL COST: $16,420 $4,105 $20,525

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

45 of 94

REGION HIGHWAY PROJECTS - MADISON

STIP PLAN: 2016 - Original

Page 46: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-93 ProjectDescription

ADDITIONAL LANES ON CR-93 (WINCHESTER ROAD) FROM CR-983 (DOMINION CIRCLE) TO CR-406 (NAUGHER ROAD)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 2.300 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061222 ACAA61222 ATRP (010) CONSTRUCTION

ADDITIONAL ROADWAY LANES

2019 $10,385 $5,115 $15,500

TOTAL COST: $10,385 $5,115 $15,500

Route CR-93 ProjectDescription

ADDITIONAL LANES ON CR-93 (WINCHESTER ROAD) FROM FLINT RIVER TO .10 MILE PAST BELL FACTORY ROAD

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 0.530 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059776 ACAA59776 ATRP (012) CONSTRUCTION

ADDITIONAL ROADWAY LANES

2016 $2,542 $635 $3,177

TOTAL COST: $2,542 $635 $3,177

Route CR-93 ProjectDescription

ADDITIONAL LANES ON CR-93 (WINCHESTER ROAD) FROM CR-406 (NAUGHER ROAD) TO CR-389 (RIVERTON ROAD)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.000 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061457 ACAA61457 ATRP (012) CONSTRUCTION

ADDITIONAL ROADWAY LANES

2019 $7,366 $2,581 $9,947

TOTAL COST: $7,366 $2,581 $9,947

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

46 of 94

REGION HIGHWAY PROJECTS - MADISON

STIP PLAN: 2016 - Original

Page 47: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-NA ProjectDescription

WIDENING AND REALIGNMENT OF CHURCH ST. (PHASE I) FROM MONROE ST. TO E. OF PRATT AVE. AND REALIGNMENT OF PRATT AVE. INCLUDING BRIDGE REPLACEMENTS OVER PINHOOK CREEK (BINS# 003521 AND 008439) IN THE CITY OF HUNTSVILLE

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.100 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049499 STPHV 4500 (217) CONSTRUCTION

ADDITIONAL ROADWAY LANES

2018 $10,988 $3,305 $14,293

TOTAL COST: $10,988 $3,305 $14,293

Route CR-NA ProjectDescription

HUNTSVILLE NORTHERN BYPASS FROM 1.2 MILES EAST OF CR-86 (PULASKI PIKE) TO 1500 FT EAST OF SR-1 (US-231/431) INTERSECTION

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 12.600 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061849 ST-045-000-015 () RIGHT OF WAY

GRADE, DRAIN, BASE, PAVE AND BRG

2016 $0 $0 $0

100061850 NHF-STPAAF 4514 (252)

UTILITIES

GRADE, DRAIN, BASE, PAVE AND BRG

2019 $3,056 $764 $3,820

100061851 NHF-STPAAF 4514 (252)

CONSTRUCTION

GRADE, DRAIN, BASE, PAVE AND BRG

2019 $18,951 $4,738 $23,688

TOTAL COST: $22,007 $5,502 $27,508

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

47 of 94

REGION HIGHWAY PROJECTS - MADISON

STIP PLAN: 2016 - Original

Page 48: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-NA ProjectDescription

KELLNER ROAD EXTENSION TO ZIERDT ROAD

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 2.200 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062261 STPHV 4514 (253) PRELIMINARY ENGINEERING

GRADE, DRAIN, BASE AND PAVE

2017 $440 $110 $550

TOTAL COST: $440 $110 $550

Route CR-NA ProjectDescription

KELLNER ROAD EXTENSION FROM WALL TRIANA HWY TO SOUTH OF BUSINESS PARK BLVD

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 2.200 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061239 ACAA61239 ATRP (010) CONSTRUCTION

GRADE, DRAIN, BASE AND PAVE

2019 $8,040 $3,960 $12,000

TOTAL COST: $8,040 $3,960 $12,000

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

48 of 94

REGION HIGHWAY PROJECTS - MADISON

STIP PLAN: 2016 - Original

Page 49: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route NA- ProjectDescription

CLEARING AND GRUBBING AND STRUCTURE REMOVAL FOR THE RELOCATION OF CHURCH STREET AND PRATT AVENUE IN HUNTSVILLE

Type of Work CLEARING AND GRUBBING

Project Length in Miles 1.100 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100033484 STPHV 4500 (200) CONSTRUCTION

CLEARING AND GRUBBING

2016 $355 $89 $444

TOTAL COST: $355 $89 $444

Route NA- ProjectDescription

IMPROVE PEDESTRIAN FACILITIESATFIVE POINTS ; PROJECT LOCATED NEAR HOLMES AV, PRATT AV, AND ANDREW JACKSON AV. IN HUNTSVILLE

Type of Work STREETSCAPE

Project Length in Miles 0.000 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100045139 STPAA AL61 (900) CONSTRUCTION

STREETSCAPE

2019 $474 $119 $593

TOTAL COST: $474 $119 $593

Route NA- ProjectDescription

CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES AT VARIOUS LOCATIONS IN MADISON COUNTY

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060145 STPAA NR13 (945) CONSTRUCTION

SIDEWALK 2019 $390 $98 $488

TOTAL COST: $390 $98 $488

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

49 of 94

REGION HIGHWAY PROJECTS - MADISON

STIP PLAN: 2016 - Original

Page 50: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route SR-1 ProjectDescription

