Organization and
Management
Fadwa Bawazir, CPHQ
Director, TQM Dept.
Hera General Hospital
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 2/216
Objectives
To understand theeffect of organizationand management ondaily operations
To link O&M to thedevelopment of policies andprocedures
Discussion is within thescope of hospitals.
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 3/216
Introduction
Hospitals are corporateentities
Hospitals include
supporting elements,such as
income,
operating expenses,
politics,
reporting levels,
and vast interactions withthe public, patients,employees, and physicians.
.
:
/
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 4/216
Regulatory and
competitivepressures arerequiring hospitalsand other healthcare
providers to examine their
organizationalstructures, and
to realign thosestructures to enablethem to competeflexibly.
:
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 5/216
Key Issues
Health transition
Medical Technology
Consumer
expectations andquality of care
Demographic andepidemiologicalpressures
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 6/216
Key Issues
New innovations
Informationsuperhighway
Organization of services aroundspecialized expertise
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 7/216
Shift from inpatient today care facilities
Changing patterns of care
Reallocation of spaceto meet changingneeds
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 8/216
Many modernorganizations arefunctional and
hierarchical; theysuffer from isolateddepartments, poorcoordination, andlimited lateralcommunication.
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 9/216
To eliminateinefficiencies work
processes should beredesigned
Process improvement =
Process management
/
.
=
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 10/216
Operational andadministrativeprocesses shareseveral
characteristics. Both involve
sequences of linked,interdependent
activities that togethertransform inputs intooutputs.
.
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 11/216
Both have beginningsand ends, withboundaries that canbe defined with
reasonable precisionand minimal overlap.
And both havecustomers, who may
be internal or externalto the organization.
()
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 12/216
Typically, operational processes producegoods and services thatexternal customers
consume,
while administrative processes generate
information and plansthat internal groups use.
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 13/216
Both must be aligned and
mutually supportive if theorganization is tofunction effectively
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 14/216
the need to redesignprocesses is to
improve quality,
cut costs, reduce cycle times, or
otherwise enhanceoperating
performance
:
/
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 15/216
To govern thoseadministrative andoperational processes
Policies andprocedures are
developed
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 16/216
Accreditation bodies
require that policies
are:
Documented Approved
Communicated/educated
Implemented
:
/
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 17/216
Types of Policies
Philosophical
Code of Ethics
Mission Vision
Organizational values
Code of Conduct
Dress Code
Communication culture
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 18/216
Types of Policies
Resources Deployment
Allocation of resources:
Manpower: staff distribution Equipment
Space
Financial
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 19/216
Types of Policies
Working /Departmental/Multidisciplinary policies
Processes Guidelines
Daily work/ services
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 20/216
Types of Policies
Administrative
General Rules and regulations
Leaves, personnel processes Smoking policy
Security policies
Staff development
TQM policies
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 21/216
Types of Policies
Memo policies
Management notification,
general distribution,
delegation of authority
Self Operation ProgramDirector - Dr.Talal Karima
M di l Ad i i t ti
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 22/216
Director Dr.Talal Karima
Medical Director
DR. Waleed Hussain
Anesthesia
Dr. Somya Mansoor
Dermatology
Dr. Mohamad Fatane
Emergency
Dr. Belal Mostafa
ICU
Dr. Khaled Hakim
Pediatrics & NICU
DR. Mohamad Basamad
Medicine
Dr. Samih Chakalli
Ophthalmology
Dr. Amna Falata
OB/GYN
Dr. Samih Emam
Medical
Departments
Clinical
Ancillaries
Pharmacy
Dr. Azza Shaban
Laboratory
Dr. Ahmad Ashshi
Radiology
Dr.Bothyna Abd Alshakoor
Clinical Dietary
Mrs.Marie Eden Agot
OPD
Mr. Abdulrhman Linga
Infection Control
Dr. Sayed Bukhari
CSSD
Ms. Liza Baylon
Public Health
Dr. Mohd. Anas Nashwati
Physiotherapy
Dr. Ayman Aboalftooh
TQM
Ms. Fadwa Bawazer
Nursing Services
Mrs. Sharifa Zeannat Ali
Nursing Education
Social Services
Mr.Adel Aljmaan
Surgery
Dr. Omar Abohmdan
Business Center (SMCC)
Dr. W aleed Hussain
Public Relations &Health
Education
Mr. Zohair Melibari
Training (PG&CMEC)
Mrs. Manal Karima
ENT Unit
Dr. Mahmoud Alshora
Dental
Dr. Mohamad Samy
Neurology Unit
Dr. Mousa Mejally
Endoscopy Unit
Dr. Ayman Ghaith
Medical Administration Organization Structure 2005
Cardiology Unit
Dr. Salwa Ghuneim
ECG Unit
I.V.F
Dr. Mohamad Khan
Approved
__________________
Dr. Waleed Hussain
Medical Director
Nursing Admin
Mr. Hussein Chenini
Health Educators
Ms. Wessam Ramzy
Pediatrics & NICU
Ms. Emma De Villa
ICU
Ms. Cherry Ofelia Manigo
Emergency
Ms. Balqees Sultana
Male Medical Ward
Mr. Sherawin Culajara
Female Medical Ward
Mrs. Mariama Jayan
Female Surgical Ward
Mrs. Rosalina Y Parraguirre
Male Surgical Ward
Mrs. Emma de Villa
Operating Room
Mrs. Ofelia Liedo
Obstetrics and Gunecology
Ms. Disy Lao Nashrie
SMCC
Ms. Huda Othman
Out-Patient DepartmentMs. Marian Duque
Ms. Norma Mendez
Ms. Erlinda Duncombe
Ms. Asela Bea
Endoscopy
Ms. Sharifa Rohani Barazar
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 23/216
All processes and activities
in the hospital should be
guided by policies and
procedures inline with theorganizational structures
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 24/216
Why do we need Policies and
Procedures?
To make systems work
Consistently
Continuously
Uniformed manner
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 25/216
Why do we need P&P?
