Page 1: 113746492 Bridge Maintenance Strategy and Implementation in Indonesia ENG Iwan Zarkasi

Bridge Maintenance Strategy And Implementation In Indonesia

Ministry Of Public Works Of IndonesiaDirectorate General Of Highways

Directorate Of Technical AffairsSub Directorate Of Bridge Engineering

Page 2: 113746492 Bridge Maintenance Strategy and Implementation in Indonesia ENG Iwan Zarkasi

Bridges In Indonesia

Indonesia is an archipelago and tropical country has many

rivers/channels.

Recorded more than 88,000 bridges (1,050 km) including railway

crossing/ FO.

More than 21.371 bridges (404.84 km) located on National roads.

Ministry Of Public Works Of Indonesia

Directorate General Of Highways

Directorate Of Technical Affairs

Sub Directorate Of Bridge Engineering

Page 3: 113746492 Bridge Maintenance Strategy and Implementation in Indonesia ENG Iwan Zarkasi

Bridges In Indonesia

1. Bridge Construction (National roads)

2. Bridge Condition (National roads)

Condition Description Units %

0 Good Condition 10,047 47

1Few damage (damage can be repaired through routine maintenance, and do not affect the safety or function of the bridge).

4,274 20

2 Damage that requires monitoring or maintenance in the future. 3,419 16

3 Many damage That need to be rehabilitation next years 1,709 8

4 Critical condition 854 4

5 Collapsed or is not be functioned 1,068 5

Construction Total Length (km) (%)

< 1970 93.1 23%

1970 – 1980 81.0 20%

1980 – 1990 113.4 28%

> 1990 117.4 29%

Ministry Of Public Works Of Indonesia

Directorate General Of Highways

Directorate Of Technical Affairs

Sub Directorate Of Bridge Engineering

Page 4: 113746492 Bridge Maintenance Strategy and Implementation in Indonesia ENG Iwan Zarkasi

Bridge deterioration diagram can be summarized into:

1. Early phase of damage (vague damage)

2. Propagation of damage (damage develop rapidly)

b

a

NYNK

/1/100

5

NK = Condition valueY = Bridge lifeN = design life (50)a = coefficient (4,66)b = coefficient (1,9051)

Routine maintenance

Rehabilitation

Replacement

Conditio

n v

alu

e

Reh

ab

ilit

ati

on

Ma

inte

na

nce

0

1

2

3

4

5

Ma

inte

na

nce

Ma

inte

na

nce

Rep

lac

em

en

t

Years50

Early phase of damage

PropagationOf damage

Acceptable service life limits

`

Deterioration Model

Ministry Of Public Works Of Indonesia

Directorate General Of Highways

Directorate Of Technical Affairs

Sub Directorate Of Bridge Engineering

Page 5: 113746492 Bridge Maintenance Strategy and Implementation in Indonesia ENG Iwan Zarkasi

Links DGH and the execution staff

in the province with tool to: Support National Development

Optimize the use of funds available

Facility of the system:

Inventory recording of all bridges

Condition, traffic and loading capacity rating

Identification of bridge treatment

Priority ranking of bridge works

Optimum allocation of funds

Standard procedures for implementation

Bridge Management System ‘92

Component of BMS

Policy Framework

Inspection

Emergency Action

Load Rating

IBMS & RMS

Planning & Programming

Investigation & Design

Monitoring

Ministry Of Public Works Of Indonesia

Directorate General Of Highways

Directorate Of Technical Affairs

Sub Directorate Of Bridge Engineering

Page 6: 113746492 Bridge Maintenance Strategy and Implementation in Indonesia ENG Iwan Zarkasi

Process to collect data of physical bridges condition that

can be used for programming of bridge works,

maintenance (routine, periodic), rehabilitation,

retrofitting and replacement of the bridge.

Objective

• To convince the function of bridge in a safe condition for

users, besides to keeping investment value of bridge.

• To determine the maintenance action.

Bridge inspection

Bridge Inspection

Ministry Of Public Works Of Indonesia

Directorate General Of Highways

Directorate Of Technical Affairs

Sub Directorate Of Bridge Engineering

Page 7: 113746492 Bridge Maintenance Strategy and Implementation in Indonesia ENG Iwan Zarkasi

Implementation of Bridges in Indonesia are managed using a system called the Bridge Management

System (BMS), which includes the planning / programming, feasibility studies, technical planning,

implementation, operation and maintenance of bridges.

