Toledo Refinery Site Technical Practices EP 1-1-2 FORM B Approval/Rejection of New Toledo Site Technical Practice - Form B October 2007 Revision 0.1 Page 1 of 1 Maintained by E 2 G – Shaker Heights, OH FORM B APPROVAL/REJECTION OF NEW TOLEDO SITE TECHNICAL PRACTICE FROM: SITE ENGINEERING AUTHORITY TO: EQUITY ENGINEERING GROUP DATE: PRACTICE TITLE: PRACTICE NO.  ADVISE ON THE FOLLOWING THIS DOCUMENT IS APPROVED THIS DOCUMENT IS REJECTED (BRIEF EXPLANATION) LAST APPROVED REV. NO. NEW REV. NO.  APPROVAL D ATE: CC. APPROPRIATE TA AND/OR SME

Upload: esganfia

Post on 07-Mar-2016

214 views

Category:

Documents


0 download

DESCRIPTION

inst manual

TRANSCRIPT

7/21/2019 1_1_2_FORM_B

http://slidepdf.com/reader/full/112formb 1/1

ToledoRefinery

Site Technical PracticesEP 1-1-2FORM B

Approval/Rejection of New Toledo SiteTechnical Practice - Form B

October 2007  Revision 0.1 

Page 1 of 1

Maintained by E2G – Shaker Heights, OH 

FORM B

APPROVAL/REJECTION OF NEW TOLEDO SITE TECHNICAL PRACTICE

FROM:

SITE ENGINEERING AUTHORITY

TO:

EQUITY ENGINEERING GROUP

DATE:

PRACTICE TITLE:

PRACTICE NO.

 ADVISE ON THE FOLLOWING

THIS DOCUMENT IS APPROVED

THIS DOCUMENT IS REJECTED (BRIEF EXPLANATION)

LAST APPROVED REV. NO.

NEW REV. NO.

 APPROVAL DATE:

CC. APPROPRIATE TA AND/OR SME