    1/72

    1 1022+930 20+30+20

    2 0+790 2 X 30

    3 18+740 2 X 30

    4 47+350 2 X 30

    5 1+060 2 X 30

    6 6+200 2 X 30

    Vehicular Underpass (VUP) of different spans and minimum vertical clearance shall be provide

    ew Vehicular Underpass

    S. No Chainage km Span arrangement (m)

    1 12+305 1x12

    2 31+190 1x12

    3 43+380 1x12

    4 3+010 1 x 18

    5 1075+100 1 x 12

    6 1071+544 1 x 12

    7 1063+770 1 x 12

    8 1050+370 1 x 12

    9 1033+610 1 x 12

    10 1030+230 1 x 12

    1 Underpass 57/2

    New Flyover for Vijayawada Bypass

    New Flyover for Hanuman Junction Bypass

    The total width excludes the gap between two supe

    Vehicu

    Vijayawada Bypass

    Flyovers of different spans and minimum vertic

    S. no. Chainage (km)

    Span arrangement (m)

    Hanuman Junction Bypass

    Vijayawada Gundugolanu Section

    The total width excludes the clear gap between two super structu

    (b) Details of Vehicular Underpass t

    S. No. Type of structure Bridge No

  • 7/30/2019 111230 Str Inventry

    2/72

    2 Under-pass 58/6

    3 Underpass 61/1

    4 Underpass 63/3

    5 Underpass 65/2

    6 Underpass 66/2

    7 Underpass 68/5

    8 Underpass 69/5

    S.

    No

    1 3+980 1 x 7.5

    2 22+800 1 x 7.5

    3 24+695 1 x 7.5

    4 35+950 1 x 7.5

    5 40+080 1 x 7.5

    6 41+120 1 x 7.5

    7 1073+705 1 x 7.5

    8 1068+955 1 x 7.5

    9 1067+920 1 x 7.5

    10 1066+180 1 x 7.511 1065+260 1 x 7.5

    12 1054+310 1 x 7.5

    13 1051+940 1 x 7.5

    Vijayawada Byp

    Vijayawada Gundugola

    The total width excludes the gap between two super structure

    Pedestrian Unde

    Pedestrian Underpass (PUP) of different spans and minimum vertical

    New Pedestrian/Cattle

    Chainage km Span arrangement (m)

  • 7/30/2019 111230 Str Inventry

    3/72

    S. No Chainage km Span arrangement (m)

    1 40/5 1064+415 1 X 6.00

    64/4

    1040+684

    S. No Chainage Km Span (m)

    1 1031+452 50

    Note: At service road locations, the footbridge should span across service road. Length of Ram

    5. Culverts

    Culverts as listed below shall be provided, widened, reconstructed, or extended.

    (a) Repair/Rehabilitation/Widening/Reconstruction of Culverts

    Main

    77 1049+830 RHS

    86 1047+771 RHS

    128 1040+372 RHS

    133 1039+453 RHS

    143 1038+118 RHS

    144 1038+018 RHS

    153 1035+768 RHS

    158 1034+384 RHS

    159 1034+375 RHS

    160 1034+225 RHS

    125 1040+993 RHS

    1040+08 RHS

    73 1050+927 RHS

    78 1049+631 RHS

    79 1049+371 RHS80 1049+271 RHS

    81 1049+099 RHS

    82 1048+523 RHS

    83 1048+374 RHS

    84 1048+188 RHS

    85 1048+095 RHS

    90 1046+896 RHS

    91 1046+781 RHS

    Pedestrian/Cattle Underpasses to b

    2 1 x 8.80

    * The total width excludes the gap between two super structures, which will

    New Foot Over Bridges

    S. No Chainage (Km)Car

  • 7/30/2019 111230 Str Inventry

    4/72

    92 1046+693 RHS

    97 1046+031 RHS

    98 1045+974 RHS

    99 1045+838 RHS

    100 1045+684 RHS

    101 1045+503 RHS

    102 1045+201 RHS

    103 1045+101 RHS

    104 1044+788 RHS

    105 1044+592 RHS

    106 1044+434 RHS

    107 1044+277 RHS

    108 1044+015 RHS

    109 1043+787 RHS

    110 1043+717 RHS

    111 1043+629 RHS

    112 1043+453 RHS

    113 1043+378 RHS

    114 1043+283 RHS115 1042+918 RHS

    116 1042+868 RHS

    117 1042+693 RHS

    118 1042+518 RHS

    123 1041+811 RHS

    124 1041+213 RHS

    126 1040+868 RHS

    127 1040+738 RHS

    134 1039+398 RHS

    135 1039+282 RHS

    139 1038+518 RHS

    140 1038+418 RHS

    141 1038+329 RHS

    142 1038+275 RHS

    145 1037+798 RHS

    152 1035+841 RHS

    154 1035+541 RHS

    155 1035+195 RHS

    156 1035+056 RHS

    157 1034+896 RHS

    164 1032+328 RHS

    165 1029+509 RHS

    166 1028+428 RHS168 1023+526 RHS

    171 1022/2 LHS

    1 1076+380 RHS

    5 1073+530 RHS

    8 1072+990 RHS

    9 1072+410 RHS

    12 1071+170 RHS

  • 7/30/2019 111230 Str Inventry

    5/72

    13 1070+500 RHS

    14 1069+952 RHS

    16 1069+373 RHS

    18 1068+043 RHS

    21 1067+726 RHS

    25 1066+059 RHS

    45 1063+535 RHS

    46 1063+471 RHS

    47 1063+132 RHS

    48 1061+996 RHS

    49 1061+587 RHS

    50 1061+413 RHS

    51 1055+434 RHS

    62 1053+525 RHS

    63 1053+266 RHS

    72 1051+32 RHS

    89 1047+123 RHS

    120 1042+145 RHS

    148 1036+773 RHS6 1073+460 RHS

    7 1073+280 RHS

    15 1069+813 RHS

    20 1067+816 RHS

    22 1067+415 RHS

    23 1066+532 RHS

    24 1066+153 RHS

    26 1065+592 RHS

    30 1065+011 RHS

    31 1064+798 RHS

    32 1064+643 RHS

    33 1064+421 RHS

    34 1064+404 RHS

    35 1064+316 RHS

    36 1064+159 RHS

    37 1064+093 RHS

    38 1064+037 RHS

    52 1055+419 RHS

    53 1055+193 RHS

    54 1054+951 RHS

    55 1054+896 RHS

    56 1054+785 RHS

    57 1054+757 RHS61 1053+774 RHS

    64 1052+935 RHS

    65 1052+698 RHS

    66 1052+51 RHS

    67 1052+396 RHS

    68 1052+315 RHS

    70 1051+893 RHS

    71 1051+553 RHS

  • 7/30/2019 111230 Str Inventry

    6/72

    75 1050+265 RHS

    76 1050+148 RHS

    75 1050 +37 54/3 -

    87 1047+249 RHS

    88 1047+133 RHS

    93 1046+536 RHS

    94 1046+369 RHS

    95 1046+334 RHS

    96 1046+253 RHS

    119 1042+353 RHS

    121 1042+124 RHS

    122 1042+043 RHS

    129 1040+147 RHS

    130 1039+969 RHS

    131 1039+953 RHS

    132 1039+838 RHS

    136 1039+048 RHS

    137 1038+845 RHS

    138 1038+734 RHS146 1037+047 RHS

    147 1036+911 RHS

    149 1036+562 RHS

    150 1036+521 RHS

    151 1036+375 RHS

    161 1033+965 RHS

    162 1033+758 RHS

    17 1068+314 RHS

    167 1026+355 RHS

    2 1075+7 RHS

    3 1075+120 RHS

    4 1073+700 RHS

    59 1054+372 RHS

    69 1052+001 RHS

    74 1050+508 RHS

    163 1033+668 RHS

    19 1067+945 RHS

    27 1065+313 RHS

    28 1065+192 RHS

    29 1065+166 RHS

    39 1063+989 RHS40 1063+960 RHS

    41 1063+859 RHS

    42 1063+786 RHS

    43 1063+713 RHS

    44 1063+609 RHS

    58 1054+465 RHS

    60 1054+145 RHS

  • 7/30/2019 111230 Str Inventry

    7/72

    10 1072+050 RHS

    11 1071+740 RHS

    Code Description of Improvement

    1 Widen the existing culvert to 3 lane with repairs

    2 Widen the existing culvert to 3 lane with repairs with service road

    3

    Replace the existing culvert with new culvert of 3-lane as the

    existing culvert falls in the approaches of Flyover/Underpass

    4

    Replace the existing culvert with new culvert of 3-lane with service

    road as the existing culvert falls in the approaches of

    Flyover/Underpass

    5 Widen the existing culvert to toll plaza requirement

    Note: The width of culverts shall have the same overall width as

    of the approach road

    Note: The width of culverts shall have the same overall width as of the approach road

    (b) New Culverts in Vijayawada Bypass

    S. No Chainage

    Proposed Span arrangement

    (nos x Length/Dia / Size (m))

    1 1+260 1x4x2

    2 1+520 1x5x3

    3 5+030 1x4x2

    4 5+560 1x5x2

    5 7+030 1x5x3

    6 7+680 1x5x3

    9 10+710 1x5x2

    10 17+570 1x5x2

    15 19+960 1x4x225 27+690 1x5x3

    29 28+900 1x4x2

    38 33+070 1x5x3

    53 42+230 1x4x2

    7 8+970 3x1.2

    8 8+990 3x1.2

    11 17+730 4x1.2

    12 18+070 2x1.2

    13 18+340 2x1.2

    14 18+975 3x1.2

    16 21+835 2x1.2

    17 23+020 3x1.2

    18 23+730 3x1.2

    19 24+900 2x1.2

    20 25+065 3x1.2

    21 25+905 3x1.2

    22 26+565 2x1.2

    23 27+055 2x1.2

    26 28+070 2x1.2

    Description of Imp

  • 7/30/2019 111230 Str Inventry

    8/72

    27 28+130 2x1.2

    28 28+395 2x1.2

    30 29+855 1x1.2

    31 31+540 1x1.2

    32 31+610 1x1.2

    33 31+980 2x1.2

    34 32+140 2x1.2

    35 32+280 1x1.2

    36 32+500 2x1.2

    37 32+570 1x1.2

    39 33+930 2x1.2

    40 34+410 2x1.2

    41 34+630 2x1.2

    42 35+718 2x1.2

    43 35+930 2x1.2

    44 36+085 4x1.2

    45 36+540 1x1.2

    46 37+005 1x1.2

    47 37+735 2x1.248 39+258 1x1.2

    49 39+920 4x1.2

    50 41+770 2x1.2

    51 41+990 1x1.2

    52 42+182 1x1.2

    54 42+490 1x1.2

    24 27+430 2x1.2

    (c) New Culverts in Hanuman Junction Bypass

    S.No Chainage

    Proposed Span arrangement

    (nos x Length/Dia / Size (m))

    57 1+820 1x4x2m59 2+060 1x5x2m

    66 5+060 1x4x2m

    67 5+540 1x4x2m

    55 0+720 2x1.2 m

    56 1+490 2x1.2 m

    58 1+950 2x1.2 m

    60 3+170 1x1.2 m

    61 3+530 2x1.2 m

    62 3+720 2x1.2 m

    63 3+780 2x1.2 m

    64 3+890 2x1.2 m

    65 4+010 2x1.2 m

    (d) New Culverts in Vijayawada Bypass Service Roads

    S.No Chainage

    Proposed Span arrangement

    (nos x Length/Dia / Size (m))

    68 18+340 2x1.2 m

    69 18+975 3x1.2 m

    70 23+020 3x1.2 m

    71 35+718 2x1.2 m

  • 7/30/2019 111230 Str Inventry

    9/72

    72 35+930 2x1.2 m

    73 36+085 4x1.2 m

    74 39+920 4x1.2 m

    (e) New Culverts in Hanuman Junction Bypass Service Roads

    S.No Chainage

    Proposed Span arrangement

    (nos x Length/Dia / Size (m))

    75 3+170 1x1.2 m8. Minor Bridges

    Minor bridges as listed below shall be provided, widened, reconstructed, or extended.