Stages Of Bridge Implementation

Refers to:

- NSPM Techniques

- Bridge Information Systems

- Best Practice Bridge

- Rehabilitation of Bridge Specifications

- Strengthening procedures BridgeUpgrading/Capacity Expansion Activities

Bridge Preservation activities

Data Base

BMS

Planning/Programing

-technical screening

-Economic evaluation

- Program Indication vs

Budget Constraint

Routine Maintenance

(condition 0 dan 1)

Inspection

Bridge

Condition and

Traffic Volume

Rehabilitation

periodic

(condition 2, 3 dan 4)

Generic Rehab

(condition 2 dan 3)

Special Rehab

(condition 4)

Construction

(condition 5)

Expert System

Special Inspection

Rehab planning

Rehabilitation

Work

New

Construction/

widening/

upgrading

Work

Routine

maintenance

Work

- Bridge Replacement

- Bridge Construction

- Bridge Duplication

- Bridge Widening

- Over Pass/ Under Pass

Construction

- Bridge Improvement/

upgrading

Detail planning

Rehab

Document

PLANNING & PROGRAMMING DESIGN IMPLEMENTATION

construction

documents

Rehab

Document

Routine

Maintenance

Document

Ministry Of Public Works Of Indonesia

Directorate General Of Highways

Directorate Of Technical Affairs

Sub Directorate Of Bridge Engineering

Page 8: 113746492 Bridge Maintenance Strategy and Implementation in Indonesia ENG Iwan Zarkasi

WHEN ??

Follow the recommendations

presented in inspection reports

WHO ??

An experienced or licensed professional engineer is qualified

Where to repair and rehabilitate ??

Selective criteria can be applied based on location

and on a priority basis

Which bridges to repair and

rehabilitate first?Those which require

emergency work have a higher priority depending on condition evaluation

Ministry Of Public Works Of Indonesia

Directorate General Of Highways

Directorate Of Technical Affairs

Sub Directorate Of Bridge Engineering

Page 9: 113746492 Bridge Maintenance Strategy and Implementation in Indonesia ENG Iwan Zarkasi

WHY ??

Safety, continuity of use & failure prevention.

1) Improve traffic condition

2) Addressing environmental concern

3) Increasing load capacity

4) Correcting deficiencies

5) Providing for possible future widening

6) Minimizing cost

The consideration are :

Ministry Of Public Works Of Indonesia

Directorate General Of Highways

Directorate Of Technical Affairs

Sub Directorate Of Bridge Engineering

Page 10: 113746492 Bridge Maintenance Strategy and Implementation in Indonesia ENG Iwan Zarkasi

WHAT COMPONENT ??

NEED GREATEST ATTENTION

Deck

Expantion joint

Bearing

NEED ATTENTION

SUBSTRUCTURE

constant wearing surface

erosion or earthquakes

Girder RIVER TRAINING WATERWAYS

Ministry Of Public Works Of Indonesia

Directorate General Of Highways

Directorate Of Technical Affairs

Sub Directorate Of Bridge Engineering

Page 11: 113746492 Bridge Maintenance Strategy and Implementation in Indonesia ENG Iwan Zarkasi

1) Field Inspection & structural health monitoring

2) Preparing an inspection report

3) Computing condition rating

4) Analysis & Load Rating

5) Preparing the Rehabilitation report

6) Implementing diagnostic design procedures

7) Selecting method of repair, reftrofit, rehabilitation or replacement

8) Preparing contract document

HOW ??

Ministry Of Public Works Of Indonesia

Directorate General Of Highways

Directorate Of Technical Affairs

Sub Directorate Of Bridge Engineering

Page 12: 113746492 Bridge Maintenance Strategy and Implementation in Indonesia ENG Iwan Zarkasi

1) Inventory

Inspection

Type of bridge inspection

Inspection should be done

for a life time of the bridge.

2) Routine

Inspection

3) Detail

Inspection

4) Special

Inspection

Types Of Bridge Inspection

Ministry Of Public Works Of Indonesia

Directorate General Of Highways

Directorate Of Technical Affairs

Sub Directorate Of Bridge Engineering

Page 13: 113746492 Bridge Maintenance Strategy and Implementation in Indonesia ENG Iwan Zarkasi

BRIDGE INSPECTION

INVENTORY ROUTINE D E T A I L SPECIAL

D A T A B A S E

Construction

Final Hand Over

Committee

Every

1,0 – 1,5 years

Bridge

Inspector

Every

3,0 – 5,0 years

Bridge

Inspector

When Needed

Specialist

Engineer

Strategy Of Bridge Inspection

Ministry Of Public Works Of Indonesia

Directorate General Of Highways

Directorate Of Technical Affairs

Sub Directorate Of Bridge Engineering

Page 14: 113746492 Bridge Maintenance Strategy and Implementation in Indonesia ENG Iwan Zarkasi

