TRANSPORT ASSESSMENT THE EASTBOURNE ACADEMY BRODRICK ROAD, EASTBOURNE CLIENT Kier Construction Longley House International Drive Southgate Drive Crawley West Sussex RH10 6AQ Ref: H17141/2.1 Date: November 2011 CONSULTING ENGINEERS Gyoury Self Partnership 16/17 Boundary Road Hove East Sussex BN3 4EF Tel: 01273 414413 Fax: 01273 414014

Upload: others

Post on 12-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 111108 Eastbourne Academy Full TA DRAFT · 2011. 11. 21. · 4.5.2 Information from the draft travel plan indicates that one third (1/3) of the pupils would use the bus if it was

 

TRANSPORT ASSESSMENT   

THE EASTBOURNE ACADEMY BRODRICK ROAD, EASTBOURNE 

     

    CLIENT Kier Construction Longley House International Drive Southgate Drive Crawley West Sussex RH10 6AQ  Ref:  H17141/2.1 Date:  November 2011 

CONSULTING ENGINEERS Gyoury Self Partnership16/17 Boundary Road

HoveEast Sussex

BN3 4EF

Tel: 01273 414413 Fax: 01273 414014 

Page 2: 111108 Eastbourne Academy Full TA DRAFT · 2011. 11. 21. · 4.5.2 Information from the draft travel plan indicates that one third (1/3) of the pupils would use the bus if it was

Kier Construction  ‐ Gyoury Self Partnership – consulting engineers Transport Assessment, Eastbourne Academy 

Date Job No. November

2011 4062

1

  

CONTENTS 

EXECUTIVE SUMMARY 

1.0  INTRODUCTION 

2.0  SITE DESCRIPTION AND PROPOSED DEVELOPMENT 

3.0  METHODOLOGY 

4.0  ANALYSIS OF EXISTING SCHOOL TRAVEL PLAN FOR THE EASTBOURNE TECHNOLOGY COLLEGE 

5.0  TRANSPORTATION INFRASTRUCTURE 

6.0  DEVELOPMENT IMPACT 

7.0  PARKING 

8.0  TRAVEL PLAN 

9.0  SITE VISIT 

10.0  SUMMARY AND CONCLUSIONS 

 

 SCHEDULE OF APPENDICES   APPENDIX 1  

LOCATION PLAN 

APPENDIX 2    PROPOSED SCHOOL SITE PLAN   

APPENDIX 3    LOCATION OF PUPILS WITHIN THE CATCHMENT AREA  

APPENDIX 4  EASTBOURNE BUS MAP AND LOCATION OF BUS STOPS  

APPENDIX 5  TRICS DATA BASE PRINTOUT FOR MULTIMODAL TRIPS FOR SECONDARY SCHOOLS  

APPENDIX 6    TRAFFIC FLOW DATA  

APPENDIX 7    EXTRACT FROM ESCC SUPLEMENTARY PLANNING GUIDANCE – PARKING STANDARDS AT DEVELOPMENT 

Compiled by  :   Allen Rollings 

  

ISSUE  DATE  Revision  COMPILED  CHECKED 

Draft  08 November  Draft 1  AR  MR 

Planning  11th November  Final  AR  MR 

         

Page 3: 111108 Eastbourne Academy Full TA DRAFT · 2011. 11. 21. · 4.5.2 Information from the draft travel plan indicates that one third (1/3) of the pupils would use the bus if it was

Kier Construction  ‐ Gyoury Self Partnership – consulting engineers Transport Assessment, Eastbourne Academy 

Date Job No. November

2011 4062

2

Executive Summary 

Kier  Construction  commissioned  Gyoury  Self  Partnership  to  prepare  a  Transport  Assessment  for  the redevelopment of  the Eastbourne Academy  site on Brodrick Road, Eastbourne.   The proposal  is  to  re‐model and re‐furbish  large sections of  the Academy and allow  for an  increase of  the number of pupils from approximately 720 to 900 which is the current school capacity.  

East Sussex County Council Highways department is of the opinion, and we agree, that the new Academy would have little impact on the existing road network as the number of pupils at the new Academy will be similar to the existing college.  

The  proposed  site  is well  suited  for  bus  services,  and  therefore  there  is  no  proposal  to  enhance  the services.  

