1[1]. pump ()
DESCRIPTION
pumpTRANSCRIPT
CEBU POWER PLANT PROJECT
COMMISSIONING TEST RECORD
Item No. : Equipment : System :
COMMISSIONING CHECK SHEETNo. Description Specification Remarks
1. Electric Motor ManufacturerTypeSerial NumberProtection ClassOutput (kW)Voltage / Phase / HerzCurrent (A) at full loadSpeed (rpm)Connection Method
2. Pump ManufacturerTypeSerial Number
Total Head (m)Speed (rpm)
No. Check Point Witness Remarks
1. MotorName Plate Rating VisualVoltage ± 10%Frequency ± 0.04Connection with the motor with main terminal box drawing VisualAll Gaskets VisualAll bolts and nuts VisualCheck oil level for oil lubricated VisualForeign materials and general cleanliness in motor VisualSwitch on of the space heater when motor is stop VisualMegohmmeter (applying 1000 V) 100 M-ohmThe rotor turns freely VisualRotation ( Viewed from load side) C.W
2. PumpParallel 0.1mm '(T.I.R)
Angular 0.05mmComplete Installation VisualOther accessories installation VisualFoundation bolts VisualCheck Line-Up to Suction VisualAll bolts and nuts VisualSuction Valve OpenDischarge Valve VisualPrime VisualFlushing, Sealing is available VisualCheck Level for Lube Oil Visual
Certified by Name Signature Date
Test Executor
Rated Capacity (㎥/h)
Acceptance Criteria
Recording /Check
Alignment between pump and motor
DOOSAN
KEPCO SPC
7-1. Test Data Sheet for Motor Solo Run Test.
CEBU POWER PLANT PROJECT
MOTOR SOLO RUN TEST RECORD
Item No. Equipment System
Manufacturer Starting Current (A) Serial No.
Output (KW) Rated Current (A) Temperature (deg.C)
Voltage (V) Motor Speed (rpm) Humidity (%)
No. Description Criteria Recording Remarks
1
2 Noise Level(dB A)
3
Vertical (DE/NDE)
Horizontal (DE/NDE)
Axial (DE/NDE)
Item Time(min) 0 30 60 90 120 150 180 210 240 Remarks
"R" Phase
"S" phase
"T" Phase
DE Side
NDE Side
Test Start Time Logging Start Time Logging End Time
<Measure Point>
Certified by Name Signature Date
Test Executor
DOOSAN
Rotation Direction (Viewed from load side)
Vib
rati
on
(mm
/se
c. R
MS
)
Current (A)(No load)
Motor Temp' (deg.C)
Remarks:
KEPCO SPC
CEBU POWER PLANT PROJECT
COMMISSIONING TEST RECORD
Item No. : Equipment : System :
PUMP LOAD TEST RECORD
No.Check Time
0 min. 30 min. 60 min. 90 min. 120 min. RemarksCheck Item
1
Suction
Discharge
TDH (Bar) = Dis.- Suc
2
MotorNDE
DE
PumpNDE
DE
3
Motor
"V" (NDE/DE) / / / / /
"H" (NDE/DE) / / / / /
"A" (NDE/DE) / / / / /
Pump
"V" (DE/NDE) / / / / /
"H" (DE/NDE) / / / / /
"A" (DE/NDE) / / / / /
4
"R" Phase
"S" Phase
"T" Phase
5
6 Noise Level (dB(A)) at 1 m distance
7 Revolution (rpm)
8
"U" Phase
"U" Phase Spare
"V" Phase
"V" Phase Spare
"W" Phase
"W" Phase Spare
9 Flow Rate (t/hr)
Remarks : Start Time ; Logging Start Time ;
Certified by Name Signature Date
Test Executor
Pressure(Bar G)
Te
mp
. (℃
)V
ibra
tio
n(m
m/s
ec
. R
MS
)
Current (A)at Full Load
Ambient Temp. (℃)
MotorWinding Temp (℃)
<Measure Point>
DOOSAN
KEPCO SPC