To protect the staff
To ensure patient safety
To ensure competency
To establish systems
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 26/216
Hera General Hospital PolicyManagement System
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 27/216
Purpose
To define and outline the policyand procedure development and
up keep system.
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 28/216
Policy:
the rules and regulations.
Definitions
Procedures:
are the steps to be
followed inimplementing certain
policy.
:
:
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 29/216
Policy
1. All policy and procedures of Hera
General Hospital will be governed by
the rules and regulations outlined in this
policy.
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 30/216
2 . All departments should establish and
develop their policies and procedure togovern their functions and activities
according to their scope of services.
Policy
/
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 31/216
3 . All policies and procedures should notcontradict with the government rules and
regulations and MOH policies and procedures.
.
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 32/216
Policy
4. According to theapproved formatpolicies andprocedures should
include thefollowing headings:
:
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 33/216
KING FAISAL SPECIALIST
HOSPITAL
AND RESEARCH CENTER INTERNAL POLICY AND/OR PROCEDURE (IPP)
TITLE/DESCRIPTION :
MORTALITY AND MORBIDITY REVIEW
APPROVED
BY :
ISSUE DATE:
JUNE 2000
POLICY NUMBER:
QM 004
APPLIES TO:
QUALITY
MANAGEMENT
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 34/216
APP ADMINISTRATIVE POLICY AND/OR PROCEDURE
NUMBER: PR 001 TITLE: Handling and Processing patient complaints
PUBLICATION
DATE: January 2001
EFFECTIVE
DATE: To: All Hospital staff
Chief of Medical staff
Patient Relations/Executives on duty
Clinical Review Analysts
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 35/216
SUBJ
ECT:
ADMISSION FOR OUTPATIENT
SURGICAL
REFERENCE
#1005
PROCEDURE PAGE: 1
DEPARTMENT: OUTPATIENT SURGERY OF: 3
EFFECTIVE:
APPROVED BY: REVISED:
Medical Consultant Network
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 36/216
4.1 Department Name
4.2 Index Number
4.3 Date Issued:4.4 Replaces Policy
No:
4.5 Effective Date:
4.6 Pages: _x_ of _y__ 4.7 Title/Description:
4.8 Applies To:
4/14/2
4/3
4/4 4/5
4/6 __ ____
4/74/8
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 37/216
4.9 Statement of Purpose:
4.10 Definitions:
4.11 Policy:
4.12 Procedure:
4.13 Equipments andforms
4.14 Responsibilities4.15 References
4/9 /
4/10
4/114/12
4/13
4/14 4/15
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 38/216
5. All items mentioned in the
policy should benumbered as follows:
1.1
1.1.1
1.1.21.2
1.2.1
1.2.2
2.1
2.1.1
:
1/1
1/1/1
1/2
1/2/1
1/2/2
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 39/216
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 40/216
/
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 41/216
6. The headingsand the footageshould becompleted in
every page of the policy.
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 42/216
7. Any revisions which arerecommended for the policyshould follow the samepattern of authority.
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 43/216
8. All policies andprocedures aresubject for
review everytwo (2) yearsand revised asneeded.
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 44/216
9. To ensuremultidisciplinaryapproach to theservices provided
in the hospital, allpolicies shall bereviewed by amulti-disciplinary
team.
(
)
.
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 45/216
An essential reviewingbody is the Policy andProcedure ReviewCommittee.
Other standing committees shallreview policies
pertinent to theirscope.
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 46/216
Policies that are
reviewed by astanding committeedo not requirereview and approval
of the Policy andProcedure ReviewCommittee.
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 47/216
flow charts are developed to show allthe steps in a process;
the process is then made moreefficient by eliminating multipleapprovals and checkpoints,
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 48/216
finding opportunities to reduce waitingtime,
smoothing the hand-offs betweendepartments, and
grouping related tasks andresponsibilities
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 49/216
PROCEDURE
1. Department Head/Supervisor should review the existing policyand procedures and identifyfunctions carried out in thedepartment/service
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 50/216
PROCEDURE
2. Department Head and/or Employee:
2.1 Identify the need for policy
2.2 Identify involved people/ department in the
implementation of policy.
/:
2/1
2/2/
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 51/216
2.3 Contact Total Quality Management Dept. (or
the organizations’ office in charge of the P&P
system) to verify the existence of the policy.2.4 Draft the policy in cooperation with the
involved staff/section/ department.
PROCEDURE
2/3
2/4 /
/
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 52/216
2.5 Forward policy draft to the Policy and Procedure
Review Committee
2.6 Policy and Procedure Review Committee reviews
the policy and procedure and forwards comments
and recommends corrections to the initiating
department.
PROCEDURE
2/5 (
)
2/6
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 53/216
PROCEDURE
2.7 Department carries out the recommended
changes.
2.8 Policies and Procedures are forwarded toPolicy and Procedure Review Committee for
final review and approval.
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 54/216
2.9 Policies andProcedures isforwarded to theTQM Dept. fornumbering and
circulated togoverningauthorities forapproval.
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 55/216
2.10 Policies and Procedures is
communicated to the department
responsible for implementation.2.11 In-service training and education is
organized for the staff.
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 56/216
3. Numbering System:
3.1 The numbering system for the policies andprocedures is an alpha numeric oneconsisting of 6 digits, 3 letters followed bythree numbers.