SR-1 (MEMORIAL PARKWAY) FROM 0.31 MI S OF CR-75 (MASTIN LAKE RD) TO CR-65 (WINCHESTER RD) INCLUDING AN OVERPASS AT CR-75 AND ACCESS IMPROVEMENTS TO CR-65

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 1.887 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100041419 ST-045-001-015 () RIGHT OF WAY

GRADE, DRAIN, BASE, PAVE AND BRG

2017 $0 $4,848 $4,848

100041420 NHF 8510 (009) UTILITIES

GRADE, DRAIN, BASE, PAVE AND BRG

2019 $683 $171 $853

100004926 NHF 8510 (009) CONSTRUCTION

GRADE, DRAIN, BASE, PAVE AND BRG

2019 $23,880 $5,970 $29,850

TOTAL COST: $24,563 $10,989

$35,551

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

50 of 94

REGION HIGHWAY PROJECTS - MADISON

STIP PLAN: 2016 - Original

Page 51: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route SR-2 ProjectDescription

ADDITIONAL LANES SR-2 (US-72) FROM BALCH ROAD TO HUGHES ROAD IN THE CITY LIMITS OF MADISON

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.552 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061224 ACAA61224 ATRP (012) CONSTRUCTION

ADDITIONAL ROADWAY LANES

2019 $4,400 $2,167 $6,567

TOTAL COST: $4,400 $2,167 $6,567

Route SR-2 ProjectDescription

ADDITIONAL LANES SR-2 (US-72) FROM COUNTY LINE ROAD TO PROVIDENCE MAIN ROAD IN THE CITY OF HUNTSVILLE

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 16.320 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061845 NHF 0002 (566) RIGHT OF WAY

ADDITIONAL ROADWAY LANES

2019 $6,121 $1,530 $7,651

100061846 NHF 0002 (566) UTILITIES

ADDITIONAL ROADWAY LANES

2019 $2,409 $602 $3,012

100061847 NH 0002 () CONSTRUCTION

ADDITIONAL ROADWAY LANES

2019 $24,000 $6,000 $30,000

TOTAL COST: $32,530 $8,132 $40,662

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

51 of 94

REGION HIGHWAY PROJECTS - MADISON

STIP PLAN: 2016 - Original

Page 52: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route SR-255 ProjectDescription

INTERCHANGE AT BLAKE BOTTOM ROAD AND SR-255 (RESEARCH PARK BLVD)

Type of Work INTERCHANGE

Project Length in Miles 0.000 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059775 ACAA59775 ATRP (009) CONSTRUCTION

INTERCHANGE

2017 $7,196 $1,799 $8,995

TOTAL COST: $7,196 $1,799 $8,995

Route SR-53 ProjectDescription

ACCESS MANAGEMENT AND INTERSECTION IMPROVEMENTS ON SR-53 (US-231) FROM HOBBS ISLAND ROAD TO SOUTH OF WEATHERLY ROAD

Type of Work UNCLASSIFIED

Project Length in Miles 12.582 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061839 NH 0053 (571) RIGHT OF WAY

UNCLASSIFIED 2019 $320 $80 $400

100061838 NH 0053 (571) UTILITIES

UNCLASSIFIED 2019 $1,233 $308 $1,541

100061840 RP-NH 0053 () CONSTRUCTION

UNCLASSIFIED 2019 $9,210 $2,303 $11,513

TOTAL COST: $10,764 $2,691 $13,455

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

52 of 94

REGION HIGHWAY PROJECTS - MADISON

STIP PLAN: 2016 - Original

Page 53: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-106 ProjectDescription

BRIDGE REPLACEMENT ON CR-106 (NEW HOME ROAD) AT CLEAR CREEK BIN #1815

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061315 ACBRZ61315 ATRP (015)

CONSTRUCTION

BRIDGE REPLACEMENT

2018 $806 $201 $1,007

TOTAL COST: $806 $201 $1,007

Route CR-213 ProjectDescription

BRIDGE REPLACEMENT ON CR-213 (GLENDALE ROAD) AT EDDY BRANCH BIN # 4163

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061306 ACBRZ61306 ATRP (008)

CONSTRUCTION

BRIDGE REPLACEMENT

2017 $244 $61 $305

TOTAL COST: $244 $61 $305

Route CR-291 ProjectDescription

BRIDGE REPLACEMENT ON CR-291 (MT. SINAI ROAD) AT SLAB CREEK BIN#8403

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061314 BRZ 4818 (250) CONSTRUCTION

BRIDGE REPLACEMENT

2018 $766 $233 $999

TOTAL COST: $766 $233 $999

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

53 of 94

REGION HIGHWAY PROJECTS - MARSHALL

STIP PLAN: 2016 - Original

Page 54: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-NA ProjectDescription

RESURFACING INDUSTRIAL BOULEVARD AND JACKSON STREET IN THE CITY OF ALBERTVILLE

Type of Work RESURFACING

Project Length in Miles 1.450 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059485 ACOA59485 ATRP (006) CONSTRUCTION

RESURFACING

2016 $698 $305 $1,003

TOTAL COST: $698 $305 $1,003

Route NA- ProjectDescription

CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES AT VARIOUS LOCATIONS IN MARSHALL COUNTY

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060147 STPAA NR13 (935) CONSTRUCTION

SIDEWALK 2016 $625 $158 $783

TOTAL COST: $625 $158 $783

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

54 of 94

REGION HIGHWAY PROJECTS - MARSHALL

STIP PLAN: 2016 - Original

Page 55: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route SR-168 ProjectDescription

