11 presented by: kevin smith, manager september 29, 2015 orp’s path to reinvigorating technology...

13
1 1 Presented by: Kevin Smith, Manager September 29, 2015 ORP’s Path to Reinvigorating Technology Development DOE National Cleanup Workshop EM Technology Development Panel

Upload: bernadette-mosley

Post on 03-Jan-2016

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 11 Presented by: Kevin Smith, Manager September 29, 2015 ORP’s Path to Reinvigorating Technology Development DOE National Cleanup Workshop EM Technology

11

Presented by: Kevin Smith, Manager September 29, 2015

ORP’s Path to Reinvigorating

Technology DevelopmentDOE National Cleanup Workshop

EM Technology Development Panel

Page 2: 11 Presented by: Kevin Smith, Manager September 29, 2015 ORP’s Path to Reinvigorating Technology Development DOE National Cleanup Workshop EM Technology

2

Office of River Protection (ORP)ORP is responsible for planning, integrating, and managing the River Protection Program executed by contractors performing work under ORP management. ORP has 225 employees*, both federal and contractor.

Washington River Protection Solutions (WRPS)WRPS is the prime contractor responsible for safely managing and operating the Tank Farms. WRPS has 2,054 employees*.

Bechtel National, Inc. (BNI)BNI is responsible for the engineering, construction, startup and commissioning of the Waste Treatment and Immobilization Plant. BNI has 2,864 employees*.

Advanced Technology and Laboratories International (ATL)ATL is the prime contractor responsible for managing the 222-S Laboratory. ATL has 73 employees*.

*As of July 2015

Our Team

Page 3: 11 Presented by: Kevin Smith, Manager September 29, 2015 ORP’s Path to Reinvigorating Technology Development DOE National Cleanup Workshop EM Technology

3

MissionTo safeguard the nuclear waste stored in Hanford’s 177 underground tanks, and to manage the waste safely and responsibly until it can be treated in the Waste Treatment and Immobilization Plant (WTP) for final disposition.

VisionTo be a high-performing, innovative organization that is safety-conscious and employee-focused, and committed to achieving our mission with environmental and fiscal responsibility.

Our Mission and Vision

Page 4: 11 Presented by: Kevin Smith, Manager September 29, 2015 ORP’s Path to Reinvigorating Technology Development DOE National Cleanup Workshop EM Technology

4

Hanford Site

Page 5: 11 Presented by: Kevin Smith, Manager September 29, 2015 ORP’s Path to Reinvigorating Technology Development DOE National Cleanup Workshop EM Technology

5

Effluent Treatment Facility Ponds

ORP Area of Responsibility

Page 6: 11 Presented by: Kevin Smith, Manager September 29, 2015 ORP’s Path to Reinvigorating Technology Development DOE National Cleanup Workshop EM Technology

6

Hazardous Operations

Aging infrastructure

Chemical, radioactive waste Construction

Chemical hazards Industrial hazards

Page 7: 11 Presented by: Kevin Smith, Manager September 29, 2015 ORP’s Path to Reinvigorating Technology Development DOE National Cleanup Workshop EM Technology

7

Technical Challenges

Real-time Workforce Monitoring & Protection

Technical IssuesScientific Challenges

Page 8: 11 Presented by: Kevin Smith, Manager September 29, 2015 ORP’s Path to Reinvigorating Technology Development DOE National Cleanup Workshop EM Technology

8

Teaming with Our Contractors and Industry

Page 9: 11 Presented by: Kevin Smith, Manager September 29, 2015 ORP’s Path to Reinvigorating Technology Development DOE National Cleanup Workshop EM Technology

9

Revitalizing Innovation

Revitalizing Innovation & Seeking Technological Advancements

Portable air quality monitor

Portable infrared camera

Open-Path Fourier Transform Infrared (FTIR) Spectroscopy

Fixed FLIR Optical Gas Imager

Ultraviolet Differential Optical Absorption Spectroscopy

FTIR Stack Monitor

Page 10: 11 Presented by: Kevin Smith, Manager September 29, 2015 ORP’s Path to Reinvigorating Technology Development DOE National Cleanup Workshop EM Technology

10

Collaboration and STEM

STEM Programs

InternshipsCollaborative Studies

NQA-1Testing Capabilities

Engaging Universities

Page 11: 11 Presented by: Kevin Smith, Manager September 29, 2015 ORP’s Path to Reinvigorating Technology Development DOE National Cleanup Workshop EM Technology

11

Restoring National Laboratory Teamwork

National Laboratories

Page 12: 11 Presented by: Kevin Smith, Manager September 29, 2015 ORP’s Path to Reinvigorating Technology Development DOE National Cleanup Workshop EM Technology

12

Store & Reintroduce Cs/Sr from LAWPS

Move slurry from remote SSTs

Real time ID of vapors to protect workers

Filter for nitrosamines

DST space / minimize liquid

Sampling / Waste Acceptance for WTP

Eliminate vapors at the source

Tank Farm Misc.

Waste Treatment & Immobilization Plant Misc.

0 2 4 6 8 10 12 14

Submittals by Topical Area

Enabling Creativity and Innovation

ORP’s 2015 Grand Challenge Workshop

ORP; 3HQ DOE; 1

PNNL; 11

LANL/PNNL/

WRPS; 1

ORNL/SRNL; 1INL; 1

SRNL; 10

INL/ SRNL, 1

UW; 1

AD, 1WRPS; 4

WSU; 1FIU; 1 Nez Perce tribe; 1

Page 13: 11 Presented by: Kevin Smith, Manager September 29, 2015 ORP’s Path to Reinvigorating Technology Development DOE National Cleanup Workshop EM Technology

13

Better achieving the mission through innovation, creativity

and the next generation.