/:
3/1
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 57/216
3. Numbering System:
3.2 Eachdepartment/unit willbe designated threeletters to reflect itsname as well as ablock of numbersfrom 001 to 999.
3/2 001999
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 58/216
Departments Assigned Acronyms
Hospital Administration APP
Total Quality Management TQM
Infection Control ICS Management of Information MIS
Education and Training ETD
Public Relations PRD
Numbering System:
Numbering System:
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 59/216
Medical Services MDS
Internal Medicine IMD
Intensive Care ICU
Emergency Dept. EMD
Surgery SUD
OB/Gyne OBG
Pediatrics PED Nursery NIC
Anesthesia ANE
Dental DEN
Ophthalmology OPH Neurology NEU
ENT ENT
Nursing NSG
Numbering System:
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 60/216
Administrative Affairs AAP
Recruitment REC
Personnel Services PER
Finance Services FIN
Legal Affairs LEG
Government Relations GOV
Religious Affairs REL
Numbering System:
Numbering System:
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 61/216
Ancillary Clinical Services ACS
Physiotherapy PHY
Radiology RAD
Pharmacy PHA
Endoscopy END
Public Health PUB
Clinical Dietary DIT Laboratory LAB
Medical Supplies MSP
Medical Records MRD
Medical Coordination MCD
Patient Affairs PAD
Medical Reports MRP
Social Services SOC
Admissions and Discharge AND
Numbering System:
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 62/216
Support Services SUP
Maintenance MAN Biomedical BMD
Security SEC
Safety SAF
Housekeeping HKS
Laundry LAU
Food Services FDS
Housing HSG
Transportation TRP
Property Control PCL
Central Supplies & Sterilization SSD
Numbering System:
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 63/216
8. Approvals
8.1. The one who prepared the policy
should sign. If prepared by a
group then an additional
approval sheet is attached to thepolicy with the signature of all
members of the group. The
leader of the group signs on
every page of the policy.
8/1 .
.
.
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 64/216
8. Approvals
8.2. Interdepartmental policies
should be reviewed and
singed by all departmentheads concerned.
- -
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 65/216
8. Approvals
8.3. All policies and procedures are reviewed and signed by
the Total Quality Management Department
8.4. All policies and procedures should be approved by the
following division heads as applicable and their official
stamp affixed as appropriate
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 66/216
9.1. Minimum of two (2)
weeks between the
date of issue and the
date of effect shall
be given for
orientation and in-service training
Policy Implementation
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 67/216
9.2. Implementation
process involves a
period of three (3)
months to give time
for distribution,
familiarization, actual practice and
monitoring
/
Policy Implementation
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 68/216
9.3. All the hospital staff shallsign in the
Acknowledgement Sheet
to signify that they have
read and understood thePolicies and Procedures
(Hospital Wide,
Departmental, Safety,
Infection Control, etc.).
Original Copy filed as
page 3 in the Manual kept
in every department
(
)...
Policy Implementation
Acknowledgement Sheet
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 69/216
g
KINGDOM OF SAUDI ARABIA
Ministry of Health
Directorate of Health Affairs
Holy Makkah
HOSPITALWIDE POLICIES AND PROCEDURE STAFF ACKNOWLEDGEMENT SHEET
I, the undersigned, have read and understood the contents of this Hospital-wide Policy and Procedure Manual.
NAME ID NO. SIGNATURE DATE
Note: Original Copy in the Hospital Wide Policies and Procedure Manual.Duplicate Copy to be forwarded to the Total Quality Management
(TQM) Department.
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 70/216
Policy Termination
10.1. Policies should be
terminated when cancelled
by a later policy
10.2. A policy may beterminated by authority of
the Program Director
/
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 71/216
RESPONSIBILITY
1. It is the responsibility of each Department
Head to develop policy and procedure within
their scope of service
2. The Department Head shall cooperate and
coordinate inter-related departmental
policies.
.
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 72/216
RESPONSIBILITY
3. TQM Department isresponsible to provideassistance to the
departments to developtheir policy andprocedures.
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 73/216
4. TQM Department
is responsible for the upkeep andmonitoring of thepolicy and
proceduressystem of thedepartment.
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 74/216
EQUIPMENTS AND FORMS
1. Policy and Procedure Form
2. Acknowledgement Sheet
3. Policy Review Sheet4. Policy Revision Sheet
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 75/216
Thank you
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 76/216
Practical ProjectManagement
October 2006
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 77/216
77
Overview
Introduction to Project Management Project Management Context Integration Management Scope Management Time Management Cost Management Quality Management
Human Resource Management Communications Management Risk Management Procurement Management
Module 1: Introduction to Project
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 78/216
78
j
Management
Objectives
Define what project is and describe projectmanagement
Understand the history of projectmanagement
Understand the growing need for betterproject management
Discuss key elements of the projectmanagement framework
Discuss recent trends in project
management research and software
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 79/216
79
Project Management Defined
Project management is the application of knowledge, skills, tools, and techniques toproject activities in order to meet projectrequirements
A project is a temporary endeavorundertaken to achieve a particular aim.Project management knowledge and
practices are best described in terms of their component processes
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 80/216
80
History of Project Management
Some people argue that building theEgyptian pyramids was a project, as wasbuilding the Great Wall of China
Most people consider the ManhattanProject to be the first project to use “modern” project management
This three-year, $2 billion (in 1946
dollars) project had a separate projectmanager and a technical manager
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 81/216
81
Project Management Framework
A set of processes, tools and templates,designed to be used together to manage aproject through its lifecycle
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 82/216
82
Define your project
Select a real-life project
Define the project
Discuss within group
Select spokesperson Share with the rest
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 83/216
83
Recent Trends in Research and Software
7 Actions for Success: broaden views,communicate in 3D, political operative,assert yourself, be flexible, & sharpensocial skills
Five major challenges of today: globalteams, moving parts, development,partners, and project portfolios
Five levels of excellence: Level 1 is ad-
hoc, (2) planned, (3) managed, (4)integrated, and (5) sustained
Software: Microsoft Project
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 84/216
84
Develop a framework
Briefly outline your PM framework usingthe real-life project previously described.
Module 2: The Project Management
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 85/216
85
j g
Context
Objectives Understand the systems view of project
management Explain the differences among functional, matrix,
and project organizational structures Explain why stakeholder management and top
management commitment are critical for aproject’s success
Understand the initiation, planning, execution,and closure phases of the project life cycle
Understand effective project initiation, planning,execution, control, and closing
Distinguish between project development andproduct development
Discuss the unique attributes and diverse natureof information technology projects
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 86/216
86
Systems View
Systems philosophy: View things assystems, interacting components workingwithin an environment to fulfill some purpose
Systems analysis: problem-solving approach
Systems management: Address business,technological, and organizational issues beforemaking changes to systems
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 87/216
87
Formal Organizational Frames
Structural frame: Focuses on roles andresponsibilities, coordination, and control.Organization charts help define this frame.