REPLACE BRIDGE, BIN 003362, SR-168 OVER SHORT CREEK 3 MILES EAST SR-1 (US-431) (SUFF=48.1, STATUS=FO)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.750 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049732 BR 0168 (501) RIGHT OF WAY

BRIDGE REPLACEMENT

2019 $85 $21 $107

100049733 BR 0168 (501) UTILITIES

BRIDGE REPLACEMENT

2019 $40 $10 $50

100049734 BR 0168 (501) CONSTRUCTION

BRIDGE REPLACEMENT

2019 $2,724 $681 $3,405

TOTAL COST: $2,850 $712 $3,562

Route SR-205 ProjectDescription

REPLACE BIN 000210 ON SR-205 OVER DRUM CREEK (SUFF=52.8, STAT=2)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.038 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060666 RP-BR 0205 (506) RIGHT OF WAY

BRIDGE REPLACEMENT

2016 $323 $81 $403

100040784 RP-BR 0205 (506) CONSTRUCTION

BRIDGE REPLACEMENT

2017 $2,114 $529 $2,643

TOTAL COST: $2,437 $609 $3,046

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

55 of 94

REGION HIGHWAY PROJECTS - MARSHALL

STIP PLAN: 2016 - Original

Page 56: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-28 ProjectDescription

BRIDGE REPLACEMENT AND APPROACHES ON CR-28 (VAUGHN BRIDGE ROAD) OVER FLINT CREEK BIN # 6691

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area DECATUR COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059675 ACBR59675 ATRP (009) CONSTRUCTION

BRIDGE REPLACEMENT

2016 $2,096 $524 $2,620

TOTAL COST: $2,096 $524 $2,620

Route CR-43 ProjectDescription

ADD LANES ON CR-43 (SPRING AV.) FROM DAY RD TO CEDAR LAKE RD SOUTH OF SR-67 ANDWOF SR-3, PROJECT SPONSOR CITY OF DECATUR

Type of Work UTILITY ADJUSTMENT

Project Length in Miles 3.575 Urban Area DECATUR COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100043404 STPOA 9215 (600) UTILITIES

UTILITY ADJUSTMENT

2016 $2,443 $611 $3,054

100033425 STPOA 9215 (600) CONSTRUCTION

ADDITIONAL ROADWAY LANES

2018 $9,439 $2,360 $11,798

TOTAL COST: $11,882 $2,970 $14,852

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

56 of 94

REGION HIGHWAY PROJECTS - MORGAN

STIP PLAN: 2016 - Original

Page 57: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-61 ProjectDescription

RESURFACE MOULTON STREET, CR-61 (OLD MOULTON ROAD), AND 12TH AVENUE SOUTH WEST IN THE CITY OF DECATUR

Type of Work RESURFACING

Project Length in Miles 2.390 Urban Area DECATUR COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100058404 ACOA58404 ATRP (016) CONSTRUCTION

RESURFACING

2016 $1,253 $313 $1,566

TOTAL COST: $1,253 $313 $1,566

Route CR-NA ProjectDescription

ADDITIONAL LANES ON WEST MOULTON STREET FROM COCKRELL AVENUE TO EXISTING 4-LANE

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 0.950 Urban Area DECATUR COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059677 ACOA59677 ATRP (013) CONSTRUCTION

ADDITIONAL ROADWAY LANES

2017 $1,771 $520 $2,291

TOTAL COST: $1,771 $520 $2,291

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT AND APPROACHES ON CEDAR CREEK ROAD OVER CEDAR CREEK BIN #18217

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area DECATUR COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061816 ACBRZ61816 ATRP (013)

CONSTRUCTION

BRIDGE REPLACEMENT

2017 $668 $167 $835

TOTAL COST: $668 $167 $835

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

57 of 94

REGION HIGHWAY PROJECTS - MORGAN

STIP PLAN: 2016 - Original

Page 58: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route NA- ProjectDescription

RESURFACE AUSTINVILLE-FLINT ROAD, CENTRAL AVENUE SW, AND MILL ROAD IN THE CITY OF DECATUR

Type of Work RESURFACING

Project Length in Miles 3.190 Urban Area DECATUR COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100058400 ACOA58400 ATRP (010) CONSTRUCTION

RESURFACING

2016 $956 $239 $1,195

TOTAL COST: $956 $239 $1,195

Route NA- ProjectDescription

RESURFACE SOUTH GREENWAY DRIVE FROM OLD HWY 24 TO GORDON TERRY PARKWAY (SR-24) IN THE TOWN OF TRINITY

Type of Work RESURFACING

Project Length in Miles 0.874 Urban Area DECATUR COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062270 STPOA 5214 (250) CONSTRUCTION

RESURFACING

2016 $266 $67 $333

TOTAL COST: $266 $67 $333

Route NA- ProjectDescription

BRIDGE REPLACEMENT, RESURFACING, AND TRAFFIC STRIPE ON COTACO-FLORETTE ROAD FROM SR-67 TO SR-36 BIN #3884

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 4.095 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061814 ACBR61814 ATRP (013) CONSTRUCTION

BRIDGE REPLACEMENT

2016 $1,713 $428 $2,141

TOTAL COST: $1,713 $428 $2,141

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

58 of 94

REGION HIGHWAY PROJECTS - MORGAN

STIP PLAN: 2016 - Original

Page 59: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route SR-3 ProjectDescription