The provision of car parking spaces meets the maximum required by East Sussex County Council although the new Academy will use the same car‐park as the existing sports hall. This is considered acceptable due to the low usage of the sports hall during school hours. 

100 covered and vandal proof cycle  racks will be provided with a possible expansion  should  the need arise. 

The pedestrian access to the new Academy is to be upgraded to improve safety standards. 

Overall the re‐development proposals are considered suitable in transportation terms. 

 

 

 

 

               

    

Page 4: 111108 Eastbourne Academy Full TA DRAFT · 2011. 11. 21. · 4.5.2 Information from the draft travel plan indicates that one third (1/3) of the pupils would use the bus if it was

Kier Construction  ‐ Gyoury Self Partnership – consulting engineers Transport Assessment, Eastbourne Academy 

Date Job No. November

2011 4062

3

INTRODUCTION  1.1 This  Transport  Assessment  has  been  prepared  for  Kier  Construction  in  conjunction  with  the 

above development  and no  responsibility  is  accepted  to  any  third party  for  all or part of  this study in connection with this or any other development. 

1.2 GSP  Partnership  has  been  commissioned  by  Kier  Construction  to  carry  out  a  Transport Assessment  in connection with  the  redevelopment of  the existing Eastbourne Academy  site  in the Hampden Park area of Eastbourne on Brodrick Road. (See Plan in Appendix 1).  

1.3 The Assessment  has  been  prepared  in  accordance with  “Transport Assessments Guidance  for Development Proposals in East Sussex”. 

1.4 The Assessment  summarises the collection of data from a number of sources as follows: 

Draft School Travel Plan for Eastbourne Technology College 

Accident Data from East Sussex County Council 

East Sussex County Council postcode catchment data for the existing schools 

Bus route information 

TRICS Data Base 

SITE DESCRIPTION AND PROPOSED DEVELOPMENT 

2.1 The Eastbourne Academy is situated in the Hampden Park area of Eastbourne on Brodrick Road. The site  is  in the freehold ownership of East Sussex County Council.   The college runs east‐west on  the  site  and  sits  to  the  north  of  playing  fields.  Generally  the  college  is  surrounded  by residential properties except  for on  the west of  the  site, where  the  Lindfield  Special School  is located.  In  addition  to  the  existing  college  there  are  two  other  facilities,  ‘The Hampden  Park Youth Centre’ and a sports hall operated by Eastbourne Borough Council. 

2.2 The entrance to the college and the sports hall is from Brodrick Road at the north‐west corner of the  site.  At  the  north‐east  corner  of  the  site  is  the  entrance  to  services  such  as  the  college kitchens. A  small car park  is  located north‐west of  the college and  is used by  the users of  the sports hall. 

2.3 It  is proposed  to  re‐model  and  re‐furbish  the  existing  site buildings  and  site  landscaping.  The sports hall will be retained. 

2.4 The main  access  to  the  new  academy  is  from  Brodrick  Road  as  currently  exists.  In  order  to improve  visibility  and  safety  the  access  is  to  be widened,  this will  segregate  pedestrian  and vehicle  movements.  The  existing  access  at  the  east  side  of  the  site  is  retained  to  provide pedestrian and emergency access (See plan in Appendix 2). 

   

Page 5: 111108 Eastbourne Academy Full TA DRAFT · 2011. 11. 21. · 4.5.2 Information from the draft travel plan indicates that one third (1/3) of the pupils would use the bus if it was

Kier Construction  ‐ Gyoury Self Partnership – consulting engineers Transport Assessment, Eastbourne Academy 

Date Job No. November

2011 4062

4

 

METHODOLOGY 

3.1 In the preparation of this Transport Assessment we have used the following information: 

Pupil postcode locations. 

Eastbourne bus route map. 

School transport information. 

Accident records. 

Draft School travel plan from the Eastbourne Technology College  

Supplementary Planning Guidance notes 

TRICS Data Base 

3.2 This Transport Assessment concentrates on the following: 

Analysis of the existing School Travel Plan for the Eastbourne Technology College. 

The  impact  of  the  additional  traffic  from  the  new  academy  to  the  existing  highway network. 

The impact and implications of the new academy to the existing public transport facilities. 

The safety implication on the local routes to school. 

The impact of residential and employment development sites that may be included in the local development framework for Eastbourne Borough Council. 