Human resources frame: Focuses onproviding harmony between needs of theorganization and needs of people.
Political frame: Assumes organizations
are coalitions composed of variedindividuals and interest groups. Conflictand power are key issues.
Symbolic frame: Focuses on symbols
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 88/216
88
Organizational Structures
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 89/216
89
Organizational Structures
Stakeholder and Top Management
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 90/216
90
Commitment
Top management can help projectmanagers:
Secure adequate resources.
Get approval for unique project needs in atimely manner.
Receive cooperation from peoplethroughout the organization.
Learn how to be better leaders.
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 91/216
91
Project Life Cycle Phases
Project Development vs Product
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 92/216
92
Development
Discuss the similarities and differences of project development versus productdevelopment within your specific career. 5minutes. Share with your peers.
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 93/216
93
What makes a good project manager?
Discuss the skills and characteristicsneeded to be a good and successfulproject manager. 10 minutes. Share withthe rest of your peers.
Module 3: Project Integration
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 94/216
94
Management
Objectives Describe an overall framework for project
integration management as it relates to the otherproject management knowledge areas and theproject life cycle
Understand the integrated change controlprocess, planning for and managing changes, andusing a change control system
Explain tools and techniques to assist in project
plan execution of integrated projects such asGantt Charts, S-Curves, and PERTs
Explain project plan execution, its relationship toproject planning, the factors related to successfulresults
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 95/216
95
Project Integration Management
Project Plan Development: taking theresults of other planning processes andputting them into a consistent, coherentdocument—the project plan
Project Plan Execution: carrying out theproject plan
Integrated Change Control: coordinating
changes across the entire project
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 96/216
96
Integrated Change Control
Integrated change control involvesidentifying, evaluating, and managingchanges throughout the project life cycle
Three main objectives of change control: Influence the factors that create
changes to ensure they arebeneficial
Determine that a change hasoccurred
Manage actual changes when and
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 97/216
97
Tools and Techniques
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 98/216
98
Tools and Techniques
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 99/216
99
Tools and Techniques
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 100/216
100
Tools and Techniques
Importance of Project Planning the
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 101/216
101
Execution
Discuss the reason and importance of preparing a plan before executing it usingcases specific to your area of responsibility. 10 minutes. Share withyour peers.
S k h ld A l i
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 102/216
102
Stakeholder Analysis
Documents important (often sensitive)information about stakeholders such as
stakeholders’ names and organizations
roles on the project
unique facts about stakeholders
level of influence and interest in the project
suggestions for managing relationships
Identify, Prioritize, Understand
S k h ld A l i
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 103/216
103
Stakeholder Analysis
conduct a brief stakeholder analysis categorize their relation and advocating of
the project
Module 4: Project Scope
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 104/216
104
Management
Objectives Describe the strategic planning process,
apply different project selection methods,such as a net present value analysis, a
weighted scoring model, and a balancedscorecard, and understand the importanceof creating a project charter
Explain the scope planning process and
contents of a scope statement Discuss the scope definition process and
construct a work breakdown structure
Understand the importance of scope
S i Pl i P
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 105/216
105
Strategic Planning Process
S i Pl i P
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 106/216
106
Strategic Planning Process
Scope Planning and Definition
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 107/216
107
Processes
Scope planning: Deciding how the scopewill be defined, verified, and controlled.
Scope definition: Reviewing the project
charter and preliminary scope statementand adding more information asrequirements are developed and changerequests are approved.
S S
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 108/216
108
Scope Statement
In your group, place the initial project tobe managed in the Scope Statementformat. 10 minutes. Share with the rest of your peers.
W k B kd S (WBS)
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 109/216
109
Work Breakdown Structure (WBS )
Using the same project as before andbuilding on previous activities, develop aWBS chart with your group. 10 minutes.Share with the rest of your peers.
B i P i i l f C i WBS
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 110/216
110
Basic Principles for Creating WBSs
1. A unit of work should appear at only one place in the WBS.2. The work content of a WBS item is the sum of the WBSitems below it.
3. A WBS item is the responsibility of only one individual, eventhough many people may be working on it.
4. The WBS must be consistent with the way in which work is
actually going to be performed; it should serve the projectteam first and other purposes only if practical.5. Project team members should be involved in developing the
WBS to ensure consistency and buy-in.6. Each WBS item must be documented to ensure accurate
understanding of the scope of work included and not
included in that item.7. The WBS must be a flexible tool to accommodate inevitable
changes while properly maintaining control of the workcontent in the project according to the scope statement.
Scope Verification and Scope ChangeC l
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 111/216
111
Control
Suggestions for Reducing Incomplete and ChangingRequirements
Develop and follow a requirements managementprocess.
Use techniques such as prototyping, use casemodeling.
Put requirements in writing and keep themcurrent.
Create a requirements management database for
documenting and controlling requirements. Conduct adequate testing throughout the project
life cycle.
Review changes from a systems perspective.
Emphasize completion dates to help focus on
Module 5: Project Time
M
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 112/216
112
Management
Objectives Understand the importance of project schedules
and good project time management Define activities as the basis for developing
project schedules
Explain how various tools and techniques helpproject managers perform activity durationestimating and schedule development
Understand and use critical path analysis andcritical chain scheduling
Describe how to use several techniques forshortening project schedules
Use a Gantt chart for schedule planning andtracking schedule information
Discuss how reality checks and people issues are
involved in controlling and managing changes to
S h d l d Ti M
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 113/216
113
Schedules and Time Management
Activity definition: Identifying the specific activities thatthe project team members and stakeholders must performto produce the project deliverables.
Activity sequencing: Identifying and documenting therelationships between project activities.
Activity resource estimating: Estimating how many
resources a project team should use to perform projectactivities. Activity duration estimating: Estimating the number of
work periods that are needed to complete individualactivities.
Schedule development: Analyzing activity sequences,
activity resource estimates, and activity duration estimatesto create the project schedule. Schedule control: Controlling and managing changes to
the project schedule.