REPLACE SOUTHBOUND BRIDGE, BIN 000882, SR-3 (US-31) OVER CEDAR CREEK

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.750 Urban Area DECATUR COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049717 BR 0003 (591) RIGHT OF WAY

BRIDGE REPLACEMENT

2019 $68 $17 $85

100049718 BR 0003 (591) UTILITIES

BRIDGE REPLACEMENT

2019 $40 $10 $50

100049719 BR 0003 (591) CONSTRUCTION

BRIDGE REPLACEMENT

2019 $2,040 $510 $2,550

TOTAL COST: $2,149 $537 $2,686

Route SR-NA ProjectDescription

CURB RAMP INSTALLATIONS AND MODIFICATIONS ON SR-20, SR-36 AND SR-3 (US-31) IN MORGAN COUNTY AND SR-53 IN LIMESTONE COUNTY

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area DECATUR COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061284 STPAA NR13 (952) CONSTRUCTION

SIDEWALK 2018 $157 $39 $196

TOTAL COST: $157 $39 $196

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

59 of 94

REGION HIGHWAY PROJECTS - MORGAN

STIP PLAN: 2016 - Original

Page 60: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-51 ProjectDescription

LEVEL, RESURFACE, TRAFFIC STRIPE, MARKERS, MARKINGS, AND LEGENDS ON CR-51 FROM SHOALS MPO LIMITS NORTH TO CR-65

Type of Work RESURFACING

Project Length in Miles 0.868 Urban Area SHOALS COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065032 STPOA 1714 (256) CONSTRUCTION

RESURFACING

2016 $130 $33 $162

TOTAL COST: $130 $33 $162

Route CR-NA ProjectDescription

RESURFACING AND TRAFFIC STRIPE CR-20 FR CR-27 TO COLBERT STEAM PLANT RD,CR-47 FR SR-2 TO CR-148,CR-148 FROM CR-47 TO TUSCUMBIA CL,CR-22 FR SR-20 TO MUSCLE SHOALS CL,CR-61(GNAT POND RD) FROM CR-22 TO SR-184,CR-61(GATE 6 RD)FROM JERRY DAVID DR TO CR-40

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area SHOALS COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065033 STPOA 1715 (251) CONSTRUCTION

RESURFACING

2017 $1,151 $288 $1,439

TOTAL COST: $1,151 $288 $1,439

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

60 of 94

REGION HIGHWAY PROJECTS - COLBERT

STIP PLAN: 2016 - Amendment # 1

Page 61: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-NA ProjectDescription

RESURFACING AIR DEPOT ROAD FROM COLLEGE PARKWAY TO LONESOME BEND ROAD IN THE CITY OF GLENCOE

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064393 STPOA 2815 () PRELIMINARY ENGINEERING

RESURFACING

2019 $31 $8 $39

100064394 STPOA 2815 () CONSTRUCTION

RESURFACING

2019 $303 $76 $379

TOTAL COST: $334 $84 $418

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

61 of 94

REGION HIGHWAY PROJECTS - ETOWAH

STIP PLAN: 2016 - Amendment # 1

Page 62: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route SR-13 ProjectDescription

US-43 FR SR-64 TO CR-140 (ADDED LANES) SR-64 TO CR-47 4 LN DIVIDED CR-47 TO CR-140 5 LN SECTION

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 4.825 Urban Area SHOALS COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100048218 EBF-NHF 0013 (535) UTILITIES

GRADE, DRAIN, BASE AND PAVE

2016 $792 $510 $1,302

100004264 EBF-NHF 0013 (535) CONSTRUCTION

GRADE, DRAIN, BASE AND PAVE

2016 $8,544 $2,136 $10,680

TOTAL COST: $9,336 $2,646 $11,982

Route SR-13 ProjectDescription

ADDITIONAL LANES SR-13 (US-43) FROM CR-140 TO TENNESSEE STATE LINE

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 5.675 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100048219 NHF 0013 (551) UTILITIES

GRADE, DRAIN, BASE AND PAVE

2016 $1,097 $423 $1,521

100004265 NHF 0013 (551) CONSTRUCTION

GRADE, DRAIN, BASE AND PAVE

2016 $10,436 $2,609 $13,045

TOTAL COST: $11,533 $3,032 $14,565

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

62 of 94

REGION HIGHWAY PROJECTS - LAUDERDALE

STIP PLAN: 2016 - Amendment # 1

Page 63: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-NA ProjectDescription

HUNTSVILLE NORTHERN BYPASS FROM 1500 FEET EAST OF SR-1 (US-231/431) INTERSECTION TO WINCHESTER ROAD

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 18.180 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062235 STPHV 4514 () PRELIMINARY ENGINEERING

GRADE, DRAIN, BASE AND PAVE

2019 $120 $30 $150

100062236 STPHV 4514 () RIGHT OF WAY

GRADE, DRAIN, BASE AND PAVE

2019 $1,520 $380 $1,900

100062237 STPHV 4514 () UTILITIES

GRADE, DRAIN, BASE AND PAVE

2020 $1,506 $376 $1,882

TOTAL COST: $3,146 $786 $3,932

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

63 of 94

REGION HIGHWAY PROJECTS - MADISON

STIP PLAN: 2016 - Amendment # 2

Page 64: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-162 ProjectDescription

WIDEN CR-162 (STEELE STATION ROAD) FROM SR-77 TO CR-203 (SUTTON BRIDGE ROAD)