Survey Method:

1. Institutional Survey (Ledger)

2. Visual Survey (Inventory, Routine, Detail)

3. Special Survey (Measurement Tools)

Survey

Sequence of Bridge Inspection :

Start

Finish

Link Direction

Ministry Of Public Works Of Indonesia

Directorate General Of Highways

Directorate Of Technical Affairs

Sub Directorate Of Bridge Engineering

Page 15: 113746492 Bridge Maintenance Strategy and Implementation in Indonesia ENG Iwan Zarkasi

TECHNIC ECONOMIC BUSSINESS IMPLEMENTATION

Design

Safety, reliability;

design life time

Load < or >

strength

Construction

quality

Materials

Preservation

Maintenance

strategy

Condition

Life-cycle cost

Analysis

Maintenance

Replacement

User cost

Optimisation

Return on

investments

Financial

strategies

Determines costs

and performance to

high extend!

Strategic planning

Operational

planning

• Inspections

• Prioritization

Data systems

=> Reliable models

are essential

tools

Functional

demands

Deterioration

process

Measures

• Type / extend

• Intervals

• Cost

Inspections

Bridge Preservation Strategy

Ministry Of Public Works Of Indonesia

Directorate General Of Highways

Directorate Of Technical Affairs

Sub Directorate Of Bridge Engineering

Page 16: 113746492 Bridge Maintenance Strategy and Implementation in Indonesia ENG Iwan Zarkasi

Bridge Preservation

Ministry Of Public Works Of Indonesia

Directorate General Of Highways

Directorate Of Technical Affairs

Sub Directorate Of Bridge Engineering

MAINTAIN A BRIDGE STRUCTURE FROM

DETERIORATION OR DAMAGE

PERIODIC MAINTENANCE

ROUTINE MAINTENANCE

REHABILITATION AND REPLACEMENT

BRIDGE PRESERVATION

Page 17: 113746492 Bridge Maintenance Strategy and Implementation in Indonesia ENG Iwan Zarkasi

Gro

uting

Ste

el P

late

Bondin

gC

FR

P

Examples of standard Bridge Preservation

Ministry Of Public Works Of Indonesia

Directorate General Of Highways

Directorate Of Technical Affairs

Sub Directorate Of Bridge Engineering

Page 18: 113746492 Bridge Maintenance Strategy and Implementation in Indonesia ENG Iwan Zarkasi

Imp

rove

me

nt

Exp

an

sio

n J

oin

t

Bearing

Re

pla

ce

me

nt

Re

pa

intin

g

Examples of standard Bridge Preservation

Ministry Of Public Works Of Indonesia

Directorate General Of Highways

Directorate Of Technical Affairs

Sub Directorate Of Bridge Engineering

Page 19: 113746492 Bridge Maintenance Strategy and Implementation in Indonesia ENG Iwan Zarkasi

impro

vem

ent

with W

eld

ing

Str

essin

gIm

pro

vem

ent

concre

te

Examples of standard Bridge Preservation

Ministry Of Public Works Of Indonesia

Directorate General Of Highways

Directorate Of Technical Affairs

Sub Directorate Of Bridge Engineering

Page 20: 113746492 Bridge Maintenance Strategy and Implementation in Indonesia ENG Iwan Zarkasi

SHMS for LONG and COMPLEX BRIDGES

Ministry Of Public Works Of Indonesia

Directorate General Of Highways

Directorate Of Technical Affairs

Sub Directorate Of Bridge Engineering

Page 21: 113746492 Bridge Maintenance Strategy and Implementation in Indonesia ENG Iwan Zarkasi

Structural Health Monitoring

System (SHMS)

• A system which can be used to detect a defect in the

structure with a Non-Destructive Test (NDT).

• This system could maintain the structure, so the

structure’s degradation and defect can be detected

early.