S h d li d Ti M
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 114/216
114
Scheduling and Time Management
Why are project schedules important?What sort of schedule conflicts could withexpect in your specific project? 10minutes. Share with the rest of yourpeers.
A ti it D ti E ti ti
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 115/216
115
Activity Duration Estimating
After defining activities and determiningtheir sequence, the next step in timemanagement is duration estimating
Duration includes the actual amount of
time worked on an activity plus elapsedtime
Effort is the number of workdays or workhours required to complete a task. Effort
does not equal duration People doing the work should help create
estimates, and an expert should reviewthem
S h d l D l pm t
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 116/216
116
Schedule Development
Schedule development uses results of theother time management processes todetermine the start and end date of theproject and its activities
Ultimate goal is to create a realisticproject schedule that provides a basis formonitoring project progress for the timedimension of the project
Important tools and techniques includeGantt charts, PERT analysis, critical pathanalysis, and critical chain scheduling
Criti l P th Meth d
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 117/216
117
Critical Path Method
CPM is a project network analysistechnique used to predict total projectduration
A critical path for a project is the series of activities that determines the earliest time by which the project can be completed
The critical path is the longest path
through the network diagram and has theleast amount of slack or float
Finding the Critical Path
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 118/216
118
Finding the Critical Path
First develop a good project networkdiagram
Add the durations for all activities on eachpath through the project network diagram
The longest path is the critical path
Schedule Trade offs
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 119/216
119
Schedule Trade-offs
Shorten a Project Schedule
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 120/216
120
Shorten a Project Schedule
Overlapped
Tasks or fast
tracking
Shortened
duration thru
crashing
Originalschedule
Critical Chain Scheduling
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 121/216
121
Critical Chain Scheduling
Critical chain scheduling is a method of scheduling that takes limited resourcesinto account when creating a projectschedule and includes buffers to protect
the project completion date
Critical chain scheduling assumesresources do not multitask because it
often delays task completions andincreases total durations
Example of Critical Chain Scheduling
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 122/216
122
Example of Critical Chain Scheduling
Scheduling using PERT
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 123/216
123
Scheduling using PERT
PERT weighted average formula: optimistic time + 4X most likely time + pessimistic time
6
Example:
PERT weighted average =
8 workdays + 4 X 10 workdays + 24 workdays = 12 days6
where 8 = optimistic time, 10 = most likely time, and 24 =pessimistic time
Scheduling
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 124/216
124
Scheduling
Develop a schedule for your project usingsome of the tools presented thus far.There is no rule against combiningtechniques. If fact, pulling the best from
each may be advantageous. 15 minutes.Share with the rest of your peers.
Controlling and Managing Change
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 125/216
125
Controlling and Managing Change
Review the draft schedule or estimatedcompletion date in the project charter.
Prepare a more detailed schedule with theproject team.
Make sure the schedule is realistic andfollowed.
Alert top management well in advance if
there are schedule problems.
Managing Change
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 126/216
126
Managing Change
Using the recently created schedules,assess their reality. What things havebeen adjusted to the schedule to helpmanage change? 10 minutes. Share with
peers.
Module 6: Project Cost Management
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 127/216
127
Module 6: Project Cost Management
Objectives Explain basic project cost management
principles, concepts, and terms
Understand the importance of good
project cost management Explain cost estimating using definitive,
budgetary, and rough order of magnitude(ROM) estimates
Understand the processes involved in costbudgeting and preparing a cost estimate
Understand the benefits of earned value
management and project portfolio
Cost management
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 128/216
128
Cost management
Resource planning: determining whatresources and quantities of them shouldbe used
Cost estimating: developing an estimateof the costs and resources needed tocomplete a project
Cost budgeting: allocating the overall cost
estimate to individual work items toestablish a baseline for measuringperformance
Cost control: controlling changes to the
Cost Management
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 129/216
129
Cost Management
Why is good cost management important?Why bother with it?
Methods of Cost Estimating
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 130/216
130
Methods of Cost Estimating
Earned Value Management
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 131/216
131
Earned Value Management
Earned Value - Planned Costs = ScheduleVariance (SV)
Earned Value - Actual Costs = CostVariance (CV)
Cost Control
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 132/216
132
Cost Control
Project cost control includes monitoring cost performance
ensuring that only appropriate project changesare included in a revised cost baseline
informing project stakeholders of authorizedchanges to the project that will affect costs
Earned value management is an importanttool for cost control
Project Portfolio Management
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 133/216
133
Project Portfolio Management
Five levels for project portfoliomanagement
Put all your projects in one database
Prioritize the projects in your database
Divide your projects into two or three budgetsbased on type of investment
Automate the repository
Apply modern portfolio theory, including risk-return tools that map project risk on a curve
Cost Plan View
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 134/216
134
Cost Plan View
Module 7: Project Quality
Management
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 135/216
135
Management
Objectives Define project quality management
Describe quality planning and itsrelationship to project scope management
Discuss the importance of qualityassurance
Understand the importance of projectquality management
List the three outputs of the qualitycontrol process
Understand the tools and techniques for
quality control such as Pareto analysis
Quality Management Program
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 136/216
136
Quality Management Program
Quality management planning andimplementing policies, procedures, andrequirements.
Quality control ensuring that work is being
performed and that work is being checkedprior to its acceptance.
Quality assurance verifying that qualitycontrol tasks are being performed.
Continuous quality improvementcontinually pursuing improvement in thequality of the project process.
Quality costs redoing a project item even
'
Quality Planning and Quality Assurance
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 137/216
137
Quality Planning and Quality Assurance
Quality Definitions Quality Materials
Quality Events
Importance of Quality Management
Discuss the importance of qualitymanagement and assurance. How maythey vary from project to project?
Tools and Techniques for Quality Control
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 138/216
138
Control
Pareto Analysis Steps to identify the important causes using
Pareto analysis Step 1: Form a table listing the causes and their
frequency as a percentage .