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 1.090 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065579 STPOA 8105 (601) UTILITIES

GRADE, DRAIN, BASE AND PAVE

2017 $825 $210 $1,035

TOTAL COST: $825 $210 $1,035

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

64 of 94

REGION HIGHWAY PROJECTS - ETOWAH

STIP PLAN: 2016 - Amendment # 8

Page 65: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route I -65 ProjectDescription

NEW LIGHTING SYSTEM FOR REST AREA ON I-65 IN CULLMAN COUNTY

Type of Work LIGHTING

Project Length in Miles 3.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100057469 IM I065 (481) PRELIMINARY ENGINEERING

LIGHTING 2017 $227 $25 $253

100057470 IM I065 (481) CONSTRUCTION

LIGHTING 2019 $1,391 $155 $1,545

TOTAL COST: $1,618 $180 $1,798

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

65 of 94

REGION HIGHWAY PROJECTS - CULLMAN

STIP PLAN: 2016 - Amendment # 11

Page 66: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-NA ProjectDescription

BRIDGE AND APPRO CHURCH STREET BRIDGE OVER BIG SPRING AT BIG SPRING PARK

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.000 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100051833 DEMO A179 () RIGHT OF WAY

BRIDGES AND APPROACHES

2019 $10 $0 $10

TOTAL COST: $10 $0 $10

Route CR-NA ProjectDescription

UTILITY RELOCATION ON RYLAND PIKE FROM SR-2 (US-72) TO EVERETT ROAD

Type of Work SHOULDER WIDENING

Project Length in Miles 0.000 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066077 STPHV 4516 (250) UTILITIES

SHOULDER WIDENING

2019 $2,040 $510 $2,550

TOTAL COST: $2,040 $510 $2,550

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

66 of 94

REGION HIGHWAY PROJECTS - MADISON

STIP PLAN: 2016 - Amendment # 11

Page 67: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-255 ProjectDescription

WIDEN, RESURFACE AND STRIPE CR-255 FROM SR-176 TO CR-78 - DCP 25-255-16

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 2.025 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066357 FLAP FLAP (009) CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2016 $546 $137 $683

TOTAL COST: $546 $137 $683

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

67 of 94

REGION HIGHWAY PROJECTS - DEKALB

STIP PLAN: 2016 - Amendment # 13

Page 68: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-NA ProjectDescription

RESURFACING OF EAST 2ND STREET FROM 150' EAST OF SR-117 (KENTUCKY AVENUE) TO PATSY LEE DRIVE

Type of Work RESURFACING

Project Length in Miles 1.070 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066421 ACNU66421 ATRP (017) CONSTRUCTION

RESURFACING

2017 $285 $71 $356

TOTAL COST: $285 $71 $356

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

68 of 94

REGION HIGHWAY PROJECTS - JACKSON

STIP PLAN: 2016 - Amendment # 13

Page 69: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-NA ProjectDescription

IMPROVEMENTS TO PEPI AVE/MARKATE AVE FR 2ND ST TO RIVER RD W/ NORFOLK SOUTHERN RR XING, AL AVE FR 6TH ST TO AVALON AVE, SHEFFIELD AVE FR 6TH ST TO AVALON AVE, COVENANT DR/JOHN ALDRIDGE DR FR SR-2(US-43) TO 6TH ST, AND ELLEDGE LN FR KING ST TO 6TH ST

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area SHOALS COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065043 STPOA 1715 (252) PRELIMINARY ENGINEERING

RESURFACING

2017 $64 $16 $80

100065044 STPOA 1715 (252) CONSTRUCTION

RESURFACING

2018 $776 $194 $969

TOTAL COST: $840 $210 $1,049

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

69 of 94

REGION HIGHWAY PROJECTS - COLBERT

STIP PLAN: 2016 - Amendment # 14

Page 70: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route SR-35 ProjectDescription

DEMOLITION AND REMOVAL OF STRUCTURES ON SR-35 IN JACKSON COUNTY, SR-77 IN ETOWAH COUNTY, AND SR-9 IN CHEROKEE COUNTY

Type of Work STRUCTURE REMOVAL

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066464 STPAA 0035 (532) CONSTRUCTION

STRUCTURE REMOVAL

2017 $296 $74 $370

TOTAL COST: $296 $74 $370

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

70 of 94

REGION HIGHWAY PROJECTS - CHEROKEE

STIP PLAN: 2016 - Amendment # 15

Page 71: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route I -65 ProjectDescription

RESURFACE I-65 FROM SOUTH OF CR-222 (MP 304.1) TO NEAR HURRICANE CREEK (MP 315.500)

Type of Work RESURFACING

Project Length in Miles 19.555 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066222 IM I065 (482) PRELIMINARY ENGINEERING

RESURFACING

2017 $675 $75 $750

100066223 IM I065 (482) CONSTRUCTION

PAVEMENT MINOR REHABILITATION

2019 $14,002 $1,556 $15,558

TOTAL COST: $14,677 $1,631 $16,308

Route SR-74 ProjectDescription

REPLACE BRIDGE, BIN 001618, ON SR-74 (US-278) OVER BRINDLEY CREEK 0.8 MILE EAST OF SR-69 (SUFF=50.8, STATUS=FO)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.250 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066197 BR 0074 (517) RIGHT OF WAY

