Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS OFFICE OF THE SECRETARY Manila JUL 15 2021 DEPARTMENT ORDER ) ) NO. 62 ~ Series of 2021 ft ;1\-11 202 1 SUBlECT: REVISED LIMITS OF DELEGATED AUTHORITY OF REGIONAL DIRECTORS AND DISTRICT ENGINEERS TO APPROVE PLANS FOR FEASIBILITY STUDY, CONCEPTUAL DESIGN, DETAILED ENGINEERING DESIGN, AS-STAKED, AND AS-BUILT In order to provide for more effective and expeditious implementation of projects and based on the result of the assessment conducted by the Bureau of Design on the design capability of DPWH field offices, the limits of delegated authority of the following Regional Directors and District Engineers to approve Plans for Feasibility Study, Conceptual Design, Detailed Engineering Design, As-Staked, and As-Built with respect to locally-funded infrastructure projects within their respective region/district are hereby increased as follows: A. REGIONAL OFFICES 1. All Regional Directors, with a rating of Outstanding or Very Satisfactory are hereby authorized to approve plans for Feasibility Study, Conceptual Design, Detailed Engineering Design, As-Staked, and As-Built up to Php 300 Million in cost, as follows: Re ional Office 1. NCR 2. CAR 3. Re ion I 4. Re ion II 5. Re ion III 6. Re ion IV-A 7. Re' ion IV-B 8. Re ion V 9. Re ion VI 10. Re ion VII 11. Re ion VIII 12. Re ion IX 13. Re ion X 14. Re ion XI 15. Re ion XII 16. Re ion XIII 2. For projects greater than Php 300 Million in cost, approval of plans for Feasibility Study, Conceptual Design, Detailed Engineering Design, As-Staked, and As-Built shall be undertaken by Central Office.

Upload: others

Post on 30-Dec-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: -112021 - dpwh.gov.ph

Republic of the PhilippinesDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

OFFICE OF THE SECRETARYManila

JUL 1 5 2021DEPARTMENT ORDER )

)

NO. 62 ~Series of 2021 ft ;1\-112021

SUBlECT: REVISED LIMITS OF DELEGATEDAUTHORITY OF REGIONALDIRECTORS AND DISTRICTENGINEERS TO APPROVE PLANS FORFEASIBILITY STUDY, CONCEPTUALDESIGN, DETAILED ENGINEERINGDESIGN, AS-STAKED, AND AS-BUILT

In order to provide for more effective and expeditious implementation of projects and basedon the result of the assessment conducted by the Bureau of Design on the design capabilityof DPWH field offices, the limits of delegated authority of the following Regional Directors andDistrict Engineers to approve Plans for Feasibility Study, Conceptual Design, DetailedEngineering Design, As-Staked, and As-Built with respect to locally-funded infrastructureprojects within their respective region/district are hereby increased as follows:

A. REGIONAL OFFICES

1. All Regional Directors, with a rating of Outstanding or Very Satisfactory are herebyauthorized to approve plans for Feasibility Study, Conceptual Design, DetailedEngineering Design, As-Staked, and As-Built up to Php 300 Million in cost, as follows:

Re ional Office1. NCR2. CAR3. Re ion I4. Re ion II5. Re ion III6. Re ion IV-A7. Re' ion IV-B8. Re ion V9. Re ion VI10. Re ion VII11. Re ion VIII12. Re ion IX13. Re ion X14. Re ion XI15. Re ion XII16. Re ion XIII

2. For projects greater than Php 300 Million in cost, approval of plans for Feasibility Study,Conceptual Design, Detailed Engineering Design, As-Staked, and As-Built shall beundertaken by Central Office.

Page 2: -112021 - dpwh.gov.ph

D,O, No, (,2. series of 2021: Revised Limits of Delegated Authority of Regional Directors and District Engineersto approve Plans for Feasibility Study, Conceptual Design, Detailed Engineering Design, As-Staked, and As-Built

Page 2 of 6

B. DISTRICT ENGINEERING OFFICES

1. The District Engineers of the following District Engineering Offices with a rating ofOutstanding or Very Satisfactory are authorized to approve plans for Feasibility Study,Conceptual Design, Detailed Engineering Design, As-Staked, and As-Built up to Php100 Million in cost, as follows:

ro•...'5..ro c:U a-'0.ro Q)

50::::proZ

Q)>:proL-•...,!!l£c:E ,2"OOl<C Q)roO:::L-Q)

"0L-aU

c:a'0.Q)0:::

c:a'0.Q)0:::

Offices

Page 3: -112021 - dpwh.gov.ph

D.O. No.JM.., series of 2021: Revised Limits of Delegated Authority of Regional Directors and District Engineersto approve Plans for Feasibility Study, Conceptual Design, Detailed Engineering Design, As-Staked, and As-Built

Page 3 of 6

AuroraSataan 1st

Sataan 2nd

Bulacan 1St

Sulacan 2nd- Nueva Eci"a 1st--c Nueva Eci"a 2nd0

Pam an a1st"enQ)