Step 2 : Arrange the rows in the decreasing order of importance of the causes i.e. the most important cause first
Step 3: Add a cumulative percentage column tothe table
Step 4: Plot with causes on x- and cumulative percentage on y-axis
Step 5 : Join the above points to form a curve
Step 6 : Draw line at 80% on y-axis parallel to x-axis. Then drop the line at the point of
intersection with the curve on x-axis This point
Pareto Analysis Sample
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 139/216
139
Pareto Analysis Sample
Six Sigma
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 140/216
140
Six Sigma
It requires an organization-widecommitment
Six Sigma organizations have the abilityand willingness to adopt contraryobjectives, like reducing errors andgetting things done faster
It is an operating philosophy that is
customer-focused and strives to drive outwaste, raise levels of quality, and improvefinancial performance at breakthrough levels
Six Sigma
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 141/216
141
Six Sigma
Quality Control Chart
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 142/216
142
Quality Control Chart
Testing
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 143/216
143
Test g
Unit test Integration testing
System testing
A test plan is simply a high-level summaryof the areas (functionality, elements,regions, etc.)
Quality Control Plan
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 144/216
144
Q y
What sort of tools would you use and whatwill you be looking for when assessingquality in a project?
Module 8: Project Human Resource
Management
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 145/216
145
g
Objectives Discuss the importance of good human resource
management on projects Summarize key concepts for managing people by
understanding the theories of Abraham Maslow, FrederickHerzberg, David McClelland, and Douglas McGregor onmotivation, H. J. Thamhain and D. L. Wilemon oninfluencing workers, and Stephen Covey on how people andteams can become more effective
Discuss organizational planning and be able to create aproject organizational chart, responsibility assignmentmatrix, and resource histogram
Understand important issues involved in project staff acquisition and explain the concepts of resourceassignments, resource loading, and resource leveling
Assist in team development with training, team-buildingactivities, and reward systems
Project Human Resources
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 146/216
146
j
Human resource planning: Identifyingand documenting project roles,responsibilities, and reportingrelationships.
Acquiring the project team: Getting theneeded personnel assigned to and workingon the project.
Developing the project team: Building
individual and group skills to enhanceproject performance.
Managing the project team: Trackingteam member performance, motivating
team members rovidin timel
Keys to Managing People
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 147/216
147
y g g p
Psychologists and management theoristshave devoted much research and thoughtto the field of managing people at work
Important areas related to projectmanagement include
motivation (intrinsic and extrinsic)
influence and power
effectiveness
Abraham Maslow on Motivation
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 148/216
148
Herzberg’s Motivational and Hygiene
Factors
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 149/216
149
McClelland’s Acquired-Needs
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 150/216
150
q
Achievement: People with a high needfor achievement seek to excel and thustend to avoid both low-risk and high-risksituations .
Affiliation: Those with a high need foraffiliation need harmonious relationshipswith other people and need to feel
accepted by other people.
Power: A person's need for power can beone of two types - personal andinstitutional .
McGregor’s Theory X and Theory Y
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 151/216
151
g y y
Thamhain and Wilemon’s Ways to Have
Influence on Projects
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 152/216
152
j
1. Authority: the legitimate hierarchical right toissue orders2. Assignment: the project manager's perceived
ability to influence a worker's later workassignments
3. Budget: the project manager's perceived abilityto authorize others' use of discretionary funds4. Promotion: the ability to improve a worker's
position5. Money: the ability to increase a worker's pay and
benefits6. Penalty: the project manager's ability to causepunishment
7. Work challenge: the ability to assign work thatcapitalizes on a worker's enjoyment of doing a
particular task
Improving Effectiveness - Covey’s 7Habits
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 153/216
153
Project managers can apply Covey’s 7habits to improve effectiveness onprojects
Be proactive
Begin with the end in mind
Put first things first
Think win/win
Seek first to understand, then to beunderstood
Synergize
Sharpen the saw
Creating a Motivating Environment
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 154/216
154
g g
Discuss various instances where you havebeen motivated and where you havemotivated others. Try to associate it toone or more of the principles discussed in
this module.
Organizational Planning
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 155/216
155
g g
Organizational planning involvesidentifying, documenting, andassigning project roles,
responsibilities, and reportingrelationships
Outputs and processes include
project organizational chartswork definition and assignment
process
responsibility assignment matrixes
Project Organizational Charts
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 156/216
156
j g
Work Definition and AssignmentProcess
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 157/216
157
Responsibility Assignment Matrix
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 158/216
158
p y g
Resource Histogram
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 159/216
159
g
Project Staff Acquisition
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 160/216
160
Staffing plans and good hiring proceduresare important in staff acquisition, as areincentives for recruiting and retention
Research shows that people leave their jobs because they don’t make adifference, don’t get proper recognition,
aren’t learning anything new, don’t liketheir coworkers, and want to earn moremoney
Resource Loading and Leveling
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 161/216
161
Resource loading refers to the amount of individual resources an existing projectschedule requires during specific timeperiods
Resource leveling is a technique forresolving resource conflicts by delaying
tasks. The main purpose of resourceleveling is to create a smootherdistribution of resource usage and reduceoverallocation
Team Development Activities
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 162/216
162
Different types of people
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 163/216
163
Meyers-Briggs Type Indicator (MBTI) Extrovert/Introvert (E/I)
Sensation/Intuition (S/N)
Thinking/Feeling (T/F)
Judgment/Perception (J/P) Social Styles Profile
Drivers
Expressives
Analyticals Amiables
General Advice on Teams
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 164/216
164
Be patient and kind with your team. Fix the problem instead of blaming people.
Establish regular, effective meetings.
Allow time for teams to go through the basicteam-building stages.
Limit the size of work teams to three to sevenmembers.
Plan some social activities to help project teammembers and other stakeholders get to know
each other better. Stress team identity.
Nurture team members and encourage them tohelp each other.
