11 2014 regional conference design-build start sooner... finish faster 1 when to select a...
TRANSCRIPT
![Page 1: 11 2014 REGIONAL CONFERENCE DESIGN-BUILD START SOONER... FINISH FASTER 1 When to Select a Subcontractor in the Design Build Process Moderator:Ted Laszlo,](https://reader036.vdocument.in/reader036/viewer/2022082710/56649e6f5503460f94b6cb78/html5/thumbnails/1.jpg)
11
2014REGIONAL CONFERENCE
DESIGN-BUILDSTART
SOONER...FINISH FASTER
When to Select a Subcontractor in the Design Build Process
Moderator: Ted Laszlo, GH PhippsPanel: Jim Dent, Weifield Electric
Tal Clark, US EngineeringBrian Patton, JR ButlerEric Moe, Puma Steel
![Page 2: 11 2014 REGIONAL CONFERENCE DESIGN-BUILD START SOONER... FINISH FASTER 1 When to Select a Subcontractor in the Design Build Process Moderator:Ted Laszlo,](https://reader036.vdocument.in/reader036/viewer/2022082710/56649e6f5503460f94b6cb78/html5/thumbnails/2.jpg)
22
2014REGIONAL CONFERENCE
DESIGN-BUILDSTART
SOONER...FINISH FASTER
Value Through Early Involvement
![Page 3: 11 2014 REGIONAL CONFERENCE DESIGN-BUILD START SOONER... FINISH FASTER 1 When to Select a Subcontractor in the Design Build Process Moderator:Ted Laszlo,](https://reader036.vdocument.in/reader036/viewer/2022082710/56649e6f5503460f94b6cb78/html5/thumbnails/3.jpg)
33
2014REGIONAL CONFERENCE
DESIGN-BUILDSTART
SOONER...FINISH FASTER
Design/Cost Relationship Design/Cost Relationship
$
Ran
ge o
f D
esi
gn
Details of the Design
Cost (and performance) is fixed
Designing to the Budget
![Page 4: 11 2014 REGIONAL CONFERENCE DESIGN-BUILD START SOONER... FINISH FASTER 1 When to Select a Subcontractor in the Design Build Process Moderator:Ted Laszlo,](https://reader036.vdocument.in/reader036/viewer/2022082710/56649e6f5503460f94b6cb78/html5/thumbnails/4.jpg)
44
2014REGIONAL CONFERENCE
DESIGN-BUILDSTART
SOONER...FINISH FASTER
Award Criteria During the Process
Pre-Design-10% -5% 0% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% 55% 60% 65% 70% 75%
Design
Design/Draw-Build35% Design or Greater
PreliminaryDesign
Design-Build20% -35%
DesignCriteriaDesign-
Build5% - 20%
DirectSole-Source
Selection-10% - 5%
QualificationsEmphasis
Technical & PriceEmphasis
Low PriceEmphasis
CRITERIA DOCUMENTSDescribes End Result
BRIDGING DOCUMENTSPrescribes How To Achieve End Result
SchematicDesign
DesignDevelopment
Construction Documents
Programming
![Page 5: 11 2014 REGIONAL CONFERENCE DESIGN-BUILD START SOONER... FINISH FASTER 1 When to Select a Subcontractor in the Design Build Process Moderator:Ted Laszlo,](https://reader036.vdocument.in/reader036/viewer/2022082710/56649e6f5503460f94b6cb78/html5/thumbnails/5.jpg)
55
2014REGIONAL CONFERENCE
DESIGN-BUILDSTART
SOONER...FINISH FASTER
Managing the ProcessManaging the Process
Key Owner Management Points:Well defined program requirementsUnderstanding of contractClear directionTimely decisionsCollaborative atmosphereTimely Payment
Key Attributes of a Successful ProjectLeadershipCollaborationTRUST