Ministry Of Public Works Of Indonesia

Directorate General Of Highways

Directorate Of Technical Affairs

Sub Directorate Of Bridge Engineering

Page 22: 113746492 Bridge Maintenance Strategy and Implementation in Indonesia ENG Iwan Zarkasi

Suramadu Bridge

Surabaya, Jawa Timur,Main Span Cable-Stayed: 192 + 434 + 192 meter Total Length: 5400 meter

Ministry Of Public Works Of Indonesia

Directorate General Of Highways

Directorate Of Technical Affairs

Sub Directorate Of Bridge Engineering

Page 23: 113746492 Bridge Maintenance Strategy and Implementation in Indonesia ENG Iwan Zarkasi

Bridge Management Information System In Suramadu

Bridge

Inspection

Manual Inspection

(Inventory, Routine, Detail)

Automatic monitoring

(CCTV, Digital sensor)Database

Technical evaluation of the

condition of bridges elements

and structural of the bridge

Condition value

0 and 1

Condition value

2

Condition value

3

Condition value

4

Condition value

5

Routine

maintenancePeriodic

maintenance

Repair and/or

retrofit

Retrofit or

Replacement

Replacement

bridge

Special Inspection

only for capacity

building or retrofitting program

Ministry Of Public Works Of Indonesia

Directorate General Of Highways

Directorate Of Technical Affairs

Sub Directorate Of Bridge Engineering

Page 24: 113746492 Bridge Maintenance Strategy and Implementation in Indonesia ENG Iwan Zarkasi

The Importance of SHMS

• Suramadu Bridge has a very complex structure.

• Suramadu is a huge investation.

• Degradation / Structure deterioration needs to be monitored

continuously.

• Manual monitoring activity will cost a lot of time and money.

• Is based on visual bridge inspection

• Requires a lot of time and money

• Provides a high risk to the checker

SHMS

Manual Monitoring Activity

Ministry Of Public Works Of Indonesia

Directorate General Of Highways

Directorate Of Technical Affairs

Sub Directorate Of Bridge Engineering

Page 25: 113746492 Bridge Maintenance Strategy and Implementation in Indonesia ENG Iwan Zarkasi

Function of SHMS

Traffic

Management

Structural

Maintenance

Design

VerificationSHMS

• Verify assumption

used in the bridge’s

design

• Plan the bridge’s

maintenance program

• Adjust level of safety traffic

control

• Monitor traffic condition

• Restrict overload vehicle

Ministry Of Public Works Of Indonesia

Directorate General Of Highways

Directorate Of Technical Affairs

Sub Directorate Of Bridge Engineering

Page 26: 113746492 Bridge Maintenance Strategy and Implementation in Indonesia ENG Iwan Zarkasi

no instrumentation

Visual inspection with simple instrument

Page 27: 113746492 Bridge Maintenance Strategy and Implementation in Indonesia ENG Iwan Zarkasi

SHMS

Page 28: 113746492 Bridge Maintenance Strategy and Implementation in Indonesia ENG Iwan Zarkasi

Component of Suramadu SHMS

Collect Data by

Sensing measured

material

Transform the

data to TCP/IP

form

Store and Process the

retrieved data from the network

Ministry Of Public Works Of Indonesia

Directorate General Of Highways

Directorate Of Technical Affairs

Sub Directorate Of Bridge Engineering

Page 29: 113746492 Bridge Maintenance Strategy and Implementation in Indonesia ENG Iwan Zarkasi

Suramadu Bridge’s SensorNo Sensor Type Parameter Measured

1 Anemometer Direction and Speed of wind

2 Air Temperature and Relative Humidity Sensor (AT&RH) Ambient Temperature and Relative Humidity

3 Temperature Concrete and Structure Temperature

4 Strain Gauge Concrete and Structure Strain

5 Weight In Motion System (WIM) Vehicle weight

6 GPS Position of the Bridge in 3D

7 Accelerometer Vibration of the bridge

8 EM Sensor (EMS) Cable force

9 Seismic Accelerometer (SE-ACC) Vibration in case of earthquake

10 Bi-Axial Tiltmeter (TLM) Lean of the bridge

11 Video Camera Bridge’s traffic

12 Displacement (LVDT) Displacement of the bridge

13 Rain Sensor Precipitation at Causeway Madura and Surabaya

14 Steel Box Girder Corrosion Sensor Corrosion at Steel Box

15 Concrete Corrosion Sensor on Pile Cap Corrosion at concrete on pile cap

16 Steel Bar Corrosion Sensor on Pile Cap Corrosion at steelbar on pile cap

17 Cathodic Protection Monitoring Sensor Cathodic Protection

18 Reset and Monitoring Power Supply Sensor Power Supply of the sensor

19 Dehumidifier Controller Sensor Dehumidifiers on the bridge

20 ALPR Vehicle’s plate number

Page 30: 113746492 Bridge Maintenance Strategy and Implementation in Indonesia ENG Iwan Zarkasi

Suramadu SHMS

Page 31: 113746492 Bridge Maintenance Strategy and Implementation in Indonesia ENG Iwan Zarkasi