ANALYSIS OF  EXISTING  SCHOOL  TRAVEL  PLAN  FOR  THE  EASTBOURNE  TECHNOLOGY COLLEGE 

4.1 The capacity of the 11‐16 6FE academy will be 900 pupils, 180 pupils in each year. The catchment area  covering  the  existing  Eastbourne Academy  (see Appendix  3)  is  the most  likely  to  attract pupils  to  the new Academy. The Transport Assessment  therefore uses  the existing Eastbourne Technology  college  travel  pattern  of  pupils  and  staff  to  the  existing  college  and  adapts  them where possible to the new Academy. 

4.2 The draft  school  travel plan  for  the Eastbourne Technology College has been  supplied by East Sussex County Council.  The draft travel plan is dated 2006 and an effort has been made to obtain a  full  and  updated  travel  plan  for  this  study,  however  no  plan was  provided  at  the  time  of preparing this Transport Assessment. 

4.3 From  the  draft  travel  plan  report  dated  2006  it  has  been  established  that  the  Eastbourne Technology  College  had  820  students  and  119  teaching  and  support  staff.  According  the  last OFSTED  report  dated  2008  the  number  of  pupils  on  roll  was  717  and  the  number  of  staff currently was 133 (teaching, non‐teaching and support staff). 

 

 

Page 6: 111108 Eastbourne Academy Full TA DRAFT · 2011. 11. 21. · 4.5.2 Information from the draft travel plan indicates that one third (1/3) of the pupils would use the bus if it was

Kier Construction  ‐ Gyoury Self Partnership – consulting engineers Transport Assessment, Eastbourne Academy 

Date Job No. November

2011 4062

5

 

4.4 Eastbourne Technology College 

All the below information is extracted from Draft Travel Plan dated 2006 supplied by East Sussex County Council. Please note that all data is presented as numbers rather than percentages. 

4.4.1    Where students live.   

Area  Number 

Hampden Park  322 

Shinewater  20 

Old Town  19 

Stone Cross  5 

Other  79 

Table 1 – Where students live 

4.4.2  Method of transport to come to school 

Mode  Number 

Walk  301 

Car  71 

Bus  87 

Cycle  15 

Train  3 

Other  2 

Table 2 – Modes of transport 

4.4.3 No  information on how staff  travels  to school has been supplied. The draft  travel plan states that “the Head teacher suggested staff shared cars to ease environmental concerns and reduce the pressure on the overcrowded car park. This was accepted and reinforced”. This statement indicates that the preferred mode of transport for most of the staff is the car.    

4.5 Conclusions Drawn from Existing Information 

4.5.1 Eastbourne Technology College has a high number of pupils walking to school and a low number of pupils  cycling. However,  the  survey  included  in  the draft  travel plan  shows that 50% of the pupils will cycle to school if the cycle facilities on site are to be updated and secured.  

4.5.2 Information from the draft travel plan  indicates that one third (1/3) of the pupils would use the bus if it was a service only for the school. The ideal solution would be a bus stop directly  outside  the  academy  which  will  allow  the  staff  to  effectively  supervise  the students waiting for the bus, this has not been taken up by East Sussex County Council but as the changes to the school are not excessive it is no longer considered necessary.  

4.5.3     An  Item  indicated by  86  pupils  in  the  survey which  is  addressed  in  the proposal  is  to provide improved and safe cycle storage. 

Page 7: 111108 Eastbourne Academy Full TA DRAFT · 2011. 11. 21. · 4.5.2 Information from the draft travel plan indicates that one third (1/3) of the pupils would use the bus if it was

Kier Construction  ‐ Gyoury Self Partnership – consulting engineers Transport Assessment, Eastbourne Academy 

Date Job No. November

2011 4062

6

4.5.4   It  is anticipated  that  the  catchment area  for  the new academy will be  from  the whole area served by the current Academy  (See Plan  in Appendix 3).  It  is therefore  likely that most students will need to travel approximately the same distance as they do now.  

TRANSPORTATION INFRASTRUCTURE 

5.1 Highway Network  

5.1.1 Brodrick  Road,  running  along  the  Eastbourne  Technology  College  site,  is  a  local  road connecting  to  residential areas. This  road  is  traffic calmed and  is around 6.0 metres  in width with footways either side. Also, there are parking bays on one side of the road and parking  restrictions  at  the  other  side.  In  front  of  the  school  pedestrian  entrance  is  a speed hump. 