    (a) Details of Minor Bridges

    S.

    No

    13 1032+815 RHS

    7 1055+743 RHS

    8 1048+338 Four

    8 1048+338 Four

    9 1043+091 Four

    9 1043+091 Four

    10 1043+055 Four

    10 1043+055 Four

    12 1036+052 Four

    12 1036+052 Four

    14 1030+415 RHS

    15 1026+335 LHS

    15 1026+335 RHS

    16 1024+188 LHS

    16 1024+188 RHS

    17 1022+851 RHS13 1032+815 LHS

    1 1075+820 LHS

    1 1075+820 RHS

    2 1072+737 LHS

    2 1072+737 RHS

    3 1068+844 LHS

    3 1068+844 RHS

    4 1067+326 LHS

    4 1067+326 RHS

    5 1065+78 LHS

    5 1065+78 RHS

    6 1062+540 Four

    6 1062+540 Four

    7 1055+743 LHS

    11 1037+246 Four

    11 1037+246 Four

    14 1030+415 LHS

    17 1022+851 LHS

    Structure No. Chainage (Km) Location

  • 7/30/2019 111230 Str Inventry

    10/72

    Description of Improvement code for Minor Bridges

    Code Description of Improvement

    1 Retain with repairs as given at para 11 below.

    2 Add new 2 lane structure with footpath parallel to the existing

    structure as the widening of existing structure is not possible

    3 Widen the existing 2 / 4 lane Bridge after repairs as per para 11

    below to 3 / 6 lane.

    4 Provide separate bridge for service road as given at Table (d) below.

    S. Proposed Span arrangement

    No Nos x length (m)

    1 3+360 1x31

    2 5+840 2x5x3

    3 8+210 2x26

    4 9+560 1x5x3

    5 10+450 1x4x2

    6 10+980 1x5x2

    7 13+020 2x4x2

    8 19+305 2x4x29 21+240 1x20

    10 22+035 1x5x3

    11 22+815 2x4x2

    12 23+350 2x19

    13 24+350 2x5x2

    14 24+850 2x4x2

    15 26+350 1x5x3

    16 29+340 1x25

    17 30+565 1x10

    18 33+250 1x28

    19 33+715 2x4x2

    20 34+250 1x12

    21 35+250 1x6x2

    22 36+500 1x12

    23 40+900 1x10

    24 42+690 1x5x2

    25 43+880 1x5x2

    26 44+690 1x25

    27 44+950 2x4x2

    Proposed Span arrangement

    Nos x length (m)

    1 2+750 1x7.5x3.5m

    2 5+391 2x16m

    Chainage

    * Total width excludes the clear gap between the two superstru

    (c) New Minor Bridges for Han

    (b) New Minor Bridges for V

    S.No Chainage

    * Total width excludes the clear gap between the two superstru

  • 7/30/2019 111230 Str Inventry

    11/72

    (d) New Minor Bridges on Service RoadsS. Chainage

    No. Km

    1 MNB No: 29/2 1075+820

    MNB No:

    32/2

    3 MNB No: 36/1 1068+844

    MNB No:

    37/6

    5 MNB No: 39/2 1065+780

    MNB No:

    42/1

    MNB No:

    49/1

    8 MNB No: 67/3 1037+246

    9 MNB No: 76/1 1030+415

    (e) New Minor Bridges on Service Roads in Vijayawada bypass

    Proposed Span arrangement

    Nos x length (m)

    1 22+815 2x4x2m

    2 24+850 2x4x2m

    3 40+900 1x10m

    9. Major Bridges

    Major bridges as listed below shall be provided, widened, reconstructed, or extended.Bridges to be Retained with Repair

    64/5

    1040+481

    70/3

    1034+907

    Code Description of Improvement

    1 Retain with repairs as given at para 11 below.

    (b) New 4 Lane Major Bridges for Vijayawada Bypass

    Structure No

    4 1067.326

    2 1072+737

    7 1055+743

    6 1062+540

    S.No Chainage

    10 MNB No: 1022+851

    2 LHS & RHS

    Description of Improvement code for Major Bridges

    S. No Structure No. Chainage (km) Location

    1 LHS & RHS

  • 7/30/2019 111230 Str Inventry

    12/72

    1 15+970 Krishna River

    o superstructures, which will be dictated by roadway alignment.

    (c) New Major Bridge on Service Roads for Vijayawada Bypass

    1 43+250 Chimala Vagu

    10. Rail Over Bridges (ROBs)

    ROBs as listed below shall be provided, widened, reconstructed, or extended.

    (a) Rail Over Bridges (ROBs) to be retained with Repair

    S. No Structure No. / Chainage Location

    55/2 LHS

    1049+845 RHS

    70/7 LHS

    1034+134 RHS

    (b) New 4 Lane ROBs for Vijayawada Bypass

    1 2+500 ROB

    2 20+590 ROB

    3 45+870 ROB

    11 Repairs and Rehabilitation of Structures:

    S. No Chainage (km) Name of River / stream

    S. No Chainage (km) Name of River / stream

    2 43+250 Chimala Vagu

    * As per Railway requirement these spans shall be o

    ** Total width excludes the clear gap between the two superstruc

    The following shall be applicable

    (i) The proposed span arrangement of the ROB is tentative and subject to change as per avail

    shall be designed, constructed and maintained as per the requirement of Railway authorities. Th

    1

    2

    S. No Chainage (km) Type

    (iii) The ROB shall be constructed and maintained by the con

    (iv) All expenditure related to construction, maintenance and sup

    (v) All charges payable to the Railways like P&E, D&G, Capitalise

    (vi) In any case the total length of viaduct portion sh

  • 7/30/2019 111230 Str Inventry

    13/72

    Common repair & rehabilitation measures (For all structures):

    12 At grade intersections

    rsection Improvement

    S. No. Chainage Side

    1 1076+630 Right

    2 1075+107 Left

    3 1075+107 Right

    4 1074+140 Left

    5 1074+110 Left

    6 1074+040 Right

    7 1074+010 Right

    8 1073+940 Left

    9 1073+850 Left

    10 1073+830 Right

    11 1073+780 Left

    12 1073+730 Left

    13 1073+690 Left

    14 1073+605 Right

    15 1073+590 Left

    2. Paint structure numbers in continu

    . Provide water collector channels after end of approach slab for a length equal to 2.5 times th

    Provide RCC drainage chutes with energy dissipator basins at ground at 5 m intervals with one

    around wing walls/ cantilever returns to be filled up, duly compacted, and pitched with boulder

    tings. Fill up the hole in deck slab around spout. Replace drainage spouts with short or missing d

    7. Construct concrete inspection ladders on boulder pitching around abutments for

    ut for assessment of condition of the structure and to finalize its repair and rehabilitation. Based

    1. Remove debris/ vegetation from pier and abutme

    14.

    Replace / rehabilitate damaged upstream and downstream launching15. Replace all RCC railing adjoining carriageway with R

    8. Remove vegetation from vent way and pitching aro

    9. False steining of well foundations shall be di

    10. Replace all damaged elastomeric bearin

    11. Clean all metallic bearings, replace missing / damaged

    of old bridges with T beam and slab superstructure with strip seal type expansion joint after r

    13. Replace / rehabilitate damaged stone pitching on

  • 7/30/2019 111230 Str Inventry

    14/72

    16 1073+555 Right

    17 1073+535 Left

    18 1073+470 Left

    19 1073+420 Left

    20 1073+370 Right

    21 1073+320 Right

    22 1073+185 Right

    23 1073+100 Right

    24 1073+000 Left/Right

    25 1071+635 Left

    26 1071+630 Right

    27 1071+525 Left

    28 1071+520 Right

    29 1071+300 Left

    30 1070+345 Left

    31 1067+925 Left

    32 1067+880 Right

    33 1067+075 Left/Right

    34 1066+940 Right

    35 1066+880 Right

    36 1066+153 Left

    37 1065+780 Left

    38 1065+715 Right

    39 1065+700 Left

    40 1065+665 Right

    41 1065+620 Right

    42 1065+592 Left

    43 1065+270 Left

    44 1064+550 Left

  • 7/30/2019 111230 Str Inventry

    15/72

    45 1064+520 Right

    46 1064+520 Right

    47 1063+765 Left

    48 1054+590 Right

    49 1054+420 Right

    50 1054+323 Left

    51 1054+320 Left

    52 1052+580 Left

    53 1047+878 Left

    54 1047+878 Right

    55 1031+452 Left

    56 1031+452 Left

    57 1030+218 Left

    58 1030+218 Right

    13. Longitudinal Drains

    14. Protection works

    15. Overpasses

    Nil16. Proposed Retaining Structures

    Corrosion Protection for reinforcement shall conform to the requirement of IRC SP: 80 2008 Guidelines for C

    Remedial Measures for Concrete Bridge Structures.

    Longitudinal Drains shall be provided on both sides of carriageway as

    The Protection Works shall be provided as per Sched

    Provide Retaining / RE walls as per the cross section schedule /typ

    17. Corrosion Protection for Reinforcement

  • 7/30/2019 111230 Str Inventry

    16/72

    70 5.5 2 x 13.4

    60 5.5 2 x 12.0

    60 5.5 2 x 12.0

    60 5.5 2 x 12.0

    60 5.5 2 x 13.4

    60 5.5 2 x 13.4

    at locations indicated below

    Minimum Vertical Clearance (m) Total width* (m) Remarks

    5.5 2 x 12 Mandadam Road

    5.5 2 x 12 Nunna Road

    5.5 2 x 12 Agiripalli Road

    5.5 2 x 13.4Gudivada Road (SH-46) Cum

    Channel

    5.5 2 x 13.4 Pedda avutapalli

    5.5 2 x 13.4 Pottipadu

    5.5 2 x 13.4 Veeravalli

    5.5 2 x 13.4 Eluru bypass

    5.5 2 x 13.4 Eluru bypass

    5.5 2 x 13.4 Denduluru

    1047+307 2 x 13.4

    Repair approach slab settlement.

    Repair settled earth fill around

    abutments and provided crated

    boulder pitching.

    r structures, which will be dictated by the roadway Alignment

    lar Underpasses

    Flyovers

    l clearance shall be provided at locations indicated below

    Effective length (m) Vertical Clearance (m) Total width* (m)

    es, which will be dictated by the roadway alignment

    o be repaired and widened

    ./ Chainage Km Widen to Deck width (m)Remarks

  • 7/30/2019 111230 Str Inventry

    17/72

    1046+378 2 x 13.4 Repair approach slab settlement.

