11 22 2015 sergreeeeeeet

3
Date : 11/XX/2015 Name : Abid Ali Total Inspected 160 Balance 0 Quantity for Visual ITN NO Discipline Module NO. Inspected ITN-0000000-XX-XXXX FIT-UP TOTAL 0 0 ITN-0000000-SS-0472 30 98 98 ITN-0000000-SS-0469 29 6 6 N/A 48 48 30 mpi 6 6 29 mpi 2 2 VISUAL TOTAL 160 160 GRAND TOTAL 160 160 To be inspected FIT-UP (structural) VISUAL (structural) Radiographs (Film Review) NDT (witness)

Upload: abidaliabid1

Post on 18-Feb-2016

222 views

Category:

Documents


0 download

DESCRIPTION

wertwertbn wrgtwertgwtwer wtwetrtwertwerr

TRANSCRIPT

Page 1: 11 22 2015 sergreeeeeeet

Date : 11/XX/2015 Name : Abid Ali

Total Inspected 160Balance 0

Quantity for Visual or Fit-up (structural)

ITN NO Discipline Module NO. To be inspected Inspected Accepted

ITN-0000000-XX-XXXX

FIT-UP TOTAL 0 0 0

ITN-0000000-SS-0472 30 98 98 95ITN-0000000-SS-0469 29 6 6 6

N/A 48 48 47

30 mpi 6 6 629 mpi 2 2 2

VISUAL TOTAL 160 160 156GRAND TOTAL 160 160 156

FIT-UP (structural)

VISUAL (structural)

Radiographs (Film Review)

NDT (witness)

Page 2: 11 22 2015 sergreeeeeeet

Inspection HistoryDate 298

10 1107

Quantity for Visual or Fit-up (structural) 11 74

Rejected Balance Remarks 12 1514 7415 36516 24917 3018 9819 98720 50

0 0 21 298

3 00 0

1 0

0 00 0

4 0 total 33474 0

M30 lighting support M29 Jb supports