Republic of the PhilippinesDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE SECRETARYManila
JUL 1 5 2021DEPARTMENT ORDER )
)
NO. 62 ~Series of 2021 ft ;1\-112021
SUBlECT: REVISED LIMITS OF DELEGATEDAUTHORITY OF REGIONALDIRECTORS AND DISTRICTENGINEERS TO APPROVE PLANS FORFEASIBILITY STUDY, CONCEPTUALDESIGN, DETAILED ENGINEERINGDESIGN, AS-STAKED, AND AS-BUILT
In order to provide for more effective and expeditious implementation of projects and basedon the result of the assessment conducted by the Bureau of Design on the design capabilityof DPWH field offices, the limits of delegated authority of the following Regional Directors andDistrict Engineers to approve Plans for Feasibility Study, Conceptual Design, DetailedEngineering Design, As-Staked, and As-Built with respect to locally-funded infrastructureprojects within their respective region/district are hereby increased as follows:
A. REGIONAL OFFICES
1. All Regional Directors, with a rating of Outstanding or Very Satisfactory are herebyauthorized to approve plans for Feasibility Study, Conceptual Design, DetailedEngineering Design, As-Staked, and As-Built up to Php 300 Million in cost, as follows:
Re ional Office1. NCR2. CAR3. Re ion I4. Re ion II5. Re ion III6. Re ion IV-A7. Re' ion IV-B8. Re ion V9. Re ion VI10. Re ion VII11. Re ion VIII12. Re ion IX13. Re ion X14. Re ion XI15. Re ion XII16. Re ion XIII
2. For projects greater than Php 300 Million in cost, approval of plans for Feasibility Study,Conceptual Design, Detailed Engineering Design, As-Staked, and As-Built shall beundertaken by Central Office.
![Page 2: -112021 - dpwh.gov.ph](https://reader030.vdocument.in/reader030/viewer/2022013005/61cd42bb8badb629ee2751b5/html5/thumbnails/2.jpg)
D,O, No, (,2. series of 2021: Revised Limits of Delegated Authority of Regional Directors and District Engineersto approve Plans for Feasibility Study, Conceptual Design, Detailed Engineering Design, As-Staked, and As-Built
Page 2 of 6
B. DISTRICT ENGINEERING OFFICES
1. The District Engineers of the following District Engineering Offices with a rating ofOutstanding or Very Satisfactory are authorized to approve plans for Feasibility Study,Conceptual Design, Detailed Engineering Design, As-Staked, and As-Built up to Php100 Million in cost, as follows:
ro•...'5..ro c:U a-'0.ro Q)
50::::proZ
Q)>:proL-•...,!!l£c:E ,2"OOl<C Q)roO:::L-Q)
"0L-aU
c:a'0.Q)0:::
c:a'0.Q)0:::
Offices
![Page 3: -112021 - dpwh.gov.ph](https://reader030.vdocument.in/reader030/viewer/2022013005/61cd42bb8badb629ee2751b5/html5/thumbnails/3.jpg)
D.O. No.JM.., series of 2021: Revised Limits of Delegated Authority of Regional Directors and District Engineersto approve Plans for Feasibility Study, Conceptual Design, Detailed Engineering Design, As-Staked, and As-Built
Page 3 of 6
AuroraSataan 1st
Sataan 2nd
Bulacan 1St
Sulacan 2nd- Nueva Eci"a 1st--c Nueva Eci"a 2nd0
Pam an a1st"enQ)
Pam an a 2nd0:::Pam an a3rd
Tarlac 1st
Tarlac 2nd
Zambales 1st
Zambales 2nd
Satan as 1st
Satan as 2nd
Satan as 3rd
Satan as 4th
Cavite 1st
Cavite 2nd
< Cavite 3rdI>- La una 1stc.Q La una 2nd01Q) La una 3rd0:::
uezon 1st
uezon 2nd
uezon 3rd
uezon 4th
Rizal 1st
Rizal 2nd
Mihaoto Occidental(0 Mindoro OrientalI
~ Southern Mindoroc Palawan 1st0·en Palawan 3rdQ)