5.1.2 Brodrick Road connects to Henfield Road with a T‐junction. Henfield Road is a residential road with footways either side. 

5.1.3 Brodrick Road also connecting to Lindfield Road with a mini‐roundabout. Lindfield Road is a residential road with footways either side. 

5.1.4 Pigs  Lane  is  a  footpath  near  Eastbourne  Technology  College.  The  draft  travel  plan provided states that some of the students use this footpath but they considered  it as a risk to their safety and security. Also, the draft travel plan states that “The  lighting has recently  been  upgraded  along  Pigs  Lane.  There were  imminent  plans  to  cut  down  the bushes and scrubs along the path to enable a pedestrian to have a clear view of the path and its surrounding areas and see any oncoming danger.” 

5.2 Safety Implications On The Local Routes To School  

5.2.1 East Sussex County Council’s Highways Department has  supplied accident data  for  the following junctions in the area: 

5.2.2 Brodrick Road/Lindfield Road  

5.2.3 Brodrick Road/Henfield Road 

All  the  above  was  supplied  for  the  3  years  commencing  01/01/2007.  (Detailed information  is  not  included within  this  Transport Assessment  as  it  is  considered  to  be confidential) 

5.2.4 There were no accident records involving personal injuries in any of these junctions.  

5.2.5 The above indicates that the risk of accidents to the school children would not be a major factor in the consideration of a new academy in the Brodrick Road area. 

   

Page 8: 111108 Eastbourne Academy Full TA DRAFT · 2011. 11. 21. · 4.5.2 Information from the draft travel plan indicates that one third (1/3) of the pupils would use the bus if it was

Kier Construction  ‐ Gyoury Self Partnership – consulting engineers Transport Assessment, Eastbourne Academy 

Date Job No. November

2011 4062

7

5.3 Public Transport Network  

5.4 Buses 

5.4.1 The  Eastbourne  Technology  College  is  served  by  two  routes.  These  are  summarised below in Table 3 and the routes are shown in Appendix 4.  

Service Number  Route  Frequency 

Eastbourne Loop Town  Centre  ‐  District  General  Hospital  ‐ Willingdon Trees ‐ Hampden Park ‐ Winkney Farm ‐ Langney ‐ Langney Point ‐ Town Centre 

Every 12 to 15 minutes 

1 / 1A Hamlands ‐ Willingdon Trees ‐ Old Town ‐ Town Centre ‐ Seaside ‐ Langney  

Every 10 minutes 

Table 3 – Bus Routes 

5.4.2 The  closest  bus  stops  are  those  located  on  Brodrick  Road  and  Lindfield  Road  (see Appendix 4). 

5.4.3 The draft  travel plan  for Eastbourne Technology College  indicates  that  the bus services are an  issue for the school as 87 students (source: 2006 draft travel plan) that used the bus service often found that the timetable did not fit with their needs. 

5.4.4 According the draft travel plan, the school is in favour for the Bus Company introducing a School Bus Service as the survey shows that 1/3 of the students would use the service, however  this  is outside  the  control of Kier Construction or  indeed East  Sussex County Council as the bus company will only respond if there is a proven demand. 

5.4.5 Also, the draft travel plan indicates that the school is in favour of a bus stop directly  outside the school. This stop would be used at the start and finish of the school day and would  enable  staff  to  supervise  students waiting  for  the bus.  The  changes of  the bus stops are also outside the control of Kier Construction and as there is no change in school numbers, the changes cannot be justified. 

5.5 Trains 

5.5.1 Hampden Park train station  is the nearest train station to the new Academy. There  is a service about every 20 minutes from Eastbourne. 

5.5.2 The  draft  travel  plan  for  the  Eastbourne  Technology  College  indicates  that  a  small number of students (3 students) use the train. 

DEVELOPMENTIMPACT

6.1 Impact Of The Additional Traffic From The New Academy 

6.1.1 The adoption of the proposal to replace the existing school and to allow an increase of up to 900 pupils will have minimum  impact on the traffic along the  local roads around the new Academy.  

