Claus Iversen
2008 – til i dag, Construction Manager, D&R and Marine Works, Femern A/S
2005 – 2008 Construction Manager, Bosphorus, Istanbul, The Marmaray Project, Immersed Tunnel
1995 – 2001 Contract Director, D&RØresundskonsortiet, DK
1975 – 1995, Danish Hydraulic InstituteMarine Works
CIV 210. september 2015
20-11-2015
2
CIV
CIV
20-11-2015
3
Øresund tunnelfabrikNordhavn, København
10. september 20155
10. september 2015CIV
20-11-2015
4
10. september 2015CIV
The Marmaray Project
• Total length of CR-Project app. 77 km:– At grade, European side 19.6 km – At grade, Asian side 43.4 km– Bored tunnels 12.2 km– Immersed tube tunnel 1.4 km
10. september 2015CIV 8From Halkali to Gebze
20-11-2015
5
The Background (1860)
10. september 2015CIV 9
Gravet ned i havbunden
10. september 2015CIV 10
20-11-2015
6
Dredging Works
CIV 11
Contaminated soil: 120.000 m3 Clean soil: 1.000.000 m3
Stone backfill: 130.000 m3 Soil backfill: 800.000 m3
Immersed Tunnel Yard
10. september 2015CIV 12
20-11-2015
7
Tuzla Construction Yard
10. september 2015CIV 13
20-11-2015
8
20-11-2015
9
10. september 2015CIV 17
20-11-2015
10
Elements, today, E4 – E1
10. september 2015CIV 20
20-11-2015
11
Bosphorus, Marine Works
10. september 2015CIV 22
20-11-2015
12
20-11-2015
13
Nedsænket på et tunnelfundament
10. september 2015CIV 25
Tunnelfundament
CIV10. september 2015
26
20-11-2015
14
Bosphorus, Marine Works
10. september 2015CIV 27
20-11-2015
15
Immersion Barge
10. september 2015CIV 29
CIV 30
Preparing element for immersion
10. september 2015
20-11-2015
16
Sænkning af elementer
CIV10. september 2015
31
Monteringsudstyr oven på elementerne
CIV 3210. september 2015
20-11-2015
17
Sammenkobling mellem tunnelelement ogsænkepram
CIV10. september 2015
33
Indvendigt udstyr i elementerne
CIV10. september 2015
34
20-11-2015
18
Inside Element 7, today
10. september 2015CIV 35
Tunnelelement klart til nedsænkning
CIV10. september 2015
36
20-11-2015
19
CIV
Wirer så tykke som håndled
Udstyr i kontrolrummet
CIV 3810. september 2015
20-11-2015
20
10. september 2015CIV
Tunnelportal og ramper
40
20-11-2015
21
10. september 2015CIV 41
10. september 2015CIV 42
20-11-2015
22
10. september 2015CIV 43
20-11-2015
23