Take additional actions to work with virtual team
Module 9: Project
Communications Mgmt
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 165/216
165
g
Objectives Understand the importance of goodcommunication on projects and describe themajor components of a communicationsmanagement plan
Discuss the elements of project communicationsplanning, including information distribution,performance reporting, and administrativeclosure
Discuss various methods for project informationdistribution and the advantages anddisadvantages of each
List various methods for improving projectcommunications, such as managing conflicts,running effective meetings, using e-maileffectively, and using templates
Communications Management Plan
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 166/216
166
A description of a collection and filingstructure for gathering and storing varioustypes of information
A distribution structure describing what
information goes to whom, when, and how A format for communicating key project
information
A project schedule for producing the
information Access methods for obtaining the
information
A method for updating the
Project Communications ManagementProcesses
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 167/216
167
Communications planning: determiningthe information and communicationsneeds of the stakeholders
Information distribution: making needed
information available in a timely manner Performance reporting: collecting and
disseminating performance information
Administrative closure: generating,
gathering, and disseminating informationto formalize phase or project completion
Communications Planning
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 168/216
168
Information Distribution
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 169/216
169
Getting the right information to the rightpeople at the right time and in a usefulformat is just as important as developingthe information in the first place
Important considerations include using technology to enhance information
distribution
formal and informal methods for distributinginformation
Information Distribution
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 170/216
170
Discuss various methods for projectinformation distribution and theadvantages and disadvantages of each.
Media Choice Table
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 171/216
171
Performance Reporting
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 172/216
172
Performance reporting keeps stakeholdersinformed about how resources are beingused to achieve project objectives
Status reports describe where the project
stands at a specific point in time Progress reports describe what the project
team has accomplished during a certain periodof time
Project forecasting predicts future projectstatus and progress based on past informationand trends
Status review meetings often include
erformance re ortin
Administrative Closure
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 173/216
173
A project or phase of a project requiresclosure
Administrative closure produces
project archives
formal acceptance
lessons learned
Suggestions for Improving ProjectCommunications
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 174/216
174
Manage conflicts effectively Develop better communication skills
Run effective meetings
Use e-mail effectively Use templates for project communications
Conflict Handling Modes, in Preference
Order
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 175/216
175
Confrontation or problem-solving: directlyface a conflict
Compromise: use a give-and-takeapproach
Smoothing: de-emphasize areas of differences and emphasize areas of agreement
Forcing: the win-lose approach Withdrawal: retreat or withdraw from an
actual or potential disagreement
Running Effective Meetings
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 176/216
176
Determine if a meeting can be avoided Define the purpose and intended outcome
of the meeting
Determine who should attend the meeting
Provide an agenda to participants beforethe meeting
Prepare handouts, visual aids, and makelogistical arrangements ahead of time
Run the meeting professionally
Build relationships
Using E-Mail Effectively Tips
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 177/216
177
Ensure it is an appropriate medium forwhat you want to communicate Be sure to send the e-mail to the right
people Use meaningful subjects Limit the content to one main subject, and
be as clear and concise as possible Limit the number and size of attachments Delete e-mail you don’t need, and don’t
open it if you question the source Make sure your virus software is up to
date Respond to and file e-mails quickly
Using Templates for ProjectCommunications
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 178/216
178
Many people are afraid to ask for help Providing examples and templates for
project communications saves time andmoney
Organizations can develop their owntemplates, use some provided by outsideorganizations, or use samples from
textbooks Recall that research shows that companies
that excel in project management makeeffective use of templates
Communication Channels
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 179/216
179
Discuss various individual communicationneeds and how to determine the numberof communications channels.
Module 10: Project Risk Management
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 180/216
180
Objectives Understand what risk is and the importance of
good project risk management Discuss the elements involved in risk
management planning
Describe the risk identification process and toolsand techniques to help identify project risks Discuss the qualitative risk analysis process and
explain how to calculate risk factors, useprobability/impact matrixes, the Top Ten RiskItem Tracking technique, and expert judgment torank risks
Explain the quantify risk analysis process andhow to use decision trees and simulation toquantitative risks
Discuss what is involved in risk monitoring and
The Importance of Project Risk Management
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 181/216
181
Project risk management is the art andscience of identifying, assigning, andresponding to risk throughout the life of aproject and in the best interests of
meeting project objectives Risk management is often overlooked on
projects, but it can help improve projectsuccess by helping select good projects,determining project scope, and developingrealistic estimates
Risk Management Planning
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 182/216
182
The main output of risk managementplanning is a risk management plan
The project team should review projectdocuments and understand the
organization’s and the sponsor’s approachto risk
The level of detail will vary with the needs
of the project
Risk Management Planning
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 183/216
183
Risk Identification
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 184/216
184
Risk identification is the process of understanding what potentialunsatisfactory outcomes are associatedwith a particular project
Several risk identification tools andtechniques include Brainstorming
The Delphi technique
Interviewing SWOT analysis
Risk Identification
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 185/216
185
Activity – Identify Risks
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 186/216
186
Identify the risks using the project youhave been working on for each area of project management covered thus far.
Qualitative Risk Analysis
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 187/216
187
A risk analysis assesses the likelihood andimpact of identified risks to determinetheir magnitude and priority. Riskquantification tools and techniques
include: Probability/Impact matrixes
The Top 10 Risk Item Tracking technique
Expert judgment
Probability/Impact Matrices
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 188/216
188
Top 10 Risk Item Tracking
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 189/216
189
Quantitative Risk Analysis
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 190/216
190
Often follows qualitative risk analysis, butboth can be done together or separately
Large, complex projects involving leadingedge technologies often require extensive
quantitative risk analysis
Main techniques include
Simulation
Decision tree analysis
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 191/216
Decision Trees and Expected Monetary Value (EMV)
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 192/216
192
Risk Response Planning
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 193/216
193
Risk avoidance: eliminating a specificthreat or risk, usually by eliminating itscauses
Risk acceptance: accepting the
consequences should a risk occur Risk transference: shifting the
consequence of a risk and responsibilityfor its management to a third party
Risk mitigation: reducing the impact of arisk event by reducing the probability of its occurrence
Risk Monitoring and Control
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 194/216
194
Monitoring risks involves knowing theirstatus
Controlling risks involves carrying out therisk management plans as risks occur
Workarounds are unplanned responses torisk events that must be done when thereare no contingency plans
The main outputs of risk monitoring andcontrol are corrective action, projectchange requests, and updates to otherplans
Good Project Risk Management
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 195/216
195
Unlike crisis management, good projectrisk management often goes unnoticed
Well-run projects appear to be almosteffortless, but a lot of work goes into
running a project well Project managers should strive to make
their jobs look easy to reflect the results
of well-run projects
Module 11: Project ProcurementManagement
Obj ti
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 196/216
196
Objectives Understand the importance of project
procurement management and the increasing useof outsourcing for information technologyprojects
Describe the procurement planning process,procurement planning tools and techniques,types of contracts, and statements of work
Discuss what is involved in solicitation planningand the difference between a request for proposaland a request for quote
Explain what occurs during the solicitationprocess
Describe the source selection process anddifferent approaches for evaluating proposals orselecting suppliers
Procurement Management
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 197/216
197
Procurement means acquiring goodsand/or services from an outside source.