6.1.2 TRICS Database has been used to calculate the  increase  in traffic. TRICS Data (shown  in Appendix 5) for a 900 pupil school indicates that: 

   

Page 9: 111108 Eastbourne Academy Full TA DRAFT · 2011. 11. 21. · 4.5.2 Information from the draft travel plan indicates that one third (1/3) of the pupils would use the bus if it was

Kier Construction  ‐ Gyoury Self Partnership – consulting engineers Transport Assessment, Eastbourne Academy 

Date Job No. November

2011 4062

8

Total Daily Trips   

900 x 0.968 trips equalling 871 trips  

As this is now only an increase from the current 717 pupils, it is anticipated that the additional trips would be: 

871 x 183/900 equalling 177 trips 

 

AM Daily Peak Trips 

900 x 0.236 trips equalling 212 trips generated in the morning peak 8am to 9am 

As this is now only an increase from the current 717 pupils, it is anticipated that the additional AM trips would be: 

212 x 183/900 equalling 43 trips 

PM Daily Peak Trips 

900 x 0.141 trips equalling 127 trips generated in the afternoon peak 3pm to 4pm 

As this is now only an increase from the current 717 pupils, it is anticipated that the additional PM trips would be: 

127 x 183/900 equalling 26 trips 

6.1.3 The TRICS data analysis  indicates  that the additional traffic generated by the Academy, 43 additional morning  trips and 26 additional afternoon  trips, are minimal  so  they are unlikely    to affect  the capacity of  the existing road  infrastructure of  the area.  It should also be borne in mind that if the school was currently running at full capacity there would be no increase in traffic generation. 

6.1.4 The  information  supplied  by  East  Sussex  County  Council  as  to  the  traffic  flows  of  the Brodrick Road and side roads near the new Academy have been analysed and presented in Appendix 6. 

6.1.5 The  analysis  shows  that  at  the AM  peak  (8am  –  9am)  the Academy will  increase  the eastbound flows by 19% and the westbound flows by 15%. At the PM (3pm – 4pm) the increase at the eastbound traffic flows will be 5% and at the westbound will be 26%. 

6.1.6 The  analysis  supports  the  opinion  of  the  East  Sussex  County  Council  Highways department  that  the  new  academy  will  have  little  impact  on  the  existing  highway network as the pupil roll of the academy will be similar to the existing college. 

6.2 Possible  Impact Of Residential and Employment Development Sites That may Be  Included  In The Local Development Framework For Eastbourne Borough Council (LDF)  

6.2.1 Eastbourne Borough Council has published a number of possible development  sites  to meet the regional target agreed by the government and these are made up of mainly an irregular  pattern  of  small development  sites  throughout  the  catchment  area.  It  is  not possible  to  calculate whether  the  total  addition  of  these  sites would  have  any major impact on the number of pupils attending the new academy. It therefore follows that at this stage it is very difficult to anticipate the affect that these development sites will have on the highway network. 

Page 10: 111108 Eastbourne Academy Full TA DRAFT · 2011. 11. 21. · 4.5.2 Information from the draft travel plan indicates that one third (1/3) of the pupils would use the bus if it was

Kier Construction  ‐ Gyoury Self Partnership – consulting engineers Transport Assessment, Eastbourne Academy 

Date Job No. November

2011 4062

9

Parking 

7.1 Car Parking Provisions   

7.1.1 A small car park is located north‐west of the college and is used by the users of the sports hall.  

7.1.3 The  information provided states there are 59 car‐parking spaces on site with 2 disabled bays near the sports hall.  

7.2.3 For  the  re‐developed 900 pupil Academy  at  the  site  it would  appear  that  the parking provision  should be according  to  the Supplementary Planning Guidance  (See Appendix 7). The information supplied to date infers that the school has 52 teaching staff, 57 non‐teaching staff and 24 support staff, total of 133. According to East Sussex County Council SPG the site should have maximum 81 spaces of which 79 for staff and 2 for visitors. Also, East Sussex County Council SPG states that for a site with up to 200 spaces, 5% of total capacity should be disable car parking spaces. 

7.1.4 The current scheme will provide 102 car parking spaces of which 2 will be for visitors and 9 disabled parking spaces. 

