    Department of Public Works and HighwaysRegistry of Contractors for Civil Works Projects

    Contract Profile for Eligibility Processing

    Date: December 9, 2011

    Form NR-002

    Region/District Office: Region VI Iloilo 2 nd ED, Balabag, Dumangas, IloiloProject/ Contract ID: 11GG0041Project/ Contract Name: Construction of School Build., Iloilo State College of Fisheries

    Btac. Nuevo Polytechnic Institute CampusA. Completion of 2 Storey School BuildingB. Construction of 2 Storey Laboratory Buidling

    Project Location: Brgy. Poblacion Ilaya, Barotac Nuevo, IloiloContract Duration (CD): a. 60 CD; b. 90 CD

    Approved Budget for the Contract (ABC): A. P 2,940,000.00B. P 4,410,000.00 Name of Newspaper for this Advertisement: Manila Standard TodayIssuance of Bidding Documents: Dec. 8 Dec. 28, 2011Cost of Bid Documents: P 5,000.00

    Major Categories ofWorks

    Unit ofMeasure Dimension

    Cost Estimate forEach

    Major Category ofWork

    Similar Major Categoriesof Work

    A. BIL M 9.50x25 2,940,000.00 BIH, BIM

    B. BIL M 9.16x34.15 P 4,410,000.00 BIH, BIM

    Major Categories of Work

    Code Category of Work DescriptionDimension

    Unit ofMeasure

    Code Category of Work DescriptionDimension

    Unit ofMeasure

    BCB Bridges-Construction-Bailey lm MBG Maintenance Buildings StoriesBCC Bridges-Construction-Concrete lm MFC Maintenance Flood Control CmBCS Bridges-Construction-Steel lm MRB Maintenance Roads and Bridges Km

    BCP Bridges-Construction-With Bored Piles lm PHC Ports/Harbors-Causeway LmBIH Buildings-Industrial Plant-HIGH Rise stories PHW Ports/Harbors-Wharf LmBIL Buildings-Industrial Plant-LOW Rise stories RCA Roads-New Const.-Asphalt KmBRB Bridges-Rehabilitation-Bailey lm RCG Roads-New Const.-Gravel KmBRC Bridges-Rehabilitation-Concrete lm RCP Roads-New Const.-PCCP KmBRR Bridges-Rehabilitation-Retrofitting lm RRA Roads-Rehabilitation-Asphalt KmBRS Bridges-Rehabilitation-Steel lm RRG Roads-Rehabilitation-Gravel KmBRP Bridges-Rehabilitation-With Bored Piles lm RRP Roads-Rehabilitation-PCCP KmFHG Flood Control/Hydraulics/Dredging cm TEA Traffic Eng g Signage PieceFHD Flood Control/Hydraulics/Dams cm TEP Traffic Engg -Pavement Markings LmFHP Flood Control/Hydraulics/Pumping Stn. Unit TES Traffic Eng g Signalization setFHN Flood Control/Hydraulics/Drainage lmFHR Flood Control/Hydraulics/River Control lmFHW Flood Control/Hydraulics/Water Supply lm

    Implementing Office Signature GERARDO G. PARRA, JR. Date: December 9, 2011BAC Chairman