11771v 001 pp 105 rev c_3427 000 a pg tpf 00004 rev p01

49

Upload: ilgarn

Post on 11-Aug-2015

65 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 2: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 3: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 4: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 5: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 6: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 7: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 8: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 9: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 10: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 11: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 12: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 13: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 14: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 15: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 16: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 17: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 18: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 19: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 20: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 21: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 22: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 23: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 24: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 25: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 26: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 27: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 28: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 29: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 30: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 31: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 32: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 33: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 34: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01

1

TPFR MASTER DOCUMENT REGISTER Monthly Cut Off Date:BOURIAgip Oil Ltd. (Libya Branch)PM: Yannick Le CarrerDPM: Craig Hanlon % COMPLETION BASIS:DCC : Delphine Godefroy 1 Approved 100% WHEN APPROVED BY THE COMPANY

ISSUE STATUS:2

P = CURRENT LIVE DOC A = FOR APPROVAL 80% WHEN ISSUED FOR COMPANY REVIEWS= SUPERSEDED DOC R = FOR REVIEW 3 Not approved 40% WHEN ISSUED FOR INTERNAL COMMENTSV=CANCELLED, VOID, OR REPLACED DOC 4 Returned with Comments 10% AFTER DOCUMENT ELABORATION START N= NEW DOCUMENT / DRAWING

ORIGORGDSPL DIC IDC DL PM / DPM PLAN ACTUAL TARGET PLAN NEW ACTUAL

COMPISSUE REF COMPANY COMPANY COMPANY COMPANY % CONTRACTOR

Doc

umen

t Ty

pe

DO

C S

TA

T

TITLE CO

MP

AN

Y

ST

AT

US

ENTITY ENG REVIEW REVIEW APPROVALAPPROVAL DISCPL START START COMPLETE ISSUEFORECAST

DATE ISSUE

ACTUAL TRANSMITTAL NOTE

REF. DUE RETURN

ACTUAL RETURN (E-MAIL)

ACTUAL RETURN (FAX)

ISSUE STATUS weight COMP

RE-ISSUEDATE

cl: c

lient

int:

inte

rnal

LOCA UNI D TY ORI PROG Project No. UnitDoc. Type Mat. Code Serial Rev.

cl (PMA) GENERALclclcl (PMA) PLANNING-COST CONTROLclclcl (PMA) PROCUREMENT-EXPEDITING-INSPECTIONclclcl (PMA) QAclclcl (PMA) HSEclclclcl DETAILED DESIGNcl FLEXIBLE PIPEclclcl STRUCTUREcl (DE) UMBILICALclcl (DE) SUBSEAclcl INSTALLATION AIDSclclcl INSTALLATIONclcl MOBILISATION MANUALSclcl INSTALLATION MANUALSclcl TRENCHING PROCEDURESclcl PRE-COMMISSIONING PROCEDURESclcl SURVEY PROCEDURESclclclcl PRE-ENGINEERING SURVEY DRAWINGSclclcl MANUFACTURING AND INTEGRATION TEST PROCEDUREclcl SPOOL FABRICATION PROCEDURES HDV CHA AGR YLCclclcl LE TRAIT MANUFACTURING UNIT TBA FMA DTH/FMA HCO YLCclclcl HAZID REPORTclcl AS BUILT DOCUMENTATION

10

11

12

PROCEDURES AND REPORTS (PR)

Rev. No.:

COMPANY STATUS CODE:

BOURI EAD DEVELOPMENT PROJECT- Work Package #2, Flowline and Riser System and Umbilical Installation / AGIP Doc. No. 3427-000-A-PG-TPF-00010 (The Master Document Register)

Previous Issue Date:

Latest Revision Date:

(1) Ref. AGIP Spec.:3400-000-A-SG-EAM-00001 (2) TECHNIP Ref.: Project Documentation Numbering Procedure- GENP003 Rev. 1

CO

MP

AN

YR

EV

.

PROG: Progressive No.

LOCA: Project Number or Location Number UNI: Facility Unit No.D: DisciplineTY: Document TypeORI: Originator

COMPANY COMMENTS OVERDUE

DOCUMENT STATUS:90% WHEN REISSUED FOR COMPANY REVIEW INCLUDING COMPANY COMMENTS

I = FOR INFO

Technip Document Number

ENGINEERING (E)

PROJECT MANAGEMENT AND ADMINISTRATION (PMA)

AGIP Document Number

Approved on conditions, Doc. must be resubmitted.

Page 35: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 36: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 37: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 38: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 39: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 40: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 41: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 42: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 43: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 44: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 45: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 46: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 47: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 48: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01
Page 49: 11771V 001 PP 105 REV C_3427 000 A PG TPF 00004 REV P01