7.1.5 The proposed  site also  includes  the  sports hall which according  to East Sussex County Council SPG should have 73 ‐ 77 parking spaces as a stand alone facility. The use of the sports hall during the school hours is low and therefore the parking provision allowing for approximately  20  additional  spaces  over  the maximum  required  for  the Academy  use alone should be adequate along with a strictly controlled parking system forming part of the Travel Plan accompanying this Transport Assessment. During out of school hours the parking provided for the Academy will be used by the sports hall users. 

7.1.6 The opening hours of the sports hall are: 

Monday to Thursday  08:40 – 22:30 

Friday  08:40 – 22:00 

Saturday  08:40 – 18:00 

Sunday  08:40 – 19:00 

Table 4 – Sports Hall Opening Hours 

Table 4 shows that the sports hall morning opening hours are the same as the Academy’s opening hours. But  it  is reasonable to argue that the busiest time of the sports hall will be after the school has finished, after 15:30.   

7.1.7 The proposed plan does not show  if a drop off and pick up area will be provided. It has been  established  that  the  East  Sussex  County  Councils  Development  Control  Section normally require this provision and it should also cater for buses and coaches. As there is no  increase  in the attendees over the maximum capacity therefore this provision  is not considered necessary. 

7.2 Cycle Space Provisions 

7.2.1 The construction of a new academy would give an opportunity to encourage cycling by including safe covered storage,  locker provision  for change of clothing. The East Sussex Parking Standards (See Appendix 7) lay down that there should be 180 long‐term bicycle 

Page 11: 111108 Eastbourne Academy Full TA DRAFT · 2011. 11. 21. · 4.5.2 Information from the draft travel plan indicates that one third (1/3) of the pupils would use the bus if it was

Kier Construction  ‐ Gyoury Self Partnership – consulting engineers Transport Assessment, Eastbourne Academy 

Date Job No. November

2011 4062

10

parking spaces provided as part of the new development these spaces should be under‐cover and vandal proof. As in the case of other Academies agreement has been reached to provide 100 spaces and the use of these is to be monitored and possibly extended in the future depending on demand. 

TRAVEL PLAN 

8.1  A Travel Plan has been prepared similar to that submitted with the planning application for the St. Leonards Academy and will accompany this Transport Assessment.

SITE VISIT 

9.1 A  joint  site  visit  with  the  Highway  Authority    was  held  at  the  Academy’s  opening  hours  on Wednesday 9th November 2011 and the following points were noted:‐  

1. At the morning of the visit there were no problems dropping off the students as there is a  long  frontage  to  the Academy protected by no parking zig‐zag  lines which were used for this purpose; 

2. A small number used the entrance to the Academy and reversed into the road to return in the westerly direction from which they came; 

3. It was however noted that Tuesday to Thursday there are staggered starting and closing times  of the Academy but on Mondays and Fridays they coincide; 

4. It was agreed that the Highway Authority would observe a Monday or Friday but  it was considered that as the later opening and closing times were for older pupils the number of cars used in this operation would be minimal compared with the observed Wednesday morning operation for the younger element of the pupils; 

5. The  new  proposed  layout  of  the Academy  allows  for  a  drop‐off  and  circulatory  route inside  the grounds and  therefore  the  current operation will be  superceded by a much safer one; 

6. A meeting was  held with  the  Vice  Principle  and  Site Manager who  both  agreed  the principles contained in the draft Travel Plan; 

7. It did become apparent that a number of issues such as the layout of the car‐parking and the  type  and  form  of  the  cycle  storage  are  yet  to  be  agreed  but  these  aspects  are considered to be relatively minor. 

 

 

 

 

 

 

 

 

Page 12: 111108 Eastbourne Academy Full TA DRAFT · 2011. 11. 21. · 4.5.2 Information from the draft travel plan indicates that one third (1/3) of the pupils would use the bus if it was

Kier Construction  ‐ Gyoury Self Partnership – consulting engineers Transport Assessment, Eastbourne Academy 

Date Job No. November

2011 4062

11

SUMMARY AND CONCLUSIONS 

10.1  It  is  concluded  that  the  re‐developed  academy  can  physically  be  positioned  on  the  existing Eastbourne Technology College site with a vehicular and pedestrian access  from Brodrick Road which will be upgraded for pedestrians and therefore improving the safety of the entrance. 

10.2 From the information on the draft Travel Plan provided it can be established that whilst there is a       large  number  of  pupils walking  to  school  some  parents  choose  to  drop  off  and  pick  up  their children. There are also a small number of pupils that currently cycle to school.  

