Work Order Work Order NO : 000010 Work Trade :Mechanical Work Order Status : Closed Work Type : corrective Work priority : Emergency Assigned to : FET Collage Received by : ibraheem khress Requester : Dr khaleel Abu shgair Received Data/Time : Phone Number : PM Target Start Data : PM Target End Data : Problem Description : Problem in Motion and Spindle Rotation Note to Technician : Failure Code : 1 Check list No: Asset No : 1,2,3,4 Location NO : 2 Asset Name : Fagor Turning Location Name : CNC LAB Case description Action Taken Part and labor Details **D=Direct Issue , I = Inventory Data and Time work was started Data : Time : Spindle drive breaker is tripped . Power down the machine, reset the breaker on the spindle amp and turn

Upload: ibraheem-khress

Post on 10-Nov-2015

212 views

Category:

Documents


0 download

DESCRIPTION

11WO

TRANSCRIPT

Work OrderWork Order NO : 000010 Work Trade :Mechanical Work Order Status : Closed Work Type : corrective Work priority : Emergency Assigned to : FET Collage Received by : ibraheem khress Requester : Dr khaleel Abu shgair Received Data/Time : Phone Number : PM Target Start Data : PM Target End Data : Problem Description : Problem in Motion and Spindle Rotation Note to Technician : Failure Code : 1 Check list No: Asset No : 1,2,3,4 Location NO : 2Asset Name : Fagor Turning Location Name : CNC LAB

Power down the machine, reset the breaker on the spindle amp and turn onpower.Spindle drive breaker is tripped.Case description Action Taken Prevention Taken

Part and labor Details

**D=Direct Issue , I = Inventory

Data and Time work was started Data : Time : Data and Time work was completed Data : Time :Certification and Work Completion

Name and Signature of Technician/Engineer Name and Signature of Requester/Supervisor

Name Signature Data : Time : Name Signature Data : Time :

Please rate our services : 1-Poor 2-Fair 3-Good 4-Very Good 5-Excellent

Work OrderWork Order NO : 000011 Work Trade :Mechanical Work Order Status : Open Work Type : Prevention Work priority : Normal PM checklistChecklist No : 4Checklist Desc: 1- Check spindle belts2- Check spindle temperature and adjust chiller card3- Check chiller system and adjust, and clean pump filter, fill if necessary4- Check drawbar for proper retention and pressure at tool in/out 5- Check and adjust spindle tram6- Change Spindle Motor filter if applicable