    Repair settled earth fill around

    abutments and provided crated

    boulder pitching.

    1044+019 2 x 13.4 Repair approach slab settlement.

    Repair settled earth fill around

    abutments and provided crated

    boulder pitching.

    1041+795 2 x 13.4 Repair approach slab settlement.

    Repair damaged railing.

    1039+952 2 x 13.4 Repair approach slab settlement.

    Repair damaged wearing coat.

    1038+859 2 x 13.4 Repair approach slab settlement.

    1036+557 2 x 13.4 Repair approach slab settlement.

    Add more drainage spouts

    connected with water collector

    i e.1035+217 2 x 13.4 Repair approach slab settlement.

    3.5 2 x 12

    3.5 2 x 12

    3.5 2 x 12

    3.5 2 x 12

    3.5 2 x 12

    3.5 2 x 12

    3.5 2 x 13.4 Atkur

    3.5 2 x 13.4 Telaprolu Access

    3.5 2 x 13.4 Ambapuram

    3.5 2 x 13.4 Kodurupadu Acecess3.5 2 x 13.4 Veeravalli

    3.5 2 x 13.4 Bommuluru

    3.5 2 x 13.4 Dasarigudem

    ass

    nu Section

    , which will be dictated by the roadway alignment

    passes

    clearance shall be provided at locations indicated below.

    Underpasses

    Minimum Vertical Clearance (m) Total width* (m) Remark

  • 7/30/2019 111230 Str Inventry

    18/72

    Total width* (m) Remark

    2 x 13.4Repair approach slab

    settlement

    VC (m) Width (m) Crossing Location

    5.5 3.5Denduluru Junction (Drain to

    Canal)

    s of footbridge to be finalised with IE to suit the site conditions

    Service Road Type

    - Box NV

    - Box 1 x 5.00

    - Box 1 x 1.50

    - Box 1 x 4.60

    - Box 1 x 4.00

    - Box 1 x 2.00

    - Box 1 x 2.00

    - Box 1 x 1.50

    - Box 1 x 1.50

    - Box 1 x 5.00

    - Box 1 x 2.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00- Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 2 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    Repaired and Widened

    2 x 13.4

    Repair approach slab

    settlement. Repair damaged

    railing.

    e dictated by the roadway alignment

    with Ramps

    riagewaySpan Vents x Length (m)

  • 7/30/2019 111230 Str Inventry

    19/72

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 2 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00- Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 2 x 1.00

    - Pipe 5 x 1.00

    - Pipe 11 x 1.00- Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Box 1 x 2.30

    - Box 1 x 1.20

    - Box 1 x 1.20

    - Box 1 x 1.50

    - Box 1 x 2.50

  • 7/30/2019 111230 Str Inventry

    20/72

    - Box 1 x 1.50

    - Box 1X1.90

    - Box 1x2.50

    - Box 1X2.00

    - Box 1x1.7

    - Box 1x1.10

    - Box 1 x 4.50

    - Box 1 x 4.26

    - Box 1 x 4.26

    - Box 1 x 4.20

    - Box 1 x 2.44

    - Box 1 x 5.46

    - Box 1 x 4.40

    - Box 1 x 1.20

    - Box 1 x 5.60

    - Box 1 x 5.00

    - Box 1 x 1.00

    - Box 1 x 3.60

    - Box 1 x 4.00- Pipe 1 x 0.75

    - Pipe 1 x 0.75

    - Pipe 1 x 0.75

    - Pipe 1 x 0.75

    - Pipe 1 x 0.75

    - Pipe 1 x 0.75

    - Pipe 1 x 0.75

    - Pipe 1 x 0.75

    - Pipe 1 x 0.75

    - Pipe 1x0.75

    - Pipe 1 x 0.75

    - Pipe 3 x 1.00

    - Pipe 1 x 0.75

    - Pipe 1 x 0.75

    - Pipe 1 x 0.75

    - Pipe 1 x 0.75

    - Pipe 1 x 0.75

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00- Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

  • 7/30/2019 111230 Str Inventry

    21/72

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    SR Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00- Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 2 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 2 x 1.00

    - Pipe 2 x 1.00

    - Box 1x2.50

    - Box 1 x 6.10

    - Box 1 x 2.50

    - Box 1 x 2.00

    - Box 1 x 1.20

    Box 3 x 1.80

    - Box 1 x 1.10

    - Box 1 x 2.00

    - Box 1 x 3.00

    - Pipe 1 x 1.00

    - Pipe 1 x 1.00

    - Pipe 1 x 0.75

    - Pipe 1 x 0.75

    - Pipe 1 x 0.75- Pipe 1 x 0.75

    - Pipe 1 x 0.75

    - Pipe 1 x 0.75

    - Pipe 1 x 0.75

    - Pipe 1 x 0.75

    - Pipe 1 x 1.00

    - Pipe 1 x 0.75

  • 7/30/2019 111230 Str Inventry

    22/72

    - Box 1 x 1.40

    - Box 1 x 2.50

    Type of Structure Type sec

    Box 1

    Box 1

    Box 1

    Box 1

    Box 1

    Box 1

    Box 1

    Box 3

    Box 1Box 1

    Box 1

    Box 1

    Box 1

    Hume Pipe 1

    Hume Pipe 1

    Hume Pipe 3

    Hume Pipe 1

    Hume Pipe 1

    Hume Pipe 2

    Hume Pipe 1

    Hume Pipe 2

    Hume Pipe 1

    Hume Pipe 2

    Hume Pipe 1

    Hume Pipe 1

    Hume Pipe 1

    Hume Pipe 1

    Hume Pipe 1

    rovement Code for Culverts

  • 7/30/2019 111230 Str Inventry

    23/72

    Hume Pipe 1

    Hume Pipe 1

    Hume Pipe 1

    Hume Pipe 2

    Hume Pipe 1

    Hume Pipe 1

    Hume Pipe 1

    Hume Pipe 1

    Hume Pipe 1

    Hume Pipe 1

    Hume Pipe 1

    Hume Pipe 1

    Hume Pipe 1

    Hume Pipe 9

    Hume Pipe 2

    Hume Pipe 2

    Hume Pipe 1

    Hume Pipe 1

    Hume Pipe1

    Hume Pipe 1

    Hume Pipe 2

    Hume Pipe 1

    Hume Pipe 1

    Hume Pipe 1

    Hume Pipe 1

    Hume Pipe 1

    Type of StructureType sec

    Box Culvert 4Box Culvert 4

    Box Culvert 4

    Box Culvert 4

    Pipe Culvert 4

    Pipe Culvert 8

    Pipe Culvert 4

    Pipe Culvert 8

    Pipe Culvert 4

    Pipe Culvert 4

    Pipe Culvert 4

    Pipe Culvert 4

    Pipe Culvert 4

    Type of StructureType sec

    Pipe Culvert 2

    Pipe Culvert 2

    Pipe Culvert 2

    Pipe Culvert 2

  • 7/30/2019 111230 Str Inventry

    24/72

    Pipe Culvert 2

    Pipe Culvert 2

    Pipe Culvert 2

    Type of StructureType sec

    Pipe Culvert 8

    Span Arrangement Deck Width

    (No x Length) (m)

    1 x 20.80 10.2 1

    8 x 5.75 15.2 3

    5 x 6.00 15.2 3

    5 x 6.00 15.2 3

    1 x 8.80 15.2 3

    1 x 8.80 15.2 3

    1 x 8.80 15.2 3

    1 x 8.80 15.2 3

    3 x 5.20 15.2 3

    3 x 5.20 15.2 3

    5 x 6.40 15.2 3

    1 x 6.80 15.2 3

    1 x 6.80 15.2 3

    7 x 6.70 15.2 3

    7 x 6.70 15.2 3

    4 x 3.60 15.2 31 x 20.80 10.2 2,4

    3 x 4.45 13.4 3, 4

    3 x 4.45 13.4 3, 4

    3 x 6.80 15.2 3, 4

    3 x 6.80 15.2 3, 4

    3 x 6.75 13.4 3, 4

    3 x 6.75 13.4 3, 4

    6 x 6.75 15.2 3, 4

    6 x 6.75 15.2 3, 4

    3 x 5.75 13.4 3, 4

    3 x 5.75 13.4 3, 4

    2 x 3.90 15.2 3, 4

    2 x 3.90 15.2 3, 4

    8 x 5.75 15.2 3, 4

    1 x 9.3 13.4 3,4

    1 x 9.3 13.4 3,4

    5 x 6.40 13.4 3,4

    2 x 7.20 13.4 3,4

    New Structure Details

    Improvement Proposal

  • 7/30/2019 111230 Str Inventry

    25/72

    PSC T girder and slab Both LHS & RHS 2x12

    R.C.C Box cell Both LHS & RHS 2x12

    PSC T girder and slab Both LHS & RHS 2x12

    R.C.C Box cell Both LHS & RHS 2x12

    R.C.C Box cell Both LHS & RHS 2x12

    R.C.C Box cell Both LHS & RHS 2x12

    R.C.C Box cell Both LHS & RHS 2x12

    R.C.C Box cell Both LHS & RHS 2x12R.C.C T-girder and slab Both LHS & RHS 2x12

    R.C.C Box cell Both LHS & RHS 2x12

    R.C.C Box cell Both LHS & RHS 2x12

    R.C.C T-girder and slab Both LHS & RHS 2x12

    R.C.C Box cell Both LHS & RHS 2x12

    R.C.C Box cell Both LHS & RHS 2x12

    R.C.C Box cell Both LHS & RHS 2x12

    PSC T girder and slab Both LHS & RHS 2x12

    R.C.C Solid slab Both LHS & RHS 2x12

    PSC T girder and slab Both LHS & RHS 2x12

    R.C.C Box cell Both LHS & RHS 2x12

    R.C.C Solid slab Both LHS & RHS 2x12

    R.C.C Box cell Both LHS & RHS 2x12

    R.C.C Solid slab Both LHS & RHS 2x12

    R.C.C Solid slab Both LHS & RHS 2x12

    R.C.C Box cell Both LHS & RHS 2x12

    R.C.C Box cell Both LHS & RHS 2x12

    PSC T girder and slab Both LHS & RHS 2x12

    R.C.C Box cell Both LHS & RHS 2x12

    R.C.C Box cell Both LHS & RHS 2x15.20

    RCC T girder and slab Both LHS & RHS 2x15.20

    Type of Structure SIDE Total Width**

    tures, which will be dictated by roadway alignment.

    man Junction bypass

    ijayawada Bypass

    Type of Structure SIDE Total Width (m)*

    tures, which will be dictated by roadway alignment.