BRIDGE REPLACEMENT

2017 $35 $9 $43

TOTAL COST: $35 $9 $43

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

71 of 94

REGION HIGHWAY PROJECTS - CULLMAN

STIP PLAN: 2016 - Amendment # 15

Page 72: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route I -65 ProjectDescription

RESURFACING ON I-65 FROM 0.1 MILE SOUTH OF CSXT OVERPASS (MP 359.000) TO TENNESSEE STATE LINE

Type of Work PREVENTATIVE MAINTENANCE LEVEL 1

Project Length in Miles 14.458 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065905 IM I065 (483) PRELIMINARY ENGINEERING

PREVENTATIVE MAINTENANCE LEVEL 1

2017 $146 $16 $162

100065906 IM I065 (483) CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 1

2018 $4,198 $466 $4,664

TOTAL COST: $4,344 $483 $4,826

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

72 of 94

REGION HIGHWAY PROJECTS - LIMESTONE

STIP PLAN: 2016 - Amendment # 15

Page 73: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route SR-36 ProjectDescription

BRIDGE REPLACEMENT ON SR-36 BIN # 001775 OVER GUM SPRING CREEK (MP 28.839) AND BIN # 001776 ROAN CREEK (MP 29.229) (SUFF = 54.5, STAT = 2)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.326 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100040782 BR 0036 (503) CONSTRUCTION

BRIDGE REPLACEMENT

2019 $1,938 $485 $2,423

TOTAL COST: $1,938 $485 $2,423

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

73 of 94

REGION HIGHWAY PROJECTS - MORGAN

STIP PLAN: 2016 - Amendment # 17

Page 74: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route I -65 ProjectDescription

RESURFACE I-65 FROM HURRICANE CREEK (MP 315.665) TO SOUTH OF THE CSX RAILROAD BRIDGE (MP 319.055)

Type of Work PREVENTATIVE MAINTENANCE LEVEL 1

Project Length in Miles 6.786 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066224 IM I065 (490) PRELIMINARY ENGINEERING

PREVENTATIVE MAINTENANCE LEVEL 1

2018 $273 $30 $303

100066225 IM I065 (490) CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 1

2019 $1,636 $182 $1,818

TOTAL COST: $1,909 $212 $2,121

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

74 of 94

REGION HIGHWAY PROJECTS - CULLMAN

STIP PLAN: 2016 - Amendment # 19

Page 75: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-17 ProjectDescription

2 FT SAFETY WIDENING AND RESURFACING OF CR-17 (BALCH ROAD) FROM SOUTH OF CR-21 (BROWNS FERRY ROAD) TO NORTH OF CR-27 (GOOCH LANE) IN THE CITY OF MADISON

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 2.440 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066571 DE AL81 (940) PRELIMINARY ENGINEERING

WIDENING AND RESURFACING (RDWY)

2018 $150 $0 $150

TOTAL COST: $150 $0 $150

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

75 of 94

REGION HIGHWAY PROJECTS - MADISON

STIP PLAN: 2016 - Amendment # 20

Page 76: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route SR-2 ProjectDescription

BRIDGE REPLACEMENT (BIN 001709) ON SR-2 (US-72) OVER SR-20

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.370 Urban Area SHOALS COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066652 BR 0002 (579) PRELIMINARY ENGINEERING

BRIDGES AND APPROACHES

2018 $404 $101 $505

TOTAL COST: $404 $101 $505

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

76 of 94

REGION HIGHWAY PROJECTS - LAUDERDALE

STIP PLAN: 2016 - Amendment # 21

Page 77: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-17 ProjectDescription

2 FT SAFETY WIDENING AND RESURFACING OF CR-17 (BALCH ROAD) FROM SOUTH OF CR-21 (BROWNS FERRY ROAD) TO NORTH OF CR-27 (GOOCH LANE) IN THE CITY OF MADISON

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 2.450 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100046745 DE-STPAA-STPHV AL81 ()

CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2019 $1,486 $195 $1,681

TOTAL COST: $1,486 $195 $1,681

Route CR-93 ProjectDescription

ADDITIONAL LANES ON CR-93 (WINCHESTER ROAD) FROM CR-406 (NAUGHER ROAD) TO CR-389 (RIVERTON ROAD)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.000 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066800 ACNU61457 ATRP (012) UTILITIES

ADDITIONAL ROADWAY LANES

2017 $1,181 $1,599 $2,780

TOTAL COST: $1,181 $1,599 $2,780

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

77 of 94

REGION HIGHWAY PROJECTS - MADISON

STIP PLAN: 2016 - Amendment # 21

Page 78: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route SR-205 ProjectDescription

REPLACE BIN 000210 ON SR-205 OVER DRUM CREEK (SUFF=52.8, STAT=2)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.020 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066802 RP-BR 0205 (506) UTILITIES

BRIDGE REPLACEMENT

2017 $1,032 $258 $1,290

TOTAL COST: $1,032 $258 $1,290

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

78 of 94

REGION HIGHWAY PROJECTS - MARSHALL

STIP PLAN: 2016 - Amendment # 21

Page 79: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route SR-36 ProjectDescription

BRIDGE REPLACEMENT ON SR-36 BIN # 001775 OVER GUM SPRING CREEK (MP 28.839) AND BIN # 001776 ROAN CREEK (MP 29.229) (SUFF = 54.5, STAT = 2)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.652 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066924 BR 0036 (503) RIGHT OF WAY

