    Department of Public Works and Highways

    Registry of Contractors for Civil Works Projects

    Contract Profile for Eligibility Processing

    Date: November 23, 2011

    Form NR-002

    Region/District Office: Region VIIloilo 2nd

    ED, Balabag, Dumangas, Iloilo

    Project/ Contract ID: 11GG0029 (Cluster Contract)

    Project/ Contract Name: (A) Repair and Maintenance of Flood Control and Drainage

    Systems, Structure and Facilities, Suage River Control

    Project Location: Pototan, Iloilo

    (B) Repair and Maintenance of Flood Control and

    Drainage Facilities, Suage River ControlProject Location: Pototan, Iloilo

    (C) Repair and Maintenance of Flood Control and Drainage

    System, Structures and Facilities, Jalaur River Control

    Project Location: Dingle, Iloilo

    (D) Repair and Maintenance of Flood Control and DrainageSystem, Structures and Facilities, Jalaur River Control

    Project Location: Calinog, Iloilo

    Contract Duration (CD): 45 CD

    Approved Budget for the Contract (ABC): A. P 500,000.00

    B. P 500,000.00

    C. P 700,000.00D. P 900,000.00

    Name of Newspaper for this Advertisement: Manila Standard Today

    Issuance of Bidding Documents: Nov. 23Dec. 20, 2011

    Cost of Bid Documents: P 1,000.00

    Major Categories of

    Works

    Unit of

    MeasureDimension

    Cost Estimate for

    Each

    Major Category of

    Work

    Similar Major Categories

    of Work

    MFC LM 8.00 P 500,000.00FHN, FHG, FHR, FHD

    MFC LM 8.00 P 500,000.00FHN, FHG, FHR, FHD

    MFC LM 8.50 P 700,000.00FHN, FHG, FHR, FHD

    MFC LM 18.00 P 900,000.00FHN, FHG, FHR, FHD

    Major Categories of Work

    Code Category of Work Description

    Dimension

    Unit of

    Measure

    Code Category of Work Description

    Dimension

    Unit of

    Measure

    BCB Bridges-Construction-Bailey lm MBG Maintenance Buildings Stories

    BCC Bridges-Construction-Concrete lm MFC Maintenance Flood Control Cm

    BCS Bridges-Construction-Steel lm MRB Maintenance Roads and Bridges Km

    BCP Bridges-Construction-With Bored Piles lm PHC Ports/Harbors-Causeway Lm

    BIH Buildings-Industrial Plant-HIGH Rise stories PHW Ports/Harbors-Wharf Lm

    BIL Buildings-Industrial Plant-LOW Rise stories RCA Roads-New Const.-Asphalt Km

  • 8/11/2019 11GG0030

    2/2

    BRB Bridges-Rehabilitation-Bailey lm RCG Roads-New Const.-Gravel Km

    BRC Bridges-Rehabilitation-Concrete lm RCP Roads-New Const.-PCCP Km

    BRR Bridges-Rehabilitation-Retrofitting lm RRA Roads-Rehabilitation-Asphalt Km

    BRS Bridges-Rehabilitation-Steel lm RRG Roads-Rehabilitation-Gravel Km

    BRP Bridges-Rehabilitation-With Bored Piles lm RRP Roads-Rehabilitation-PCCP Km

    FHG Flood Control/Hydraulics/Dredging cm TEA Traffic Engg Signage Piece

    FHD Flood Control/Hydraulics/Dams cm TEP Traffic Engg-Pavement Markings Lm

    FHP Flood Control/Hydraulics/Pumping Stn. Unit TES Traffic Engg Signalization set

    FHN Flood Control/Hydraulics/Drainage lm

    FHR Flood Control/Hydraulics/River Control lm

    FHW Flood Control/Hydraulics/Water Supply lm

    Implementing Office Signature GERARDO G. PARRA, JR. Date: November 23, 2011

    BAC Chairman