10.3 As the catchment area of the new academy will be the same as the existing college, it is unlikely to result in some of the pupils having to travel a longer distance to school, and therefore it is not expected that more pupils will travel by car.  

10.4 The  traffic  analysis  showed  that  the  additional  trips  that  the  new  academy will  generate  are minimal,  so  the highway network would appear  to be able  to  cope with  the additional  traffic generated from the new development. 

10.5 As  the  proposed  site  is well  suited  for  bus  services,  there  are  no  plans  to  alter  the  current arrangements.  

10.6 The new academy will use the same car park as the existing sports hall and its use during the day is minimal and therefore considered acceptable.  

10.7 It  is proposed  to provide 102  car parking  spaces of which 2 will be  for visitors and 9 disabled parking spaces along with 100 covered and vandal proof cycle spaces. 

10.8 A  travel  plan will  be  introduced  to  control  the  use  of  the  car‐park  and  promote  sustainable transport to the new Academy. 

10.9 Overall  the  re‐developed  Academy  on  the  Eastbourne  Technology  College  site  appears  to  be suitable in transportation terms. 

   

Page 13: 111108 Eastbourne Academy Full TA DRAFT · 2011. 11. 21. · 4.5.2 Information from the draft travel plan indicates that one third (1/3) of the pupils would use the bus if it was

Kier Construction  ‐ Gyoury Self Partnership – consulting engineers Transport Assessment, Eastbourne Academy 

Date Job No. November

2011 4062

11

APPENDIX 1   LOCATION PLAN 

   

Page 14: 111108 Eastbourne Academy Full TA DRAFT · 2011. 11. 21. · 4.5.2 Information from the draft travel plan indicates that one third (1/3) of the pupils would use the bus if it was

Kier Construction  ‐ Gyoury Self Partnership – consulting engineers Transport Assessment, Eastbourne Academy 

Date Job No. November

2011 4062

12

APPENDIX 2 

PROPOSED SCHOOL SITE PLAN  

   

Page 15: 111108 Eastbourne Academy Full TA DRAFT · 2011. 11. 21. · 4.5.2 Information from the draft travel plan indicates that one third (1/3) of the pupils would use the bus if it was
Page 16: 111108 Eastbourne Academy Full TA DRAFT · 2011. 11. 21. · 4.5.2 Information from the draft travel plan indicates that one third (1/3) of the pupils would use the bus if it was

gta civils ltd – consulting engineers Transport Assessment, Eastbourne Academy  

Date Job No. June 2010 3507

14

APPENDIX 3 – CATCHMENT AREA MAPS 

 

LOCATION OF PUPILS WITHIN THE CATCHMENT AREA 

OF THE EASTBOURNE ACADEMY 

 

Page 17: 111108 Eastbourne Academy Full TA DRAFT · 2011. 11. 21. · 4.5.2 Information from the draft travel plan indicates that one third (1/3) of the pupils would use the bus if it was

gta civils ltd – consulting engineers Transport Assessment, Eastbourne Academy  

Date Job No. June 2010 3507

15

Page 18: 111108 Eastbourne Academy Full TA DRAFT · 2011. 11. 21. · 4.5.2 Information from the draft travel plan indicates that one third (1/3) of the pupils would use the bus if it was

gta civils ltd – consulting engineers Transport Assessment, Eastbourne Academy  

Date Job No. June 2010 3507

16

 

APPENDIX 4 

EASTBOURNE BUS MAP AND BUS STOPS LOCATION 

 

Page 19: 111108 Eastbourne Academy Full TA DRAFT · 2011. 11. 21. · 4.5.2 Information from the draft travel plan indicates that one third (1/3) of the pupils would use the bus if it was

Kier Construction  ‐ Gyoury Self Partnership – consulting engineers Transport Assessment, Eastbourne Academy 

Date Job No. November

2011 4062

17

BUS MAP          

  

   

Page 20: 111108 Eastbourne Academy Full TA DRAFT · 2011. 11. 21. · 4.5.2 Information from the draft travel plan indicates that one third (1/3) of the pupils would use the bus if it was

Kier Construction  ‐ Gyoury Self Partnership – consulting engineers Transport Assessment, Eastbourne Academy 