BRIDGE REPLACEMENT

2019 $273 $68 $341

100066926 BR 0036 (503) UTILITIES

BRIDGE REPLACEMENT

2019 $163 $41 $204

TOTAL COST: $436 $109 $545

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

79 of 94

REGION HIGHWAY PROJECTS - MORGAN

STIP PLAN: 2016 - Amendment # 21

Page 80: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-63 ProjectDescription

RESURFACING, SHOULDERS, AND TRAFFIC STRIPE ON CR-63 FROM THE MARSHALL COUNTY LINE TO HODGES STREET - JCP 36-47-16

Type of Work RESURFACING

Project Length in Miles 1.665 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067343 STPNU 3616 (251) CONSTRUCTION

RESURFACING

2017 $399 $200 $599

TOTAL COST: $399 $200 $599

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

80 of 94

REGION HIGHWAY PROJECTS - JACKSON

STIP PLAN: 2016 - Amendment # 26

Page 81: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-NA ProjectDescription

VARIOUS STREET IMPROVEMENTS ON N COMMONS ST W, N COMMONS ST E, KING ST, 6TH ST, E COMMONS ST N, E COMMONS ST S, JOE WHEELER DR, N DICKSON ST, E 5TH ST, HOOK ST

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area SHOALS COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065035 STPOA 1716 (250) PRELIMINARY ENGINEERING

RESURFACING

2018 $64 $16 $80

TOTAL COST: $64 $16 $80

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

81 of 94

REGION HIGHWAY PROJECTS - COLBERT

STIP PLAN: 2016 - Amendment # 30

Page 82: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route SR-3 ProjectDescription

BRIDGE REPLACEMENT BINS 006153 AND 001391 ON SR-3 (US-31) OVER NORFOLK SOUTHERN RAILROAD

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.010 Urban Area DECATUR COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067287 BR 0003 (618) PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2019 $566 $141 $707

TOTAL COST: $566 $141 $707

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

82 of 94

REGION HIGHWAY PROJECTS - LIMESTONE

STIP PLAN: 2016 - Amendment # 30

Page 83: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-322 ProjectDescription

BRIDGE ON CR-322 (ARBOR ACRES ROAD) OVER TRIBUTARY TO DRUM CREEK BIN # 4180

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061312 ACBRZ61312 ATRP (011)

CONSTRUCTION

BRIDGE REPLACEMENT

2018 $148 $51 $199

TOTAL COST: $148 $51 $199

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

83 of 94

REGION HIGHWAY PROJECTS - MARSHALL

STIP PLAN: 2016 - Amendment # 30

Page 84: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route I -65 ProjectDescription

RESURFACING AND TRAFFIC STRIPE ON I-65 FROM SOUTH OF CR-222 (MP 304.100) TO SR-74 (US-278) AT MP 307.500

Type of Work PREVENTATIVE MAINTENANCE LEVEL 2

Project Length in Miles 3.400 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067549 IM I065 (495) CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 2

2019 $4,350 $483 $4,833

TOTAL COST: $4,350 $483 $4,833

Route SR-74 ProjectDescription

REPLACE BRIDGE, BIN 001618, ON SR-74 (US-278) OVER BRINDLEY CREEK 0.8 MILES EAST OF SR-69 (SUFF=50.8, STATUS=FO)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.250 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067821 BR 0074 (517) UTILITIES

BRIDGE REPLACEMENT

2018 $8 $2 $10

TOTAL COST: $8 $2 $10

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

84 of 94

REGION HIGHWAY PROJECTS - CULLMAN

STIP PLAN: 2016 - Amendment # 31

Page 85: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route SR-2 ProjectDescription

WIDENING SR-2(US-72) FROM JEFFERSON ST TO JUST EAST OF CSX RAILROAD UNDERPASS IN ATHENS GRADE, DRAIN, BASE, PAVE, SIGNAL, AND RETAINING WALLS

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 0.118 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067910 DE-NHF A205 (937) RIGHT OF WAY

ADDITIONAL ROADWAY LANES

2019 $192 $10 $202

100067911 DE-NHF A205 (937) UTILITIES

ADDITIONAL ROADWAY LANES

2019 $121 $30 $152

TOTAL COST: $313 $40 $354

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

85 of 94

REGION HIGHWAY PROJECTS - LIMESTONE

STIP PLAN: 2016 - Amendment # 31

Page 86: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route CR-NA ProjectDescription

NATCHEZ TRACE PARKWAY OVERLAY PARK ROAD FROM MP 316.55 TO MP 334.55

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067955 FLAP FLAP () CONSTRUCTION

RESURFACING

2019 $4,170 $1,042 $5,212

TOTAL COST: $4,170 $1,042 $5,212

Route SR-2 ProjectDescription

REPLACE BRIDGES AND APPROACHES, BIN 001708 AND BIN 005442, ON SR-2 (US-72) OVER ASHE BOULEVARD (SUFF=66.2, STATUS=FO)

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.200 Urban Area SHOALS COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068037 BRF 0002 (529) RIGHT OF WAY

BRIDGES AND APPROACHES

2018 $68 $17 $85

TOTAL COST: $68 $17 $85

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

86 of 94

REGION HIGHWAY PROJECTS - COLBERT

STIP PLAN: 2016 - Amendment # 33

Page 87: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route SR-91 ProjectDescription

BRIDGE REPLACEMENT AND APPROACHES ON SR-91 OVER DUCK RIVER, BIN 004129

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.500 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068169 BR 0091 () PRELIMINARY ENGINEERING