We outsource for the following reasons:
To reduce both fixed and recurrent costs
To allow the client organization to focus on itscore business
To access skills and technologies
To provide flexibility
To increase accountability
Project Procurement ManagementProcesses
P t l i d t i i h t
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 198/216
198
Procurement planning: determining whatto procure and when
Solicitation planning: documentingproduct requirements and identifyingpotential sources
Solicitation: obtaining quotations, bids,offers, or proposals as appropriate
Source selection: choosing from amongpotential vendors
Contract administration: managing therelationship with the vendor
Contract close-out: completion andsettlement of the contract
Project Procurement ManagementProcesses
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 199/216
199
Procurement Planning
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 200/216
200
Procurement planning involves identifyingwhich project needs can be best met byusing products or services outside theorganization. It includes deciding
whether to procure how to procure
what to procure
how much to procure
when to procure
Make-or-buy analysisMake or Buy Example: Assume you can lease an item you
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 201/216
201
Make or Buy Example: Assume you can lease an item you
need for a project for $150/day. To purchase the item, theinvestment cost is $1,000, and the daily cost would beanother $50/day. How long will it take for the lease cost tobe the same as the purchase cost? If you need the item for12 days, should you lease it or purchase it?
Set up an equation so the “make” is equal to the “buy.” In thisexample, use the following equation. Let d be the numberof days to use the item.
$150d = $1,000 + $50dSolve for d as follows:
Subtract $50d from the right side of the equation to
get$100d = $1,000
Divide both sides of the equation by $100d = 10 days
Th l t i th th h t t 10 d If
Types of Contracts
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 202/216
202
Fixed-price or lump-sum: involve afixed total price for a well-defined productor service
Cost-reimbursable: involve payment to
the seller for direct and indirect costs Time and material contracts: hybrid of
both fixed-price and cost-reimbursable,
often used by consultants Unit price contracts: require the buyer
to pay the seller a predetermined amountper unit of service
Cost Reimbursable Contracts
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 203/216
203
Cost plus incentive fee (CPIF): thebuyer pays the seller for allowableperformance costs plus a predeterminedfee and an incentive bonus
Cost plus fixed fee (CPFF): the buyerpays the seller for allowable performancecosts plus a fixed fee payment usuallybased on a percentage of estimated costs
Cost plus percentage of costs (CPPC): the buyer pays the seller for allowableperformance costs plus a predetermined
Contract Types Versus Risk
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 204/216
204
Statement of Work
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 205/216
205
A statement of work is a description of thework required for the procurement
Many contracts, or mutually bindingagreements, include SOWs
A good SOW gives bidders a betterunderstanding of the buyer’s expectations
Statement of Work
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 206/216
206
Solicitation planning
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 207/216
207
Solicitation planning involves preparingseveral documents:
Request for Proposals: used to solicitproposals from prospective sellers
Requests for Quotes: used to solicitquotes for well-defined procurements
Invitations for bid or negotiation and initial
contractor responses are also part of solicitation planning
Solicitation planning Outline for a Request for Proposal:
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 208/216
208
Outline for a Request for Proposal:
I. Purpose of RFPII. Organization’s Background III. Basic RequirementsIV. Hardware and Software Environment
V. Description of RFP ProcessVI. Statement of Work and Schedule InformationVII. Possible Appendices
A. Current System OverviewB. System RequirementsC. Volume and Size DataD. Required Contents of Vendor’s
Response to RFPE. Sample Contract
Solicitation
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 209/216
209
Solicitation involves obtaining proposals orbids from prospective sellers
Organizations can advertise to procuregoods and services in several ways
approaching the preferred vendor
approaching several potential vendors
advertising to anyone interested
A bidders’ conference can help clarify thebuyer’s expectations
Source selection
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 210/216
210
Source selection involves: evaluating bidders’ proposals
choosing the best one
negotiating the contract
awarding the contract
It is helpful to prepare formal evaluation
procedures for selecting vendors. Buyersoften create a “short list.”
Sample Proposal Evaluation Sheet
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 211/216
211
Detailed Criteria for Selecting Suppliers
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 212/216
212
Contract Administration
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 213/216
213
Contract administration ensures that theseller’s performance meets contractualrequirements
Contracts are legal relationships, so it is
important that legal and contractingprofessionals be involved in writing andadministering contracts
Many project managers ignore contractualissues, which can result in seriousproblems
Suggestions on Change Control forContracts
Changes to any part of the project need to
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 214/216
214
Changes to any part of the project need tobe reviewed, approved, and documentedby the same people in the same way thatthe original part of the plan was approved
Evaluation of any change should includean impact analysis. How will the changeaffect the scope, time, cost, and quality of the goods or services being provided?
Changes must be documented in writing.Project team members should alsodocument all important meetings andtelephone calls
Contract Close-out
7/30/2019 11 Policies Bilingual
http://slidepdf.com/reader/full/11-policies-bilingual 215/216
215
Contract close-out includes product verification to determine if all work
was completed correctly and satisfactorily
administrative activities to update records to
reflect final results archiving information for future use
Procurement audits identify lessonslearned in the procurement process
Review / Summary