Date Job No. November

2011 4062

18

APPENDIX 5 

TRICS DATA BASE PRINTOUT FOR MULTIMODAL TRIPS FOR SECONDARY SCHOOLS 

  

TRIP RATE for Land Use 04 ‐ EDUCATION/B ‐ SECONDARY         Calculation Factor:      1 PUPILS                                    ARRIVALS    DEPARTURES    TOTALS     No.  Ave.  Trip  No.  Ave.  Trip  No.  Ave.  Trip Time Range  Days  PUPILS  Rate  Days  PUPILS  Rate  Days  PUPILS  Rate 00:00‐01:00  0  0  0 0  0 0 0  0 001:00‐02:00  0  0  0 0  0 0 0  0 002:00‐03:00  0  0  0 0  0 0 0  0 003:00‐04:00  0  0  0 0  0 0 0  0 004:00‐05:00  0  0  0 0  0 0 0  0 005:00‐06:00  0  0  0 0  0 0 0  0 006:00‐07:00  0  0  0 0  0 0 0  0 007:00‐08:00  10  982  0.027 10  982 0.003 10  982 0.0308:00‐09:00  11  1067  0.216 11  1067 0.02 11  1067 0.23609:00‐10:00  11  1067  0.027 11  1067 0.01 11  1067 0.03710:00‐11:00  11  1067  0.012 11  1067 0.011 11  1067 0.02311:00‐12:00  11  1067  0.014 11  1067 0.015 11  1067 0.02912:00‐13:00  11  1067  0.019 11  1067 0.02 11  1067 0.03913:00‐14:00  11  1067  0.019 11  1067 0.016 11  1067 0.03514:00‐15:00  11  1067  0.012 11  1067 0.021 11  1067 0.03315:00‐16:00  11  1067  0.025 11  1067 0.116 11  1067 0.14116:00‐17:00  11  1067  0.015 11  1067 0.085 11  1067 0.117:00‐18:00  11  1067  0.019 11  1067 0.045 11  1067 0.06418:00‐19:00  10  1112  0.019 10  1112 0.018 10  1112 0.03719:00‐20:00  1  1913  0.039 1  1913 0.018 1  1913 0.05720:00‐21:00  1  1913  0.025 1  1913 0.027 1  1913 0.05221:00‐22:00  1  1913  0.005 1  1913 0.05 1  1913 0.05522:00‐23:00  0  0  0 0  0 0 0  0 023:00‐24:00  0  0  0 0  0 0 0  0 0Daily Trip Rates:    0.493     0.475     0.968

 

     

Page 21: 111108 Eastbourne Academy Full TA DRAFT · 2011. 11. 21. · 4.5.2 Information from the draft travel plan indicates that one third (1/3) of the pupils would use the bus if it was

Kier Construction  ‐ Gyoury Self Partnership – consulting engineers Transport Assessment, Eastbourne Academy 

Date Job No. November

2011 4062

19

APPENDIX 6  TRAFFIC FLOW DATA 

Page 22: 111108 Eastbourne Academy Full TA DRAFT · 2011. 11. 21. · 4.5.2 Information from the draft travel plan indicates that one third (1/3) of the pupils would use the bus if it was

gta civils ltd – consulting engineers Transport Assessment, Eastbourne Academy  

Date Job No. June 2010 3507

20

 

Page 23: 111108 Eastbourne Academy Full TA DRAFT · 2011. 11. 21. · 4.5.2 Information from the draft travel plan indicates that one third (1/3) of the pupils would use the bus if it was

Kier Construction  ‐ Gyoury Self Partnership – consulting engineers Transport Assessment, Eastbourne Academy 

Date Job No. November

2011 4062

21

 

Page 24: 111108 Eastbourne Academy Full TA DRAFT · 2011. 11. 21. · 4.5.2 Information from the draft travel plan indicates that one third (1/3) of the pupils would use the bus if it was

 APPENDIX 7  EXTRACT FROM ESCC SUPLEMENTARY PLANNING GUIDANCE CAR‐PARKING 

 

 

 

Page 25: 111108 Eastbourne Academy Full TA DRAFT · 2011. 11. 21. · 4.5.2 Information from the draft travel plan indicates that one third (1/3) of the pupils would use the bus if it was

Kier Construction  ‐ Gyoury Self Partnership – consulting engineers Transport Assessment, Eastbourne Academy 