  • 7/30/2019 111230 Str Inventry

    26/72

    3 x 4.45 2x8.70 LHS & RHS

    3 x 6.75 2x8.70 LHS & RHS

    3 x 5.75 2x8.70 LHS & RHS

    1 x 9.30 2x8.70 LHS & RHS

    5 x 6.40 8.7 LHS

    R.C.C Box cell Both LHS & RHS 2x8.70

    R.C.C Box cell Both LHS & RHS 2x8.70

    R.C.C Solid slab Both LHS & RHS 2x8.70

    Span Arrangement (No x Length) Deck Width (m) Improvement Proposal

    Span Arrangement (m) Total Width (m) Remarks

    6x6.75 2x8.70 LHS & RHS

    3x6.80 2x8.70 LHS & RHS

    8x5.75 2x8.70 LHS & RHS

    2x3.90 2x8.70 LHS & RHS

    Type of Structure SIDE Total Width (m)

    2 x 7.20 8.7 LHS

    4 x 32.30 9.91 1

    Existing Structure Details

    24.53+36.38+37.15 +36.85+24.68 9.91 1

  • 7/30/2019 111230 Str Inventry

    27/72

    Proposed Span Arrangement

    nos x length(m)

    x n erpass

    +101x30+1x40+2x30 PSC T girder and slab Both LHS & RHS

    Proposed Span Arrangement

    nos x length(m)

    2 x 30 PSC T girder and slab Both LHS & RHS

    Repair and Rehabilitation

    Measures

    Total Width**

    (m)

    1x20+(3x24)+1x20 8.4 2 x 12.0

    8x30+(3x24)+8x30 8.4 2 x 12.0

    7x30+(1x24+1x30+1x24)+3x30 8.4 2 x 12.0

    Both LHS & RHS

    Type of structure Side

    Type of structure Side

    2x30 PSC T girder and slab

    Minimum Vertical

    Clearance (m)

    f composite deck slab with steel girders.

    tures, which will be dictated by roadway alignment.

    in case of above ROBs:

    ability of Railway boundaries/requirement of the railways, but total length is fixed.

    e plans and the designs shall be prepared in consultation with the concerned railway

    As given at para 11 below.

    Span Arrangement (m)*

    cessionaire under the supervision of the Railways.

    rvision of ROB shall be borne by the Concessionaire.

    Maintenance, etc., shall be borne by the Concessionaire

    all not be less than indicated in the table.

  • 7/30/2019 111230 Str Inventry

    28/72

    Approach to Type (NH/SH/MDR/VR) Treatment

    China avutapalli VR Connected through Service road

    Peda avutapalli VR Connected through Service road

    Atkur VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    ous and uniform chainage.

    height of embankment with a minimum length of 15 m

    drainage chute at start and end of water collector chann

    in wire crates as per provisions of IRC: 89 and MoRT

    own take pipes. Install missing drainage spouts at locati

    n easy access to the river bed for inspection.

    on the defects observed and test results, a comprehensive repair and rehabilitation pl

    t caps, expansion joints and bridge deck.

    aprons of bed protection works.CC crash barrier.

    und abutments.

    mantled.

    gs.

    earing components.

    habilitating / strengthening / thickening the deck slab n

    mbankments.

  • 7/30/2019 111230 Str Inventry

    29/72

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    Telaprolu old road VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    Veeravalli gsb road VR Connected through Service road

    To village road VR Connected through Service road

  • 7/30/2019 111230 Str Inventry

    30/72

    Veeravalli VR Connected through Service road

    To village road VR Connected through Service road

    Velleru VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    Eluru VR Connected through Service road

    To village road VR Connected through Service road

    To village road VR Connected through Service road

    Village road VRProper Left-in Left-out to be

    provided

    Eluru VRProper Left-in Left-out to be

    provided

    Denduluru VRProper Left-in Left-out to be

    provided

    To village road VRProper Left-in Left-out to be

    provided

    Kovvali VR Connected through Service road

    Rajahmundry VR Connected through Service road

    orrosion Prevention, Monitoring and

    per the cross section schedules / types given at para 1.2.

    le D

    s given at para 1.2.

  • 7/30/2019 111230 Str Inventry

    31/72

    Gundugolanu

    Start of Bypass

    NH 9 Crossing

    End of Bypass

    Start of Bypass

    End of Bypass

    Remark

  • 7/30/2019 111230 Str Inventry

    32/72

  • 7/30/2019 111230 Str Inventry

    33/72

    Type sec

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 9

    1 4

    1 41 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    Imp. Code

  • 7/30/2019 111230 Str Inventry

    34/72

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 41 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 4

    1 6

    1 6

    1 61 6

    1 8

    2 5

    2 8

    2 5

    2 4A

    2 4A

  • 7/30/2019 111230 Str Inventry

    35/72

  • 7/30/2019 111230 Str Inventry

    36/72

    2 4A

    2 8

    2 8

    2 5

    2 5

    2 5

    2 5

    2 5

    2 5

    2 5

    2 5

    2 5

    2 5

    2 5

    2 5

    2 5

    2 5

    2 5

    2 52 5

    2 5

    2 5

    2 5

    2 5

    2 4

    2 8

    3 5

    3 6

    4 5

    4 8

    4 8

    4 8

    4 8

    4 9

    4 8

    4 8

    4 8

    4 8

    4 8

    48

    4 8

    4 8

    4 8

    4 8

    4 8

    4 8

    4 8

  • 7/30/2019 111230 Str Inventry

    37/72

    5 4A

    5 8

  • 7/30/2019 111230 Str Inventry

    38/72

  • 7/30/2019 111230 Str Inventry

    39/72

    Type sec

    6

    4A

    4

    4

    4

    4

    4

    4

    4

    4

    8

    6

    6

    6

    6

    46

    4A

    4A

    5

    5

    8

    8

    4A

    4A

    5

    5

    4A

    4A

    4A

    4

    4

    8

    4

  • 7/30/2019 111230 Str Inventry

    40/72

    Type sec

    1

    1

    1

    1

    1

    1

    1

  • 7/30/2019 111230 Str Inventry

    41/72

  • 7/30/2019 111230 Str Inventry

    42/72

    Total Width**

    (m)

    2x12

    Total Width

    (m)

    2x8.70

    2x12

  • 7/30/2019 111230 Str Inventry

    43/72

    S No Ch Total

    Nos spans Span Nos spans Span length Nos Cways W of C way

    7 1055+743 8 5.75 46 1 10.25

    8 1048+338 5 6 30 1 10.3

    8 1048+338 5 6 30 1 10.3

    9 1043+091 1 8.8 8.8 1 12

    9 1043+091 1 8.8 8.8 1 1210 1043+055 1 8.8 8.8 1 12

    10 1043+055 1 8.8 8.8 1 12

    12 1036+052 3 5.2 15.6 1 12

    12 1036+052 3 5.2 15.6 1 12

    14 1030+415 5 6.4 32 1 8.55

    15 1026+335 1 6.8 6.8 1 9.75

    15 1026+335 1 6.8 6.8 1 9.75

    16 1024+188 7 6.7 46.9 1 8.5

    16 1024+188 7 6.7 46.9 1 8.5

    17 1022+851 4 3.6 14.4 1 8.25

    1 1075+820 3 4.45 13.35 1 10.2

    1 1075+820 3 4.45 13.35 1 8.52 1072+737 3 6.8 20.4 1 10.2

    2 1072+737 3 6.8 20.4 1 8.3

    3 1068+844 3 6.75 20.25 1 10.2

    3 1068+844 3 6.75 20.25 1 8.5

    4 1067+326 6 6.75 40.5 1 10.3

    4 1067+326 6 6.75 40.5 1 8.5

    5 1065+78 3 5.75 17.25 1 10.2

    5 1065+78 3 5.75 17.25 1 8.6

    6 1062+540 2 3.9 7.8 1 10.2

    6 1062+540 2 3.9 7.8 1 10.2

    7 1055+743 8 5.75 46 1 11.3

    11 1037+246 1 9.3 9.3 1 12

    11 1037+246 1 9.3 9.3 1 12

    14 1030+415 5 6.4 32 1 8.55

    17 1022+851 2 7.2 14.4 1 10.2

    Span Arrangement Exg Width Arrangement

  • 7/30/2019 111230 Str Inventry

    44/72

    Total Area Imp code Typ sec Remarks

    Nos Cways W of C way Nos Cways W of C way width Sqm

    1 15.2 1 5.95 5.95 273.7 3 4A

    1 15.2 1 5.9 5.9 177 3 4

    1 15.2 1 5.9 5.9 177 3 4

    1 15.2 1 4.2 4.2 36.96 3 4

    1 15.2 1 4.2 4.2 36.96 34

    1 15.2 1 4.2 4.2 36.96 3 4

    1 15.2 1 4.2 4.2 36.96 3 4

    1 15.2 1 4.2 4.2 65.52 3 4

    1 15.2 1 4.2 4.2 65.52 3 4

    1 15.2 1 7.65 7.65 244.8 3 8

    1 15.2 1 6.45 6.45 43.86 3 6

    1 15.2 1 6.45 6.45 43.86 3 6

    1 15.2 1 7.7 7.7 361.13 3 6

    1 15.2 1 7.7 7.7 361.13 3 6

    1 15.2 1 7.95 7.95 114.48 3 4

    1 13.4 1 4.2 4.2 56.07 3, 4 4A

    1 13.4 1 5.9 5.9 78.765 3, 4 4A

    1 15.2 1 6 6 122.4 3, 4 5

    1 15.2 1 7.9 7.9 161.16 3, 4 5

    1 13.4 1 4.2 4.2 85.05 3, 4 8

    1 13.4 1 5.9 5.9 119.475 3, 4 8

    1 15.2 1 5.9 5.9 238.95 3, 4 4A

    1 15.2 1 7.7 7.7 311.85 3, 4 4A

    1 13.4 1 4.2 4.2 72.45 3, 4 5

    1 13.4 1 5.8 5.8 100.05 3, 4 5

    1 15.2 1 6 6 46.8 3, 4 4A

    1 15.2 1 6 6 46.8 3, 4 4A

    1 15.2 1 4.9 4.9 225.4 3, 4 4A

    1 13.4 1 2.4 2.4 22.32 3,4 4

    1 13.4 1 2.4 2.4 22.32 3,4 4

    1 13.4 1 5.85 5.85 187.2 3,4 8

    1 13.4 1 4.2 4.2 60.48 3,4 4

    Pro Width Arrangement Req Width Arrangement

  • 7/30/2019 111230 Str Inventry

    45/72

    S No Ch Total Total

    Nos spans Span Nos spans Span length Nos Cways W of C way width

    13 1032+815 1 20.8 20.8 1 10.2 10.2

    13 1032+816 1 20.8 20.8 1 9.5 9.5

    1 1075+820 3 4.45 13.35 1 9.5 9.5

    1 1075+820 3 4.45 13.35 1 9.5 9.5

    2 1072+737 3 6.8 20.4 1 9.5 9.52 1072+737 3 6.8 20.4 1 9.5 9.5

    3 1068+844 3 6.75 20.25 1 9.5 9.5

    3 1068+844 3 6.75 20.25 1 9.5 9.5

    4 1067+326 6 6.75 40.5 1 9.5 9.5

    4 1067+326 6 6.75 40.5 1 9.5 9.5

    5 1065+78 3 5.75 17.25 1 9.5 9.5

    5 1065+78 3 5.75 17.25 1 9.5 9.5

    6 1062+540 2 3.9 7.8 1 9.5 9.5

    6 1062+540 2 3.9 7.8 1 9.5 9.5

    7 1055+743 8 5.75 46 1 9.5 9.5

    11 1037+246 1 9.3 9.3 1 9.5 9.5

    11 1037+246 1 9.3 9.3 1 9.5 9.5

    14 1030+415 5 6.4 32 1 9.5 9.5

    17 1022+851 2 7.2 14.4 1 9.5 9.5

    (b) New Minor Bridges for Vijayawada Bypass

    1 3+360 1 31 31 2 12 24

    2 5+840 2 5 10 2 12 243 8+210 2 26 52 2 12 244 9+560 1 5 5 2 12 245 10+450 1 4 4 2 12 246 10+980 1 5 5 2 12 247 13+020 2 4 8 2 12 248 19+305 2 4 8 2 12 249 21+240 1 20 20 2 12 2410 22+035 1 5 5 2 12 2411 22+815 2 4 8 2 12 2412 23+350 2 19 38 2 12 2413 24+350 2 5 10 2 12 2414 24+850 2 4 8 2 12 2415 26+350 1 5 5 2 12 2416 29+340 1 25 25 2 12 2417 30+565 1 10 10 2 12 2418 33+250 1 28 28 2 12 2419 33+715 2 4 8 2 12 2420 34+250 1 12 12 2 12 2421 35+250 1 6 6 2 12 2422 36+500 1 12 12 2 12 2423 40+900 1 10 10 2 12 2424 42+690 1 5 5 2 12 2425 43+880 1 5 5 2 12 2426 44+690 1 25 25 2 12 2427 44+950 1 4 4 2 12 24