Pam an a 2nd0:::Pam an a3rd

Tarlac 1st

Tarlac 2nd

Zambales 1st

Zambales 2nd

Satan as 1st

Satan as 2nd

Satan as 3rd

Satan as 4th

Cavite 1st

Cavite 2nd

< Cavite 3rdI>- La una 1stc.Q La una 2nd01Q) La una 3rd0:::

uezon 1st

uezon 2nd

uezon 3rd

uezon 4th

Rizal 1st

Rizal 2nd

Mihaoto Occidental(0 Mindoro OrientalI

~ Southern Mindoroc Palawan 1st0·en Palawan 3rdQ)

0::: RomblonMarindu ueAlba 1st

Alba 2nd

Alba 3rd

> Camirenes Nortec Camarines Sur 1st0·en Camarines Sur 2ndQ)

0::: Camarines Sur 3rdCamarines Sur 4thCamarines Sur 5thMasbate 1st

Page 4: -112021 - dpwh.gov.ph

D.O. No.~, series of 2021: Revised Limits of Delegated Authority of Regional Directors and District Engineersto approve Plans for Feasibility Study, Conceptual Design, Detailed Engineering Design, As-Staked, and As-Built

Page 4 of 6

......>c.20'1Q)

0::::

............>c.20'1Q)

0::::

..................>Co'51Q)

0::::

Masbate 2nd

Masbate 3rd

Sorso on 1st

Sorso on 2nd

Anti ueCa iz ptCa iz 2nd

GuimarasIloilo 1st

Iloilo 2nd

Iloilo 3rd

Iloilo 4th

Iloilo CiSacolod CiNe ros Occidental 1st

Ne ros Occidental 3rd

Ne res Occidental 4th

AklanCebu 1st

Cebu 2nd

Cebu 3rd

Cebu 4th

Cebu 5th

Cebu 6th

Cebu CiSohol 1st

Sohol 2nd

Sohol 3rd

Ne res Oriental 1st

Ne res Oriental 2nd

Ne ros Oriental 3rd

Si ui"orLe e 1st

Le e 2nd

Le e 3rd

Le e 4th

Le e 5th

Southern Le eSiliranEastern SamarNorthern Samar 1st

Northern Samar 2nd

Samar 1st

Samar 2nd

Tacloban Ci

Page 5: -112021 - dpwh.gov.ph

D,O. No, ("2, series of 2021: Revised Limits of Delegated Authority of Regional Directors and District Engineersto approve Plans for Feasibility Study, Conceptual Design, Detailed Engineering Design, As-Staked, and As-Built

Page 5 of 6

XI-t

Co'enQ)a::

xc.2C'lQ)a::

I-tXco'enQ)a::

I-tI-tXc,2C'lQ)a::

I-tI-tI-tXc,2C'lQ)a::

Zamboan a CiIsabela CiZamboan a del Norte 1st

Zamboan a del Norte 2nd

Zamboan a del Norte 3rd

Zamboan a del Sur 1st

Zamboan a del Sur 2nd

Zamboan a Sibu a 1st

Zamboan a Sibu a 2nd

Bukidnon 1st

Bukidnon 2nd

Bukidnon 3rd

Misamis Occidental 1st

Misamis Occidental 2nd

Lanao del Norte 1st

Lanao del Norte 2nd

Cami uinMisamis Oriental 1st

Misamis Oriental 2nd

Ca a an de Oro 1st

Ca a an de Oro 2nd

Davao Ci 1st

Davao Ci 2nd

Com ostela ValleDavao del NorteDavao del SurDavao OccidentalDavao Oriental 1st

Davao Oriental 2nd

Saran aniCotabato CiNorth Cotabato 1st

North Cotabato 2nd

South Cotabato 1st

South Cotabato 2nd

Sultan Kudarat 1st

Sultan Kudarat 2nd

Cotabato Sub-DEOSuri ao del Sur 1st

Suri ao del Sur 2nd

Butuan CiA usan del NorteA usan del Sur 1st

A usan del Sur 2nd

Suri ao del Norte 1st

Suri ao del Norte 2nd

Page 6: -112021 - dpwh.gov.ph

D.O. No. (,2, series of 2021: Revised Limits of Delegated Authority of Regional Directors and District Engineersto approve Plans for Feasibility Study, Conceptual Design, Detailed Engineering Design, As-Staked, and As-Built

Page 6 of 6

2. Other District Engineers, whose ratings are satisfactory and below or no rating, areauthorized to approve plans for Feasibility Study, Conceptual Design, DetailedEngineering Design, As-Staked, and As-Built not greater than Php 50 Million, asfollows:

1.2.3.4.5.6.7.8.9.10.11.

**delayed submission

This order shall take effect immediately and supersedes Department Order No. 20, series of2018 and Department Order No. 114, series of 2020.

~t0---MARK A. VILLARSecretary