BRIDGES AND APPROACHES

2019 $687 $172 $859

TOTAL COST: $687 $172 $859

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

87 of 94

REGION HIGHWAY PROJECTS - CULLMAN

STIP PLAN: 2016 - Amendment # 33

Page 88: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route I -59 ProjectDescription

RECONSTRUCTION OF THE NORTHBOUND ROADWAY ON I-59 FROM SOUTH OF SR-35 (MP 217.850) TO NORTH OF SR-7 (MP 225.60)

Type of Work PAVEMENT REHABILITATION

Project Length in Miles 7.750 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066507 IM I059 (407) PRELIMINARY ENGINEERING

PAVEMENT REHABILITATION

2018 $900 $100 $1,000

TOTAL COST: $900 $100 $1,000

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

88 of 94

REGION HIGHWAY PROJECTS - DEKALB

STIP PLAN: 2016 - Amendment # 33

Page 89: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route I -565 ProjectDescription

I-565, INTERCHANGE IMPROVEMENTS AT CR-115 (GREENBRIER ROAD) (PRIORITY #23)

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 0.250 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100051962 IMF I565 (308) CONSTRUCTION

GRADE, DRAIN, BASE AND PAVE

2018 $13,299 $1,478 $14,777

TOTAL COST: $13,299 $1,478 $14,777

Route I -65 ProjectDescription

RESURFACING ON I-65 FROM 0.2 MILE NORTH OF SR-2 (US-72) TO 0.1 MILE SOUTH OF CSXT OVERPASS

Type of Work PREVENTATIVE MAINTENANCE LEVEL 2

Project Length in Miles 15.500 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065907 IM I065 (492) PRELIMINARY ENGINEERING

PREVENTATIVE MAINTENANCE LEVEL 2

2018 $585 $65 $650

100065908 IM I065 () CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 2

2019 $9,817 $1,091 $10,908

TOTAL COST: $10,402 $1,156 $11,558

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

89 of 94

REGION HIGHWAY PROJECTS - LIMESTONE

STIP PLAN: 2016 - Amendment # 33

Page 90: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route I -59 ProjectDescription

RESURFACING AND TRAFFIC STRIPE ON I-59 FROM .39 MILES SOUTH OF CR-276 (STEPHENS GAP ROAD) TO THE DEKALB COUNTY LINE

Type of Work PREVENTATIVE MAINTENANCE LEVEL 1

Project Length in Miles 3.974 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068314 IM I059 (409) PRELIMINARY ENGINEERING

PREVENTATIVE MAINTENANCE LEVEL 1

2018 $270 $30 $300

TOTAL COST: $270 $30 $300

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

90 of 94

REGION HIGHWAY PROJECTS - ETOWAH

STIP PLAN: 2016 - Amendment # 36

Page 91: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route I -65 ProjectDescription

WELCOME CENTER REHABILITATION NEAR I-65 NORTH OF ATHENS

Type of Work REST AREA REHABILITATION

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063652 IM I065 (496) PRELIMINARY ENGINEERING

REST AREA REHABILITATION

2018 $492 $55 $546

TOTAL COST: $492 $55 $546

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

91 of 94

REGION HIGHWAY PROJECTS - LIMESTONE

STIP PLAN: 2016 - Amendment # 36

Page 92: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route SR-35 ProjectDescription

INTERSECTION IMPROVEMENTS AT SR 35 AND AIRPORT ROAD IN FT. PAYNE

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.410 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068764 NH 0035 (535) PRELIMINARY ENGINEERING

INTERSECTION IMPROVEMENTS

2019 $129 $32 $162

100065375 NH 0035 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2019 $606 $152 $758

TOTAL COST: $735 $184 $919

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

92 of 94

REGION HIGHWAY PROJECTS - DEKALB

STIP PLAN: 2016 - Amendment # 38

Page 93: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route I -59 ProjectDescription

RESURFACING AND TRAFFIC STRIPE ON I-59 FROM .13 MILES SOUTH OF SR-77 (MP 181.056) TO .78 MILES NORTH OF THE ATN RAILROAD OVERPASS (MP 183.800)

Type of Work PREVENTATIVE MAINTENANCE LEVEL 1

Project Length in Miles 2.744 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068312 IM I059 () PRELIMINARY ENGINEERING

PREVENTATIVE MAINTENANCE LEVEL 1

2019 $200 $22 $222

TOTAL COST: $200 $22 $222

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

93 of 94

REGION HIGHWAY PROJECTS - ETOWAH

STIP PLAN: 2016 - Amendment # 38

Page 94: 10/30/2018 ALABAMA DEPARTMENT OF TRANSPORTATION … · Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State-Other TOTAL ... 2017 $5,738 $1,435 $7,173 TOTAL

Route I -565 ProjectDescription

RESURFACING I-565 FROM I-65 (MP 0.00) TO MP 5.63

Type of Work PREVENTATIVE MAINTENANCE LEVEL 2

Project Length in Miles 11.260 Urban Area HUNTSVILLE COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066496 IM I565 (313) PRELIMINARY ENGINEERING

PREVENTATIVE MAINTENANCE LEVEL 2

2019 $318 $35 $354

100066497 IM I565 () CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 2

2020 $5,600 $622 $6,223

TOTAL COST: $5,918 $658 $6,576

11/9/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

94 of 94

REGION HIGHWAY PROJECTS - LIMESTONE

STIP PLAN: 2016 - Amendment # 38