    (c) New Minor Bridges for Hanuman Junction bypass

    1 2+750 1 7.5 7.5 2 15.2 30.4

    Width ArrangementSpan Arrangement

  • 7/30/2019 111230 Str Inventry

    46/72

    2 5+391 2 16 32 2 15.2 30.4

    (d) New Minor Bridges on Service Roads 0 0

    1 1075+820 3 4.45 13.35 2 8.7 17.4

    2 1072+737 3 6.8 20.4 2 8.7 17.4

    3 1068+844 3 6.75 20.25 2 8.7 17.4

    4 1067.326 6 6.75 40.5 2 8.7 17.4

    5 1065+780 3 5.75 17.25 2 8.7 17.4

    6 1062+540 2 3.9 7.8 2 8.7 17.4

    7 1055+743 8 5.75 46 2 8.7 17.4

    8 1037+246 1 9.3 9.3 2 8.7 17.4

    9 1030+415 5 6.4 32 1 8.7 8.7

    10 1022+851 2 7.2 14.4 1 8.7 8.7

    (e) New Minor Bridges on Service Roads in Vijayawada bypass

    1 22+815 2 4 8 2 8.7 17.4

    2 24+850 2 4 8 2 8.7 17.4

    3 40+900 1 10 10 2 8.7 17.4

  • 7/30/2019 111230 Str Inventry

    47/72

    Area Imp code Typ sec Remarks

    Sqm

    212.2 2,4 6 Additional 2 lane str as str cannot be widened.

    197.6 2,4 6 Providing separate bridge for service road

    126.8 3, 4 4A Providing separate bridge for service road

    126.8 3, 4 4A Providing separate bridge for service road

    193.8 3, 4 5 Providing separate bridge for service road193.8 3, 4 5 Providing separate bridge for service road

    192.4 3, 4 8 Providing separate bridge for service road

    192.4 3, 4 8 Providing separate bridge for service road

    384.8 3, 4 4A Providing separate bridge for service road

    384.8 3, 4 4A Providing separate bridge for service road

    163.9 3, 4 5 Providing separate bridge for service road

    163.9 3, 4 5 Providing separate bridge for service road

    74.1 3, 4 4A Providing separate bridge for service road

    74.1 3, 4 4A Providing separate bridge for service road

    437 3, 4 4A Providing separate bridge for service road

    88.35 3,4 4 Providing separate bridge for service road

    88.35 3,4 4 Providing separate bridge for service road

    304 3,4 8 Providing separate bridge for service road

    136.8 3,4 4 Providing separate bridge for service road

    HT

    744 New MIB Vijayawada Bypass

    240 New MIB Vijayawada Bypass 3

    1248 New MIB Vijayawada Bypass

    120 New MIB Vijayawada Bypass 3

    96 New MIB Vijayawada Bypass 2

    120 New MIB Vijayawada Bypass 2

    192 New MIB Vijayawada Bypass 2

    192 New MIB Vijayawada Bypass 2

    480 New MIB Vijayawada Bypass

    120 New MIB Vijayawada Bypass 3

    192 New MIB Vijayawada Bypass 2

    912 New MIB Vijayawada Bypass

    240 New MIB Vijayawada Bypass 2

    192 New MIB Vijayawada Bypass 2

    120 New MIB Vijayawada Bypass 3

    600 New MIB Vijayawada Bypass

    240 New MIB Vijayawada Bypass

    672 New MIB Vijayawada Bypass

    192 New MIB Vijayawada Bypass 2

    288 New MIB Vijayawada Bypass

    144 New MIB Vijayawada Bypass 2

    288 New MIB Vijayawada Bypass

    240 New MIB Vijayawada Bypass

    120 New MIB Vijayawada Bypass 2

    120 New MIB Vijayawada Bypass 2

    600 New MIB Vijayawada Bypass

    96 New MIB Vijayawada Bypass 2

    228 New MIB for Hanuman Junction bypass 3.5

  • 7/30/2019 111230 Str Inventry

    48/72

    972.8 New MIB for Hanuman Junction bypass

    0

    232.3 New MIB on Service Roads

    355 New MIB on Service Roads

    352.4 New MIB on Service Roads

    704.7 New MIB on Service Roads

    300.2 New MIB on Service Roads

    135.7 New MIB on Service Roads

    800.4 New MIB on Service Roads

    161.8 New MIB on Service Roads

    278.4 New MIB on Service Roads

    125.3 New MIB on Service Roads

    139.2 New MIB on Sr Roads in Vwada bypass 2

    139.2 New MIB on Sr Roads in Vwada bypass 2

    174 New MIB on Sr Roads in Vwada bypass

  • 7/30/2019 111230 Str Inventry

    49/72

    MainService

    Road Type

    77 1049+830 RHS - Box NV 1

    86 1047+771 RHS - Box 1 x 5.00 1

    128 1040+372 RHS - Box 1 x 1.50 1

    133 1039+453 RHS - Box 1 x 4.60 1

    143 1038+118 RHS - Box 1 x 4.00 1

    144 1038+018 RHS - Box 1 x 2.00 1

    153 1035+768 RHS - Box 1 x 2.00 1

    158 1034+384 RHS - Box 1 x 1.50 1

    159 1034+375 RHS - Box 1 x 1.50 1

    160 1034+225 RHS - Box 1 x 5.00 1

    125 1040+993 RHS - Box 1 x 2.00 1

    1 1076+380 RHS - Box 1 x 2.30 2

    5 1073+530 RHS - Box 1 x 1.20 2

    8 1072+990 RHS - Box 1 x 1.20 2

    9 1072+410 RHS - Box 1 x 1.50 212 1071+170 RHS - Box 1 x 2.50 2

    13 1070+500 RHS - Box 1 x 1.50 2

    14 1069+952 RHS - Box 1X1.90 2

    16 1069+373 RHS - Box 1x2.50 2

    18 1068+043 RHS - Box 1X2.00 2

    21 1067+726 RHS - Box 1x1.7 2

    25 1066+059 RHS - Box 1x1.10 2

    45 1063+535 RHS - Box 1 x 4.50 2

    46 1063+471 RHS - Box 1 x 4.26 2

    47 1063+132 RHS - Box 1 x 4.26 2

    48 1061+996 RHS - Box 1 x 4.20 2

    49 1061+587 RHS - Box 1 x 2.44 2

    50 1061+413 RHS - Box 1 x 5.46 2

    51 1055+434 RHS - Box 1 x 4.40 2

    62 1053+525 RHS - Box 1 x 1.20 2

    63 1053+266 RHS - Box 1 x 5.60 2

    72 1051+32 RHS - Box 1 x 5.00 2

    89 1047+123 RHS - Box 1 x 1.00 2

    120 1042+145 RHS - Box 1 x 3.60 2

    148 1036+773 RHS - Box 1 x 4.00 2

    S. NoChainage

    (Km)

    Carriageway Span Vents

    x Length

    (m)