0::: RomblonMarindu ueAlba 1st
Alba 2nd
Alba 3rd
> Camirenes Nortec Camarines Sur 1st0·en Camarines Sur 2ndQ)
0::: Camarines Sur 3rdCamarines Sur 4thCamarines Sur 5thMasbate 1st
![Page 4: -112021 - dpwh.gov.ph](https://reader030.vdocument.in/reader030/viewer/2022013005/61cd42bb8badb629ee2751b5/html5/thumbnails/4.jpg)
D.O. No.~, series of 2021: Revised Limits of Delegated Authority of Regional Directors and District Engineersto approve Plans for Feasibility Study, Conceptual Design, Detailed Engineering Design, As-Staked, and As-Built
Page 4 of 6
......>c.20'1Q)
0::::
............>c.20'1Q)
0::::
..................>Co'51Q)
0::::
Masbate 2nd
Masbate 3rd
Sorso on 1st
Sorso on 2nd
Anti ueCa iz ptCa iz 2nd
GuimarasIloilo 1st
Iloilo 2nd
Iloilo 3rd
Iloilo 4th
Iloilo CiSacolod CiNe ros Occidental 1st
Ne ros Occidental 3rd
Ne res Occidental 4th
AklanCebu 1st
Cebu 2nd
Cebu 3rd
Cebu 4th
Cebu 5th
Cebu 6th
Cebu CiSohol 1st
Sohol 2nd
Sohol 3rd
Ne res Oriental 1st
Ne res Oriental 2nd
Ne ros Oriental 3rd
Si ui"orLe e 1st
Le e 2nd
Le e 3rd
Le e 4th
Le e 5th
Southern Le eSiliranEastern SamarNorthern Samar 1st
Northern Samar 2nd
Samar 1st
Samar 2nd
Tacloban Ci
![Page 5: -112021 - dpwh.gov.ph](https://reader030.vdocument.in/reader030/viewer/2022013005/61cd42bb8badb629ee2751b5/html5/thumbnails/5.jpg)
D,O. No, ("2, series of 2021: Revised Limits of Delegated Authority of Regional Directors and District Engineersto approve Plans for Feasibility Study, Conceptual Design, Detailed Engineering Design, As-Staked, and As-Built
Page 5 of 6
XI-t
Co'enQ)a::
xc.2C'lQ)a::
I-tXco'enQ)a::
I-tI-tXc,2C'lQ)a::
I-tI-tI-tXc,2C'lQ)a::
Zamboan a CiIsabela CiZamboan a del Norte 1st
Zamboan a del Norte 2nd
Zamboan a del Norte 3rd
Zamboan a del Sur 1st
Zamboan a del Sur 2nd
Zamboan a Sibu a 1st
Zamboan a Sibu a 2nd
Bukidnon 1st
Bukidnon 2nd
Bukidnon 3rd
Misamis Occidental 1st
Misamis Occidental 2nd
Lanao del Norte 1st
Lanao del Norte 2nd
Cami uinMisamis Oriental 1st
Misamis Oriental 2nd
Ca a an de Oro 1st
Ca a an de Oro 2nd
Davao Ci 1st
Davao Ci 2nd
Com ostela ValleDavao del NorteDavao del SurDavao OccidentalDavao Oriental 1st
Davao Oriental 2nd
Saran aniCotabato CiNorth Cotabato 1st
North Cotabato 2nd
South Cotabato 1st
South Cotabato 2nd
Sultan Kudarat 1st
Sultan Kudarat 2nd
Cotabato Sub-DEOSuri ao del Sur 1st
Suri ao del Sur 2nd
Butuan CiA usan del NorteA usan del Sur 1st
A usan del Sur 2nd
Suri ao del Norte 1st
Suri ao del Norte 2nd
![Page 6: -112021 - dpwh.gov.ph](https://reader030.vdocument.in/reader030/viewer/2022013005/61cd42bb8badb629ee2751b5/html5/thumbnails/6.jpg)
D.O. No. (,2, series of 2021: Revised Limits of Delegated Authority of Regional Directors and District Engineersto approve Plans for Feasibility Study, Conceptual Design, Detailed Engineering Design, As-Staked, and As-Built
Page 6 of 6
2. Other District Engineers, whose ratings are satisfactory and below or no rating, areauthorized to approve plans for Feasibility Study, Conceptual Design, DetailedEngineering Design, As-Staked, and As-Built not greater than Php 50 Million, asfollows:
1.2.3.4.5.6.7.8.9.10.11.
**delayed submission
This order shall take effect immediately and supersedes Department Order No. 20, series of2018 and Department Order No. 114, series of 2020.
~t0---MARK A. VILLARSecretary