    Imp. Code

  • 7/30/2019 111230 Str Inventry

    50/72

    Type sec

    4

    4

    4

    4

    4

    4

    4

    4

    4

    4

    4

    5

    8

    5

    4A4A

    4A

    4A

    4A

    8

    8

    8

    8

    8

    4A

    4A

    4A

    4A

    4A

    4A

    4A

    4A

    5

    5

    5

  • 7/30/2019 111230 Str Inventry

    51/72

    S No Ch Total

    Nos spans Span Nos spans Span length Nos Cways W of C way Nos Cways

    77 1049+830 1 2 2 1 23 1

    86 1047+771 1 5 5 1 23 1

    128 1040+372 1 1.5 1.5 1 23 1

    133 1039+453 1 4.6 4.6 1 23 1

    143 1038+118 1 4 4 1 23 1144 1038+018 1 2 2 1 23 1

    153 1035+768 1 2 2 1 23 1

    158 1034+384 1 1.5 1.5 1 23 1

    159 1034+375 1 1.5 1.5 1 23 1

    160 1034+225 1 5 5 1 23 1

    125 1040+993 1 2 2 1 23 1

    1 1076+380 1 2.3 2.3 1 23 1

    5 1073+530 1 1.2 1.2 1 23 1

    8 1072+990 1 1.2 1.2 1 23 1

    9 1072+410 1 1.5 1.5 1 23 1

    12 1071+170 1 2.5 2.5 1 23 1

    13 1070+500 1 1.5 1.5 1 23 114 1069+952 1 1.9 1.9 1 23 1

    16 1069+373 1 2.5 2.5 1 23 1

    18 1068+043 1 2 2 1 23 1

    21 1067+726 1 1.7 1.7 1 23 1

    25 1066+059 1 1.1 1.1 1 23 1

    45 1063+535 1 4.5 4.5 1 23 1

    46 1063+471 1 4.26 4.26 1 23 1

    47 1063+132 1 4.26 4.26 1 23 1

    48 1061+996 1 4.2 4.2 1 23 1

    49 1061+587 1 2.44 2.44 1 23 1

    50 1061+413 1 5.46 5.46 1 23 1

    51 1055+434 1 4.4 4.4 1 23 162 1053+525 1 1.2 1.2 1 23 1

    63 1053+266 1 5.6 5.6 1 23 1

    72 1051+32 1 5 5 1 23 1

    89 1047+123 1 1 1 1 23 1

    120 1042+145 1 3.6 3.6 1 23 1

    148 1036+773 1 4 4 1 23 1

    10 1072+050 1 1.4 1.4 1 23 1

    11 1071+740 1 2.5 2.5 1 23 1

    Span Arrangement Exg Width Arrangement Pro Width

  • 7/30/2019 111230 Str Inventry

    52/72

    Total Area Imp code Typ sec Remarks

    W of C way Nos Cways W of C way width Sqm

    30 1 8 8 16 1 4

    30 1 8 8 40 1 4

    30 1 8 8 12 1 4

    30 1 8 8 36.8 1 4

    30 1 8 8 32 1 430 1 8 8 16 1 4

    30 1 8 8 16 1 4

    30 1 8 8 12 1 4

    30 1 8 8 12 1 4

    30 1 8 8 40 1 4

    30 1 8 8 16 1 4

    30 1 8 8 18.4 2 5

    30 1 8 8 9.6 2 8

    30 1 8 8 9.6 2 5

    30 1 8 8 12 2 4A

    30 1 8 8 20 2 4A

    30 1 8 8 12 2 4A30 1 8 8 15.2 2 4A

    30 1 8 8 20 2 4A

    30 1 8 8 16 2 8

    30 1 8 8 13.6 2 8

    30 1 8 8 8.8 2 8

    30 1 8 8 36 2 8

    30 1 8 8 34.08 2 8

    30 1 8 8 34.08 2 4A

    30 1 8 8 33.6 2 4A

    30 1 8 8 19.52 2 4A

    30 1 8 8 43.68 2 4A

    30 1 8 8 35.2 2 4A30 1 8 8 9.6 2 4A

    30 1 8 8 44.8 2 4A

    30 1 8 8 40 2 4A

    30 1 8 8 8 2 5

    30 1 8 8 28.8 2 5

    30 1 8 8 32 2 5

    75 1 53 53 74.2 5 4A

    75 1 53 53 132.5 5 8

    1010.06

    rrangement Req Width Arrangement

  • 7/30/2019 111230 Str Inventry

    53/72

    S No Ch Total Total

    Nos spans Span Nos spans Span length Nos Cways W of C way width

    17 1068+314 1 2.5 2.5 1 48 48

    167 1026+355 1 6.1 6.1 1 30 30

    2 1075+7 1 2.5 2.5 1 48 48

    3 1075+120 1 2 2 1 49.3 49.3

    4 1073+700 1 1.2 1.2 1 49.3 49.3

    59 1054+372 3 1.8 5.4 1 49.3 49.369 1052+001 1 1.1 1.1 1 49.3 49.3

    74 1050+508 1 2 2 1 75 75

    163 1033+668 1 3 3 1 49.3 49.3

    Span Arrangement Width Arrangement

  • 7/30/2019 111230 Str Inventry

    54/72

    Area Imp code Typ sec Remarks

    Sqm

    120 3 5 MC+Sr rd

    183 3 6 MC

    120 4 5 MC+Sr rd

    98.6 4 8 MC+Sr rd

    59.16 4 8 MC+Sr rd

    266.22 4 8 MC+Sr rd54.23 4 8 MC+Sr rd

    150 4 9 MC+Sr rd

    147.9 4 8 MC+Sr rd

    1199.11

  • 7/30/2019 111230 Str Inventry

    55/72

    S No Ch Height of Total

    Nos spans Span Nos spans Span box length Nos Cways W of C way

    1 1076+380 1 2.3 2.3 2 9.5

    5 1073+530 1 1.2 1.2 2 9.5

    8 1072+990 1 1.2 1.2 2 9.5

    9 1072+410 1 1.5 1.5 2 9.5

    12 1071+170 1 2.5 2.5 2 9.513 1070+500 1 1.5 1.5 2 9.5

    14 1069+952 1 1.9 1.9 2 9.5

    16 1069+373 1 2.5 2.5 2 9.5

    18 1068+043 1 2 2 2 9.5

    21 1067+726 1 1.7 1.7 2 9.5

    25 1066+059 1 1.1 1.1 2 9.5

    45 1063+535 1 4.5 4.5 2 9.5

    46 1063+471 1 4.26 4.26 2 9.5

    47 1063+132 1 4.26 4.26 2 9.5

    48 1061+996 1 4.2 4.2 2 9.5

    49 1061+587 1 2.44 2.44 2 9.5

    50 1061+413 1 5.46 5.46 2 9.5

    51 1055+434 1 4.4 4.4 2 9.5

    62 1053+525 1 1.2 1.2 2 9.5

    63 1053+266 1 5.6 5.6 2 9.5

    72 1051+32 1 5 5 2 9.5

    89 1047+123 1 1 1 2 9.5

    120 1042+145 1 3.6 3.6 2 9.5

    148 1036+773 1 4 4 2 9.5

    (b) New Culverts in Vijayawada Bypass

    1 1+260 1 4 2 4 1 26

    2 1+520 1 5 3 5 1 26

    3 5+030 1 4 2 4 1 264 5+560 1 5 2 5 1 26

    5 7+030 1 5 3 5 1 26

    6 7+680 1 5 3 5 1 26

    9 10+710 1 5 2 5 1 26

    10 17+570 1 5 2 5 1 26

    15 19+960 1 4 2 4 1 26

    25 27+690 1 5 3 5 1 26

    29 28+900 1 4 2 4 1 26

    38 33+070 1 5 3 5 1 26

    53 42+230 1 4 2 4 1 26

    (c) New Culverts in Hanuman Junction Bypass

    57 1+820 1 4 2 4 1 33

    59 2+060 1 5 2 5 1 33

    66 5+060 1 4 2 4 1 33

    67 5+540 1 4 2 4 1 33

    Width ArrangementSpan Arrangement

  • 7/30/2019 111230 Str Inventry

    56/72

    Total Area Imp code Typ sec Remarks

    width Sqm

    19 43.7 2 5 Service road bridge on both sides

    19 22.8 2 8 Service road bridge on both sides

    19 22.8 2 5 Service road bridge on both sides

    19 28.5 2 4A Service road bridge on both sides

    19 47.5 2 4A Service road bridge on both sides19 28.5 2 4A Service road bridge on both sides

    19 36.1 2 4A Service road bridge on both sides

    19 47.5 2 4A Service road bridge on both sides

    19 38 2 8 Service road bridge on both sides

    19 32.3 2 8 Service road bridge on both sides

    19 20.9 2 8 Service road bridge on both sides

    19 85.5 2 8 Service road bridge on both sides

    19 80.94 2 8 Service road bridge on both sides

    19 80.94 2 4A Service road bridge on both sides

    19 79.8 2 4A Service road bridge on both sides

    19 46.36 2 4A Service road bridge on both sides

    19 103.74 2 4A Service road bridge on both sides

    19 83.6 2 4A Service road bridge on both sides

    19 22.8 2 4A Service road bridge on both sides

    19 106.4 2 4A Service road bridge on both sides

    19 95 2 4A Service road bridge on both sides

    19 19 2 5 Service road bridge on both sides

    19 68.4 2 5 Service road bridge on both sides

    19 76 2 5 Service road bridge on both sides

    26 104 1

    26 130 1

    26 104 126 130 1

    26 130 1

    26 130 1

    26 130 1

    26 130 3

    26 104 1

    26 130 1

    26 104 1

    26 130 1

    26 104 1

    33 132 4

    33 165 4

    33 132 4

    33 132 4

    3438.08

  • 7/30/2019 111230 Str Inventry

    57/72

    no span length total length

    1 1064+415 1 6 6

    2 1040+684 1 8.8 8.8

    * The total width excludes the gap between two super structures, which will be

    Pedestrian/Cattle Underpasses to be Repaired and WSpan arrangement (m)

    S. No Chainage km

  • 7/30/2019 111230 Str Inventry

    58/72

    Nos of CwaysW of each

    cway

    2 13.4 Repair approach slab settlement

    2 13.4Repair approach slab settlement.

    Repair damaged railing.

    dictated by the roadway alignment

    Remark

    idenedWidth of the structure in m

  • 7/30/2019 111230 Str Inventry

    59/72

    S No Ch Total

    Nos spans Span Nos spans Span length Nos Cways

    1 1064+415 1 6 6 2

    2 1040+684 1 8.8 8.8 2

    Span Arrangement Exg Width

  • 7/30/2019 111230 Str Inventry

    60/72

    Total Area Imp code Typ sec

    W of C way Nos Cways W of C way Nos Cways W of C way width Sqm

    12 2 13.4 2 2.4 4.8 28.8

    12 2 13.4 3 2.4 7.2 63.36

    rrangement Pro Width Arrangement Req Width Arrangement

  • 7/30/2019 111230 Str Inventry

    61/72

    Remarks

  • 7/30/2019 111230 Str Inventry

    62/72

    S No Ch Total Minimum

    Nos spans Span Nos spans Span Nos spans Span length V clearence

    Vijayawada Bypass 0

    1 3+980 1 7.5 7.5 3.5

    2 22+800 1 7.5 7.5 3.5

    3 24+695 1 7.5 7.5 3.5

    4 35+950 1 7.5 7.5 3.5

    5 40+080 1 7.5 7.5 3.5

    6 41+120 1 7.5 7.5 3.5

    Vijayawada Gundugolanu Section 0 3.5

    7 1073+705 1 7.5 7.5 3.5

    8 1068+955 1 7.5 7.5 3.5

    9 1067+920 1 7.5 7.5 3.5

    10 1066+180 1 7.5 7.5 3.5

    11 1065+260 1 7.5 7.5 3.5

    12 1054+310 1 7.5 7.5 3.5

    13 1051+940 1 7.5 7.5 3.5

    Span Arrangement

  • 7/30/2019 111230 Str Inventry

    63/72

    Total Area Imp code Typ sec Remarks

    Nos Cways W of C way width Sqm

    0 0

    2 12 24 180

    2 12 24 180

    2 12 24 180

    2 12 24 180

    2 12 24 180

    2 12 24 180

    2 13.4 26.8 201 Atkur

    2 13.4 26.8 201 Telaprolu Access

    2 13.4 26.8 201 Ambapuram

    2 13.4 26.8 201 Kodurupadu Acecess

    2 13.4 26.8 201 Veeravalli

    2 13.4 26.8 201 Bommuluru

    2 13.4 26.8 201 Dasarigudem

    Width Arrangement

  • 7/30/2019 111230 Str Inventry

    64/72

    Structure Inventory for NH-5 Vijaywada - Gundugolanu Highway

    MIBs

    Widening of MIBs

    os span Span Height width

    15 1026+335RW 1 6.80 3.50 6.45 6.80 6

    15 1026+335LW 1 6.80 3.50 6.45 6.80 6

    9 1043+091RW 1 8.80 4.50 4.20 8.80 4

    9 1043+091LW 1 8.80 4.50 4.20 8.80 4

    10 1043+055RW 1 8.80 4.50 4.20 8.80 4

    10 1043+055LW 1 8.80 4.50 4.20 8.80 4

    11 1037+246RW 1 9.30 3.00 2.40 9.30 4

    11 1037+246LW 1 9.30 3.00 2.40 9.30 4

    6 1062+540RW 2 3.90 2.50 6.00 7.80 4A

    6 1062+540LW 2 3.90 2.50 6.00 7.80 4A

    17 1022+851RW 2 7.20 3.00 4.20 14.40 417 1022+851LW 4 3.60 3.00 7.95 14.40 4

    1 1075+820RW 3 4.45 3.00 4.20 13.35 4A

    1 1075+820LW 3 4.45 3.00 5.90 13.35 4A

    12 1036+052RW 3 5.20 2.50 4.20 15.60 4

    12 1036+052LW 3 5.20 2.50 4.20 15.60 4

    5 1065+78RW 3 5.75 2.75 4.20 17.25 5

    5 1065+78LW 3 5.75 2.75 5.80 17.25 5

    3 1068+844RW 3 6.75 4.50 4.20 20.25 8

    3 1068+844LW 3 6.75 4.50 5.90 20.25 8

    2 1072+737RW 3 6.80 2.50 6.00 20.40 5

    2 1072+737LW 3 6.80 2.50 7.90 20.40 5

    8 1048+338RW 5 6.00 4.50 5.90 30.00 4

    8 1048+338LW 5 6.00 4.50 5.90 30.00 4

    14 1030+415RW 5 6.40 3.50 7.65 32.00 8

    14 1030+415LW 5 6.40 3.50 5.85 32.00 8

    4 1067+326RW 6 6.75 5.00 5.90 40.50 4A

    4 1067+326LW 6 6.75 5.00 7.70 40.50 4A

    16 1024+188RW 7 6.70 3.00 7.70 46.90 6

    16 1024+188LW 7 6.70 3.00 7.70 46.90 6

    7 1055+743RW 8 5.75 8.00 5.95 46.00 4A

    7 1055+743LW 8 5.75 8.00 4.90 46.00 4A

    New Construction of MIBs

    S No Ch Span Arrangement Total Total Typ sec

    Nos span Span Height width length

    11 1037+246RN 1 9.30 3.00 9.50 9.30 4

    11 1037+246LN 1 9.30 3.00 9.50 9.30 4

    6 1062+540RN 2 3.90 2.50 9.50 7.80 4A

    6 1062+540LN 2 3.90 2.50 9.50 7.80 4A

    17 1022+851RN 2 7.20 3.00 9.50 14.40 4

    1 1075+820RN 3 4.45 3.00 9.50 13.35 4A

    1 1075+820LN 3 4.45 3.00 9.50 13.35 4A

    Sr. No. ChainageSpan Arrangement Total

    LengthTypical

    C/S

  • 7/30/2019 111230 Str Inventry

    65/72

    os span Span Height widthSr. No. Chainage

    Span Arrangement Total

    Length

    Typical

    C/S

    5 1065+78RN 3 5.75 2.75 9.50 17.25 5

    5 1065+78LN 3 5.75 2.75 9.50 17.25 5

    3 1068+844RN 3 6.75 4.50 9.50 20.25 8

    3 1068+844LN 3 6.75 4.50 9.50 20.25 8

    2 1072+737RN 3 6.80 2.50 9.50 20.40 5

    2 1072+737LN 3 6.80 2.50 9.50 20.40 5

    14 1030+415RN 5 6.40 3.50 9.50 32.00 8

    4 1067+326RN 6 6.75 3.50 9.50 40.50 4A

    4 1067+326LN 6 6.75 5.00 9.50 40.50 4A

    7 1055+743RN 8 5.75 8.00 9.50 46.00 4A

    (b) New Minor Bridges for Vijayawada Bypass

    5 10+450 1 4.00 2.00 24.00 4.00

    27 44+950 1 4.00 2.00 24.00 4.00

    6 10+980 1 5.00 2.00 24.00 5.00

    24 42+690 1 5.00 2.00 24.00 5.00

    25 43+880 1 5.00 2.00 24.00 5.00

    4 9+560 1 5.00 3.00 24.00 5.00

    10 22+035 1 5.00 3.00 24.00 5.00

    15 26+350 1 5.00 3.00 24.00 5.0021 35+250 1 6.00 2.00 24.00 6.00

    7 13+020 2 4.00 2.00 24.00 8.00

    8 19+305 2 4.00 2.00 24.00 8.00

    11 22+815 2 4.00 2.00 24.00 8.00

    14 24+850 2 4.00 2.00 24.00 8.00

    19 33+715 2 4.00 2.00 24.00 8.00

    13 24+350 2 5.00 2.00 24.00 10.00

    2 5+840 2 5.00 3.00 24.00 10.00

    (c) New Minor Bridges for Hanuman Junction bypass

    1 2+750 1 7.50 3.50 30.40 7.50

    (d) New Minor Bridges on Service Roads

    8 1037+246S 1 9.30 3.00 17.40 9.306 1062+540S 2 3.90 2.50 17.40 7.80

    10 1022+851S 2 7.20 3.00 8.70 14.40

    1 1075+820S 3 4.45 3.00 17.40 13.35

    5 1065+780S 3 5.75 2.75 17.40 17.25

    3 1068+844S 3 6.75 4.50 17.40 20.25

    2 1072+737S 3 6.80 2.50 17.40 20.40

    9 1030+415S 5 6.40 3.50 8.70 32.00

    4 1067+326S 6 6.75 5.00 17.40 40.50

    7 1055+743S 8 5.75 8.00 17.40 46.00

    (e) New Minor Bridges on Service Roads in Vijayawada bypass

    1 22+815 2 4.00 6.00 17.40 8.00

    2 24+850 2 4.00 3.50 17.40 8.00

    Box Culverts

    os span Span Height width

    89 1047+123 1 1.00 1.00 8.00 1.00 5

    25 1066+059 1 1.10 1.00 8.00 1.10 8

    5 1073+530 1 1.20 1.20 8.00 1.20 8

    8 1072+990 1 1.20 1.20 8.00 1.20 5

    Sr. No. ChainageSpan Arrangement Total

    Length

    Typical

    C/S

  • 7/30/2019 111230 Str Inventry

    66/72

    os span Span Height widthSr. No. Chainage

    Span Arrangement Total

    Length

    Typical

    C/S

    62 1053+525 1 1.20 1.20 8.00 1.20 4A

    10 1072+050 1 1.40 1.50 53.00 1.40 4A

    128 1040+372 1 1.50 1.50 8.00 1.50 4

    158 1034+384 1 1.50 1.50 8.00 1.50 4

    159 1034+375 1 1.50 1.50 8.00 1.50 4

    9 1072+410 1 1.50 1.50 8.00 1.50 4A

    13 1070+500 1 1.50 1.50 8.00 1.50 4A

    21 1067+726 1 1.70 1.50 8.00 1.70 8

    14 1069+952 1 1.90 1.50 8.00 1.90 4A

    77 1049+830 1 2.00 2.00 8.00 2.00 4

    144 1038+018 1 2.00 2.00 8.00 2.00 4

    153 1035+768 1 2.00 2.00 8.00 2.00 4

    125 1040+993 1 2.00 2.00 8.00 2.00 4

    18 1068+043 1 2.00 2.00 8.00 2.00 8

    1 1076+380 1 2.30 2.00 8.00 2.30 5

    49 1061+587 1 2.44 2.00 8.00 2.44 4A

    12 1071+170 1 2.50 2.50 8.00 2.50 4A

    16 1069+373 1 2.50 2.50 8.00 2.50 4A

    11 1071+740 1 2.50 2.50 53.00 2.50 8120 1042+145 1 3.60 3.00 8.00 3.60 5

    143 1038+118 1 4.00 3.00 8.00 4.00 4

    148 1036+773 1 4.00 3.00 8.00 4.00 5

    48 1061+996 1 4.20 3.00 8.00 4.20 4A

    46 1063+471 1 4.26 3.00 8.00 4.26 8

    47 1063+132 1 4.26 3.00 8.00 4.26 4A

    51 1055+434 1 4.40 3.00 8.00 4.40 4A

    45 1063+535 1 4.50 3.00 8.00 4.50 8

    133 1039+453 1 4.60 3.50 8.00 4.60 4

    86 1047+771 1 5.00 3.50 8.00 5.00 4

    160 1034+225 1 5.00 3.50 8.00 5.00 4

    72 1051+32 1 5.00 3.50 8.00 5.00 4A50 1061+413 1 5.46 3.50 8.00 5.46 4A

    63 1053+266 1 5.60 3.50 8.00 5.60 4A

    69 1052+001 1 1.10 1.00 49.30 1.10 8

    4 1073+700 1 1.20 1.00 49.30 1.20 8

    3 1075+120 1 2.00 1.50 49.30 2.00 8

    74 1050+508 1 2.00 1.50 75.00 2.00 9

    17 1068+314 1 2.50 2.00 48.00 2.50 5

    2 1075+7 1 2.50 2.00 75.00 2.50 5

    163 1033+668 1 3.00 2.50 49.30 3.00 8

    167 1026+355 1 6.10 3.00 30.00 6.10 6

    59 1054+372 3 1.80 1.50 49.30 5.40 8

    89 1047+123 1 1.00 1.00 19.00 1.00 5

    25 1066+059 1 1.10 1.00 19.00 1.10 8

    5 1073+530 1 1.20 1.00 19.00 1.20 8

    8 1072+990 1 1.20 1.00 19.00 1.20 5

    62 1053+525 1 1.20 1.00 19.00 1.20 4A

    9 1072+410 1 1.50 1.50 19.00 1.50 4A

    13 1070+500 1 1.50 1.50 19.00 1.50 4A

    21 1067+726 1 1.70 1.50 19.00 1.70 8

  • 7/30/2019 111230 Str Inventry

    67/72

    os span Span Height widthSr. No. Chainage

    Span Arrangement Total

    Length

    Typical

    C/S

    14 1069+952 1 1.90 1.50 19.00 1.90 4A

    18 1068+043 1 2.00 2.00 19.00 2.00 8

    1 1076+380 1 2.30 2.00 19.00 2.30 5

    49 1061+587 1 2.44 2.00 19.00 2.44 4A

    12 1071+170 1 2.50 2.00 19.00 2.50 4A

    16 1069+373 1 2.50 2.00 19.00 2.50 4A

    120 1042+145 1 3.60 2.50 19.00 3.60 5

    148 1036+773 1 4.00 2.50 19.00 4.00 5

    48 1061+996 1 4.20 2.50 19.00 4.20 4A

    46 1063+471 1 4.26 2.50 19.00 4.26 8

    47 1063+132 1 4.26 2.50 19.00 4.26 4A

    51 1055+434 1 4.40 3.00 19.00 4.40 4A

    45 1063+535 1 4.50 3.00 19.00 4.50 8

    72 1051+32 1 5.00 3.00 19.00 5.00 4A

    50 1061+413 1 5.46 3.00 19.00 5.46 4A

    63 1053+266 1 5.60 3.00 19.00 5.60 4A

    1 1+260 1 4.00 2.00 26.00 4.00 1

    3 5+030 1 4.00 2.00 26.00 4.00 1

    15 19+960 1 4.00 2.00 26.00 4.00 129 28+900 1 4.00 2.00 26.00 4.00 1

    53 42+230 1 4.00 2.00 26.00 4.00 1

    2 1+520 1 5.00 3.00 26.00 5.00 1

    4 5+560 1 5.00 2.00 26.00 5.00 1

    5 7+030 1 5.00 3.00 26.00 5.00 1

    6 7+680 1 5.00 3.00 26.00 5.00 1

    9 10+710 1 5.00 2.00 26.00 5.00 1

    10 17+570 1 5.00 2.00 26.00 5.00 3

    25 27+690 1 5.00 3.00 26.00 5.00 1

    38 33+070 1 5.00 3.00 26.00 5.00 1

    57 1+820 1 4.00 2.00 33.00 4.00 4

    66 5+060 1 4.00 2.00 33.00 4.00 467 5+540 1 4.00 2.00 33.00 4.00 4

    59 2+060 1 5.00 2.00 33.00 5.00 4

    VUP/CUP

    os span Span Height width

    1 1064+415 1 6.00 3.50 4.80 6.00

    2 1040+684 1 8.80 3.50 7.20 8.80

    1 3+980 1 7.50 3.50 24.00 7.50

    2 22+800 1 7.50 3.50 24.00 7.503 24+695 1 7.50 3.50 24.00 7.50

    4 35+950 1 7.50 3.50 24.00 7.50

    5 40+080 1 7.50 3.50 24.00 7.50

    6 41+120 1 7.50 3.50 24.00 7.50

    7 1073+705 1 7.50 3.50 26.80 7.50

    8 1068+955 1 7.50 3.50 26.80 7.50

    9 1067+920 1 7.50 3.50 26.80 7.50

    10 1066+180 1 7.50 3.50 26.80 7.50

    11 1065+260 1 7.50 3.50 26.80 7.50

    Sr. No. ChainageSpan Arrangement Total

    Length

    Typical

    C/S

  • 7/30/2019 111230 Str Inventry

    68/72

    os span Span Height widthSr. No. Chainage

    Span Arrangement Total

    Length

    Typical

    C/S

    12 1054+310 1 7.50 3.50 26.80 7.50

    13 1051+940 1 7.50 3.50 26.80 7.50

  • 7/30/2019 111230 Str Inventry

    69/72

  • 7/30/2019 111230 Str Inventry

    70/72

    os span Span Height widthSr. No. Chainage

    Span Arrangement Total

    Length

    Typical

    C/S

    5 1065+78LW 3 5.75 2.75 5.80 17.25 5

    5 1065+78RN 3 5.75 2.75 9.50 17.25 5

    5 1065+78LN 3 5.75 2.75 9.50 17.25 5

    5 1065+780S 3 5.75 2.75 17.40 17.25

    3 1068+844RW 3 6.75 4.50 4.20 20.25 8

    3 1068+844LW 3 6.75 4.50 5.90 20.25 8

    3 1068+844RN 3 6.75 4.50 9.50 20.25 8

    3 1068+844LN 3 6.75 4.50 9.50 20.25 8

    3 1068+844S 3 6.75 4.50 17.40 20.25

    2 1072+737RW 3 6.80 2.50 6.00 20.40 5

    2 1072+737LW 3 6.80 2.50 7.90 20.40 5

    2 1072+737RN 3 6.80 2.50 9.50 20.40 5

    2 1072+737LN 3 6.80 2.50 9.50 20.40 5

    2 1072+737S 3 6.80 2.50 17.40 20.40

    8 1048+338RW 5 6.00 4.50 5.90 30.00 4

    8 1048+338LW 5 6.00 4.50 5.90 30.00 4

    14 1030+415RW 5 6.40 3.50 7.65 32.00 8

    14 1030+415LW 5 6.40 3.50 5.85 32.00 8

    14 1030+415RN 5 6.40 3.50 9.50 32.00 89 1030+415S 5 6.40 3.50 8.70 32.00

    4 1067+326RN 6 6.75 3.50 9.50 40.50 4A

    4 1067+326RW 6 6.75 5.00 5.90 40.50 4A

    4 1067+326LW 6 6.75 5.00 7.70 40.50 4A

    4 1067+326LN 6 6.75 5.00 9.50 40.50 4A

    4 1067+326S 6 6.75 5.00 17.40 40.50

    16 1024+188RW 7 6.70 3.00 7.70 46.90 6

    16 1024+188LW 7 6.70 3.00 7.70 46.90 6

    7 1055+743RW 8 5.75 8.00 5.95 46.00 4A

    7 1055+743LW 8 5.75 8.00 4.90 46.00 4A

    7 1055+743RN 8 5.75 8.00 9.50 46.00 4A

    7 1055+743S 8 5.75 8.00 17.40 46.00

    Box Culverts

    os span Span Height width

    89 1047+123 1 1.00 1.00 8.00 1.00 5

    89 1047+123 1 1.00 1.00 19.00 1.00 5

    25 1066+059 1 1.10 1.00 8.00 1.10 8

    69 1052+001 1 1.10 1.00 49.30 1.10 8

    25 1066+059 1 1.10 1.00 19.00 1.10 8

    4 1073+700 1 1.20 1.00 49.30 1.20 8

    5 1073+530 1 1.20 1.00 19.00 1.20 88 1072+990 1 1.20 1.00 19.00 1.20 5

    62 1053+525 1 1.20 1.00 19.00 1.20 4A

    5 1073+530 1 1.20 1.20 8.00 1.20 8

    8 1072+990 1 1.20 1.20 8.00 1.20 5

    62 1053+525 1 1.20 1.20 8.00 1.20 4A

    10 1072+050 1 1.40 1.50 53.00 1.40 4A

    128 1040+372 1 1.50 1.50 8.00 1.50 4

    158 1034+384 1 1.50 1.50 8.00 1.50 4

    159 1034+375 1 1.50 1.50 8.00 1.50 4

    Sr. No. ChainageSpan Arrangement Total

    Length

    Typical

    C/S

  • 7/30/2019 111230 Str Inventry

    71/72

    os span Span Height widthSr. No. Chainage

    Span Arrangement Total

    Length

    Typical

    C/S

    9 1072+410 1 1.50 1.50 8.00 1.50 4A

    13 1070+500 1 1.50 1.50 8.00 1.50 4A

    9 1072+410 1 1.50 1.50 19.00 1.50 4A

    13 1070+500 1 1.50 1.50 19.00 1.50 4A

    21 1067+726 1 1.70 1.50 8.00 1.70 8

    21 1067+726 1 1.70 1.50 19.00 1.70 8

    14 1069+952 1 1.90 1.50 8.00 1.90 4A

    14 1069+952 1 1.90 1.50 19.00 1.90 4A

    3 1075+120 1 2.00 1.50 49.30 2.00 8

    74 1050+508 1 2.00 1.50 75.00 2.00 9

    77 1049+830 1 2.00 2.00 8.00 2.00 4

    144 1038+018 1 2.00 2.00 8.00 2.00 4

    153 1035+768 1 2.00 2.00 8.00 2.00 4

    125 1040+993 1 2.00 2.00 8.00 2.00 4

    18 1068+043 1 2.00 2.00 8.00 2.00 8

    18 1068+043 1 2.00 2.00 19.00 2.00 8

    1 1076+380 1 2.30 2.00 8.00 2.30 5

    1 1076+380 1 2.30 2.00 19.00 2.30 5

    49 1061+587 1 2.44 2.00 8.00 2.44 4A49 1061+587 1 2.44 2.00 19.00 2.44 4A

    17 1068+314 1 2.50 2.00 48.00 2.50 5

    2 1075+7 1 2.50 2.00 75.00 2.50 5

    12 1071+170 1 2.50 2.00 19.00 2.50 4A

    16 1069+373 1 2.50 2.00 19.00 2.50 4A

    12 1071+170 1 2.50 2.50 8.00 2.50 4A

    16 1069+373 1 2.50 2.50 8.00 2.50 4A

    11 1071+740 1 2.50 2.50 53.00 2.50 8

    163 1033+668 1 3.00 2.50 49.30 3.00 8

    120 1042+145 1 3.60 2.50 19.00 3.60 5

    120 1042+145 1 3.60 3.00 8.00 3.60 5

    1 1+260 1 4.00 2.00 26.00 4.00 13 5+030 1 4.00 2.00 26.00 4.00 1

    15 19+960 1 4.00 2.00 26.00 4.00 1

    29 28+900 1 4.00 2.00 26.00 4.00 1

    53 42+230 1 4.00 2.00 26.00 4.00 1

    57 1+820 1 4.00 2.00 33.00 4.00 4

    66 5+060 1 4.00 2.00 33.00 4.00 4

    67 5+540 1 4.00 2.00 33.00 4.00 4

    148 1036+773 1 4.00 2.50 19.00 4.00 5

    143 1038+118 1 4.00 3.00 8.00 4.00 4

    148 1036+773 1 4.00 3.00 8.00 4.00 5

    48 1061+996 1 4.20 2.50 19.00 4.20 4A

    48 1061+996 1 4.20 3.00 8.00 4.20 4A

    46 1063+471 1 4.26 2.50 19.00 4.26 8

    47 1063+132 1 4.26 2.50 19.00 4.26 4A

    46 1063+471 1 4.26 3.00 8.00 4.26 8

    47 1063+132 1 4.26 3.00 8.00 4.26 4A

    51 1055+434 1 4.40 3.00 8.00 4.40 4A

    51 1055+434 1 4.40 3.00 19.00 4.40 4A

    45 1063+535 1 4.50 3.00 8.00 4.50 8

    45 1063+535 1 4.50 3.00 19.00 4.50 8

    133 1039+453 1 4.60 3.50 8.00 4.60 4

  • 7/30/2019 111230 Str Inventry

    72/72

    os span Span Height widthSr. No. Chainage

    Span Arrangement Total

    Length

    Typical

    C/S

    4 5+560 1 5.00 2.00 26.00 5.00 1

    9 10+710 1 5.00 2.00 26.00 5.00 1

    10 17+570 1 5.00 2.00 26.00 5.00 3

    59 2+060 1 5.00 2.00 33.00 5.00 4

    72 1051+32 1 5.00 3.00 19.00 5.00 4A

    2 1+520 1 5.00 3.00 26.00 5.00 1

    5 7+030 1 5.00 3.00 26.00 5.00 1

    6 7+680 1 5.00 3.00 26.00 5.00 1

    25 27+690 1 5.00 3.00 26.00 5.00 1

    38 33+070 1 5.00 3.00 26.00 5.00 1

    86 1047+771 1 5.00 3.50 8.00 5.00 4

    160 1034+225 1 5.00 3.50 8.00 5.00 4

    72 1051+32 1 5.00 3.50 8.00 5.00 4A

    50 1061+413 1 5.46 3.00 19.00 5.46 4A

    50 1061+413 1 5.46 3.50 8.00 5.46 4A

    63 1053+266 1 5.60 3.00 19.00 5.60 4A

    63 1053+266 1 5.60 3.50 8.00 5.60 4A

    167 1026+355 1 6.10 3.00 30.00 6.10 6

    59 1054+372 3 1.80 1.50 49.30 5.40 8

    VUP/CUP

    os span Span Height width

    1 1064+415 1 6.00 3.50 4.80 6.00

    1 3+980 1 7.50 3.50 24.00 7.50

    2 22+800 1 7.50 3.50 24.00 7.50

    3 24+695 1 7.50 3.50 24.00 7.50

    4 35+950 1 7.50 3.50 24.00 7.50

    5 40+080 1 7.50 3.50 24.00 7.50

    6 41+120 1 7.50 3.50 24.00 7.507 1073+705 1 7.50 3.50 26.80 7.50

    8 1068+955 1 7.50 3.50 26.80 7.50

    9 1067+920 1 7.50 3.50 26.80 7.50

    10 1066+180 1 7.50 3.50 26.80 7.50

    11 1065+260 1 7.50 3.50 26.80 7.50

    12 1054+310 1 7.50 3.50 26.80 7.50

    13 1051+940 1 7.50 3.50 26.80 7.50

    2 1040+684 1 8.80 3.50 7.20 8.80

    Sr. No. ChainageSpan Arrangement Total

    Length

    Typical

    C/S